Kanata/Stittsville Realtors Business Mixer Kanata Golf and Country
Transcription
Kanata/Stittsville Realtors Business Mixer Kanata Golf and Country
Kanata/Stittsville Realtors Business Mixer Kanata Golf and Country Club February 23, 2015 Stittsville Development and Road Network Plan 1 2 5831 Hazeldean Road and 33 Johnwoods Street: This site is located immediately west of the Fairwinds community with Maple Grove to the north and Hazeldean/Poole Creek to the south of the site. Plan of subdivision provides for the following: 3 202 single-detach lots, 50 blocks for 100 semi-detached units, 27 blocks for 123 row-housing units, one block for a future school site, one block for a park, two open space blocks for the Poole Creek Corridor, 14 streets, two blocks for pathways 5831 Hazeldean Road and 33 Johnwoods Street Con’t: Total = 425 units The lands contain a portion of Poole Creek. A small portion of lands connect to Hazeldean Road which is identified as a pathway on the draft plan of subdivision. Along the north side of the Poole Creek Corridor a pathway will be provided. The pathway will connect the pedestrian system through sidewalks and pathways, providing pedestrian access throughout the subdivision to Hazeldean Road. 4 590 Hazeldean Road: The Plan of Subdivision proposes to develop: 245 detached residential dwellings and 503 townhouse dwellings. The lands abutting Hazeldean Road include 3.7 ha to be developed for commercial uses. The proposal includes a 2.36 ha site for an elementary school, located in the north-east portion of the site, abutting the easterly lot line. Total = 748 units The following open space amenities are proposed for the site: 1) 5.73 ha District Park along the southerly lot line adjacent to the Trans-Canada Trail. 2) 3.58 ha Community Park along the westerly lot line in the central portion of the property and an Open Space corridor of 2.35 ha along the Carp River tributary. 3) Additional access to the Trans Canada Trail is also proposed. 5 5734-5754 Hazeldean Road/2 Iber Road: The site consists of three parcels of land, 5734 Hazeldean Road, 5754 Hazeldean Road and 2 Iber Road. These parcels are bounded by Iber Road, Hazeldean Road and Fringewood Drive and are located south of Hazeldean Road, west of Iber Road and east of Fringewood Drive in the Stittsville community. Description of Site and Surroundings: Combined, the properties are approximately 44,365 m² and are graded flat with sparsely planted trees. The site is currently vacant; however, two single detached dwellings existed on the subject properties and have been demolished since. An onsite watercourse exists through 2 Iber Road and will be re-aligned along Iber Road through this development. Purpose of Site Plan Control Proposal: To develop subject lands into a mix of retail, commercial, and office buildings. The current proposal includes six one-storey retail buildings and two, two-storey office buildings, one with ground floor retail. 6 5734-5754 Hazeldean Road/2 Iber Road Con’t: Proposal Details: The site plan illustrates two one-storey retail buildings (2,285m² and 1,175m²) fronting Hazeldean Road, with a loading zone along Fringewood Drive. The interior of the site proposes to include a large format retail building (3,619m²) a 750m² multi-tenant retail building and two 396m² retail buildings (suitable for restaurants or banks). Two two-storey office buildings (2,744m² and 2,753m²) are proposed to front onto Iber Road, with ground floor commercial proposed in one of these two buildings. The proposed site layout includes required vehicle and bike parking at 434 and 64 spaces, respectively. The site plan includes one vehicular access on Fringewood Drive, one on Hazeldean Road, and two on Iber Road. 6111-6141 Hazeldean Road Minto Development This land is located to the west of Jackson Trails, north of Hazeldean Road, and east of Echowoods. The subdivision proposes single family homes and townhomes. The community totals approximately 454 homes that include a park and conservation area protecting Feedmill Creek. The City and public comments have been received on the application. Currently Minto is reviewing the public and technical comments and updating the subdivision submission. More information on this development can be found at the City’s development application website at www.ottawa.ca/devapps . For more information and to be added to the notification list for this development please contact my office and the City Planner, Patricia McCann-MacMillan at [email protected] or 613-580-2424 x13799. Proposed Keg Steakhouse at 15 Huntmar: Planning and Growth Management Department has received applications for a Site Plan for a site known municipally as 15 Huntmar Drive located on the northwest corner of Huntmar Drive and Hazeldean Road. The application is to develop a single storey Keg Restaurant with an enclosed patio on the southwest side of the building. One hundred and thirty five surface parking spaces are proposed with right in-right-out vehicle access from both Huntmar Drive and Hazeldean Road. A bicycle rack and landscaping is also being proposed. The property is vacant, has an area of 7,360 m2 with 80.17 m of frontage on Huntmar Drive and 72.39 m on Hazeldean Road. It is located across from “The Shoppes at Fairwinds”. The formal planning circulation is still being prepared and in approximately a week it should be available on www.ottawa.ca/devapps . 