2C16-105 Addendum 01
Transcription
2C16-105 Addendum 01
City of Bristol BRISTOL, CONNECTICUT 06010 Invitation to Bid 2C16-105 Synthetic Turf Field at Bristol Central High School Addendum 01 May 27, 2016 Interested bidders are advised that the due date has been changed to Friday June 3, 2016 at 2:00pm. Electrical Drawings E-01 through E-03 Electrical drawings are revised and reissued to include modifications to the electrical design. Revisions to the electrical drawings have been clouded. SK-1 SK-1 – Plan Addition is included and attached to this Addendum No.1. Two additional items have been added to the scope of the base bid project. 1. The existing accessible parking area shall be relocated to accommodate the installation of the athletic field lighting pole. Existing pavement shall be saw cut and removed to the extents shown on SK-1. The existing accessible parking sign shall be relocated to the location shown on SK-1. The parking spaces shall be restriped. Concrete filled steel bollards shall be installed to protect the new light pole. 2. There are (4) four existing track lane gates installed on the inside of the existing running track. These gates shall either be protected from construction activity or removed and reinstalled in their current location(s). Section 004200 Bid Proposal Revised Bid Proposal Form Pages 004200-3 and 004200-4 are issued and herein made a part of these specifications; bidders are to discard the original two pages and replace with the revised two pages. Special Provisions Section 00 00 02 Schedule of Values, Item 2.G The City of Bristol has selected Turf System D as provided by Sprinturf, LLC. The selected contractor shall carry such cost as quoted by the vendor, as part of its schedule of values. An Equal Opportunity Employer http://www.bristolct.gov/bids 111 North Main Street Bristol, CT 06010 Sprinturf, LLC 550 Long Point Road, Suite 205 Mount Pleasant, SC 29464 Attn: Bruce Cheskin Tel: (843) 936-6023 Fax: (843) 284-8823 Email: [email protected] Please note the following questions and subsequent responses: Q1. What is the budget for this project? A1. The overall budget allocated for all costs, inclusive of design, construction, etc. at both schools is $3,615,000.00. The overall budget allocated for all costs, inclusive of design, construction, etc. at Bristol Central High School is $1,725,000.00. Q2. Who is responsible for paying all of the proposed testing requirements for the field? A2. Testing costs shall be the responsibility of the Owner unless otherwise noted in the technical specifications. Q3. Will a temporary fence be required for the project and if yes, what are the specifications for the temporary fence? A3. Temporary fence is not required; the contractor is responsible for securing the site. Q4 In regards to the Bleacher Alternates, A3 & A4, the Plans SD-6 & SD-7 call out these alternates as Add Alternates. The Bid Proposal sheet under BID ALTERNATE ITEMS call out A3 and A4 not as add alternates but complete alternates. Are these Add alternates which would have the additional cost added on to the base bid or are these complete alternates which are called out on the Bid Proposal sheets? A4. The base bid should include the installation of a concrete pad and 747 seat bleacher system as detailed in the bid documents. Alternates A3 and A4 should represent the increase in cost above the base bid price for the 747 seat bleacher and concrete pad. Q5. The existing track appears to remain with no additional work to be done to it per the plans. Specification, Section 33 33 00 Synthetic Track Surfacing, Part 1 – GENERAL, 1.1 SUMMARY, E, calls for the installation of the synthetic track and D-Zone shall be directed by a technical supervisor provided by the contractor who has previous experience and is familiar with the requirements of the manufacturer of the track system. Does this contract include any existing track work? A5. The bid documents detail reconstruction of both d-zones with track surfacing. This work is to be conducted as outlined in the technical specifications. City of Bristol CT Invitation to Bid 2C16-105 - Addendum 01 Page 2 of 3 Q6. Who’s responsible for the existing topsoil? A6. See General Provisions in the Project Specifications. All topsoil/loam material excavated from the site shall be transported by the contractor and deposited at a City site within (5) five miles from the site. Q7. Who is responsible for installing the synthetic turf nailer to the existing concrete curb? A7. It is the General Contractor’s responsibility to installer the turf nailer. Q8. Page 22 of the bid specs, item 13 requires a qualification that all bidders have performed 5 synthetic field installations within the past 5 years. This is a difficult requirement to meet for