TABLE OF CONTENTS
Section 1: Executive Summary
A. Introduction
B. Background
C. UW-Richland Facilities Master Plan Guiding Principles
D. Notes on the Master Planning Process
E. Mine Phase (Info Gathering) Summary
F. Define Phase (Programming) Summary
G. Align & Design Phase Summary
H. Recommendations
I. Conceptual Budget
J. Phasing / Implementation Plan
1.0
1.1
1.1
1.2
1.2
1.3
1.4
1.5
1.5
1.5
1.6
Section 2: Program Summary
A. Introduction
B. Qualitative Summary (Priorities)
C. Quantitative Summary
D. Operational Summary
2.0
2.1
2.1
2.2
2.3
Section 3: Master Plan
A. Introduction
B. Site Conditions
C. Surrounding Context
D. Master Plan Overview
E. UW-Richland Master Plan
3.0
3.1
3.1
3.1
3.1
3.2
Section 4: Building Condition Report
A. Introduction
B. Maintenance and Infrastructure Improvement Budget
C. Maintenance and Infrastructure Needs Summary
D. Science Hall
E. Classroom Building
F. Miller Memorial Library
G. Mellvill Hall
H. Wallace Student Center
I. Roadrunner Gymnasium
J. East Hall
4.0
4.1
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
Appendix A: Programming Data
1. Priorities Survey
2. Stakeholder Survey and Interview
3. Student Center Program
Appendix B: Steering Committee Workshops – Meeting Minutes
1. Workshop 1 Meeting Minutes
2. Workshop 2 Meeting Minutes
3. Workshop 3 Meeting Minutes
Appendix C: Owner Provided Academic Data
1. UW-Richland Strategic Plan 2012-2017
Appendix D: Owner Provided Facilities Data
1. Classroom Usage Schedule
2. UW-Richland Capital Facilities Plan
3. UW-Richland Technology Plan
4. UW-Richland Health and Safety Compliance
5. UW-Richland Rigging Inspection Report
6. Draft of Strategic Plan for UW-Richland Smart Farm
Appendix E: Flood Plain Process
1. Summary of Process for Building in a Flood Plain
Appendix F: Proposed Symons Recreation Complex Addition
Section One:
Executive Summary
EXECUTIVE SUMMARY 1.1
1. EXECUTIVE SUMMARY
A. Introduction
In April of 2013, the University of Wisconsin-Richland commissioned Strang, Inc. to perform a longrange Facilities Master Plan encompassing their campus. This work included an existing building
condition report for each building, facility maintenance planning, programming of needs, and master
planning of the campus to define a 10 year development plan and beyond. The purpose of the Facilities
Master Plan is to help effectively guide the University of Wisconsin-Richland in updating, maintaining
and proactively planning for the infrastructure needed to support the university’s mission, vision, and
strategic goals.
This master plan was prepared by the architects and engineers at Strang, Inc. in collaboration with SAA
Design Group, a planning, landscape architecture and civil engineering firm. Essential input and
guidance was provided throughout the development of this report by the UW-Richland Steering
Committee consisting of the following representatives:
James
Aagaard
Assistant Professor (Music)
Khalid
Abdl-Haleem
Student Representative
Bob
Bellman
Richland County Board Member
Glen
Brown
Campus View residence Hall Director
Brandon Fetterly
Associate Campus Dean/Associate Professor (Chemistry)
Gary
Network Administrator
Gobin
Annette Hackbarth-Onson
Assistant Campus Dean for Student Affairs
Patrick Hagen
CEO/ Dean
George Henze
Senior Student Services Coordinator
Paul
Kinney
Richland County Board Member
Dundee McNair
Assistant Campus Dean for Administrative and Financial Services
Evertt
Newberry
Buildings & Ground Superintendent (Retired)
John
Poole
Assistant Campus Dean for Student Affairs (Retired)
Tom
Waalkens
Buildings & Ground Superintendent
Darlo
Wentz
UW-Richland Foundation Executive Secretary
Aharon Zorea
Associate Professor (History)
Additional input was provided by student government and program staff.
B. Background
The University of Wisconsin-Richland is a two year institution in Richland County in Wisconsin and as
one of 13 Colleges in the UW Colleges is a component of the University of Wisconsin System. The
campus lies on the northeast side of the City of Richland Center. The University of Wisconsin-Richland
is accredited by the Higher Learning Commission of the North Central Association of Colleges and
Schools (NCA).
EXECUTIVE SUMMARY 1.2
The University of Wisconsin-Richland campus is located on approximately 135 acres of partially
wooded rolling prairie. UW-Richland offers courses to begin any of more than 200 majors. Many UW–
Richland students mark completion of the first half of a bachelor’s degree by earning the Associate of
Arts and Science degree and use the Guaranteed Transfer Program, under which students are
guaranteed admission to a four-year University of Wisconsin System campus of their choice if they
meet certain academic requirements. The college serves approximately 280 full-time and 250 part-time
students annually.
C. UW-Richland’s Facilities Master Plan Guiding Principles
The facilities master plan must first and foremost support and extend the mission, values and vision of
The University of Wisconsin-Richland. The goal of the university is to empower the students and enrich
the community. The University of Wisconsin-Richland is a valued and integral partner within the
Richland Center community. During the Master Planning process, the Steering Committee established
the following list of Guiding Principles that shaped the creation and execution of the Facilities Master
Plan:
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
A campus that is as friendly and welcoming as the people are
A campus that is fully a part of the community
A campus that the community is proud of
A campus with a unique “sense of place”
A campus with a recognizable and vibrant center that is culturally significant
A campus where it is easy to find your way around intuitively
A campus with a strong commitment to sustainability
A campus with a natural beauty that is deeply connected to the natural
environment
A campus that is up to date and competitive, while possessing a “rustic
sophistication” that is indigenous to Southwestern Wisconsin
A campus that provides a memorable experience to students, staff and the
community
A campus with a strong sense of community among faculty, staff, and students
A campus where students are well taken care of in a supportive, family-like
environment
Facilities that are fully used by students, a place they can truly call “home”
A campus where professors and staff are fully accessible and have a close
relationship with the students
A campus of active learning and collaborative study
A campus of light filled and comfortable learning spaces
“A Venue of Choice!”… for anything: an excellent education, a wedding reception,
business and academic conferences
A campus that accommodates the collective expertise and wisdom that exists on
campus, and enables the successful dissemination of this expertise to the world
EXECUTIVE SUMMARY 1.3
D. Notes on the Master Planning Process
Strang/ SAA incorporated a Mine/ Define/ Align/ Design approach to master planning as outlined below
in Figure 1.1. This collaborative approach provided ample opportunity to listen to current stakeholders,
explore multiple options, and arrive at a master plan solution that not only accommodates the needs of
students and staff, but builds in flexibility to deal with the uncertainty of future economic, technological
and demographic conditions.
Figure 1.1 Strang’s Facilities Master Planning Approach
E.
Mine Phase (Info Gathering) Summary
Following an initial organizational meeting to develop the master planning work plan and schedule,
Strang/SAA conducted a series of data gathering tasks to familiarize themselves with the university. A
team of architects, engineers and planners were sent to conduct site observations to photograph, and
complete building condition evaluations of each UW-Richland building. The team documented existing
conditions related to the site and buildings including mechanical, electrical, and plumbing. They also
reviewed drawings and recently conducted facilities studies and reports provided by UW-Richland which
included:
ƒ
2012-2017 UW-Richland Strategic Plan
ƒ
UW-Richland Health and Safety Compliance
ƒ
2011 UW-Richland Capital Facilities Planning
ƒ
2002 UW-Richland Student Center Fine Arts Building Expansion Project
ƒ
2012- 2013 UW-Richland Technology Plan
ƒ
Coppertop Rigging Report and several documents pertaining to solar studies
See appendices C and D for owner provided data.
EXECUTIVE SUMMARY 1.4
The listening phase also included a review of UW-Richland’s academic plan as well as demographic
information relating to UW-Richland’s service area. Surveys were sent electronically to each primary
instructional and administrative department within the University, followed by a day of on-site interviews
involving 10 stakeholder groups representing a cross-section of students, faculty, community
representatives, administrative staff and others. See appendix A for stakeholder comments.
Finally, a Steering Committee workshop was conducted to share the highlights from the stakeholder
interviews. See appendix “B” for copies of meeting minutes from each workshop.
F.
Define Phase (Programming) Summary
The Listening phase provided a foundation of information which formed the basis for further analytical
exploration. During the discovery phase, the Strang/SAA team built upon this foundation to evaluate
multiple ways to achieve UW-Richland’s objectives ultimately leading toward the discovery of the most
ideal master planning solution. Facility programming was the first step in discovery. The facility
programming process is an essential diagnostic step in identifying and analyzing information that will
influence the facilities design options. Figure 1.2 presents Strang’s facility programming approach.
The facility program describes the University’s priorities for the future and illustrates options related to
those priorities. Throughout the course of this exercise, Strang/SAA’s integrated team of architects,
engineers and planners carefully identified, evaluated and weighed qualitative, operational and
quantitative data. Based on this information, the team developed a comprehensive facility program that
outlines options and makes recommendations. See Chapter 2 for detailed program data.
A building condition report and long-range infrastructure maintenance plan was also developed utilizing
data collected from on-site evaluations and discussions with facilities staff. The maintenance plan
identifies required improvements necessary for the long-term utilization of existing facilities and
organizes the improvements into logical projects which can be budgeted on an annual basis over a ten
year period. Recommended improvements include items for general aesthetics, maintenance issues to
maintain a weather-tight building envelope, and several upgrades aimed at improved energy efficiency
and reduced operations costs. See Chapter 4 for the detailed building condition report and
infrastructure improvement plan.
Figure 1.2 Strang’s Facility Programming Approach
EXECUTIVE SUMMARY 1.5
G. Align and Design Phase Summary
With the program information in place, the Master Planning process progressed to its final two steps,
the Align and Design Phases in which through a series of Steering Committee workshops, the master
plan took graphic form. At a site specific scale, the Master Plan examines how each building functions
and its relationship with the rest of the campus. The Master Plan addresses campus identity, student
experience, sustainable practices and potential locations for future expansion and development. In
summary, the Master Plan is composed of two components: remodeling of the existing buildings to
enhance existing departments and construction of new buildings. See Chapter 3 for detailed
representations of suggested remodeling and new construction along with the associated phasing
approach.
H. Recommendations
Although many options were explored that met the defined program requirements, the recommended
master plan shown in Chapter 3 was found to be the most advantageous to UW-Richland’s ultimate
success for the following reasons:
Optimized adjacencies and operational efficiencies within the facilities
Improved accessibility, public wayfinding and amenities
Ability to integrate modern building systems and technologies
Improved long-term economics
Ability to expand & accommodate future growth needs
Create a unified “front door” to the campus
I. Conceptual Budget
To define total project development costs, many non-construction expenses must be considered to
establish reasonable budgets that can be used for planning purposes. Keep in mind that these costs are
merely budgets and can vary considerably depending upon UW-Richland’s ultimate choices and current
market conditions. The cost estimates discussed in this report are in 2013 dollars and should be
adjusted to account for inflation and changes to construction material and labor costs in the local market
at the time each project is to be constructed. Nevertheless, they are valuable benchmarks to gauge
anticipated costs and to facilitate further discussions concerning funding options. Figures 1.3 provides
an overview of budgetary costs for various work identified in the Master Plan. See Chapter 3 for
detailed cost itemization of campus capital projects and long-term maintenance/infrastructure
improvements.
EXECUTIVE SUMMARY 1.6
Figure 1.3
Anticipated
Budgeted Cost
Master Plan – Capital Improvements
Implementation
(2012 Dollars)
Phase 1: Classroom Building Remodel
2015-2016
$900,000 - $1,000,000
Phase 2A: Student Center Addition
2018-2019
$6,000,000 - $7,000,000
Phase 2B: Performing Arts Center Remodel
2018-2019
$4,000,000 - $5,000,000
Phase 3A: East Hall Remodel
2019-2020
$200,000 - $300,000
Phase 3B: Melvill Hall Remodel
2019-2020
$1,200,000 - $1,300,000
Phase 4: Library Remodel
2021-2022
$700,000 - $800,000
Phase 5A: Gymnasium Addition
2022-2023
$2,000,000 - $3,0000,000
Phase 5B: Gymnasium Remodel
2022-2023
$1,400,000 - $1,500,000
Phase 6: Greenhouse & Science Building Update
2023-2024
$700,000 - $800,000
Phase 7: Site Improvement Projects
Total
J.
Over the next 10 years
$1,350 ,000 - $1,500,000
$18,000,000-$20,000,000
Phasing/Implementation Plan
The 10 year maintenance/infrastructure improvement recommendations found in Chapter 4 identify
ongoing maintenance and infrastructure improvement projects that are intended to be budgeted and
paid for out of UW-Richland’s annual facilities budget allocations. The plan allows costs to be spread
out over a ten year period and prioritized based upon urgency.
All capital improvement projects identified in the Master Plan will require additional funding. The Master
Plan provides a basis for discussions offering statistics relating to need, cost and community benefits.
By following through on the recommendations found in this Master Plan, the University of WisconsinRichland will be able to enhance student success and provide 21st century education for the foreseeable
future.
Section Two:
Program Summary
PROGRAM DATA 2.1
2. PROGRAM SUMMARY
A. Introduction
The first step of our programming exercise involved gathering extensive information about UWRichland, your staff and your educational priorities utilizing the data gathering tools found in Appendix
A. Strang reviewed information that the campus provided as part of this programming exercise including
existing building floor plan layouts, organizational charts and facility statistics (See Appendix C for this
data). We also gained insights from surveys and group conversations; these discussions revealed
important insights from the individuals who have hands-on knowledge of the campus’s intricacies.
B. Qualitative Summary
Based upon the information gained through these efforts, priority surveys, tours of your facilities and
visioning workshops, we developed an in-depth understanding of your qualitative preferences.
Physical Environment/ Safety is an important priority for the campus, especially in the parking lots and
outside the buildings. Temperature control, cleanliness and air quality is also important to the faculty
and staff of UW-Richland.
Amenities/ Much like the kitchen is often the social hub of a family home, food service amenities is very
crucial to the social culture at UW-Richland. Other amenities that the campus deems as important
include fitness and informational amenities.
Efficiency / We discovered that student workflow and expandability is very important to the campus.
More efficient and flexible classroom arrangements are also needed.
Value / Quality of the built environment and value was defined as a significant consideration for your
programming effort, while being sensitive to tax dollars in terms of materials and building system
selections. It is important to consider both short-term and long-term costs in relation to durability and
maintainability, work efficiency, educational benefit and especially energy efficiency.
Image / The campus must form a positive initial impression on the students and the public, and will
assist in communicating UW-Richland’s values. Building forms, furniture and colors should be used to
inspire emotions and associations and reflect a campus vision. Design concepts must complement the
nature of the mission, underscore the culture and reinforce the message.
Sustainability / Sustainability in terms of reduced impact on the environment, daylighting and exterior
views, energy efficiency, maintainability and a healthy indoor environment were identified as very
important programming considerations. Demonstrating leadership in sustainable environmental issues
and incorporating practical sustainable features into the facilities to create an interpretive learning
environment is also a priority. This could be done by introducing energy saving systems like geothermal, solar, and heating by burning biomass, like wood chips.
Accommodating Diversity/ UW-Richland has a strong international program that may be developed
even further in the future. Because of this, any changes the campus makes should keep these students
in mind.
PROGRAM DATA 2.2
Educational Environment / The educational environments need to be healthy, comfortable and
efficient. In addition, they should inspire and motivate. Our programming indicates that the learning
environments should be flexible to incorporate many pedagogies including active learning.
Technology/ As technology changes so do higher educational institutions. There is an increasing
desire among students to have access to wireless technologies and to be able to remote into the
campus while they are off campus. UW-Richland has some great technology already on campus, and
desires it to be accessible and used by as many students as possible.
Collaboration/ UW-Richland’s building program should support collaboration and conferencing while
maintaining privacy and reducing interruptions. The campus wants to incorporate café setting and some
casual breakout areas. It is important that the buildings facilitate interaction with the surrounding
communities and educational partners.
C. QUANTITATIVE PROGRAM DATA
Introduction
The quantitative program data translates the qualitative and operational findings from the previous
sections into specific quantities. In turn, these quantities establish the ideal size for the facility. Data
gathering tools included:
⁄
⁄
⁄
⁄
Staff interviews
Questionnaires and surveys
Inventories of existing space
Benchmarking data
Several qualitative issues that were identified have a direct impact on project size. For instance, the
University’s desire for classroom flexibility suggests room sizes that are standardized and slightly larger,
however with higher utilization ratios, total square footage can actually be reduced. The ideal facility
design would have higher utilization through multi-use spaces. The end result would be a very efficient
and functional facility with a minimum of underutilized space.
The information gathered from all of the above sources is synthesized in Appendix A of this report.
UW-Richland does not see its student enrolment increasing over the next 10 years. A study of the
existing room usage was done (See Figure 2.1) and determined that the campus currently uses about
160 of its 280 available weekly classroom hours for its traditional classrooms. This total was calculated
by the total number of rooms seven (7) multiplied by 40 hours. Assuming that each classroom can be
used from 8:00am until noon and then again from 1:00pm until 5:00pm, five (5) days per week.
Because the campus has so many available classroom hours and it has many small classroom spaces
that only work for a few select classes, the Master Plan is recommending consolidating and shifting
classrooms to provide for larger and more flexible classroom spaces. This will result in a net loss of one
(1) classroom. This will bring the total number of weekly classroom hours down from 280 to 240 hours.
PROGRAM DATA 2.3
This move will still provide for nearly 80 class hours per week that are not used and will provide the
campus with more flexible and usable classrooms.
Room
Weekly
Hours
Used
Weekly
Hours
Open
Total
102
201
203
204
206
213
315
Existing Total
6.5
27.75
28
27.5
31
17.25
22.5
160.5
33.5
12.25
12
12.5
9
22.75
17.5
119.5
40
40
40
40
40
40
40
280
Projected
Total
160.5
79.5
240
Figure 2.1 – Classroom Usage
D. Operational Summary
Introduction
A key objective of the facility programming effort is to determine the operational requirements, including
workflow and physical adjacencies. Programming also reveals how departments work together.
Operational elements of the program include:
⁄ Communication among staff
⁄ Collaboration opportunities
⁄ Workspace and classroom flexibility
⁄ Technological requirements
⁄ How students and staff work and learn on a day to day basis
Spatial Organization
During the programming effort with UW-Richland, we developed several diagrams to represent the
working relationships between different campus areas. Through discussion with various departments
the required adjacencies were established. Chapter 3 shows how these adjacencies were
accomplished in a diagrammatic floor plan layout.
Classroom Space Standards
In today’s academic setting, the physical environment should support a balance of concentration,
collaboration, mobility and flexibility. Strang carefully reviewed how the campus works and identified a
classroom space standard that would help achieve campus goals (See Figure 2.2 and 2.3). These
standard size rooms are created by transforming the four smaller classrooms on the east side of the
Classroom Building to three larger classrooms. These new classrooms can now accommodate 36
PROGRAM DATA 2.4
students in a lecture setting and 24 students in an active learning setting comfortably. This is important
because most classes on campus have the capacity to have 36 students.
Figure 2.2 -Lecture
Figure 2.3 – Active Learning
Student Center Building
Early on in the process, a new Student Center was identified as a high priority need for the campus.
This quickly rose to the top of the list for the following reasons:
x
The existing Student Center is outdated and does not help attract potential students
x
The campus lacks a signature building to act as the “entrance to the campus”
x
The existing performing arts space doesn’t have any wings, the rigging is outdated and
the fly loft is too low to function properly
x
The kitchen equipment is old and in need of replacement
x
The need for a lobby with a ticket counter and coat check which currently do not exist
x
The need for the Student Affairs and Business Services departments to be visible to
visitors
x
The desire for a student lounge/game room
x
The Student Center does not currently have a secure designated space
x
The performing arts space is currently lacking room for many back of house functions
Members of the Steering Committee and Strang worked together through a programming workshop to
develop the space needs program found in Appendix A.
The new Student Center will be the “Front Door” to the campus. It will house an updated and attractive
Commons, Kitchen, Student Activities Spaces, updated facilities for Music and Theater including the
relocation of the existing Mac Lab from the Extension Building to this facility. In order that The Student
PROGRAM DATA 2.5
Center be a truly effective “Front Door” to the campus, the project involves the relocation of Student
Affairs, Business Services, Foundation, Continuing Education and Dean’s Offices to this facility, as well
as the incorporation of a “Pippin-like” Conference/Dining room. The site plan design of the new Student
Center reinforces the “Front Door” concept by the reconfiguration of the campus entry drive, the
creation of an effective drop-off area and the placement of a pleasant south-facing patio area
immediately adjacent to the Commons.
Site
To define the ideal location for expansion on the sites, the qualitative and operational site elements
must be accounted for, as well as quantitative aspects such as number of required parking stalls and
building size.
UW-Richland’s most important site issues are student safety, adequacy of parking, connectivity
between buildings and ease of maintenance. Equally important are sustainable factors such as energy
efficiency, ample green space, protection of views and public accessibility. By utilizing the undeveloped
property south of the existing Student Center, ample land is available to accommodate the campus’s 10
year projections and those well beyond.
I
S
V I E W
V I E W S
S
V I E W
CONNECTION TO
HIGH SCHOOL
I
E
S
V I E
W
D
ATHLETIC
FIELDS
F
J
B
C
B
A
DROP
OFF
C
C
B
G
BIKE & PED.
TRAIL TO PINE
RIVER TRAIL
& DOWNTOWN
G
RESIDENTIAL
HALLS
G
G Evaluate branding
opportunity here
F Trees require arborist
E B-Ball Courts-Existing
D Tennis Courts-Existing
C Eroding stream corridor
B Parking-Existing
A Ring Road Circulation
Area of pooling
stormwater to be corrected
Stream corridor dominated
with invasive species
FEMA Floodplain
Drainage
Bicycle Circulation
Vehicle Circulation
Ped. Circulation
LANDSCAPE
ANALYSIS
Section Three:
Master Plan
MASTER PLANNING 3.1
3. MASTER PLANNING
A. Introduction
The Master Plan is a tool for future planned growth and expansion of the UW-Richland campus. The
Master Plan looks at the context of the campus from a regional scale to a smaller, site specific scale;
from the existing campus to a future campus. For the future growth and expansion of the campus, we
must understand how the campus currently functions in relationship to its surroundings, what existing
relationships and opportunities can be enhanced and in what areas the campus should focus on in the
future. On the campus itself, we also explore the current circulation and campus layout and identify
areas for future growth and development.
B. Site Conditions
Every site has differing physical conditions that can support or challenge a particular development at
that location; the UW-Richland Campus is no different. The campus has a strong relationship to its
environment. Brush Creek runs through the campus which also has sections of rolling farmland and
important view sheds. Storm water management systems and outdoor educational facilities have a
strong impact on the proposed Master Plan for the campus. The building condition reports in Chapter 4
explain the current building and site conditions in more detail and offer recommendations for future
maintenance and infrastructure improvements. The Master Plan builds upon these recommendations
and incorporates many of them into the capital improvement projects that are defined.
C. Surrounding Context
The following items summarize opportunities for UW-Richland to improve connections to the
surrounding communities and establish partnerships to promote its mission.
Establish a campus core to develop a central activity hub for the entire campus
Improve the visibility and identity of UW-Richland’s vehicular and pedestrian entrances
Provide clear and attractive signage at key intersections to direct visitors to the campus
Provide alternative transportation connections to the campus
Provide connections to the High School to the northwest
D.
Master Plan Overview
The Master Planning process involves evaluating campuses on two levels: a large community scale and
a smaller, site specific scale. In the larger context, the campus has local connections with nearby high
schools, the local industry and residents. At a state level, UW-Richland has relationships with the UW
System, Central Administration and the other 13 two-year colleges under the UW Colleges system.
These adjacencies provide opportunities for shared resources between users and impact how the
Master Plan is ultimately developed.
At a site specific scale, the Master Plan examines how the site functions as a campus. The Master Plan
addresses campus identity, pedestrian experience, sustainability practices and potential locations for
new buildings on the site.
The Steering Committee evaluated multiple master planning options before arriving at the
recommended Master Plan that is presented on the following pages. Through a series of Steering
Committee workshops, each option was evaluated in terms of its ability to support student success,
MASTER PLANNING 3.2
financial feasibility and logistics in terms of phasing and construction. The master plans that follow
evolved from this sifting and winnowing of ideas to arrive at the plans most suitable for UW-Richland.
E. UW-Richland Master Plan
The Campus Master Plan as identified in Figures 3.3 through 3.4 has been organized into phases to
facilitate funding availability and build flexibility into the Master Plan. Ideally, Phases 1, 2, and 3 would
be completed at the same time as many of the moving functions depend on one another, but because
of lack of funding they could be done at separate times. Phases 3A and 3B also have functions that
coordinate with one another, so having them completed at the same time would be ideal. Phases 4 and
5 could happen down the road as they are not as pressing as the first three phases. Phase 6 can be
dispersed over the next 10 years, as many of the changes proposed in this phase correlate directly with
several of the previous phases.
Every building on campus has an issue with snow and ice sliding off of the roof. This is especially a
concern above entrances. For this reason it is recommended that a fixed canopy be built at each of the
campus building entrances as each facility is remodeled.
Phase 1 Summary of Work
Phase 1: Classroom Building Remodel
Phase 1 of the Master Plan (see Figure 3.2) is facilitated by the remodel of the Classroom Building. This
remodel will include an update of all the finishes within the building including bathrooms, floors, ceiling
tile and the removal of the existing wood paneling, which will be replaced with drywall. We recommend
updating the lighting in each of the classrooms to have dimmable lighting on the front presentation wall.
This wall should also have two computer display screens. These screens could change over time
depending on technology available and the needs of the campus. Some examples of these screens
include projection screens, large monitors, and touchscreens. Each classroom door should have a
window placed within it to provide transparency and help deal with security. Each class room should be
equipped with whiteboards on all of its walls and lightweight tables and chairs, which will help facilitate
multiple class sizes and teaching styles.
It is recommended that the building’s thermal comfort problems be addressed by replacing the current
furnace system with a VAV system.
Much like every other building on campus, the construction of a permanent awning system is
recommended at the building’s front entrance.
As part of this remodel we recommend moving technology and equipment from Smart Classroom
(Room 315) in the Library to Room 204 in classroom building and move the computer lab that is
currently in Room 211 into Room 315 of the library building. This will consolidate the classrooms into
the same building while allowing the library to house multiple computer labs. One of the labs will be
permanently open to the student body while the other will function as a lab but can be used for classes.
MASTER PLANNING 3.3
Phase 2 Summary of Work
Phase 2A: Student Center Addition
Phase 2A of the Master Plan (see Figure 3.2) is facilitated by the construction of a new Student Center
addition. Through several workshops, the committee discussed whether to remodel the existing Wallace
Student Center, make an addition to the current Student Center, or create an entirely new building that
would act as a Student Center. After deliberation and recommendations by Strang, the Steering
Committee decided that building an addition as well as remodeling the existing Student Center is the
best choice for the campus, both now and for the foreseeable future. Please see Appendix A for a
Space Needs Program for the Student Center Addition and Remodel.
The location of the addition was determined to be attached to the Wallace Student Center’s south facing
façade. This location was selected because of its potential presence as one enters from either of UWRichland’s two main entrances off of Highway 14. One of the goals of the committee since early on in
the master planning process was that the campus needs a “front door”. This new signature addition
would act as that. By having the new addition in close proximity to the existing Performing Arts
Departments, many spaces can be shared. For example: the lobby/commons area for the new addition
can double as the pre- and post-function area for the Performing Arts space. They can also share more
ancillary spaces such as toilet and mechanical rooms.
A large portion of the campus along Brush Creek is currently within a flood plain; the new design should
take this into account. While this does not mean that a building cannot be constructed within the flood
plain, it does mean that the campus will have to go through a potentially lengthy process to remove
areas of the building site out of the flood plain. This CLOMAR/LOMAR process can take upwards of two
years (See Appendix E for more details). We recommend starting this process soon after this master
plan is completed. This will allow UW Richland full flexibility in the design of both this additional and any
future new buildings or additions.
This new facility will benefit not only the campus but also the entire Richland Center community. There
will be unique spaces, like a black box multi use space, that will be the first of its kind in the community.
This space will give the performing arts on campus additional rehearsal spaces and allow them to hold
more intimate performances. This same space can be used for conferencing, student orientation and
could be reserved by people or groups from the community.
This new addition will house many functions including: a commons area, student activities area, and a
Mac/MIDI computer lab and will house the Student Affairs, Business. Foundation, and the Dean’s
offices. The Addition will also house the Continuing Education office and storage.
International students make up a significant population of UW-Richland’s student body. Currently
international students congregate in their coordinator’s office. An international student’s lounge would
provide a designated space for students to socialize while allowing their coordinator a separate and
quieter working environment.
The new campus commons area will house a cafeteria, a student lounge, a game room, a bookstore, an
art gallery and some ancillary spaces such as toilet rooms and storage. This part of the Student Center
will become the social hub of campus where students go to eat, study and socialize on campus. This
MASTER PLANNING 3.4
will make current students want to stay on campus before, after and in between classes, and also help
draw prospective students to the campus.
The student activities area that will be part of this building will include the Student Senate, a faculty
office and a quiet room. The quiet room will have a small kitchenette with a sink and a small refrigerator
so that it can be used as a mother’s room. The room could also be used for meditation or prayer.
The Mac/MIDI computer lab that is currently in East Hall will move to this new building. This will bring
the equipment closer to the performing art students whose use it was originally intended. Bringing the
equipment across the creek near to where the student body spends most of their time will help with
awareness of their availability and allow more students to use the equipment.
This phase should also ignite some of the site recommendations such as the new drop-off, courtyard
and patio.
Phase 2B: Student Center Remodel
The Committee recommends that the remodeling of the existing Student Center follow on the heels of
the completion of the new addition. This will allow the existing building to still function as it has while the
new addition is being constructed. For example, by not starting the demolition of the existing kitchen
until the new kitchen has been built, the campus will be able to provide food preparation services
throughout the year with minimal disruptions.
The largest renovation that will occur during remodeling of the existing Student Center will be the
transformation of the existing commons and kitchen into back-of-house functions for the performing
arts. The largest new area in the existing building will be a new music rehearsal room. The finishes in
the Coppertop performing space will also get updated as part of this phase.
Most of the remodel of this building will be interior with the exception of raising the roof for the Black
Box Theater, and so that a taller space can be created for a functional fly loft and its associated wings.
The current stage doesn’t have enough height for a functional fly loft and it doesn’t have any wing
space, which makes it difficult for performances to operate.
The existing space lacks storage which results with the Music and Theater departments borrowing
storage from other places on campus. It is proposed that the new building have storage for student
instruments, percussion, props, costumes and storage for robes and T-shirts.
The Music Department will continue to be housed in this building with access to a piano lab/music room
and a music library, both of which are recommended to increase in size. The building will continue to
house two small music practice rooms and a third larger one is recommended as well a larger music
rehearsal room. The committee also recommends a faculty office/music studio for the use of this
department.
The Theater Department will also continue to be housed in this building. A faculty office, men’s and
women’s dressing rooms, costume shop/laundry room and two wings on either side of the stage will be
MASTER PLANNING 3.5
added to the building as part of this phase. Other areas that are recommended to be enlarged are the
makeup room and the scene shop. It is recommended that the equipment in the 3D art lab be moved to
this new scene shop. This would allow more students on campus to have access to the equipment,
including the Theater and Art departments.
Other functions that will serve the Music and Theater departments that will be part of the addition
include the lobby, a ticket booth/box office and a coat check.
Phase 3 Summary of Work
Phase 3A: East Hall Remodel
Phase 3A of the Master Plan (see Figure 3.2) is facilitated by the remodel of East Hall. The East Hall
remodel is suggested to take place after the Student Center remodel and either concurrently with, or
before the remodel of Melvill Hall. This remodel mainly focuses on converting spaces that had their
functions move into the Student Center. Converting the existing MAC lab into new UW Extensions
offices and the existing 3D art studio into Campus storage. It is also recommended as part of this
remodel to inspect the underground ductwork and replace the system if needed.
Phase 3B: Melvill Hall Remodel
Phase 3B of the Master Plan (see Figure 3.2 & 3.3) will be the remodel of Melvill Hall. This remodel is
suggested to take place a short time after the completion of the Student Center because the Student
Affairs, Business, Foundation, Continuing Education and Dean’s Offices need to be moved in to the
Student Center before their existing space in Melvill Hall can be transformed as part of this project.
These existing spaces will be transformed into offices, conference rooms, and math and reading labs.
Many offices will be enlarged in this process and offices will be realigned by department.
The building will have its finishes updated including bathrooms, flooring and ceiling tile. The existing
Multimedia Lab is currently underutilized. This room will be converted into another office in this
proposed phase. The existing distance education classes should have its storage removed and the
finishes updated.
After the Continuing Education Department moves into East Hall its space can be used by the rest of
the building occupants for storage, which is something that is needed in this particular building.
Part of this phase will be the replacement of the current furnaces in the new part of the building with a
Variable Air Volume (VAV) system and rezone or retrofit existing RTUs in old part of the building. This
will solve the temperature control issues that currently exist in this space.
This phase will also include a rework of the thermal and moisture protection configuration of the roof of
the existing west addition to Melvill Hall to solve its moisture and condensation issues.
Student confidentiality is very important to the staff at UW Richland. Currently several offices have very
poor acoustical separation. Part of this project will be to upgrade the acoustical separation between
rooms and add additional outlets to each office.
MASTER PLANNING 3.6
The Steering Committee is recommending that the entrance at the northwest corner be removed and
replaced by a window. This will cut down on the amount of canopies the campus installs, improves
circulation and creates an interior alcove/small breakout area that is needed in this building.
Phase 4 Summary of Work
Phase 4: Library Remodel
Phase 4 of the Master Plan (see Figure 3.2) is facilitated by the remodel of the Library. This remodel will
include an update of all the finishes within the building including bathrooms, floors, ceiling tile and the
removal of the existing wood paneling, which will be replaced with drywall.
To facilitate better pedestrian flow it is recommended to transform the eastern set of doors from exit
doors to a second entrance. This will include installing doors with some transparency in them and
creating a vestibule.
The Library Director's office should be relocated from its existing home in Room 309 to the existing
study room in Room 308. A window will also need to be installed in the east wall of the office so that the
director has direct views of the checkout and better sight lines of the rest of the library. Room 309 would
then function as a study room.
Creating a separate closet for IT, so that maintenance and IT are in separate spaces, is a very
important part of this phase.
It is recommended to replace current furnaces with a VAV system or two (2) packaged single zone VAV
systems. This will help with temperature control issues in this building.
Phase 5 Summary of Work
Phase 5A: Gymnasium Addition
Phase 5A of the Master Plan (see Figure 3.2) is facilitated by an addition to the gym building. This
addition is recommended to attach to the west façade of the existing gym building. The addition will
include a large multifunction classroom space, a new weight room and storage. A new entrance and
lobby to be completed as part of this phase will give the building a visible front entrance as well as help
bring the building up to ADA standards.
A portion of the footprint of the addition is currently within a flood plain; the design of this addition should
take this into account. The campus will have to go through a CLOMAR/LOMAR process to remove
portions of the building site out of the flood plain, which can take upwards of two years (See Appendix E
for more details).
Phase 5B: Gymnasium Remodel
Phase 5B of the Master Plan (see Figure 3.2) is facilitated by the remodel of the gym building. This will
be a general remodeling of existing building including accessibility and interior finish upgrade. This
phase will upgrade the hallways, bathrooms, offices, locker rooms and showers.
MASTER PLANNING 3.7
Phase 6 Summary of Work
Phase 6: Greenhouse and Science Building Update
Phase 6 of the Master Plan (see Figure 3.2) is facilitated by an addition of a greenhouse and the
remodel of the Science Building. This phase is recommended to be the last of the outlined phases
partially because this building, having been renovated in 2000 is the campus facility that is the one that
has had the most recent renovation. As a result, its interior finishes are mostly updated.
As part of this phase we recommend the following: 1) Replacement of the current HVAC control system
and 2) Replacement of the carpet in the “Pit” (lecture hall) with a hard surface floor, as food service
occurs in this room.
The casework in the Geology Lab will be replaced with casework that is designed to holds rocks.
Display cases will be constructed in the corridor in this proposed phase. The current countertops will be
replaced with countertops that are more durable and can take the wear and tear from the students and
faculty.
All existing refrigerators that are currently not rated to hold explosive materials should be replaced with
ones that can. Each lab and prep room should have a fume hood on a separate circuit. Eyewash
stations shall be installed in each lab and prep room that doesn’t currently have one.
The addition of a greenhouse on the south side of the building off Room 114 and a cadaver tank that
are proposed in this phase will enhance the educational experience of the students.
Phase 7 Summary of Work
Phase 7: Site Improvement Projects
Phase 7 of the Master Plan (see Figure 3.4) is facilitated by a series of site improvement projects. Most
of the site improvements can be thought of as separate mini projects that do not need to be done at the
same time. A few of these projects would ideally be done in conjunction with building remodels or
additions. One of these is the development of a student quad over the existing concrete patio area
integrated with new arrival drop-off. This project would preferably happen while Phase 1 is occurring.
To help improve the pedestrian experience on campus we are suggesting a pedestrian crossing to
Residential Hall across US Highway 14 from the campus and the introduction of a coordinated family of
site amenities and pedestrian wayfinding elements. We are also suggesting developing a wellness trail
that runs through the campus incorporating an interpretive signage system and workout stations.
To promote biking on campus, this Master Plan suggests the implementation of several bike racks and
shelters, scattered across the campus. A joint extension of a bike path that connects the High School to
the campus just south of the tennis courts.
The drainage issues on north sides of the buildings will be resolved by regrading the site to create a
swale to redirect water. The drainage issues at the west entrance to the Science Building will be
addressed through the creation of a dry stream bed which will help to drain the water away from the
building.
MASTER PLANNING 3.8
A phased reduction of lawn and introduction of native prairie landscape along the banks of Brush Creek
is also recommended. Placing rocks on the edge of the banks of Brush Creek will help to reduce
erosion and naturalize the edges of the creek.
To improve the experience for a visitor arriving by vehicle, a realignment of the middle entry drive is
recommended. The realignment will connect the middle and east entry drives via an enlarged parking
facility and separate the driving lane from the parking lanes. It is suggested to relocate digital read-aboard signage to new 'middle' drive location.
It is recommended to redo the existing Symons lot as part of the gymnasium addition. This will keep the
parking lots separate while providing a drop-off for the gym building. (see Figure 3.4)
20
40
80
20
40
80
MATH
ENG.
AD
HES
WRITING
LAB
MATH
LAB
MATHMATH
MATH
ENG.
ENG.
ENG.
ENG.
PHIL.
ENG.
POLY.
HIS
CHEM
BUS
BUS
EME
HIS
EME
SOC
EME
SPAN
ART
IT
IT
PSY
MELVILL HALL REMODEL
BC
ESIFY
40
80
FIGURE 3.3
20
C 2013
N
11/08/2013
CIRCULATION
CLASSROOM (ART STUDIO)
CLASSROOM (DISTANCE ED)
CLASSROOM (GENERAL)
CONFERENCE
FOOD SERVICES
GYMNASIUM
LAB (COMPUTER)
LAB (SCIENCE, MATH, WRITING)
OFFICE (ADMINISTRATION)
OFFICE (BUSINESS)
OFFICE (DEAN & FOUNDATION)
OFFICE (FACULTY/ IAS)
OFFICE (STUDENT SERVICES)
OFFICE (UW EXTENSIONS)
STUDY/ LIBRARY
THEATER
UTILITY/ SERVICE/ STORAGE
BATHROOMS
KEY
MASTER PLANNING 3.11
IN
ED
NA
TU
R
IZ
AL
PL
T
AN
GS
RO
A
GYMDRUNN
NAS ER
IUM
4
AY 1
IGHW
US H
MELVILL HALL
SYMONS
RECREATION
COMPLEX
DRY
CLASSROOM
BUILDING
STR
EAM
BED
WALLACE
STUDENT CENTER
NGS
N NGS
AN
P ANTINGS
PLAN
PLANT
D PLANTINGS
ED
ALIZED
U A
N URALIZED
NATURALIZE
NATURALIZ
NATURALI
NATURA
NATU
NATURALIZED
NA
MILLER
MEMORIAL
LIBRARY
SCIENCE
HALL
EAST
HALL
ED P
RALIZ
NATU
0
70
140 FEET
DESIGN
GROUP
FIGURE 3.4
GS
LANTIN
MASTER PLANNING 3.12
BANCROFT DR
HIVE DR
BUILDING CONDITION REPORT 4.1
4. BUILDING CONDITION REPORT
A.
Introduction
As part of the data gathering process, the existing UW Richland buildings were evaluated with respect to
their overall condition. The goal was to identify items which may impact the continued use and/or
renovation of these buildings for campus functions over the next 10 years. The evaluation consisted of
visual observations by Strang’s team of Architects and Engineers, plus interviews with campus facility
management staff to identify known problems. The following pages contain itemized building condition
reports for each campus. Included are 10 year maintenance and infrastructure improvement plans with
budgets costs and suggested timeframe for implementation.
B.
Maintenance and Infrastructure Improvement Budget
Figure 4.1 represents the combined budgets for all recommended maintenance and infrastructure
improvement projects identified in the report prioritized into annual budgets over a 10 year period. The
detailed budget spreadsheets found on the following pages are intended to be used as a working tool for
planning annual facilities budgets on an ongoing basis.
Maintenance and Infrastructure Needs Summary
Building Condition Report 4.2
Figure 4.1
The following chart identifies recommended renovation costs per campus.
Project costs have been calculated in 1 year increments over a 10 year period.
Descriptions of each campuses improvements/modifications are detailed in the building
evaluations section of this study. Costs include site, building, plumbing, HVAC,
electrical, technology systems, general contractor overhead and profit, contingencies,
permits, design fees, and inflation at 5% per year.
Total
2023
2022
2021
2020
2019
2018
2017
2016
2015
Campus
2014
Present Cost in
Thousands ($)
Note: The budgets are in addition to normal annual facility operations and routine
maintenance costs and should be considered additive as special projects.
Classroom Building
164
15
0
0
34
37
52
56
21
0
0
215
Library
163
12
0
0
34
13
80
56
21
0
0
216
Student Center
205
24
77
0
58
13
0
56
21
0
0
249
Melvill
255
38
0
150
24
19
0
56
21
0
0
309
34
21
0
6
5
6
0
0
0
0
0
38
Gymnasium
270
14
0
0
58
38
0
0
71
195
0
377
Science Building
291
36
44
0
0
23
0
0
95
0
220
417
40
12
22
24
10
27
11
13
12
14
33
176
1422
170
143
181
224
176
143
238
260
209
252
1997
East Hall
Site
ANNUAL COST
$
1,997,240 TOTAL MAINTENANCE COST
University of Wisconsin - Richland Center
Infrastructure Study
BUILDING CONDITION REPORT 4.3.1
Recommended Maintenance / Repairs
Science Building
1.05
Total
2023
2022
2021
2020
2019
2018
Annual Inflation Rate :
2017
2016
2015
2014
Quanity
Description of Work
Present Costper
item in Thousands
($)
Item
Projected Cost - Thousands /
Remarks
Building - Exterior
1 Tuck pointing of brickwork
40
Caulking and gasket repairs at
2
exterior windows and doors
10
13
1
13
Replace exterior door thresholds
3
where they are degrading
8
10
1
10
4
Paint and repair exterior soffits
8
12
1
12
5
Repair column at South West
entrance
10
15
1
15
Paint and repair panels below
6
exterior windows
6
9
1
9
7 Other?
0
0
8 Other?
0
0
9 Other?
0
0
Sub-Total Costs
59
82
0
0
0
0
23
0
0
95
1
59
0
0
118
Building - Interior
10 ADA upgrades at restrooms
5
1
11 Asbestos testing/abatement
20
1
5
1
5
33
1
33
12
Remove materials stored in front of
electrical panels
1
1
13
Replace flooring in Lecture Hall
with hard surface flooring
25
1
28
1
28
14 Update Casework in Geology Lab
15
1
17
1
17
Add fume hood on a separate
15 circuit to each lab and prep room
that doesn't already have one
80
1
130
1
130
Replace countertops in labs with
more durable surfaces
35
1
57
1
57
16
1
1
1
17 Other?
0
0
18 Other?
0
0
17 Other?
0
0
Sub-Total Costs
18
Plumbing
Backflow protection upgrades at
exterior hose bibs
181
6
44
0
0
0
0
0
0
0
220
270
0
0
1
0
Flush valve replacement at main
19
restroom
4
4
1
4
20
Provide year round inspection
access to acid neutralizing basin
0
0
1
0
21
Provide hands free eye wash
upgrade at chemical sinks
20
21
1
21
22 Other?
0
0
23 Other?
0
0
24 Other?
0
0
Sub-Total Costs
24
25
0
0
0
0
0
0
0
0
0
25
Strang, Inc.
Madison, WI
2012028-001-Maintenance Plan; Science
University of Wisconsin - Richland Center
Infrastructure Study
BUILDING CONDITION REPORT 4.3.2
1.05
Total
2023
2022
2021
2020
2019
2018
Annual Inflation Rate :
2017
2016
2015
2014
Description of Work
Quanity
Present Costper
item in Thousands
($)
Item
Projected Cost - Thousands /
Remarks
Mechanical
25 Other?
0
0
26 Other?
0
0
27 Other?
0
0
28 Other?
0
0
29 Other?
0
0
0
0
2
2
1
2
31 Adjust candela rating
2
2
1
2
32 Other?
0
0
33 Other?
0
0
34 Other?
0
0
Sub-Total Costs
30
Electrical
Add digital communicator to fire
alarm.
Sub-Total Costs
4
4
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4
Summary of Recommended Maintenance / Repairs
Exterior Costs
82
0
0
0
0
23
0
0
95
0
0
118
Interior Costs
Plumbing Costs
181
6
44
0
0
0
0
0
0
0
220
270
24
25
0
0
0
0
0
0
0
0
0
25
Mechanical Costs
0
0
0
0
0
0
0
0
0
0
0
0
Electrical Costs
4
4
0
0
0
0
0
0
0
0
0
4
291
36
44
0
0
23
0
0
95
0
220
417
TOTAL COST PER YEAR
(In Thousands of Dollars)
$
417,336 Total 10 year Maintenance and Repair Costs
Strang, Inc.
Madison, WI
2012028-001-Maintenance Plan; Science
BUILDING CONDITION REPORT 4.3.3
BUILDING CONDITION CHECKLIST
UW-Richland: Science Hall
1200 Highway 14 West
Richland Center, WI 53581
Statistics
Number of
Levels
Building Overview
Description
1 story
Approximate
Gross Area
14,707 gsf
Dates of
Construction,
Additions, or
Remodels
1967 original building
with an addition in 2000
Science Hall is located on the western edge of campus. Primary
functions include science classrooms, labs, lecture and support
spaces
The building is constructed of brick and masonry exterior walls,
concrete slab-on-grade floor system, steel joist and metal deck
roofing system with copper metal roof and fascia. Doors and
windows are primarily aluminum.
Condition
The building is in good condition and expected to remain serviceable
with regularly scheduled maintenance.