7 180 Huntmar Drive Zoning By-law Amendment: Planning and Growth Management has received an application for a Zoning By-law Amendment at 180 Huntmar Drive (D02-02-15-0007). The site is located on the east side of Huntmar Drive, between Palladium Drive and Maple Grove Road. The proposed zoning amendment is to rezone the property from Development Reserve (DR) Zone to Mixed Commercial (MC) Zone in order to permit a private school and medical facility. A sign will be posted on the property and owners within 120 m radius of the lands will receive a notification by mail. Interested residents will need to view the application online at DevApps at www.ottawa.ca/devapps . 8 1620 Maple Grove: The current application is to revise the approved Draft Plan of Subdivision. Approximately 803 total dwelling units are proposed including 109 single-detached and 694 multiple attached. Blocks for the development of an elementary school, a commercial site, a storm water management pond, two parks and Kanata West sanitary pumping station proposed. Access will be provided by a roadway connection to Maple Grove Road to the north and two future public roads to Hazeldean Road to the south through the Trinity commercial lands. The Subdivision will be complemented by public pathway blocks and pedestrian access to the Poole Creek corridor, the Carp River corridor and the relocated Hazeldean Tributary to be located within a publicly-dedicated 30 metre block located to the south. 9 Fairwinds North: Mattamy has 167 homes to be built in Phase 3, north of Maple Grove. There are two elementary schools projected for Fairwinds North. TheOttawa Catholic School Board has land set aside based on the seven year reserve plan. This is the final year coming up where they must make a decision. The second school is with the Ottawa Carlton District School Board. The board has not yet agreed to the seven year reserve, their designated land is between 33 Johnwoods and the Tartan development. Site plans have not yet been approved. Future Road Network - (North South Arterial) Robert Grant: (see attached map) The future development of the North-South Arterial road – known now as Robert Grant - will run from Fernbank Road to Hazeldean Road and eventually onwards to the Palladium Drive to Highway 417 interchange. This will provide a bypass to the east of Stittsville, alleviating traffic from Stittsville Main Street. The construction of the north South Arterial will occur in three phases: 1) Fernbank to Abbott 2) Abbott to Hazeldean 3) Hazeldean east of Huntmar It is assumed that a key primary condition of development will be early implementation of the first two lanes of the North-South Arterial between Hazeldean Road and Fernbank Road. Abbott Street west will be extended eastbound and will connect to the North-South Arterial Road. In your package I have attached a copy of the future planned transportation projects that depicts the future North South arterial as well as the extension from Stittsville Main Street/Maple Grove to Palladium. 10 11 Stittsville Main Street Community Design Plan (CDP): Since November 2012 I have been working with the City’s planning department and a project advisory committee made up of community members and a wide range of stakeholders, as consultants for the draft CDP for Stittsville Main Street. The CDP includes a vision and framework for Main Street’s long term development. building variety and heights, density, heritage preservation, Parks and pathways, making room for pedestrians, cars, people. The character of Stittsville is changing from a rural village into a suburban community as Ottawa expands beyond the Greenbelt. In working on the CDP I continue to encourage that the village core of Stittsville and Main Street maintain its historical grass roots feel. 12 Fernbank Development and Future Stittsville Growth: 1) The Fernbank development is expected to be completed within 5-10 years with an estimated population growth of 35000. 2) The Fairwinds Maple grove development should be finished in the next two years with an estimated population increase of 3000 to 5000. 3) The Tartan development at 33 Johnwoods is estimated at 1500 residents. 4) The Richcraft development beside Lowes will be completed in eight years with an estimated population for this area of 1500 to 20,000. In total we are anticipating growth of over 71,000 in addition to the current population of Stittsville at 27,000. 13 Pedestrian and cycling traffic: The City traffic department is working on proposed roadway modifications for Iber and Abbott as well as in Fernbank. i.e. New concrete sidewalks on Abbott, Westerly extension of Abbott Street to Iber Road, new northbound left-turn lane, new concrete median on Abbott Street, new right and left turn lanes on Iber Road. Fernbank Road and Founders Way/Abbott Extension: 14 New traffic signal New northbound left-turn lane New southbound right-turn lane New multi-use pathway on Fernbank Road New concrete median on Fernbank Road New Traffic Circle at Fernbank Road and Shea Road: The project involved the realignment of the north leg of Shea Road by approximately 90m to the east and a single lane roundabout at Fernbank Road and Shea Road. This project is complete and the altered mitigation of traffic has proven to be successful. 15 Stittsville South Urban Expansion Area: The Stittsville South Land Owners are planning to commence a co-ordinated municipal approval and Environmental Assessment Act processes for the lands known as the Stittsville South Urban Expansion Area, as shown on the key plan. This property is adjacent to, and south of, Hartsmere Drive. The purpose of the project is to detail the Land Use and Transportation & Servicing Infrastructure for this proposed new community in the west end of the City of Ottawa. 