Site contractors in CT. Will there be any exceptions to this requirement? The completion of 5 athletic fields in CT is more reasonable. The qualification for work perfomed by a competent site contractors would cover the installation of the base materials, grading work and the ability to install the various site improvements. Could this requirement be relaxed to 2 synthetic fields in the past 5 years or could the installation of natural grass fields be included as a substitution to meet the qualifications? A8. As noted on the Statement of Bidder’s Qualifications the bidder may utilize subcontractors to satisfy the requirements of Item 13. Q9. There are no conduits and wiring shown on the prints for the (4) Musco LED security lights on the poles. Should it be added to the scope of work and what is required for consuit and wiring? A9. Separate wiring will be provided for the LED security fixtures. This revision is incorporated in the drawing changes issued with this Addendum. Q10. Is there a allowance for Eversource utility fees or will the Town be billed directly? A10. The City will be billed directly. Q11. Will the wiring for the athletic field lights be included in Base Bid Item 11 or Item 12? A11. This work shall be included in Base Bid Item 11. Q12. The 15’ High Ball Safety Netting At Flush Concrete Curb detail on Plan SD-1 illustrates a 36” x 16” concrete curb with a 30” sleeve. The specs for the Athletic Equipment for the 15’ HT Ball Safety Netting calls for 48” sleeves. If this is the case for the 48” sleeve, then the concrete curb needs to be deeper than what the detail shows. Please clarify the correct sleeve size and curb depth. City of Bristol CT Invitation to Bid 2C16-105 - Addendum 01 Page 3 of 3 A12. 30” is the correct length for the ball safety netting gound sleeve. The foundation detail on sheet SD-1 is correct. Please disregard the dimension noted in the specification. All other terms and conditions remain unchanged. A copy of the prebid meeting agenda and attendance is attached for reference. Roger D. Rousseau Purchasing Agent Tel (860) 584-6195 Fax (860) 584-6171 Attachments: Revised Electrical Drawings Additional Work Sketch Prebid meeting agenda Prebid meeting attendance Revised bid pages 004200-3 and 4 Acknowledgement form (3 pages) (1 pages) (3 pages) (1 page) (1 page) (1 page) City of Bristol CT Invitation to Bid 2C16-105 - Addendum 01 Page 4 of 3 RETURN THIS FORM IMMEDIATELY! City of Bristol, Connecticut Acknowledgment: Receipt of Bid Documents Bid Number: 2C16-105 Title: Synthetic Turf Field at Bristol Central High School Addendum 01 Please take a moment to acknowledge receipt of the attached documents. Your compliance with this request will help us to maintain proper follow-up procedures while ensuring that all recipients have the opportunity to submit proposals. Date Addendum 01 was issued May 26, 2016 Date Addendum 01 was received ____/____/____ Do you plan to submit a proposal? Yes_____ No_____ ________________________________________________________________ Print or type the following information: Company name: _______________________________________________ Address: _______________________________________________ City or Town: _______________________________________________ Phone: _______________________________________________ Fax: _______________________________________________ Email: _______________________________________________ Received by: _______________________________________________ Note: Faxed acknowledgments are requested! FAX (860) 584-6171 A cover sheet is NOT necessary. IMPORTANT: DO NOT FAX PROPOSALS. PROPOSALS MUST BE SUBMITTED IN SEALED PACKAGES W N S E REMOVE EXISTING ACCESSIBLE PARKING SIGN. SALVAGE OR RECONSTRUCT BASE AND FOUNDATION IN-KIND Sc or bo SAWCUT AND REMOVE EXISTING ASPHALT PAVEMENT AND RESTORE AREA TO LAWN ar d 8' REMOVE AND STOCKPILE (4) EXISTING TRACK LANE GATES (ONE AT EACH END OF TRACK RADII). REMOVE AND REINSTALL FOUNDATION OR PROTECT FOR REUSE. IF FOUNDATION REMOVED THEN REINSTALL IN SAME LOCATION. 8' INSTALL (3) 4' HT. 6" DIA. CONCRETE FILLED PAINTED STEEL BOLLARDS TO PROTECT ATHLETIC FIELD LIGHT POLE. BOLLARD SHALL EXTEND 4' BELOW GRADE AND SHALL HAVE A 12" DIA. CONCRETE FOUNDATION 18' RE-STRIPE VAN ACCESSIBLE PARKING STALL. Ò 99 Realty Drive Cheshire, Connecticut 06410 (203) 271-1773 Fax (203) 272-9733 www.miloneandmacbroom.com DATE MAY 26, 2016 SCALE X"=X' PROJ. NO. 2235-57 DESIGNED KCF DRAWN KCF CHECKED DWD RELOCATED EXISTING ACCESSIBLE PARKING SIGN 15' 30' 0 1/2" 1" PROJECT PHASE: ADDENDUM NO.1 - PLAN ADDITIONS FOR BID SYNTHETIC FIELD AT BRISTOL CENTRAL HIGH SCHOOL 480 WOLCOTT STREET BRISTOL, CONNECTICUT 0' DRAWING NAME: SK-1 REVISED: --Copyright Milone & MacBroom, Inc - 2016 In accordance with the attached specifications