Recommendations
Recommended maintenance and/or repairs:
x Grade site around building to slope away from foundation
x Trim or remove plantings that are too close to building
x Concrete lifting of sidewalks that have settled
x Tuck pointing of brickwork
x Caulking and gasket repairs at exterior windows and doors
x Replace exterior door thresholds where they are degrading
x Paint and repair exterior soffits
x Paint and repair panels below exterior windows
x ADA upgrades at restrooms
x Asbestos testing/abatement if remodeling occurs in original bldg.
x Remove materials stored in front of electrical panels
BUILDING CONDITION REPORT 4.3.4
x
x
x
x
x
x
Add digital communicator to fire alarm (adjust candela rating)
Control upgrades to mechanical systems
Backflow protection upgrades at exterior hose bibs
Flush valve replacement at main restroom within next 10 years
Provide year round inspection access to acid neutralizing basin
Provide hands free eye wash upgrade at chemical sinks
BUILDING CONDITION REPORT 4.3.5
BUILDING CONDITION CHECKLIST
UW-Richland: Science Hall – Bldg. 100
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1967 remodeled in 2001
Architectural
Site at Building
Grade / Drainage
Poor condition, several spots drain toward building. See photo A-5
Plantings
Too close to buildings. See photo A-6
Sidewalks
Some have settled. See photo A-7
Signage
Excellent condition
Retaining Walls
N/A
Stairs / Ramps /
Railings
N/A
Exterior
Exposed Foundation
Wall
Good, but stained at base
Exterior Wall System
Tuck pointing needed in several areas at original building.
See photo A-8 and A-9
Areawells
N/A
Sill Flashings
Good condition
Window System
Alum. Sliders, serviceable
Window Flashing /
Lintel Condition
Lintels in good condition at addition
BUILDING CONDITION REPORT 4.3.6
Glazing / Gaskets
Doors / Frames
Good condition at addition, some repairs needed at original
Excellent at addition. Poor at some original locations
Door Hardware
Good condition
Door Seals /
Threshold
Poor at original. See photo A-5
Fascia
Good condition
Soffits
Poor at original and at mechanical area. See photos A-11
and A-12
Columns / Capitals
N/A
Canopies
N/A
Awnings / Shading
Devices
N/A
Exterior Stairs /
Ramps
N/A
Exterior Screen Walls
N/A
Exterior Painting
Needed at original soffits and panels below windows.
See photo A-13
Patio / Terrace
N/A
Exterior
Miscellaneous
Misc. repairs needed at panels below windows. See photo A-14
BUILDING CONDITION REPORT 4.3.7
Structure (omit section if completed by structural engineer)
Foundation Walls
Good condition
Concrete Slab
Good condition
Typical Floor Framing
N/A
Roof Framing
Not observed or not visible
Interior Columns /
Bearing Walls
Not observed or not visible
Exterior Structural
Steel Members
Not observed or not visible
Roof
Roof
Material / System
Visual Evaluation
Copper Roof – Good condition, observed from ground.
Roof Accessories, appurtenances
Copper Roof Edge
Good condition
Wall flashings
N/A
Drains
Not observed
Scuppers / Overflows
Gutters / Downspouts
Good condition
Equipment Curbs
Not observed
Equipment Platforms
Not observed
MEP Penetrations /
Condition
Not observed
BUILDING CONDITION REPORT 4.3.8
Interior Systems
Doors / Frames
Solid core wood doors in hollow metal frames, good condition
Hardware
Lever action hardware on most doors
Borrowed Lites /
Frames
Hollow metal in good condition
Perimeter Glazing /
Sealant / Sills
Good condition
Casework / Shelving
Wood in good condition
Interior Metalwork
N/A
Interior Masonry
None exposed
Toilet Rooms /
Fixtures /
Accessories
Multiple issues with ADA including turning radiuses, pull side door
clearance, mounting heights. See photos A-17, A-18 and A-19
Wall Mounted
Equipment
No issues noted
Appliances
N/A
Elevator / Finishes
N/A
Stairs / Finishes
N/A
Interior System
Miscellaneous
Wood window sills beginning to wear. See photo A-20
Interior Finishes
BUILDING CONDITION REPORT 4.3.9
Mostly GWB
Wall surfaces
Painting
Good condition
Transparent / Sealers
Good condition
Interior Flooring /
Base Material
Vct, good condition with a small amount of cracking at original
entry. See photo A-21
Ceilings
Acp lay-in, good condition
Architectural Photos
Photo A-1
Photo A-2
BUILDING CONDITION REPORT 4.3.10
Photo A-3
Photo A-4
Photo A-5
Photo A-6
Photo A-7
Photo A-8
BUILDING CONDITION REPORT 4.3.11
Photo A-9
Photo A-10
Photo A-11
Photo A-12
Photo A-13
Photo A-14
BUILDING CONDITION REPORT 4.3.12
Photo A-15
Photo A-16
Photo A-17
Photo A-18
Photo A-19
Photo A-20
BUILDING CONDITION REPORT 4.3.13
Photo A-21
Photo A-22
BUILDING CONDITION REPORT 4.3.14
BUILDING CONDITION CHECKLIST
UW-Richland: Science Hall – Bldg. 100
1200 U.S. 14
Richland Center, WI
Original building constructed in 1967 remodeled in 2001
Electrical
Electrical Distribution
Location(s)
Installed Date(s)
The Science Building houses the second 480/277V system.
Installed in 2000
277/480, 1200A Switchboard, with significant spare breaker space.
ELEC PHOTO 1: SCIENCE 105507
120/208, 400A Panelboard, with significant spare breaker space.
Ampacity vs loading was not measured.
ELEC PHOTO 2: SCIENCE 105915
Voltage/Phase
Ampacity
Physical Capacity
A 400A disconnect is tapped off the switchboard to feed Wallace
and Classroom Buildings.
Multiple 120/208 and 277/480V panels serve the building, with labs
having dedicated panels. Adequate spaces for additional loads are
available in many panels.
ELEC PHOTO 3: SCIENCE 110234
ELEC PHOTO 4: SCIENCE 110629
ELEC PHOTO 5: SCIENCE 111850
All equipment appears to be Square D.
Violations/ Concerns
Equipment stored in electrical rooms encroaches on required panel
clearances.
Others
Recommendations
The system is adequate.
BUILDING CONDITION REPORT 4.3.15
Standby Power Systems
Generator
Fed from campus-wide standby power system
Panel
480/277 40A with ample space.
Fire Alarm
Basic System
Simplex 4005 Fire Alarm Panel
No offsite or central communications
Coverage
Horn-Strobe coverage is located throughout corridors and many
other areas.
Duct smoke detectors are installed in HVAC system.
ADA Compliance
Visual appliances installed in most areas, but it appears that
candela rating is not correct in many cases.
No notification coverage in mechanical mezzanine or in small
common rooms, such as 106A
Recommendations
Add a digital communicator to existing fire alarm to report system
status to a monitoring agency. Adjust strobe candela rating (and
add capacity to notification circuits, if necessary)
Mass Notification System
Basic System
Served by campus mass notification system
Telephone
Basic System
Served by campus PBX system
Data
Basic System
The main campus servers are located in 106B building.
Most building equipment also located in these racks.
ELEC PHOTO 6: SCIENCE 112622
Smaller network racks are located in the lab areas.
BUILDING CONDITION REPORT 4.3.16
Support Methods
Return air plenum?
Unknown
Equipment Condition
Good condition.
Lighting
Overview of Fixtures
Recessed parabolic lighting in classrooms, offices, T8 Lamping
Lensed Troffers in Labs, T8 Lamping
ELEC PHOTO 7: SCIENCE 111103
Teleconference-specific lighting in distance learning room.
Dark Areas
None Observed
LED Exit Lights
Yes
Egress Lighting
Description &
coverage
Selected fixtures are connected to campus standby power system.
Others
Lighting Controls
Dual Lighting Levels
Yes
Daylight Controls
None Noted
Automatic Shutoff
Occupancy sensors
BUILDING CONDITION REPORT 4.3.17
Wiring Devices
GFCI
GFCI appears to be provided per code.
ELEC PHOTO 8: SCIENCE 111112
General Condition
Good condition.
Some surface raceway has openings that expose wiring.
ELEC PHOTO 9: SCIENCE 111121
BUILDING CONDITION REPORT 4.3.18
ELEC PHOTO 10: SCIENCE 105507
ELEC PHOTO 11: SCIENCE 105915
ELEC PHOTO 12: SCIENCE 110234
ELEC PHOTO 13: SCIENCE 110240
ELEC PHOTO 14: SCIENCE 110629
ELEC PHOTO 15: SCIENCE 111850
BUILDING CONDITION REPORT 4.3.19
ELEC PHOTO 16: SCIENCE 111103
ELEC PHOTO 17: SCIENCE 111112
ELEC PHOTO 18: SCIENCE 111121
ELEC PHOTO 19: SCIENCE 112622
BUILDING CONDITION REPORT 4.3.20
BUILDING CONDITION CHECKLIST
UW-Richland: Science Hall – Bldg. 100
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1967 remodeled in 2001
Heating, Ventilation and Air Conditioning
HVAC Building Services
Primary Heating
2 Thermal Solutions Hot Water Boilers and Constant Volume Air
Handler Unit with hot water reheat coil. Bypass fan at AHU allows
reheat coils at control valves for heat on chance of AHU failure.
Electric cabinet unit heaters in vestibules.
Boiler Controls
Packaged boiler controls tied into building DDC system.
Boiler feed system
Pot feeder.
Heating Distribution
Ducted constant volume system in good condition with reheat
variable air volume control terminals.
Pipe Insulation
Fiberglass insulation on interior hot water system piping is in good
condition. The elastomeric insulation used on exterior refrigeration
piping is in serviceable to good condition.
Comments
Recommendations
There appears to be control issues in this building in part because
the return air duct may not be sized to account for the fume hoods
to be off. Humidity issues identified between infiltration items and
with how cooling staging operates.
Consider adding variable frequency drive control to AHU fan. Allow
terminal control valves to act as true variable air volume units rather
than constant volume. Link fume hood operation to outside air
intake. Coordinate with remote condenser manufacturer about
variable cooling capability, or look at replacing AHU cooling coils
and/or the remote condenser to allow variable cooling.
HVAC Controls
Basic system
Honeywell “CARE” System. Facilities staff indicated that this is an
older control system that is difficult to maintain and support.
BUILDING CONDITION REPORT 4.3.21
Thermostats and
control valves
Honeywell TSTATs and control valves.
Comments
The building was upgraded with mechanical systems and controls
back in 2001, but the control system installed was near being
outdated at that time. Since then, the system has been reported to
be hard to interface with and troubleshoot.
Recommendations
Work with facilities staff on scheduling the next O&M replacement
of any of the main mechanical systems (boiler, AHU, condenser,
etc) and prior to that replacement get a mechanical designer to
design a revised control sequence of operation. Upgrade the
controls while the system is down with the mechanical replacement.
Ventilation
Toilet exhaust
All bathrooms are ducted to one roof exhaust fan that is in
serviceable condition.
Janitors closets
Tied in with bathroom exhaust.
Apartment bathroom
NA
Trash and recycling
storage rooms
NA
Kitchen Hood
NA
Classroom Air
Handling Unit
Fume hood operation is not tied to outside air control. It appears as
if the system is operating at near 100% outside air at all times.
Fume hood fans are in serviceable condition.
Sanctuary & Dining
Room Air Handling
Unit
NA
Recommendations
Facilities staff have attempted to mitigate the outside air issues, but
a full mechanical design study should be commissioned to trouble
shoot the system and provide a control sequence.
BUILDING CONDITION REPORT 4.3.22
Air Conditioning
Cooling
The IT room has a dedicated residential grade split system remote
condensing unit that is in good condition. There have been some
control issues due to the residential grade unit not having humidity
control options as needed for these types of spaces. The building is
served by a remote condensing system serving DX coils at the
constant volume central Air Handling Unit.
Special Equipment
Dehumidifiers
There is not specialty dehumidification, but there were fans set up
near vestibules to try and help evaporate standing water issues.
There is a dedicated humidifier that serves the AHU. Like most of
the buildings on this campus, humidity issues exist due to operable
windows and large infiltration issues.
BUILDING CONDITION REPORT 4.3.23
HVAC Photos
Building Signage
Boilers and Pumps
Direct Door to Outside Issues
Electric CUH in Vestibule
T-STAT
Lab with Hoods
BUILDING CONDITION REPORT 4.3.24
Humidifier
Bypass Fan
Insulated Air Separator
Previous AHU RTU Location
Abandoned Vent
Bathroom Exterior Fan
BUILDING CONDITION REPORT 4.3.25
Fume Hood Fans
Refrigerant Piping
IT Condenser
Remote Condenser
BUILDING CONDITION REPORT 4.3.26
BUILDING CONDITION CHECKLIST
UW-Richland: Science Hall Bldg. 100
1200 U.S. 14
Richland Center, WI
Original building constructed in 1967 remodeled in 2001
Plumbing
Plumbing Building Services
Water
City Meter water.
Sewer
City Sewer
Storm
Drainage to grade via gooseneck.
Natural Gas
Available
Others
Fire Protection
Basic system
None
Classification
N/A
Fire Pump
N/A
Comments
BUILDING CONDITION REPORT 4.3.27
Plumbing Water Protection, Conditioning & Heating
Water Softener
Yes, fair working condition.
Water Heating
Electric water heater non recirculating system. Good condition
Back Flow Protection
Not up to current code at any of the exterior hose Bibb and mop
basins. Any fixture with threaded fittings shall have minimum in line
vacuum breaker (ASSE 1011)
Water Polishing
N/A
Others
Plumbing Fixtures
Water Closets
Water closets in fair condition in main restroom, replace flush valve
in next 10 yrs.
Water closet in family restroom in excellent condition.
Lavatories
Lavatories in main restroom are in good to fair condition, Faucets
are in fair condition. Faucets and traps are not to current ADA
requirement. Faucets handles are not ADA
Faucet in family restroom in excellent condition.
Mop Service Basins
Good condition, backflow protection is an issue with hose
attachments. (Photo P-1)
Water Coolers
Bi-level unit in good condition.
Sinks & fittings
Lab gas fittings
Lab faucets and gas turrets in excellent condition.
BUILDING CONDITION REPORT 4.3.28
Floor Drains
Good condition
Showers
None
Roof Drains
Yes, conditions not verified
Others
Plumbing Special Equipment
Water Conditioners /
Polishing
Acid Neutralizing
Central unit, was recondition recently per maintenance staff, Unit
location outside building with no access to cover due to ground
covered. Recommend to provide access for annual inspection of
condition and to verify limestone volume. Unknown condition of
piping downstream of dilution basin. If cast iron piping it could be
very corroded condition.
Grease Interceptors
None
Garage catch basin
None
Emergency Eye &
Shower
Drench in good condition (Photo P-2). Eye washes at chemical
sinks not to current OSHA. Units shall be hands free and stay open
during use.
Sump pumps & lift
stations
Not in use
BUILDING CONDITION REPORT 4.3.29
Plumbing Piping
Water Systems
Copper and galvanized supplies. In good to fair condition on
exterior unknown condition interior.
Sanitary, Acid &
Storm Piping
Sanitary is cast iron unknown condition below slab
Storm is cast iron and in fair to good condition above slab.
Acid waste is orion piping.
Lab/Med Gases
Natural gas good condition.
Vacuum turrets in good condition, flex piping to portable units.
Pipe Insulation
Yes in fair to good condition
Others
Plumbing Photos
Photo P-1
Photo P-2
University of Wisconsin - Richland Center
Maintenance Plan
BUILDING CONDITION REPORT 4.4.1
Recommended Maintenance / Repairs
Classroom Building
3
10
1
13
1
13
4
Replace exterior door thresholds where
they are degrading
2
1
3
1
3
5
Replace knob door handles with ADA
lever action hardware
7
1
9
1
9
6
Paint and repair exterior soffits
8
1
12
1
12
7
Paint and repair panels below exterior
windows
6
1
9
1
9
8
Other?
0
0
1
0
9
Other?
0
0
1
0
10 Other?
0
0
1
0
Total
13
2023
1
2022
13
2021
1
2020
10
Replace glazing in windows where
hermetic seal has failed
2019
2
2018
1
2017
40
Caulking and gasket repairs at exterior
windows and doors
2016
Tuck pointing of brickwork
2015
1
2014
Description of Work
Quanity
1.05
Present Costper
item in Thousands
($)
Annual Inflation Rate :
Item
Projected Cost - Thousands /
Remarks
Building - Exterior
Sub-Total Costs
83
56
0
0
0
0
37
0
56
1
56
21
0
0
114
Building - Interior
11 ADA upgrades at restrooms
5
1
7
1
7
12
Corrections to protruding object
(telephone booth in corridor)
3
1
4
1
4
13
Asbestos testing/abatement if
remodeling occurs in original bldg.
20
1
27
1
27
14
Repairs to acoustical panel ceiling
systems
10
1
13
1
13
15
Remove materials stored in front of
electrical panels
1
1
1
1
1
16 Other?
0
0
1
0
17 Other?
0
0
1
0
18 Other?
0
0
1
0
Sub-Total Costs
39
0
0
0
0
0
52
0
0
0
0
52
Plumbing
Backflow protection upgrades at
exterior hose bibs
0
1
0
1
0
ADA upgrades for faucets, traps and
20
electric water coolers
4
1
4
1
4
3
1
3
1
3
19
21
Evaluate condition of underground
waste pipe with camera
22 Other?
0
0
1
0
23 Other?
0
0
1
0
24 Other?
0
0
1
0
Sub-Total Costs
7
7
0
0
0
0
0
0
0
0
0
7
Strang, Inc.
Madison, WI
2012028-001-Maintenance Plan; Classroom
University of Wisconsin - Richland Center
Maintenance Plan
BUILDING CONDITION REPORT 4.4.2
1
6
27 Other?
0
0
1
0
28 Other?
0
0
1
0
29 Other?
0
0
1
0
Total
6
2023
1
2022
6
2021
26 Supply Hepa Filters at return grills
2020
1
2019
1
2018
1
2017
1
2016
1
Description of Work
2015
25 Air quality testing for mold
Item
2014
1.05
Quanity
Annual Inflation Rate :
Present Costper
item in Thousands
($)
Projected Cost - Thousands /
Remarks
Mechanical
7
Sub-Total Costs
7
0
0
0
0
0
0
0
0
0
7
Electrical
30 Replace fire alarm system
25
1
30
1
30
31 Add emergency lighting inverter
3
1
4
1
4
32 Other?
0
0
1
0
33 Other?
0
0
1
0
34 Other?
0
0
1
0
Sub-Total Costs
28
0
0
0
34
0
0
0
0
0
0
34
Summary of Recommended Maintenance / Repairs
Exterior Costs
83
0
0
0
0
37
0
56
21
0
0
114
Interior Costs
39
0
0
0
0
0
52
0
0
0
0
52
Plumbing Costs
7
7
0
0
0
0
0
0
0
0
0
7
Mechanical Costs
7
7
0
0
0
0
0
0
0
0
0
7
Electrical Costs
28
0
0
0
34
0
0
0
0
0
0
34
TOTAL COST PER YEAR
164
15
0
0
34
37
52
56
21
0
0
215
(In Thousands of Dollars)
$
215,083 Total 10 year Maintenance and Repair Costs
Strang, Inc.
Madison, WI
2012028-001-Maintenance Plan; Classroom
BUILDING CONDITION REPORT 4.4.3
BUILDING CONDITION CHECKLIST
UW-Richland: Classroom Building-
1200 Highway 14 West
Richland Center, WI 53581
Statistics
Number of
Levels
Building Overview
Description
Condition
Recommendations
1 story
Approximate
Gross Area
8,383 gsf
Dates of
Construction,
Additions, or
Remodels
1967
The Classroom Building is located on the north western edge of
campus. Primary functions include general purpose classrooms, art
room, and support spaces
The building is constructed of brick and masonry exterior walls,
concrete slab-on-grade floor system, steel joist and metal deck
roofing system with copper metal roof and fascia. Doors and
windows are primarily aluminum.
The building is in fair condition and expected to remain serviceable
with regularly scheduled maintenance.
Recommended maintenance/repair work:
x Grade site around building to slope away from foundation
x Trim or remove plantings that are too close to building
x Concrete lifting of sidewalks that have settled
x Tuck pointing of brickwork
x Caulking and gasket repairs at exterior windows and doors
x Replace glazing in windows where hermetic seal has failed
x Replace exterior door thresholds where they are degrading
x Replace knob door handles with ADA lever action hardware
x Paint and repair exterior soffits
x Paint and repair panels below exterior windows
x ADA upgrades at restrooms
BUILDING CONDITION REPORT 4.4.4
x
x
x
x
x
x
x
x
x
x
Corrections to protruding object (telephone booth in corridor)
Wood paneling replacement
Asbestos testing/abatement if remodeling occurs
Repairs to acoustical panel ceiling systems
Remove materials stored in front of electrical panels
Replace fire alarm system
HVAC replacements to improve ventilation
Backflow protection upgrades at exterior hose bibs
ADA upgrades for faucets, traps and electric water coolers
Evaluate condition of underground waste pipe with camera
BUILDING CONDITION REPORT 4.4.5
BUILDING CONDITION CHECKLIST
UW-Richland: Classroom Building – Bldg. 200
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1967
Architectural
Site
Grade / Drainage
Poor against building. See photos A-3 and A-4
Plantings
Too close to building. See photo A-5
Site Drains
One manhole cover close by
Sidewalks
Settling at building is a problem. See photo A-6
Signage
Excellent
Retaining Walls
N/A
Stairs / Ramps /
Railings
N/A
Exterior
Exposed Foundation
Wall
Good
Brick repairs needed in places, especially at base of wall. See
photos 1247 and 1258.
Exterior Wall System
Areawells
N/A
Sill Flashings
Good
BUILDING CONDITION REPORT 4.4.6
Window System
Alum. Sliders, serviceable condition. Hermetic seal failing on some
glazing. See photo A-11
Window Flashing /
Lintel Condition
No lintels
Glazing / Gaskets
Caulking in fair condition other than a few spots. See photos A-12
and A-13
Doors / Frames
Alum., serviceable. Patching needed at hardware retro-fits. See
photo A-14
Door Hardware
Serviceable
Door Seals /
Threshold
Poor, missing parts and/or rust. See photos A-16 and A-17
Fascia
Good
Soffits
Some repairs plus paint needed. See photo A-18
Columns / Capitals
N/A
Canopies
N/A
Awnings / Shading
Devices
N/A
Exterior Stairs /
Ramps
N/A
Exterior Screen Walls
N/A
Exterior Painting
Poor, needed at soffits and panels below windows. See photos A-3
and A-4
Exterior
Miscellaneous
BUILDING CONDITION REPORT 4.4.7
Structure
Foundation Walls
Good condition
Concrete Slab
Good condition
Typical Floor Framing
N/A
Roof Framing
Not observed
Interior Columns /
Bearing Walls
Not observed
Exterior Structural
Steel Members
Not observed
Roof
Copper Roof
Material / System
Visual Evaluation
Good condition
Roof Accessories, appurtenances
Roof Edge
Good condition
Wall flashings
Good condition
Drains
Not observed
Scuppers / Overflows
Gutters / Downspouts
Good condition
Equipment Curbs
Not observed
Equipment Platforms
Not observed
MEP Penetrations /
Condition
Not observed
BUILDING CONDITION REPORT 4.4.8
Ladder / Access
Hatch / Skylights
Not observed
Expansion Control
Not observed
Interior Systems
Doors / Frames
Solid core wood doors in hollow metal frames, original and in poor
condition but serviceable.
Hardware
Mostly knob hardware. See photo A-19 should be replaced with
ADA lever action hardware.
Borrowed Lites /
Frames
Transoms filled with wood. Good condition
Perimeter Glazing /
Sealant / Sills
Serviceable
Casework / Shelving
Wood, poor condition serviceable
Interior Masonry
Good condition
Toilet Rooms /
Fixtures /
Accessories
Not fully accessible in terms of stall size, mounting heights, pipe
insulation, etc. See photo A-20
Wall Mounted
Equipment
Telephone booth is a protruding object, not in compliance with ADA.
See photo A-21
Appliances
N/A
Elevator / Finishes
N/A
Stairs / Finishes
N/A
BUILDING CONDITION REPORT 4.4.9
Interior System
Miscellaneous
Interior Finishes
Wood paneling is in poor condition, aged. Vwc is in serviceable
condition.
Wall surfaces
Good condition
Painting
Transparent / Sealers
Serviceable
Interior Flooring /
Base Material
Asbestos tile in most areas. Some carpet which is serviceable
Ceilings
Interior Finish
Miscellaneous
Acp spline system, stained and failing in many locations. See
photos A-22 and A-23
BUILDING CONDITION REPORT 4.4.10
Architectural Photos
BUILDING CONDITION REPORT 4.4.11
BUILDING CONDITION REPORT 4.4.12
BUILDING CONDITION REPORT 4.4.13
BUILDING CONDITION REPORT 4.4.14
BUILDING CONDITION CHECKLIST
UW-Richland: Classroom Building – Bldg. 200
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1967
Electrical
Electrical Distribution
Location(s)
Installed Date(s)
Voltage/Phase
Ampacity
Physical Capacity
Fed from normal campus-wide 480/277V system and campus wide
standby 480/277V system.
Room 202, 1967
ELEC PHOTO 1: CLASSROOM 104219
ELEC PHOTO 2: CLASSROOM 104230
Panel LP3: 480/277 200A (2) 3-pole spares
Panel R3: 120/208 200A (2) 3-pole spares. Fed from LP3 via (3)
single phase transformers.
Ampacity vs. loading was not measured.
Equipment manufactured by Kinney
Violations/ Concerns
Proper panel clearances are not met. Storage of material infringes
on panel clearances
Others
Equipment is aging, but older Kinney equipment is, generally,
regarded as reliable.
Recommendations
The system can remain, as long as it meets the need of the
building. However, if the building is remodeled or significantly
upgraded, all new electrical distribution equipment should be
installed. Rooms with electrical panels should be cleared of all
storage that infringes on panel clearances.
Standby Power Systems
Generator
Panel
Fed from campus-wide standby power system
480/277 30A, 1-2 spaces for additional breakers.
BUILDING CONDITION REPORT 4.4.15
Fire Alarm
Basic System
Original 1967 Simplex Fire Alarm Panel. Audible-only notification.
No offsite or central communication.
ELEC PHOTO 4: CLASSROOM 104655
Coverage
Audible-notification from a few locations.
ADA Compliance
Not ADA compliant: no visual notification
Pull Stations mounted too high to meet ADA requirements and wire
pulls have been added to provide access.
Recommendations
The system should be replaced as soon as possible with a modern
system with ADA compliant notification and a digital communicator
to report system status to a monitoring agency. Automatic early
detection, such as smoke detectors, is recommended for property
protection, since no sprinkler system is installed.
Mass Notification System
Basic System
Served by campus mass notification system
Telephone
Basic System
Served by campus PBX system
Data
Basic System
A small rack, connected to the campus data system, is located in
room 202 to distribute to a small number of hardwired computers
and WiFi access points.
ELEC PHOTO 3: CLASSROOM 104655
Support Methods
Return air plenum?
Unknown
Equipment Condition
Good, but cable management should be added.
BUILDING CONDITION REPORT 4.4.16
Lighting
Overview of Fixtures
General: 1x4 Troffers retrofitted to T8 Lamps.
Dark Areas
None Observed
LED Exit Lights
Exits signs have been retrofitted with LED lamps.
Egress Lighting
Description &
coverage
Selected corridor fixtures are connected to the standby power
system.
Others
Lighting Controls
Dual Lighting Levels
None Noted
Daylight Controls
None Noted
Automatic Shutoff
None Noted
Wiring Devices
GFCI
GFCI devices were not observed in wet locations or locations near
sinks/mop basins.
General Condition
Have been replaced as needed. Most appear to be in adequate
condition.
BUILDING CONDITION REPORT 4.4.17
Electrical Photos
ELEC PHOTO 4: CLASSROOM
104219
ELEC PHOTO 5: CLASSROOM
104230
ELEC PHOTO 6: CLASSROOM
104655
ELEC PHOTO 7: CLASSROOM
104713
ELEC PHOTO 4: CLASSROOM
104655
BUILDING CONDITION REPORT 4.4.18
BUILDING CONDITION CHECKLIST
UW-Richland: Classroom Building – Bldg. 200
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1967
Heating, Ventilation and Air Conditioning
HVAC Building Services
Primary Heating
Building is served by 6 residential style gas fired furnaces in good
condition. 3 furnaces are served by a single makeup air/economizer
type blower fans that are in poor condition and are unlikely to be
code compliant.
Boiler Controls
NA
Boiler feed system
NA
Heating Distribution
Ducted system is in serviceable condition.
Pipe Insulation
Refrigerant piping is in poor to serviceable condition.
Comments
Recommendations
Humidity issues throughout building. No confidence in economizer
function for the furnace systems. Ventilation and air quality is
questionable throughout building. There is no relief capability for the
building. Major infiltration issues due to operable window conditions.
Built up over time controls are a mess.
Replace furnaces with VAV type system with modulating cooling for
better humidity control. Provide new system with real ventilation,
economizer and relief capability. Consider upgrading to a VAV
system with room control and monitoring to correct humidity,
heating, and cooling issues.
HVAC Controls
Basic system
All electric controls with a Honeywell building controller with
patchwork built-up-over-time zone and relay control systems within
the zone and in the mechanical penthouse.
BUILDING CONDITION REPORT 4.4.19
Thermostats and
control valves
Honeywell for the zone controllers and sensors. A mix match of
relays up in the mechanical penthouse for control of the furnaces,
“economizer fan”, and cooling control.
Comments
The controls in the penthouse are a nightmare with the endless
patchwork assembly of relays.
Recommendations
The built-up-over-time and patchwork assembly of residential and
commercial grade systems is a mess. Building should be scheduled
for major HVAC upgrade and have the controls standardized at that
time.
Ventilation
Toilet exhaust
Individual fans per bathroom with wall outlet vents.
Janitors closets
No exhaust in janitors closets.
Apartment bathroom
NA
Trash and recycling
storage rooms
NA
Kitchen Hood
NA
Classroom Air
Handling Unit
Despite the lack of viable ventilation control, the zoning of this
building is good. There is effectively one classroom per furnace
unit which makes for solid temperature control.
Sanctuary & Dining
Room Air Handling
Unit
NA
Recommendations
Replace the furnace system with something that can actually
provide ventilation. Replace the windows to eliminate the operable
capability to control infiltration.
BUILDING CONDITION REPORT 4.4.20
Air Conditioning
Cooling
2 remote condensers serve all 6 of the furnace units.
Special Equipment
Dehumidifiers
No specialty dehumidifiers and no humidification either.
BUILDING CONDITION REPORT 4.4.21
HVAC Photos
Building Signage
Ceiling Returns
Wall Transfers
Humidity Issues with Windows
Shop MAU Unit
Furnaces and MAU
BUILDING CONDITION REPORT 4.4.22
The Shop MAU OA Ductwork
Remote Condensers
Penthouse Access 1
Penthouse Access 2
Penthouse Access 3
BUILDING CONDITION REPORT 4.4.23
BUILDING CONDITION CHECKLIST
UW-Richland: Classroom Building Bldg. 200
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1967
Plumbing
Plumbing Building Services
Water
City Metered Water
Sewer
City Sewer.
Storm
Drainage to grade via gooseneck.
Natural Gas
Available
Others
Fire Protection
Basic system
None
Classification
N/A
Fire Pump
N/A
Comments
BUILDING CONDITION REPORT 4.4.24
Plumbing Water Protection, Conditioning & Heating
Water Softener
None
Water Heating
Electric water heater in good to fair condition
Back Flow Protection
Not up to current code at any of the exterior hose Bibb and mop
basins. Any fixture with threaded fittings shall have minimum in line
vacuum breaker (ASSE 1011)
Water Polishing
N/A
Others
Plumbing Fixtures
Water Closets
Water Closets are wall mount flush valve, water closets in good
condition, flush valve are in working order but are showing age.
Recommendation to replace with water conserving flush valves in
next 10 yrs.
Urinals
Floor mount with auto flush. Condition of units is fair to good
condition
Lavatories
Lavatories are in good condition, Faucets are in fair condition.
Faucets and traps are not to current ADA requirement. Traps shall
be wrapped or offset and faucets handles are not ADA
Mop Service Basins
Good condition, backflow protection is an issue with hose
attachments.
Water Coolers
Single wall mount unit, in good condition, but are not ADA
(Photo P-1)
Sinks & fittings
Need ADA compliance on traps, and faucet handles
BUILDING CONDITION REPORT 4.4.25
Floor Drains
In good condition
Roof Drains
Yes-Condition not verified.
Others
Plumbing Special Equipment
Water Conditioners /
Polishing
None
Acid Neutralizing
Abandoned
Sump pumps & lift
stations
Not in use
Others
Plumbing Piping
Water Systems
Copper and galvanized supplies. In good to fair condition on
exterior unknown condition interior.
Sanitary, Acid &
Storm Piping
Sanitary is cast iron, good condition above slab, unknown condition
of piping below slab.
Storm is cast iron good condition above slab, unknown condition of
piping below slab. Building was formerly used as Science hall which
had acid waste. Due to former use, it is recommended to camera
the system to get an idea of what condition the piping is in.
Lab/Med Gases
None
Pipe Insulation
Yes-fair to good condition
BUILDING CONDITION REPORT 4.4.26
Plumbing Photos
Photo P-1
University of Wisconsin - Richland Center
Infrastructure Study
BUILDING CONDITION REPORT 4.5.1
Recommended Maintenance / Repairs
Library
1.05
12
4
Paint and repair panels below
exterior windows
6
1
9
1
9
Total
1
2023
12
2022
1
2021
8
2020
Paint and repair exterior soffits
2019
3
2018
1
2017
10
2016
1
2015
40
Caulking and gasket repairs at
2
exterior windows and doors
Description of Work
2014
1 Tuck pointing of brickwork
Item
Quanity
Annual Inflation Rate :
Present Costper
item in Thousands
($)
Projected Cost - Thousands /
Remarks
Building - Exterior
56
13
1
56
1
13
5 Other?
0
0
6 Other?
0
0
7 Other?
0
0
Sub-Total Costs
8
Building - Interior
ADA upgrades at restrooms, coat
racks, service counter
Replace knob door handles with
9
ADA lever action hardware
10
Wood cabinetry repairs or
replacements
11 Asbestos testing/abatement
12
Repairs to acoustical panel ceiling
systems
64
0
0
0
0
13
0
56
21
0
0
90
5
1
7
1
7
5
1
7
1
7
15
1
20
1
20
20
1
27
1
27
15
1
20
1
20
Remove materials stored in front of
13
electrical panels
1
14 Other?
0
0
15 Other?
0
0
16 Other?
0
0
Sub-Total Costs
17
Plumbing
Backflow protection upgrades at
exterior hose bibs
1
61
1
1
1
0
0
0
0
80
0
0
0
0
81
1
1
1
1
1
18 ADA upgrades for faucets & traps
2
1
2
1
2
19 Other?
0
0
20 Other?
0
0
21 Other?
0
0
Sub-Total Costs
3
3
0
0
0
0
0
0
0
0
0
3
Strang, Inc.
Madison, WI
2012028-001-Maintenance Plan; Library
University of Wisconsin - Richland Center
Infrastructure Study
BUILDING CONDITION REPORT 4.5.2
1
6
24 Other?
0
0
25 Other?
0
0
26 Other?
0
0
Total
6
2023
1
2022
6
2021
23 Supply Hepa Filters at return grills
2020
1
2019
1
2018
1
2017
1
2016
1
Description of Work
2015
22 Air quality testing
Item
2014
1.05
Quanity
Annual Inflation Rate :
Present Costper
item in Thousands
($)
Projected Cost - Thousands /
Remarks
Mechanical
Sub-Total Costs
7
7
0
0
0
0
0
0
0
0
0
7
Electrical
27 Replace fire alarm system
25
1
30
1
30
28 Add Emergency Lighting Inverter
3
1
4
1
4
29 Other?
0
0
30 Other?
0
0
31 Other?
0
0
Sub-Total Costs
28
0
0
0
34
0
0
0
0
0
0
34
Summary of Recommended Maintenance / Repairs
Exterior Costs
64
0
0
0
0
13
0
56
21
0
0
90
Interior Costs
61
1
0
0
0
0
80
0
0
0
0
81
Plumbing Costs
3
3
0
0
0
0
0
0
0
0
0
3
Mechanical Costs
7
7
0
0
0
0
0
0
0
0
0
7
Electrical Costs
28
0
0
0
34
0
0
0
0
0
0
34
TOTAL COST PER YEAR
163
12
0
0
34
13
80
56
21
0
0
216
(In Thousands of Dollars)
$
215,721 Total 10 year Maintenance and Repair Costs
Strang, Inc.
Madison, WI
2012028-001-Maintenance Plan; Library
BUILDING CONDITION REPORT 4.5.3
BUILDING CONDITION CHECKLIST
UW-Richland: Miller Memorial Library
1200 Highway 14 West
Richland Center, WI 53581
Statistics
Number of
Levels
Building Overview
Description
Condition
Recommendations
1 story
Approximate
Gross Area
12,544 gsf
Dates of
Construction,
Additions, or
Remodels
1967
Miller Memorial Library is located on the north central edge of
campus. Primary functions include general purpose library, computer
lab, work room and support spaces.
The building is constructed of brick and masonry exterior walls,
concrete slab-on-grade floor system, steel joist and metal deck
roofing system with copper metal roof and fascia. Doors and
windows are primarily aluminum.
The building is in fair condition and expected to remain serviceable
with regularly scheduled maintenance.
Recommended maintenance/repair work:
x Grade site around building to slope away from foundation
x Trim or remove plantings that are too close to building
x Concrete lifting of sidewalks that have settled
x Tuck pointing of brickwork
x Caulking and gasket repairs at exterior windows and doors
x Replace knob door handles with ADA lever action hardware
x Paint and repair exterior soffits
x Paint and repair panels below exterior windows
x ADA upgrades at restrooms, coat racks, service counter
x Wood cabinetry repairs or replacements
x Asbestos testing/abatement if remodeling occurs
BUILDING CONDITION REPORT 4.5.4
x
x
x
x
x
x
x
Repairs to acoustical panel ceiling systems
Remove materials stored in front of electrical panels
Replace fire alarm system
Air quality testing recommended
HVAC replacements to improve ventilation
Backflow protection upgrades at exterior hose bibs
ADA upgrades for faucets and traps
BUILDING CONDITION REPORT 4.5.5
BUILDING CONDITION CHECKLIST
UW-Richland: Miller Memorial Library– Bldg. 300
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1967
Architectural
Site
Grade / Drainage
Poor, several spots where water drains toward buildings. See
photos A-3 and A-4
Plantings
Too close to building in many areas. See photo A-5
Sidewalks
Many have settled at building. See photos A-6 and A-7
Signage
Good
Retaining Walls
N/A
Stairs / Ramps /
Railings
N/A
Exterior
Exposed Foundation
Wall
Good condition. Some surface spalling due to water ponding at
wall. See photo A-4
Exterior Wall System
Brick is deteriorating in areas at base of wall due to water damage.
See photo A-8
Areawells
N/A
Sill Flashings
Alum. Good condition
Window System
Alum. Sliders, serviceable condition,
Window Flashing /
Lintel Condition
No lintels
BUILDING CONDITION REPORT 4.5.6
Glazing / Gaskets
Some caulking beginning to pull from surfaces
Doors / Frames
Serviceable
Door Hardware
Serviceable
Door Seals /
Threshold
Serviceable
Copper
Fascia
Good condition
Soffits
Poor condition, need patching, paint. See photos A-10 and A-11
Columns / Capitals
N/A
Canopies
N/A
Awnings / Shading
Devices
N/A
Exterior Stairs /
Ramps
None
Exterior Screen Walls
None
Exterior Painting
Poor condition below windows and at soffits. See photo A-4.
Exterior
Miscellaneous
Structure
Foundation Walls
Good condition
BUILDING CONDITION REPORT 4.5.7
Concrete Slab
Good condition
Typical Floor Framing
N/A
Roof Framing
Not observed
Interior Columns /
Bearing Walls
Not observed
Exterior Structural
Steel Members
Not observed
Roof
Roof Copper
Material / System
Visual Evaluation
Good condition
Roof Accessories, appurtenances
Copper Roof Edge
Good condition
Wall flashings
Good condition
Drains
Not observed
Scuppers / Overflows
Gutters / Downspouts
Good condition
Equipment Curbs
Not observed
Equipment Platforms
Not observed
MEP Penetrations /
Condition
Not observed
Ladder / Access
Hatch / Skylights
Not observed
BUILDING CONDITION REPORT 4.5.8
Expansion Control
Not observed
Interior Systems
Doors / Frames
Wood doors in HM frames, original, serviceable
Hardware
Many doors still have knob hardware. See photo A-14
Borrowed Lites /
Frames
Some alum. Borrowed lights, good condition
Perimeter Glazing /
Sealant / Sills
Serviceable
Casework / Shelving
Older and in poor condition. No Ada height service counter. See
photos A-15 and A-16
Interior Metalwork
N/A
Interior Masonry
Exposed brick and CMU in some places, good condition
Toilet Rooms /
Fixtures /
Accessories
Multiple accessibility issues in restrooms, mounting heights, pull
side door clearance, broken ceramic tile at toilet. See photos A-17,
A-18, A-19 and A-20
Wall Mounted
Equipment
Mounting height concerns with coat rack in lobby. Not ADA
compliant. See photo A-21
Appliances
N/A
Elevator / Finishes
N/A
Stairs / Finishes
N/A
Interior Finishes
BUILDING CONDITION REPORT 4.5.9
Drywall cracking in spots. See photo A-22 CMU s in good shape
Wall surfaces
Painting
Serviceable
Transparent / Sealers
Serviceable
Interior Flooring /
Base Material
Chipped Asbestos flooring in lobby. See photo A-23. Carpet is
wrinkling in library. See photo A-24
Ceilings
1x1 acp spline ceiling in lobby, beginning to fail. See photo A-25
2x2 acp in library, beginning to sag. See photo A-26
BUILDING CONDITION REPORT 4.5.10
Architectural Photos
BUILDING CONDITION REPORT 4.5.11
BUILDING CONDITION REPORT 4.5.12
BUILDING CONDITION REPORT 4.5.13
BUILDING CONDITION REPORT 4.5.14
BUILDING CONDITION REPORT 4.5.15
BUILDING CONDITION CHECKLIST
UW-Richland: Miller Memorial Library– Bldg. 300
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1967
Electrical
Electrical Distribution
Location(s)
Installed Date(s)
Voltage/Phase
Ampacity
Physical Capacity
Fed from normal campus-wide 480/277V system and campus wide
standby 480/277V system.
Room 303, 1967
Picture 1: MILLER 102053
480/277 200A (1) 3-pole spare
120/208 100A (3) 3-pole spares. Fed from 480/277 Panel via (3)
single phase transformers.
Ampacity vs. loading was not measured.
Equipment manufactured by Kinney
Violations/ Concerns
Proper panel clearances are not met. Storage of material infringes
on panel clearances
Others
Equipment is aging, but older Kinney equipment is, generally,
regarded as reliable.
Recommendations
The system can remain, as long as it meets the need of the
building. However, if the building is remodeled or significantly
upgraded, all new electrical distribution equipment should be
installed. Rooms with electrical panels should be cleared of all
storage that infringes on panel clearances.
Standby Power Systems
Generator
Fed from campus-wide standby power system
Panel
480/277 30A, no spaces.
Picture 2: MILLER 102053
BUILDING CONDITION REPORT 4.5.16
Fire Alarm
Basic System
Original 1967 Simplex Fire Alarm Panel. Audible-only notification.
No offsite or central communication.
Picture 3: MILLER 102343
Coverage
Audible-notification from a few locations.
Some Heat Detection Observed.
Picture 4: MILLER 102552
ADA Compliance
Recommendations
Not ADA compliant: no visual notification
Pull Stations mounted too high to meet ADA requirements and wire
pulls have been added to provide access.
Picture 5: MILLER 101757
The system should be replaced as soon as possible with a modern
system with ADA compliant notification and a digital communicator
to report system status to a monitoring agency. Automatic early
detection, such as smoke detectors, is recommended for property
protection, since no sprinkler system is installed.
Mass Notification System
Basic System
Served by campus mass notification system
Telephone
Basic System
Served by campus PBX system
Data
Basic System
A small rack, connected to the campus data system, is located in
room 303 to distribute to a small number of hardwired computers
and WiFi access points.
Picture 6: MILLER 102341
Support Methods
Return air plenum?
Unknown
Equipment Condition
Good, but cable management should be added..
BUILDING CONDITION REPORT 4.5.17
Lighting
Overview of Fixtures
Book Stacks: 1x4 Troffers retrofitted to T8 Lamps.
General 4x4 Pendants Retrofitted with T8 Lamps
Picture 7: MILLER 102430
Picture 8: MILLER 102852
Dark Areas
None Observed
LED Exit Lights
Exits signs have been retrofitted with LED lamps.
Egress Lighting
Description &
coverage
Selected corridor fixtures are connected to the standby power
system.
Some unit-battery lights were observed, but were not tested.
Others
Lighting Controls
Dual Lighting Levels
None Noted
Daylight Controls
None Noted
Automatic Shutoff
None Noted
Wiring Devices
GFCI
GFCI devices were not observed in wet locations or locations near
sinks/mop basins.
General Condition
Have been replaced as needed. Most appear to be in adequate
condition.
Other
Significant use of power-poles and surface raceway throughout
space. Most appears to be in good condition.
Picture 9: MILLER 102445
BUILDING CONDITION REPORT 4.5.18
Electrical Photos
Picture 10: MILLER 102053
Picture 11: MILLER 101757
Picture 13: MILLER 102552
Picture 12: MILLER 102343
BUILDING CONDITION REPORT 4.5.19
Picture 14: MILLER 102341
Picture 15: MILLER 102430
Picture 16: MILLER 102445
Picture 17: MILLER 102852
BUILDING CONDITION REPORT 4.5.20
BUILDING CONDITION CHECKLIST
UW-Richland: Miller Memorial Library– Bldg. 300
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1967
Heating, Ventilation and Air Conditioning
HVAC Building Services
Primary Heating
Building is served by 6 residential style gas fired furnaces in good
condition. 2 Furnaces in the penthouse on the west side of the
building, with 4 in the penthouse on the east. Pairs of furnaces are
served by a single makeup air/economizer type blower fans that are
in poor condition and are unlikely to be code compliant.
Boiler Controls
NA
Boiler feed system
NA
Heating Distribution
Ducted system is in serviceable condition.
Pipe Insulation
Refrigerant piping is in poor to serviceable condition.
Comments
Recommendations
Humidity issues throughout building. No confidence in economizer
function for the furnace systems. Ventilation and air quality is
questionable throughout building. There is no relief capability for the
building. Built up over time controls are a mess.
Air quality testing ASAP to determine if mold growth in underfloor
return system. If mold or contaminants are present, provide HEPA
filters at furnace returns until system can be replaced. Replace
furnaces with VAV type system with modulating cooling for better
humidity control and provide a new return air pathway. Provide new
system with real ventilation, economizer and relief capability.
Consider upgrading to a VAV system with room control and
monitoring to correct humidity, heating, and cooling issues.
HVAC Controls
Basic system
All electric controls with a Honeywell building controller with
patchwork built-up-over-time zone and relay control systems within
the zone and in the mechanical penthouse.
BUILDING CONDITION REPORT 4.5.21
Thermostats and
control valves
Honeywell for the zone controllers and sensors. A mix match of
relays up in the mechanical penthouse for control of the furnaces,
“economizer fan”, and cooling control.
Comments
The controls in the penthouses are a nightmare with the endless
patchwork assembly of relays.
Recommendations
The built-up-over-time and patchwork assembly of residential and
commercial grade systems is a mess. Building should be scheduled
for major HVAC upgrade and have the controls standardized at that
time.
Ventilation
Toilet exhaust
Individual fans per bathroom with wall outlet vents.
Janitors closets
No exhaust in janitors closets.
Apartment bathroom
NA
Trash and recycling
storage rooms
NA
Kitchen Hood
NA
Classroom Air
Handling Unit
The zoned off classroom is very stagnant. Unsure if properly zoned
or ventilated. Appears as if the remodel was done with little to no
thought put into the mechanical impact.
Sanctuary & Dining
Room Air Handling
Unit
NA
Recommendations
Replace the furnace system with something that can actually
provide ventilation.
BUILDING CONDITION REPORT 4.5.22
Air Conditioning
Cooling
Of the two furnaces on the west side serving the office space, only
1 has a DX cooling coil with remote condenser that is in good
condition. For the 4 furnaces serving the library and classroom
area, they shared 2 remote condensing units in poor condition.
Special Equipment
Dehumidifiers
There were no dedicated dehumidifiers, but there was a CARNES
humidifier connected to two of the 4 library furnaces.
BUILDING CONDITION REPORT 4.5.23
HVAC Photos
Building Signage
Door Transfer
Floor Return
Low Wall Return
New Classroom
Diffuser Layout
BUILDING CONDITION REPORT 4.5.24
Wall T-STAT
Humidifier
Penthouse Access
Control Panel
Mix Match Controls
Library Furnaces for Library
BUILDING CONDITION REPORT 4.5.25
Library Furnaces for Offices
Retrofitted Roof Curb
Remote Condenser
Remote Condensers
Furnace Vents at Penthouse
BUILDING CONDITION REPORT 4.5.26
BUILDING CONDITION CHECKLIST
UW-Richland: Miller Memorial Library Bldg. 300
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1967
Plumbing
Plumbing Building Services
Water
City Meter water.
Sewer
City Sewer
Storm
Drainage to grade via gooseneck.
Natural Gas
Available
Others
Fire Protection
Basic system
None
Classification
N/A
Fire Pump
N/A
Comments
BUILDING CONDITION REPORT 4.5.27
Plumbing Water Protection, Conditioning & Heating
Water Softener
None
Water Heating
Electric water heater in good condition
Back Flow Protection
Not up to current code at any of the exterior hose Bibb and mop
basins. Any fixture with threaded fittings shall have minimum in line
vacuum breaker (ASSE 1011)
Water Polishing
N/A
Others
Plumbing Fixtures
Water Closets
Water Closets are wall mount flush valve, water closets in good
condition, flush valve are in working order but are showing age.
Recommendation to replace with water conserving flush valves in
next 10 yrs. ADA? (Photo-P-1)
Urinals
Floor mount with auto. Condition of units is are in good condition
(Photo P-2)
Lavatories
Lavatories are in good condition, Faucets are in fair condition.
Faucets and traps are not to current ADA requirement. Traps shall
be wrapped or offset and faucets handles are not ADA. (Photo- P3)
Mop Service Basins
Good condition, backflow protection is an issue with hose
attachments
Water Coolers
Good condition, but are not
Sinks & fittings
Need ADA compliance on traps, and faucet handles
BUILDING CONDITION REPORT 4.5.28
Floor Drains
Good condition
Roof Drains
Unverified condition
Others
Plumbing Special Equipment
Garage catch basin
None
Sump pumps & lift
stations
Not in Use.
Others
Plumbing Piping
Water Systems
Copper and galvanized supplies. In good to fair condition on
exterior unknown condition interior.
Sanitary, & Storm
Piping
Sanitary is cast iron, good condition above slab, unknown condition
of piping below slab.
Storm is cast iron good condition above slab , unknown condition of
piping below slab.
Pipe Insulation
Yes- fair to good condition
Others
BUILDING CONDITION REPORT 4.5.29
Plumbing Photos
Photo P-1
Photo P-3
Photo P-2
University of Wisconsin - Richland Center
Infrastructure Study
BUILDING CONDITION REPORT 4.6.1
Recommended Maintenance / Repairs
Melvill Hall
1.05
6
1
Total
1
2023
6
29
2022
13
56
2021
1
2020
13
2019
1
2018
10
2017
1
2016
25
Caulking and gasket repairs at
3
exterior windows and doors
Building - Exterior
Cleaning and Tuck pointing of
brickwork where damaged
2015
1
1
Description of Work
2014
40
ADA upgrades at exterior stairs
2
and ramps
Item
Quanity
Annual Inflation Rate :
Present Costper
item in Thousands
($)
Projected Cost - Thousands /
56
1
29
4
Replace knob door handles with
ADA lever action hardware
5
1
5
Paint and repair exterior soffits
8
1
12
1
12
6
Paint and repair panels below
exterior windows
6
1
9
1
9
7 Other?
0
0
8 Other?
0
0
9 Other?
0
0
Sub-Total Costs
10
Building - Interior
ADA upgrades at restrooms and
electric water coolers
94
0
0
29
0
19
0
56
21
0
0
125
5
1
6
1
6
Widen interior doors at existing
11
building for ADA accessibility
80
1
93
1
93
12 Asbestos testing/abatement
20
1
23
1
23
1
0
1
0
0
1
0
13
Repairs to acoustical panel ceiling
systems
0
14
Remove materials stored in front of
electrical panels
0
15 Other?
0
0
16 Other?
0
0
17 Other?
0
0
Sub-Total Costs
18
Plumbing
Backflow protection upgrades at
exterior hose bibs
105
0
0
122
0
0
0
0
0
0
0
122
1
1
1
1
1
19 ADA upgrades for faucets & traps
3
1
3
1
3
20 Other?
0
0
21 Other?
0
0
22 Other?
0
0
Sub-Total Costs
4
4
0
0
Remarks
0
0
0
0
0
0
0
4
Strang, Inc.
Madison, WI
2012028-001-Maintenance Plan; Melvill
University of Wisconsin - Richland Center
Infrastructure Study
BUILDING CONDITION REPORT 4.6.2
1.05
Total
2023
2022
2021
2020
2019
2018
Annual Inflation Rate :
2017
2016
2015
Description of Work
2014
Present Cost in
Thousands ($)
Item
Projected Cost - Thousands /
26 Other?
0
0
27 Other?
0
0
Sub-Total Costs
Electrical
Add digital communicator and ADA
notification to fire alarm
7
7
0
0
0
0
0
0
0
0
0
7
17
18
1
18
Provide egress lighting in west
29
wing
5
5
1
5
30 Add Emergency Lighting Inverter
3
3
1
3
Create Campus-Wide Fire Alarm
31 Network (in lieu of individual digital
communicators)
20
30 Other?
0
0
31 Other?
0
0
32 Other?
0
0
28
Sub-Total Costs
45
22
26
22
1
Remarks
22
0
0
0
0
0
0
0
0
48
Summary of Recommended Maintenance / Repairs
Exterior Costs
94
0
0
0
0
120
0
0
0
0
0
120
Interior Costs
105
0
0
0
0
134
0
0
0
0
0
134
Plumbing Costs
4
4
0
0
0
0
0
0
0
0
0
4
Mechanical Costs
7
7
0
0
0
0
0
0
0
0
0
7
Electrical Costs
45
26
22
0
0
0
0
0
0
0
0
48
TOTAL COST PER YEAR
255
38
22
0
0
254
0
0
0
0
0
314
(In Thousands of Dollars)
$
313,830 Total 10 year Maintenance and Repair Costs
Strang, Inc.
Madison, WI
2012028-001-Maintenance Plan; Melvill
BUILDING CONDITION REPORT 4.6.3
BUILDING CONDITION CHECKLIST
UW-Richland: Melvill Hall
1200 Highway 14 West
Richland Center, WI 53581
Statistics
Building Overview
Description
Condition
Recommendations
Number of
Levels
1 floor
Approximate
Gross Area
18,070
Dates of
Construction,
Additions, or
Remodels
1967 original building
with an addition in 1997
Melvill Hall is located on the south west portion of campus. Primary
functions include administrative offices, conference center, student
services and support spaces.
The building is constructed of brick and masonry exterior walls,
concrete slab-on-grade floor system, steel joist and metal deck
roofing system with copper metal roof and fascia. Doors and
windows are primarily aluminum.
The building is in good condition and expected to remain serviceable
with regularly scheduled maintenance.
Recommended priority work:
x Grade site around building to slope away from foundation
x Trim or remove plantings that are too close to building
x Cleaning and Tuck pointing of brickwork where damaged
x Caulking and gasket repairs at exterior windows and doors
x Replace knob door handles with ADA lever action hardware
x Paint exterior soffits
x Paint panels below exterior windows
x ADA upgrades at restrooms and electric water coolers
x Widen interior doors at existing building for ADA accessibility
x Asbestos testing/abatement if remodeling occurs
x Repairs to acoustical panel ceiling systems
BUILDING CONDITION REPORT 4.6.4
x
x
x
x
x
x
x
Remove materials stored in front of electrical panels
Add digital communicator and ADA notification to fire alarm
Provide egress lighting in west wing
Air quality testing recommended
HVAC replacements to improve ventilation
Backflow protection upgrades at exterior hose bibs
ADA upgrades for faucets and traps
BUILDING CONDITION REPORT 4.6.5
BUILDING CONDITION CHECKLIST
UW-Richland: Melvill Hall – Bldg. 400
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1967 / Addition in 1998
Architectural
Site
Grade / Drainage
Plantings
Relatively flat
Some are too close to building. See photo A-3
Site Drains
None
Sidewalks
Good condition
Curb Cuts
Good condition
Signage
Recently redone
Retaining Walls
None
Stairs / Ramps /
Railings
Ramps to many entries
Exterior
Exposed Foundation
Wall
Exterior Wall System
Sill Flashings
Window System
Some delamination of water proofing coating. See photo A-5
Brick is in good condition although stained at base due to water
damage. See photo A-4
Alum. Flashings, good condition, needs to be re caulked. See
photo A-6
Original alum windows, double sliders, each single glazed
BUILDING CONDITION REPORT 4.6.6
Window Flashing /
Lintel Condition
Lintels covered by caulk. Not observed
Glazing / Gaskets
Most caulking beginning to pull away from surfaces. See
photo A-6
Doors / Frames
Aluminum doors and frames, serviceable condition. Original
Door Hardware
Some surface rusting of components. See photo A-7
Door Seals /
Threshold
Weather stripping repairs needed. See photos A-4 and A-8
Fascia
Copper fascia, good condition
Soffits
EIFS soffits, good condition, some touch up painting required
Columns / Capitals
Brick columns, good condition but some staining of brickwork.
See photo A-9
Canopies
Good condition
Awnings / Shading
Devices
N/a
Exterior Stairs /
Ramps
Conc., good condition
Exterior Screen Walls
N/A
Exterior Painting
Touch up painting needed at EIFS. See photo A-10
Patio / Terrace
N/A
Structure
Foundation Walls
Good condition
BUILDING CONDITION REPORT 4.6.7
Concrete Slab
Good condition
Typical Floor Framing
N/A
Roof Framing
Not observed
Interior Columns /
Bearing Walls
Not observed
Exterior Structural
Steel Members
Not observed
Roof
Roof Copper
Material / System
Visual Evaluation
Good condition
Roof Accessories, appurtenances
Copper Roof Edge
Good condition
Wall flashings
Good condition
Drains
Not observed
Scuppers / Overflows
Gutters / Downspouts
Minimal gutters, good condition
Equipment Curbs
Not observed
Equipment Platforms
Not observed
MEP Penetrations /
Condition
Not observed
Ladder / Access
Hatch / Skylights
Not observed
BUILDING CONDITION REPORT 4.6.8
Expansion Control
Not observed
Interior Systems
Doors / Frames
Most doors are solid core wood, original but serviceable condition.
In original side, HM door frames are only 31 1/2" clear. Hardware in
original building is mostly knob type. Most HM frames in
serviceable condition. See photos A-11 and A-12
Hardware
See above
Borrowed Lites /
Frames
Transoms above most doors. Some filled with plywood, other with
Translucent glass. Serviceable condition
Perimeter Glazing /
Sealant / Sills
Good condition
Casework / Shelving
Limited amount but good condition
Interior Metalwork
N/A
Interior Masonry
Good condition
Toilet Rooms /
Fixtures /
Accessories
Mounting heights ok, missing vertical grab bar. Missing insulation
on pipes below sink. See photos A-13 and A-14
Wall Mounted
Equipment
No concerns noted
Appliances
N/A
Elevator / Finishes
N/A
Stairs / Finishes
N/A
BUILDING CONDITION REPORT 4.6.9
Interior Finishes
Painted drywall, good condition
Wall surfaces
Painting
Transparent / Sealers
Interior Flooring /
Base Material
Ceilings
Interior Finish
Miscellaneous
Serviceable
Serviceable
CT in restrooms and vestibules, good condition
VCT in remodel areas, good condition but some areas of creaking
and deformation. See photo A-15
2x2 lay-in at original, 1x1 ACP spline system at addition with some
dropped tiles. See photo A-16
BUILDING CONDITION REPORT 4.6.10
Architectural Photos
BUILDING CONDITION REPORT 4.6.11
BUILDING CONDITION REPORT 4.6.12
BUILDING CONDITION CHECKLIST
UW-Richland: Melvill Hall – Bldg. 400
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1967 / Addition in 1998
Electrical
Electrical Distribution
Location(s)
Installed Date(s)
Voltage/Phase
Ampacity
Physical Capacity
Fed from normal campus-wide 480/277V system and campus wide
standby 480/277V system.
East Wing: Room 431, 1967
ELEC PHOTO 1: MELVILL 092946
West Wing: Maintenance 458, 1998
ELEC PHOTO 2: MELVILL 094348
East Wing: 480/277 200A some available space
East Wing 120/208 100A No available space, fed from 480/277V
panel via (3) single phase transformers.
Ampacity vs. loading was not measured.
Equipment manufactured by Kinney
West Wing: A 3-phase transformer feeds a 100A, 120/208 panel.
No available breaker space. Equipment manufactured by Siemens.
Violations/ Concerns
Proper panel clearances are not met. Storage of material infringes
on panel clearances
Others
Equipment is aging, but older Kinney equipment is, generally,
regarded as reliable. Siemens equipment is in good condition.
Recommendations
The system can remain, as long as it meets the need of the
building. However, if the building is remodeled or significantly
upgraded, all new electrical distribution equipment should be
installed. Rooms with electrical panels should be cleared of all
storage that infringes on panel clearances.
Standby Power Systems
Generator
Fed from campus-wide standby power system
Panel
480/277 50A, 1 space for additional breaker.
BUILDING CONDITION REPORT 4.6.13
Fire Alarm
Simplex 4005 Fire Alarm Panel installed in 1998.
ELEC PHOTO 3: MELVILL 094341
Basic System
The original fire alarm panel has been abandoned in place.
ELEC PHOTO 4: MELVILL 093039
No offsite or central communications
The Simplex 4005 panel was disabled at the time of the visit due to
a battery charging error.
Coverage
Smoke Detection is located throughout the corridors.
Horn-Strobe coverage is located throughout corridors.
ELEC PHOTO 5: MELVILL 140229
ADA Compliance
Notification coverage in corridors appears to be adequate but
common spaces, such as classrooms, shared offices, conference
rooms do not have ADA-required coverage.
Recommendations
Add a digital communicator to existing fire alarm to report system
status to a monitoring agency. Add ADA notification to all common
areas.
Mass Notification System
Basic System
Served by campus mass notification system
Telephone
Basic System
Served by campus PBX system
Data
Basic System
A rack, connected to the campus data syste is located in 451. A
floor mounted rack houses network equipment serving this building.
ELEC PHOTO 6: MELVILL 092116
The campus network headend is located in 434. See Campus
Wide Systems for more information.
Support Methods
Return air plenum?
Unknown
BUILDING CONDITION REPORT 4.6.14
Equipment Condition
Good, but cable management should be added.
Lighting
Overview of Fixtures
General: 1x4 Troffers retrofitted to T8 Lamps.
Some downlighting with retrofit CFL lighting
ELEC PHOTO 7: MELVILL 140232
ELEC PHOTO 8: MELVILL 135927
Dark Areas
None Observed
LED Exit Lights
Exits signs have been retrofitted with LED lamps
Egress Lighting
Description &
coverage
Selected fixtures in East Wing are connected to standby power.
No egress lighting provided in West Wing.
Others
Lighting Controls
Dual Lighting Levels
None Noted
Daylight Controls
None Noted
Automatic Shutoff
None Noted
Wiring Devices
GFCI
GFCI devices were not observed in wet locations or locations near
sinks/mop basins.
General Condition
Have been replaced as needed. Most appear to be in adequate
condition.
BUILDING CONDITION REPORT 4.6.15
Electrical Photos
ELEC PHOTO 9: MELVILL 092946
ELEC PHOTO 10: MELVILL 094348
ELEC PHOTO 11: MELVILL 093039
ELEC PHOTO 12: MELVILL 094341
BUILDING CONDITION REPORT 4.6.16
ELEC PHOTO 13: MELVILL 140229
ELEC PHOTO 14: MELVILL 092116
ELEC PHOTO 16: MELVILL 140232
ELEC PHOTO 15: MELVILL 135927
BUILDING CONDITION REPORT 4.6.17
BUILDING CONDITION CHECKLIST
UW-Richland: Melvill Hall – Bldg. 400
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1967 / Addition in 1998
Heating, Ventilation and Air Conditioning
HVAC Building Services
Primary Heating
East half of building is 6 residential style gas fired furnaces in good
condition. The outside air and economizer fan function for the east
furnace system is unlikely to be code compliant. West half is gas
fired packaged RTU’s with packaged controls.
Boiler Controls
NA
Boiler feed system
NA
Heating Distribution
Ducted system in serviceable condition for both furnace and RTU
systems. The RTU systems are ceiling supplied and returned, but
are not well zoned however and have led to significant heating and
cooling issues on the west side of the building.
Pipe Insulation
Refrigerant piping is in poor to serviceable condition.
Comments
Recommendations
Humidity issues throughout building. No confidence in economizer
function for the furnace systems. Ventilation and air quality is
questionable throughout building. There is no relief capability for the
furnace side system. Built up over time controls are a mess.
Air quality testing ASAP to determine if mold growth in underfloor
return system for east side furnace system. If mold or contaminants
are present, provide HEPA filters at furnace returns until system
can be replaced. Replace furnaces with VAV type system with
modulating cooling for better humidity control and provide a new
return air pathway. Provide new east system with real ventilation,
economizer and relief capability. For the West RTU’s, rework duct
layout to better handle zone. Consider upgrading to a VAV system
with room control and monitoring to correct humidity, heating, and
cooling issues.
HVAC Controls
Basic system
All electric controls with a Honeywell building controller with
patchwork built-up-over-time zone and relay control systems in the
mechanical penthouse. The West side RTU’s are on single zone
BUILDING CONDITION REPORT 4.6.18
standalone controllers.
Thermostats and
control valves
Honeywell for the zone controllers and sensors. A mix match of
relays up in the mechanical penthouse for control of the furnaces,
“economizer fan”, and cooling control.
Comments
The east furnace system is a control nightmare with the endless
patchwork assembly of relays. The zone controllers for the west
RTU’s are incapable of keeping zone comfort and humidity with
how ductwork distribution was done.
Recommendations
The built-up-over-time and patchwork assembly of residential and
commercial grade systems is a mess. Building should be scheduled
for major HVAC upgrade and have the controls standardized at that
time. Controls alone can’t fix west RTU issues, this needs to be
rezoned or provided with individual room controls and sensors.
Ventilation
Toilet exhaust
Individual fans per bathroom with wall outlet vents.
Janitors closets
Only the western janitor’s closet has a wall switch exhaust fan. The
east half of the building has non-vented janitor’s closets.
Apartment bathroom
NA
Trash and recycling
storage rooms
NA
Kitchen Hood
NA
Classroom Air
Handling Unit
The main classroom has a dedicated relief fan that did not appear
to be interconnected to the RTU’s serving the space. This relief fan
also exhausts right into the RTU outside air intake which is not code
compliant.
Sanctuary & Dining
Room Air Handling
Unit
NA
BUILDING CONDITION REPORT 4.6.19
Recommendations
Replace the furnace system with something that can actually
provide ventilation. Rework or replace the west RTU’s and include
actual relief into the system operation and control sequences. The
operable windows also create infiltration issues and should be
replaced to types that cannot be opened.
Air Conditioning
Cooling
The 6 east furnace units utilize 2 remote DX condensing units that
are in poor condition. The refrigerant is split between 3 furnaces per
remote condenser. The west RTU’s utilize packaged DX cooling
and are in serviceable to good condition.
Special Equipment
Dehumidifiers
There are no dedicated humidifiers or dehumidifiers in this building.
There are significant humidity issues due to the equipment and
installation methods utilized.
BUILDING CONDITION REPORT 4.6.20
HVAC Photos
Building Signage
Door Transfer
Floor Return 1
Floor Return 2
Floor Return Outlet
Low Wall Return
BUILDING CONDITION REPORT 4.6.21
Humidity Issues
After Hour Override
Zone Controller
Building Controller
Diffuser Type Layout
Retrofit Controls
BUILDING CONDITION REPORT 4.6.22
Relay Box
Penthouse Access
Make Up Air Fan
Duct Furnaces
Spliced Refrigerant Piping
Roof Gas Piping
BUILDING CONDITION REPORT 4.6.23
Remote Condensers
West RTU 2 and Relief
West RTU 1
BUILDING CONDITION REPORT 4.6.24
BUILDING CONDITION CHECKLIST
UW-Richland: Melvill Hall Bldg. 400
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1967 / Addition in 1998
Plumbing
Plumbing Building Services
Water
City Metered water.
Sewer
City Sewer.
Storm
Drainage to grade via gooseneck.
Natural Gas
Available
Others
Fire Protection
Basic system
None
Classification
N/A
Fire Pump
N/A
Comments
BUILDING CONDITION REPORT 4.6.25
Plumbing Water Protection, Conditioning & Heating
Water Softener
None
Water Heating
Multiple tank type Electric units. Units are in Fair to Good condition.
Back Flow Protection
Not up to current code at any of the exterior hose Bibb and mop
basins. Any fixture with threaded fittings shall have minimum in line
vacuum breaker (ASSE 1011)
Water Polishing
N/A
Others
Plumbing Fixtures
Water Closets
Water Closets are wall mount flush valve, water closets in good
condition.
Urinals
Wall mount with sensor. Condition of units is good condition
Lavatories
Lavatories are in good condition, Faucets are in fair condition.
Faucets and traps are not to current ADA requirement. Traps shall
be wrapped or offset and faucets handles are not ADA (Photo P-1)
Mop Service Basins
Good condition, backflow protection is an issue with hose
attachments.
Water Coolers
Single wall hung unit, is in good condition, but are not ADA
(Photo P-2)
Sinks & fittings
Need ADA compliance on traps, and faucet handles
BUILDING CONDITION REPORT 4.6.26
Floor Drains
Are in good condition.
Roof Drains
Yes-Condition not verified.
Others
Plumbing Special Equipment
Water Conditioners /
Polishing
N/A
Sump pumps & lift
stations
Abandoned
Others
Plumbing Piping
Water Systems
Copper and galvanized supplies. In good to fair condition on
exterior unknown condition interior.
Sanitary, & Storm
Piping
Sanitary is cast iron, good condition above slab, unknown condition
of piping below slab.
Storm is cast iron good condition above slab, unknown condition of
piping below slab.
Lab/Med Gases
None
Pipe Insulation
Yes-fair to good condition
Others
BUILDING CONDITION REPORT 4.6.27
Plumbing Photos
P
Photo P-1
Photo P-2
University of Wisconsin - Richland Center
Infrastructure Study
BUILDING CONDITION REPORT 4.7.1
Recommended Maintenance / Repairs
Student Center
1.05
1
12
5
Paint and repair panels below
exterior windows
6
1
9
1
9
1
Total
12
2023
1
33
2022
8
56
2021
Paint and repair exterior soffits
2020
4
2019
1
2018
10
2017
1
2016
30
Caulking and gasket repairs at
3
exterior windows and doors
Building - Exterior
Cleaning and Tuck pointing of
brickwork where damaged
2015
1
1
Description of Work
2014
40
ADA upgrades at exterior stairs
2
and ramps
Item
Quanity
Annual Inflation Rate :
Present Cost per
item in Thousands
($)
Projected Cost - Thousands /
56
1
33
13
1
13
6 Other?
0
0
7 Other?
0
0
8 Other?
0
0
Sub-Total Costs
9
Building - Interior
ADA upgrades at restrooms and
electric water coolers
94
0
33
0
0
13
0
56
21
0
0
123
5
1
6
1
6
10 Asbestos testing/abatement
20
1
22
1
22
Repairs to acoustical panel ceiling
11
systems
10
1
11
1
11
6
1
6
12
Replace knob door handles with
ADA lever action hardware
5
1
12
Remove materials stored in front of
electrical panels
1
1
1
1
1
13 Other?
0
0
14 Other?
0
0
15 Other?
0
0
Sub-Total Costs
16
Plumbing
ADA upgrades for faucets, traps
and electric water cooler
41
1
44
0
0
0
0
0
0
0
0
45
7
1
7
1
7
17 Grease interceptor upgrade
15
1
16
1
16
18 Other?
0
0
19 Other?
0
0
20 Other?
0
0
Sub-Total Costs
22
23
Remarks
0
0
0
0
0
0
0
0
0
23
Mechanical
21 Other?
0
0
22 Other?
0
0
23 Other?
0
0
24 Other?
0
0
Sub-Total Costs
0
0
0
0
0
0
0
0
0
0
0
0
Strang, Inc.
Madison, WI
2012028-001-Maintenance Plan; Student
University of Wisconsin - Richland Center
Infrastructure Study
BUILDING CONDITION REPORT 4.7.2
1.05
4
0
28 Other?
0
0
Total
1
2023
4
2022
1
0
2021
3
27 Other?
2020
26 Add Emergency Lighting Inverter
2019
55
2018
1
2017
55
2016
1
2015
45
Description of Work
2014
25 Replace fire alarm
Item
Quanity
Annual Inflation Rate :
Present Cost per
item in Thousands
($)
Projected Cost - Thousands /
Remarks
Electrical
29 Other?
Sub-Total Costs
0
48
0
0
0
0
58
0
0
0
0
0
0
58
Summary of Recommended Maintenance / Repairs
Exterior Costs
94
0
33
0
0
13
0
56
21
0
0
123
Interior Costs
41
1
44
0
0
0
0
0
0
0
0
45
Plumbing Costs
22
23
0
0
0
0
0
0
0
0
0
23
Mechanical Costs
0
0
0
0
0
0
0
0
0
0
0
0
Electrical Costs
48
0
0
0
58
0
0
0
0
0
0
58
TOTAL COST PER YEAR
205
24
77
0
58
13
0
56
21
0
0
249
(In Thousands of Dollars)
$
249,401 Total 10 year Maintenance and Repair Costs
Strang, Inc.
Madison, WI
2012028-001-Maintenance Plan; Student
BUILDING CONDITION REPORT 4.7.3
BUILDING CONDITION CHECKLIST
UW-Richland: Wallace Student Center
1200 Highway 14 West
Richland Center, WI 53581
Statistics
Number of
Levels
Building Overview
Description
Condition
Recommendations
1 floor
Approximate
Gross Area
19,409 gsf
Dates of
Construction,
Additions, or
Remodels
1967
The Wallace Student Center is located on the south east portion of
campus. Primary functions include food service, performing arts and
support spaces.
The building is constructed of brick and masonry exterior walls,
concrete slab-on-grade floor system, steel joist and metal deck
roofing system with copper metal roof and fascia. Doors and
windows are primarily aluminum.
The building is in good condition and expected to remain serviceable
with regularly scheduled maintenance.
Recommended priority work:
x Grade site around building to slope away from foundation
x Trim or remove plantings that are too close to building
x Cleaning and Tuck pointing of brickwork at building and site
x ADA upgrades at exterior stairs and ramps
x Caulking and gasket repairs at exterior windows and doors
x Replace knob door handles with ADA lever action hardware
x Paint/repair exterior soffits
x Paint/repair panels below exterior windows
x ADA upgrades at restrooms and electric water coolers
x Asbestos testing/abatement if remodeling occurs
x Repairs to acoustical panel ceiling systems
BUILDING CONDITION REPORT 4.7.4
x
x
x
x
x
x
Remove materials stored in front of electrical panels
Replace fire alarm
HVAC control systems upgrades
Backflow protection upgrades at exterior hose bibs
ADA upgrades for faucets, traps and electric water cooler
Grease interceptor upgrade
BUILDING CONDITION REPORT 4.7.5
BUILDING CONDITION CHECKLIST
UW-Richland: Wallace Student Center – Bldg. 500
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1967
Architectural
Site
Grade / Drainage
Poor, standing water in many places. See photos A-3 and A-4
Plantings
Too close to building. See photos A-5 and A-6
Sidewalks
Many slope toward building due to settlement. See photos A-7 and
A-8
Signage
Excellent
Retaining Walls
Need to be tuck pointed or replaced. See photos A-9, A-10 and A11
Stairs / Ramps /
Railings
Railings and rise/run appear to be non-compliant. See photos A-6
and A-12
Exterior
Exposed Foundation
Wall
Good but stained where water has settled against wall.
Brick in good condition except at base. See photo A-13
Exterior Wall System
Areawells
N/A
Sill Flashings
Serviceable condition
Window System
Alum sliders, serviceable condition
Window Flashing /
Lintel Condition
Serviceable condition
BUILDING CONDITION REPORT 4.7.6
Glazing / Gaskets
re caulking needed
Doors / Frames
Alum., Serviceable condition
Door Hardware
Serviceable condition
Door Seals /
Threshold
Poor condition, several missing, some removed to obtain better
slope of concrete. See photos A-15 and A-16
Copper
Fascia
Good condition
Soffits
Serviceable, need paint. See photo A-17
Columns / Capitals
N/A
Canopies
N/A
Awnings / Shading
Devices
N/A
Exterior Stairs /
Ramps
Ramp by flag pole appears to have too steep of slope
Exterior Screen Walls
Brickwork needs cleaning and tuck pointing
Exterior Painting
Several soffits need cleaning and painting as well as panels above
and below windows. See photos A-18 and A-19
Patio / Terrace
Serviceable Condition
Structure
Foundation Walls
Good condition
Concrete Slab
Good condition
BUILDING CONDITION REPORT 4.7.7
Typical Floor Framing
Not observed
Roof Framing
Not observed
Interior Columns /
Bearing Walls
Not observed
Exterior Structural
Steel Members
Not observed
Roof
Roof Copper
Material / System
Visual Evaluation
Good condition
Roof Accessories, appurtenances
Copper Roof Edge
Good condition
Wall flashings
Good condition
Drains
Not observed
Scuppers / Overflows
Gutters / Downspouts
Good condition
Equipment Curbs
Not observed
Equipment Platforms
Not observed
MEP Penetrations /
Condition
Not observed
Ladder / Access
Hatch
Good condition
Expansion Control
Not observed
Interior Systems
BUILDING CONDITION REPORT 4.7.8
Doors / Frames
Hardware
Solid core wood doors in hollow metal frames, original in poor
condition but serviceable.
Mostly knob type hardware throughout. See photo A-21
Borrowed Lites /
Frames
Transoms and sidelights, good condition
Perimeter Glazing /
Sealant / Sills
Serviceable condition
Casework / Shelving
Older wood cabinetry in
Serviceable condition
Interior Metalwork
N/A
Interior Masonry
Good condition
Toilet Rooms /
Fixtures /
Accessories
Multiple ADA issues including mounting heights, pull side
clearances, toilet stall size, etc. See photos A-22, A-23 and A-24
Wall Mounted
Equipment
No issues noted
Appliances
N/A
Elevator / Finishes
N/A
Stairs / Finishes
N/A
Interior Finishes
Wall surfaces
Painting
VWC is beginning to fail at some seams. See photo A-25
Good in most areas. See photo A-26 for water damage at entry.
BUILDING CONDITION REPORT 4.7.9
Transparent / Sealers
Serviceable condition
Primarily VCT in good condition
Interior Flooring /
Base Material
Ceilings
ACP lay-in ceilings in serviceable condition, some water stains and
tile damage. See photo A-27
BUILDING CONDITION REPORT 4.7.10
Architectural Photos
BUILDING CONDITION REPORT 4.7.11
BUILDING CONDITION REPORT 4.7.12
BUILDING CONDITION REPORT 4.7.13
BUILDING CONDITION REPORT 4.7.14
BUILDING CONDITION REPORT 4.7.15
BUILDING CONDITION CHECKLIST
UW-Richland: Wallace Student Center – Bldg. 500
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1967
Electrical
Electrical Distribution
Location(s)
Installed Date(s)
Fed from campus-wide 480/277V system that originates in Science
Building and campus wide standby 480/277V system.
Room 519, 1967, re-fed in 2000
An abandoned feed from the original campus system remains, and
can be connected, manually, if needed.
480/277 400A (2) 3-pole spares
120/208 225A (2) 3-pole spares. Fed via (3) 25kva single phase
transformers. Transformers also feed theatrical dimmer panel.
Voltage/Phase
Ampacity
Physical Capacity
Ampacity vs. loading was not measured.
Equipment manufactured by Kinney
ELEC PHOTO 1: WALLACE 113753
Kitchen: 277/480 225A, no spare
Kitchen: 120/208, 200A, no spare. Fed via (3) 5kva single phase
transformers
ELEC PHOTO 2: WALLACE 115545
Violations/ Concerns
Proper panel clearances are not met. Storage of material infringes
on panel clearances
Others
Equipment is aging, but older Kinney equipment is, generally,
regarded as reliable.
Recommendations
The system can remain, as long as it meets the need of the
building. However, if the building is remodeled or significantly
upgraded, all new electrical distribution equipment should be
installed. Rooms with electrical panels should be cleared of all
storage that infringes on panel clearances.
Standby Power Systems
Generator
Fed from campus-wide standby power system
BUILDING CONDITION REPORT 4.7.16
Panel
480/277 30A, 1-2 spaces for additional breakers.
Fire Alarm
Basic System
Original 1967 Simplex Fire Alarm Panel. Audible-only notification.
No offsite or central communication.
Coverage
Audible-notification from a few locations.
ADA Compliance
Not ADA compliant: no visual notification
Pull Stations mounted too high to meet ADA requirements and wire
pulls have been added to provide access.
Recommendations
The system should be replaced as soon as possible with a modern
system with ADA compliant notification and a digital communicator
to report system status to a monitoring agency. Automatic early
detection, such as smoke detectors, is recommended, since no
sprinkler system is installed.
Mass Notification System
Basic System
Served by campus mass notification system
Telephone
Basic System
Served by campus PBX system
Data
Basic System
A small rack, connected to the campus data system, is located in
room 519 to distribute to a small number of hardwired computers
and WiFi access points.
ELEC PHOTO 3: WALLACE 114345
Support Methods
Return air plenum?
Unknown
BUILDING CONDITION REPORT 4.7.17
Equipment Condition
Good, but cable management should be added
Lighting
Overview of Fixtures
Corridors: 1x4 Troffers Retrofitted with T8 Lamps
Dining: 4x4 Troffers Retrofitted with T8 Lamps
Corridors: 1x4 Troffers retrofitted to T8 Lamps.
Auditorium: 4x4 Troffers Retrofitted with T8 Lamps and
Incandescent Downlights
Theatrical Lighting Mostly tungsten ellipsoidals and incandescent
floodlighting, with some intelligent lighting
ELEC PHOTO 4: WALLACE 134813
ELEC PHOTO 5: WALLACE 134900
ELEC PHOTO 6: WALLACE 134950
ELEC PHOTO 7: WALLACE 114725
Dark Areas
None Observed
LED Exit Lights
Exits signs have been retrofitted with LED lamps.
Egress Lighting
Description &
coverage
Selected corridor fixtures are connected to the standby power
system.
Others
Lighting Controls
Dual Lighting Levels
None Noted
Daylight Controls
None Noted
Automatic Shutoff
None Noted
BUILDING CONDITION REPORT 4.7.18
Theatrical Lighting
ETC I86 dimmer rack, 66 circuit. 15 spare
ELEC PHOTO 8: WALLACE 114332
Wiring Devices
GFCI
GFCI devices were not observed in wet locations or locations near
sinks/mop basins.
ELEC PHOTO 9: WALLACE 134655
ELEC PHOTO 10: WALLACE 134707
General Condition
Have been replaced as needed. Most appear to be in adequate
condition.
BUILDING CONDITION REPORT 4.7.19
Electrical Photos
ELEC PHOTO 11: WALLACE
113753
ELEC PHOTO 12: WALLACE
115545
ELEC PHOTO 13: WALLACE
114345
ELEC PHOTO 14: WALLACE
134655
ELEC PHOTO 15: WALLACE
134707
BUILDING CONDITION REPORT 4.7.20
ELEC PHOTO 16: WALLACE
134813
ELEC PHOTO 17: WALLACE
134900
ELEC PHOTO 18: WALLACE
134950
ELEC PHOTO 19: WALLACE
114332
ELEC PHOTO 20: WALLACE
114725
BUILDING CONDITION REPORT 4.7.21
BUILDING CONDITION CHECKLIST
UW-Richland: Wallace Student Center – Bldg. 500
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1967
Heating, Ventilation and Air Conditioning
HVAC Building Services
Primary Heating
Hot Water cast iron boiler and pumps serves the theater, music
room, and cafeteria air handler units. Perimeter vestibules served
with hot water cabinet unit heaters. HW unit heaters used in storage
and utility spaces.
Boiler Controls
Pneumatic controlled system.
Boiler feed system
NA
Heating Distribution
Ducted AHU systems and terminal unit heaters, all in serviceable
condition.
Pipe Insulation
Elastomeric refrigerant piping is in poor to serviceable condition.
Hot water piping appears to be a mix of asbestos and fiberglass
and is in serviceable condition.
Comments
Recommendations
The theatre didn’t originally have cooling and had dedicated
cooling-only RTU’s added later. The return duct for the heating only
theatre AHU was significantly loud for this being a theatre space.
Given the overall age of this building and existing HVAC systems it
is still in surprisingly good shape.
Given the age of the existing systems, they are nearing the end of
their lives. Asbestos abatement should be accomplished for the
piping insulation. Coordinate with facilities staff and a mechanical
designer to select replacements and system design and control
upgrades, and then institute these replacements and upgrades
during scheduled O&M system down times.
HVAC Controls
Basic system
Pneumatic, but systems are old.
BUILDING CONDITION REPORT 4.7.22
Thermostats and
control valves
Pneumatic and electric by mix of manufacturers.
Comments
Existing system is pneumatic with little to no status monitoring
capability.
Recommendations
During scheduled O&M replacement of any of the major systems,
take this opportunity to upgrade to at least a building level DDC
control system.
Ventilation
Toilet exhaust
Dedicated room exhaust fans run to exterior wall vents.
Janitors closets
Not exhausted.
Apartment bathroom
NA
Trash and recycling
storage rooms
NA
Kitchen Hood
3 hoods total in the cafeteria area in poor to serviceable condition.
Classroom Air
Handling Unit
NA
Sanctuary & Dining
Room Air Handling
Unit
Cafeteria area is served by a dedicated hot water heated air
handling unit with 3 remote DX cooling units serving what appears
to be a 3 row coil.
Recommendations
Given the age of these existing systems, schedule O&M
replacement times and get a mechanical designer to assist with
updating the control systems.
BUILDING CONDITION REPORT 4.7.23
Air Conditioning
Cooling
2 packaged cooling only roof top units in serviceable condition
serve the theater area. 3 remote DX compressors in poor to
serviceable condition serve the cooling coil for the cafeteria unit.
With how the staging is set up for the cafeteria unit, when replacing
the AHU or condensers, it would be prudent to go to a modulating
scroll style compressor for better dehumidification & cooling control.
The music room has a remote DX condenser on the roof that is in
poor to serviceable condition. The fan coil unit and remote DX
condenser serving the kitchen is in good condition.
Special Equipment
Dehumidifiers
There are no dedicated dehumidification units. But there is a
humidifier in poor condition serving the theatre.
BUILDING CONDITION REPORT 4.7.24
HVAC Photos
Building Signage
Abandoned Through Wall Fan
Dishwasher Exhaust
Grease Hood 1
Grease Hood 1A
Grease Hood 2
BUILDING CONDITION REPORT 4.7.25
Grease Hood 2A
Kitchen DX FCU and HW UH
HW Unit Heater
HW CUH
Cafeteria AHU
Cafeteria DX Cooling Coil
BUILDING CONDITION REPORT 4.7.26
Boiler Room Blower Fan
Boiler
Combustion Air Intake
Hot Water Pumps
Pneumatic Controls at Boiler
Theater Heating Return 1
BUILDING CONDITION REPORT 4.7.27
Theater Heating Return 2
Theater Heating Supply
Theater Cooling Returns
Theater Cooling Supply
Theater Cooling RTU 1
Theater Cooling RTU 2
BUILDING CONDITION REPORT 4.7.28
Remote FCU DX Condenser
Cafeteria Condensing Units
BUILDING CONDITION REPORT 4.7.29
BUILDING CONDITION CHECKLIST
UW-Richland: Wallace Student Center Bldg. 500
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1967
Plumbing
Plumbing Building Services
Water
City Metered water.
Sewer
City Sewer, Problems with backups in kitchen area.
Storm
Drainage to grade via gooseneck.
Natural Gas
Available.
Others
Fire Protection
Basic system
Wet system at stage area only, rest of building not sprinklered.
Classification
Light Hazard
Fire Pump
N/A
Comments
BUILDING CONDITION REPORT 4.7.30
Plumbing Water Protection, Conditioning & Heating
Water Softener
Simplex unit for kitchen, in fair condition
Water Heating
Gas gravity vent unit, dated but still in working condition, should be
replaced in the next 10 years. Suggestion to install high efficiency
unit at that time.
Back Flow Protection
Water Polishing
Not up to current code at any of the exterior hose Bibb and mop
basins. Any fixture with threaded fittings shall have minimum in line
vacuum breaker (ASSE 1011)
N/A
Others
Plumbing Fixtures
Water Closets
Water Closets are wall mount flush valve, water closets in good
condition, flush valve are in working order but are showing age.
Recommendation to replace with water conserving flush valves in
next 10 yrs. (Photo-P-3)
Urinals
Wall mount manual and floor mount with auto flush. Condition of
units is fair to good condition (Photo P-2)
Lavatories
Lavatories are in good condition, Faucets are in fair condition.
Faucets and traps are not to current ADA requirement. Traps shall
be wrapped or offset and faucets handles are not ADA. (Photo- P2)
Mop Service Basins
Good condition, backflow protection is an issue with hose
attachments.
Water Coolers
Good condition, but are not ADA (Photo P-1)
Sinks & fittings
Need ADA compliance on traps, and faucet handles
BUILDING CONDITION REPORT 4.7.31
Kitchen Sinks &
fittings
Stainless steel units, sinks are in good condition, but faucets are in
fair condition and should be replaced in the next 5 years or so.
Lab gas fittings
N/A
Floor Drains
In good condition
Showers
N/A
Roof Drains
Yes-Condition not verified.
Others
Plumbing Special Equipment
Water Conditioners /
Polishing
Softener in kitchen area in fair to good condition
Acid Neutralizing
N/A
Grease Interceptors
Small under sink unit, maintenance has had issues with unit. Unit is
very small for a kitchen this size. Recommend replacement in next
5 years with bigger unit. (Photo P-4)
Garage catch basin
None
Emergency Eye &
Shower
None
Sump pumps & lift
stations
Abandoned
BUILDING CONDITION REPORT 4.7.32
Air compressors
None
Others
Plumbing Piping
Water Systems
Copper and galvanized supplies. In good to fair condition on
exterior unknown condition interior.
Sanitary, Acid &
Storm Piping
Sanitary below slab is cast iron, unknown condition of piping. Due
to age of system and backup in kitchen it is recommended to
camera the system to get an idea of what condition the piping is in.
Lab/Med Gases
None
Pipe Insulation
Yes- fair to good condition.
Others
BUILDING CONDITION REPORT 4.7.33
Plumbing Photos
Photo - P1
Photo - P2
Photo - P3
Photo – P4
University of Wisconsin - Richland Center
Infrastructure Study
BUILDING CONDITION REPORT 4.8.1
Recommended Maintenance / Repairs
Gymnasium
1.05
1
19
4
Replace knob door handles with
ADA lever action hardware
5
1
6
1
6
5
Paint and repair exterior soffits
8
1
Total
19
2023
1
2022
15
2021
13
2020
1
2019
13
2018
1
2017
10
Replace hollow metal doors and
3
frames that are rusting
2016
1
2015
40
Caulking and gasket repairs at
2
exterior windows and doors
Description of Work
2014
1 Tuck pointing of brickwork
Item
Quanity
Annual Inflation Rate :
Present Cost per
item in Thousands
($)
Projected Cost - Thousands /
Remarks
Building - Exterior
59
12
1
59
1
12
6 Other?
0
0
7 Other?
0
0
8 Other?
0
0
Sub-Total Costs
9
Building - Interior
ADA upgrades at restrooms and
interior stairs (handrails)
78
0
0
0
0
38
0
0
71
0
0
109
30
1
47
1
47
10 Ceramic tile repairs in restrooms
5
1
8
1
8
11 Asbestos testing/abatement
20
1
31
1
31
12
Repairs to acoustical panel ceiling
systems
15
1
23
1
23
13
Remove materials stored in front of
electrical panels
1
1
2
1
2
14 Other?
0
0
15 Other?
0
0
16 Other?
0
0
Sub-Total Costs
17
Plumbing
Backflow protection upgrades at
exterior hose bibs
18 ADA upgrades for faucets & traps
19
Provide emergency eye wash and
shower at shop area
71
0
0
0
0
0
0
0
0
110
0
110
1
1
1
1
1
6
1
6
1
6
6
1
6
1
6
20 Other?
0
0
21 Other?
0
0
22 Other?
0
0
Sub-Total Costs
13
14
0
0
0
0
0
0
0
0
0
14
Strang, Inc.
Madison, WI
2012028-001-Maintenance Plan; Gymnasium
University of Wisconsin - Richland Center
Infrastructure Study
BUILDING CONDITION REPORT 4.8.2
1.05
Total
2023
2022
2021
2020
2019
2018
Annual Inflation Rate :
2017
2016
2015
2014
Description of Work
Quanity
Present Cost per
item in Thousands
($)
Item
Projected Cost - Thousands /
Remarks
Mechanical
23 Other?
0
0
24 Other?
0
0
25 Other?
0
0
26 Other?
0
0
27 Other?
0
0
Sub-Total Costs
0
0
0
0
0
0
0
0
0
0
0
0
Electrical
28 Replace fire alarm
45
1
55
1
55
29 Add Emergency Lighting
3
1
4
1
4
Option 1) Replace
Generator/Transfer Switch (to use
only for non “Life Safety Loads”
30 such as boilers). Emergency
lighting will need to be covered with
building specific Emergency
systems for code compliance.
55
1
Option 2) Remove
Generator/Transfer Switch.
Emergency lighting will need to be
31
covered with building-specific
Emergency systems for code
compliance.
5
0
30 Other?
0
0
31 Other?
0
0
32 Other?
0
0
Sub-Total Costs
108
85
0
0
0
1
85
58
0
0
0
0
85
0
144
Summary of Recommended Maintenance / Repairs
Exterior Costs
78
0
0
0
0
38
0
0
71
0
0
109
Interior Costs
71
0
0
0
0
0
0
0
0
110
0
110
Plumbing Costs
13
14
0
0
0
0
0
0
0
0
0
14
Mechanical Costs
0
0
0
0
0
0
0
0
0
0
0
0
Electrical Costs
108
0
0
0
58
0
0
0
0
85
0
144
TOTAL COST PER YEAR
270
14
0
0
58
38
0
0
71
195
0
377
(In Thousands of Dollars)
$
376,668 Total 10 year Maintenance and Repair Costs
Strang, Inc.
Madison, WI
2012028-001-Maintenance Plan; Gymnasium
BUILDING CONDITION REPORT 4.8.3
BUILDING CONDITION CHECKLIST
UW-Richland: Roadrunner Gymnasium
1200 Highway 14 West
Richland Center, WI 53581
Statistics
Number of
Levels
1 floor
Approximate
Gross Area
19,548 gsf
Dates of
Construction,
Additions, or
Remodels
1967
Building Overview
The Road Runner Gymnasium is located on the south portion of
campus. Primary functions include garage, maintenance shop,
weight room, gymnasium, lockers, showers and support spaces.
Description
The building is constructed of brick and masonry exterior walls,
concrete slab-on-grade floor system, steel joist and metal deck
roofing system with copper metal roof and fascia. Doors and
windows are primarily aluminum.
Condition
The building is in serviceable condition and expected to remain
serviceable with regularly scheduled maintenance.
Recommendations
Recommended priority work:
x Grade site around building to slope away from foundation
x Trim or remove plantings that are too close to building
x Concrete lifting of sidewalks that have settled
x Tuck pointing of brickwork
x Caulking and gasket repairs at exterior windows and doors
x Replace hollow metal doors and frames that are rusting
x Replace knob door handles with ADA lever action hardware
x Paint and repair exterior soffits
x ADA upgrades at restrooms and interior stairs (handrails)
x Ceramic tile repairs in restrooms
x Asbestos testing/abatement if remodeling occurs
BUILDING CONDITION REPORT 4.8.4
x
x
x
x
x
x
x
Repairs to acoustical panel ceiling systems
Remove materials stored in front of electrical panels
Replace fire alarm system
HVAC replacements due to age and wear
Backflow protection upgrades at exterior hose bibs
ADA upgrades for faucets and traps
Provide emergency eye wash and shower at shop area
BUILDING CONDITION REPORT 4.8.5
BUILDING CONDITION CHECKLIST
UW-Richland: Roadrunner Gymnasium– Bldg. 600
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1967
Architectural
Site
Grade / Drainage
Plantings
Poor, relatively flat around building
Too close to building, causing brick deterioration. See photos A-3
and A-4
Sidewalks
Settling at building. See photo A-5
Signage
Excellent, new
Retaining Walls
N/A
Stairs / Ramps /
Railings
N/A
Bike Racks
Close to building
Exterior
Exposed Foundation
Wall
stained in areas due to high water and mulch beds above brick
line
Brick in good condition except at base of wall where water
damage has occurred. See photos A-6 and A-7
Exterior Wall System
Areawells
N/A
Sill Flashings
Serviceable condition
BUILDING CONDITION REPORT 4.8.6
Window System
Alum. Sliders, serviceable condition
Window Flashing /
Lintel Condition
Lintels covered by caulk, not observed
Glazing / Gaskets
Re-caulking needed
Doors / Frames
HM doors and frames beginning to deteriorate. See photos A-9,
A-10 and A-11
Door Hardware
Serviceable condition
Door Seals /
Threshold
Poor condition and rusting. See photo A-12
Copper
Fascia
Good condition
Soffits
EIFS, serviceable, needs painting. See photo A-13
Also need to remove bee hives.
Columns / Capitals
N/A
Canopies
Serviceable condition
Awnings / Shading
Devices
N/A
Exterior Stairs /
Ramps
Good condition, recent repairs made
Exterior Screen Walls
N/A
Exterior Painting
Soffits need painting
Patio / Terrace
N/A
BUILDING CONDITION REPORT 4.8.7
Structure
Foundation Walls
Good condition
Concrete Slab
Good condition
Typical Floor Framing
N/A
Roof Framing
Not observed
Interior Columns /
Bearing Walls
Not observed
Exterior Structural
Steel Members
Not observed
Roof
Roof Copper
Material / System
Visual Evaluation
Good condition
Roof Accessories, appurtenances
Copper Roof Edge
Good condition
Wall flashings
Good condition
Drains
Not observed
Scuppers / Overflows
Gutters / Downspouts
Good condition
Equipment Curbs
Not observed
Equipment Platforms
Not observed
MEP Penetrations /
Condition
Not observed
BUILDING CONDITION REPORT 4.8.8
Ladder / Access
Hatch / Skylights
Not observed
Expansion Control
Not observed
Interior Systems
Doors / Frames
Solid core wood in hollow metal frames, serviceable condition.
Hardware
Mostly knob type
Borrowed Lites /
Frames
N/A
Perimeter Glazing /
Sealant / Sills
Serviceable condition
Casework / Shelving
Wood cabinets, serviceable condition
Interior Metalwork
N/A
Interior Masonry
CMU walls, good condition
Toilet Rooms /
Fixtures /
Accessories
ADA issues, mirror height, pipe insulation, pull side door clearance,
vertical grab bar. See photos A-15, A-16 and A-17
Wall Mounted
Equipment
Ok
Appliances
N/A
Elevator / Finishes
N/A
Excessive rise, handrails don't extend beyond treads
Stairs / Finishes
BUILDING CONDITION REPORT 4.8.9
Interior Finishes
Wall surfaces
Painting
Transparent / Sealers
Interior Flooring /
Base Material
Ceilings
Good condition in most places. Ceramic tile repairs needed in
restroom. See photo A-18
Good condition
Serviceable condition
Older wood floor and rubber base in gym, but serviceable.
ACT spline system starting to fail in places
BUILDING CONDITION REPORT 4.8.10
Architectural Photos
BUILDING CONDITION REPORT 4.8.11
BUILDING CONDITION REPORT 4.8.12
BUILDING CONDITION REPORT 4.8.13
BUILDING CONDITION CHECKLIST
UW-Richland: Roadrunner Gymnasium– Bldg. 600
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1967
Electrical
Electrical Distribution
Location(s)
Installed Date(s)
Voltage/Phase
Ampacity
Physical Capacity
Fed from normal campus-wide
480/277V system and campus wide
standby 480/277V system.
Room 632, 1967
480/277 600A (2) 3-pole spaces.
Room 632
ELEC PHOTO 1: PHYS ED 100420
120/208 225A (2). Fed via (3) single
phase transformers. Room 629
ELEC PHOTO 2: PHYS ED 100503
120/208 200A (12) 1-pole spaces.
Fed via (3) single phase transformers.
Room 612
ELEC PHOTO 3: PHYS ED 101019
Ampacity vs. loading was not
measured.
Equipment manufactured by Kinney
Violations/ Concerns
Proper panel clearances are not met.
Storage of material infringes on panel
clearances
Others
Equipment is aging, but older Kinney
equipment is, generally, regarded as
reliable.
Recommendations
The system can remain, as long as it
meets the need of the building.
However, if the building is remodeled
or significantly upgraded, all new
electrical distribution equipment
should be installed. Rooms with
electrical panels should be cleared of
all storage that infringes on panel
clearances.
BUILDING CONDITION REPORT 4.8.14
Standby Power Systems
Generator
Fed from campus-wide standby
power system
Panel
480/277 30A, 1-2 spaces for
additional breakers.
Fire Alarm
Basic System
Original 1967 Simplex Fire Alarm
Panel. Audible-only notification. No
offsite or central communication.
Coverage
Audible-notification from a few
locations.
ADA Compliance
Recommendations
Not ADA compliant: no visual
notification
Pull Stations mounted too high to
meet ADA requirements and wire
pulls have been added to provide
access.
The system should be replaced as
soon as possible with a modern
system with ADA compliant
notification and a digital
communicator to report system status
to a monitoring agency. Automatic
early detection, such as smoke
detectors, is recommended for
property protection, since no sprinkler
system is installed.
Mass Notification System
Basic System
Served by campus mass notification
system
Telephone
Basic System
Served by campus PBX system
BUILDING CONDITION REPORT 4.8.15
Data
Basic System
A small rack, connected to the
campus data system, is located in
room 202 to distribute to a small
number of hardwired computers and
WiFi access points.
Support Methods
Return air plenum?
Unknown
Equipment Condition
Good, but cable management should
be added.
Lighting
Overview of Fixtures
Corridors 4x4 Troffers Retrofitted with
T8 Lamps
Locker Rooms: 1x4 Troffers retrofitted
to T8 Lamps.
Gymnasium: High pressure sodium
Weight Room: Industrial fluorescent
retrofitted with 8 lamps
ELEC PHOTO 4: PHYS ED 100057
ELEC PHOTO 5: PHYS ED 100058
ELEC PHOTO 6: PHYS ED 100059
ELEC PHOTO 7: PHYS ED 101152
ELEC PHOTO 8: PHYS ED 101347
Dark Areas
None Observed
LED Exit Lights
Exits signs have been retrofitted with
LED lamps.
Egress Lighting Description &
coverage
Selected corridor fixtures are
connected to the standby power
system.
Some unit-battery lights were
observed, but were not tested.
Others
BUILDING CONDITION REPORT 4.8.16
Lighting Controls
Dual Lighting Levels
None Noted
Daylight Controls
None Noted
Automatic Shutoff
None Noted
Wiring Devices
GFCI
GFCI devices were not observed in
wet locations or locations near
sinks/mop basins.
General Condition
Have been replaced as needed. Most
appear to be in adequate condition.
BUILDING CONDITION REPORT 4.8.17
Electrical Photos
ELEC PHOTO 1: PHYS ED 100420
ELEC PHOTO 2: PHYS ED 100503
ELEC PHOTO 3: PHYS ED 101019
ELEC PHOTO 4: PHYS ED 100057
ELEC PHOTO 5: PHYS ED 100058
BUILDING CONDITION REPORT 4.8.18
ELEC PHOTO 6: PHYS ED 100059
ELEC PHOTO 8: PHYS ED 101347
ELEC PHOTO 7: PHYS ED 101152
BUILDING CONDITION REPORT 4.8.19
BUILDING CONDITION CHECKLIST
UW-Richland: Roadrunner Gymnasium– Bldg. 600
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1967
Heating, Ventilation and Air Conditioning
HVAC Building Services
Primary Heating
Pumped Hot Water Boiler system.
Boiler Controls
Pneumatic controls from Johnson Controls Incorporated. JCI.
Boiler feed system
Pot feeder in bypass across the pumps. Serviceable condition.
Heating Distribution
Hot water piping to unit heaters, cabinet unit heaters, and heating
only air handling units.
Pipe Insulation
Likely asbestos. Still in good to serviceable condition.
Comments
Given the age of this building and everything being original existing
equipment, the system has held up very well.
Recommendations
Given that this system has been in operation since 1967, everything
in it is well passed the expected lifespan. Asbestos abatement
should be accomplished for the hot water piping. And it would be
prudent to schedule O&M replacement of the pumps, boiler, AHU’s,
and terminal unit heaters before they start catastrophically failing.
HVAC Controls
Basic system
Pneumatic controls, originally provided by JCI. In serviceable
condition.
Thermostats and
control valves
Pneumatic by JCI. Thermostats are in poor condition. Control
valves are in poor to serviceable condition.
BUILDING CONDITION REPORT 4.8.20
Comments
Overall the control system has held up well over the years but is
starting to show its age. It was difficult to confirm if the night set
back works.
Recommendations
Upgrade to a digital electronic control system during the next major
HVAC O&M system overhaul.
Ventilation
Toilet exhaust
Bathrooms have dedicated fans per room vented to wall discharge
vents. The locker rooms are tied together and are served by a
dedicated fan in the mechanical mezzanine.
Janitors closets
Not exhausted.
Apartment bathroom
NA
Sport and equipment
room
Dedicated exhaust serving the space in serviceable condition.
Kitchen Hood
NA
Classroom Air
Handling Unit
NA
Sanctuary & Dining
Room Air Handling
Unit
NA
Recommendations
Other than age, the systems overall are in serviceable condition.
Air Conditioning
Cooling
No cooling existing in Gymnasium facility.
BUILDING CONDITION REPORT 4.8.21
Special Equipment
Dehumidifiers
No humidifiers or dehumidifiers in this facility.
BUILDING CONDITION REPORT 4.8.22
HVAC Photos
Building Signage
Boiler Room Fan
Fan Controls
Gym AHU
HW Boiler
Locker Room AHU
BUILDING CONDITION REPORT 4.8.23
HW Pumps
HW Unit Heater
JCI T-STAT
HW CUH
Pneumatic Controls
Underground Returns
BUILDING CONDITION REPORT 4.8.24
BUILDING CONDITION CHECKLIST
UW-Richland: Roadrunner Gymnasium Bldg. 600
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1967
Plumbing
Plumbing Building Services
Water
City Metered water
Sewer
City Sewer
Storm
Drainage to grade via gooseneck.
Natural Gas
Available
Others
Fire Protection
Basic system
None
Classification
N/A
Fire Pump
N/A
Comments
BUILDING CONDITION REPORT 4.8.25
Plumbing Water Protection, Conditioning & Heating
Water Softener
Central unit, Presently working and in fair condition, but showing its
age. Recommend replacement in next 5 years.
Water Heating
Gas gravity vent unit, dated but still in working condition, should be
replaced in the next 5 years. Suggestion to install high efficiency
unit at that time.
Back Flow Protection
Not up to current code at any of the exterior hose Bibb and mop
basins. Any fixture with threaded fittings shall have minimum in line
vacuum breaker (ASSE 1011)
Water Polishing
N/A
Others
Plumbing Fixtures
Water Closets
Water Closets are wall mount flush valve, water closets in good
condition, flush valve are in working order but are showing age.
Recommendation to replace with water conserving flush valves in
next 5 yrs
Urinals
Floor mount with auto flush. Condition of units are in good condition
Lavatories
Lavatories are in good condition, Faucets are in fair condition.
Faucets and traps are not to current ADA requirement. Traps shall
be wrapped or offset and faucets handles are not ADA
Mop Service Basins
Good to fair condition, backflow protection is an issue with hose
attachments.
Water Coolers
Single wall hung units in good condition, but are not ADA
(Photo P-2)
Sinks & fittings
Need ADA compliance on traps, and faucet handles
BUILDING CONDITION REPORT 4.8.26
Floor Drains
Trench drain in garage are in Fair to good condition.
Showers
Shower controls are not ADA. Also recommend shower heads be
replace due to hardness buildup. Replace with water conserving
heads. (Photo P-1)
Roof Drains
Yes-Condition not verified.
Others
Plumbing Special Equipment
Water Conditioners /
Polishing
Aged and should be replaced in the next 5 yrs
Garage catch basin
Emergency Eye &
Shower
None in maintenance shop area, recommended for safety reasons
and should be installed ASAP.
Sump pumps & lift
stations
Abandoned
Air compressors
In working condition, has aged well. Replacement should be
planned in 5-10 years max. (Photo P-3)
Others
Plumbing Piping
Water Systems
Copper and galvanized piping appears in good to fair condition.
Sanitary, & Storm
Piping
Sanitary is cast iron, good condition above slab, unknown condition
of piping below slab.
Storm is cast iron good condition above slab, unknown condition of
piping below slab.
Lab/Med Gases
none
BUILDING CONDITION REPORT 4.8.27
Pipe Insulation
Yes- fair condition.
Others
Plumbing Photos
Photo P-1
Photo P-3
Photo P-2
University of Wisconsin - Richland Center
Infrastructure Study
BUILDING CONDITION REPORT 4.9.1
Recommended Maintenance / Repairs
East Hall
Building - Exterior
Replace knob door handles with
ADA lever action hardware
6
1
1.05
Total
2023
2022
2021
2020
2019
2018
Annual Inflation Rate :
2017
2016
1
2015
5
2014
Quanity
1
Description of Work
Present Cost per
item in Thousands
($)
Item
Projected Cost - Thousands /
6
2 Other?
0
0
3 Other?
0
0
4 Other?
0
0
Sub-Total Costs
5
Building - Interior
ADA upgrades at restrooms and
reception window
5
0
0
0
6
0
0
0
0
0
5
1
1
1
7 Other?
0
0
8 Other?
0
0
9 Other?
0
0
10
Plumbing
Backflow protection upgrades at
exterior hose bibs
6
1
1
6
Remove materials stored in front of
6
electrical panels
Sub-Total Costs
6
0
6
1
1
1
0
6
0
0
0
0
0
0
0
7
0
1
0
1
0
11 ADA upgrades for faucets & traps
2
1
2
1
2
12 Other?
0
0
13 Other?
0
0
14 Other?
0
0
Sub-Total Costs
2
2
Remarks
0
0
0
0
0
0
0
0
0
2
Mechanical
15 Air quality testing
1
1
1
1
1
16 Supply Hepa Filters at return grills
6
1
6
1
6
17 Other?
0
0
18 Other?
0
0
19 Other?
0
0
Sub-Total Costs
7
7
0
0
0
0
0
0
0
0
0
7
Strang, Inc.
Madison, WI
2012028-001-Maintenance Plan; East
University of Wisconsin - Richland Center
Infrastructure Study
BUILDING CONDITION REPORT 4.9.2
1.05
Total
2023
2022
2021
2020
2019
2018
11
Annual Inflation Rate :
2017
1
2016
2014
10
2015
Quanity
Description of Work
Present Cost per
item in Thousands
($)
Item
Projected Cost - Thousands /
Remarks
Electrical
20
Add digital communicator and
ADA notification to fire alarm
1
11
Add Emergency Lighting Inverter
21 and rewire lighting to provide
emergency branch.
4
22 Other?
0
0
23 Other?
0
0
24 Other?
0
0
Sub-Total Costs
14
5
11
0
0
1
5
5
0
0
0
0
0
0
15
Summary of Recommended Maintenance / Repairs
Exterior Costs
5
0
0
0
0
6
0
0
0
0
0
6
Interior Costs
6
1
0
6
0
0
0
0
0
0
0
7
Plumbing Costs
2
2
0
0
0
0
0
0
0
0
0
2
Mechanical Costs
7
7
0
0
0
0
0
0
0
0
0
7
Electrical Costs
14
11
0
0
5
0
0
0
0
0
0
15
TOTAL COST PER YEAR
34
21
0
6
5
6
0
0
0
0
0
38
(In Thousands of Dollars)
$
38,137 Total 10 year Maintenance and Repair Costs
Strang, Inc.
Madison, WI
2012028-001-Maintenance Plan; East
BUILDING CONDITION REPORT 4.9.3
BUILDING CONDITION CHECKLIST
UW-Richland: East Hall
1200 Highway 14 West
Richland Center, WI 53581
Statistics
Building Overview
Description
Condition
Recommendations
Number of
Levels
1 floor
Approximate
Gross Area
4,280
Dates of
Construction,
Additions, or
Remodels
TBD
East Hall currently houses the U.W. Extensions department, a 3D
wood studio and a conference and computer room. It is at the far
south east end of campus.
The building is constructed of brick and wood stud walls, concrete
slab-on-grade floor system, wood truss and wood deck roofing
system with asphalt shingles and wood fascia. Doors and windows
are primarily residential wood variety.
The building is in good condition and expected to remain serviceable
with regularly scheduled maintenance.
Recommended priority work:
x Provide steps and railings at rear exits
x Replace knob door handles with ADA lever action hardware
x ADA upgrades at restrooms and reception window
x Remove materials stored in front of electrical panels
x Add digital communicator and ADA notification to fire alarm
x HVAC replacements to improve control and ventilation
x Backflow protection upgrades at exterior hose bibs
x ADA upgrades for faucets and traps
BUILDING CONDITION REPORT 4.9.4
BUILDING CONDITION CHECKLIST
UW-Richland: East Hall– Bldg. 700
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1970
Architectural
Site
Grade / Drainage
Good condition
Plantings
Good, kept away from building
Sidewalks
Good
Signage
Good
Retaining Walls
N/A
Stairs / Ramps /
Railings
Need stair at rear exits to prevent drop-off. See photo A-3, A-4 and
A-5
Exterior
Exposed Foundation
Wall
Good condition
Exterior Wall System
Wood and brick, good condition. Some staining at upper brickwork.
See photo A-6
Areawells
N/A
Sill Flashings
Good condition
Window System
Residential windows, good condition
Window Flashing /
Lintel Condition
Good condition
BUILDING CONDITION REPORT 4.9.5
Glazing / Gaskets
Good condition
Doors / Frames
Good condition
Door Hardware
Good condition but knob hardware. See photo A-5
Door Seals /
Threshold
Good condition
Fascia
Wood, good condition
Soffits
Wood, good condition
Columns / Capitals
N/A
Canopies
N/A
Awnings / Shading
Devices
N/A
Exterior Stairs /
Ramps
Step down at rear exits is too severe
Exterior Screen Walls
N/A
Exterior Painting
Good condition
Patio / Terrace
N/A
Structure
Foundation Walls
Good condition
Concrete Slab
Good condition
BUILDING CONDITION REPORT 4.9.6
Typical Floor Framing
Not observed
Roof Framing
Not observed
Interior Columns /
Bearing Walls
Not observed
Exterior Structural
Steel Members
Not observed
Roof
Roof Shingle
Material / System
Visual Evaluation
Serviceable condition
Roof Accessories, appurtenances
Coping / Parapet /
Roof Edge /
Good condition
Wall flashings
Good condition
Drains
Not observed
Scuppers / Overflows
Gutters / Downspouts
Good condition
Equipment Curbs
Not observed
Equipment Platforms
Not observed
MEP Penetrations /
Condition
Not observed
Ladder / Access
Hatch / Skylights
Not observed
Expansion Control
Not observed
Interior Systems
BUILDING CONDITION REPORT 4.9.7
Doors / Frames
Solid core wood doors in hollow metal and some wood frames,
good condition.
Hardware
Mostly knob type hardware. See photo A-9
Borrowed Lites /
Frames
Alum. At front entry, good condition
Perimeter Glazing /
Sealant / Sills
Good condition
Casework / Shelving
Wood materials, serviceable condition. Not fully accessible
See photos A-10 and A-11
Interior Metalwork
N/A
Interior Masonry
N/A
Toilet Rooms /
Fixtures /
Accessories
Not fully accessible, pull side clearance, stall width plus missing
vertical grab bar. See photo A-12 and A-13
Wall Mounted
Equipment
No issues noted
Appliances
N/A
Elevator / Finishes
N/A
Stairs / Finishes
N/A
Interior Finishes
Wall surfaces
GWB
Good condition
BUILDING CONDITION REPORT 4.9.8
Painting
Good condition
Transparent / Sealers
Good condition
Interior Flooring /
Base Material
Mostly VCT, good condition
Ceilings
ACP concealed spline system, good condition
BUILDING CONDITION REPORT 4.9.9
Architectural Photos
BUILDING CONDITION REPORT 4.9.10
BUILDING CONDITION REPORT 4.9.11
BUILDING CONDITION REPORT 4.9.12
BUILDING CONDITION CHECKLIST
UW-Richland: East Hall– Bldg. 700
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1970
Electrical
Electrical Distribution
Location(s)
Installed Date(s)
Pole mounted transformer with exterior meter socket.
Main panel in 717.
Voltage/Phase
Ampacity
Physical Capacity
120/208, 400A, (2) 3-pole spare
120/208, 225A, no spare
Manufacturer by Square D
ELEC PHOTO 1: EAST 131626
Violations/ Concerns
Equipment stored in electrical rooms encroaches on required panel
clearances.
Others
Recommendations
The system can remain, as long as it meets the need of the
building. However, if the building is remodeled or significantly
upgraded, new electrical distribution equipment should be installed.
Standby Power Systems
Generator
No Generator. An “emergency” panel is fed with a tap-ahead-ofmain, which is no longer regarded as an emergency system.
Panel
120/208V, 100A, 8 spaces for additional breakers.
ELEC PHOTO 2: EAST 131629
Fire Alarm
Basic System
Simplex 4006
ELEC PHOTO 3: EAST 131632
BUILDING CONDITION REPORT 4.9.13
Coverage
Smoke Detection in corridors
ADA Compliance
Corridors and Classrooms have visual coverage. Other common
spaces such as conference rooms, reception area, workrooms don’t
have visual coverage that meets ADA requirements.
Recommendations
Add a digital communicator to existing fire alarm to report system
status to a monitoring agency. Add ADA notification to all common
areas.
Mass Notification System
Basic System
Served by campus mass notification system
Telephone
Basic System
Served by Richland County Telephone System
Data
Basic System
A small rack, connected to the campus data system, is located in
room 717 to distribute to a small number of hardwired computers
and WiFi access points.
ELEC PHOTO 4: EAST 131642
Support Methods
Return air plenum?
Unknown
Equipment Condition
Good, but cable management should be added.
Lighting
Overview of Fixtures
Predominately T8 Wraps and Incandescent 1x1 fixtures with retrofit
CFL lamps.
ELEC PHOTO 5: EAST 133154
ELEC PHOTO 6: EAST 133158
BUILDING CONDITION REPORT 4.9.14
Dark Areas
None Observed
LED Exit Lights
Exit Signs are Incandescent.
Egress Lighting
Description &
coverage
A central 12V system, powering dedicated emergency lights is in
place, but is not functional.
ELEC PHOTO 7: EAST 133330
Others
Lighting Controls
Dual Lighting Levels
None Noted
Daylight Controls
None Noted
Automatic Shutoff
None Noted
Wiring Devices
GFCI
GFCI devices were not observed in wet locations or locations near
sinks/mop basins.
General Condition
Have been replaced as needed. Most appear to be in adequate
condition.
BUILDING CONDITION REPORT 4.9.15
Electrical Photos
ELEC PHOTO 8: EAST 131626
ELEC PHOTO 9: EAST 131629
ELEC PHOTO 10: EAST 131632
ELEC PHOTO 11: EAST 131642
ELEC PHOTO 12: EAST 133154
ELEC PHOTO 13: EAST 133158
BUILDING CONDITION REPORT 4.9.16
ELEC PHOTO 14: EAST 133330
BUILDING CONDITION REPORT 4.9.17
BUILDING CONDITION CHECKLIST
UW-Richland: East Hall– Bldg. 700
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1970
Heating, Ventilation and Air Conditioning
HVAC Building Services
Primary Heating
Building is served by 3 residential style gas fired furnaces. 2 of the
furnaces are in good condition, one is in poor condition. All 3 of the
remote condensers serving these furnaces are in poor condition.
Boiler Controls
NA
Boiler feed system
NA
Heating Distribution
Heating is distributed through a mix of overhead/wall and
underground supply ductwork. Perimeter zones are the areas
served by underground supply distribution at the walls and
windows.
Pipe Insulation
Refrigerant piping is in poor to serviceable condition.
Comments
With the water table being dangerously close to foundations, this
being the first underground supply ducted system on campus it is
frightening to think what the condition of the ductwork could be in.
Recommendations
Air quality testing ASAP to determine if mold growth in underfloor
ducted systems. If mold or contaminants are present, closure of
facility may need to occur until system can be retrofitted. Replace
furnaces with VAV type system with modulating cooling for better
humidity control and provide a new supply and return air pathway.
Consider upgrading to a VAV system with room control and
monitoring to correct humidity, heating, and cooling issues. The
outside are intake louver was mostly boarded up so the likelihood
for economizer cooling is unlikely.
HVAC Controls
Basic system
Packaged T-STAT zone controllers of mixed manufacturers.
BUILDING CONDITION REPORT 4.9.18
Thermostats and
control valves
Mixed manufacturers. The speed controller for the art room ceiling
fans is in a highly inaccessible location.
Comments
A residential type system applied to a commercial facility.
Recommendations
Convert to a building level control system and incorporate a new
mechanical system that can provide ventilation, dehumidification,
and economizer capability. Relocate fan controller in art room.
Ventilation
Toilet exhaust
Bathrooms are connected to an abandoned ducted exhaust system.
The floor supply “stack effect” is probably the only reason there
hasn’t been complaints.
Janitors closets
Not exhausted.
Apartment bathroom
NA
Trash and recycling
storage rooms
Several storage rooms, none of which were conditioned.
Kitchen Hood
There is a single residential style kitchen hood in good condition
that runs to a wall discharge.
Classroom Air
Handling Unit
Apparent floor grilles were identified in the largest room 713, but it
was undetermined if these were supply or return. All rooms except
unconditioned storage spaces are served by one of three previously
mentioned residential style furnace units.
Sanctuary & Dining
Room Air Handling
Unit
NA
Recommendations
This building is lacking functional ventilation and economizer
capability. Ventilation is likely made up through the use of operable
windows, which is leading to the sever infiltration and humidity
issues. Mechanical systems need to be converted to a commercial
level system with ventilation and dehumidification capabilities.
BUILDING CONDITION REPORT 4.9.19
Air Conditioning
Cooling
The only cooling for the building is via the 3 remote condensers
serving the 3 residential style furnaces. All three of the remote
condensers are in poor condition.
Special Equipment
Dehumidifiers
There was a floor mounted humidifier located in one of the hallways
trying to help deal with the humidity issues. No dedicated
humidifiers are present.
BUILDING CONDITION REPORT 4.9.20
HVAC Photos
Building Signage
Art and Shop Room
Ceiling Fan Controller
Dust Collection System
Filtered Returns from Art Room
Floor Supply in Art Room
BUILDING CONDITION REPORT 4.9.21
Floor Supply Diffusers
Dehumidifier
Floor Supply
Wall Supply
Unconfirmed Floor Grilles
Kitchenette
BUILDING CONDITION REPORT 4.9.22
Kitchen Hood Exhaust
Furnaces
Remote Condensers
Furnace Vents and Abandoned Fan
OA Intake Louver
BUILDING CONDITION REPORT 4.9.23
BUILDING CONDITION CHECKLIST
UW-Richland: East Hall Bldg. 700
1200 Highway 14 West
Richland Center, WI 53581
Original building constructed in 1970
Plumbing
Plumbing Building Services
Water
City Metered Water
Sewer
City Sewer
Storm
Drainage to grade via gooseneck.
Natural Gas
Available
Others
Fire Protection
Basic system
None
Classification
N/A
Fire Pump
N/A
Comments
BUILDING CONDITION REPORT 4.9.24
Plumbing Water Protection, Conditioning & Heating
Water Softener
Not in use
Water Heating
Electric unit in fair working condition (Photo P-1)
Back Flow Protection
Not up to current code at any of the exterior hose bib and mop
basins. Any fixture with threaded fittings shall have minimum in line
vacuum breaker (ASSE 1011)
Water Polishing
N/A
Plumbing Fixtures
Water Closets
Floor Mount tank unit in Excellent condition
Urinals
Wall mount unit in Excellent condition.
Lavatories
Wall mount in Excellent condition.
Mop Service Basins
Good condition, backflow protection is an issue with hose
attachments.
Water Coolers
Single wall unit, good condition, but are not ADA
Sinks & fittings
Need ADA faucet handles
Kitchen Sinks &
fittings
Stainless steel unit. In fair condition. Faucet should be replaced in
the next 5-10 years.
BUILDING CONDITION REPORT 4.9.25
Floor Drains
In good condition.
Roof Drains
Yes-Condition not verified.
Others
Plumbing Special Equipment
Water Conditioners /
Polishing
Not in use
Garage catch basin
None
Others
Plumbing Piping
Water Systems
Copper and galvanized supplies. In good to fair condition on
exterior unknown condition interior.
Sanitary, & Storm
Piping
Sanitary is cast iron, good condition above slab, unknown condition
of piping below slab.
Storm is cast iron good condition above slab, unknown condition of
piping below slab.
Lab/Med Gases
None
Pipe Insulation
Yes
Others
BUILDING CONDITION REPORT 4.9.26
Plumbing Photos
Photo P-1
BUILDING CONDITION REPORT 4.10.1
Recommended Improvements / Modifications
Site
3
4
5
Tree maintenance program.
Upgrade exterior lighting with LED
6 /Solar lighting (Ped/Vehicular)
Revision to existing signage
7 wayfinding with addition of new
buildings.
Sub-Total Costs
3
5
1
12
2
3
10
5
7
12
2
40
3
12
1
Total
5
1.05
2023
1
2022
1
2021
5
2020
1
2019
1
2018
2
Annual Inflation Rate :
2017
1
2016
2
2015
2014
2
Site
Provide bike signage from STH 14
toward designated campus bike
rack corrals.
Trim existing overgown vegetation
around campus. Remove
overgrown plantings.
Update ADA requirements
throughout campus, repair walks
and reconstruct ramps
Address heaving of sidewalks at
building entries by regrading areas
at library and science
Quanity
1
Description of Work
Present Cost per
item in Thousands
($)
Item
Projected Cost - Thousands /
2
1
1
1
1
1
1
2
1
6
Remarks
WisDOT has extended the bike
path along USH 14 to the west
end of the campus
This would include shrubs as well
as dead tree limbs
6
1
6
1
17
13
1
14
1
27
temporary fix until a permanent
solution is implemented
3
1
3
1
trim trees and replace older trees
as they die off
22
24
4
1
4
1
4
1
4
1
4
1
5
1
5
1
40
6
1
6
1
7
1
7
1
7
1
8
1
8
1
49
15
1
20
1
35
10
27
11
13
12
14
33
176
(In Thousands of Dollars)
$
176,180 Total 10 year Maintenance and Construction Costs
Strang, Inc.
Madison, WI
2012028-001-Maintenance Plan; Site
BUILDING CONDITION REPORT 4.10.2
SITE CONDITION CHECKLIST
UW Richland Campus
1200 Highway 14 West
Richland Center, WI 53581
Original construction in 1966-67 by Flad Architects/Hugh Dega Associates Landscape Architect’s
Campus Grounds
Site
Grades / Drainage/
(To Creek ?)
Needs attention in many areas. Standing water and winter snow
and ice issues with freeze/thaw cycles. Need positive drainage from
the buildings that are set low to ground.
Trees and Site
Plantings Condition
Primarily in good condition but some dead/dying trees; Some large
trees in need of pruning. Possible long-term replacement strategy
needed.
Site Drains
Drains to creek but some areas of standing water and low building
floor elevations create areas of puddling and bad freeze thaw
situations at building entrances
Pavements (General)
Mixed colors of pavements; Lots of cracking, spalling and widening
joints. Potential exists to lower some sidewalks to alleviate drainage
issues into buildings and at entrances. Should try to soften “Quad”
plaza with less pavement and more plantings, colors.
Sidewalks/Wellness
Paths/ Access
See above. Did not walk Wellness Path (muddy and wet conditions)
as not paved. Potential to expand path and provide opportunities for
expansion.
Curb Cuts
Curb cuts vary for ADA accessibility: Some stormwater from parking
lots/drives drains into lawn areas and the creek
Entry and Wayfinding
Signage
Good branding with main entrance electronic sign and new
directional wayfinding signs and campus directories. Add more
signs as required for new buildings. Interpretive system possible.
Retaining Walls?
Did not see any
Stairs / Ramps /
Railings / ADA
Some ramps look questionable if they meet current ADA guidelines.
This includes required railing design. Need to evaluate in greater
detail.
Bike Racks/ Type and
Locations
Seems to be a need for more bike racks. Very few seen. Locate
near main building entrances and parking areas. Provide signage.
Opportunities Include: Lighting upgrade to LED, Future outer ring-road circulation
opportunity, Linkages to area and regional Bike Trails, Connection to Art Building,
Shared Parking? Hwy 14 pedestrian crossing and refuge island by DOT.
BUILDING CONDITION REPORT 4.10.3
Site Photos
Areas of standing water
Drainage feature under sidewalk
West entry to Science Hall
Drainage feature in lawn area – North side
Typical site lighting
Dead Maple tree
BUILDING CONDITION REPORT 4.10.4
Concrete cracking and spalling
East end Melville Hall
Pedestrian walkway/tree canopy
Entry drive at Wallace Student Center
Standing water at entry drive
Bridge to Campus Parking Lot (east)
Drain at bridge
BUILDING CONDITION REPORT 4.10.5
Light fixture at bridge
Typical trash receptacle
East Hall and parking lot
Walkway to East Hall
East Hall
East Hall parking lot
BUILDING CONDITION REPORT 4.10.6
The Quad – Student Plaza
The Quad
The Quad
The Quad
Miller Memorial Library entry
Miller Memorial Library
BUILDING CONDITION REPORT 4.10.7
Open space on north side looking east
Open space on north side looking west
North side Symons Recreation Complex
West side access drive along Symons RC
West Parking Lot from the NW looking south
West parking Lot
BUILDING CONDITION REPORT 4.10.8
West Parking Lot along Roadrunner Gymnasium
Walkway between Gym and Symons Rec
Access drive to West Parking Lot/Main Campus
Bridge at west entry
West entry at STH 14 looking east
West entry sign at STH 14 looking west
BUILDING CONDITION REPORT 4.10.9
West entry at STH 14 looking south
Main campus entry drive - West
Drainage into lawn along west entry drive
View of campus from entry drive
BUILDING CONDITION REPORT 4.11.1
BUILDING CONDITION CHECKLIST
UW-Richland Center: Campus-Wide Systems
1200 U.S. 14
Richland Center, WI
Original system constructed in 1967
Electrical
Electrical Service Entrance
Service Entrance #1 is located in the Physical Education Building. A cityowned utility transformer is housed within the building and serves a Main
Switchboard, which feeds Melvill Hall, Physical Education Building and
Miller Library
ELEC PHOTO 1: PHYS ED 100045,
ELEC PHOTO 2: PHYS ED 100050
Location(s)
Installed Date(s)
Service Entrance #2 is located in Science Hall. A city-owned padmounted transformer is located adjacent to the building and serves a
switchboard that feeds Science Hall, Wallace Student Center and
Classroom Building. This service was installed in 2008.
ELEC PHOTO 3: SCIENCE 105048
ELEC PHOTO 4: SCIENCE 105501
An abandoned-in-place and locked out feed from Service #1 is still present
in Wallace Student Center for manual reconnection in the event of a
problem with Service #2.
Service Entrance #1: 2000A 480/277V, 3-Phase, Kinney Switchboard with
Fused Switches.
Voltage/Phase
Ampacity
Physical & Electrical
Capacity
Service Entrance #2: 1200A, 480/277V, 3-Phase Square D breaker
distribution panel. A 400A 3-phase tap/disconnect feeds Wallace Student
Center and Classroom Building.
Electrical usage vs. rated Ampacity was not measured for either service:
Service #1: Two spare fused-disconnects are available in the Main
Switchboard.
Service #2: Space for up to 10-15 spare breakers is available in the main
Switchboard.
Distribution
Violations/ Concerns
Underground distribution network
BUILDING CONDITION REPORT 4.11.2
Others
Recommendations
As buildings are upgraded or built, the systems should be evaluated to
handle the additional load required.
Standby Power Systems
Generator
Transfer Switch
Location
Distribution
Physical & Electrical
Capacity
Concerns
Recommendations
A 480/277V, 40kW, 50kVA utility-fed, natural gas generator is located in
the Physical Education Building. This Generator serves standby power
loads (selected boilers, air-handlers and HVAC controls) and emergency
lighting in all buildings, except for East Hall.
The generator is in poor condition.
ELEC PHOTO 5: PHYS ED 095531
A 100A, 3-pole transfer switch is located in the generator room.
The transfer switch is in poor condition.
ELEC PHOTO 6: PHYS ED 095311
The transfer switch is known to burn coils when a single-phase outage
occurs.
A 100A, 480/277V fused-switch distribution panel distributes standby
power to each building.
Electrical loading was not evaluated.
Two spare fused switches are available in the standby distribution
panelboard.
The standby system is original and is unreliable. Further, it does not meet
modern requirements for NEC 700 and 702 branch separation. In current
codes, Life safety items, such as egress lighting, shall be on a separate
transfer switch than non-life-safety items, such as boilers.
Further, modern requirements also require onsite fuel storage for lifesafety items, which is not the case with a natural gas generator.
It is recommended that separate emergency systems (such as lighting
inverters or unit battery lights) be installed in each building to provide
power for egress and exit lighting and other life safety loads.
If the campus finds value in backing up boilers and other equipment, then
the standby generator and transfer switch should be replaced with new.
However, if this backup is not considered critical to campus buildings and
operations, the generator could be eliminated, once other sources of
emergency power for life safety loads are in place in each building.
Fire Alarm
Basic System
Each building is served by an individual fire alarm system. See each
building for the condition of these. No central fire alarm network or even
remote reporting of status and alarm (to the fire department via a
monitoring agency) are included in any of the systems.
BUILDING CONDITION REPORT 4.11.3
Concerns
There is no way to remotely monitor the status of fire alarm equipment by
campus maintenance personnel and there is no automatic means of
alerting the fire department upon alarm.
Recommendations
Either establish a campus fire alarm network as new fire alarm systems
are installed or provide digital communicators for each fire alarm system to
directly call a central station (security monitoring agency) so that system
monitoring for alarm and supervision, per NFPA standards, is facilitated.
Mass Notification System
Basic System
Mass notification alert/lights located throughout the campus buildings are
activated through a web interface from any campus computer. A manual
override is also located in Melvill Hall 434.
ELEC PHOTO 7: MELVILL 100002
ELEC PHOTO 8: MELVILL 100003
A separate text message system, through the UW system, for emergency
alerts is also available to those who sign up to receive the alerts. The
systems are not tied together.
Headend Location
Melvill Hall 434
Equipment Condition
The system was designed using various components by an employee of
the campus. It appears to be maintained and functions well.
Concerns
Since it is not a Listed (UL or other Nationally Recognized Testing Lab)
system, its suitability may be questioned as mass notification codes and
standards mature.
The system audible and visual notification coverage does not appear to
meet NFPA or ADA standards for alarms.
Recommendations
As building fire alarm systems are replaced, the campus may consider
how mass notification functionality could be shifted to the fire alarm
systems.
Telephone
Basic System
PBX system, with individual pairs routed to every phone.
Headend
Melville Hall 434
ELEC PHOTO 9: MELVILL 110001
Equipment Condition
The equipment appears to be in good working condition and meets the
current needs of the campus. A newer voicemail system has been added
to the system.
BUILDING CONDITION REPORT 4.11.4
Recommendations
As long as adequate lines exist, the existing system can remain in use,
however, a voice over IP system is recommended when the existing
system no longer meets the campus needs.
Data
A wired and wireless data system is distributed throughout the campus.
Underground fiber in conduit serves each of the buildings with a small data
rack in each building.
Basic System
Many “thin client” stations were observed throughout the campus, served
by a VMWare server.
The service entrance is located in Melvill Hall
ELEC PHOTO 10: MELVILL 110000
Service Entrance
Location(s)
Equipment Condition
The main campus servers are located in the Science Building. Backup
servers are in Melvill Hall
ELEC PHOTO 11: SCIENCE 112629
Wireless Access has recently been upgraded to a centrally managed
system and coverage was reported to be very good throughout the
buildings.
The network switched were reported to be aging, but still functioning
properly.
Overall the system appears to serve the campus well and is appropriately
scalable.
Exterior Lighting
Site lighting in parking lot areas appear to be high pressure sodium
floodlight type fixtures that are not full cutoff.
ELEC PHOTO 12: EXTERIOR LIGHTING 135325
ELEC PHOTO 13: EXTERIOR LIGHTING 135425
Overview of Fixtures
Pedestrian lighting areas appear to be mostly original and is not cutoff, but
has been retrofit with compact fluorescent lighting.
ELEC PHOTO 14: EXTERIOR LIGHTING 135508
Exterior building lighting is mostly high pressure sodium and is not cutoff.
ELEC PHOTO 15: EXTERIOR LIGHTING 135904
Some bollard and tree lighting was also observed.
ELEC PHOTO 16: EXTERIOR LIGHTING 135215
ELEC PHOTO 17: EXTERIOR LIGHTING 135140
Dark Areas
Concerns
The campus was not observed in the darkness.
Much of the campus lighting does not appear to be high performance and
likely does not provide the best balance of safety/security and efficiency.
Much of the building mounted exterior lighting throughout campus appears
BUILDING CONDITION REPORT 4.11.5
to be in poor condition or has shields built to protect it from ice falling from
building roofs.
Some of the conduit and wiring methods appear to be in need of repair.
ELEC PHOTO 18: EXTERIOR LIGHTING 133354
ELEC PHOTO 19: EXTERIOR LIGHTING 135158
Recommendations
Any landscape or building projects should include new LED site and
building fixtures
BUILDING CONDITION REPORT 4.11.6
Electrical Photos
ELEC PHOTO 20: PHYS ED 100045
ELEC PHOTO 21: PHYS ED 100050
ELEC PHOTO 22: SCIENCE 105048
ELEC PHOTO 23: SCIENCE 105501
ELEC PHOTO 24: PHYS ED 095311
ELEC PHOTO 25: PHYS ED 095531
BUILDING CONDITION REPORT 4.11.7
ELEC PHOTO 26: MELVILL 110000
ELEC PHOTO 28: SCIENCE 112629
ELEC PHOTO 27: MELVILL 110001
BUILDING CONDITION REPORT 4.11.8
ELEC PHOTO 29: EXTERIOR LIGHTING
133354
ELEC PHOTO 30: EXTERIOR LIGHTING
135140
ELEC PHOTO 31: EXTERIOR LIGHTING
135158
ELEC PHOTO 32: EXTERIOR LIGHTING
135215
ELEC PHOTO 33: EXTERIOR LIGHTING
135325
ELEC PHOTO 34: EXTERIOR LIGHTING
135425
BUILDING CONDITION REPORT 4.11.9
ELEC PHOTO 35: EXTERIOR LIGHTING
135508
ELEC PHOTO 36: EXTERIOR LIGHTING
135904
ELEC PHOTO 37: MELVILL 100002
ELEC PHOTO 38: MELVILL 100003
Appendix A:
Programming Data
Appendix A1:
Priorities Survey
Appendix A2:
Stakeholder Survey and Interview
UW Richland Stakeholder Interview Summary 2013-09-10
Campus
The Coppertop Stage and the kitchen are the only areas on the campus that are fire sprinkled. The
implementation of an updated centralized alarm system that links the buildings and has the ability to
call out, would enhance the fire safety on campus.
Snow and ice sliding off the roof at building entrances is dangerous and should be addressed on all
campus buildings.
Several of the main entrances including the gym and Melvill Hall are not ADA compliant, as they require
one to ascend stairs to access their respective main entrances. Ramps could be added to these
entrances to comply with ADA and make the campus more accessible to everyone.
Safety has been listed as a priority on the campus. Better lighting near building entrances and parking
lots would enhance safety and deter vehicle break-ins.
The introduction of bike racks around campus would promote commuter biking and help create a good
collegiate atmosphere for the students.
When it rains or when the snow melts many of the sidewalks accumulate large amounts of water. To
prevent this, the site should be pitched so that water runoff travels away from the sidewalks and
buildings.
Key spaces that prospective students pay attention to include Pippin, the Countertop, the lecture hall in
the Science Building, the gym and the Cafeteria. All of these spaces need to look professional and need
to be able to be photographed to help with the recruitment and retention of students.
There is a need for more impromptu sit-down, collaborative study and meeting spaces throughout the
campus for students to enjoy while they are not in class. This will also help to keep students on campus
during the day which encourages the social atmosphere of the campus as a whole.
Sustainable energy sources could be used to operate the campus. Some of these might even be revenue
generators. Recycling bins could be added to every building to help promote recycling.
Both the college and the community would mutually benefit from a place on campus for the two entities
to interact and collaborate. Local businesses should be invited in to convey to students some of the
developments that are going on in their own backyards.
Wood paneling has been used throughout the campus. This wall finish helps to give the campus an
outdated feel. If this paneling was replaced with drywall and a fresh coat of paint it would dramatically
help with the image of the campus by giving it an updated appearance.
Signage should be made prevalent on all buildings to facilitate wayfinding.
Library
The current library space is functional but outdated. The HVAC needs work properly to make the
current Computer Lab and Room 315 more comfortable.
The restrooms and possibly some of the doors leading into the study rooms are not ADA compliant and
need to be brought up to date.
The IT and maintenance closet need to be separated into two separate spaces.
There are recurring roof and window leakage problems that need to be addressed.
The current textbook storage may be converted into a computer lab or a study area. Currently there
exists a possibility of retaining a third party provider for textbooks therefore there may no longer be the
need to store textbooks on site.
The current study room that is adjacent to the checkout could have a window installed and be used as
the Librarian’s office. This would allow the Librarian better sightlines to the stacks and the checkout
counter. This solution would leave the Librarian without any windows to the outside, but is felt to be a
more preferred office location.
Locating a new entrance at the knuckle of the building between its West and East wings would create a
better entry sequence and help in wayfinding. The study areas, stacks and library materials would be
located in the East Wing, while the West Wing would house offices, support spaces and meeting rooms.
The Library could be opened up with compact shelving and the saved space could be used to create
collaborative study areas, an art exhibit and possibly some more areas for public computers.
The Smart Classroom (Room 315) is one of the most desirable classrooms on campus. However, its
functions are underutilized in its current location. A possible solution would be to move the Smart
Classroom to the classroom building. The computer lab from the classroom building could be relocated
to the vacated space in the Library, thus enhancing the adjacencies and uses of both functions. The
computer lab in the classroom building is underutilized because it is locked when there is not a class
using it. If it were to be moved to the Library it could still be used for classes, but when it is not being
used it can be open to the student body at large, because it can be monitored by Library staff.
Melvill Hall
If the entire Student Services staff were all located adjacent to each other there would be better synergy
and would cut down the length of trips needed to be taken each day.
International students make up a significant population of UW-Richland. Currently, international
students gather in their coordinator’s office. An international student’s lounge would provide a
designated space for students to congregate while allowing their coordinator a separate and quieter
working environment.
The existing Multimedia Lab is currently underutilized. This room could be used for some other use.
There is a need for extra storage from all departments that should be addressed.
There is a moisture and condensation problem in the roof of the “new” west expansion portion of the
building that needs to be addressed.
The HVAC needs work throughout the building as occupants are often uncomfortable.
The water temperature in the women's restroom is never hot enough and should be addressed.
The addition of more electrical outlets in offices would reduce the number of power strips used, which
would make the environment safer.
Currently several people share offices. While this works for them, it is not ideal. Preferably, there would
be enough individual offices that each faculty and space would have their own designated office.
Student confidentiality is very important to the staff at UW-Richland. Currently a few private offices do
not have very good acoustical separation. If these rooms are made to be more acoustically isolated, it
would dramatically help with student confidentiality.
The use of carpeting for flooring in Pippin should be reconsidered because food is served. However,
any alternative flooring material should be evaluated for acoustical properties.
If more electrical outlets were added, occupants would not have to use power strips.
If the south entrance was enhanced to make it feel like the main entrance it would give the entire
campus a “Front Door” and would help dramatically with wayfinding. A “Pippin like room” and Student
Affairs should be located adjacent to the Front Door.
There is a need for a dedicated and secure Student Senate office.
The Café currently works as a prefunction space during performances in the Coppertop Theater.
Student Center
Roadrunner Café
Because it is the most popular hangout, the café needs to be updated in aesthetics, equipment and in its
menu selections. This center is the social hub of the campus and is very important for retention and
recruitment. It is in a very visible location which makes it the ideal spot to house several functions
including:
1) Student elections
2) Advisor meet and greets
3) Club fairs
4) Art shows
An area that is set aside for games, and possibly a large television that can be hooked up to different
gaming systems, would create an attractive space for students.
There is a need for acoustic separation between the Café and the Four Seasons Lounge.
A larger window in which to set the dishes to be washed would be beneficial.
The introduction of an ATM would allow users to quickly access cash.
There is an expressed need for an art gallery to showcase student and community work.
New blinds would help facilitate presentations as the sun shines through the current blinds and makes it
hard to view any presentations.
Performing Arts Spaces
There is a need for a performance venue on campus. The departments and organizations on campus
would be severely disrupted if they had to use one of the other venues in Richland Center.
The Music Classroom is currently not ADA accessible and should be made to be so.
The scene shop is very small and does not function as a scene shop should. A solution is to move the
Music Program and turn the current music room into a scene shop. This would allow more space for the
scene shop, which could combine with the 3d art space so more students would have use of the best
equipment on campus. Ideally, a much larger passage way between the current music room and the
stage would have to be designed.
The music program currently has no storage space for the increasing amount of equipment it needs in
order to remain current. This includes an adequate keyboard-computer lab, percussion storage and a
secure place for student instruments.
Ideally, both the Theater Director and the Music Director should have their offices near the
rehearsal/performance areas. In the case of the Music Director, that office should be large enough to
double as a private instruction studio as well.
A second rehearsal/performance space is desired for the multiple performing arts groups on campus.
Two scenarios were discussed:
1. Black Box
A “Black Box” space would have a rehearsal or floor area identical to the size of the stage in the
Coppertop. This would allow both programs to be able to rehearse in one area and plan for a
performance, knowing the exact space of the actual performance area. The Community Band
has to wait for a theater production to end before it can begin rehearsals because the current
music room is too small and its proximity to the stage makes play rehearsals (happening at the
same time) awkward.
The Theater Program would like the option of doing more than one production per semester or
the option of doing more “experimental” productions than a traditional proscenium theater
allows. A “black box” might make this possible. Of course, such a space would need to be
flexible enough for more usages than simply the rehearsal needs of just two campus programs.
The actual room itself would need to be larger than the rehearsal area. This additional area
would have mobile seating apparatus allowing for multiple kinds of performances, as well as
additional campus and community functions.
2. Recital Hall
The Coppertop is close to being the right size for audiences of current Theater and Music
Department programs. It is, however, too large for the more intimate needs of music recitals by
soloists and small ensembles; or for any kind of academic class usage. A recital hall that could
seat 150 people is really what the campus needs. Currently we either have the Coppertop,
which seats about 300, and the Science Hall Lecture Pit which seats about 45.
A Recital Hall could be the new Music Room. The stage area could have flexible walls. This area
would be large enough to seat the Community Band or other large performing groups for
rehearsals, but made more intimate for a solo recital. As a potential classroom space it might be
more conducive for other academic programs, particularly speech classes. Community groups,
such as the Concert Association, might find it desirable.
The Coppertop
The entrances to the Auditorium are not ideal because they are located at the side of the stage instead
of at the back of the house. Other functions that should be located in, or near, the entrance are a lobby
area and a coat check area that might double for receptions. If a new entrance were to be designed at
the south end of the building the stage could be reconfigured to add wing space. Any remodeling plan
should include at least one hallway that connects one end of the building to the other.
There is a need for more storage which would include a costume shop.
The current green room/makeup room is small and doesn’t meet the needs of the programs that use it.
The need for a larger green room/makeup room was expressed.
New carpeting in the theater would help to bring the performing arts space up to date.
The fly mechanism is near the point of condemnation and has always been borderline useful. Ideally,
the roof above the stage should be raised at least six (6) additional feet in order to have a fly system that
offers real possibilities. Currently, even if the mechanism is upgraded to code, it offers limited usage.
A paint rack on the back wall of the stage would be extremely helpful. Ideally this would require a
“basement” below the stage.
Music Department
The music rehearsal area needs to be close enough to the performance area for quick mobility, but it
also needs to be “sealed off” for sound purposes.
Two (2) studios are required; one of these would double as the office of the Music Director. Both rooms
should have large double doors because one or both rooms would likely be the storage area of the
grand piano(s). These rooms should be at least double the space of the largest of the current faculty
offices.
A Music Library at least one and one-half times the size of the current room is needed. Various kinds of
space saving storage cabinetry is on the market and should be considered in the design. This room
should be located next to the Music Director’s office, for acoustic separation in between the two
studios.
More than double the current storage room is needed. This would include a room for student
instruments that would be separate from the main rehearsal room and would allow for the security of
those instruments. A separate percussion storage area adjacent to the rehearsal room is needed and,
ideally, a separate room (relatively small) for the storage of robes, t-shirts, and other such items.
The Mac Lab would function better and would get more use if it was located adjacent to the music
room.
Three (3) practice rooms are desired. The two current practice rooms are acceptable in size but not in
terms of acoustics. Ideally, they should be one and one-half times the current size. The third practice
room would be four times the size of the current practice rooms, allowing for some ensemble rehearsal
and choir sectionals.
All rehearsal and performance spaces need to have acoustical separation from other rooms and from
any sound the HVAC equipment makes.
East Hall
The 3d printing room is loud and disruptive and has no need to be located in this particular building.
The Continuing Education Department could move into this building as they are a branch of Extension.
The Mac Lab is used infrequently as it is located away from where most of the students are and the
room is locked during most of the day. The equipment and functions of this room would be better
utilized somewhere else on campus.
The HVAC is currently not performing up to the standards of the occupants.
Science Hall
The HVAC has become problematic in most of the spaces in this building. The old part of the building has
condensation forming on the windows.
A green house space would be a welcome addition to the campus and promote sustainability.
Casework that holds rocks would be favorable in the geology lab and a display cases in corridor would
be a nice addition.
Large moveable tables are desired in all classrooms and countertops that are durable are preferred in all
of the science labs. Multiple writing surfaces would make for a more flexible classroom.
All refrigerators that hold explosive materials should be rated to carry such materials. Each lab and prep
room should have a fume hood on a separate circuit. There is a need for an eyewash station in each lab
and prep room.
A cadaver tank would give a unique opportunity for the students.
The lecture hall could be updated with a hard surface floor as the room has food service capabilities.
The west entrance needs to be re-graded to prevent flooding and heaving that make the west doors
unusable in the winter. The south entrance has a Saran-wrapped column that should be looked at
further.
Gymnasium
The high pressure sodium lighting in the gym gives off a yellow hue that is troublesome to occupants.
Currently it is very difficult to get a good photo of large groups or student athletes due to the color that
the lighting emits. Replacing the entire lighting system would enhance people’s experience in the gym.
There is an expressed need for a classroom in the gym. A design to add a classroom, weight room and
storage on the west side of the building was discussed.
The locker room space is old and out-of-date and could use an updated look. It should also be expanded
to hold up to four (4) teams at once.
The main entrance is currently not well defined and is not ADA compliant nor are the existing bathrooms.
Storage is limited and in need.
Symons could possibly let student use their weight room for an additional fee.
The maintenance space in this building is deemed adequate.
A window looking into the weight room would add transparency in the gymnasium area.
Classroom Building
This building has an outdated aesthetic and could be made to look more contemporary, as it is the
building in which students spend most of their time.
The bathrooms in this building need to be remodeled to comply with ADA standards. The existing toilets
should be replaced with the newer seat height.
There are temperature control issues in this building which should be addressed.
Ideally all classrooms would be updated technologically (equal to the level of Room #315 in the Library).
They would have multiple whiteboards on all walls of the room. Having the option to be able to dim the
lights in front of the screen would also be beneficial.
Instructors locking doors in between classes has become disruptive.
Comfortable seating areas for students could act as impromptu meeting places.
In colder weather, students bring in extra clothing (coats, hats and gloves). A designated space outside
of the classroom for students to hold their gear would be helpful. Lockers could not only hold clothes
but also books and other belongings for students throughout the day.
Room numbers should be added to the walls near each classroom entrance (not only on the doors). This
would help with wayfinding when the classroom doors are open.
There is a desire to upgrade the furniture in the classrooms from chairs with a tablet arms to movable
tables with chairs. The tablet arm chairs do not allow students enough space to have more than one
book or notebook open at one time. Often students have to use their laps as tables in the current
situation. The introduction of tables would afford students who use wheelchairs, a better and more
comfortable learning environment.
An updated computer system and large podium with an abundance of space in each classroom would be
ideal for most faculty. They also want to be able to plug in their laptops.
The replacement of the carpeting in Room 203 may help to remove the odor from the room.
The introduction of a Writing Center would be beneficial to students and allow UW-Richland to provide
the same opportunities that most of the other UW System colleges already provide.
A private study room would allow students to focus on studying while on the campus.
Smart Farm
The Smart Farm would benefit from the following:
-
An area in which to hold a class that would replicate classroom space found on other parts of
the campus
A lab area to conduct tests would make it easier to hold science labs at the farm
A sink
A parking lot would make the farm more accessible and inviting to visitors
Larger restrooms that have the capacity for multiple people would allow the farm to house
larger events
Appendix A3:
Student Center Program
UW Richland Student Center Program
Space
Existing
NSF
Proposed
NSF
Notes
COMMONS
Cafeteria
(4 Seasons Lounge)
Game Room
Bookstore
Storage
Art Gallery
COMMONS TOTAL NSF
3780
720
0
0
180
0
4680
3180 Can rent out to community.
720
600
180
400
800
5880
KITCHEN & STORAGE
Office
Kitchen
Servery
Dishwashing
Receiving
Walk-in Cooler
Paper Storage
Dry Food Storage
Cleaning Supply Storage
KITCHEN & STORAGE TOTAL NSF
0
600
300
140
210
0
160
0
0
1410
120
720
350
140
180
160
60
60
60
1850
0
150
120
800
STUDENT ACTIVITIES
Faculty Office
Student Activities & Student Senate
International Student Lounge
Quiet Room
STUDENT ACTIVITIES TOTAL NSF
0
0
150
MUSIC
Faculty Office/Music Studio
Piano Lab/Music Studio
Music Library
Music Practice Room
Music Practice Room
Music Practice Room
Music Rehearsal Space
Black Box/ Conferencing(Pipin)
Student Instrument Storage
Percussion Storage
General Storage (robes, T-shirts)
MUSIC TOTAL NSF
0
110
110
45
45
0
960
0
210
0
0
1480
Adjacent to student services
180 coordinator office
120
1220
240
240
165
45
45
100
1430
1430
250
250
120
4315
THEATER
Faculty Office
House
Control Room/Booth
Stage/Fly
Dressing Women
Dressing Men
Makeup Room
Costume Shop/Laundry
Scene Shop/3D Art Studio
Storage Props
Storage Costumes
Green Room
Black Box / Conferencing(Pipin)
Lobby
Ticket Booth/Box Office
South Wing
North Wing
Coats
THEATER TOTAL NSF
STUDENT CTR (ORIG.) TOTAL NSF
STUDENT CTR (ORIG.) TOTAL GSF
STUDENT CTR (ORIG.) % EFFICIENCY
RELOCATED FUNCTIONS
Student Affairs
Business Services
Dean's Office
Foundation Office
Continuing Ed. Office & Storage
Mac/MIDI Computer Lab
RELOCATED FUNCTIONS TOTAL NSF
TOTAL GSF @ 75% EFFICIENCY
GRAND TOTAL NSF
GRAND TOTAL GSF
STUDENT CENTER REMODELED GSF
STUDENT CENTER NEW GSF
0
3880
130
1430
0
0
220
0
465
0
500
0
0
600
0
0
0
480
7705
120
3880
130
1430 Roof to be raised for fly loft
300
300
300
300
750
750
500
0
0 See Music
2000
100
600
600
480
12540
15425
18960
81.4%
25805
34407
75%
967
443
908
154
495
320
967
443
908
270
495
600
3683
4911
15425
18960
29488
39317
18960
20357
Gross 1693 at 75% efficiency
Gross 775 at 75% efficiency
Gross 1589 at 75% efficiency
Gross 472 at 75% efficiency
Gross 866 at 75% efficiency
Existing is in East Hall
Appendix B:
Steering Committee Workshops- Meeting Minutes
Appendix B1:
Workshop 1 Meeting Minutes
MEETING MINUTES
UW Richland
CLIENT:
Steering Committee Workshop
#1
SUBJECT:
IN ATTENDANCE:
PROJECT NAME:
UW Richland Master Plan
PROJECT NUMBER:
2013028
DATE:
September 16, 2013
ISSUED BY:
Justin Ballweg
Peter Tan, Strang
COPIES TO:
Justin Ballweg, Strang
UW Richland Steering Committee
Participants
Strang file
Statement of Purpose: The purpose of this meeting was to review the Master Planning Process, to
review the information gathered during the “Mine” (Information Gathering) Phase of the Master Planning
Process and to establish Guiding Principles for the Master Plan.
1.
Review of Master Planning Process
a.
b.
c.
d.
2.
Review Existing Data and Studies
a.
b.
c.
d.
e.
f.
3.
UW Richland Strategic Plan 2012-2017
Health & Safety Compliance Checklist
Capital/Facilities Planning, December 2011
Student Center/Fine Arts Building Expansion Project
Coppertop Theater Report
Solar Panel Study, 1995, Joel Goodman
Review Building Condition Reports (See Attached for font page of each section)
a.
b.
c.
d.
e.
f.
g.
4.
Mine
Define
Align
Design
Library
Melvill Hall
Student Center
East Hall
Science Hall
Gymnasium
Classroom
Review Priority Survey (See Attached)
a.
b.
c.
d.
Physical Environment
Amenities
Efficiency
Value
2013028-001-Minutes.doc
PAGE 1 OF 2
UW RICHLAND – FACILITIES MASTER PLAN
SEPTEMBER 16, 2013
e.
f.
g.
h.
i.
j.
Image
Sustainability
Accommodating Diversity
Educational Environments
Technology
Collaboration
5.
Review Stakeholder Surveys and Interviews (See Attached)
a. Library
b. Melvill Hall
c. Student Center
d. East Hall
e. Science Hall
f. Gymnasium
g. Classroom
6.
Held Visioning Session: Creation of Guiding Principles (See Attached)
a. The second hour of this meeting was dedicated to a visioning session during which we
collectively came up with the Guiding Principles of the UW Richland Facilities Master Plan.
These Guiding Principles were a collection of six to ten statements that will define the most
desired outcomes of this Master Planning process.
b. In preparation for this meeting, the Steering Committee was encouraged to come ready to
answer the following questions:
i. What do you value most about UW Richland?
ii. What do you want people to remember when they come to your campus?
iii. What is it about UW Richland’s campus facilities that you are most proud of?
iv. Aspirational question: What is it about UW Richland’s campus that you would like
to be proud of?
v. What is it about UW Richland that you would like to maintain and preserve?
vi. What would be ideal experience of UW Richland’s campus? How would you like
the visitors, students, faculty and community to feel when they are on campus?
vii. What would you like UW Richland’s relationship to the citzens, the neighbors and
the businesses in the community to be like?
viii. What would you like the UW Richland campus’s relationship to its physical,
geographical and environmental context to be?
MEETING ADJOURNED
2:00 pm
NEXT MEETING
October 4, 2013
KEY AGENDA ITEMS
Programming
2013028-001-Minutes.doc
PAGE 2 OF 2
Appendix B2:
Workshop 2 Meeting Minutes
MEETING MINUTES
UW Richland
CLIENT:
Steering Committee Workshop
#2
SUBJECT:
IN ATTENDANCE:
PROJECT NAME:
UW Richland Master Plan
PROJECT NUMBER:
2013028
DATE:
October 10, 2013
ISSUED BY:
Peter Tan
Peter Tan, Strang
COPIES TO:
UW Richland Steering Committee
Participants
Strang file
Statement of Purpose: The purpose of today’s meeting was to review the Space Needs and Facility
standards, Program for the Student Center, Smart Farm and Art Exhibits, Site Opportunities, Preferred
Development Approach for the Campus, and Potential Revenue Streams for the Campus.
1.
Approval of Meeting Minutes from Workshop #1
2.
Space Needs and Academic Facility Standards
a.
b.
c.
d.
e.
f.
g.
Furniture and equipment layouts were presented showing: 1) Current Classroom Size; 2)
1.33x Current Classroom Size; and 3) 2x Current Classroom Size. Please see the attached
powerpoint for the meeting.
An Excel spreadsheet has been created showing classroom utilization for the campus for
the fall semester, 2013. It indicates that there is extra capacity in the classrooms on
campus, allowing the possible creation of larger classrooms for active learning by removing
walls and reconfiguring classrooms.
Strang to email the Excel file to Prof. Brandon Fetterly.
Strang to add the Pit classroom in the Science Building to the spreadsheet. The Pit has 48
fixed seats, and can fit 50 students with the addition of 2 chairs.
Plan for a maximum of 38 students in Non-Science Classrooms, and 48 in Science
Classrooms.
The following scenario will be explored:
i. Move the Smart Classroom function to Room 204 in the Classroom Building
ii. Remove the walls between Rooms 203 and 211 in the Classroom Building,
creating a 48 to 50 seat classroom.
iii. The campus can afford to have a reduction in the number of classrooms by one,
through the creation of a larger classroom from 2 smaller ones. However, the
campus cannot afford to have a total reduction of 2 classrooms by the moving of
the computers into a classroom, because the presence of computers makes a
classroom too inflexible.
iv. Move the computer lab function to a location somewhere in the Library (e.g. the
former textbook storage area, or the location of the existing Smart Classroom).
There was discussion about the possibility of dispersing the computers in the
Library, but it was determined that there is still a need for classes where the
computers are all together in one space.
Faculty Offices:
i. Improved acoustical privacy is needed between faculty offices.
00 2013028-002-min.doc
PAGE 1 OF 3
UW RICHLAND – FACILITIES MASTER PLAN
SEPTEMBER 16, 2013
ii. 6 offices (History, Sociology, :Psychology, Business/Econ, HES (Health & Exercise
Science, Philosophy/Political Science) need to be 1.5x the existing size, to
accommodate students meeting with faculty in their offices.
iii. The following two disciplines can have their offices clustered in a suite around a
dedicated conference room:
1. English (4 offices)
2. Math (3 offices)
3.
Program
a.
b.
c.
Student Center: A draft space needs program spreadsheet for the new Student Center was
presented and discussed. (See attached spreadsheet)
Smart Farm: A draft of a Strategic Plan for the UW-R Smart Farm by Susan Price dated May
31, 2013 was presented.
Art Exhibits: The public spaces in the new Student Center will provide good opportunities
for the exhibition of art.
4.
Site Opportunities
a. Adjacencies and flow on the campus were discussed. Please see the attached sketch of the
Campus Plan, and the powerpoint for the meeting.
5.
Preferred Development Approach
a. Remodel and Addition to the Existing Student Center:
i. Two options were discussed: 1) A new Student Center addition at the east end of
Melvill Hall, and a remodeling of the existing Student Center building into a
Performing Arts building. 2) A remodeling and expansion of the existing Student
Center to house the Commons/Café, Student Affairs, Business services and the
Performing Arts departments.
ii. The decision was made to pursue Option 2. Please see the attached sketch of the
Campus Plan.
b. Remodel and Addition to the Existing Gym:
i. A westward expansion of the existing Gym with a new accessible entrance, and
new parking lots for the gym and Symons Center was presented. It was noted that
a portion of the expansion will be located within the floodplain, necessitating a
process of conversion of that portion of the site into a buildable classification.
c. Remodel of Classroom Building: See Item 2. of these minutes.
d. Remodel of Library: See Item 2. of these minutes.
e. Remodel of Melvill Hall: See Item 2. of these minutes.
6.
Potential revenue Streams for the campus and Smart Farm
a. Please see the attached powerpoint presentation for the meeting.
00 2013028-002-min.doc
PAGE 2 OF 3
UW RICHLAND – FACILITIES MASTER PLAN
SEPTEMBER 16, 2013
MEETING ADJOURNED
TBD
NEXT MEETING
October 21, 2013
KEY AGENDA ITEMS
a.
Discuss capital improvement options and reach a consensus around
preferred options
00 2013028-002-min.doc
PAGE 3 OF 3
b.
Discuss budgets and timeline for implementation of capital improvements
c.
Confirm master planning deliverables.
86 WEEKLY ROOM HOURS
AVAILABLE
154 WEEKLY ROOMHOURS
USED
240 TOTAL AVAILABLE
ROOM HOURS PER WEEK
40 AVAILABLE HOURS PER
WEEK PER ROOM
8AM-NOON 1PM-5PM
8 AVAILABLE HOURS PER
DAY PER ROOM
SIX GENERAL
CLASSROOMS
201, 203, 204, 206, 213, 315
Existing Classroom Utilization
continue in the Pit in Science bldg
ƒ Larger classes are typically lecture format & can
ƒ Current class size: average 22 students, max 35
ƒ Current classroom dimensions (20’-9” x 29’-0”)
ƒ Rooms 201, 203, 211, 213
Academic Facility Standards
ƒ 1.33x Current classroom size (29’-0”x 29’-0”)
ƒ To accommodate Active Learning
Academic Facility Standards
ƒ 2x Current classroom size (29’-0” x 43’-11”)
Academic Facility Standards
Appendix B3:
Workshop 3 Meeting Minutes
MEETING MINUTES
UW Richland
CLIENT:
Steering Committee Workshop
#3
SUBJECT:
IN ATTENDANCE:
PROJECT NAME:
UW Richland Master Plan
PROJECT NUMBER:
2013028
DATE:
October 21, 2013
ISSUED BY:
Justin Ballweg
Larry Barton, Strang
COPIES TO:
Justin Ballweg, Strang
UW Richland Steering Committee
Participants
Strang file
Statement of Purpose: The purpose of this meeting was to discuss the Draft Maintenance Plan and
Capital Improvement Options, as well as to confirm the master planning deliverables.
1.
Approved Meeting Minutes from Workshop #2
2.
Discussed Capital Improvement Options
a.
b.
Reached consensus around preferred options
Reached consensus of budgets and timelines for implementation of Capital Improvements.
The following phases were confirmed in order:
Phase 1A: Student Center Addition
Phase 1B: Performing Arts Center Remodel
Phase 2A: Melvill Hall Remodel
Phase 2B: East Hall Remodel
Phase 3A: Classroom Building Remodel
Phase 3B: Library Remodel
Phase 4A: Gymnasium Addition
Phase 4B: Gymnasium Remodel
Phase 5; Greenhouse and Science Update
There were also several site improvements discussed that will be take place throughout and
in conjunction with many of the building additions and remodels.
c.
Initial Capital Improvements Budgets were discussed
3.
Discussed Draft Maintenance Plan
4.
Confirmed Master Planning Deliverables
5.
Confirmed Master Planning Deliverables
a. Executive Summary
i. Introduction
ii. Background
iii. UW-Richland’s Facilities Master Plan Guiding Principles
iv. Notes on the Master Planning Process
v. Mine Phase (Info Gathering) Summary
2013028-003-Minutes
PAGE 1 OF 2
UW RICHLAND – FACILITIES MASTER PLAN
SEPTEMBER 16, 2013
b.
c.
d.
vi. Define Phase (Programming) Summary
vii. Align & Design Phase Summary
viii. Recommendations
ix. Conceptual Budget
x. Phasing / Implementation Plan
Program Summary
i. Introduction
ii. Qualitative Summary (Priorities)
iii. Operational Summary
iv. Quantitative Summary
Master Plan
i. Introduction
ii. Site Condition
iii. Surrounding Context
iv. UW Richland Master Plan
Building Condition Report
i. Introduction
ii. Maintenance and Infrastructure Improvement Budget
iii. Science Hall
iv. Classroom Building
v. Miller Memorial Library
vi. Mellvill Hall
vii. Wallace Student Center
viii. Roadrunner Gymnasium
ix. East Hall
MEETING ADJOURNED
12:45
NEXT MEETING
November 8, 2013
KEY AGENDA ITEMS
a.
Presentation of final master planning documents
b.
Recording of comments and /or final requests for modifications from
steering committee
2013028-003-Minutes
PAGE 2 OF 2
Appendix C:
Owner Provided Academic Data
Appendix C1:
UW Richland Strategic Plan 2012-2017
UW-RICHLAND
STRATEGIC PLAN
2012 – 2017
Submitted February 29, 2012
UW-Richland Strategic Plan
UW-Richland’s Strategic Planning Process
The planning process for UW-Richland’s 2012-2017 Strategic Plan originated with the Steering Committee in
November 2010. It was decided that Patrick Hagen, CEO/Dean, would team up with two Strategic Planning Cochairs. After extensive campus-wide discussion, Gail Hoffman, HES Professor, and George Henze, Senior
Student Services Coordinator, were appointed as Co-chairs by the Collegium. Dean Hagen agreed to
coordinate scheduling of meetings through his office. Together, Hoffman, Henze, and Hagen formed the
Executive Team that guided the process.
The Executive Team consulted with Steve Kohlstedt, Richland County Cooperative Extension, and identified
Paul Ohlrogge, Iowa County Cooperative Extension, as a possible consultant for the process. Mr. Ohlrogge
agreed to lend his expertise to the planning process.
The Executive Team, in consultation with Mr. Ohlrogge, determined that they wished to conduct a SWOT
analysis with a Focus Group made up of students, former students, community leaders, alumni, faculty, and
staff. In preparation for the analysis, Focus Group members were encouraged to study UW-Richland’s Mission
Statement. The Focus Group met for two hours on January 12, 2011. Mr. Ohlrogge provided the Group with
information on strategic planning and led it in a values discussion as well as a SWOT analysis. After the
meeting, members of the Focus Group were encouraged to join the Strategic Planning Committee.
Subsequently, Mr. Ohlrogge prepared a Summary Report and shared it with the Executive Team.
At UW-Richland’s Spring Retreat on January 18, the Executive Team led faculty and staff in a SWOT analysis.
Upon completion of the analysis, the Team shared the results of the Focus Group with the retreat participants.
A general discussion ensued, and the Executive Team recruited faculty and staff to join the Strategic Planning
Committee. The general understanding was that the values and SWOT analyses carried out by the Focus
Group and the faculty and staff at the Retreat would serve as a starting point for the work of the Strategic
Planning Committee. The stated goal was to complete the strategic planning process in five months.
Between January 18 and February 24, the Executive Team worked to put together a Strategic Planning
Committee. The committee would be made up of the following members: co-chairs (2); community members
(3); faculty members (2); academic staff members (2); student members (3); ex-officio members (2); and the
consultant, Mr. Paul Ohlrogge.
The Strategic Planning Committee held an extended meeting with the consultant in February and again in
April. The result of these two meetings was a 15-page “Strategic Planning Effort” document. Drafted by the
consultant, it laid out five strategic issues. The issues were refined and shaped into questions. The questions
provided the basis for five strategic themes: Theme 1: Buildings and Grounds; Theme 2: Student Recruitment
and Retention; Theme 3: Campus-Community Relations; Theme 4: Smart Farm Development and Usage; and
Theme 5: Faculty and Staff Recruitment and Retention.
At the June meeting, the Committee broke down into sub-committees based on the five strategic themes.
Each sub-committee was asked to develop Action Steps for its theme as well as anticipated potential barriers
to realizing the theme. A convener was assigned to each sub-committee. (At this point, it was clear that the
process could not be completed in five months, and a target date for October 1, 2011 was set.) At the close of
1
UW-Richland Strategic Plan
the June meeting, the sub-committees were asked to find additional members and meet at their convenience
during the summer. Each sub-committee was asked to complete its strategic theme work by September 1,
2011. The work of the consultant was complete as of the June meeting.
Upon receiving the strategic theme results from the sub-committees, the Executive Team met with the
conveners of each group to discuss the results. After that meeting, it was agreed that the Executive Team
would work to refine the strategic themes and prepare a strategic and operational plan. In the interim, Dean
Hagen shared the initial results with Dr. Jane Crisler, UW Colleges Development Officer. Dr. Crisler
recommended that the Executive Team add a sixth theme that addressed improving the academic program.
This recommendation was welcomed by the Executive Team. The sixth theme drew from the “Strategic
Planning Effort” document and the results of meetings with faculty and staff.
In the process of developing the Plan, the term “theme” was shifted to “goal.” The plan, as it’s currently
presented, consists of six goals.
The Context
The UW-Richland Strategic Plan was produced in response to SWOT analyses done with both the Focus Group
and the faculty and staff at the 2011 Spring Retreat. With a few exceptions, the strengths, weaknesses,
opportunities, and threats identified by the Focus Group appeared again in the SWOT analysis completed by
the faculty and staff. As would be expected, the faculty and staff were able to go into much more detail in
discussing these issues.
The discussion of resources centered on the fact that they have been scarce for some time and that they will
continue to be scarce in the future. The United States finds itself in the aftermath of the “Great Recession”
and the State of Wisconsin is facing a significant budget deficit. There is concern that the lack of raises and the
decrease of benefits will make it difficult to retain faculty and staff, as well as recruit them in the first place.
Low salaries and decreasing benefits, together with a lack of cultural diversity in Richland Center, make it
especially difficult to recruit diverse faculty and staff. It was expressed that the new Integrated Enrollment
Management (IEM) budget model may offer opportunities for growing campus revenue. In terms of human
resources, participants recognized that faculty and staff often feel “spread too thin” as they attempt to do
more because of rising expectations in the new budget model. At the same time, people were quick to point
out the esprit de corps that defines the campus culture. With respect to natural resources, there was concern
that UW-Richland could do more in making the campus sustainable. In terms of technology, it was suggested
that the campus needs to make strides in offering a wider variety of tools that support 21st century teaching.
The Smart Farm was cited as a great asset whose value still needs to be realized in terms of the mission of the
college.
In terms of the recruitment and retention of students, participants recognized that UW-Richland operates in a
competitive marketplace. The Wisconsin Technical College System represents a threat as many of its
institutions expand their liberal arts offerings and position themselves as transfer institutions. Madison Area
Technical College (now Madison College) is the most significant threat to UW-Richland. In addition, the
number of high school graduates is decreasing and will continue to do so until 2015. Furthermore, as the price
of college tuition goes up and the amount of personal debt grows exponentially, the value of a liberal arts
2
UW-Richland Strategic Plan
education becomes questioned by certain segments of the general public. Participants pointed out that UWRichland’s tuition had been frozen for four years and that it is the lowest in the UW System. The importance of
the Campus View Dormitories in recruiting and retaining students was also noted. Many pointed to the fact
that UW-Richland can offer the first two years of a personalized, high-quality liberal arts education at a much
lower cost than private residential colleges. Another strength of UW-Richland is its tradition in educating
international students. It was recommended that the campus pursue growth in the area of independent
international students to offset the current regional high-school demographics. Independent international
students help diversify the campus, and they pay out-of-state tuition which is a significant financial benefit
since the campus keeps $.75 for every $1 paid above in-state tuition. Other potential opportunities include
the growth of the Latino population in the region and the introduction of the Bachelor of Applied Arts and
Sciences (BAAS).
Vision Statement
Education for all!
Mission Statement
UW-Richland provides an intellectually engaging liberal arts and pre-professional education. With a global
perspective in a rural setting, UW-Richland emphasizes scholarship, service, and academic excellence.
University of Wisconsin System resources, small class size, a variety of co-curricular opportunities, 21st century
technologies, and a faculty and staff dedicated to teaching lead students to an associate of arts and science
degree and seamless transfer to UW baccalaureate institutions, the Bachelor of Applied Arts & Science or
other degree-completion collaborations. Committed to a positive, collaborative relationship with the
community, UW-Richland provides a culturally-rich environment for lifelong learners.
Our Core Values
Students: Our first commitment is to the success of our undergraduate students.
Access: We strive to make a college education a reality for anyone who puts their mind to it.
Caring: We strive to make our institution a place where people feel like family.
Communication: We strive to communicate openly and honestly.
Creativity: We strive to encourage creativity, entrepreneurialism, and innovation.
Diversity: We strive to create an environment that welcomes diverse people and perspectives.
Global Education: We strive to provide a global perspective in our rural setting.
History: We strive to value the 100-year history of higher education in Richland County.
Life-long Learning: We strive to foster learning from birth through retirement.
Quality: We strive to meet the needs of our community and realize accepted high standards.
Work Ethic: We strive to sustain our mission through efficient and effective work.
3
UW-Richland Strategic Plan
Strategic Goals and Objectives
Goal 1: Enhance the Facilities and Grounds
Objective A: Develop a Ten-Year Campus Facilities and Site Master Plan
1.
2.
3.
4.
5.
Consult with Central Administration and experienced CEO/Deans about the master planning process
Consult with Steering and create a Master Plan Ad-hoc Committee
Gather reports and data from previous planning projects
Interview firms that provide master planning services
Hire a firm and complete the process
Personnel responsible: CEO/Dean and Staff
Estimated cost: TBD
Completion date: Fall 2012-Spring 2013 (mid-term objective)
Objective B: Begin Planning for a Student Center and a Fine Arts Center
1. Meet with the Foundation Executive Director and discuss previous planning
2. Meet with the Master Planning Ad-hoc Committee to discuss the concept
3. Integrate the results of these meetings into the master planning process
Personnel responsible: CEO/Dean, Staff, and Foundation Executive Director
Estimated cost: none
Completion date: Summer 2012 (mid-term goal)
Objective C: Develop Short-term Projects that Improve the Appearance of Facilities and Grounds
1. Organize a walk-through with high-school students and parents who are unfamiliar with the facilities
and grounds
2. Organize a walk-through with faculty and staff
3. List five short-term projects that could improve the facilities and grounds
4. Complete them
5. Work with Foundation to create a facilities and grounds discretionary fund
Personnel responsible: CEO/Dean, ADAS, and Maintenance Director
Estimated cost: $100
Completion date: October 2012 (mid-term objective)
4
UW-Richland Strategic Plan
Objective D: Pursue Initiatives to Make UW-Richland a More Sustainable Campus
1. Work with Honeywell/ESG to reduce UW-Richland’s energy and water use through the Wisconsin
Performance Contract (Fall 2012)
2. Collaborate with Richland County to replace the boiler system at a ~50% savings through the
Wisconsin Performance Contract (Fall 2012)
3. Create an ad-hoc sustainable campus committee (Fall 2012)
4. Organize a campus green jobs fair (Spring 2013)
5. Work with Dale Bender to bring solar energy to the UW-Richland campus (Spring 2014)
Personnel responsible: CEO/Dean, ADAS, Maintenance Supervisor, and Student Senate
Estimated cost: $450,000
Completion date: March 2013 (long-term objective)
Objective E: Study the Maintenance Needs of UW-Richland’s Grounds and Facilities
1. Gather data on staffing needs
2. Gather data on space needs
3. Gather data on machinery and tools
Personnel responsible: ADAS and Maintenance Supervisor
Estimated cost: None
Completion date: Fall 2012 (mid-term objective)
Objective F: Investigate Temporary and Permanent Spaces for Art Exhibits
1. Meet with art professor and students to discuss exhibit space
2. Create a plan for exhibiting art work around the campus
3. Discuss a gallery space for the future Student Center
Personnel responsible: ADAS, Art Professor, Art Students
Estimated cost: $200
Completion date: March 2013 (long-term objective)
5
UW-Richland Strategic Plan
Objective G: Create a Smart Room with Mediasite Recording Capabilities in the Miller Library
Classroom (315)
1. Meet with faculty and staff to determine needs
2. Select Mediasite recording equipment and other technology
3. Complete classroom in preparation for use in Summer School 2012
Personnel responsible: ADAS, Curriculum Committee, Faculty and Staff
Estimated cost: $120,000 (Capital Investment Money from UW System/DOA)
Completion date: May 2012 (short-term objective)
Objective H: Build Additional Dormitory on Campus View Property
1.
2.
3.
4.
Meet with Campus View Board
Study campus growth projections and housing needs
Study current trends in student housing
Work with Campus View Board to realize the project
Personnel responsible: CEO/Dean, ADAS, Student Services, Campus View Executive Director, Campus View
Board, Continuing Education, and Student Senate
Estimated cost: unknown at this time
Completion date: Fall 2013 (long-term objective)
Goal 2: Increase Recruitment and Retention of Students
Objective A: Create an Ad-hoc Recruitment Committee to Advise Student Services on Recruitment
Issues
1.
2.
3.
4.
5.
6.
7.
Charge CEO/Dean to create an ad-hoc committee (Fall 2012)
Select a four-member committee, including one student (Fall 2012)
Committee studies best recruitment practices in the UW Colleges and beyond (Fall 2012)
Committee shares recruitment ideas with CEO/Dean (Spring 2013)
Committee shares ideas with Student Services staff (Spring 2013)
Student Services and Committee share ideas with faculty and staff at a Fall Retreat (Fall 2013)
Student Service’s integrates ideas into Recruitment Plan (Fall 2013)
Personnel responsible: CEO/Dean, Ad-hoc Committee, Student Services, Students
Estimated cost:______________
Completion date: Fall-Spring 2012-2013 (long-term objective)
6
UW-Richland Strategic Plan
Objective B:_Create an Ad-hoc Retention Committee to Advise Student Services on Retention
Issues
1. Charge CEO/Dean to create an ad-hoc committee (Fall 2013)
2. Select a four-member committee, including one student (Fall 2013)
3. Committee studies best retention practices in the UW Colleges, including identifying and tracking atrisk students (Fall 2013-Spring 2014)
4. Committee shares retention ideas with CEO/Dean (Spring 2014)
5. Committee shares ideas with Student Services staff (Spring 2014)
6. Student Services and Committee share ideas with faculty and staff at a Fall Retreat (Fall 2014)
7. Student Service’s integrates ideas into Retention Plan (Fall 2014)
Personnel responsible: CEO/Dean, Ad-hoc Committee, Student Services, Students
Estimated cost: none
Completion date: Fall 2014 (long-term objective)
Objective C: Offer Outreach Programs to Attract Potential Students to Visit Campus and Improve
Publicity/Visibility
1.
1.
2.
3.
Offer free admission to high-school students for sporting or other events on campus
Develop a school shadow program for high-school students
Employ the Roadrunner to attend community events
Ask current students to do panels at local high schools
Personnel responsible: Student Services, Student Recruiter, Student Senate, Foundation, Athletics
Estimated cost: $1000
Completion date: Fall 2012 (mid-term objective)
Objective D: Develop Recruitment and Retention Strategies for New Academic Initiatives
1. Survey educational needs of local businesses and industry
2. Explore the idea of satellite campuses
Personnel responsible: Student Services, Associate Dean, ASI Recruiter
Estimated cost: none
Completion date: Spring 2014 (long-term objective)
Objective E: Make High School Visits More Meaningful
1. Continue and expand 10th grade English-type in-school presentation programs
2. Develop rapport with school counselors and teachers in Southwest Wisconsin
3. Continue to refine and offer biennial Counselor’s Day at UW-Richland
7
UW-Richland Strategic Plan
Personnel responsible: Student Services, Campus Ambassadors
Estimated cost: none
Completion date: Fall 2014 (long-term objective)
Objective F: Offer In-service Days where Faculty Would Meet and Interact with their Counterparts
at Local Schools
1. Identify interested faculty
2. Contact schools and coordinate visits
3. Develop an incentive program for faculty, e.g., faculty stipend
Personnel responsible: CEO/Dean, Student Services, Faculty/IAS
Estimated cost: $500
Completion: Spring 2013 (long-term objective)
Goal 3: Strengthen Campus and Community Relations
Objective A: Build on Strong Traditions through Effective Outreach
1. Promote the campus website in the community (Spring 2012)
2. Continue to build relationships with local schools by expanding our presence with the teachers and
administration. (Spring 2013)
3. Use the experiences and stories of international students and alumni to build relations in our
community and beyond. (Spring 2013)
4. Grow relationships with the alumni in the community and beyond to recruit students (Fall 2013)
5. Continue to build the relationships with school/parent support groups and thereby expand our
recruitment of 1st generation students. (Spring 2014)
6. Work with alumni to create internships and work opportunities in the community and beyond. (Fall
2014)
7. Expand University Relations marketing budget in collaboration with the international student
coordinator to recruit globally. (Fall 2014)
Personnel Responsible: University Relations, Alumni Association, Foundation, CEO/Dean
Estimated cost: $5000
Completion date: Fall 2014
Objective B: Engaging the Community by Sharing Our Expertise
1. Host legislative visits on a regular basis (Spring 2012)
2. Become a regional leader in international education (Spring 2012)
3. Build on tradition in international education by engaging the community in a broader range of
activities (Fall 2012)
8
UW-Richland Strategic Plan
4. Communicate our mission at special events on campus (Fall 2012)
5. Invite County Board Members to classes to see what really occurs in the classroom. (Spring 2014)
6. Develop connections with the Latino population in Richland County (Spring 2014)
Personnel responsible: CEO/Dean, Student Services, Legislative Liaison Committee, International Student
Coordinator, Continuing Education
Estimated cost: $500.00
Completion date: Spring 2014
Goal 4: Establish a Plan for Usage and Development of the Smart Farm
Objective A: Define programmatic usage
1.
2.
3.
4.
Invite Chancellor Cross to visit the farm and brainstorm with us (Spring 2012)
Farm Advisory Board encourages faculty/IAS to use the farm (Fall 2012)
Draw on Extension’s expertise to plan for future farm use (Fall 2012)
Farm Advisory Board works on creating a web blog for announcing news and events taking place at the
farm (Spring 2013)
5. Research “Smartfest”(Spring 2013)
6. Invite Taliesin Architects to tour the farm and give feedback on usage (Fall 2014)
Personnel responsible: Dean, Associate Dean, Foundation, Faculty
Estimated cost: $1500.00
Completion date: Spring 2013
Objective B: Improve Buildings and Indoor Facilities
1.
2.
3.
4.
5.
6.
7.
Remove existing hay from the hayloft (Spring 2012)
Study retreat centers in the state (Fall 2013)
Enlarge existing door to hayloft (Spring 2015)
Improve electrical wiring in the upper and lower barn (Spring 2016)
Restore the buggy (Spring 2016)
Develop a farm memorabilia museum in the lower barn (Fall 2016)
Design indoor classroom space (Fall 2016)
Personnel responsible: Dean, Foundation
Estimated cost: __________
Completion date: Fall 2016
9
UW-Richland Strategic Plan
Objective C: Improve Grounds and Outdoor Facilities
1.
2.
3.
4.
5.
6.
7.
8.
Develop parking areas along the driveway from Dayton Ridge Road (Spring 2011)
Clear/mow a path from the mowed yard area to the woods (Spring 2012)
Create a sidewalk from the house to the gravel parking area (Fall 2012)
Develop a trail system on the farm (Fall 2012)
Construct a gravel parking area along the lower fields near the pond (Spring 2014)
Construct a staircase/ramp for access to the upper hay loft (Spring 2014)
Construct signs to mark parking areas and building locations (Fall 2014)
Pave the driveway (Fall 2015)
Personnel responsible: Dean, Foundation, Farm Advisory Board
Estimated cost: __________
Completion date: 2016
Goal 5: Improve Recruitment and Retention of Faculty and Staff
Objective A: Provide More Opportunities for Teaching Staff to Engage in Informal Discussions
1.
2.
3.
4.
Generate “Talk Teaching” ideas (Fall 2012)
Develop a summer “Book Club” for faculty/staff (Spring 2013)
Have one to two “Talk Teaching” sessions per semester (Fall 2013)
Promote VTLC activities by faculty/staff (Fall 2013)
Personnel responsible: Associate Dean, Faculty, Staff
Estimated cost: $200
Completion date: Fall 2012
Objective B: Create a More Intentional “Welcome Package” for New Hires
1. Social mentoring--develop informal mentoring connections (lunches, outings, etc.) between
experienced and new faculty/staff (Fall 2012)
2. Develop a spousal support network (Spring 2013)
Personnel responsible: Dean’s Office
Estimated cost: $300
Completion date: Fall 2013
Objective C: Improve Campus Morale by Regularly Recognizing Our Successes
1. Create a forum for regular sharing of “Good News” of either a professional or personal nature (Fall
2012)
2. Include “Good News” announcements as regular portion of meetings like Collegium (Fall 2012)
10
UW-Richland Strategic Plan
Personnel responsible: Steering Chair, CEO/Dean
Estimated cost: none
Completion date: Spring 2012
Objective D: Increase Professional Development Funding for Faculty and Staff
1. Promote the need for increased professional development funding from the Richland County Campus
Foundation. (Spring 2012)
2. Provide annual reports to the Foundation Board on faculty/staff activity supported by professional
development funds and how the activity impacts student success (Spring 2012)
3. Amend professional development policy to include reporting mechanism (Fall 2012)
4. Work with the Foundation to create a sabbatical fund for the campus. (Spring 2014)
Personnel responsible: Steering, Foundation Board, CEO/Dean
Estimated cost: none
Completion date: Spring 2014
Objective E: Focus Campus Retreats More on Community Building and Support
1. Steering and CEO/Dean brainstorm to restructure retreat goals
Personnel responsible: CEO/Dean, Steering
Estimated cost: none
Completion date: Summer 2012
Goal 6: Expand and Improve Academic Program
Objective A: Prepare a Model for Summer School 2013 that Will Best Serve Student Demand, Meet
Faculty/IAS Interests, and Produce a Profit for the Campus
1. Discuss current model with faculty and staff and develop a philosophy for summer school, i.e., What is
the purpose of running a summer school program?
2. Analyze summer school models from other smaller campuses UWC campuses
3. Identify ways to collaborate, especially point-to-point, with other smaller UWC campuses
4. Identify possible courses that are in high demand by students who are enrolled elsewhere
5. Investigate ways to use Campus View dorms efficiently
Personnel responsible: Associate Dean, Curriculum Committee, CEO/Dean
Estimated cost: none
Completion date: November 1, 2012 (mid-term goal)
11
UW-Richland Strategic Plan
Objective B: Create a State-of-the-Art Certified Nursing Program (CNA) that Benefits UW-Richland
Students and the Local Economy
1.
2.
3.
4.
5.
6.
Study current CNA programs offered in the UW Colleges and elsewhere
Consult with experts in the field
Identify a curriculum
Create a space for offering CNA classes
Establish partnerships with area care facilities
Launch program in fall 2012
Personnel responsible: CE Director, CEO/Dean
Estimated cost: $7000.00 (from CE and IEM Investment Money)
Completion date: Summer 2012 (mid-term goal)
Objective C: Enhance UW-Richland’s Pre-college Program and Increase the Number of Students We
Recruit
1.
2.
3.
4.
5.
Determine structure for administering and staffing the program
Continue work with the Milwaukee Renaissance Academy and partner with another middle school
Collaborate with Quest to recruit more program participants in Milwaukee
Redefine goals for the Pre-college Program
Determine ways to maintain contact with Richland-area and Milwaukee-area students during the
academic year
6. Engage faculty and IAS in teaching Pre-college courses (address pay issue)
7. Engage current UW-Richland students as mentors/advisors for the program
8. Identify grant funding that can support this program and make applications
Personnel responsible: CE Director, CEO/Dean, Student Services
Estimated costs: $2500 (IEM Investment Money)
Completion date: February 2012
Objective D: Evaluate the Adult Student Initiative (ASI) and Align it with the BAAS
1. Run a three-year pilot and assess delivery mode as to its sustainability
2. Support the development of additional AHY courses by providing experienced faculty/IAS with $1000
stipends (up to $5000).
3. Explore partnerships for point-to-point sharing of courses with other campuses
4. Consider the relationship between the ASI coordinator position and the BAAS coordinator
Personnel responsible: CEO/Dean, Associate Dean, Student Services, ASI Recruiter, Patti Wise
Estimated costs: $5000 IEM Investment Money
Completion date: February 2013 (long-term goal)
12
UW-Richland Strategic Plan
Objective E: Implement the Bachelor of Applied Arts and Sciences Degree (BAAS)
1. Collaborate with UW-Rock County on developing the degree/curriculum
2. Create a BAAS Curriculum Planning Team
3. Work with provost’s office at UW-Platteville to determine a mode of operation for managing BAAS
curriculum
4. Select upper-division courses from UW-Platteville that will be offered as part of the UW-Richland BAAS
5. Develop UW-Richland courses, service learning courses, and internships that will be offered as part of
the BAAS
6. Make presentations to area businesses and service clubs on the BAAS
7. Explore combining the .25 BAAS Adult Student Advisor and .25 Professional Experience Coordinator
with the .50 ASI Coordinator (>>1.0 FTE that manages these areas, including an internship program)
8. Work with Student Services to determine BAAS needs
9. Work with the Miller Memorial Library to determine BAAS needs
10. Work with the Textbook Center to determine BAAS needs
11. Recruit students for the BAAS
12. Launch BAAS in Fall 2013
Personnel responsible: Curriculum Committee, Associate Dean, CEO/Dean, ADSS, Library Director
Estimated cost: $500
Completion date: Fall 2013 (long-term goal)
Objective F: Support Programs and Curriculum
1. Create an ad-hoc committee to short-term program needs and staffing priorities, i.e. We currently
have three campus programs without a faculty member. What are our faculty and IAS hiring
priorities? (May 2012)
2. Create an ad-hoc committee to review our long-term programmatic needs (December 2012)
3. Create an ad-hoc committee to review our textbook rental program from a curricular perspective (May
2013)
4. Work with the Green Team to identify investment monies for faculty/IAS to support effective teaching
Personnel responsible: Associate Dean, Curriculum Committee, Student Services, Student Senate
Estimated cost: none
Completion date: January 2013
Objective G: Double the Number of Participants in UW-Richland’s Academic Alliance 2.0
(Concurrent Enrollment Program)
1.
2.
3.
4.
5.
Present new program to CESA 3 PAC
Recruit new and former schools into the program
Give Associate Dean .25% release for AA 2.0 in Spring 2012 and 2013
Expand curricular offerings
Present Academic Alliance 2.0 concept to regional service clubs
13
UW-Richland Strategic Plan
Personnel responsible: Associate Dean, Faculty, Student Services, CEO/Dean, and Departments
Estimated cost: $9,000 ($70,000 in IEM Investment Money)
Completion date: September 2013 (long-term goal)
Objective H: Utilize the Power of Technology to Advance Curricular Goals and Advance New
Pedagogies
1.
2.
3.
4.
5.
6.
Create video streaming capabilities on campus
Pilot a course using streaming technology
Provide training for Smart Board
Investigate use of technology like streaming for Adult Student Initiative
Provide faculty and IAS with mobile technology to develop teaching
Initiate a campus pilot using e-textbooks in one course
Personnel responsible: IITC, Curriculum Committee, Associate Dean
Estimated cost: $30,000 (Capital Investment Money from UW System/DOA)
Completion date: May 2014 (long-term goal)
Objective I: Increase UW-Richland’s International Student Population by Offering Summer Youth
Camps for Chinese High-school and Middle-school Students from Yueqing, China
1.
2.
3.
4.
5.
Establish program
Establish curriculum
Develop budget
Create a sister-city partnership between Yueqing and Richland Center
Work with faculty and IAS to provide curriculum
Personnel responsible: CE Director, CEO/Dean, Student Services, Campus View, Mayor’s Office
Estimated cost: $200
Completion date: March 2012
Objective J: Increase UW-Richland’s International Student Population by Creating a Pre-college
Program with High Schools in Yueqing, China
1. Establish program
2. Sign MOU in Yueqing
3. Work with faculty and IAS to develop curriculum
Personnel responsible: CEO/Dean, Chancellor’s office, Student Services, Curriculum Committee, Faculty & IAS
Estimated cost: $3500 (IEM investment money)
Completion date: February 2013
14
UW-Richland Strategic Plan
Objective K: Double S&E 103 Funding to Support Underfunded Academic Programs on Campus
1. Review S&E budget
2. Identify funds from other sources to support S&E budget
3. Identify funds to support course enhancement or new course development
Personnel responsible: Steering Committee, Budget Committee, CEO/Dean
Estimated cost: none
Completion date: April 2012
15
Appendix D:
Owner Provided Facilities Data
Appendix D1:
Classroom Usage Schedule
Room #:
201
203
204
206
213
315
102
Total
Daily Hours Used:
6.25
4.25
7
7
4.5
4.5
6.5
33.5
Daily Hours Available:
1.75
3.75
1
1
3.5
3.5
1.5
14.5
Weekly Hours Used:
27.75
28
27.5
31
17.25
22.5
6.5
154
Weekly Hours Available:
12.25
12
12.5
9
22.75
17.5
33.5
86
OPEN
OPEN
OPEN
OPEN
CLASS-315
CLASS-315
CLASS-315
CLASS-315
OPEN
OPEN
CLASS-315
CLASS-315
CLASS-315
CLASS-315
CLASS-315
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-315
CLASS-315
CLASS-315
CLASS-315
CLASS-315
CLASS-315
CLASS-315
CLASS-315
CLASS-315
OPEN
OPEN
OPEN
OPEn
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
Monday, October 07, 2013
8:00 AM
:15
:30
:45
9:00 AM
:15
:30
:45
10:00 AM
:15
:30
:45
11:00 AM
:15
:30
:45
12:00 PM
:15
:30
:45
1:00 PM
:15
:30
:45
2:00 PM
:15
:30
:45
3:00 PM
:15
:30
:45
4:00 PM
:15
:30
:45
5:00 PM
:15
:30
:45
6:00 PM
:15
:30
:45
7:00 PM
:15
:30
:45
8:00 PM
HES 127 Fitness ForMAT 091 ElementaryMAT 221 Calculus a CLASS-206
HES 127 Fitness ForMAT 091 ElementaryMAT 221 Calculus a CLASS-206
HES 127 Fitness ForMAT 091 ElementaryMAT 221 Calculus a CLASS-206
HES 127 Fitness ForMAT 091 ElementaryMAT 221 Calculus a CLASS-206
ENG 250 Introductio MAT 091 ElementaryOPEN
CLASS-206
ENG 250 Introductio MAT 091 ElementaryOPEN
CLASS-206
ENG 250 Introductio MAT 091 ElementaryOPEN
CLASS-206
ENG 250 Introductio MAT 091 ElementaryOPEN
CLASS-206
ENG 250 Introductio OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
ENG 102 Critical Wr PSY 202 IntroductoryCLASS-206
OPEN
ENG 102 Critical Wr PSY 202 IntroductoryCLASS-206
OPEN
ENG 102 Critical Wr PSY 202 IntroductoryCLASS-206
OPEN
ENG 102 Critical Wr PSY 202 IntroductoryCLASS-206
OPEN
OPEN
PSY 202 IntroductoryCLASS-206
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
LEC 100 First-Year SOPEN
HIS 112 Ancient Hist CLASS-206
LEC 100 First-Year SOPEN
HIS 112 Ancient Hist CLASS-206
LEC 100 First-Year SOPEN
HIS 112 Ancient Hist CLASS-206
LEC 100 First-Year SOPEN
HIS 112 Ancient Hist CLASS-206
BUS 101 IntroductionLEA 101 Academic RPSY 202 IntroductoryCLASS-206
BUS 101 IntroductionLEA 101 Academic RPSY 202 IntroductoryCLASS-206
BUS 101 IntroductionLEA 101 Academic RPSY 202 IntroductoryCLASS-206
BUS 101 IntroductionLEA 101 Academic RPSY 202 IntroductoryCLASS-206
BUS 101 IntroductionLEA 101 Academic RPSY 202 IntroductoryCLASS-206
BUS 101 IntroductionOPEN
OPEN
CLASS-206
BUS 101 IntroductionOPEN
OPEN
CLASS-206
BUS 101 IntroductionOPEN
OPEN
CLASS-206
BUS 101 IntroductionOPEN
OPEN
CLASS-206
BUS 101 IntroductionOPEN
OPEN
CLASS-206
BUS 101 IntroductionOPEN
OPEN
CLASS-206
BUS 101 IntroductionOPEN
OPEN
OPEN
OPEN
OPEN
HIS 101 History of th OPEN
OPEN
OPEN
HIS 101 History of th OPEN
OPEN
OPEN
HIS 101 History of th OPEN
HIS 101 History of th OPEN
OPEN
OPEN
OPEN
OPEN
HIS 101 History of th OPEN
OPEN
OPEN
HIS 101 History of th OPEN
OPEN
OPEN
HIS 101 History of th OPEN
OPEN
OPEN
HIS 101 History of th OPEN
OPEN
OPEN
HIS 101 History of th OPEN
OPEN
OPEN
HIS 101 History of th OPEN
OPEN
OPEN
HIS 101 History of th OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
OPEN
OPEN
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
Room #:
Daily Hours Used:
201
5.25
203
7.75
204
5.75
206
7
213
3.75
315
4.5
102
0
Daily Hours Available:
2.75
0.25
2.25
1
4.25
3.5
8
Weekly Hours Used:
27.75
28
27.5
31
17.25
22.5
6.5
154
Weekly Hours Available:
12.25
12
12.5
9
22.75
17.5
33.5
86
OPEN
OPEN
OPEN
OPEN
CLASS-315
CLASS-315
CLASS-315
CLASS-315
OPEN
OPEN
CLASS-315
CLASS-315
CLASS-315
CLASS-315
CLASS-315
OPEN
CLASS-315
CLASS-315
CLASS-315
CLASS-315
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-315
CLASS-315
CLASS-315
CLASS-315
CLASS-315
OPEN
OPEn
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-102
CLASS-102
CLASS-102
CLASS-102
OPEN
OPEN
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
OPEN
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
Tuesday, October 08, 2013
8:00 AM
:15
:30
:45
9:00 AM
:15
:30
:45
10:00 AM
:15
:30
:45
11:00 AM
:15
:30
:45
12:00 PM
:15
:30
:45
1:00 PM
:15
:30
:45
2:00 PM
:15
:30
:45
3:00 PM
:15
:30
:45
4:00 PM
:15
:30
:45
5:00 PM
:15
:30
:45
6:00 PM
:15
:30
:45
7:00 PM
:15
:30
:45
8:00 PM
OPEN
MAT 090 Basic MathMAT 221 Calculus a OPEN
MAT 090 Basic MathMAT 221 Calculus a OPEN
OPEN
MAT 090 Basic MathMAT 221 Calculus a OPEN
OPEN
OPEN
MAT 090 Basic MathMAT 221 Calculus a OPEn
ENG 102 Critical Wr MAT 091 ElementaryLEC 100 First-Year SCLASS-206
ENG 102 Critical Wr MAT 091 ElementaryLEC 100 First-Year SCLASS-206
ENG 102 Critical Wr MAT 091 ElementaryLEC 100 First-Year SCLASS-206
ENG 102 Critical Wr MAT 091 ElementaryLEC 100 First-Year SCLASS-206
ENG 102 Critical Wr MAT 091 ElementaryMAT 113 Trigonome CLASS-206
ECO 101 Intro to EcoENG 098 Introductio MAT 113 Trigonome CLASS-206
ECO 101 Intro to EcoENG 098 Introductio MAT 113 Trigonome CLASS-206
ECO 101 Intro to EcoENG 098 Introductio MAT 113 Trigonome CLASS-206
ECO 101 Intro to EcoENG 098 Introductio MAT 113 Trigonome CLASS-206
ECO 101 Intro to EcoENG 098 Introductio OPEN
CLASS-206
ECO 101 Intro to EcoENG 098 Introductio OPEN
CLASS-206
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
Eng 279 Woman Wr LEC 100 First-Year SPSY 250 Life Span DCLASS-206
Eng 279 Woman Wr LEC 100 First-Year SPSY 250 Life Span DCLASS-206
Eng 279 Woman Wr LEC 100 First-Year SPSY 250 Life Span DCLASS-206
Eng 279 Woman Wr LEC 100 First-Year SPSY 250 Life Span DCLASS-206
Eng 279 Woman Wr OPEN
PSY 250 Life Span DCLASS-206
LEC 100 First-Year SOPEN
OPEN
CLASS-206
LEC 100 First-Year SOPEN
OPEN
CLASS-206
LEC 100 First-Year SENG 101 College W OPEN
CLASS-206
LEC 100 First-Year SENG 101 College W OPEN
CLASS-206
LEC 100 First-Year SENG 101 College W OPEN
CLASS-206
ENG 101 College W OPEN
CLASS-206
OPEN
ENG 101 College W OPEN
CLASS-206
OPEN
ENG 101 College W EDU 201 Concepts I CLASS-206
OPEN
ENG 101 College W EDU 201 Concepts I CLASS-206
OPEN
ENG 101 College W EDU 201 Concepts I CLASS-206
OPEN
EDU 201 Concepts I CLASS-206
OPEN
OPEN
OPEN
OPEN
EDU 201 Concepts I CLASS-206
OPEN
OPEN
OPEN
OPEN
SPA 101 First Seme OPEN
OPEN
OPEN
SPA 101 First Seme OPEN
OPEN
OPEN
SPA 101 First Seme OPEN
OPEN
OPEN
SPA 101 First Seme OPEN
OPEN
OPEN
SPA 101 First Seme OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
Total
34
14
Room #:
201
203
204
206
213
315
102
Total
8
5.25
7
7
4.5
4.5
0
36.25
Daily Hours Available:
0
2.75
1
1
3.5
3.5
8
Weekly Hours Used:
27.75
28
27.5
31
17.25
22.5
6.5
154
Weekly Hours Availabl
12.25
12
12.5
9
22.75
17.5
33.5
86
Daily Hours Used:
Wednesday, October 09, 2013
8:00 AM
:15
:30
:45
9:00 AM
:15
:30
:45
10:00 AM
:15
:30
:45
11:00 AM
:15
:30
:45
12:00 PM
:15
:30
:45
1:00 PM
:15
:30
:45
2:00 PM
:15
:30
:45
3:00 PM
:15
:30
:45
4:00 PM
:15
:30
:45
5:00 PM
:15
:30
:45
6:00 PM
:15
:30
:45
7:00 PM
:15
:30
:45
8:00 PM
HES 127 Fitness Fo
HES 127 Fitness Fo
HES 127 Fitness Fo
HES 127 Fitness Fo
MAT 091 ElementaryMAT 221 Calculus a
MAT 091 ElementaryMAT 221 Calculus a
MAT 091 ElementaryMAT 221 Calculus a
MAT 091 ElementaryMAT 221 Calculus a
ENG 250 Introductio MAT 091 ElementaryOPEN
CLASS-206
CLASS-206
CLASS-206
CLASS-206
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-206
OPEN
CLASS-315
CLASS-102
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
OPEN
OPEN
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-315
CLASS-315
CLASS-315
OPEN
OPEN
CLASS-315
CLASS-315
CLASS-315
CLASS-315
CLASS-315
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-315
CLASS-315
CLASS-315
CLASS-315
CLASS-315
CLASS-315
CLASS-315
CLASS-315
CLASS-315
OPEN
OPEN
OPEN
OPEn
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
OPEN
ENG 250 Introductio MAT 091 ElementaryOPEN
CLASS-206
ENG 250 Introductio MAT 091 ElementaryOPEN
CLASS-206
ENG 250 Introductio MAT 091 ElementaryOPEN
CLASS-206
ENG 250 Introductio OPEN
OPEN
OPEN
Special Class Locati OPEN
OPEN
OPEN
Special Class Locati ENG 102 Critical Wr PSY 202 Introductor CLASS-206
Special Class Locati ENG 102 Critical Wr PSY 202 Introductor CLASS-206
Special Class Locati ENG 102 Critical Wr PSY 202 Introductor CLASS-206
Special Class Locati ENG 102 Critical Wr PSY 202 Introductor CLASS-206
Special Class Locati OPEN
PSY 202 Introductor CLASS-206
Special Class Locati OPEN
OPEN
OPEN
OPEN
Lion's Club Meeting OPEN
OPEN
OPEN
Lion's Club Meeting OPEN
OPEN
OPEN
Lion's Club Meeting OPEN
OPEN
OPEN
Lion's Club Meeting OPEN
OPEN
LEC 100 First-Year SOPEN
HIS 112 Ancient HistCLASS-206
LEC 100 First-Year SOPEN
HIS 112 Ancient HistCLASS-206
LEC 100 First-Year SOPEN
HIS 112 Ancient HistCLASS-206
LEC 100 First-Year SOPEN
HIS 112 Ancient HistCLASS-206
BUS 101 Introductio LEA 101 Academic RPSY 202 Introductor CLASS-206
BUS 101 Introductio LEA 101 Academic RPSY 202 Introductor CLASS-206
BUS 101 Introductio LEA 101 Academic RPSY 202 Introductor CLASS-206
BUS 101 Introductio LEA 101 Academic RPSY 202 Introductor CLASS-206
BUS 101 Introductio LEA 101 Academic RPSY 202 Introductor CLASS-206
BUS 101 Introductio OPEN
OPEN
CLASS-206
BUS 101 Introductio OPEN
OPEN
CLASS-206
BUS 101 Introductio OPEN
OPEN
CLASS-206
BUS 101 Introductio OPEN
OPEN
CLASS-206
BUS 101 Introductio OPEN
OPEN
CLASS-206
BUS 101 Introductio OPEN
OPEN
CLASS-206
BUS 101 Introductio OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
SPA 101 First Seme OPEN
OPEN
OPEN
SPA 101 First Seme OPEN
OPEN
OPEN
SPA 101 First Seme OPEN
OPEN
OPEN
SPA 101 First Seme OPEN
OPEN
OPEN
SPA 101 First Seme OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
11.75
Room #:
201
203
204
206
213
315
102
Daily Hours Used:
5.25
7.75
5.75
7
2.5
6
0
34.25
Daily Hours Available:
2.75
0.25
2.25
1
5.5
2
8
13.75
Weekly Hours Used:
27.75
28
27.5
31
17.25
22.5
6.5
154
Weekly Hours Available:
12.25
12
12.5
9
22.75
17.5
33.5
86
OPEN
OPEN
OPEN
OPEN
CLASS-315
CLASS-315
CLASS-315
CLASS-315
OPEN
OPEN
CLASS-315
CLASS-315
CLASS-315
CLASS-315
CLASS-315
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-315
CLASS-315
CLASS-315
CLASS-315
CLASS-315
OPEN
OPEn
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-315
CLASS-315
CLASS-315
CLASS-315
CLASS-315
CLASS
CLASS 315
315
CLASS
315
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-102
CLASS-102
CLASS-102
CLASS-102
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
CLASS-102
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
Thursday, October 10, 2013
8:00 AM
:15
:30
:45
9:00 AM
:15
:30
:45
10:00 AM
:15
:30
:45
11:00 AM
:15
:30
:45
12:00 PM
:15
:30
:45
1:00 PM
:15
:30
:45
2:00 PM
:15
:30
:45
3:00 PM
:15
:30
:45
4:00 PM
:15
:30
:45
5:00 PM
:15
:30
:45
6:00 PM
:15
:30
MAT 090 Basic MathMAT 221 Calculus a OPEN
OPEN
OPEN
MAT 090 Basic MathMAT 221 Calculus a OPEN
OPEN
MAT 090 Basic MathMAT 221 Calculus a OPEN
OPEN
MAT 090 Basic MathMAT 221 Calculus a OPEn
ENG 102 Critical Wr MAT 091 ElementaryLEC 100 First-Year SCLASS-206
ENG 102 Critical Wr MAT 091 ElementaryLEC 100 First-Year SCLASS-206
ENG 102 Critical Wr MAT 091 ElementaryLEC 100 First-Year SCLASS-206
ENG 102 Critical Wr MAT 091 ElementaryLEC 100 First-Year SCLASS-206
ENG 102 Critical Wr MAT 091 ElementaryMAT 113 Trigonome CLASS-206
ECO 101 Intro to EcoENG 098 Introductio MAT 113 Trigonome CLASS-206
ECO 101 Intro to EcoENG 098 Introductio MAT 113 Trigonome CLASS-206
ECO 101 Intro to EcoENG 098 Introductio MAT 113 Trigonome CLASS-206
ECO 101 Intro to EcoENG 098 Introductio MAT 113 Trigonome CLASS-206
ECO 101 Intro to EcoENG 098 Introductio OPEN
CLASS-206
ECO 101 Intro to EcoENG 098 Introductio OPEN
CLASS-206
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
Eng 279 Woman Wr LEC 100 First-Year SPSY 250 Life Span DCLASS-206
Eng 279 Woman Wr LEC 100 First-Year SPSY 250 Life Span DCLASS-206
Eng 279 Woman Wr LEC 100 First-Year SPSY 250 Life Span DCLASS-206
Eng 279 Woman Wr LEC 100 First-Year SPSY 250 Life Span DCLASS-206
Eng 279 Woman Wr OPEN
PSY 250 Life Span DCLASS-206
LEC 100 First-Year SOPEN
OPEN
CLASS-206
LEC 100 First-Year SOPEN
OPEN
CLASS-206
LEC 100 First-Year SENG 101 College W OPEN
CLASS-206
LEC 100 First-Year SENG 101 College W OPEN
CLASS-206
LEC 100 First-Year SENG 101 College W OPEN
CLASS-206
OPEN
ENG 101 College W OPEN
CLASS-206
OPEN
ENG 101 College W OPEN
CLASS-206
OPEN
ENG 101 College W EDU 201 Concepts I CLASS-206
OPEN
ENG 101 College W EDU 201 Concepts I CLASS-206
OPEN
ENG 101 College W EDU 201 Concepts I CLASS-206
OPEN
OPEN
EDU 201 Concepts I CLASS-206
OPEN
OPEN
EDU 201 Concepts I CLASS-206
OPEN
OPEN
OPEN
OPEN
SPA 101 First Seme OPEN
OPEN
OPEN
SPA 101 First Seme OPEN
OPEN
OPEN
SPA 101 First Seme OPEN
OPEN
OPEN
SPA 101 First Seme OPEN
OPEN
OPEN
SPA 101 First Seme OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
Total
Room #:
Daily Hours Used:
201
3
203
3
204
2
206
3
213
2
315
3
102
0
Total:
16
Daily Hours Available:
5
5
6
5
6
5
8
Weekly Hours Used:
27.75
28
27.5
31
17.25
22.5
6.5
154
Weekly Hours Available:
12.25
12
12.5
9
22.75
17.5
33.5
86
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-315
CLASS-315
CLASS-315
CLASS-315
CLASS-315
CLASS-315
CLASS-315
CLASS-315
OPEN
OPEN
CLASS-315
CLASS-315
CLASS-315
CLASS-315
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEn
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-102
CLASS-102
CLASS-102
CLASS-102
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEn
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
Friday, October 11, 2013
8:00 AM
:15
:30
:45
9:00 AM
:15
:30
:45
10:00 AM
:15
:30
:45
11:00 AM
:15
:30
:45
12:00 PM
:15
:30
:45
1:00 PM
:15
:30
:45
2:00 PM
:15
:30
:45
3:00 PM
:15
:30
:45
4:00 PM
:15
:30
:45
5:00 PM
:15
:30
:45
6:00 PM
:15
:30
:45
7:00 PM
8:00 PM
HES 127 Fitness Fo MAT 091 ElementaryMAT 221 Calculus a CLASS-206
HES 127 Fitness Fo MAT 091 ElementaryMAT 221 Calculus a CLASS-206
HES 127 Fitness Fo MAT 091 ElementaryMAT 221 Calculus a CLASS-206
HES 127 Fitness Fo MAT 091 ElementaryMAT 221 Calculus a CLASS-206
OPEN
MAT 091 ElementaryOPEN
CLASS-206
MAT 091 ElementaryOPEN
CLASS-206
OPEN
MAT 091 ElementaryOPEN
CLASS-206
OPEN
MAT 091 ElementaryOPEN
CLASS-206
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
ENG 102 Critical Wr OPEN
OPEN
OPEN
ENG 102 Critical Wr OPEN
OPEN
OPEN
ENG 102 Critical Wr OPEN
OPEN
OPEN
ENG 102 Critical Wr OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
Collegiate 4-H Club OPEN
OPEN
OPEN
Collegiate 4-H Club OPEN
OPEN
OPEN
Collegiate 4-H Club OPEN
OPEN
OPEN
Collegiate 4-H Club OPEN
OPEN
OPEN
HIS 112 Ancient HistCLASS-206
OPEN
OPEN
OPEN
OPEN
HIS 112 Ancient HistCLASS-206
OPEN
OPEN
HIS 112 Ancient HistCLASS-206
HIS 112 Ancient HistCLASS-206
OPEN
OPEN
LEC 100 First-Year SOPEN
OPEN
OPEN
LEC 100 First-Year SOPEN
OPEN
OPEN
LEC 100 First-Year SOPEN
OPEN
OPEN
LEC 100 First-Year SOPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEn
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
CLASS-213
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
32
Room
Weekly Weekly
Hours
Hours
Used
Open
Total
102
201
203
204
206
213
315
Existing Total
6.5
27.75
28
27.5
31
17.25
22.5
160.5
33.5
12.25
12
12.5
9
22.75
17.5
119.5
40
40
40
40
40
40
40
280
Projected Total
160.5
79.5
240
Appendix D2:
UW Richland Capital Facilities Plan
UNIVERSITY OF WISCONSIN-RICHLAND
CAPITAL/FACILITIES
PLANNING
December 2011
University of Wisconsin-Richland
Capital/Facilities Planning
1
Table of Contents
I.
Executive Summary
Page 3
II.
Brief Campus History and Structure
Page 4
III.
Infrastructure
Page 12
IV.
Planning and Solutions
Page 26
2
I.
Executive Summary
The current campus master plan is outdated. In the spring of 2012, the campus
will be hiring a firm to create an updated campus master plan. The master
planning process will be supported by $15,000 from Richland County and
$15,000 from Central. The remaining costs will be paid by the Richland County
Campus Foundation. The process will draw from UW-Richland’s Strategic Plan.
Given that the master planning process is imminent, it was decided that it would
be prudent to create a Planning Issues and Solutions section for the current
report that lays out issues and solutions. This section does not, however,
present a time frame for the period under review (2013-2019). Once the master
plan is complete, the issues and solutions presented in this report will be
revisited and a new version of this section will be created to reflect the results of
the master plan. At that time, a schedule will be developed that reflects the
period from 2013-2019.
There are a number of facilities projects that are of immediate concern. In the
spring of 2011, a new classroom was added to the Miller Memorial Library (Room
315). Plans are being completed now to outfit the classroom through a statefunded capital equipment allocation the amount of $120,000. It is anticipated that
this Smart classroom will be operational starting with Summer School in 2012.
The Campus View dormitories are in need of expansion. The CEO/Dean is
currently working with the Campus View Board to gather data to support the
building of a new dormitory. Expansion in this area is essential if UW-Richland is
to meet the needs of its students and increase its international student
population. With respect to the campus’s servers, it has been determined that
new network servers need to be installed on campus in the immediate future.
The county-funded concrete project connecting East Hall with the campus is
being studied by FEMA. It is anticipated that FEMA’s recommendations will be
sent on soon and that the project will be completed in 2012. Finally, UWRichland is currently undergoing an Investment Grade Audit. Honeywell/ESG will
be presenting the results to the campus in January 2012. If the audit is approved
by the Department of State Facilities, the Board of Regents, and the Governor,
the project, in the amount of approximately $300,000, will begin during the
summer of 2012. If implemented, this project is expected to save UW-Richland
approximately $35,000 in electricity and water costs per year.
Once the UW-Richland Strategic Plan is finalized in January 2012, it is possible
that additional items will be identified with respect to facilities.
3
II.
Brief Campus History and Structure
A.
Campus History, Background
1. Campus Creation/Founding
The University of Wisconsin-Richland has its roots in a century-long
County commitment to higher education, beginning with the Richland
County Teachers College, founded in 1903, and continuing with UWRichland.
In a Resolution of the Richland County Board of Supervisors on July 22,
1964, with the closing of the Richland County Teachers College imminent,
the Board resolved unanimously (27-0) to provide for the purchase of land
for the construction of a branch campus of the Wisconsin State University
System in or near Richland Center. As part of the same resolution, the
Richland County Board requested that the Wisconsin Coordinating
Committee on Higher Education establish this branch campus of the
Wisconsin State University-Platteville during the 1965-67 biennium.
Over the next two years, while planning the branch campus with state and
university officials, the Richland County Board purchased for $100,000 a
135-acre site just northwest of Richland Center, selected the Madison
architectural firm of John J. Flad and Associates to design the campus,
and awarded the general construction contract to Kraemer Brothers of
Plain. Construction of the six campus buildings began in July, 1966 and
was completed during the fall of 1967 at a cost of $3,000,000. The
Richland Campus of the Wisconsin State University-Platteville opened
September 5, 1967, with an enrollment of 300 students.
With the 1971 merger law, the Richland campus lost its branch campus
relationship with Platteville and became one of the then fourteen
freshman-sophomore campuses of the University of Wisconsin Center
System, subsequently called the University of Wisconsin Centers and in
1997, renamed the University of Wisconsin Colleges. In 2005, the
Colleges were integrated with UW Extension to become one institution.
2.
State and Local Partnership
The agreement between the UW System and Richland County is
consistent with Wisconsin Statutes. The County constructs and maintains
the facility; and the System provides academic programming, teaching
and non-teaching staff, instructional equipment, and maintenance staffing
and supplies.
4
Throughout its history, the Richland campus has enjoyed solid support
from the Richland County Board and its liaison, the UW-Richland
Committee. The Committee works closely with the CEO/Dean, the
Assistant Dean for Administrative Services, and the Building and Grounds
Superintendent to assess campus needs and to prepare annual
maintenance budgets.
3. Campus Facilities History and Inventory
a. Original Construction
The original construction of the Richland campus in 1966-67 included six
buildings: an administration/faculty office building, a classroom building, a
science building, a student center/theater/music complex, a library, and a
gymnasium. The campus was built to accommodate about 500 students.
The initial goal was to provide a small-college atmosphere while procuring
the property necessary for future expansion.
b. Later Major Building Projects
Two major building projects, neither tied to state funding but both
significant to campus programs, were the Symons Recreation Complex
and the Campus View residence halls. The Symons Recreation
Complex, which opened in 1987, was built on campus land released to
Richland County by the Board of Regents. A 3,000 square-foot addition
to the Symons Recreation Complex was completed in 1998. This addition
provided new space for weight training and other fitness programs. The
Symons Recreation Complex is operated and maintained by the City and
County.
Two residence halls, known as the Campus View dorms, were opened in
1987 and 1988. They are located across Highway 14 from the campus.
Campus View was expanded in 1999 at a cost of $1.6 million dollars.
These residence halls provide housing for 118 students each academic
year and enable the campus to host special summer residential
programs. The Richland County Campus Foundation served as the
conduit for the private funds used to construct both facilities. The
residence halls are operated and maintained by Campus View
Corporation, a private, tax-exempt 501 (c) (2) agency that works in
cooperation with the Richland County Campus Foundation and campus
representatives to promote campus programs.
In 1998, the Richland County Campus Foundation funded an addition to
the Administration Building. This project, begun with $700,000 in private
funds and $200,000 in state funds, was completed in May 1998. 7,000
5
square feet were added to the building to meet student and faculty needs
and to provide a distance learning room on the campus.
In 2001, the Richland County Campus Foundation and Richland County
completed the remodeling and expansion of the Science Building. This
project doubled the size of the original building and added/updated labs,
and created a large distance education room. The building cost was
$2,239,842 and state capital equipment purchases were $780,000.
In 2007, the Richland County Board of Supervisors approved $800,000
for maintenance and repair projects to be accomplished from 2007-2009.
The following projects have been completed to date:
Roof replacement of the Miller Memorial Library, the Classroom
Building, the Wallace Student Center, the Roadrunner Gymnasium,
and Melvill Hall at a cost of $145,944.
Air conditioner units were replaced in the Coppertop Theatre (north
and south hallways) at a cost of $20,771.
Replacement of rooftop furnaces (6 per building) on the Classroom
Building, the Miller Memorial Library, and the old part of Melvill Hall
at a cost of $28,260.
Replacement of underground communications wiring and cables
connecting all six buildings was completed at a cost of $38,450.
Replacement of underground electrical wires which supply power
between each building was completed at a cost of $67,900.
Hot-water wash, clean, prime, and paint all campus drive through
bridges and foot bridge at a cost of $3,000.
Partial replacement of concrete was completed on campus
including:
o Gymnasium/Symons sidewalk (excavation work was done
to raise and fill in the ponding area)
o Student Center patio west entrance
o All areas around two planters in the patio area west of the
Roadrunner Cafe
o South Melvill sections
o South Melvill ramp to drive
o East of the Coppertop Theatre sections
o Library south sidewalk sections
o Library east sidewalk sections
o Northside of Classroom building sections
6
o Additional areas of sidewalk
o Partial replacement of concrete curbs
At a cost of $84,900.
Replacement of one basketball court and three tennis courts,
including an interlocking modular tile system with game lines and
updated lighting system at a cost of $160,260.40.
In October of 2009, the Richland County Board of Supervisors
entered into a contract with Vierbicher Planners/Engineers/Advisors,
of Reedsburg, WI to coordinate the design and bid documents of new
interior and exterior campus signs on campus. Scope of project: (1)
Campus-wide site visit taking inventory of existing signage and
proposed changes for new signage; (2) Researching and acquiring
municipal permits and working with the DOT; (3) Preparation of
bidding documents. Richland County authorized James Greeley
Signs to receive the bid. The project included two electronic signs –
one for Symons Recreation Complex and one for UW-Richland and all
new interior and exterior campus signs. The signage project was
completed in fall 2010 at a cost of $148, 536.05.
In May 2010 the Richland County Board approved Richard Burch
Concrete Company for $136,895.00 for concrete work. (In agreeing
to fund this project, the County contributed an additional $52, 895
because there was only $84,000 remaining of the $800,000 originally
funded.) Some of the concrete work was finished in the summer and
fall 2010. In fall 2010, the portion of the project connecting East Hall to
the campus was stopped by the City of Richland Center. This was
due to potential violations of the FEMA/DNR Floodplain Ordinances
regarding Brush Creek. Richland County hired Jewell Associates
Engineers, Inc of Spring Green to work with DNR and FEMA to obtain
approval for the project. Jewell’s current contract totals $6,475.00.
Project has passed through DNR and is now at FEMA. Goal is to
receive approval and finish the project in spring 2012.
In October of 2009, East Hall (formerly Richland County Health & Human
Services Building) was obtained from the county. This building adds 4400
7
square feet of space to the campus. The building was utilized as follows:
Offices and work areas for UW Extension;Expanded classroom for the Art
Department; MAC Computer Lab; Additional Smart Conference Room.
The above work was performed by David Foley Contracting at a cost of
$68,506.00. (Richland County Funded). The restrooms were remodeled
(handicap accessible) at a cost of $19,850.00 by Turn Key Builders
owned by David Schoen. (Richland County Funded).Offices vacated by
the move of UW-Extension were made available to campus faculty/staff at
Melvill Hall. Capital Equipment purchases for East Hall and the Melvill
Hall Offices were funded by the State at a cost of $151,430.11
In 2009, an additional family and handicap access bathroom in Wallace
Student Center was built in the vestibule at a cost of $28,975.00.
In 2009-2010, the north side roof of the entry to the Wallace Student
Center was insulated. The work was completed by All Foam at a cost of
$33,650.00 funded by the county.
From 2009-2011, a number of significant improvements were made to the
Joe and Mae (Senneke) Smart Farm by the Richland County Campus
Foundation. Projects included well drilling, the addition of a geothermal
heating and cooling system, the roofing of the house, the replacement of
doors, windows, and siding on the house, the insulation of the house, and
the addition of solar energy panels. These and other smaller
improvements were done at a cost of $156,877.00 to the Foundation.
In 2010-2011, a Library Computer Lab was constructed in the north end
of the Miller Memorial Library. County Funds were used to construct the
Lab walls as a cost of $4,627.50. The work was completed by Newberry
Carpentry, LLC.
In March 2011, a new classroom was added to the southeast corner of
the Miller Memorial Library. The wall construction, the electrical and other
miscellaneous items were done by Newberry Carpentry, LLC using
County funds. The cost amounted to $5,500.00.
c. Significant Changes of Use of Space
In the summer of 2009, the general computer access lab in Classroom
203 was moved to the Library. Then the teaching lab classroom 211 was
moved to classroom 203. As a result, the campus gained a traditional
classroom.
With UW-Extension relocating to East Hall, the vacated space in Melvill
Hall has been used for staff/faculty/IAS offices, storage area and a small
conference room.
8
In 2010-2011, an office was created for the Foundation assistant by
converting a coat storage area outside of the Dean’s office and adjacent
to the office of the Foundation’s Executive Secretary. (This project was
paid for by the Foundation at a cost of $4, 417.00)
In 2010-2011, a Library Computer Lab was constructed in the north
portion of the Miller Memorial Library.
In 2010-2011, the south portion of the Miller Memorial Library was
designated as a Tutoring Center.
In March 2011, the southeast portion of the Miller Memorial Library was
designated as a classroom (Room 315).
In May 2011, a small study room in the Miller Memorial Library was
designated as a Place of Worship.
d. Significant Remodeling Projects, Greater than $50,000
per Project
Within the last five years, there have been no major projects costing
greater than $50,000.
e. UW Colleges Funded Laboratory Modernization,
Classroom Modernization, Computer Access Projects,
Greater than $5,000 per Project
Older:
In 2004-2005, a classroom modernization grant of $18,345 was approved
to provide a “thin client” solution, wherein performance of approximately
60 existing classroom laptops was boosted by operating them as thin
clients to a powerful terminal server instead of standalone work stations.
Two dual-processor servers, client licenses, and 16 hybrid thin client
terminals and LCD monitors were newly acquired for this project.This took
place in the Science building.
The 2005-2006 grant approval amount of $30,821 was designed to equip
Science Building classroom 105 with a multi-tiered lecture room with 42
thin-client computers at student seating locations to support computerdelivered instructional aids in courses characterized by large enrollments.
In addition, the campus was allocated $28,500 from the revolving general
computer access fund to upgrade the computers in the student general
access computer laboratory (Room 211).
9
Most Recent Three Years:
In 2008-2009 the Lab Modernization/Classroom Modernization program
was changed from a grant-based competitive process to one that
distributes the funding out to all campuses on an annual basis. The
campus funding for 2008-2009 was for $13,598. The Steering Committee
approved a new light board for the auditorium, chemistry data collection
sensors and art room renovation and equipment upgrades.
In 2009-2010, the campus received computer access funds of $30,151 to
upgrade the computers in the Student General Access Computer
Laboratory in the Library.
In 2010-2011, the following acquisitions were made for the biology
department using lab mod funds: 1) biotech instruction starter balance at
a cost of $8, 309.00; 2) DNA electrophoresis lab set at a cost of
$2000.00; and 3) biology models (left leg and human eye in orbit) at a cost
of $2, 280.00.
B. Campus Facility-related Governance Structure
1. Administrative Organization
At UW-Richland, the CEO/Dean works closely with the campus Assistant
Dean for Administrative Services and the campus Steering Committee in
preparing recommendations for facilities planning. Recommendations are
made to the Richland County Board, the Richland County Campus
Foundation, the UW Colleges Vice-Chancellor for Administrative and
Financial Services and the UW-Extension UW Colleges Chancellor.
2. Facilities Planning Committee
The UW-Richland Steering Committee, which includes three faculty
members, one academic staff member, and one student, serves as the
campus Facilities Planning Committee. This committee consults with the
campus Collegium and others as needed and makes recommendations to
the CEO/Dean regarding facilities use and development.
3. Local Government, Facilities Governance Interface
To widen representation and to assign specific projects, the Steering
Committee recommends the appointment of ad hoc committees. For
instance, in spring 1992, with Steering approval, the dean appointed a
twelve-member Campus Expansion Planning Committee that included
faculty, staff, and students, as well as members of the Richland County
Board, Richland County Extension, and the Richland County Campus
Foundation. This committee’s work resulted in a county-funded needs
10
assessment and a design by Taliesin architects for expanding and
remodeling the Administration Building. During 1994-95, nine faculty
members from the fine arts, music, natural sciences, psychology, and
physical education formed a Lab Needs Committee and prepared a report
for use by the Steering Committee in campus planning.
In spring 1996, after the Richland County Campus Foundation raised
private funds for an addition to the Administration Building, the Steering
Committee recommended and the dean appointed a five-member
Building Expansion Committee to work directly with Taliesin Architects to
design the addition. This committee included the Chair of the Steering
Committee, the President of the Student Senate, the Campus Business
Manager, a member of the Richland County Campus Foundation, and a
member of the Richland County Board. Meetings of this Committee were
called and chaired by the campus dean. Recommendations were made
to the dean, who served as the liaison in working with the Collegium, the
Richland County Campus Foundation, the Richland County Board,
architects, contractors, and others. In a similar fashion, in spring 1998,
the Science Building Planning committee was formed and its work
resulted in the $3.2M expanded and remodeled Science Building.
In 2002, BWZ Architects designed a report for building a University
Services Center and remodeling the Wallace Student Center into a Fine
Arts Center. The BWZ report needs to be reviewed and updated when
funding is obtained.
These examples demonstrate the way the CEO/Dean works directly with
the principal constituencies and speaks for the campus in making
recommendations to the Richland County Board, the Richland County
Campus Foundation, and the Chancellor’s office.
C.
Campus Guiding Principles
As a Regents’ designated Integrated Learning Community, the Richland
campus strives to develop cooperative, coherent, and comprehensive
approaches to education that enhance student access and achievement
and build on the special needs and assets of people, places, and
programs. In facilities planning, as in other initiatives, an effort is made to
be inclusive in consultation, open in discussion, and fair in decisionmaking so that, in developing physical facilities to serve students and the
community, the greatest good can be accomplished for the greatest
number.
11
III.
Infrastructure: Issues and Solutions
A. Mechanicals/Infrastructure
1. Heating
Roof-top furnace units were replaced in 2009 on the Administration, Science,
Classroom, and Library buildings. Instead of the Carrier units, the campus now
has 18 household Bryant furnaces. Furnace specifications are Bryant brand,
91% efficient (5 units are Model #340AAV036060; 3 units are Model
#3440AAV048080; and 10 units are Model #340AAV0600100). In1999-2000,
the state-subsidized Honeywell project improved the heat and utility efficiencies.
Two Carrier rooftop units, Model #48TJD016 were installed in the Melvill Hall
addition in 1998. These are 81% efficient. As part of the WEI project, Honeywell
installed four control damper units in 2000 to improve the comfort in Melvill Hall.
Another ten units were installed in 2001, 9 units in 2002 and 6 units in 2003 by
the County for a total of 29 units.
The Roadrunner Gymnasium and Wallace Student Center have Cleaver Brooks
boilers, which are original equipment and are over 44 years old. They are 80%
efficient, model #760-80. The units are well-maintained and monitored daily and
present no apparent problems. With the University Services Center/Fine Arts
Expansion Project, the boiler will be analyzed. Original boiler pump (6 units)
needs to be considered for replacement in 5 years.
In 2001, Science Building added 2 thermo/solution boilers (Mod#EVH-1000.)
East Hall has 3 Bryant gas furnaces that were installed approximately 1989
(#398AAZ0360 (80,)) 2002 (350MAV060 (60,)) and 2004 (350MAV048 (100)).
2. Humidification
Carnes humidifier units were installed in the library (approximately 8800 square
feet of coverage) and in the music classroom and instrument storage room
approximately 1000 square feet of coverage) in 1987. The Science Building
project upgraded and installed an electric steam humidifier, Dri steam brand,
model #VLD1, in 2000-2001.
3. Ventilation
Air handler units were updated, along with the furnaces, in 1987. The County
installed a $4,000 ventilation unit in the art studio (room 214/Classroom Building)
in 2000 to eliminate noxious fumes (approximately 750 square feet of coverage).
12
In 2000-2001, the Science Building upgraded to a single-air handler unit, a Trane
brand name, modular climate change model.
4. Air Conditioning
Two air conditioning units were updated in 1987 in the Administration, Library,
and Classroom buildings. Two units (15 tons each) were added to the
Administration (Melvill Hall) addition in 1998. In 2009, the County installed one
new air conditioning unit in the kitchen (Lennox #13ACD-048-230-11.) A new
system in the cafeteria area which consisted of three (3) Lennox units, five tons
each, model #HS29. The Science Building project installed a new Trane brand
name, 60 ton, RAUCC604B unit. In 2008, air conditioner units in the
CoppertopTheatre were replaced in the north and south hallways (Lennox
#7CA102S2BN1G.) East Hall has 3 AC units; 2 Trane (RAVC-202A, RAVC406A), and 1 Carrier unit (38CKB060S10.) which will need to replaced in the
future. As recommended by Central IT staff in 2011 a separate 1 ½ ton Carrier
air conditioning unit was placed in the Science Building in the network room.
5. Dehumidification
At present there is no fixed dehumidification unit on campus. Two
portable units are periodically used in Melvill Hall.
6. CFC and HCFC Refrigerants
These units are on the UW-Richland campus:
7 household refrigerators with R12 refrigerants, installation date
unknown
1 household deep freezer, R12 refrigerant, installation date unknown
3 household deep freezers, R134A refrigerants, installed 2006
8 10-ton air conditioners, R22 refrigerants, installed 1987
2 2-ton air conditioners, R 22 refrigerants, installed 1987
2 15-ton air conditioners, R22 refrigerants, installed 1998
2 salad bar units, R12 refrigerants, installation date unknown
1 ice making unit, R402B, installed 1998
1 ice making unit, R134A, installed 2005
1 refrigerator unit (commercial), R-134A, 2003
1 deep freezer unit (commercial), R-409, 1995
1 pass-through refrigerator unit (commercial), R-12, installation date
unknown
Plans to Achieve Compliance if CFC-based: Compliance will be achieved
incrementally as units are replaced as needed.
13
7. Electrical Service(s)
Electric service wires and feeders were replaced between each building in
2008 from special bond funding from the County.
8. Interior Lighting
In 1985, the exterior and gymnasium lighting were changed from mercury
to high pressure sodium. In 1999-2000, Honeywell, WEI-3 project,
changed all of the T-12 fluorescents to the energy savings T-8
fluorescents.
9. Emergency Lighting
There is one back-up natural gas generator for all campus buildings. This
system is 44 years old which is in need of an update of the complete
system in the next 10 years.
10. Interior
The generator runs approximately 12 lamps per building to provide a
lighted exit at the buildings.
11. Exterior
There is no emergency lighting on the exterior of the buildings or on the
campus grounds. Additional lighting will be installed with County funds to
increase campus safety.
12. Parking Lots
There is no emergency lighting in the parking lots. The parking lots were
resealed in 2008.
13. Doorways
The interiors of building doorways and exit lights are illuminated by the
emergency generator.
14. Computer Network and Distance Education Wiring
All campus buildings utilize Category 5 data cabling. The building-tobuilding data links are 62.5 micron multimode fiber optic, which is slated to
14
be upgraded to 50 micron fiber optic during the fiscal year under a
Country-funded upgrade project. The
All campus buildings utilize Category 5 data cabling. The building-to-core
network closet data links are 50 micron multimode, laser-optimized fiber
optic cable, where the Science Hall and Student Center have a 12-pair
connection and all others have 6 pairs. A 6-pair 50 micron multimode,
laser-optimized fiber optic link was recently installed connecting the
Science Hall server room to East Hall. East Hall premises network wiring
was completed in fall 2009 for modifications to the interior floor plan.
Existing Category 5 wiring to the building’s south offices was retained.
802.11B/G wireless networking is available throughout all campus
buildings. A wireless access point for East Hall was procured in November
2009 and was installed.
15. Audio/Visual Distribution Systems
All classrooms, the Pippin Conference Center, and the cafeteria have
audio/ video projection systems.
The Coppertop Theatre has a 5000 lumen, long-throw projector that
integrates with the existing theatre sound system. An accessory cart that
allows for DVD/VHS and computer projection is attached as needed for
events.
A new, 24-station combination classroom and computer lab was added
within the library.
16. Energy Distribution Systems (electric, gas, etc.)
The main system is checked by the local utility company and each building
has its own breaker panels and transformers. Repairs will be made as
needed. Electrical wiring to Melvill Hall, the Library, the Classroom
Building, and the Student Center was replaced in 2008.
17. Energy Conservation
The state-sponsored Honeywell project was completed in 2000. As part of
the WEI project, Honeywell will change the T-12 fluorescent system to the
more efficient T-8 with electronic ballasts. Honeywell installed a low
budget EMS system in all buildings to control the heating and cooling
system to conserve fuel costs. All of the campus general-access lab
computers are shut down in the evenings by a centralized management
server.
15
UW-Richland contracted with Honey/ESG starting in 2011 to do an energy
pre-audit. That was completed in May 2011. It was projected that UWRichland could save $35,000 a year in energy use if a project were
completed as part of the Wisconsin Performance Contract. In June 2011,
the Department of Administration/Department of Start Facilities signed a
contract on behalf of UW-Richland to complete an Investment Grade
Audit. A Mid-Audit was presented to UW-Richland in November 2011.
Honeywell/ESG will share the results of the Investment Grade Audit with
UW-Richland in January 2012. UW-Richland anticipates approval by the
Department of Administration and hopes to complete a project during
2012.
18. Energy Management Systems
In 1999-2000, the Honeywell project addressed placing a low budget EMS
system in each building (except Science) to control heating and cooling
systems.
19. Emergency Generator Status
The generator is original equipment (over 44 years old) and has had some
problems in the past, but is in good operational condition at present.
Suggest replacement within 5 years. The generator is tested quarterly.
19. Plumbing
There have been repairs to the 44-year-old plumbing system over the
years. Repairs are made as needed.
20. Distilled Water
With the 2000-2001 Science Building moveable equipment list, we
purchased an Economy Water Still, model #4L/HR1100.
21. Windows
All windows are original (over 42 years old) except those in the additions
to Melvill Hall and Science Hall. The energy audit found all windows to be
adequate.
22. Roofing
The copper roofs are original (over forty years old), and have small cracks
which are repaired as needed. The penthouse flat areas were replaced in
1999 with $8,000 in County funds. In 2008, the roofs were replaced in the
16
Library (however the area over the front desk was done in 2007), the
Classroom Building, Student Center, Roadrunner Gymnasium building,
Melvill Hall, and penthouses. In 2009, the East Hall main roof was
shingled and a membrane was put on the flat area of the roof.
23. Fascia and Soffits
There are small cracks being repaired, as needed, with the coppercovered fascias. Soffits were painted in 2010. In 2009, in the gym (west,)
the soffit/fascia was replaced by an insurance claim.
24. Elevators
None.
25. Telephones
The Mitel system was purchased as part of the Administration Building
Expansion and Remodeling project in 1998.
The building-to-core network closet 25, 50 and 100 pair connections were
replaced in a county-funded project during the summer of 2008 to resolve
problems with some failing underground splicers. In November 2009, a
25-pair copper connection was installed connecting East Hall to the
Science Hall phone termination backboard, enabling campus phone
system lines to East Hall.
26. Switch
In July, 1998, the campus purchased a Mitel Superconsole 1000 SX-2000
telephone system for $43,976 as part of the Administration Building
Addition and Remodeling project. With the University Services
Center/Fine Arts Expansion and Renovation project, a new switch will be
considered for purchase.
27. STS Lines
UW-Richland is no longer on the STS program. The Mitel telephone
system is undergoing a state agency long distance conversion. This is a
conversion from AT&T to CenturyLink. Conversion is a lengthy process
which CenturyLink and Wisconsin Department of Administration anticipate
will be completed in early 2012. This conversion includes UW-Richland’s
Long Distance Access T1.
29. Voice Mail
17
The original Mitel Superconsole 1000 SX-2000 telephone system did not
include a voice mail system. In 2002, a Mitel 3000 voice mail and auto
attendant system was added to the telephone system.
30. Voice/Data/Distance Education Compatibility
All campus buildings utilize Category 5 data cabling. The building-to-core
network closet data links are 50 micron multimode, laser-optimized fiber
optic cable, where the Science Hall and Student Center have a 12-pair
connection and all others have 6 pairs. A 6-pair 50 micron multimode,
laser-optimized fiber optic link was recently installed connecting the
Science Hall server room to East Hall. East Hall premises network wiring
will be expanded later this fiscal year as needed for modifications to the
interior floor plan. Existing Category 5 wiring to the building’s south offices
will be retained. Colleges-wide LAN upgrade funds dispersed in spring
2005 provided a new layer 3 core switch for the data network; the same
funds also provided gigabit fiber modules necessary to connect most of
the outlying building switches to the core switch. Gigabit fiber modules for
the remaining outlying building switches have since been installed.
Consequently, network backbone connections to all buildings run gigabit
Ethernet. In the summer of 2006, a fiber optic 10mb data uplink to the
Badgernet Converged Network (BCN) was installed, and all distanceeducation A/V traffic and data traffic were moved to this connection.
Introduction of the BCN uplink eliminated the two T1 lines that previously
carried DE and data traffic.
31. Fuel Storage Tanks
The underground fuel tank was removed in 1991 and the DNR gave UWRichland a clean site status.
32 Fire Alarm System(s)
New alarm systems are being installed during remodeling projects. The
addition to Melvill Hall received a new system in 1998 and the old portion
of Melvill Hall was connected to the new system by the County in 2001. In
2001, the Science Building received a new fire alarm system. The system
functions as an internal alert; however, it is not connected to the local fire
department. A fire alarm system is being reviewed for upgrading for East
Hall.
33. Building Locks and Security
18
In 2007, a new exterior door locknetic Van Duprin fob system was
purchased from Bonafide Safe and Lock for $12,167 with County funds.
Interior locks need to be replaced in the near future. Security checks at
UW-Richland are conducted by maintenance personnel and the local city
police.
34. Campus Storage, Shelving, etc.
Storage is limited for all departments. Additional storage space is a
priority in current and future remodeling and building projects.
B. Health and Safety
The Campus has an Emergency Action plan with delineated procedures
and contacts in the event of threats to security or personal injuries. First
aid supplies are available in each campus building. Men’s and women’s
restrooms serve as severe weather shelters in each building. Safety
showers and eye wash stations in the chemistry lab are checked at least
once a month. Safety training for maintenance and other personnel is
provided by video, on-line training, and periodic on- and off-campus
seminars. One defibrillator was purchased for the Gymnasium and
another for the Wallace Student Center. The campus instituted fire drills
in the fall and tornado drills in the spring. Various items of safety
equipment are purchased when institutional funds are available. In April
2001, a Campus Safety Committee was formed to enhance our campus
environment for employees, students, and community members by
addressing environmental health and safety concerns. The network
administrator completed and implemented a design of a centrallycontrolled campus-wide emergency notification system. In addition
effective spring 2012, an e-Alert UW-Richland will be used to provide
students, faculty and staff with e-mail and text-via-cell phone notification of
weather, related campus closings or safety emergencies.
C . Fume Hoods
As part of the Science Building Expansion and Remodeling project in 2000, five
new chemistry hoods were installed. Inspections are done annually.
D. Americans with Disabilities Act Access
As remodeling projects are completed, ADA codes are met. Melvill Hall was
made ADA compliant in 1998. The Science Building was brought into
19
compliance with remodeling and expansion in 2000. ADA access is still an issue
in bathrooms in the Classroom Building, the Library, and Gymnasium. In 2009,
a uni-sex handicapped restroom was installed in the student center. In 2001, the
County installed auto-door systems in the Library and Classroom Buildings; in
2002, Melvill Hall; in 2005, the Student Center; and in 2007, the Gymnasium.
E. Asbestos
The only known asbestos on campus is located on some of the heat pipes and
this will be replaced at the time of needed repair by authorized asbestos-removal
contractors.
F. Other Code-compliance Issues
The sprinkling system in the Coppertop Theatre was replaced at the cost of
$10,000 from County funds in 2000. Inspections are done annually.
G. Maintenance Issues, including Maintenance Costs, Staffing, Equipment
Budgets may need to be increased in the future because of inflation factors.
Staffing needs to be reviewed because of the 7,000 square-foot addition to the
Administration building, the 9,050 square-foot addition to the Science Building,
and the addition of 4400 square foot of East Hall. A more systematic equipment
replacement plan is needed and is under development by the campus.
H. Campus Security: People, Equipment, Buildings
1. Variable Times for Open Areas
There are no problems with the existing policies.
2. Audible and Visual Alarm Systems: Security, Hazard Warnings,
etc; ADA Compliant
The campus IT department has designed and implemented a centrally-controlled,
campus-wide emergency notification system. The system utilizes a campus
website as the notification medium. Distributed siren and strobe signals serve as
the notice to check the website for the event and event-response information. All
campus computers have a shortcut for this website on their desktop, and added
to their Internet Explorer “favorites.” The intent is to bi-annually train all faculty,
staff, and students to immediately check the notification website on the nearest
computer. Using two distinct audible/visual alarm signals, the system provides
separate notifications for tornado events and for hostile-persons events. In
addition effective spring 2012, e-Alert UW-Richland will be used to provide
students, factuly and staff with e-mail and text-via-cell phone notification of
weather, related campus closings or safety emergencies.
20
I. Interior Building “Landscape”
1. Signage
The replacement and addition of interior and exterior signage was completed
during the fall of 2010. This project was funded by the County.
2. Traffic Patterns (interior)
There are no interior traffic pattern problems at UW-Richland.
3. Floor Surfaces (carpet, tile, …)
About 50% of the floor surfaces (carpeting and tile) are in need of replacement
(approximate cost of $100,000) which will be done over time with the annual
County maintenance budget.
4. Wall Surfaces
Some wall surfaces could be replaced ($10,000) to enhance the décor and visual
appearance of campus.
5. Ceiling Surfaces
Approximately 50% of the ceiling areas need repair or replacement ($60,000) to
improve appearance.
6. Aesthetic Considerations
Decor of wall surfaces and finishes are dated in places by styles and materials of
1967.
J. Exterior Building and Grounds
1.
Building Construction
a. Structural Integrity
Campus buildings are all fundamentally sound.
b. Mortar
All buildings are over 44 years old but are structurally sound More repairs
seem likely in the years ahead (caulking, tuck pointing, etc. @ $7501,000/year.) These repairs will be paid by County funds.
21
c.
Signage
Project completed fall 2010.
d. Campus and Building Entrances
Modification of roofs over existing entrances is needed to prevent the
hazard of falling ice and snow. The cost of this work has been estimated
at $60,000. A less dramatic and less expensive approach --creating an
insulated, cold roof -- has been used in the new entrance to Melvill Hall
and seems to have helped the problem there. Similar insulation is
planned in the other buildings as well. The Student Center west entrance
slope was insulated (spray on) in 2003 to help alleviate the melting and
sliding ice and snow problem. The north roof of the Student Center was
insulated in 2010.
e. Lighting
Annual night walks have addressed the lighting concerns. In the 2001
County budget, two 19’ pole lights were added for the walkway to the
residence halls. In 2007, one 19’ pole was added to the east parking lot.
In 2008 the Safety Committee recommended additional patio lighting to be
installed. When County funds become available this project will be
completed. In 2009-2010, additional exterior lighting for East Hall was
added. The fall 2011 Safety Walk did not detect a need for any further
lighting for security purposes.
f. Safety
Richland County spent $44,000 in 1998 and $84,900 in 2008 to repair and
replace concrete walks to improve pedestrian safety. Additional concrete
work still needs to be done.
g. Landscaping
Landscaping is done through financial support of the Richland County
Campus Foundation and through building projects. The entrance area of
Melvill Hall was landscaped with $4,000 in Foundation funds in 2000;
eighteen trees were replaced in the west parking lot campus with $4,500
Foundation funds in 2001; and the Science Building was landscaped in
the fall of 2001 with $2,975 from the Science Building project.
h. Traffic Patterns (exterior traffic flows)
22
A surfaced pathway from the adjacent high school to the campus was
completed in 2002. This work was done as a National Guard project, with
no expense to the campus, county, or state. The pathway improves
student access to our programs and facilities.
There is persistent concern about the safety of Campus View residents
crossing Highway 14. In 2007, the City of Richland Center received
approval from the Department of Transportation to paint a crosswalk and
add speed limit signs on Highway 14. The City is still working with the
DOT to lower the speed limit. The City of Richland Center sought a federal
grant in 2010-2011 to build a bridge over Highway 14, but the grant
proposal was not funded. The DOT Highway 14 reconstruction project
slated for 2013 will include left turn lanes and a raised median at the
intersection between UW Highway 14 and the main entrance to UWRichland. This should improve safety for students crossing Highway 14
and coming to the campus.
i. Parking and Parking Lots
There are no problems with our existing parking situation. Parking lots
were resurfaced in 1996 and 2003, 2008, with plans to again be
resurfaced in 2013. In 2011 repairs of blacktop service ultra heat patching
was completed on the campus parking lots and drives at a cost of $3,100
to the County.
j. Transportation (public, commercial)
There is no city bus service to the campus.
k. Bicycle Racks
There is only one bicycle rack on campus. One more bicycle rack may be
needed ($500) near the south entrance to the Student Center.
l. Outdoor Seating Areas
When the campus was built, two permanent benches were placed in front
of the library. In November 1998, the Student Senate purchased four
redwood benches for $3,148. They were placed near the entrances to
Melvill Hall, the Classroom Building, and the Science Building. In spring,
summer, and fall, five moveable patio table/ seat/umbrella units are placed
on the Wallace Student Center concrete patio.
m. Garbage and Recycling Storage Area(s)
23
Town and Country Sanitation furnishes two large dumpsters (one for
garbage and one for paper and cardboard) and four smaller containers to
hold recyclables (aluminum, glass, tin, and plastic.) All dumpsters and
containers are located behind the campus buildings near Symons
Recreation Complex and are emptied on Mondays and Thursdays.
n. Physical Plant Garage Area
The campus garage consists of only 650 square feet with a ceiling height
of 16 feet. It is used to maintain and store fleet vehicles and types of
equipment such as a welder, torch, grinder, vise, and various hand tools.
o.
Vehicle and Equipment Storage
Because of the limited garage space, only the pickup truck and mowers
are stored in the garage area. The campus fleet consists of one rental car
which is kept outside the garage in the maintenance parking area. In the
future, the campus hopes to expand the garage area to include storage
for the car. Approximately twenty-five years ago, a pole shed was built
north of the main campus for storage.
p.
Area Directional Signage
Signs have been installed near Melvill Hall to direct visitors to specific
offices and services, including Student Services, Business Services, the
Dean's Office, and Continuing Education. Replacement of all campus
directional signage was completed in 2010.
The City put up two directional highway signs to the campus on Main
Street (State Hwy 80/56). An additional sign on the Highway 14 bypass in
Richland Center is still needed.
K. Physical Property and Land Holdings
1.
Campus Open Space
With only eight buildings on 136.44 acres (including East Hall of 1.44
acres,) the Richland campus has nearly 100 acres of open space that
could be used for additional buildings, expansion of current buildings, or
enlarged or new parking lots. The land could also be further landscaped
or restored as arboretum or prairie. Brush Creek, a native trout stream,
runs through the campus. The creek and woods and prairie provide sites
for natural resources and environmental studies.
2. Arboretum(s)
24
The campus arboretum and prairie have been maintained by a campuscommunity volunteer committee and maintenance staff, with help from the
volunteer fire department and DNR officials. The Richland County
Campus Foundation funds periodic labor costs.
3. Public Use Spaces, e.g., Bike Trails, Ball Fields, etc.
The campus includes playing fields for soccer, tennis courts, a basketball
court, and marked hiking trails. These are open to the public and
frequently used by community groups for club sports, by Richland Center
High School for physical education classes, and by interested individuals.
In 2008, complete replacement of three tennis courts and one refurbished
basketball court was done.
4. Boundary Issues
It is significant that the Richland Center High School is adjacent to our
campus. The construction of a paved pathway linking our campuses was
done for the County and school district by the National Guard in spring,
2002. Symons Recreation Complex hopes to put on an addition in the
near future.
5. Surplus Physical Property (land)
The Richland campus makes good use of all its property, so none is
considered surplus.
6. Alternate Uses of Property Areas
40 acres of farmland are rented to Rick Burkhamer at the price of $2,600
per year. This rental income helps support UW-Richland’s maintenance
department.
7. Addition of the SMART Farm
On August 5, 2009, the Joe and Mae Senneke Smart Farm came under
the ownership of the Richland County Campus Foundation. This was due
to a bequest of Mae Senneke Smart whose date of death was February 9.
2006. Joe Smart was one of the members of the Board of Directors of the
Richland County Teachers College and campaigned for the creation of
UW-Richland. The farm consists of 198 acres, house, barn, two sheds,
and a garage with living quarters. It is located approximately five miles
from UW-Richland on highway 14 west. The property will be for exclusive
25
use for UW-Richland and its collaborative partners. The farm provides
additional learning opportunities for students, faculty and staff in a variety
of disciplines.
L. Furniture
Though sturdy, most of the furniture is original to the buildings, dating
back to 1967, and therefore is old-fashioned in style and function, not
suited to computers and other modern learning devices and not attractive
by current standards of office and classroom décor. The plan is to
purchase new furniture while remodeling and expanding old buildings, as
was done in Melvill Hall and the Science Building. State funds will need to
be the primary source for these purchases, though private sources are
also an option. In 2005, new tables and chairs were purchased for the
Student Center from state special funds and continuing education funds.
New furniture for East Hall the art department, Mac lab, and shared space
with UW Extension, and a portion of Melvill Hall (where UW-Extension
was located) will need to be purchased when we receive approvable from
the state.
M. Surplus Equipment
Rummage sales have removed the majority of campus surplus equipment.
SWAP (Surplus with a Purpose), a state surplus program, is currently
being utilized.
IV. Planning Issues and Solutions
A. Planning Issues and Solutions
1. Overview of Campus Planning Issues, Solutions, Priorities
The primary goal of the Richland campus in facilities planning is to add to and
remodel space to promote educational and cultural programs that will attract
students and faculty to the campus, enhance learning through instructional
technology, provide distance-learning connections with other schools and
colleges, and enable the campus to serve as a community cultural center. As an
Integrated Learning Community, the Richland campus wants to transform and
add space to facilitate collaborative learning on campus and with the community.
The 1998 expansion of the Administration building (renamed Melvill Hall), which
provides space that encourages interconnections among administration,
26
students, faculty, staff, and community members, was a good first step in this
process.
Recent enrollment concerns and the replacement of retired faculty members,
including nearly all those in the natural sciences, made our needs more urgent.
To attract students and faculty and to provide 21st century instruction, the
Science Building was expanded and remodeled in 2000-2001. To provide
appropriate instruction in music, art, and theater and to serve the larger
community, the existing Student Center/ Music/Theater complex needs to be
remodeled, adding the art program, to provide a Fine Arts Center. In order to
develop the appropriate fine arts instructional and performance space, a new
University Services Center needs to be built to provide space for essential
student activities and support services with a modernized kitchen and dining
area. In addition, classrooms across the campus need to be redesigned and
equipped with updated multi-media instructional equipment and the gymnasium
floor needs to be replaced. These efforts will create a first-rate academic
environment for faculty and students and greatly enhance educational and
cultural assets in our area.
In addition to the need for a new University Services Center and a remodeled
Music/Theater/Art complex, there is also a need for increased and remodeled
space in the Gymnasium for physical education classes in conditioning and
weight training. The maintenance area in the Gymnasium needs a loading dock
and storage area for receiving, shipping, and storing supplies. A place to store
and repair instructional technology is also needed.
The campus plans to meet its needs by raising support and funds from the public
and private sectors to construct a new University Services Center and to develop
a Fine Arts Complex from existing facilities. These two major projects are top
priorities in the next three biennia (2011-2013, design and fund-raising; 20132015, phase one, build new University Services Center; 2015-2017, phase two,
remodel the Wallace Student Center into a Fine Arts Complex). Efforts to meet
additional specific needs will be made through annual maintenance requests to
the County and through fundraising. Additional and redesigned classroom
space, including new instructional technology, and space for storage and repair
of equipment will be a focus for a major project in 2015-2017. These needs will
likely be met by expanding and/or remodeling portions of existing buildings,
including the Gymnasium, the Library, and the Classroom Building. Additional
residence halls need to be considered for enrollment growth.
2. Space Evaluation Overview
In a pastoral setting with seven buildings (including the Symons Recreation
Complex), UW Richland is an attractive college campus. The buildings were
designed to meet the basic needs of instruction in the 1960s and to allow for
future growth. Even the 1966 architectural drawings indicate where facilities
27
might be expanded. Most classrooms are small, with seating for no more than
20-40 students. Although the theater seats 315, it is not a good space for
audiences or classes greater than 100 persons. The art room is simply a
provisionally-converted regular classroom with normal lighting and no special
studio work space. Expanding the art department to East Hall in 2009-2010
enhanced the art department’s facilities and helped us increase offerings until a
major building or remodeling project is funded. The music room was designed as
a rehearsal space for 25-30 instrumentalists and is unsuitable for other
instruction.
The theater is used as a multi-purpose room for a variety of campus and
community activities, and it lacks wing space, shop space, costume storage
space, and make-up space. The high demand on the theater space frequently
creates scheduling conflicts. The physical education building has a gymnasium
and a weight room and office and shop space for maintenance, but lacks
classrooms.
The campus lacks adequate space for student activities, such as governance, a
newspaper, international programs, counseling, academic skills, tutoring, testing,
bookstore, text rental, small-group study, and conferences.
Exterior campus space is naturally attractive but will require the replacement and
repair of brick, and maintenance of the arboretum, prairie, trees; and the pathway
to the nearby high school requires additional lighting and signage.
B. Planning Issues and Solutions
The issues and solutions presented below are recommended for the
period under review (2013-2019). At this time, it did not seem
prudent to place them in a specific time frame because the campus is
currently completing its Strategic Plan and intends to begin a campus
master plan in the spring of 2012. Presented here are issues that are
of priority and that will certainly figure into the master plan.
Planning Area: Landholdings and Boundaries
Priority
Issue Description
1.
The campus needs to hire a professional firm in 2012 to provide a new
campus master plan for future programming and facilities’ needs.
28
Develop short-term projects that improve the appearance of facilities and
grounds
Pursue initiatives to make UW-Richland a more sustainable campus.
Planning Area: Building Space
Priority
Issue Description
1.
Redesign building entryways, insulate and replace ceiling tile for Wallace
Student Center, Melvill Hall, Classroom Building, Library, and
Gymnasium.
2.
Remodel and upgrade bathrooms to be handicapped accessible in the
Wallace Student Center, Classroom, Library, and Gymnasium buildings.
3.
The campus needs space for student governance, student newspaper,
international programs, counseling, tutoring, testing, academic skills,
bookstore, text rental, child care, small group study, informal gatherings,
and receptions. The enhancing the student environment by improving
gathering/social spaces on campus include soft seating, cyber café,
quiet and noisy areas. There also is a need for soft spaces and study
areas to accommodate adult students.
4.
Administrative services to be located in one building. Dean, Business
Services, and Student Services operations relocated to the new
University Services building to provide efficiency and quality services for
students, parents, community, faculty, and staff. It will provide a onestop service area.
5.
Outdated kitchen, utilities service, and dining area facility. The kitchen
and dining areas need to be redesigned and furnished with the latest
food service equipment as the equipment is 44 years old and outdated.
The utilities have continued to be more of a problem. Additional storage
is needed.
6.
Inadequate space for IT department and distance education. Increased
I.T. equipment and greater demands for services and repair have
created need for additional space or revamped space.
A third distance education room is needed to facilitate the four-year
BAAS degree program and other collaborative programs.
29
7.
Inadequate size and design for music instruction on campus. Entry stairs
and permanent risers seriously hinder handicapped access and
instructional use. Visibility for lectures and acoustics are poor because of
room design and location. Department space has no piano lab area.
Additional storage space needed.
8.
Inadequate space for sets, costumes, makeup, and dressing rooms. The
theatre space is used by the theatre department and the music
department and for classroom exams, lectures, convocations and
numerous other campus and community activities. There is no adequate
space for building sets or storing costumes. The facility lacks an adequate
makeup room and dressing room. Crowded make-shift conditions create
health and safety hazards.
9.
Classrooms are inadequate in size, handicap access, and equipment. The
Classroom Building needs to be remodeled, updated and an addition
added. The bathrooms and drinking fountains need to be renovated for
handicap access. Additional classrooms are required to accommodate
new curriculum, Continuing Education and UW-Extension programs. All
classrooms need to be equipped with updated multi-media instructional
technology. Classrooms should include a communication
arts/performance lab for the assessment of classroom instruction and a
Video Editing Lab for the preparation of instructional materials and UR
videos. Classrooms need additional storage space. The meeting area in
Science Building Room 102 needs a kitchen area in the adjacent space.
10.
Update space for library services. The library needs to be updated and
redesigned to accommodate new cooperative learning and library
technologies.
11.
Inadequate and poorly designed space for physical education. New
lighting is needed in the Roadrunner Gymnasium. Current weight and
conditioning classes are conducted in a make-shift area shared by
maintenance for storage. Inadequate room design creates safety
concerns. Classrooms are needed for lectures and physical
education/athletic labs. Refurbish gym floors, bleachers, locker rooms,
and provide air conditioning. Concealed storage needed.
12.
Inadequate space for storage in maintenance. Campus lacks loading
dock and storage area for supplies. Increased garage space is needed to
house campus fleet vehicles and grounds maintenance equipment.
30
13.
Housing for more independent international students and special
populations. The campus goal is to increase independent students
needing additional housing. In addition, campus lacks housing for nontraditional students with families. New space needed for child care
facilities and a separate living area for Resident Hall Manager. Consider
additional dorms/residence hall space.
14.
Science building needs to install an 80 KW (120 amps) generator and 150
amps transfer switch and one more air handling unit on the emergency
panel. Then the Science, Classroom and Wallace Student Center
buildings would be connected.
15.
Gymnasium building needs to replace the existing back-up generator and
transfer switch with a new 60 KW (90 amps) generator and 150 amps
transfer switch and moving one roof- top-unit in Melvill Hall onto the
emergency panel. Then Melvill Hall, the Gym, and the Library buildings
would be connected.
Planning Area: Exterior Space
Priority
Issue Description
1.
New patio for University Services Building. A new University Services
Building will require an appropriate patio area for students, faculty, staff
and community people.
2.
Loading area for Food Service Department. The new University
Services Center will require exterior design to accommodate receiving
and shipping.
3.
New construction will require new landscaping. As buildings are
constructed, landscaping will need to be completed to match the
facilities.
4.
No outdoor performance areas. Create a patio outdoor performance
area suitable for both musical and dramatic productions.
Planning Area: Transportation and Circulation
Priority
Issue Description
1.
Develop campus circular drive. Consider a circular drive around the
south, east, and north sides of the campus. The drive will provide
access to future parking lots, and provide for enhanced physical and
personal security by enabling drive-by patrols.
31
2.
No nearby handicapped or delivery access for campus buildings. Need
a roadway linking campus buildings to provide handicapped access and
parking.
3.
Need a lighted walkway linking the campus to the high school. Need for
a lighted, paved, attractive 1000-foot pathway to facilitate student access
to shared academic programs and physical facilities.
4.
No access to campus arboretum and other outdoor area. Need to create
an integrated system of trails to link north and south sides of the
arboretum to the high school arboretum and to the city/county system of
trails. Link trails signage to our natural resources curriculum. Create a
service learning course that would help with trail and arboretum
maintenance.
Planning Area: Utilities and Services
Priority
Issue Description
1.
Sewer system in Cafeteria needs to be reconstructed. The Cafeteria
sewer system is 44 years old and needs to be reconstructed or built new.
2.
3.
Redo fire alarm system on campus. The current fire alarm system
doesn’t connect all buildings or to the fire station downtown. The fire
alarm system needs to be replaced.
Telephone services inadequate. Telephone system needs to be
upgraded.
32
Appendix D3:
UW Richland Capital Technology Plan
UW-Richland
Campus Technology Plan
2012-2013
Table of Contents
Committee Membership ........................................................................................................................... 4
UW-Richland – Technology Vision ............................................................................................................ 4
Executive Summary................................................................................................................................... 5
General Summary ..................................................................................................................................... 5
Short Term: One and Two Year Priorities ................................................................................................. 5
GOAL 1: Increase the speed and reliability of WiFi Access for Students, Faculty and Community ..... 5
GOAL 2: Increase the speed and reliability of Classroom and Lab Computers..................................... 5
GOAL 3: Increase Access to Interactive Technologies in the Classroom .............................................. 5
Long Term: Three to Five Year Objectives ................................................................................................ 5
GOAL 4: Increase Instructor Influence Over Wireless Access within each Classroom ......................... 5
GOAL 5: Increase Access to Classroom Recording Technology ............................................................ 5
GOAL 6: Improve Efficiencies by Working with Central to More Effectively Integrate Students
Services, Business Services, and Library Services ................................................................................. 5
Technology Plan Process ........................................................................................................................... 6
Start Up Process .................................................................................................................................... 6
Annual Review and Implementation Process for IIT Committee .......................................................... 7
Summary of current technology resource Inventory ................................................................................... 8
Demographics ........................................................................................................................................... 8
Infrastructure ............................................................................................................................................ 9
Central Support ..................................................................................................................................... 9
Campus Support.................................................................................................................................... 9
Instructional Space.................................................................................................................................. 10
Numbers and Types of Technology Enabled Rooms Per Building ...................................................... 10
Age and Numbers of Class/Lab Based Computers .............................................................................. 10
Administrative Resources ....................................................................................................................... 11
Numbers and Types of Technology Equipped Offices Per Building .................................................... 11
Age and Numbers of Office Based Computers and Peripherals ......................................................... 11
Age and Numbers of Non-Office Tools ............................................................................................... 11
Services ................................................................................................................................................... 12
Faculty Related.................................................................................................................................... 12
Staff Related........................................................................................................................................ 12
2
Student Related .................................................................................................................................. 13
Summary of Most Recent Technology Survey ............................................................................................ 14
Usage and Expectations .......................................................................................................................... 14
Students .............................................................................................................................................. 14
Faculty / Instructional Academic Staff ................................................................................................ 15
Administrative / Non-Instructional Staff............................................................................................. 16
Recommended Improvements and Priorities ......................................................................................... 17
Student Responses .............................................................................................................................. 17
Faculty and Instructional Academic Staff Responses ......................................................................... 17
Administration and Non-Instructional Staff Responses...................................................................... 17
Proposed Strategy ....................................................................................................................................... 18
General Summary ................................................................................................................................... 18
Short Term: One and Two Year Priorities ............................................................................................... 18
GOAL 1: Increase the speed and reliability of WiFi Access for Students, Faculty and Community ... 18
GOAL 2: Increase the speed and reliability of Classroom and Lab Computers................................... 18
GOAL 3: Increase Access to Interactive Technologies in the Classroom ............................................ 19
Long Term: Three to Five Year Objectives .............................................................................................. 20
GOAL 4: Increase Instructor Influence Over Wireless Access within each Classroom ....................... 20
GOAL 5: Increase Access to Classroom Recording Technology .......................................................... 20
GOAL 6: Improve Efficiencies by Working with Central to More Effectively Integrate Students
Services, Business Services, and Library Services ............................................................................... 21
Appendixes.................................................................................................................................................. 22
Table of Lab Mod Proposals / Approvals / Expenditures ........................................................................ 22
Questions for Technology Survey ........................................................................................................... 23
3
Committee Membership
Aharon Zorea
Chair, History Professor
Todd Roll
Library Services Director
Evan Wontor
Student Representative
Clif Cavanaugh
Physics Professor
Dorothy Thompson
University Relations
Ross Beier
Student Representative
Amanuel Teweldemedhin
Math Professor
Gary Gobin
Network Administrator
Dundee McNair
Assistant Dean for
Administrative and Financial
Services
Marilyn Peckham
Instructional Technology
UW-Richland – Technology Vision
Our planning vision for technology on the UW-Richland campus will be guided by 3 principles:
Keep our current technological infrastructure up to date for administrative and
educational needs.
Strive to be innovative as appropriate for our programs.
Approach technology as a tool supporting our primary goal of education.
4
Executive Summary
General Summary
Results of the technology survey clearly indicate that the most pressing technology concerns among
students, faculty, and staff were the need for faster and more reliable WiFi access, faster campus
computers (in labs and offices), and greater access to more advanced interactive technologies both
inside and outside the classroom. Fortunately, the IIT Committee (working with Central and Campus IT
departments) has begun the process of immediately addressing the first two goals. The third goal is in
process at the Central level, but our local infrastructure is mostly ready for implementation. Goals 4 and
5 require more specific planning, but the strategies are in place for eventually achieving these
objectives. The last goal is currently in its infancy, but there is a strategy to move it along within the 3-5
year time frame.
For more detailed explanation of each goal, the strategies for achieving them, and the measures for
proving successful completion, please see the “Proposed Strategy” section (pp. 17-20).
Short Term: One and Two Year Priorities
GOAL 1: Increase the speed and reliability of WiFi Access for Students, Faculty and
Community
GOAL 2: Increase the speed and reliability of Classroom and Lab Computers
GOAL 3: Increase Access to Interactive Technologies in the Classroom
Long Term: Three to Five Year Objectives
GOAL 4: Increase Instructor Influence Over Wireless Access within each Classroom
GOAL 5: Increase Access to Classroom Recording Technology
GOAL 6: Improve Efficiencies by Working with Central to More Effectively Integrate
Students Services, Business Services, and Library Services
5
Technology Plan Process
Start Up Process
In the fall of 2012, the UW-Richland IIT Committee launched a year-long initiative to examine
and create an enduring technology plan for the campus that could serve as guide and template
for the future. The original idea was initiated by Dean Hagen in the spring of 2012, and was
introduced to the campus during our fall retreat. The main impetus behind the technology plan
was threefold. First, there is another technological “revolution” of sorts as handheld devices
begin to replace our traditional laptop/desktop market. That trend is likely to continue and the
technology industry is applying great pressure in all areas of society (including higher education)
in order to be the first to achieve a marketing advantage in this area. Second, our institution has
been encouraging each campus to become better prepared to make intelligent technology
decisions as we face increasing pressure from outside sources to update our technology. This
new technology plan is intended to provide a vehicle were re-invigorating our campus response
to the constantly changing world of consumer technology. Third, the planning process enabled
to the IIT Committee to reevaluate its priorities and procedures. As a result, this technology
plan serves as both a resource and a template for the annual business schedule of the campus
IIT Committee.
The IIT Committee had three primary objectives during this process.
1) Draft a renewable technology plan that will help guide the campus decisions as it relates
to technology priorities for both short and long terms.
2) Re-examine the duties and responsibilities of IIT Committee so that it can continually
revise and update its technology plan on an annual basis as part its internal process.
Establish procedures to ensure the technology plan is used as a guide for the IIT
Committee’s other decisions (lab mod grants, etc.) This process is listed below.
3) Develop a set of tools that will help the IIT Committee to sustain these annual reviews of
the technology plan. These tools are included in the Appendixes.
In order to meet these objectives, the IIT Committee met ten times over the course of the year,
including several 2-hour work sessions. The process included: develop the following general
steps: planning an outline for the process for developing a technology plan; gathering
information about the kinds technology and services we currently provide; creating a survey for
gathering input on campus needs and priorities for technology and services that could serve as a
template for future plans; and reviewing the survey results to make current budget decisions
and to draft a rough outline of technology plan. The committee also hosted a special listening
session and provided periodic updates to the campus through Collegium reports.
The initial process of developing the Campus Technology plan required an unusual amount of
effort and commitment from the IIT Committee. Fortunately, the tools and templates have
been created and the process should be much easier to implement next fall. The new process
should be streamlined for next year and we hope to follow a five-meeting schedule next year
(two meetings in the fall, and three meetings in the spring).
6
Annual Review and Implementation Process for IIT Committee
Each year, the Campus IIT Committee will strive to achieve the following objectives according
the schedule listed below. This schedule should be reviewed and confirmed each year.
Spring Term Objectives
Fall Term Objectives
x
x
x
x
x
x
x
x
x
x
x
Call for Lab Mod / Other Budgeted
Proposals
Review Last Year’s Technology Plan
Review Budget/IT Reports & Projections
Identify completed objectives from
previous year
Review/revise uncompleted –
immediate objectives
Consider new ideas/development for
current year
Review Lab Mod / Other Budgeted
Proposals
Review/Approve Lab Mod Proposals
based on 1 year goals
x
x
x
x
x
x
x
[Previous Lab Mod Proposals / Approvals /
expenditures included in appendix]
x
Review Technology Survey Questions
x
x
x
[previous year’s questions included in
appendix]
x
x
x
Remove obsolete questions
Add new questions related to new
ideas/developments
Call for Lab Mod / Other Budgeted
Proposals
x
x
7
Implement technology survey
Add “listening sessions” as needed
Review Results of Survey / Listening
Sessions
Adjust 1-2 year goals
Adjust 3-5 year goals
Call for Lab Mod / Other Budgeted
Proposals
Review/Approve any other budgeted
[student tech fees] proposals based on
1 year goals
Recommend any other proposals for
next 1-2 year goals
Adjust 3-5 year objectives as needed
Make any other revisions to Technology
Plan process / vision if appropriate
Update Technology Resource Inventory
Review/Revise Technology Plan
Submit Rough Draft before April
Campus Collegium for Feedback
Submit Executive Summary
Recommendations to Steering and
Green Team Committees for their
consideration
Submit Final Draft to SharePoint for
future reference
Summary of current technology resource Inventory
Demographics
Number of Instructional Faculty/Staff Served: 70
Number of Students Served: 425
Aerohive Wireless Usage [Peak hours of the Day]
Wireless usage [By platform type]
8
Infrastructure
Central Support
Central Information Technology Services (CITS) provides support and services. Their help desk
support helps solve immediate issues. Higher level support helps with more complicated immediate
issues along with assisting with projects. CITS hosts the UW-Richland Website. They also host the
VMware vCenter. This allows us to integrate our two VMware host. This allows them to assist remote
and allow us remote access from any UW College. On campus our domain controller and firewall are
managed and maintained remotely by CITS. In the Spring of 2013, our bandwidth was upgraded from
10MB to 100MB.
Campus Support
The local area network is managed through the use of vlans. We currently we have 13 servers,
seven of these servers are VMware Virtual Machines. All servers are Microsoft operating
systems; 2003, 2007, and 2012. We have 15 switches, 14 are HP and one is a Dell. Switches are
connected by fiber.
Wireless
The 802.11B/G MonoWall Wireless Network was upgraded throughout all campus
buildings to 802.11B/G/N Aerohive Wireless Network, spring of 2013. Currently have
twelve Aerohive Access Points, AP121.This upgrade increased our coverage area by 25%.
Aerohive Access Points AP121 are Bring Your Own Device (BYOD) ready.
HVAC / Doors / Telephones / Other
The phone system is a Mitel Private Branch Exchange (PBX). The Mitel SX2000 controller is
used to manage and maintain our phones. The Mitel 3300 controller is used to manage and
maintain our voice mail.
9
Instructional Space
Science
Building
Classroom
Building
East Hall
Numbers and Types of Technology Enabled Rooms Per Building
Smart
Smart
Broadcast
Lab
Conference
Other /
Rooms
“Enhanced”
Rooms
Spaces
Rooms
Specialized
2
7
1
3 Mobile
6
1
Melvill Hall
1
1 Smart
1
1 Mobile
1
1 Smart
1
1
1 Mobile
Coppertop
1
3
1
1 Mobile
2 Smart
4
2
Smart Farm
x
x
x
x
x
x
8
2
Gymnasium
Total
8
7
1
Library
Total
0
13
1
4
11
4
2
34
“Smart Classrooms” include a desktop computer, one projector, a media player (DVD / VHS)
“Smart Enhanced Classrooms” include the same setup as a Smart Classroom, and includes an
additional smart board, with additional projector
“Broadcast Classrooms” include basic Smart Classroom, with recording or broadcasting (Point to
Point or other Video Conference tools)
“Lab Space” refers to any room with multiple computers. The “Mobile” designation refers to a class
pack of computers that can be moved from room to room.
“Conference Rooms” refer to any meeting space. The “Smart” designation refers to rooms that also
have computer / projector combination. The “Mobile” designation refers to a computer / projector
combination on a cart.
“Other / Specialized” refers to any spaces that include isolated computers or other specialized
technical equipment dedicated to a specific task.
Age and Numbers of Class/Lab Based Computers
Desktops
Thin Clients
Laptops
Projectors
1 Year Old
2-3 Years Old
4-5 Years Old
6+ Years Old
1
16
39
59
20
4
15
28
24
10
1
5
2
19
Class Printers
/ Scanners
1
3
2
15
Administrative Resources
Numbers and Types of Technology Equipped Offices Per Building
Enhanced
Setup with
Extra
Total
5
5
34
45
Library
4
4
Coppertop
2
2
Gymnasium
2
2
Minimal Setup
(Shared)
Minimum
Setup
(Individual)
Enhanced
Setup
Science
Building
Mellvill Hall
x
x
x
2
7
2
Total
2
7
2
47
54
“Minimal Setup” includes a desktop computer with a single monitor
“Enhanced Setup” includes a desktop computer with dual monitors
“Enhanced Setup with Extras” includes desktop computer with one or two monitor plus a printer,
an external storage device, or other unique peripheral
Age and Numbers of Office Based Computers and Peripherals
Desktops
Printers
External Storage
Total
1 Year Old
7
1
2
10
2-3 Years Old
15
5
20
4-5 Years Old
3
3
6
6+ Years Old
29
38
67
Total
54
47
1 year old
2-3 years old
4-5 years old
6+ years old
Total
2
Age and Numbers of Non-Office Tools
Copiers
Shared Printers
FAX Machines
1
2
1
1
3
5
6
11
1
103
Specialized
Services
Technology on campus is not limited to inventories of hardware and software. A great deal of the
resources necessary to maintain and manage technology is dedicated to provide support services. The
Instructional/Information Technology Department at UW-Richland has two full time staff members, and
three part time student workers. In 2012-2013: Marilyn Peckham served as Instructional Technologist ;
Gary Gobin served as Network Administrator; and the student workers were: Evan Wontor, Kane Sharp,
Ross Beier. The number of student workers will be limited to two in the 2013-2014. The IT Staff is
responsible for the following services.
Faculty Related
x Provides local support for classroom management software (Desire 2 Learn, Blackboard
Collaborate, and other related software)
x Uploading video and editing software to online servers for classroom specific projects,
which includes digital conversion of analog video tapes, as well as the maintenance of the
MediaSite classroom recording system
x Maintains and services hardware in offices and classrooms, including: desktop computers,
printers, Smart Boards, scanners, projectors, phones, and other hardware
x Maintains and services hardware and software necessary for video conference, including
point-to-point, non-online distance education, compressed video, and other tools
x Maintains and services microphone and sound related system in class and conference
rooms, including portable devices
x Provided regular instructional workshop on various hardware, software, and other
technology based system on an annual and semi-annual basis. Also provides individualize
training as needed.
Staff Related
x Provides support (installation, maintenance, updates) for desktop applications including
Windows, Microsoft Office, Blackboard Collaborate and others local specialized tools
x Manages network based storage and drive mapping for local files each faculty/staff
member, including individual and group permissions, including backup protection for all files
(individual, shared, and system files).
x Maintains and services hardware in offices and common spaces including: desktop
computers, printers (private and shared), networking for copiers, and door lock
programming.
x Manages audio-visual tools, loanable laptops/tablets, and phones system
x Maintains and services hardware and software necessary for video conference, including
point-to-point, non-online distance education, compressed video, and other tools
x Maintains and services microphone and sound related system in class and conference
rooms, including portable devices
12
x
x
Provided regular instructional workshop on various hardware, software, and other
technology based system on an annual and semi-annual basis. Also provides individualize
training as needed.
Provided regular instructional workshop on various hardware, software, and other
technology based system on an annual and semi-annual basis. Also provides individualize
training as needed.
Student Related
x Provides management of student printing/network/wireless accounts
x Provides individual software support for tools regularly used in classroom related activities
x Maintains and services lab based desktops, thin clients, and laptop/tablet packs, as well as
shared scanners, and printers
x Maintains supplies for student lab based hardware (ink, paper, toner, and other
consumables).
x Provided regular instructional workshops for D2L, E-mail, Distance education, video editing,
and other software on an annual and semi-annual basis. Also provides individualize training
as needed
13
Summary of Most Recent Technology Survey
In January of 2013, the IIT Committee conducted a survey of faculty, staff, students, and other related
constituencies of the campus to gather information of the state of technology usage at UW-Richland.
The survey was intended to find out three main kinds of information from our campus community
members: 1) What kinds of technology were people using? 2) How well has the campus been meeting
people’s technology needs and expectations? 3) What kinds of changes in technology do people most
want to see? The survey was administered online, and was also available in hard copy format upon
request. A little more than 15 percent of the campus community responded, resulting in the following
results and generalizations.
Usage and Expectations
Students:
Just under half of survey respondents were students, of which more than two-thirds had no
previous collegiate experience, and the remaining third had some.
Application and Performance
Math / Natural Sciences
Humanities / Fine Arts
Social Sciences
Student majors
Technological Expectations
Two thirds of the students use a WiFi enabled laptop, and a quarter of the students use a WiFi
enabled smart phone every day. A small number of students are using tablet computing devices
(about 15 percent) every day or nearly every day – among those, students are using the WiFi
more than 3G/4G to access the internet by a ratio of 2:1. More than a quarter of the students
also use color printers two or three times a week, while the slightly fewer use black/white
printers with the same frequency. Only about 15 percent of student use their own private
printers.
Student Use of Software
Almost all students are using email every day, with 62 percent using school email, and 37
percent using non-school email. Less than half the students use one of their Office Suite tools
on a daily basis, but every student reported using social networking at least once a week, and
more than half use social networking (Facebook / Twitter, etc.) on a daily basis. More than half
the students also reported playing games online, or on their device, at least two or three times a
day (33 percent reported daily gaming). Almost all students use their Office Suite tools on their
laptop, with only a small minority (less than ten percent) using these tools on their tablet,
smartphone, or directly from a website. But a quarter of the students used their electronic
calendar through a smart phone or tablet device at least two or three times a week (if not daily).
Less than 10 percent of the students access their online calendar through a laptop, and about a
third of the students do not use an electronic calendar at all.
14
Classroom Experience
About half the students felt the classroom experience at UW-Richland was about the same as
their previous educational institution. While a third reported they had everything they needed
in a classroom, there were at least half who thought there were some areas in classroom
technology that needed improvement.
Faculty / Instructional Academic Staff:
The second largest category of respondents was comprised of faculty and instructional academic
staff. More than 75 percent of those who spend some part of the time teaching in a classroom
responded to the survey.
Instructional Academic Staff (with NO prior teaching experience
Instructional Academic Staff (with some prior teaching experience)
Assistant Professor (with some prior teaching experience)
Associate Professor
Respondents
Full Professor
Math / Natural Sciences
Social Sciences
Humanities / Fine Arts
Application and Performance
Areas of Specialization
Classroom Experience
52 percent of Faculty/IAS feel their classrooms are about the same as their previous experience,
and very well equipped. 48 percent feel their classrooms are either less equipped or noticeably
ill-equipped than their previous experience. Most would like to see some improvement in the
classroom, and a small minority (8 percent) has a difficult time because of poorly equipped
classrooms.
Office Experience
Two thirds of Faculty/IAS members feel their offices are well equipped and better than what
they are used to from their previous positions. A little less than half would like to see some (or
many) areas of technology in the offices improved.
15
Technological Experience
More than half of Faculty/IAS members use copy machines and printers (private or shared
access) every day. More than a quarter also use WiFi or 3G/4G enabled phones and laptops
every day. Another quarter use these tools, and others (including scanners and color printers)
two or three times a week.
Technology Used in Office and Classroom
Almost every Faculty/IAS member uses their office desktop computer on a daily basis, with only
slightly fewer also using dry erase boards, classroom projectors, and land-line phones on a daily
basis. Half of respondents also use a local storage device every day, and a quarter use smart
boards at least two or three times a week.
Software Usage
Almost every Faculty/IAS member uses classroom management software on a daily basis, and
those who do not use such software daily, do so at least two or three times a week. In addition,
half of respondents also use video streaming software at least two or three times a week.
About a quarter of respondents also use other web based tools, commercial cloud storage and
other administrative software at least two to three times a week, and some every day.
Administrative / Non-Instructional Staff
Only about 15 percent of the respondents were administrators, or some other non-instructional
staff members. Among those, half were administrators.
Staff Expectations
Among those who responded to the survey, 83 percent felt their offices were at least as well (if
not better) equipped than their previous place of employment. A quarter said they had
everything they need to do what they need to do, and a little more than half said there were
some areas of technology that could be improved.
Use of Technology
Half of the Staff respondents use a land-line phone and desktop computer every day, another
quarter use these tools at least two or three times a week. Less than 10 percent use any other
form of technology (audio, video, CD/DVD, TV, or dry erase boards) more than once a week.
Use of Software
Almost every Staff member reported using Office Suite tools and school email at least two or
three times a week (75 percent reported using them every day). About half the respondents
also use specialized web-based software on a daily basis (or close to it). A little less than 60
percent use electronic calendars, and those who do use their desktop computers to access them
rather than their phone or tablet device (by a ratio of 3:1). Most Staff members reported never
using social networking or instant message (or if they do, they use it rarely).
16
Recommended Improvements and Priorities
Student Responses
More than half the students felt the most urgent priority for improving technology at UW-Richland was
to ensure faster WiFi access, and more reliable WiFi access. An equal number of students felt the next
priority (to be dealt with soon) should be improving the speed of campus computers, expanding the
number of campus desktop computers, and generally improving the speed of online access. A minority
of students (between 10 and 20 percent) called for greater versatility in student management tools (D2L
and PRISM) and greater connectivity to online calendar tools.
In the free form comment section, Students repeated the general need for faster/more reliable
WiFi access and faster/more reliable computers in student labs. Some students also emphasized the
need for more reliable scanners and wireless printers. Several comments encouraged more training for
professors so they could be more comfortable using Smart Boards in the classrooms. Other issues not
prompted by the survey, but mentioned by students include: better building security, more lighting
around campus, emergency phones around campus, more access to electrical outlets, and increased
access to WiFi and printers in the dorms.
Faculty and Instructional Academic Staff Responses
Three quarters of the Faculty / Instructional Academic Staff identified the need for faster and more
reliable WiFi access as the campus’ most urgent technological priority. The remaining respondents
placed WiFi access as their second more urgent priority, but also identified the need for greater access
to tablet technologies, more reliable file transfer tools on campus, and greater access to classroom
recording tools as their more urgent priorities. Other priorities identified as needing to be dealt with
very soon include: greater access to Smart Boards, greater access to classroom recording, faster access
to online for private devices (laptops, phones, and tablets), more reliable video conferencing software,
and more training for using classroom technologies.
In the free form comment section, Faculty / Instructional Academic Staff echoed the need for
faster, more reliable access to WiFi, but also emphasized the need for faster classroom computers.
Several comments mentioned the time it takes to start a classroom (or office) computer, and asked for
some IT solution (such as automatic waking to counter the automatic shut-down). Several comments
also mentioned the need for greater availability of Smart Boards in more classrooms. Several comments
further mentioned the need for upgraded projectors, and access to technology to block (or control)
student WiFi during class time. Other issues not prompted by the survey include: need for more
presentation clickers; software to allow instructors to see what is on student screens in lab settings;
increased access to shared drives across campus and off campus; better distribution of existing
classroom tools (so there are fewer “unused” resources); replace black podiums with smaller units;
greater access to tablets; more white board space; and more digital signage.
Administration and Non-Instructional Staff Responses
About half the Administration / Non-Instructional Staff respondents identified faster and more reliable
access to WiFi as their most urgent priority. Beyond that, there was much less consensus over what the
next priorities should be. Some trends (none of which were more than 20 percent) indicated a need for
more versatile file transfer tools, more training for classroom technologies, more versatile student ID
technology, and more reliable phones, printers, and more access to laptops.
In the free form comment section, Administration / Non-Instructional Staff repeated the need
for faster and more reliable WiFi access, but also indicated a need for faster office computers and
greater access to printing options in more places. Other issues not prompted by the survey include
better tools for transferring video recordings to DVD, cell phones for staff, connecting fire alarms to
automatic alerts to the fire department, and greater access to electrical outlets.
17
Proposed Strategy
General Summary
The technology survey clearly indicated that the most pressing technology concerns among students,
faculty, and staff were the need for faster and more reliable WiFi access, faster school computers (in
labs and offices), and a greater access to more advanced interactive technologies both inside and
outside the classroom. Fortunately, the IIT Committee (working with Central and Campus IT
departments) has begun the process of immediately the first two priorities. Both the short term and
long term priorities identify strategies for meeting the third priority.
Short Term: One and Two Year Priorities
These goals are necessarily specific in detail, and may be partially completed at the time of drafting the technology
plan. Strategies and Evidence points shou ld also be detail -specific to enable immediate implementation.
GOAL 1: Increase the speed and reliability of WiFi Access for Students, Faculty and
Community
x
x
x
x
Strategies for Attaining Goal 1
Use Student Tech fees to purchase of 12 new Aerohive transmitters/software
Work with Central IT to expand of UW-Richland’s broadband capacity
Evidence of Successfully Meeting Goal 1
Increase the number of Wireless Transmitters so that the capacity grows by 25 percent
See a decrease in prioritization of faster/more reliable WiFi access in Technology Survey 20132014
GOAL 2: Increase the speed and reliability of Classroom and Lab Computers
x
x
x
x
x
Strategies for Attaining Goal 2
Use combination Student Tech Fees / Lab Mod Proposals to place the Thin Client in Science
Building room 102 (24 units)
Use funds from Central’s computer modernization monies to replace student lab computers
during 2013-2014 budget. Use existing student lab computers to upgrade most urgent
Classroom / Office desktop needs
Develop a local IIT solution for “waking up” desktop computers in each classroom at the start of
each day to reduce “boot” times
Evidence of Successfully Meeting Goal 2
Update/Replace 30 percent of Lab Computers (and subsequent classroom / office computers
through internal hardware migration)
See a decrease in prioritization of faster/more classroom computers in Technology Survey 20132014
18
GOAL 3: Increase Access to Interactive Technologies in the Classroom
x
x
x
x
Strategies for Attaining Goal 3
Use Student Tech fee, Lab Mod, and Wish List money to purchase more Smart Boards for at
least two classrooms per building
Provide some (more than one) training session for Faculty / Academic Instructional Staff on how
to use Smart Board technology
Evidence of Successfully Meeting Goal 3
Double the number of Smart Board Enabled Classrooms in each building
See a decrease in prioritization of expanded access to Smart Boards in Technology Survey 20142015
19
Long Term: Three to Five Year Objectives
These goals are intended to serve as broader guidelines and will not be detail -specific. Strategies will necessarily
be broad, and the higher the number of the goal, the n the more long -term the expected achievement.
GOAL 4: Increase Instructor Influence Over Wireless Access within each Classroom
x
x
x
x
x
x
x
x
x
Strategies for Attaining Goal 4
Work with Central Administration to purchase/develop software that enables local control over
Virtual Software Applications
Train local IIT Staff to manage BYOD technology both locally and in cooperation with Central
Train local Faculty/Instructional Academic Staff to utilize BYOD technology in their classrooms
Acquire more tablet devices for faculty / staff use to encourage BYOD implementation
Evidence of Successfully Meeting Goal 4
Central Administration implements software that enables local control over Virtual Software
Applications
Local IIT Staff have attended at least one workshop / training seminar in how to administer
BYOD technology
At least three training sessions on implementing BYOD technology in the classroom are made
available on campus for local faculty/instructional academic staff
At least one tablet device is made available for any faculty / staff who would use it at least two
or three times a week for classroom activities
Decrease in prioritization in Technology Survey 2013-2014
GOAL 5: Increase Access to Classroom Recording Technology
x
Strategies for Attaining Goal 5
Investigate more Cost Effective Classroom Recording Technologies, and successfully find a price
point comparable to existing “smart classroom” technology. [This is a critical step, which all other
steps depend on – meaning that further movement toward this goal must be delayed until this step is met]
x
x
x
x
x
x
x
Train local Faculty/Instructional Academic Staff to utilize Classroom Recording technology in
their classrooms
Increase usage of existing Classroom Recording Technology (MediaSite) among Faculty / Staff by
30 percent
Equip at least one Classroom Recording Technology enabled room per building
Evidence of Successfully Meeting Goal 5
At least three training sessions made available on campus for local faculty/instructional
academic staff
Faculty and Staff increase their use of Classroom Recording Technology by 30 percent
At least one Classroom Recording Technology enabled room per building
Decrease in prioritization in Technology Survey 2013-2014
20
GOAL 6: Improve Efficiencies by Working with Central to More Effectively Integrate Students
Services, Business Services, and Library Services
x
x
x
x
x
Strategies for Attaining Goal 6
Create an ad hoc group to work with relevant departments at the Central and Local level to
identify the services that can be more efficiently combined into a more integrated
software/hardware solution
Create a specific list of objectives to be satisfied through a more integrated software/hardware
solution
Identify specific budget liabilities that could be reduced as a result of a more integrated
software/hardware solution
Evidence of Successfully Meeting Goal 6
A specific plan is created for implementing a more integrated software/hardware solution
Specific budget sources have been identified to procure/ maintain a more integrated
software/hardware solution
21
Appendixes
Table of Lab Mod Proposals / Approvals / Expenditures
[see linked file: Lab Mod Proposals 2005 – 2012 and Current 2013 Spring.xlsx ]
22
Questions for Technology Survey
[These can also be viewed in linked document : IIT Committee Technology Plan – Proposed Survey – 2013]
General Categorization [to determine 1 of 3 survey options – this question is given to everyone]
Question 1 (part I): Please check your current position/status
[keep in mind that these distinctions will help with later aggregation – for purpose of the survey questions, there are only three
divisions: students; faculty/IAS; and staff]
x
x
x
x
x
x
x
x
x
x
x
x
Student with no college experience prior to coming to UW Richland
Student with some college experience prior to coming to UW Richland
Instructional Academic Staff with no experience teaching at another institution
Instructional Academic Staff with some experience teaching at another institution
Assistant Professor with no experience teaching at another institution
Assistant Professor with some experience teaching at another institution
Associate Professor
Full Professor
Non-Instructional Staff in Non-Administrative Position
Non-Instructional Staff in Administrative Position
UW Extension Faculty / Staff
Non Student, Non-UW Employee
Question 1 (part II): It has been [choose from a pull down option list] since I was
as a school/job prior to coming UW Richland
Options: 1 semester,
1 year,
1-3 years;
3-5 years;
more than 5 years
Question 1 (part III): Please check your major / area of specialization
[check all that apply] [this information is purely for later aggregation purposes, and will have no impact of the survey
questions]
x
x
x
x
x
x
x
x
Math / Natural Sciences
Social Sciences
Humanities / Arts
Business / Economics
Health / Fitness / Athletics
Student Related Services
Grounds / Maintenance
Administration
23
Audience Specific Questions [Students / Instructional Faculty / Non -Instructional Staff]
[the purpose of this question set (Q2 & Q3) is to assess general perception/satisfaction of existing technology – we will use the
data to determine how satisfied various constituent groups are (and thereby identify areas that may need improvement)]
Question 2: How does the classroom technology here compare to the
technology of where you came from?
¾
¾
¾
Student Version: In terms of technology, how does the classroom experience at UW-Richland compare with
the experience at your previous school (high school or college)?
Instructional Faculty Version: In terms of technology, how does the classroom experience at UW-Richland
compare with the experience at your previous job?
Non-Instructional Staff Version: THIS QUESTION IS NOT ASKED
Part I Options:
x
x
x
x
x
UW Richland’s Classrooms are very well equipped
UW Richland’s Classrooms are better equipped than what I am used to
UW Richland’s Classrooms are about the same as what I am used to
UW Richland’s Classrooms are less equipped than what I am used to
UW Richland’s Classrooms are noticeably ill equipped
Part II Options:
x
x
x
x
x
I have everything I need in the classroom
There are some areas in the classroom that I would like to see improvement
There are many areas in the classroom where I would like to see improvement
I have a difficult time doing what I need to do because of the poorly equipped classrooms
I do not use technology in the classroom to any meaningful extent
Question 3: How does the technology in your work environment here compare
to the technology of where you came from?
¾
¾
¾
Student Version: In terms of technology, how does the available technology outside of the classroom
compare with the experience at your previous school (high school or college)?
Instructional Faculty Version: In terms of technology, how does the available technology in your office
compare with the experience at your previous job?
Non-Instructional Staff Version: In terms of technology, how does the job-related technology available on
campus compare with the experience at your previous job?
Part I Options:
x
x
x
x
x
UW Richland is very well equipped with available technology resources
UW Richland is generally better equipped with available technology than what I am used to
UW Richland is equipped with available technology about as well as what I am used to
UW Richland is generally less equipped with available technology than what I am used to
UW Richland is noticeably ill equipped with technology resources
Part II Options:
x
x
x
x
x
I have everything I need to do what I need to do
There are some areas that UW Richland could improve to help me do what I need to do
There are many areas that UW Richland could improve to help me do what I need to do
I have a difficult time doing what I need to do because of UW Richland’s inadequate technology
I do not use technology at UW Richland to any meaningful extent
24
These are the new divisions – do not include the titles of each division, with the question – just
ask, “…select the technology…”
Division for Question 4 (two pages – one page per part)
Hardware - Common
Smart Phone (using wifi), Smart Phone (using 3G/4G), Laptop Computer (using wifi), Personal Laptop
Computer (no wifi), Personal Laptop Computer (using wifi), School Tablet/iPad (using wifi), Personal
Tablet/iPad (using wifi), Personal Tablet/iPad (using 3G/4G), School Common Access Printer, Private
Access Printer; Color Printers, Copy Machines, Fax Machine, Scanning Machine [14 total]
Hardware – Non-Common
Land-line phone, Old Cell phone, School Desktop Computer, School Laptop Computer (no wifi), Still
Camera, Video Camera, Audio Recorder, Classroom Projector, Television, Digital Sign/ Announcement
Monitor, Tape Player, CD Player, Videotape Player, DVD Player, Blue-Ray Player, Dry Erase Board,
Smartboard, Specialized Lighting Equipment, Specialized Sound Equipment, Specialized Lab/Studio
Equipment, Specialized Non-Lab/Studio Equipment (movable), Specialized Non-Lab/Studio Equipment
(non-movable) [23 total]
Division for Question 5 (two pages – one page per part)
Software – Personal
Office Suite (Word, Excel, Access, Powerpoint, etc.) on your computer, Office Suite (Word, Excel, Access,
Powerpoint, etc.) on your tablet/smart phone, Office Suite (Word, Excel, Powerpoint, etc.) on a website, Audio
Software, Video Software, Photo Software, non-school email, school email, instant messaging, online calendar (not
connected with phone/tablet), online calendar (connected with phone/tablet), social networking (Facebook, Twitter,
etc.), Web based reference sites (Gov.net, Wikipedia, etc.), News Services (Drudgereport, MSNBC Online, etc.),
Online Reservations, Online Shopping Games (device only), Games (online), Games (Massive Multiplayer Online),
General “Web Surfing” [19 total]
Software – Class/Discipline
Online Administrative Software (WISDOM, My UW System, etc.), Classroom Management tools (D2L, blogs, wikis,
etc.), Student Management (PRISM, etc.), Web based tools (Google maps, Language translator, etc.), Web
publishing (web design, blog, etc.), Online Conference (Connect, Blackboard Collaborate), video calling (Skype,
iChat, etc.), Music Streaming (Pandora, iTunes, etc.), Video Streaming (Netflix, Hulu, Youtube, etc.), Commercial
Cloud Storage (iCloud, Amazon Cloud, any files saved online), UW Colleges Server Storage (Sharepoint, Public
Folders, Shared Network Drive), File Transfer (Home Access to School Files), external storage (extra hard drive),
local device storage (on desktop/laptop/tablet), Specialized Software Unique to your work, Specialized Software (for
any reason other than your work) [17 total]
25
Division for Question 6 (two pages – one page per part)
Hardware - Individual
Faster Private Access Computers, Faster Wifi Access, More reliable Wifi access, More Private Access to Desktops, Greater
Access to Laptops, More reliable Access for Private Tablets/iPads, More Versatile Student ID Cards, More Reliable Phones,
Greater access to photography equipment, Greater access to Audio Recording, Greater access to Audio players, More Online
Storage options, More local storage options (extra drives, etc.), Greater Access to private access printers, greater access to
color printers, more reliable printers, greater access to video players (Video tape), greater access to video players (DVD/Blue
Ray), More Reliable Sound equipment, greater access to electrical outlets [20 total]
Hardware - Classroom
Faster Public Access Computers, Faster Online Access, Greater Access to Desktops, Greater Access to Common Accessed
Tablets/iPads, More reliable public communication systems (announcement boards, digital signage, etc.), Greater access to
Smartboards, Greater access to Video Projection, Greater access to Video Recording, Greater access to classroom recording,
greater access to copy machines, more reliable copy machines, greater access to scanning machines, more reliable scanning
machines, Greater access to FAX machines, greater access to Common Access Printers, Greater access to Specialized Sound
Equipment, Greater Access to specialized lighting Equipment, more reliable Sound equipment, greater access to specialized
lab/studio equipment, greater access to non-lab/studio equipment (movable), greater access to non-lab/studio equipment (non
movable), more efficient plant/building security tools (doors, alarms, etc.), more efficient HVAC tools [23 total]
Division for Question 7 (two pages – one page per part)
Software - Personal
Greater Access to Office Suite tools on personal Tablets/iPads, Greater Access to Audio editing Software, Greater Access to
Audio streaming Software, Greater Access to Video editing software, Greater access to video recording tools, More reliable
access to video streaming software, Greater options for instant messaging outside of campus, Greater options for instant
messaging within campus, greater access to online calendar tools, more connectivity to online calendar tools, more sophisticated
tools for using social networking, greater access to web publishing tools, more variety of student management tools, more
versatility of student management tools (from desktop, to laptop, to tablets, to phones), greater access to file transfer tools (files
from home), greater access to entertainment based software (games, surfing, etc.) [16 total]
Software - Organizational
Greater Access to Web Based Office Suite tools, more reliable file transfer tools on campus, greater access to classroom
recording tools, greater access to specialized software for work, greater access to specialized software (for any reason other
than work), Greater options for instant messaging outside of campus, Greater options for instant messaging within campus,
greater access to online calendar tools, more connectivity to online calendar tools, more sophisticated tools for using social
networking, greater access to web publishing tools, more variety of student management tools, more versatility of student
management tools (from desktop, to laptop, to tablets, to phones), greater access to video conferencing, more reliable access to
video conferencing, greater access to UW Colleges server storage, more versatile file transfer tools on campus (from classroom
to tablet to smartphone), more training for classroom based technologies, more training for how to incorporate technology in the
classroom, more training for online based software tools (PRISM, D2L, My UW System, etc.), more training for online forms,
more training for basic technology literacy [22 total]
26
[the purpose of this question set (Q8 & Q9 & Q10) is to provide an opportunity for free-form suggestions of needs that may not
have been included in the previous questions. We will use the data to determine if there are other problem areas that the
committee is unaware of but that various constituent groups are concerned about (and therefore may require short term / long
term planning to remedy)
Question 8: If you had the opportunity to make five improvements to our
existing technology in the classrooms, what would they be? [five empty boxes,
with ranking numbers]
Question 9: If you had the opportunity to make five improvements to our
existing technology outside of the classrooms, what would they be? [five
empty boxes, with ranking numbers]
Question 10: Do you have comments/observations that you think would help
the committee in drafting/reviewing our campus technology plan? [a single
large general comment box – limited to 250 words]
27
Appendix D4:
UW Richland Health and Safety Compliance
HEALTH AND SAFETY COMPLIANCE CHECKLIST
LOCATION: _Richland __________________________________ DATE: __7/30/2013_____________
Findings
WORK ENVIRONMENT SAFETY
Employees are not engaged in ergonomic
hazards, e.g. awkward posture, forceful
lifting/pushing/pulling, vibration, contact
stress, etc.
Employees’ work areas are adequately
illuminated.
Employees lunch areas pose no exposure to
toxic materials or other health hazards.
Employees work areas are clean, orderly and
free of obstruction.
Employees are not engaged in unsafe acts.
Employees are wearing appropriate task
related PPE when working.
Comments
Employee work and break areas are in good
condition.
PPE was available and employees that I observed
were using proper PPE.
Area of concern – The costume area and scene
shop have excessive storage with items stored
above the rafters. Storage should be reduced and
re-arranged in an orderly manner. Photo 21,
22,23, 25
Findings
BLOODBORNE PATHOGENS (DCOMM 32.15,
1910.1030)
A written exposure control plan has been
developed that includes a list the affected job
classifications and/or tasks, implementation
dates and post exposure evaluation
procedures.
Universal precautions and work practice
controls are used to eliminate/reduce
possible exposure.
Hepatitis B vaccinations have been offered to
affected employees.
Affected employees have and are using the
proper Personal Protective Equipment (PPE)
Affected employees have received initial and
annual training.
Comments
The written is older and should be updated.
Findings
COMPRESSED AIR (DCOMM 32.15, 1910.242)
Appropriate PPE is worn when using
compressed air for cleaning (i.e. safety
glasses or safety goggles and a faceshield
for severe exposure.
Compressed air nozzles used for cleaning
limit air pressure to less than 30 p.s.i..
Comments
I observed safety glasses and facesheilds in the
maintenance area.
Findings
Comments
Employees are due for a refresher training.
Need to verify that air lines used for cleaning
meet the 30 psi requirement. This can be meet
with a nozzle rated for 30 psi or a pressure
reducer in line with compressor.
1
COMPRESSED GAS CYLINDERS (DCOMM 32.15,
1910.101)
Cylinders are stored only in designated
areas.
Cylinders are stored and transported in a
vertical position and secured from falling by a
chain or rope.
Cylinders are stored in areas that are
protected from external heat sources such as
flames, radiant heat and electric arc welding.
Valve caps are in place when cylinders are
not in use.
Acetylene and oxygen gas cylinders are not
stored next to each other (even when empty)
and are separated by at least 20 feet or a
noncombustible barrier at least 5 feet high
having a fire-rating of at least one-half hour.
Cylinders in the maintenance area were store
correctly, chained and in good condition. Photo 4
Findings
CONFINED SPACES (DCOMM 32, Chapter VI)
A written entry program has been developed
which incorporates the use of an entry
checklist and designates which employees
have an active role in confined space entry.
All confined spaces have been assessed and
identified as Level 1 or Level 2 in accordance
with IHLR 32.64(5).
Confined spaces (except manholes) are
labeled with a legible sign.
Rescue procedures for acquiring additional
help in the event of an emergency are
established prior to entering a confined
space.
All entrants, attendants and rescue
personnel have received training on entry
procedures and have the proper sampling
device and equipment.
Comments
No confined space identified.
Paint booth area – appears to be an empty
cylinder stored and not secured, remove cylinder.
Photo 10
Site should have a policy statement that any
confined space work would be contracted and
not performed by facility staff.
Findings
ELECTRICAL EQUIPMENT/SAFETY (DCOMM
32.15, 1910, Subpart S)
All electrical equipment is properly grounded.
The grounding prong (third prong) on all
plugs is in place.
Electrical equipment, located near water, are
protected by a ground fault circuit interrupter
(GFCI).
All switches and wiring carry the electrical
load for which they are rated.
Employees who face a risk of electric shock
that is not reduced to a safe level have
received training in safe work practices (see
1919.332).
Extension cords are not being used in place
of permanent wiring.
Cords and wiring are inspected periodically
Comments
The facility has an arc flash program in place to
protect employees.
Fan in maintenance area had a damaged guard
and the electrical cord was spliced. Photo 7
Electrical vault had storage in the room, storage
should be removed. The fire rating on the doors
had been painted over, remove paint so rating is
legible. Fire door was blocked open, do not
block. Photo 12
Observed a junction box in Science Hall that was
not covered.
Power strips were being used in the Theater
2
for wear, fraying or burning. Damaged
cords/wiring are replaced or repaired
immediately.
Wiring components, such as plugs, outlets,
junction boxes, etc. are maintained in a good
working condition.
Electrical outlets, junction boxes, fuse boxes
and switch boxes are kept closed at all times
and the coin hole openings are closed or
sealed.
A 30 inch clearance is maintained in front of
all electrical service panels.
audio room, add additional outlets.
Extension cord being used in the Library room
301 in place of permanent wiring.
Open junction box in Melvin Hall room 451.
Findings
EMERGENCY ACTION PLANS (DCOMM 32.15,
1910.38)
A current written emergency action and fire
protection plan has been developed and has
been reviewed with employees.
A sufficient number of persons have been
designated and trained as floor
captains/wardens to assist in the safe and
orderly emergency evacuation of employees.
An alarm system has been established in
accordance with the size and structure of the
building and the number of occupants (see
1910.165).
Comments
Plan is in place.
Findings
EMERGENCY EXITS (DCOMM 32.15, 1910.36)
All exits are marked with an exit sign and
illuminated by a reliable light source.
All exits are free from obstructions.
Doors or walkways that do not lead to an
outside exit are marked as "NOT AN EXIT".
Comments
Observed a blocked exit in East Hall. Remove
items. Photo 20
Findings
EMERGENCY EYEWASH AND SHOWERS
(DCOMM 32.297)
Emergency eyewashes/showers are
available and immediately accessible in work
areas for emergency use whenever the eyes
or body of any person may be exposed to
materials that are corrosive or can cause
irreversible eye or bodily injury. Note:
Immediately accessible is defined as within
15 seconds with no obstructions to interfere
with accessibility.
Drenching/flushing facilities provide 15
minutes of continuous flush.
Plumbed eyewash units are activated weekly
to flush the line and verify proper operation.
Comments
Eye wash and showers are provided and in good
condition.
Science Hall room 110 - fire rating on door has
been painted over, remove paint so rating is
legible.
Generator room – testing and maintenance is
being performed. Add terminal covers to
batteries and remove storage.
General note – Facility has wall mount
emergency lighting which is not required since
adding the generator. These create a false sense
of security, remove or maintain so they are
functional.
Add an EXIT sign in the Art area classroom.
Eye wash and showers are being activated
monthly, increase testing to weekly and
document.
We did not notice an eye wash or shower in the
Biology area, need to determine if an exposure
hazard exists.
3
Findings
FLAMMABLE AND COMBUSTIBLE LIQUIDS
(DCOMM 32.15, 1910.106)
Stored quantities of flammable and
combustible liquids are kept to an absolute
minimum.
Flammable and combustible liquids are
stored in approved safety cans.
Flammable liquid storage tanks and drums
are properly grounded and bonded to avoid
static electrical charges and sparks.
Containers of flammable or combustible
liquids are properly labeled.
Containers are inspected periodically for
corrosion and damage.
Smoking is not permitted in areas where
flammable or combustible materials are used
or stored.
Comments
Storage in the garage area was generally good.
Findings
FLOOR LOADING PROTECTION (DCOMM 32.15,
1910.22)
Elevated storage areas are load-rated and
the rating is posted.
Comments
None noted.
Findings
GAS/ARC WELDING AND CUTTING (DCOMM
32.15, 1910.23 & 1910.24)
Welding cables and hoses are in good
condition with no cuts, cracks or punctures.
Electrodes are not stored in the electrode
holders.
Gas valves on oxy-acetylene units are shut
off and drained of pressure when the unit is
not in use.
Gas valves on oxy-acetylene cylinders are
equipped with anti-flashback valves.
Arc welding areas are shielded with flash
protection curtains to protect other workers
from radiation.
Each welder is provided with proper PPE
(i.e. welding helmet/shield, etc.).
Adequate ventilation is provided.
Only qualified (trained) welders are allowed
to perform welding and cutting operations.
Comments
I did observe that welding areas were in good
condition – PPE was provided and flash curtains
were in place.
Garage area - Waste oil should be stored in a
rated can with rated funnel. Photo 6
Theater area needs a flammable storage cabinet.
Abandoned Paint Booth – Area was designed as
a high hazard room for the paint booth
requirements. The exhaust system has been
removed creating an opening in the ceiling and
reducing the rating of the room. Paint and
supplies are stored in the area – remove items,
supply flammable storage cabinets or return
room to hazard rating as designed. Photo 11
4
Findings
GUARDING FLOORS, STAIRS AND WALL
OPENINGS (DCOMM 32.22, 1910.23)
All open floors, more than 4 feet above
ground level, are equipped with a standard
guard rail consisting of a top rail 42 inches
high, mid-rail and a toeboard 4 inches high.
The guardrail is strong enough to withstand a
200-pound force applied sideways.
Exterior stairways or steps having 4 or more
risers are equipped with standard railings or
standard handrails on each side. Exterior
stairways or steps more than 50 feet wide
are provided with one or more intermediate
handrails.
Comments
No areas noted that would require the guarding.
Findings
HAND AND POWER TOOLS (DCOMM 32.15,
1910.242)
Hand and power tools are only used when
the guards are in place.
Tools are inspected periodically for damage
and defects.
All power cords are equipped with a third
grounding prong unless the tool is labeled as
"Double Insulated".
Employees are trained in the proper
operation of hand and power tools.
Appropriate PPE (i.e. safety glasses, gloves
etc.) is worn at all times.
Comments
In the maintenance are I noticed guards were in
place.
Findings
HAZARD COMMUNICATION (DCOMM 32.15,
1910.1200)
A written hazard communication program
has been developed and is available to
employees for review.
An inventory list of all hazardous chemicals
and materials used in the workplace has
been developed and is updated as needed.
Material Safety Data Sheets (MSDS) are
readily available to employees for each
hazardous chemical/product used in the
workplace.
All containers of hazardous
chemicals/products are properly labeled.
Affected employees are trained on how to
read MSDSs and warning labels and how to
safely handle each hazardous material.
Comments
There is no written hazard communication
program, develop the written program.
Exterior stairs did provide hand rails.
Room 715 we observed the guard removed from
the table saw. We question about the area
needing a lockout/tagout and personal protective
equipment program for users. Need to verify if
the dust collection system is grounded.
Need to improve the MSDS’s inventory system.
MSDS’s in the maintenance area were in one file
folder. No real order, should be alphabetic so
products are easy to find in an emergency. We
did check a few products and did find the MSDS.
The standard also calls for MSDS access to be
clearly posted and indicates the location of the
MSDS’s. Suggest using the yellow MSDS binders
that can be purchased and wall mounted.
(Maintenance, Lab and Housekeeping areas)
Update training is needed.
5
Findings
HEARING CONSERVATION (DCOMM 32.15,
1910.95)
A hearing conservation program (i.e. noise
monitoring, engineering controls, audiometric
testing, hearing protection and training) has
been developed when sound levels equal or
exceed an eight hour time-weighted average
(TWA) of 85 decibels.
Comments
Good program in place. The testing was
conducted in 1999. If equipment or staff have
changed then the program will need to be
updated. Overall program should be reviewed
and updated.
Findings
HOISTS, CHAINS, SLINGS AND WIRE ROPES
(DCOMM 32.15, 1910.184)
Hoists, chains, slings and wire ropes are
inspected:
Before use by the operator.
Monthly by a person trained to
recognize defects and authorized to
remove damaged equipment from
service.
Defected equipment and slings and ropes
are immediately removed from service and
repaired by authorized personnel.
Comments
None on site
Findings
HOUSEKEEPING (DCOMM 32.21, 1910.22)
All work areas, passageways, storage rooms
and areas around machinery are level and
kept in good repair, clean, dry and free from
obstructions.
Comments
In general all areas are in good condition. I have
noted specific areas for improvement in other
sections of the report.
Findings
LADDERS (DCOMM 32.23, 1910.25)
All ladders are inspected for damage and
defects prior to each use.
Ladders are placed only on stable surfaces
and are free from grease, oil and dirt.
Metal ladders are not being used around
electrical wiring.
Ladder repairs are performed by trained
personnel only.
All employees who use ladders have
received proper training on safe ladder use.
Portable ladders are not used to gain access
to a roof, floor, or platform, unless the top of
the ladder extends at least 3 feet above the
point of support.
All portable rung ladders are equipped with
nonslip safety feet.
Stepladders that are more than 15 feet in
height are held by an attendant when in use
Comments
I observed a wide variety of ladders available for
staff. All appeared in good condition.
Science Hall room 104A needs better
organization. Photo 15
Ladder training was provided several years ago,
refresher training is needed.
6
unless the ladder is securely lashed or
blocked.
Findings
LOCKOUT/TAGOUT (DCOMM 32.15, 1910.147)
A written Lockout/Tagout program has been
developed and reviewed with affected
supervisors and employees.
Written machine-specific lockout/tagout
procedures have been developed and are
available to affected employees.
Authorized employees have adequate energy
isolating devices (i.e. locks, hasps, etc.).
An annual program evaluation/audit is
conducted to verify effectiveness.
All authorized, affected and other employees
have been trained/instructed on
lockout/tagout procedures.
Comments
The HVAC employee has been trained in LOTO
procedures.
Findings
MACHINE GUARDING (DCOMM 32.15, 1910.212)
All exposed belts, pulleys and gears are
guarded on all sides.
d with a blade guard
and blade cover, splitter and anti-kickback
dogs. The drive belt is also guarded.
Radial arm saws are equipped with a blade
guard and a self-retracting mechanism.
Bandsaws are equipped with a blade guard
that covers all of the blade except for the
point of operation.
Stationary belt sanders have a guard on both
pulleys at the end of the belt table.
Stationary power tools are equipped with a
safety device which prevents automatic
restart after a power outage.
Abrasive wheel grinders are equipped with:
A tool rest that is maintained at a
1/8" clearance from the wheel.
A tongue guard, located at the top of
the wheel, that is maintained at a
1/4" clearance from the wheel.
A guard that covers all sides of the
wheel and drive shaft.
Comments
Maintenance area has a box fan with a damaged
fan blade guard. Photo 7
Review and update the written plan.
Provide “affected” employee training to staff that
may come in contact with area where LOTO is in
place.
Grinder is maintenance shop needs guard
adjustments. Photo 1,2,9
Table saw in Art Lab did not have the guards in
place. Guards are in the coffee can next to the
saw, install guards. Photo 19
Grinder in Arts Lab needs guard adjustment.
Also noticed open ended sanders and polishers
in the Arts area. Per OSHA 1910.215 a spindle
guard is required for grinders. However this item
is not listed or sold as a grinder. I would suggest
that operator procedures be posted at the work
area that includes – Shoulder length or longer
hair needs to be contained so it will not come in
contact with moving parts, no loose fitting
clothing, use of an apron to keep clothing from
making contact with moving parts. Should there
been incident with this item it would most likely
be reviewed under the OSHA General Duty
Clause. Photo 16, 17,18
Findings
PERSONAL PROTECTIVE EQUIPMENT (PPE)
(DCOMM 32.15, 1910.132)
Personal protective equipment (PPE) is
selected and issued based upon a Written
Hazard Assessment for each job task or
work area.
Employees are trained on the proper use,
Comments
I observed the availability of PPE such as face
shields, safety glasses and hearing protection.
Site suggested that a refresher training be
provided. Also indicated a need for fall protection
equipment and training.
7
maintenance, limitations, storage and
disposal of PPE.
Findings
PORTABLE FIRE EXTINGUISHERS (DCOMM
32.15, 1910.157)
Fire extinguishers are selected according to
the fire hazards present.
Fire extinguishers are accessible and free
from obstructions.
All fire extinguishers are being inspected:
Annually by a certified, professional
vendor.
Monthly by a designated employee.
Employees designated to use a portable fire
extinguisher are trained at least annually on
the proper use of a fire extinguisher.
Comments
Extinguishers were check annually.
Monthly visual checks need to be conducted
which includes:
• Extinguishers are in their designated places
• There are no obstructions to access or visibility
• Safety seals are not broken or missing
• There is no evidence of physical damage,
corrosion, leakage or clogged nozzle
• Pressure gauge readings are in the proper
range or position
• Operating instructions are legible and facing
outward
• Fullness – confirmed by weighing or lifting
Blocked extinguishers noticed:
Garage, Maintenance Shop, Science Hall room
106. Photo 5, 8
Room 431 – install a wall mounted “flag” type
sign for better identification.
Findings
POWERED INDUSTRIAL TRUCKS (DCOMM 32.15,
1910.178)
All powered industrial truck operators are
properly trained in the safe operation, fueling
and maintenance of the assigned vehicle.
All trucks are inspected before being place
into service on each shift.
Trucks found to be in need of repair and/or
unsafe are immediately removed from
service and repaired by authorized personnel
only.
Comments
Site does have an aerial lift and a tractor
mounted fork lift.
Findings
POWER MOWERS (DCOMM 32.15, 1910.212)
All blade and discharge guards are properly
installed and maintained.
Hearing protection is worn by the operator if
noise levels are above 90 decibels at
operating speeds.
Appropriate eye and foot protection is being
worn by operators when mowers are running.
Fueling is done only when the power mower
is turned off.
Comments
Observed that all equipment guards were in
place. Safety glasses and hear protection
provided.
Findings
Comments
Training needs to be conducted for al operators.
8
RESPIRATORY PROTECTION (DCOMM 32.15,
1910.134)
Exposure monitoring has been conducted to
determine the need for respiratory protection
and to insure that respirator protection
factors are not exceeded.
Standard operating procedures for selecting
and using respiratory protection have been
developed.
Employees required to use respirators have
been medically evaluated, fit tested and
properly trained.
Respirators are properly used, cleaned and
maintained.
No job tasks require the use of respirators.
Findings
WISCONSIN STATE STATUTE (101.055)
A record (log) of injuries and illnesses is
properly maintained.
Employee Rights and Protection Notice
(DDCOMM SBO 9301-PR 07/92) is posted
where notices for employees usually appear.
Comments
All injuries and illness are reported to the
Workers Comp Coordinator.
OTHER RELATED ITEMS:
Steel roofs created a snow and ice slide hazard. Photo 14
Install ice/snow guards to prevent the risk of falling ice/snow in entrance areas and where sidewalks
run close to the building. We should also review methods for directing water away from entrances
and sidewalks.
The ladder in the Theater that leads to the catwalk area is open and allows access by anyone in the area.
Secure the ladder with an entry gate or ladder guard.
COMPLETED BY: _______________________________ TITLE:________________________
9
Appendix D5:
UW Richland Rigging Inspection Report
Appendix D6:
Draft of Strategic Plan for UWR Smart Farm
Draft of Strategic Plan for UWR Smart Farm May 31, 2013
The purpose of this strategic plan draft is to summarize direction for the Smart Farm after meeting with
several key persons and considering the feasibility of over 180 ideas and suggestions offered by various
groups. I was hired by the Foundation to create a draft of strategic approach for the farm. Timelines
and priorities established are based on the best possible estimations with current resources.
Goal 1 Curriculum
Design and develop courses or aspects of courses (credit, non-credit) that strengthen outcomes for
teachers and learners and promote excellence by utilizing the Smart Farm and enhancing the UW
Richland curriculum
Objective 1 New Course(s) for credit toward AA or BAAS at UW Richland
1. LEC 100 First Year Seminar
Held at the Smart Farm. Offer - Fall 2014.
Instructor: Sue Price
Objective 2 Course activity to include the use of the Smart Farm
1. BUS 210 Business Communication - host a field trip for elementary students to the
farm. Spring 2013. Instructor: Wayne Morganthaler
2. AST 100 Survey of Astronomy- secure funding for a telescope to be housed at the
Smart Farm for use by in laboratory possibly Spring 2015, Fall 2015 Instructor: Clif
Cavanaugh
3. Student projects for classes – Fall 2013/Spring 2014
A. History class – project of writing a history of the Smart Farm
For inclusion in documentation and future museum display
Objective 3 Courses for professional development credit– work with licensing agencies to
provide workshops/seminars that would meet the licensure requirements for teachers.
1. Contact Dave Allen with CESA 3 about developing offerings for teachers’ license
renewal. Summer workshops/Seminars for teachers K-12
Goal 2 Research/Land Use
Establish and conduct research that provides educational opportunities with emphasizes on scholarship,
service and academic excellence, engaging collaboration whenever possible. Manage use of forestland
and cropland.
Objective 1 –Research for faculty professional development and collaboration
1. Solar panels – energy generated and tracked on internet. Ongoing. Norlene
Emerson
2. Entomology research considering pollinators. Jennifer Gavinski and Teresa Schueller
Summer 2013 identifying collaborators. Connecting with scientists from UW
Madison,UW Platteville and UW LaCrosse . Proposal completed by December 2013.
Targeted date for research to begin – Summer 2014.
Objective 2 – Undergraduate student research – research projects that involve at least one
student
1. BIO 101 Concepts of Biology and BIOL 171 Animal Biology – hold labs for each of
these courses at the Smart Farm – Fall 2013. Instructors: Teresa Schuller, Jennifer
Gavinski
2. Smart Farm Student internship – summer internship at farm to do light maintenance
work, assist with day workshops, assist any researchers conducting research, act as host
to visitors.
3. Secure funding for a pier for the pond for access for sample collections
Academic year 2013-2014
4. Establish visiting researchership/professorship - much of the endowment could be
on-site housing. Criteria to receive would include engaging UWR students for at least 4
hours per week for 4 weeks. Minimum length of time would be one month with a
maximum of 4 months. The serene quiet setting of the farm is the main marketing
concept. Put out call to all disciplines of UWR. Contingent on housing available at the
farm
Objective 3 – Land Use. Directed by individuals assigned to the project(s) .
1. School Forest. Annual survey completed by Foundation Office.
2. Managed Forest Land Stewardship Forestry Plan – Jan 2012 to Dec 2036. 18 acres of
mature timber not to be harvested. Consider the potential for that area. Duane
Simonson
3. Maintain 5000 trees planted as a part of a 10 year Conservation Reserve Program.
Wayne Morganthaler, Duane Simonson, Norlene Emerson. Student volunteers.
4. Conservation Plan in place for cropland. Cropland is under lease.
Goal 3 Encourage and support community outreach/recreation, considering all age groups and a
diversity of learning methods
Objective 1 – On-going projects that enhance the Smart Farm experience
1. Bee hives - Sue Sharp has been contacted in April 2013 about having bee hives at the
farm.
2. Trails for hiking. Maintained by Wayne Morganthaler and Duane Simonson
Objective 2 – One day events: workshops/seminars/demonstrations
1. Public Forum - Consider the Land: Sustaining and Respecting It. Wisconsin Institute
for Public Policy and Service grant received $1,000 Academic year 2013-14 Patrick
Hagen, Adam Hady and Sue Price
2. Event with Faculty College, May 2014. Jessica Laeseke encouraging Office of
Professional Development, UW System
3. Possibility – Organic Valley bring mobile Biofuel unit to hold a workshop.
Contact: Nicole Spinelli, Organic Valley
Objective 3 - Outreach working with K-12 educators
1. Grant opportunities through LEAFLet - School Forest
2. Work with high school ag teacher on gardens
Objective 4 – Outreach opportunities for community members
1. Meet with, encourage and support the walking efforts, including Nordic walking with
Claire and Patty Hagg
2. Gail Hoffman has suggested meeting with Health Human Services Dana Churchill and
Dr. Bard regarding the “Richland Fit” program
Appendix E:
Flood Plain Process
Appendix E1:
Summary of Process for Building in a Flood Plain
SummaryofProcessforBuildingintheFloodPlain
Constructinganewbuildinginanexistingfloodplainrequiresatwostepreviewprocessandthe
approvaloftheWisconsinDNRandtheFederalEmergencyManagementAdministration(FEMA)
ThefirststeppriortotheconstructionoftheprojectistoobtainaConditionalLetterofFloodPlainMap
Revision(CLOMR):
x Appliestoaanyproposedstructureinthefloodplainthatwillraisethefloodelevation
x Requiresanapplicationandevaluationoftheimpact
x InvolvesFEMA’scommentontheeffectsthataproposedprojectwouldhaveonthefloodplain
map(FIRM)
x NotapermitandstillrequireslocalandWisDNRreviewandapproval
x Doesnotrevisethefloodplainmap;mustbefollowedbyaLOMRrequestwhenproject
completed
ThesecondstepisoncetheprojecthasbeencompletedaLetterofFloodPlainMapRevision
(LOMR)mustbesubmitted:
x
x
x
x
x
x
Appliestoanexistingstructureorparcelofland
AletterfromFEMAofficiallyrevisingthecurrentmaptoshowchangestofloodplains,
floodways,orfloodelevations.
RequiresWisDNRreview/approval
LOMRrequiredwithanychange(increaseordecrease)inthebasefloodelevationorfloodplain
boundariesresultingfromphysicalchangesornewstudies
CommunitymustnotifyFEMAwithin6monthsofthechanges
Requestforchangestoeffectivemapsmustbeinitiatedbycommunity’sfloodplain
administrator
Communityisultimatelyresponsibleandmustconcurwiththerevision
x
REQUIREMENTS
x Propertyownernotification–forareaswheretheprojectwillincreasetheBaseFloodElevation
(BFE),relativetoexistingconditions
x Nostructuresimpactedcertificationthatnoinsurablestructuresareaffectedbytheincreased
BFE’s
x Evaluationofalternatives–cantheprojectberedesignedtoavoidincreases?Whynot?
x EndangeredSpeciesActcompliance
COMMUNITYRESPONSIBILITIES
Floodplainadministratorsignsthenecessaryformsorprovidesletterthatincludes“reasonablysafe
fromflooding”certificationandmeetsESArequirement
Moredetailontheprocessat:
http://dnr.wi.gov/topic/floodplains/documents/lomcpresentation2012.pdf