16 Carp Road Widening Environmental Assessment: Overview and Study Purpose The City of Ottawa initiated a Class Environmental Assessment (EA) Study in June 2013 for the widening of Carp Road from Highway 417 in the north, to Hazeldean Road in the South. This Study is being carried out in accordance with the requirements for a Schedule “C” project under the Municipal Class Environmental Assessment Process. The City’s 2008 Transportation Master Plan (TMP) identifies the need for Carp Road to, “widen from two lanes to four lanes between Highway 417 to Hazeldean Road”. The widening is identified as a Phase 2 project in the TMP, to be completed between 2016 and 2022. The widening has been identified to address growing vehicle/traffic demand in the western portion of the Kanata-Stittsville Area. This need is being re-confirmed as part of this ongoing EA. 17 5385, 5395 and Part of 5431 Fernbank Road: The lands are located to the north of Fernbank Road, west of Terry Fox Drive, and south of Cope Drive extension. The municipal addresses are 5385, 5395 and Part of 5431 Fernbank Road. The vacant 7 hectares of land are within the future Phase 7 of the Blackstone development in the Fernbank community. The Blackstone development occupies 120 hectares of the southeast portion and consists of seven phases with over 1,800 dwelling units and blocks for parks, ponds and schools. The subject lands are currently zoned Development Reserve Zone (DR). A dual zone of Minor Institutional Subzone A/Residential Third Density Subzone Z (I1A/R3Z) is being requested to allow a secondary school. The lands are designated as General Urban Area under the Official Plan, which permits the development of a full range and choice of housing types in combination with conveniently located employment, retail, service, cultural, leisure, entertainment and institutional uses. The lands are also subject to the Fernbank Community Design Plan (CDP) which was prepared to guide development in the Fernbank Community and was approved by Council in September 2010. In the CDP, the planned secondary school was originally located to the north of Cope Drive extension. The lands were originally designated for residential uses 18 5385, 5395 and Part of 5431 Fernbank Road Con’t: Owing to grade raise challenges associated with the lands, the applicant proposes to switch the school site with the residential lands. The resulting school site will be of the same size as the original plan and with similar road accesses from Cope Drive extension and a future collector road. The Ottawa Catholic School Board is the end user of the school site and has no objection to the proposed change. Under the City’s Zoning By-law, the I1A zone is intended to permit minor institutional uses and to minimize the impact of these minor institutional uses located in close proximity to residential uses, by ensuring that such uses are of a scale and intensity that is compatible with neighbourhood character. The I1A zone is appropriate for the planned secondary school. A dual zone of I1A/R3Z is being proposed to allow flexibility that should the school board decide not to develop the site for institutional uses, the R3Z zone will apply to the subject lands, which allows a mix of residential building forms ranging from detached to townhouse dwellings. The dual zone has been utilized for many school sites across Greenfield developments in the city and is appropriate for the subject lands. 19 Stittsville Public High School Update: A Stittsville Public High School was listed as the #4 priority in the OCDSB’s capital priorities submission approved on 22 October 2013. OCDSB staff continue to interact with Ministry staff OCDSB received a large infusion of capital funding in the last round (about $49M), there is some uncertainty as to whether we can expect a similar amount again this year Especially given the political and fiscal situations at the provincial level. The board is asking for $36.1M for our Stittsville High School. Under Open Access, parents can choose to send their kids to Sacred Heart at Grade 9 which leads the Ministry staff to believe that parents who don't like the distance to South Carleton have a genuine choice. Three Messages the community has expressed to the Minister of Education 1) parents who have chosen a non-denominational education for their children do not want to have to enrol them in a crowded Catholic high school, but be able to continue in a non-denominational public high school in their own community; 20 2) the growth in Stittsville is not slowing down and to the best of our knowledge there's no other community of this size in Ontario that doesn't have a public high school; 3) It is inefficient and costly to be bussing over 500 high school students 10 to 15 km away from home every day out of a relatively compact suburban community to a small rural village well outside the urban transit area. I encourage concerned parents you to write to Minister Liz Sandals: Email [email protected] Thank you for the opportunity to present this information to you. I welcome you to contact my office should you have any questions or wish to review in further detail any of the current and future developments within the Stittsville Community. Shad Qadri Councillor, Serving the community of Stittsville within the City of Ottawa 110 Laurier Avenue West Ottawa, ON K1P 1J1 Tel: 613-580-2476; Fax: 613-580-2516 Email: [email protected] www.shadqadri.com www.ottawa.ca 21 22