entitled "Contract 2C16-105 Synthetic Field at Bristol Central High School"; the undersigned agrees to perform all work as shown within these specifications. See Special Provision Section 00 00 04 – NTC – Schedule of Values for Lump Sum Bid Item, Synthetic Turf Infill System Options, and Bid Alternate Item descriptions. LUMP SUM BASE BID ITEMS Line 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Description Site Preparation Site Removals Sediment and Erosion Controls Earthwork and Grading Storm Drainage System Athletic Field Subsurface Drainage Synthetic Turf (Turf System D) Synthetic Running Track Improvements Track and Field Events 747-Seat Aluminum Bleachers Electrical Work Athletic Field Lighting Project Closeout UOM LS LS LS LS LS LS LS LS LS LS LS LS LS The TOTAL AMOUNT of this Bid, as computed by the Bidder is: Qty Price 1 $_____________ 1 _____________ 1 _____________ 1 _____________ 1 _____________ 1 _____________ 1 $ 548,500.00___ 1 _____________ 1 _____________ 1 _____________ 1 _____________ 1 _____________ 1 _____________ Total all lines $_____________ __________________________________________________________________ ______________________________________________________ DOLLARS and __________________________________ CENTS. $________________________ SYNTHETIC TURF INFILL SYSTEM OPTIONS Line A. B. C. D. Description Turf System A Turf System B Turf System C Turf System D UOM LS LS LS LS Qty 1 1 1 1 Price $485,800.00____ $572,700.00____ $517,600.00____ $548,500.00____ UOM LS LS LS LS LS Qty 1 1 1 1 1 Price $4,700.00______ _____________ _____________ _____________ _____________ BID ALTERNATE ITEMS Line A1. A2. A3. A4. A5. Description Center Field Logo Ball Safety Posts and Netting 945-Seat Aluminum Bleachers 1,508-Seat Aluminum Bleachers Pedestrian Lighting 004200-3 BREAKDOWN BY COST AND TRADES In order to properly evaluate the proposal, the following information is required. The Scope of Work to be awarded will not be influenced by the cost and quantity information provided here. Total Material $___________________ Total Labor Cost ___________________ Equipment ___________________ Subcontractor(s) ___________________ Total Applicable Sales and Use Taxes ___________________ Total Bond Cost ___________________ Allowances ___________________ Total Bid (same amount as shown above) $___________________ Total Estimated On-Site Man Hours ___________________ 004200-4 SYNTHETIC FIELD AT BRISTOL CENTRAL HIGH SCHOOL BRISTOL, CONNECTICUT #2C16-105 PRE-BID MEETING AGENDA MAY 19, 2016 AT 10:00 AM PROJECT: Synthetic Field at Bristol Central High School 480 Wolcott St Bristol, Connecticut RFP #: 2C16-105 MMI #: 2235-57 INTRODUCTIONS: A. OWNER: City of Bristol Purchasing Agent Roger Rousseau B. FUNDING: Local C. ENGINEER: Milone & MacBroom, Inc. Project Manager Lead Landscape Architect David Dickson, L.A. Kevin Fuselier , L.A. CORRESPONDENCE: A. CORRESPONDENCE TO OWNER: Roger D. Rousseau Purchasing Agent Tel: (860) 584-6195 Fax: (860) 584-6171 Email: [email protected] http://www.bristolct.gov/bids B. CORRESPONDENCE TO ENGINEER: Milone & MacBroom Inc. 99 Realty Drive Cheshire, CT 06410 Attn: Dave Dickson Project Manager Tel: (203) 271-1771 Fax: (203) 272-9733 Email: [email protected] GENERAL INFORMATION: Non-Mandatory Pre-Bid May 19, 2016 at 10:00 AM Bid Opening Date: June 1, 2016 at 2:00 PM (Wednesday) Anticipated Notice to Proceed June 2016 Begin Construction July 5, 2016 Substantial Completion: October 27, 2016 Liquidated Damages: $500.00/Day Prevailing Wages: Yes Last Day to Submit Questions: May 26, 2016 (Thursday) Last Day to post Addenda: May 27, 2016 (Friday) ITEMS TO BE HIGHLIGHTED: • Bid Documents may be obtained for a non-refundable fee of $50.00 (plus tax and shipping where applicable), from Merritt Graphics 650 Franklin Avenue Hartford CT 06114 Tel (860) 296-2500 http://www.merrittgraphics.com/ • Turf Bids Opened: May 18, 2016 o Cost Includes Synthetic Turf System and Shock/Drainage Pad o Building Committee to review submissions May 20, 2016. o Fixed cost(s) will be issued via addendum • Track Improvements o Reconstructed D-zones o 2 New Long Jump Event Areas o New Concrete Discus Pad • Other Site Improvements o 747-Seat Aluminum Bleacher and Conc. Pad o (4) Pole Athletic Field Lighting System • Add Alternates o Add Alternate No. A1 – Center Field Logo (Included with Turf Bid) o Add Alternate No. A2 – Ball Safety Post and Netting Ground sleeves are included in base bid o Add Alternate No. A3 – 945-Seat Aluminum Bleachers o Add Alternate No. A4 – 1508-Seat Aluminum Bleachers o Add Alternate No. A5 – Pedestrian Lighting • Addendum/Addenda NOTE: Any Addenda will be emailed to the addresses provided on the sign in sheet for this meeting and/or all plan holders. QUESTIONS FROM BIDDERS: