Recently Completed Projects – EN Engineering – TOTAL
Transcription
Recently Completed Projects – EN Engineering – TOTAL
EN Engineering Recently Completed Projects Table of Contents Section Description Page 1 Automation Projects (Natural Gas) 2 2 Automation Projects (Liquid Products) 12 3 Automation Projects (Electrical Utility & Power) 18 4 Automation Projects (Non-Energy) 19 5 Compressor Station Projects 21 6 Pipeline and Meter Stations Projects 26 7 Distribution Systems Projects 40 8 Storage Projects 50 9 LNG & Propane Air Plant Projects 59 10 Liquid Projects 61 11 Corrosion Service Projects 71 12 Metallurgical Services Projects 81 13 Consulting Service Projects 90 14 Peak Shaving Power Projects 95 15 Pipeline Integrity Services Projects 97 16 Telecom Projects 102 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 1 of 102 Recently Completed Projects - Automation Projects (Natural Gas) Client: Project Description: Project Title: Location: Kinder Morgan Conversion of Compressor Station PLC Platforms Compressor Station Control System Upgrade Hersher, Illinois USA Complete rewrite of station PLC control software and conversion from a Siemens 555 PLC platform to a Rockwell ControlLogix platform for the company’s largest and most critical gas storage facility comprised of 11 reciprocating compressor units, 3 gas turbine compressor units and a gas dehydration plant. Also included in the project scope were development of a new ControlLogix ESD PLC program and complete rewrite of the station Wonderware HMI application and integration of a new compressor control system into the existing plant-wide control network. Services provided included sequence of operation development, PLC and HMI programming, commissioning and preparation of a complete operators manual for the station control system. CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT Turbine Compressor Station Control Software Rewrite CONFIDENTIAL Confidential USA Complete rewrite and optimization of ControlLogix station and ESD PLC programs and RSView SE station HMI. Control system functionality included automatic sequencing for single stage and series operation of two Solar Taurus gas turbines, recycle valve control, surge control, gas cooling control and control and monitoring of station auxiliary systems. The scope of services included, completion of the functional specification, development sequence of operations and cause and effect charts, PLC and HMI programming, integration of the control system with the pipeline SCADA system and commissioning. Client: Project Description: Project Title: Location: Kinder Morgan Compressor Station Automation Upgrade Station 204 Automation Columbus Junction, Iowa USA Design, programming and commissioning of a PLC based compressor station control system and emergency shutdown system for an expansion of an existing compressor station / gas storage facility. The system is designed to provide monitoring and control of 7 engine driven reciprocating compressors, 75 yard valves and 5 gas storage fields. The control system functionality includes flow and pressure control and monitoring, remote control of satellite compressor station and 99 operator configurable flow modes. The station control system is based on the Allen Bradley ControlLogix platform with Wonderware HMI software. The ESD system is based on the Siemens 545 PLC platform. The project scope included conversion from a Siemens 545 based PLC control system to a ControlLogix based control system, integration of the new control system with existing flow computers, an upgrade of the existing PLC-based ESD system, control panel design and fabrication, PLC and HMI programming and on-site commissioning services. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 2 of 102 Recently Completed Projects - Automation Projects (Natural Gas) Client: Project Description: Project Title: Location: CenterPoint Energy New Compressor Station PLC, HMI and ESD Implementation North Louisiana Expansion Panola, Texas & Vernon, Louisiana USA Design, programming and commissioning of PLC based compressor station control systems and emergency shutdown systems for two new compressor stations with gas turbine driven centrifugal compressor units. The control systems are based on the Allen Bradley ControlLogix platform with Allen Bradley RSView HMI software. The systems are designed for remote, unattended operation and provide automatic station start capability and pressure setpoint control. Project scope included control panel design and fabrication, PLC and HMI programming and on-site commissioning services. Client: Project Description: Project Title: Location: Kinder Morgan Control System Network and Wellhead Control System Upgrade Station 388 Control System Upgrade Longview, Texas USA Provided programming and commissioning of a PLC system designed to serve as a control system network master to coordinate communication between multiple PLC based control systems and HMIs from different vendors, for control of a compressor station, dehydration plant, two CO2 removal process plants and seven compressor units. Project scope also included development of algorithms and PLC software for remote pressure / flow control of over 40 I/W wells and communication with RTUs for a gas storage field. The control system is based on the Allen Bradley ControlLogix platform with Wonderware HMI software. Client: Project Description: Project Title: Location: Rockies Express Pipeline (REX) Control System Software and Commissioning Rockies Express Western United States (Multi-State) Configuration of control system software and commissioning of station control and ESD systems for ten new compressor stations for a 1,600 mile, 1.8 BCF/D, cross country pipeline. The horsepower at these facilities consists of gas turbine/centrifugal, engine driven/reiprocating and motor driven/cetrifugal compressors. The control systems are based on the Allen Bradley ControlLogix platform with Wonderware HMI software. The systems are designed for remote, unattended operation and provide automatic station start capability and setpoint control. Project scope included configuration, modification and testing of PLC and HMI software, integration of unit control systems with station controls, control system loop checks and on-site commissioning services. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 3 of 102 Recently Completed Projects - Automation Projects (Natural Gas) Client: Project Description: Project Title: Location: Kinder Morgan New Compressor Station PLC, HMI and ESD Implementation Station 214 Automation Columbus Junction, Iowa USA Design, programming and commissioning of a PLC based compressor station control system and emergency shutdown system for a grass roots compressor station. The control system is based on the Allen Bradley ControlLogix platform with Wonderware HMI software. The system was designed for remote, unattended operation and provides automatic station start capability and pressure setpoint control. Project scope included control panel design and fabrication, PLC and HMI programming and on-site commissioning services. Client: Project Description: Project Title: Location: Kinder Morgan Control System Hardware and Software Upgrade 388 Gas Cooler Control System Longview, Texas USA Design, programming and commissioning of a PLC based control system for gas cooling and separation equipment which was installed at this existing facility as part of a storage capacity expansion project. The control system is based on the Allen Bradley ControlLogix platform with Wonderware HMI software. Project scope included control panel design and fabrication, PLC and HMI programming, integration of the new control system into the existing station control system and on-site commissioning services. Client: Project Description: Project Title: Location: Central New York Oil & Gas Subsidiary of Inergy Optimization of Compressor Station Control Systems Stagecoach Storage Facility Control System Upgrade Owego, New York USA Assessment and optimization of control systems for a compressor station and gas storage field. Control systems for station yard valves, the station ESD system, three electric motor driven centrifugal compressor units, a dehydration plant, and the gas measurement/control system are being reviewed and upgraded as part of this project. All of these systems are based on the Allen Bradley PLC5 platform. The project also includes programming and start-up of Omni flow computers for injection and storage wells. ENE is also serving as the control system consultant to facilitate integration of a new compressor unit control system with existing station and ESD control systems for the horsepower expansion project. The scope of services includes assessment and analysis, control system troubleshooting, modification of existing PLC programs, flow computer programming and on-site commissioning services. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 4 of 102 Recently Completed Projects - Automation Projects (Natural Gas) Client: Project Description: Project Title: Location: Nicor Gas Control System Hardware and Software Upgrade Station 50 Turbine Control System Upgrade Troy Grove, Illinois USA Project scope included design, programming, control panel fabrication and commissioning of PLC a based control system for an Allison 501KC5 / Dresser Rand CDP-416 gas turbine/cetrifugal compressor package. The control system is based on the Allen Bradley ControlLogix PLC platform with a Panelview touchscreen PC running RSView ME as the HMI. Control system functionality includes all start/stop sequencing, shutdown and alarm functions, fuel control control, surge control, temperature limiting and automatic load control. Fuel, surge and temperature limiting algorithms and software for this application were developed by ENE. Client: Project Description: Project Title: Location: Kinder Morgan Compressor Station PLC and HMI Upgrade Station 201 Unit Control System Upgrade Hersher, Illinois USA Design, programming and commissioning of a PLC based control system for an engine driven reciprocating compressor unit (Cooper Bessemer 10W330). The control system is based on the Siemens 545 PLC with a touch screen PC running Wonderware Intouch as the HMI. Control system functionality includes all start/stop sequencing, shutdown and alarm functions, speed control, air/fuel ratio control, ignition timing control and automatic load control. Calculations included fuel torque, compressor torque, horsepower, capacity, flow, loadstep and compressor efficiency. Client: Project Description: Project Title: Location: Kinder Morgan Compressor Station Control System Hardware and Software Upgrade Exterran Compressor Package Control System Mills County, Iowa USA Designed, fabricated, commissioned and programmed a control panel for a compressor unit package consisting of a Caterpillar 3612 engine and an Ariel JGD6 compressor. The control system is based on the Allen-Bradley ControlLogix platform with a Wonderware InTouch 9.0 operator interface. A ProSoft MVI56-MCM Modbus module provides communications between the unit ControlLogix PLC and the Caterpillar engine control system PL1000 interface. The PLC control system funtionality includes all compressor control, safety and monitoring funtions, valve sequencing and modulated recycle valve control. The HMI provides monitoring, control, historical and real-time alarming, logging and trending for both the engine and comperssor control systems. The HMI program provides on-linehelp files, Cause & Effect Charts, and operational manuals. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 5 of 102 Recently Completed Projects - Automation Projects (Natural Gas) Client: Nicor Gas Project Description: Compressor Station Control System Hardware and Software Upgrade Station 70 Unit Control System Upgrade Pontiac, Illinois USA Project Title: Location: Design, programming, control panel fabrication and commissioning of PLC based control systems for two engine driven reciprocating compressor units. The control systems are based on the Allen Bradley ControlLogix PLC with a Panelview touchscreen PC running RSView ME as the HMI. Control system functionality includes all start/stop sequencing, shutdown and alarm functions, speed control, air/fuel ratio control, ignition timing control and automatic load control. Calculations include fuel torque, compressor torque, horsepower, capacity, flow, loadstep and compressor efficiency. Units automated included two Clark HRA-8Ts. Client: Louisville Gas and Electric Project Description: Compressor Station Control System Hardware and Software Upgrade Unit Control System Upgrade Magnolia, Kentucky USA Project Title: Location: Design, programming, control panel fabrication and commissioning of PLC based control systems for three engine driven reciprocating compressor units. The control systems were based on the Allen Bradley ControlLogix PLC with FlexIO and a Panelview touchscreen PC running RSView ME as the HMI. Control system functionality included all start/stop sequencing, shutdown and alarm functions, speed control, air/fuel ratio control, ignition timing control and automatic load control. Calculations include fuel torque, compressor torque, horsepower, capacity, flow, loadstep and compressor efficiency. Units automated included five Cooper Bessemer GMV8s. Client: Louisville Gas and Electric Project Description: Compressor Station Control System Hardware and Software Upgrade Unit Control System Upgrade Muldraugh, Kentucky USA Project Title: Location: Design, programming, control panel fabrication and commissioning of PLC based control systems for three engine driven reciprocating compressor units. The control systems were based on the Allen Bradley ControlLogix PLC with FlexIO and a Panelview touchscreen PC running RSView ME as the HMI. Control system functionality included all start/stop sequencing, shutdown and alarm functions, speed control, air/fuel ratio control, ignition timing control and automatic load control. Calculations include fuel torque, compressor torque, horsepower, capacity, flow, loadstep and compressor efficiency. Units automated included two Cooper Bessemer GMV10s. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 6 of 102 Recently Completed Projects - Automation Projects (Natural Gas) Client: Kinder Morgan Project Description: Project Title: Location: New Compressor Station PLC, HMI and ESD Station 803 Automation Mt. Pleasant, Texas USA Programming and commissioning of a natural gas compression station control system and emergency shutdown system. Project scope also included design, fabrication, commissioning and programming of control panels for the 2 compressor units with Caterpillar 3616 engines utilizing the PL1000 communication interface module. The Allen-Bradley ControlLogix platform with a Wonderware InTouch 9.0 operator interface was implemented on all four control schemes. All HMI programs have integrated help files, Cause & Effect Charts, and operational manuals. The operator interfaces also provide historical and real-time alarming, logging and trending. A ProSoft MVI56-MCM Modbus module was employed for the communications between the unit ControlLogix PLCs and the Caterpillar PL1000s. This provides detailed and critical engine data to be displayed on the each operator interface. Client: Kinder Morgan Project Description: Project Title: Location: Retrofit Compressor Station PLC, HMI Implementation Station 184 Unit Control System Upgrade Sayre, Oklahoma USA Retrofit of new PLC-based unit control panels on three TCV Clark engine/compressor units. The project scope included the reverse engineering of the existing OEM pneumatic control panels, and defining functional requirements, design, fabrication, installation, and commissioning of the new control panels. ENE also designed, installed and commissioned a new fiber optic Ethernet control network for the compressor station. The engine governor, the air manifold pressure & temperature, the ignition timing, gas cooler discharge temperature and all water and oil cooling PID control loops are integrated into the PLC’s. Each unit control panel is equipped with a dedicated touchscreen HMI operator interface running Wonderware for local control, operating data, statuses and alarm histories. Client: Kinder Morgan Project Description: Project Title: Location: Retrofit Compressor Station PLC, HMI Implementation Station 206 Unit Control System Upgrade St. Elmo, Illinois USA Detailed design, programming and commissioning of the software for a new retrofit unit control panel for a Cooper-Bessemer engine/compressor unit with gas cooling at a natural gas storage facility. The engine governor, the air manifold pressure & temperature, the ignition timing, gas cooler discharge temperature and all water and oil cooling control loops are integrated into the PLC. The unit control panel is equipped with a dedicated touchscreen HMI operator interface running Wonderware for local control, operating data, statuses and alarm histories. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 7 of 102 Recently Completed Projects - Automation Projects (Natural Gas) Client: Project Description: Project Title: Location: Nicor Gas Compressor Station Control System Hardware and Software Upgrade Station 70 Unit Control System Upgrade Pontiac, Illinois USA Design, programming, control panel fabrication and commissioning of PLC based control systems for two engine driven reciprocating compressor units. The control systems are based on the Allen Bradley ControlLogix PLC with a Panelview touchscreen PC running RSView ME as the HMI. Control system functionality includes all start/stop sequencing, shutdown and alarm functions, speed control, air/fuel ratio control, ignition timing control and automatic load control. Calculations include fuel torque, compressor torque, horsepower, capacity, flow, loadstep and compressor efficiency. Units automated included two Clark HRA-8Ts. Client: Project Description: Project Title: Location: Louisville Gas and Electric Compressor Station Control System Hardware and Software Upgrade Unit Control System Upgrade Magnolia, Kentucky USA Design, programming, control panel fabrication and commissioning of PLC based control systems for three engine driven reciprocating compressor units. The control systems were based on the Allen Bradley ControlLogix PLC with FlexIO and a Panelview touchscreen PC running RSView ME as the HMI. Control system functionality included all start/stop sequencing, shutdown and alarm functions, speed control, air/fuel ratio control, ignition timing control and automatic load control. Calculations include fuel torque, compressor torque, horsepower, capacity, flow, loadstep and compressor efficiency. Units automated included five Cooper Bessemer GMV8s. Client: Project Description: Project Title: Location: Louisville Gas and Electric Compressor Station Control System Hardware and Software Upgrade Unit Control System Upgrade Muldraugh, Kentucky USA Design, programming, control panel fabrication and commissioning of PLC based control systems for three engine driven reciprocating compressor units. The control systems were based on the Allen Bradley ControlLogix PLC with FlexIO and a Panelview touchscreen PC running RSView ME as the HMI. Control system functionality included all start/stop sequencing, shutdown and alarm functions, speed control, air/fuel ratio control, ignition timing control and automatic load control. Calculations include fuel torque, compressor torque, horsepower, capacity, flow, loadstep and compressor efficiency. Units automated included two Cooper Bessemer GMV10s. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 8 of 102 Recently Completed Projects - Automation Projects (Natural Gas) Client: Project Description: Project Title: Location: Northern Natural Gas Control Panels and Compressor Automation Upgrade Oakland Automation Project Phase I & II Oakland, Iowa USA Hardware and Software upgrade of Automation for Five (5) Clark TLA-10 Vertical Engines. Designed and manufactured Station Panel, Unit Panels, and Remote Valve Panels. Packaged servers, power supplies, media converters, Ethernet switches and ancillary equipment into a 19” EIA cabinet. Implemented AllenBradley ControlLogix PLC for the Station PLC, Unit PLCs, Remote Valve Panels. Implemented code for an Allen-Bradley RSView SE HMI with Client/Server architecture with 2 rich client HMI terminals for the control room; rich client terminals (touchscreens) at identified hazardous and non-hazardous locations. Deployed Ethernet switches, media converters, power supplies, & communications equipment at the HMI end of the network. Exchange data with existing PLCs, RTUs, HMIs, UPS & fire controller. Provided the Functional Requirement Documents (FRD), Drawings, Job Books & Documentation. Coordinated the Startup & commissioning of this system. Phase II involved modification of Station PLC code and Station HMI integration with new Solar Turbine installation. Client: Project Description: Project Title: Location: Northern Natural Gas Control Panels and Compressor Automation Upgrade Paulina Automation Project Paulina, Iowa USA Hardware and Software upgrade of Automation for Five (5) Clark TLA-10 Vertical Engines. Designed and manufactured Station Panel and Remote Valve Panels. Develop code for Allen-Bradley ControlLogix PLC for the Station PLC; Unit PLCs. Develop code for Allen-Bradley FlexLogix PLC for the Remote Valve Panel PLCs. Develop code for an Allen-Bradley RSView SE HMI with Client/Server architecture and 2 Rich Client HMI Terminals in Control Room and Hazardous Locations (touchscreen). Exchange data with existing PLCs, RTUs, HMIs, UPS & fire controller. Provide the Functional Requirement Documents (FRD), Drawings, Job Books & Documentation. Coordinate the Startup & commissioning of this system. Client: Project Description: Project Title: Location: Northern Natural Gas Compressor Functional Documentation (FRD) Macksville Compressor Station FRD Macksville, Kansas USA Document existing station PLC & HMI logic. Document interaction of HMI with outside devices. Examine MOE block diagrams to determine interaction with the HMI. Produce complete Compressor Functional Documentation (FRD) for compressor station. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 9 of 102 Recently Completed Projects - Automation Projects (Natural Gas) Client: Project Description: Project Title: Location: Northern Natural Gas PLC/HMI Upgrade & Commission Compressor Station Mullinville Station Automation Project Mullinville, Kansas USA Develop code for an Allen-Bradley ControlLogix PLC for Station PLCand Hot/ Cold Well PLC. Develop code for an Allen-Bradley FlexLogix PLC for the Remote RTU Panel PLC. Modify existing Wonderware InTouch HMI for interface to new ControlLogix and FlexLogix processors. Design and develop Station manifold flow path and MAOP matrix. Provide automatic flow path color code based on external pipeline path. Exchange data with existing PLCs, RTUs, HMIs, UPS & fire controller. Provide the Functional Requirement Documents (FRD), Drawings, Job Books & Documentation. Coordinate the Startup & commissioning of this system. Client: Project Description: Project Title: Location: Northern Natural Gas Compressor Functional Documentation (FRD) Macksville Compressor Fire & Gas Upgrade Macksville, Kansas USA Develop logic in the TI PLC program to handle configuration of a new 2573 serial interface card; map data from the Detronics fire and gas controller; and map fire and gas data to SCADA. Develop HMI screens for interaction to the fire and gas data. Develop auto-dialer alarms based on the data from the fire and gas controller. Clean up and optiomize the existing fire and gas logic that currently resides in the TI PLC program. Client: Project Description: Project Title: Location: Northern Natural Gas Compressor Functional Documentation (FRD) Macksville/Cunningham Turnaround Macksville, Kansas USA Develop logic in the TI PLC to handle the configuration of 1 new turnaround sequence. Add PLC code to the TI PLC to handle the configuration of 2 PID loops with anti-windup to replace the existing ramp open / ramp closed PLC logic for valves 40 and 99. Optimize existing TI PLC existing logic with retention of existing functionality. Provide complete TI PLC documentation inside of the PLC program and in the form of Excel spreadsheets. Startup and commissioning of the TI PLC to include testing and verification of an estimated 83 discreet and 5 analog I/O points. Review and training in regards to the functionality of the Macksville turnaround TI PLC. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 10 of 102 Recently Completed Projects - Automation Projects (Natural Gas) Client: Northern Natural Gas Project Description: Optimize PLC Logic & Commission Compressor Project Title: Redfield Compressor Station Integration Location: Redfield, Iowa USA Develop logic in the TI PLC to handle the configuration of 1 new turnaround sequence; 2 PID loops with anti-windup to replace the existing ramp open/ramp closed PLC logic for valves 40 and 99. Optimize existing TI PLC logic that will improve operation and retain existing functionality. Provide complete TI PLC documentation inside of the PLC program and in the form of Excel spreadsheets. Startup and commissioning of the TI PLC to include testing and verification of an estimated 83 discreet and 5 analog I/O points. Review and training in regards to the functionality of the Macksville turnaround TI PLC. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 11 of 102 Recently Completed Projects - Automation Projects (Liquid Projects) Client: BP Pipelines North America – Liquids Operations Project Description: SCADA System Upgrade; PLC, HMI, Panel Design, P&ID’s, PLC and Switchgear Drawing packages Project Title: BP Number 1 System Crude Oil & Products Location: Mid Continent Region USA Gulf Coast Region USA Rocky Mountain Region USA Pacific Northwest USA Provided engineering services to BP throughout core and JV pipeline business units for both their crude oil and product divisions. Included development of SCADA and systems for Blending Stations, Tank Stations, Metering Stations, Booster Stations and Junction/Block Valve sites. ENE Partnership with BP led to developing standard PLC and HMI code modules to minimize software development and installations costs. ENE developed standards have been implemented in conjunction with Operator Qualification requirements that were also implemented throughout BP. Project involved upgrade of minimum of 27 BP facilities across the United States and involved the following: SCADA System Upgrade; PLC, HMI, Panel Design, P&ID’s, PLC and Switchgear Drawing packages; Integrated automatic switching system; Upgrade and tank integration Client: BP Pipelines North America – Liquids Operations Project Description: SCADA System Upgrade (Active Project) PLC, HMI, Panel Design, P&ID’s, PLC and Switchgear Drawing packages Project Title: BP “V” System – Dubuque to Sugar Creek Location: Iowa, USA Provided engineering services to BP throughout core and JV pipeline business units for both their crude oil and product terminal locations in Iowa, USA. Included development of SCADA and systems Terminal Facilities. Project involved upgrade of minimum of 2 BP facilities: Cedar Rapids and Council Bluffs, Iowa. Overall project involved: SCADA System Upgrade (Active Project) PLC, HMI, Panel Design, P&ID’s, PLC and Switchgear Drawing packages. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 12 of 102 Recently Completed Projects - Automation Projects (Liquid Projects) Client: Project Description: BP - Olympic Pipeline Company Redundant (satellite/frame relay/fiber optic) Communications System Implementation Project Title: BP Olympic Pipeline Communications Upgrade Location: Oregon & Washington, USA Olympic Pipe Line Company, a fuel product transporter delivering products from the mainline to bulk terminals at Seattle, Sea-Tac International Airport, Tacoma, Olympia and Vancouver, Washington and Linnton and Portland, Oregon. The BP Olympic Pipeline system includes 12 Main Line stations, 2 Booster Stations, 8 Delivery Facilities, and all pipeline Block Valve and Junctions locations. EN Engineering assisted BP Olympic in implementing a revilutionary redundant (satellite/frame relay/fiber optic) communications system. If primary communications were lost to the Control Center, the system would automatically transfer to the backup communications system automatically. Client: Project Description: Project Title: Location: Plains All American Pipeline PT SCADA System Upgrade Pacific LA Marine Terminal LLC SCADA System Long Beach, California USA “Plains Pipeline” provides crude and products storage capabilities for a majority of the refineries in the Los Angeles area. The PT Supervisory Control and Data Acquisition (SCADA) System is designed to allow control, monitoring, and other operations-related functions of 5 automated pumping and heating stations, 8 valve boxes, 1 vapor combustion system, and 20 mimic sites. Hardware/software architecture consisted of Siemens TI PLC-based system and Industrial PC’s (Windows 2000 OS) employing Wonderware Intouch designed around a Wide Area Network (WAN) configuration. Wonderware InTouch applications communicate with redundant SQL Server databases located at the Long Beach Control Center logging time and event based data. Integrated into the Wonderware application is a Sybase PowerBuilder client/server database front-end application developed by EN Engineering. to provide Movement Logging, Leak Detection, Customer Product Transfer Ticketing, Air Quality Emissions Management, and Inventory Management in addition to many other documentation requirements. Installation eliminated need for paper logging of station operating parameters and movement logs which until recently was done manually by the station operators and dispatchers. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 13 of 102 Recently Completed Projects - Automation Projects (Liquid Projects) Client: Project Description: SemStream L.P. Design and Install Terminal Truck Rack Automation System for Propane Distribution Truck Terminals Project Title: Terminal Truck Rack Automation Project Location: Arkansas, Missouri, Indiana USA SemStream is a midstream company engaged in natural gas liquids (NGLs) supply, marketing, propane terminal operations and risk management services. It is one of the largest private propane terminal operators in the industry. SemStream owns and operates 10 private propane terminals in six states with combined throughput capacity of more than 300 million gallons per year. All 10 of the terminals operate 24 hours a day, seven days a week, and serve customers throughout the Mid-South and Midwestern United States. EN Engineering designed and developed a TACS (Terminal Automation Control System) Server/Client based system for Delivery, Inventory, Facility Access, Bill of Lading, and Billing of propane transactions for four (4) propane terminals across Midwest United States. Client: Project Description: Explorer Pipeline Design and Install PLC, HMI and SCADA System For 12 New and 12 Existing Pumping Stations Project Title: Explorer 2003 Mainline Expansion Project Location: Various States, USA Explorer operates a 1,400 mile pipeline system that transports gasoline, diesel fuel and jet fuel from the Gulf Coast to the Midwest. The expansion project included the addition of 12 green field pumping stations, modification to 12 existing pump stations, addition of 500,000 bbls or additional storage capacity, and implementation of a new SCADA system at the company’s corporate headquarters in Tulsa. Develop code for 12 Allen-Bradley ControlLogix Process Control PLCs and ControlLogix Safety Shutdown System (SSS) at each of the new pumping stations. Develop code for 3 Allen-Bradley ControlLogix Process Control PLCs at tank farm facilities Modify code for Allen-Bradley SLC Process Control PLCs at the existing pipeline booster stations Develop code for an Allen-Bradley ControlLogix central data communications processor in Tulsa. Develop a MODBUS TCP interface to the new SCADA system. A wide area SCADA network was implemented, via 56k frame relay network, with satellite backup, which would provide a bumpless communications transfer within 15 seconds of failure on the primary network. Develop HMI color graphic application for all facilities, using Rockwell Automation RSView32, and later RSViewSE platforms. Provide start-up and field commissioning support and training Develop system documentation and operations manuals Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 14 of 102 Recently Completed Projects - Automation Projects (Liquid Projects) Client: OneOK Partners Project Description: Automation of existing natural gas liquids salt dome storage caverns and truck loading facilities Project Title: OneOk – Conway Terminal Location: Near McPherson, Kansas USA Conway Terminal specializes in the underground storage and truck loading of NGL products. It is comprised of 44 Salt Dome Storage Caverns, 4 Truck Loading Spots, Brine Water System, and a Dehy System. One GE 90-70 and two 90-30 PLC’s were used in the Automation of the Terminal Terminal operations were addressed with 3 X GE PLC’s, 1 90-70 and 2 X 90-30’s. The GE90-70 PLC handles the bulk of the Terminal Automation. This includes the metering, Dehy Control, Vaporizer Control, Pump Control, and Meter Proving. A Diamond Loading System handles truck Loading/Unloading. Communications at the Conway Terminal was mostly via Ethernet either over copper or Ethernet Radio. Communications between Conway Station and Haverhill Station/Eldorado Terminal was via Leased Phone line using two Black Box 3600 Leased Line Modems and two Freewave Radios. Modbus was the protocol that is used for the communications. The HMI system was derived with 2 X Wonderware Viewer nodes, and one data server. The server is a Dell 2550 Server with redundant hard drives, power supplies, and network cards. Server is responsible for gathering all the data from the field using the GEHCS, and EFMMGR. GEHCS driver is used to retrieve the data from the GE PLC’s via Ethernet. EFMMGR retrieves the Modbus data from Haverhill Station and Eldorado Terminal. Wonderware’s SCADA alarm package is also installed on the server to annunciate any Haverhill or Eldorado alarms to the Haverhill/Eldorado personnel via their pagers. Data Trending at the Terminal is done using the Canary Labs Trending Package. All trend data is written to the Dell Server and is kept for a year. However DOT trend data is stored off to a CD and saved for 5 years. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 15 of 102 Recently Completed Projects - Automation Projects (Liquid Projects) Client: Wespac Energy Group Project Description: Jet Fuel Delivery Automation and SCADA System Project Title: 10th Avenue Jet Fuel Delivery Pipeline Automation Location: San Diego Airport, California USA SCADA system was implemented to allow easy interaction to receive jet-fuel from Kinder Morgan into Wespac’s Quality Control facility. Wespac delivers jet-fuel, ondemand, to the San Diego International Airport. All actions with the SCADA system are reported on the HMIs located at the terminal the airport control building. Historical logs of all alarms, actions and pipeline properties are kept in the Intellution and Canary Labs trending software. Field data is collected into the GE 90-30 PLCs utilizing GE rack mountable I/O, Genius distributed I/O, Modbus communication to Accuload flow-computer and to Kinder Morgan 90-70 PLC. Field data is presented to operations using Intellution iFix32 HMI software. Intellution iFix32 communicates to the GE 90-30 PLCs through a GE OPC server. Client: Project Description: Project Title: Location: Enterprise Products Partners LP Design and Install Automation for Cavern Inventor Management Cavern Inventory Management Project (CIMP) USA The Cavern Inventory Management Project (CIMP) software allows the operators to obtain current accurate information about the product to brine ratio in each of twelve underground caverns. Real-time calculations are performed on each cavern’s data to find compensation factors for temperature and pressure plus ratedependent meter factors to extend the meters flow rate ranges. The CIMP system allows Enterprise to eliminate the potential for cavern overfill, eliminate force balanced cavern measurement, and provide more accurate and reliable information for scheduling and deliveries and to obtain compliance with the Texas Railroad Commission Rule 95(1) (3). Real-time field data is collected by two TI-555 PLCs and communicated to CIMP through a central CTI-2572 DDE server. The two PLCs act as primary and backup units, allowing for temporary failure of either without loss of data or compromise of system integrity. Refer to the figure 2 below showing the communication layout. All events and reports are kept in an MS-SQL database for retrieval and review utilizing Powerbuilder for report generation and Wonderware for HMI. All reports are also published for remote retrieval using Modbus slave communication to Arcom Director communication equipment. The data is published to support Williams’ Customer Interface Support standard report retrieval format. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 16 of 102 Recently Completed Projects - Automation Projects (Liquid Projects) Client: Enterprise Product Partners / Williams Project Description: Automation of existing natural gas liquids salt dome Project Title: Enterprise/Williams Conway Station Location: Near McPherson, Kansas USA Conway Station specializes in the underground storage and transportation of NGL products for much of the Midwest USA. It is comprised of 84 Salt Dome Storage Caverns, 9 Electric Mainline Units, Brine Water Systems, Flare Systems, and Dehy Systems. Automation of all these systems requires many different communications protocols and PLC platforms. The Storage Cavern network must safely store different NGL products that Conway Station handles. Each one of the caverns is controlled via a GE VersaMax or TIRTU PLC and a MDS radio. The PLC is responsible for monitoring the product and brine psi’s, hazgas levels, and operate the ESD valves. The MDS radio is used to relay the cavern data back to control room using the Modbus protocol. Outside the Caverns, Station Operations are handled by 8 X TI 555/545 PLC’s. The TI PLC’s are located at 6 different locations around the station complex. Each PLC handles a specific task dependent on it’s location in the station. These tasks range from operating Flare Systems, Degasifier/Brine Systems, Mainline Units, Limitorque Valve Communications, Control Valves, or the NH3 Loading Rack. Helping the TI PLC’s are GE VersaMax PLC’s. These PLC’s handle the smaller processes like running the 2 Dehy Regin Heaters, Fresh/Fire Water Pumps, and the Rain Water Recovery Pumps. Client: Project Description: Project Title: Location: Enterprise Products Partners LP Design and Install Automation for Cavern Inventor Management Cavern Inventory Management Project (CIMP) USA The Cavern Inventory Management Project (CIMP) software allows the operators to obtain current accurate information about the product to brine ratio in each of twelve underground caverns. Real-time calculations are performed on each cavern’s data to find compensation factors for temperature and pressure plus ratedependent meter factors to extend the meters flow rate ranges. The CIMP system allows Enterprise to eliminate the potential for cavern overfill, eliminate force balanced cavern measurement, and provide more accurate and reliable information for scheduling and deliveries and to obtain compliance with the Texas Railroad Commission Rule 95(1) (3). Real-time field data is collected by two TI-555 PLCs and communicated to CIMP through a central CTI-2572 DDE server. The two PLCs act as primary and backup units, allowing for temporary failure of either without loss of data or compromise of system integrity. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 17 of 102 Recently Completed Projects - Automation Projects (Electrical Utility & Power) Client: Project Description: Project Title: Location: Southern California Edison Phased Upgrade SCADA System Eastern Hydro Automation System Upgrade California, USA Eastern Hydro Automation System (EHAS) is a SCADA system designed to automate the functioning of the hydro power plants and facilities such as Reservoir/Lake control, water releases and diversions, to satisfy mandatory FERC requirements for Fish water release and overspills on dams etc, in the Eastern Hydro Region of Edison. EHAS design is based on an integrated, distributed controller and HMI based architecture. The widely distributed power plants and water management systems are integrated via a network across all EH divisions and facilities using a dedicated network designated as “E_HydroNet” that spans thousands of acres across California. Automation System hardware design is based on an integrated, distributed controller and HMI based architecture, utilizing Allen-Bradley Controllers of the ControlLogix and CompactLogix family. Release 16 of the ControlLogix and CompactLogix software was utilized to take full advantage of Add-On Instructions and internal PLC alarming with ALMA and ALMA instructions. The Automation System software architecture is based on a client-server architecture utilizing state-of-the-art control and visualization software from Rockwell Software. The design is modular with the software functions deployed across multiple servers. Rockwell Automation is the parent company of Allen-Bradley. With Allen-Bradley PLC hardware specified by SCE, Rockwell Automation’s RSView SE was selected as the HMI to take advantage of the common framework and infrastructure designed into the hardware and software components of these products. The PLC hardware/software and RSView HMI software were designed specifically to function together. This provides a distinct advantage over other third party HMI products. The current Rockwell Software in use at SCE is as follows: Rockwell FTView SE 5.0 Rockwell FTHistoria Rockwell FTAssetCentre Rockwell RSLinx Enterprise Rockwell RSLogix 5000 Release 16. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 18 of 102 Recently Completed Projects – Automation Projects (Non-Energy) Client: Flowers Foods, Mrs. Smith’s Bakeries Project Description: PLC & HMI Implementation Manufacturing Expansion Project Title: Mrs. Smith’s Pies Bakery Expansion Location: Stillwell, Oklahoma USA Flowers Foods (Mrs. Smith’s Bakeries) manufacturers frozen pies and specialty pastries for domestic distribution. EN Engineering was contracted to provide programming for Allen-Bradley PLC5/SLC500 processors and RSView32 HMI software for the expansion of this plant. This plant at that time was the largest bakery in the world. Programming involved: Main Flower Silos and Distribution; Main Sugar Silos and Distribution; Minors Control System; Mixer Control System; Corn Syrup Control System; Fruit and Pumpkin Control System; Trough Wash System; and Pie Line Dough Delivery System Client: Hills Pet Nutrition Project Description: Project Title: Location: Automation of Pet Food Manufacturing Facility Hustopece Facility Automation Hustopece, Czech Republic Involved large scale automation of pet food manufacturing facility with very large volume of IO’s, deployment of PLC’s, HMI’s and wide array of manufacturing automation systems. Facility incorporated complex deployment of Rockwell PLC’s in conjunction with WonderWare HMI interface. Automation system was integrated with client’s “business systems” to further improve performance and facilitate operations. BALANCE OF INFORMATON CONFIDENTIAL PER CLIENT REQUEST. Client: Hills Pet Nutrition Project Description: Project Title: Location: Automation of Pet Food Manufacturing Facility Emporia Facility Automation Emporia, Kansas USA Involved large scale automation of pet food manufacturing facility with very large volume of IO’s, deployment of PLC’s, HMI’s and wide array of manufacturing automation systems. Facility incorporated complex deployment of Rockwell PLC’s in conjunction with WonderWare HMI interface. Automation system was integrated with client’s “business systems” to further improve performance and facilitate operations. BALANCE OF INFORMATON CONFIDENTIAL PER CLIENT REQUEST. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 19 of 102 Recently Completed Projects – Automation Projects (Non-Energy) Client: Israeli Chemicals Ltd. (ICL Performance Products LP) Project Description: Project Title: Location: Boiler Facility Conversion from DCS to PLC Control ICL Lawrence Boiler Automation Upgrade Lawrence, Kansas USA ICL is engaged in the development, manufacture and marketing of fertilizers, industrial products, metallurgy, and performance products. EN Engineering converted the existing Honeywell TDC DCS control system to an Allen-Bradley PAC based control system. The existing TDC hardware was replaced with a total of 5 Allen-Bradley ControlLogix processors. The operator interface selected was Wonderware Archestra. Phase I of the project was automation of the plant Boiler Control System which supplies up to 89,000 lbs/hour of process steam to the plant. This includes plant master burner modulation, water drum level control, deaerator, condensate ad flash tank level controls. Client: Fuel Tech Inc. Project Description: Project Title: Location: Selective Non-Catalytic Reduction (SNCR) Installation NIPSCo Schahfer 883P Panel Design & Programming Wheatfield, Indiana Fuel Tech a leader in Air Pollution Control (APC) Systems, are installed worldwide. Products include emission reducing NOx control systems, and proprietary urea-toammonia conversion technology, for use in selective catalytic reduction (SCR) systems. EN Engineering developed and designed, electrical drawings and logic diagrams, as well as fabricated, furnished and programmed control panels for the Fuel Tech SCR system at the Schahfer power generation plant. The PLC system consisted of Allen-Bradley’s PAC based control system ControlLogix and utilized PanelView 1500 operator interfaces. . Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 20 of 102 Recently Completed Projects - Compressor Station Projects Client: Williams Transco Project Description: Replace Two 7,000 HP Motors with Two 16,000 HP Siemens Motors. Project included VFD and Lube Oil Console Replacements also. Project Title: Station 205 Motor Replacements Location: Princeton, New Jersey Client: Project Description: Project Title: Location: Central Valley Gas Storage LLC Gas Storage Facility with Three CAT 3612 Compressor Packages Central Valley Gas Storage California USA Performed engineering and construction support services including project management, detailed design, bills of material, material and equipment specifications, and preparation of construction documents for the installation of a Greenfield compressor station consisting of three 3550 HP CAT 3612 engine compressor units, dehydration and process facilities, and associated ancillary systems. Client: Project Description: Project Title: Location: Williams Midstream Field Services Midstream Compressor Station with 3516 Compressor Package Springville Compressor Station Pennsylvania USA Performed engineering and construction support services including project management, detailed design, bills of material, material and equipment specifications, and preparation of construction documents for the installation of a Greenfield compressor station consisting of three 1150 HP separable, single stage, CAT 3516 engine compressor units and associated ancillary systems. Client: Project Description: Project Title: Location: Consumers Energy Gas Storage Expansion with Five CAT 3616 Compressor Packages Ray Compressor Station Plant No. 3 Expansion Michigan USA Performed engineering and construction support services including project management, detailed design, PLC programming and automation, bills of material, material and equipment specifications, construction specifications, and preparation of construction documents for the installation of five 4,735 HP CAT 3616 engine compressor units with two stage Aersal compressors and dehydration facilities at an existing compressor station located at a natural gas storage field. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 21 of 102 Recently Completed Projects - Compressor Station Projects Client: Project Description: Project Title: Location: National Fuel Gas Supply EPC of Two Midstream Compressor Stations Bowen and Wellendorf Compressor Stations Pennsylvania USA Performed EPC services including project management, detailed design, and preparation construction documents for the installation of one 1150 HP CAT 3516 engine compressor unit at a greenfield compressor station and one 345 HP engine driven compressor unit at a greenfield compressor station. ENE subcontracted the construction services for these two facilities. Client: Project Description: Project Title: Location: Kinder Morgan / NGPL Mainline Electric Drive Compressor Unit Replacement Compressor Replacement at Station 104 Kansas USA Responsible for detailed engineering and design, preparation of construction documents and procurement for the installation of a 13,000 HP Siemens motor driven Dresser Rand 50 PDI-HS compressor to replace an existing compressor unit. Client: Project Description: Project Title: Location: El Paso Energy / SNG Greenfield Turbine Compressor Station Riceboro Compressor Station Georgia USA Detailed design, construction documents and procurement for one new greenfield compressor station. This compressor station will consist of one 7,500 HP gas turbine driven centrifugal compressor unit and associated ancillary systems. Client: Project Description: Project Title: Location: Kinder Morgan / NGPL Storage Facility Compressor Replacement with CAT 16CM34 Station 201 Illinois USA Project management, detailed design, construction documents, bills of material, and material and equipment specifications for the installation of a 7800 HP separable, single stage, CAT 16-CM34 engine/reciprocating compressor package and gas cooling. The compressor unit installation was a replacement and expansion of existing compression at the storage field. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 22 of 102 Recently Completed Projects - Compressor Station Projects Client: Project Description: Project Title: Location: CenterPoint Energy Three Mainline Turbine Compressor Stations North Louisiana Expansion Texas & Louisiana USA The scope of this 3 phase project included project management, detailed design, automation services, and preparation of material lists and construction documents for: two new compressor stations, each consisting of a 10,000 horsepower gas turbine driven centrifugal compressor unit; and the addition of one 15,000 horsepower gas turbine centrifugal compressor unit at another station. Client: Project Description: Project Title: Location: AGL Resources Two Mainline Electric Drive Compressor Stations HRX Compression Project Virginia, USA Provided flow modeling for 180 miles of high pressure gas transmission line, and provided detailed design, construction documents, and material procurement for two new compressor stations. Each compressor station consists of 1-10,000 hp electric motor driven centrifugal compressor unit and associated ancillary systems. Client: Project Description: Project Title: Location: Northern Border Pipeline Greenfield Electric Drive Compressor Station Compressor Station Expansion Project Iowa, USA Detailed design, project management, and preparation of material lists and construction documents were provided for a new mainline compressor station. The unit was a 16,000 hp electric motor VFD centrifugal compressor package. Client: Project Description: Project Title: Location: Texas Gas Transmission Mainline Station Expansion with Turbine Compressor Unit Haughton Compressor Station Expansion Louisiana, USA This project involved project management, detailed design, and preparation of material lists and construction documents for the installation of a 6,000 hp gas turbine driven centrifugal compressor addition at an existing station. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 23 of 102 Recently Completed Projects - Compressor Station Projects Client: Project Description: Project Title: Location: Kinder Morgan / NGPL Design, Project-Manage, Constr. Docs Compressor Expand Station 206 (Storage Field) Illinois, USA Provided project management, detailed design, construction documents, bills of material, and material/equipment specifications for the installation of a separable, two stage, 4,700 bhp engine/reciprocating compressor package and gas cooling. This unit, used for injection and withdrawal, replaced two existing engines at a storage field. Client: Project Description: Project Title: Location: Southern Star Compressor Station Expansion & Modification Ozark Trails-Grabham Compressor Station Expansion Kansas USA The station expansion consisted of the design and installation of new high pressure discharge bottles on a Cooper GMVH reciprocating compressor, a new high pressure aftercooler, a new discharge header to supply a separate gas source, and four new regulation facilities. Client: Project Description: Project Title: Location: Nicor Gas Turbine Expansion at Storage Facility Troy Grove Storage Facility Addison, Illinois USA An expansion of an existing station involving the design and project management for the installation of a 15,000 horsepower gas turbine driven centrifugal compressor addition. Client: Project Description: Project Title: Location: Kinder Morgan (Horizon Pipeline) Mainline Turbine Compressor Station Horizon Compressor Station No. 113 Illinois USA Provided project management, engineering design, construction documents, material procurement, and construction inspection for the installation of a 9,000 hp gas turbine driven centrifugal compressor addition. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 24 of 102 Recently Completed Projects - Compressor Station Projects Client: Project Description: Project Title: Location: Ozark Gas Transmission (Spectra Energy) Preliminary Design of Two Mainline Electric Drive Compressor Stations East End Expansion Project Arkansas, Missouri, Illinois USA Provided project management, FERC resource reports, detailed design, construction documents and procurement for three new compressor stations. Each compressor station consists of 2-10,000 hp electric motor driven centrifugal compressor units and the associated ancillary systems. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 25 of 102 Recently Completed Projects - Pipeline and Meter Stations Projects Client: Project Description: Project Title: Location: WGL Station Design Rockville Station Reconstruction Rockville, MD The WGL Rockville project involves the re-development and engineering design of a major gate station facility that is supplied from two transmission pipeline sources. The facility combines the various feeds, provides storage, and peak demand production while interconnected to three distribution system pipelines supplying nearly 30 percent of the area’s load demands. The design was completed in 3 phases, including gate station design, gas conditioning, process injection, pressure regulation, line heaters, filter/separators, and SCADA design. The station is designed to allow a peak flow of 31MMscfh. Client: Nicor Gas Project Description: Project Title: Location: 36” Hudson Line Casing Extension N/A Illinois, USA Designed for the extension of a split sleeve 42” casing extension to be added onto the existing 42” casing under existing I-55 and a proposed high-speed rail track. Detailed design was required to fabricate and install the new sleeve without harming the integrity of the existing 36” pipeline (operating at over 500psig) Extensive excavation and prefabrication work led to a project cost of nearly $300K. CONFIDENTIAL CLIENT Client: Project Description: Confidential Preliminary design and detailed cost estimate for CO2 Pipeline form a coal gasification plant. Project Title: CO2 Pipeline Study Location: Midwest Project management, preliminary design and detailed cost estimate for options to move CO2 from a coal gasification plant to underground storage or injection into existing oil fields for enhanced recovery. The project evaluated multiple pipeline routes ranging from 100 to 290 miles. The faculties included the pipeline, launchers and receivers, pipeline interconnects, custody transfer metering systems, substation, pump stations and other associated facilities. In addition, provided a table top evaluation of the environmental permitting, and associated risks of each route. Client: Project Description: Project Title: Location: Vectren Energy Transmission Transmission Engineering Design and Management Multiple Indiana and Ohio USA Analyze and design various improvements to Vectren’s Transmission system, including pipeline, station (purchase points, regulator and metering stations), odorization, CNG, turbine loading analysis. Additionally, estimates and bills of material were produced. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 26 of 102 Recently Completed Projects - Pipeline and Meter Stations Projects Client: Project Description: Enbridge 160 miles of 36-inch pipeline paralleling existing company owned pipelines. Project Title: Eastern Access Location: Indiana, Michigan Project management and engineering design for the installation of 160 miles of 36inch pipeline in Indiana and Michigan. The project paralleled the existing company corridor and included multi-pig launcher and receiver facilities, mainline block valves, station interconnects, multiple route options. The scope of work included the development of alignment sheets, road and rail road crossings, directional drills, survey, site specific drawings, and cathodic protection. Client: Enbridge Project Description: 37 miles of 20-inch pipeline Project Title: 20-inch Pipeline Location: Michigan Project management and engineering design for the installation of 37 miles of 20-inch pipeline. The project included launchers and receivers, mainline block valves, and station interconnects. The scope of work included route selection, survey, development of alignment sheets, road and rail road crossings, directional drills, cathodic protection design and ac mitigation design. Client: Praxair Inc. Project Description: Pipeline Relocation at Dickey Rd & Cline Rd Overpass Project Title: 24” O2, 18” O2, 8”N2 & 8” H2 Pipelines Relocation Location: East Chicago, Indiana, USA Detailed engineering design, material and construction specification for the replacement and installation of approximately 3,000 feet (parallel main) of new (1) 24” Oxygen line, (1) 18” Oxygen line, (1) 8” Nitrogen line, and (1) 8” Hydrogen line in East Chicago, Indiana. Project included: valving facilities and multiple HDD railroad crossing in highly congest industrial location. Client: Praxair Inc. Project Description: Above Grade Oxygen Piping and Skid Fabrication Project Title: 18” & 24” O2 Check Valve Skid Project Location: East Chicago, Indiana, USA Detailed engineering design and the material specification for an 18” and 24” stainless steel oxygen piping facilities and skids. Including the engineering design of the monel velocity exempt materials (VEM) and of the tie-in connections at the Praxair East Chicago facility. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 27 of 102 Recently Completed Projects - Pipeline and Meter Stations Projects Client: Project Description: Project Title: Location: Vectren Energy Transmission Transmission Engineering Design and Management Multiple Indiana and Ohio USA Analyze and design various improvements to Vectren’s Transmission system, including pipeline, station (purchase points, regulator and metering stations), odorization, CNG, turbine loading analysis. Additionally, estimates and bills of material were produced. Client: Duke Energy Project Description: New Pipeline and Station Installation Project Title: Zimmer Power Plant Project Location: Cincinnati, Ohio USA Project included design of 2 mile high pressure pipeline and new station facilities to feed the Zimmer Power Plant. Pipeline scope included launcher and receiver facilities, and 4 horizontal directional drills. Station scope included ultrasonic meters, pipeline heater, and pressure regulators. Client: Project Description: Project Title: Location: Xcel Energy Engineering Design & Specification for Valve Sets 8” Mesa to Chalk Bluffs Lateral Colorado USA Provided detailed engineering design and specifications for the modification of 28 valve sets along the 8” Mesa to Chalk Bluffs Lateral in order to prepare the line for pressure and in-line inspection tool runs. The modifications included the detailed engineering design and specifications for 5 full ILI barrel- Launcher/Receivers. In addition, 6 Hydrostatic Pressure Test Procedures were provided as part of the 2012 Integrity Management Program. Client: Project Description: Project Title: Location: Xcel Energy Engineering Design, Specification & Project Management for Valve Sets 4” Westlake Lateral Colorado USA Provided detailed engineering design, specifications and project management for the modification of 1 valve set and 1 meter station along the 4” Westlake Lateral in order to prepare the line for hydrostatic pressure testing. In addition, 1 Hydrostatic Pressure Test Procedure was provided as part of the 2012 Integrity Management Program. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 28 of 102 Recently Completed Projects - Pipeline and Meter Stations Projects Client: Project Description: Xcel Energy Engineering Design, Specification & Project Management for Valve Sets Project Title: 6” South Longmont Lateral Location: Colorado USA Provided detailed engineering design, specifications and project management for the modification of 1 meter station valve set along the 6” South Longmont Lateral in order to prepare the line for hydrostatic pressure testing. In addition, 1 Hydrostatic Pressure Test Procedure was provided as part of the 2012 Integrity Management Program. Client: Southwest Gas Project Description: Gas Main Replacement Project Title: Cal-Trans SR89 Public Improvement Location: California USA Provided detailed conflict analysis and subsequent gas facility relocation for a 6” Steel (225# MOP) main and a 2” PE (43# MOP) main in coordination with approximately 8 miles of roadway improvements to West Lake Boulevard (State Route 89). The project included relocation of vaults, upsizing of both mains per system improvement demand and directional boring under multiple creeks. The project was a multi-phase project with an aggressive construction schedule. Client: Williams Transco Project Description: Replace Two 7,000 HP Motors with Two 16,000 HP Siemens Motors. Project included VFD and Lube Oil Console Replacements also. Project Title: Station 205 Motor Replacements Location: Princeton, New Jersey Client: Project Description: Project Title: Location: Williams Midstream Thirty-Four Mile Gathering Pipeline and Related Facilities Gathering Pipeline Project Pennsylvania USA Detailed engineering design and project management of 33.5 miles of new 24” natural gas gathering pipeline, including pig launcher/receiver facilities, mainline valves, inlet ultrasonic meter station, EFM equipment and filter separation facilities. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 29 of 102 Recently Completed Projects - Pipeline and Meter Stations Projects Client: Project Description: Project Title: Location: National Fuel Gas Supply M&R and Pigging Facilities Holbrook Meter Station Pennsylvania USA Detailed engineering design and procurement for measurement and pigging facilities including: ultrasonic meters, pressure regulators, bi-directional valving skid, filter separation facilities, a pig launcher, and two pig receivers. Client: Project Description: Project Title: Location: Nicor Enerchange LLC New Pipeline, M&R and Pigging Facilities Central Valley Gas Storage Project California USA Detailed engineering design and procurement of approximately 1 mile each of new 24” and 16" natural gas pipelines, including pig launchers/receivers facilities, flow and pressure control regulation, and meter station site preparation. Client: Project Description: Project Title: Location: Southern Natural Gas Mainline Pipeline Expansion Project – 80 Miles South System III Expansion Georgia, Mississippi & Alabama USA Preliminary engineering design and FERC application/drawings support and Detailed engineering design and field engineering/construction support for approximately 80 miles of new 30”, 36" and 42" natural gas pipelines, including pig launchers/receivers facilities, crossover facilities, mainline valves, station connections, and HDD designs. Client: Project Description: Project Title: Location: Empire Pipeline (National Fuel) New 78 Mile 24” OD Pipeline and M&R Facilities Empire Pipeline New York USA Detailed engineering design, procurement, and project management of 78 miles of new 24” natural gas pipeline and 3 measurement facilities including: ultrasonic meters, EFM equipment, and pressure regulators. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 30 of 102 Recently Completed Projects - Pipeline and Meter Stations Projects Client: Project Description: Project Title: Location: Williams Transco Engineering & Procurement Pipeline and M&R Facilities Rockies Connector Project Pennsylvania, USA Provide detailed engineering design and project management for a project consisting of 130 miles of new 30” natural gas pipeline and related meter stations and interconnects. This project was postponed and has not been constructed. Client: Project Description: Project Title: Location: Wisconsin Public Service Design of 56 Miles of Pipeline Laterals Guardian II Laterals Wisconsin USA Designed 56 miles of 12", 14", 16", and 20" pipeline for four laterals extending from a pipeline to existing and new stations. The project included material specifications, engineering design, survey, construction oversight, and inspection services. Client: Project Description: Project Title: Location: Wisconsin Public Service Five New M&R Stations and Modification or Seven Additional Sites Guardian II Meter Station Wisconsin USA Provided engineering design, procurement services and support, and construction management for 5 new meter stations, 5 new regulating stations, and the modification on 7 existing stations on high pressure transmission and distribution pipeline. Client: Project Description: Project Title: Location: Ozark Gas Transmission (Spectra Energy) Design of 226 Mile Mainline Pipeline and Related Facility East End Expansion Arkansas and Mississippi USA Detailed engineering design and project management to support the FERC Filing for a project consisting of 226 miles of new 36” natural gas pipeline, five custody transfer meter stations, and 3 compressor stations. The project was postponed and has not been constructed. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 31 of 102 Recently Completed Projects - Pipeline and Meter Stations Projects Client: Project Description: Project Title: Location: Southern Star Uprate and Relocate 20” OD & 16” OD Pipelines Ozark Trails Project Missouri and Kansas USA Provide detailed design consisting of the following: uprating of 13.5 miles of 20" pipeline, installation of a 20" launcher and receiver, installation of two regulator stations; looping of 1 mile of 20" pipeline and relocation of regulator station; relocation of 1,500 feet of 16" pipeline; removal of 1 mile of 8" pipeline and replacement with 16" pipeline. Client: Project Description: Project Title: Location: Horizon Pipeline Pipeline Expansion Consisting of 28 Miles of Mainline and Five M&R Stations Horizon Pipeline Illinois USA Completed the detailed engineering design, procurement, and project management for a gas pipeline expansion project. The project consisted of 28 miles of 36” pipeline, 5 custody transfer measurement facilities including ultrasonic meters, EFM equipment, pressure regulators, line heaters, and gas quality monitoring equipment. ENE also supplied support for the customer FERC filings, public hearings, and county permitting. Client: Project Description: Project Title: Location: Alliant Energy Design & Project Management for Pipeline Interconnect Stations and Related Facilities PIEC Pipeline and Meter Station Iowa USA Detailed engineering design and project management of a gas pipeline to interconnect two transmission pipelines to a multi-unit gas turbine driven electric generating plant. The facilities included 13 miles of 20” pipeline, one meter and regulator station, two regulator interconnect stations, and odorization facilities. Facilities also included the design and project management of 13 miles of 16” HDPE cooling water lines for the generating plant. Scope of services consisted of engineering design and drafting, material specification, and construction management. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 32 of 102 Recently Completed Projects - Pipeline and Meter Stations Projects Client: Project Description: Project Title: Location: MidAmerican Energy Design & Project Management for Pipeline Connect Gas Turbine Driven Power Plants Greater Des Moines Energy Center Project Iowa USA Detailed design and project management of a gas pipeline connecting a gas transmission line to two multi-unit gas turbine driven electric generating plants. The facilities included 13 miles of 16” pipeline, a pipeline interconnection station, odorization facilities, and two delivery regulator stations. Client: Project Description: Project Title: Location: Williams Northwest Pipeline Design & Specification for M&R Station Starkey Gulch Interconnect Facilities Colorado USA Provide detailed design, material specification, and material lists for a meter/regulator station sized to measure and regulate 750 MMSCF/D at a design pressure of 1440 psig. Facilities included a single 16" ultrasonic meter run and 10" regulator run. Client: Project Description: Project Title: Location: Peoples Energy Design and Project Management of Interconnector Pipeline Elwood Loop Project Illinois USA Detailed engineering design and project management of a gas pipeline interconnecting multiple pipelines. The facilities included a 3 mile 36” pipeline, one measurement and regulator station, two regulator stations and related interconnect tie-in facilities. Scope of services consists of engineering design and drafting, materials and equipment specifications and construction management. Client: NiSource Project Description: Design & Procurement Interconnector Pipeline Project Title: Erie Lackawanna Project Location: Indiana USA Detailed engineering design and project management of gas pipeline interconnecting two transmission pipelines. The facilities consisted of 7 miles of 30” pipeline along with the interconnection facilities to two transmission pipelines. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 33 of 102 Recently Completed Projects - Pipeline and Meter Stations Projects Client: Project Description: Project Title: Location: Southern Star Engineering Pipeline Replacement Sedalia Pipeline Missouri USA A multi-year project to provide engineering design for 25 miles of pipeline replacement. Client: Project Description: Project Title: Location: United States Gypsum Engineer Pipeline to New Manufacturing Facility Washingtonville Project Pennsylvania USA Provided engineering design for the installation of 18 miles of 6" transmission pipeline to supply a new plant. The project scope also included the design of a new tap station along with a metering and regulating station at the plant. Client: Project Description: Project Title: Location: Peoples Energy Engineering and Project Management Pipeline Feed Gas Turbine Driven Power Plant Des Plaines Greenland Project Illinois USA Detailed engineering design and project management of a gas pipeline connecting a multi-unit gas turbine driven electric generating plant. Project also included approximately 6.5 miles of 12" pipe. Client: Project Description: Project Title: Location: Questar Design & Specification Custody Transfer Stations Wamsutter Expansion Project Wyoming USA Designed and provided material specifications and material lists for two new custody transfer meter stations and interconnects. The meter station consisted of a 36" diameter filter separator, (2) 12" ultrasonic meters, and a 16" flow control regulator with bypass. . Client: Nicor Gas Project Description: Project Title: Location: Design & Specifications Wellhead Separator Water-knockout Vessel Project Northern Illinois USA Provided all engineering design and specifications for the installation of a new wellhead separator for an injection/withdrawal well. All related auxiliary systems including orifice metering and fuel gas systems were included in the project. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 34 of 102 Recently Completed Projects - Pipeline and Meter Stations Projects Client: Ameren Project Description: Project Title: Location: Design and Specifications M & R Facility Shanghai Ultrasonic Meter Project Illinois USA Designed a new meter facility, including material specifications and material lists, consisting of 2-8" ultrasonic meters and the associated valves and piping. Client: Southern Star Central Gas Pipeline Project Description: Project Title: Location: Design & Specification Custody Transfer Stations Aquila-Harper Interconnect Missouri USA Provided detailed design, material specifications, and material lists for a new custody transfer meter station and interconnect. The meter station consisted of a 12" ultrasonic meter, dual run 4"/6" regulator facility, and a 36" diameter filter separator. Client: Southern Star Project Description: Project Title: Location: Design & Specification Pig Receiver Facility Line “G” Andover Receiver Kansas USA Provided detailed design, material specification, and material lists for a new 20" pig receiver facility. Client: Project Description: Project Title: Location: Southern Star Pipeline Replacement Project Pittsburgh Pipe Replacement Kansas USA Provided all engineering aspects for a multi-year pipeline replacement project encompassing 17 miles of 12" pipe and a custody transfer meter station. Client: Kinder Morgan Project Description: Design & Specification Mainline Regulator Facilities Project Title: Gulf Coast Mainline Regulators and District 302 Gulf Coast Regulators Location: Arkansas USA Designed and specified material for the installation of new mainline regulator facilities. This work, due to reclassification, included installation of new valves for regulation of pressures at a new MAOP. An additional project to install a new 30" and 36" valve, relocate an existing 30" and 36" valve, and install an additional regulator facility was also designed. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 35 of 102 Recently Completed Projects - Pipeline and Meter Stations Projects Client: Project Description: Project Title: Location: Southern Star Design New Regulation Facility and Discharge Piping Ozark Trails Missouri USA Complete design of a new regulation facility including: 6" and 4" flow control regulators; all associated control equipment; and redesign of the discharge piping to accommodate the installation of a new gas aftercooler. Client: Southern Star Project Description: Project Title: Location: Analysis & Design Pipeline Replacement Line “G” 12” Pipe Replacement Kansas USA Provided analysis and design for the removal and replacement of 4,100' of 20" pipeline with a 12" pipeline. Client: Southern Star Project Description: Project Title: Location: Design & Material Specification Pig Launcher Line “G” Wichita Crossover Launcher Kansas USA Provide detailed design, material specification, and material lists for a new 20" pig launcher facility. Client: Kinder Morgan Project Description: Design & Specification Mainline Valves & Pig Receiver Project Title: Gulf Coast Receiver/Valve Relocation Location: Arkansas USA Engineering design and material specification for new 30" mainline valve installation, including the relocation of existing 3-30" mainline valves and one pig receiver facility. Client: Project Description: Project Title: Location: Kinder Morgan Design & Specification Pipeline Replacement Amarillo #3 36” Pipe Replacement, Dist. 113 Texas USA Provided detailed design, material specifications, and material lists for the replacement of 7,000' of 36" line.. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 36 of 102 Recently Completed Projects - Pipeline and Meter Stations Projects Client: Project Description: Project Title: Location: Kinder Morgan Design & Specification Crossover Piping Station 113 30” Crossover Illinois USA Designed, including material specification and material lists, the installation of 400' of 30" crossover piping within an existing compressor station.. Client: Project Description: Project Title: Location: Southern Star Design and Specification Piping Replacement and M&R Station Riverton Pipeline Extension Kansas USA Provide detailed design, material specifications and material lists for a 1 mile 16" pipeline and custody transfer meter station. The pipeline included 1,100' of directional drilling and the meter station included regulation, ultrasonic meters and filter separator, and gas chromatograph. Client: Project Description: Project Title: Location: Kinder Morgan Engineering Design for Hydrostatic Testing Pipeline N/A Midwest United States A multi-year contract to provide detailed engineering design for the hydrostatic testing. To date, over 18 projects have been completed encompassing over 365 miles of 10" through 42" mainline. Client: Kinder Morgan Project Description: Design & Specification Pig Launcher/Receiver Project Title: Howard St. Pigging #1 and #2 Location: Illinois USA Two projects to provide detailed design, material specification, and material lists for the installation of a 30" pig launcher, 36" pig launcher, and applicable receiver facilities. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 37 of 102 Recently Completed Projects - Pipeline and Meter Stations Projects Client: Project Title: Location: Kinder Morgan Project Description: Design & Specification Removal of 24 in and 26 in Mainline Drips Volo #1 Drip Replacement and Amarillo #3 Line Drip Replacement Illinois USA Provide detailed design, material specification, and material lists on two projects for the removal of a 24" mainline drip, a 36" mainline drip, and the installation with new flushable design mainline drips. Client: Project Description: Project Title: Location: Dominion Engineering Review Custody Transfer Stations Meter Station Audits East Coast USA Provide engineering review of 5 custody transfer meter stations for code compliance and gas loss studies. The project included detailed report findings and recommendations. Client: Project Description: Project Title: Location: Kinder Morgan Design 60 in Filter/Separator Sta. 346 Filter Separator Installation and Tejas Pipeline Crockett to Goodrich Pipeline Expansion Texas USA Provide design for the installation of a 60" filter separator at an existing compressor station and 24" launcher/receiver including mainline valve facilities. Client: Kinder Morgan Project Description: Design & Material Specification Relocate Pipeline Project Title: Volo Line Higgins Rd. Relocation Location: Illinois and Texas USA Performed 3 projects to provide detailed design, material specification, and material lists for the relocation of 1,900' of 24" line, 3,657' of 30" line, and 15,000' of 36" line. Client: Project Description: Project Title: Location: Southern Star Design M&R Stations Clever Meter and Brookline Meter Missouri USA Designed two new custody transfer meter stations including interconnects. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 38 of 102 Recently Completed Projects - Pipeline and Meter Stations Projects Client: Southern Star Project Description: Design & Material Specification Pig Launch/Receivers Project Title: VP Pipeline Location: Oklahoma USA Provide detailed design, material specification, and material lists for the retirement/replacement of 16" launcher and receiver facilities. Client: Project Description: Project Title: Location: USG Design & Specification Pipeline and M&R Stations N/A Washingtonville, Pennsylvania USA Provided detailed design, material specification, and material lists for the installation of 18 miles of 6" pipe and associated facilities. The design included two stations; an interconnect with Transco Pipeline and a Plant Station. The stations involved heating, regulation, metering and launcher and receiver equipment. Client: Nicor Gas Project Description: Project Title: Location: Design & Specifications Pipeline Replacement 14 Miles 36” Aux Sable Project Northern Illinois USA Provided all engineering design, material/construction specifications and material/pipe procurement for the replacement of 14 miles of 36” pipe. Also provided details for station connections and main line valve actuation modifications. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 39 of 102 Recently Completed Projects - Distribution Systems Projects Client: Project Description: Project Title: Location: Vectren Energy Delivery GIS Storage Mapping & Analysis Multiple Indiana and Ohio USA Provide storage mapping and system analysis using existing Smallword GIS system to map wells geology and assist in the conversion of Vectren’s existing system over to an ESRI based mapping and asset management system. Client: Project Description: Project Title: Location: Vectren Energy Delivery System Improvement Projects Terre Haute 135# Uprate Indiana USA Various pressure elevation (Uprate) design projects including 9 miles of main from 60# to 135# in Terre Haute, IN; 25 miles of plastic main from 30# to 60# in Lafayette, IN and 5 miles of plastic main from 30# to 60# in Rockville, IN. These all included investigating current material on the system, design replacement areas, design regulator replacements/upgrades and write step by step uprate plan. Client: Project Description: Project Title: Location: Integrys Energy Accelerated Main Replacement City of Chicago Accelerated Main Replacement Chicago, Illinois USA Multi-year accelerated main replacement project to replace approximately 100 miles of BS/CI pipe annually. Scope of work includes survey, design, line of lay selection, City of Chicago submittal preparation, and traffic control plans. Unique challenges include installation in highly populated metropolitan areas, coordination with the City of Chicago and other utilities, and installation of uncommon 18” plastic pipe. Client: Project Description: Project Title: Location: Vectren Energy Cost Estimating, Material Lists, SysOp Plans, and GIS for Bare Steel Main Replacement N/A Indiana and Ohio USA Multi-year contract to provide detailed design, cost estimating, project material lists, system operation plans and GIS design for replacement of approximately 100 miles of bare steel and cast iron main annually. This is a 20 program expected to run thru 2028. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 40 of 102 Recently Completed Projects - Distribution Systems Projects Client: Project Description: Project Title: Location: Vectren Energy Delivery System Improvement Projects N/A Indiana USA Various pressure elevation (Uprate) design projects including 9 miles of main from 60# to 135# in Terre Haute, IN; 25 miles of plastic main from 30# to 60# in Lafayette, IN and 5 miles of plastic main from 30# to 60# in Rockville, IN. These all included investigating current material on the system, design replacement areas, design regulator replacements/upgrades and write step by step uprate plan. Client: Project Description: Project Title: Location: Vectren Energy Delivery Public Improvements N/A Indiana USA Provide detailed analysis and design of multiple capital improvement projects. This includes reviewing conflicts and negotiating with the roadway design consultant to eliminate the need to relocate gas main, full design, estimating and materials lists for each project. Client: Vectren Energy Delivery Project Description: GIS Asset Management Project Title: N/A Location: Indiana and Ohio USA On-going program to update Vectren’s GIS Smallworld asset management program with the most recent as-built information. This work consists of the drafting and data entry of: distribution gas main, gas services, gas regulators, gas leaks, and gas leak repairs. Client: Project Description: Project Title: Location: National Grid Gas Main Replacement Projects N/A Various Cities, Massachusetts Provide detailed design, material specification, and material list for multiple projects replacing main and regulator stations located in various cities in and around Boston, MA. Projects vary in size from 1000’ of 6” main to 13,000’ of 12” main to 2000’ of 20” steel main. Design components included designing bridge crossings, RR crossings, coordinating running line with other utilities, regulator station design, and permitting. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 41 of 102 Recently Completed Projects - Distribution Systems Projects Client: Project Description: Project Title: Location: NIPSCO Public Improvements N/A Indiana, USA Provide detailed analysis and design of multiple capital improvement projects for state, municipal, and private projects. By performing high level SUE studies to determine existing gas main locations, projects are analyzed to determine conflicts, negotiated when possible, and designed for gas main relocation when required. Projects range from 500’ of distribution main to 12,000’ of 8” high pressure main. Client: Project Description: Project Title: Location: Nicor Gas Gathering Line Replacements N/A Illinois, USA Designed over $5MM of capital improvements to the overall gathering line system in Pontiac. Replaced several thousand feet of existing steel pipe, ranging from 6” – 12” in size. Design incorporated pigging facilities (both conventional and Argus style) pipeline drips and a slug catcher installation upstream of the current dehy towers. Client: Nicor Gas Project Description: Project Title: Location: Gathering Line Replacements N/A Illinois, USA Designed over $5MM of capital improvements to the overall gathering line system in Pontiac. Replaced several thousand feet of existing steel pipe, ranging from 6” – 12” in size. Design incorporated pigging facilities (both conventional and Argus style) pipeline drips and a slug catcher installation upstream of the current dehy towers. Client: Southwest Gas Project Description: Design & Drafting Services For Main Replacement Project Title: N/A Location: Northern Nevada USA Multi-year contract since 2003 to provide drafting/design services for annual replacement of approximately 15 miles of PVC main. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 42 of 102 Recently Completed Projects - Distribution Systems Projects Client: Project Description: Project Title: Location: Duke Energy (Formerly Cinergy) Design, Material Lists & Permitting for Cast Iron Main Replacement N/A Ohio USA Multi-year contract to provide detailed design, material lists and permitting applications for various 2-5 mile modules, for replacement of approximately 50 miles of cast iron main annually. Project is expected to run thru 2016. Client: Project Description: Project Title: Location: Nicor Gas Storage Projects N/A Illinois USA Provided detailed design, material specifications, and material lists for various compressor station equipment, both new installations and revisions, within the company's gas storage fields. The scope of the project included gathering lines, station piping and miscellaneous compressor equipment upgrades. An average total of $7.5MM worth of capital projects have been designed annually from 2008 - 2010. Client: Project Description: Project Title: Location: Nicor Gas Public Improvements N/A Illinois USA An on-going contract since 2002 to provide detailed analysis and design for capital improvement projects for state, municipal and private projects. By performing high level SUE studies to determine existing gas main locations, projects are analyzed to determine conflicts, negotiated when possible, and designed for gas main relocation when required. The scope of the projects ranges from 36” transmission main to 2” PE distribution piping. Annually, $16.9MM of projects are designed each year. Client: Project Description: Project Title: Location: Nicor Gas System Improvement Projects N/A Illinois USA An on-going contract to provide detailed design, estimates and material specifications for system upgrades ranging from transmission station interconnects to 2” distribution piping. Approximately $2.6MM of capital improvements are designed each year. Client: Nicor Gas Project Description: Distribution Main Replacement Projects Project Title: N/A Location: Illinois USA Multi-year contract since 2002 to provide all aspects of engineering design for an average annual replacement of over 30 miles of cast iron main. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 43 of 102 Recently Completed Projects - Distribution Systems Projects Client: Project Description: Project Title: Location: Nicor Gas Transmission Projects N/A Illinois USA An on-going project to provide preliminary engineering services, detailed cost estimates, and engineering design for transmission pipeline projects. Included in the project is design of new station facilities. On average, from 2008 to 2010 the annual worth of capital projects is 5.3MM. Client: Project Description: Project Title: Location: Nicor Gas Regulator Station Replacements N/A Illinois USA On-going project to provided detailed design, material lists and permitting requirements for various regulation facilities. Since 2007, an average of over 45 vault regulator systems have been design on a annual basis, resulting in over 6.5MM in capital projects annually. Client: Project Description: Project Title: Location: Washington Gas Cast Iron & Bare Steel Main Replacement Projects N/A Maryland, DC and Virginia USA On-going program since 2006 to provide detailed design, cost estimate, material list and permitting for various replacement projects in Maryland, District of Columbia and Virginia for annual replacement of 20 miles of cast iron, bare steel, and mechanically coupled mains. Client: Project Description: Project Title: Location: Washington Gas Public Improvement (AOP) Projects N/A Maryland, DC and Virginia USA Provided detail analysis and design for over 50 projects annually since 2006. Projects require reviewing conflicts, negotiating with developers, municipalities and State DOT’s to avoid relocation of Washington Gas’ facilities. Preparation of cost estimates, material lists and permit applications. Project scopes range from 2” PE distribution piping to 24” high pressure distribution piping.. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 44 of 102 Recently Completed Projects - Distribution Systems Projects Client: Project Description: Project Title: Location: Southwest Gas Design & Drafting Services For Main Replacement N/A Northern Nevada USA Multi-year contract since 2003 to provide drafting/design services for annual replacement of 15 miles of PVC main. Client: Project Description: Project Title: Location: Washington Gas Design Relocation Existing Pipeline Cross County Connector Maryland USA Designed the relocation of 6,000 feet of 8” plastic main due to construction of a crosscounty interconnect highway system. Complications included the grade elevation lowering between 7’ and 25’ and elevation build-up between 7’ and 15’. Coordinated with county officials and consulting engineers to decide on new main alignment, coordinated with Washington Gas construction supervisor and county developer to avoid exposing main while existing roadway was disturbed. Client: Project Description: Project Title: Location: Washington Gas Gas Main Relocation Projects Dulles Metrorail Project Virginia USA Headed gas main relocation of 15+ projects in extremely congested Tysons Corner. Projects included relocation of 2” - 12” gas mains, as well as supporting a 30” main across a large span of tunnel excavation. Coordinated permitting, traffic control, SOE plans, and daily project adjustments. Client: Baltimore Gas and Electic Project Description: Gas Main Relocation Construction Management Project Title: SHA Route 1 – 12” Relocation Location: Maryland USA Managed gas main relocation of 1 mile of 12” steel gas main in State Highway Route 1, including 850’ HDD under the Little Patuxent River. Coordinated permitting, traffic control, and environmental plans with SHA District 3. Client: Project Description: Project Title: Location: Baltimore Gas and Electic Gas Main Replacement & Regulator Station Projects N/A Maryland USA Multi-year contract since 2005 to provide detailed design, material lists and cost estimates for gas main replacement and regulator station projects. To date, more than 25 miles of replacement and 30 regulator projects have been completed. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 45 of 102 Recently Completed Projects - Distribution Systems Projects Client: Project Description: Project Title: Location: Southwest Gas Replacement of 8.0 in Diameter Transmission Pipeline N/A Arizona USA Provided preparation of all details for the replacement of 7,100' of 8" transmission line with 16" pipe along with the design of two valve nest tie-in points. Also included was detailed profile views for the installation of the main in an area of significant proposed grading. Client: Project Description: Project Title: Location: Minnesota Energy Resources Replacement of 8 & 10 in Diameter Transmission Pipeline N/A Minnesota USA Provided engineering design for the replacement of 12,000' of 8" and 10" transmission line with 12" main. Two valve nest tie-in points were included. The scope of the project included survey and land acquisition coordination. Client: Project Description: Project Title: Location: Minnesota Energy Resources Pipeline M&R Station Design N/A Minnesota USA Designed the installation of a regulator station, including the design of the inlet/outlet piping, 2" regulator runs with relief valves, as well as a station bypass and tie-in to a Bruest "HotCat" heater. Client: Nicor Gas Project Description: Replacement of 22 in Diameter Transmission Pipeline & Directional Bore Project Title: N/A Location: Illinois USA Designed the replacement of 400' of 22" mainline along a major highway. The design required a detailed bore profile to assist the pipeline contractor in avoiding existing utilities in area. The main is installed at a depth of approximately 35' below the roadway. Client: Project Description: Project Title: Location: Nicor Gas Pig Launcher Design and Project Management N/A Illinois USA Provided detailed design, material specifications, and material list for the installation of (2) 42" pig launcher receiver barrels at two separate station locations. This involved preparing detailed bid packages, participating in the bid and construction meetings, and resolving conflicts during construction. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 46 of 102 Recently Completed Projects - Distribution Systems Projects Client: Project Description: Project Title: Location: Nicor Gas Replacement of 8 in Diameter Transmission Pipeline & Directional Bore River Crossing Through Rock Illinois USA Performed the engineering design for the relocate of an 8" distribution main across the Fox River. The design involved directional drilling through rock with an alternative design for open cutting if conditions allowed. Project also included coordination of construction permit approvals from the various agencies including the Army Corp of Engineers, IEPA, Village of Batavia, and Park District. Client: Project Description: Project Title: Location: Nicor Gas Design Regenerator for Dehydration System at Storage Field N/A Illinois USA Provided detailed design, material specifications, and material lists for a $1.5MM BTU/hr regenerator on an existing dehydration system in one of the company's storage field stations. Client: Illinois River Energy Project Description: Pipeline M&R Station Design Plant Fuel Line Project Title: Nicor Gas Project Location: Illinois USA Designed 8,900' of 8" main, 1,020' of 6" service line, a 12" turbine metering and regulation facility, and associated fuel line piping for the servicing of an ethanol plant. Client: Project Description: Project Title: Location: Washington Gas Relocation Design of 6 in Plastic Main H Street Main Relocation Washington D.C. USA Designed relocation of 5,200 feet of new 6” plastic main to avoid conflicts with new trolley car tracks and associated underground electric vaults and cables being installed in Washington D.C. Design complications included congested areas, coordinating with PEPCO, DC WASA and VERIZON for construction layout and working with consulting engineer for District of Columbia Department of Transportation to select appropriate new alignment for gas main. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 47 of 102 Recently Completed Projects - Distribution Systems Projects Client: Project Description: Project Title: Location: Nicor Gas Design and Material Specificaiton Pipeline Heater N/A Illinois USA Provided detailed design, material specification and material lists for the installation of a $1MM BTU/Hr boiler system to replace an existing indirect pipeline heater. Client: Project Description: Project Title: Location: USG Project Oversight Automatic Shut-Off Valve N/A Iowa USA Provided project oversight for the installation of an automatic shut-off valve, designed to close on an over or under pressure condition. ENE provided design-build services including all engineering, procurement, construction supervision, and sign-off. Client: Project Description: Project Title: Location: New Jersey Natural Gas Detailed Design & Planning for Install 24 in Transmission Pipeline Toms River Loop New Jersey USA Provided detailed design, sediment and erosion control plans, traffic control plans, application and acquisition of environmental and road opening permits, utility locating using conventional methods, vacuum excavation and ground penetrating radar, and participation in environmental/municipal meetings for the installation of a 7 mile, 24” Transmission pipeline. Other project deliverables included initial preliminary route critique with client and drill path calculations for four directional drills under the Toms River and three smaller tributaries. Client: Project Description: Project Title: Location: Xcel Energy Integrity Management Program N/A Colorado USA Providing project management of over ten (10) separate pipeline IMP projects throughout the state of Colorado. The responsibilities include: engineering assessment, design & drafting, sourcing of In-Line Inspection (ILI) tools, and construction inspection to allow the Company’s natural gas pipeline system to be constructed and tested. . Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 48 of 102 Recently Completed Projects - Distribution Systems Projects Client: Project Description: Project Title: Location: Wisconsin Public Service Design & Construction Management Transmission Laterals & Pipeline Guardian II Laterals Wisconsin USA Designed 56 miles of 12", 14", 16", and 20" pipeline for four laterals extending from a pipeline to existing and new stations. The project included material specifications, engineering design, survey, construction oversight, and inspection services. Client: Project Description: Project Title: Location: Yankee Gas Design, Material Lists, Service work & Permitting for Cast Iron Main Replacement N/A Connecticut USA Multi-year contract to provide detailed design, material lists, service work and permitting applications for various 1-3 mile projects, for replacement of approximately 20 miles of cast iron main annually. Client: Project Description: Project Title: Location: Dominion – East Ohio Gas Design, Material Lists, & Permitting for Bare Steel/Cast Iron Main Replacement N/A Ohio USA Provide detailed design, material lists, and permitting applications for various 1-3 mile projects, for replacement of approximately 15 miles of cast iron main annually. Client: National Grid Project Description: Design and Material Specifications for Pipeline Heaters and Regulation Stations. Project Title: N/A Location: Massachusetts and New York USA Provided detailed design, material specification and material lists for the installation of new pipeline heaters and replacement/upgrade of existing regulation facilities. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 49 of 102 Recently Completed Projects - Storage Projects Client: Nicor Gas Project Description: Project Title: Location: Thermal Oxidizer at Reboiler #6 N/A Illinois, USA Installation of a 3.0MM BTU/HR thermal oxidizer to replace the existing less efficient flare stack at Reboiler #6. Worked through the procurement process of analyzing bids and selecting a vendor. Fuel gas piping and foundation design were included in the overall project. Capital cost of nearly $750K Client: Ameren Gas Project Description: Project Title: Location: Pipeline Integrity Work N/A Illinois, USA Miscellaneous portions throughout the Glasford Storage Field were addressed to minimize low points, remove siphon drips and install new log drips. Design modifications to make the existing gathering lines pig-gable, such as removing restrictions in the line like SR fittings and unbarred tees or plug valves. The design also included the installation of multiple launchers and receivers at critical points. Client: Project Description: Project Title: Location: Ameren Gas Wellhead Improvements N/A Illinois, USA Work consisted of (3) specific locations at the Shanghai Facility. Installation at the wells, from wing valve through outlet valve, including a new water knockout separator and clamp on ultrasonic meters to monitor gas flow as well as water production. Control valve and fiberglass building installation along with concrete and saline discharge design was also included. Client: Project Description: Project Title: Location: NGPL / Kinder Morgan Compressor Unit Replacement – CAT 16 CM 34 Compressor Station 201 Herscher, Illinois USA Project management, detailed design, construction documents, bills of material and material/equipment specifications for the installation of a separable, single stage, 8,000 BHP engine/reciprocating compressor package and gas cooling. Unit is a replacement and expansion of existing compression at the field. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 50 of 102 Recently Completed Projects - Storage Projects Client: Project Description: Project Title: Location: NGPL / Kinder Morgan Expansion of H2S Scavenger System Station 201 Herscher, Illinois USA Project management, detailed design, construction documents, bills of material and material/equipment specifications for the expansion of the existing H2S scavenging system to allow treatment of an additional 300 MMCF/D of gas at the storage facility. Client: Project Description: Project Title: Location: NGPL / Kinder Morgan Compressor Unit Replacement – 4700 HP Engine Compressor Station 206 St. Elmo, Illinois USA Project management, detailed design, construction documents, bills of material and material/equipment specifications for the installation of a separable, two stage, 4,700 BHP engine/reciprocating compressor package and gas cooling. Unit replaced two of the existing engines at the storage field and will be used for injection and withdrawal. Client: Project Description: Project Title: Location: Nicor Gas Design & Project Management Install Gas Turbine Driven Centrifugal Compressor Troy Grove Storage Facility Addison, Illinois USA Project management, detailed design, and preparation of construction documents for the installation of a 15,000 horsepower gas turbine driven centrifugal compressor addition. CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: Confidential Client Project Management & Cost Estimate – Underground Gas Storage Field Storage Field Development Study Kentucky USA Provided project management, preliminary engineering, and preparation of detailed cost estimates to evaluate the costs to develop two depleted gas fields for underground gas storage. Facilities proposed as a result of the preliminary engineering study included storage field and gathering system, compressor facilities, gas dehydration systems, regulation and metering, and interconnecting lateral. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 51 of 102 Recently Completed Projects - Storage Projects CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: Confidential Client Project Management & Cost Estimate – Underground Gas Storage Field Storage Field Development Study California USA Provided project management, preliminary engineering, and preparation of detailed cost estimates to evaluate the costs to develop a natural gas storage field. Facilities proposed as a result of the preliminary engineering study included storage field and gathering system, compressor facilities, water separation, dehydration and water collection systems, regulation and metering, and interconnecting lateral. N/A Client: Project Description: Project Title: Location: Sierra Gas Storage Natural Gas Storage Project Development Grant 13 Storage Development Project Michigan USA Provided overall natural gas storage project development consulting service to the owners of the company. The Grant 13 field is potentially a very large natural gas storage field located in Northern Michigan. When completed, it will have a working capacity of about 70 BCF and will likely be designed to withdraw more than 1 BCF/Day. The consulting services provided included all aspects of the development process. Client: Ameren Project Description: Gas Storage Water Injection Facility Project Title: Shanghai Storage Water Injection Facility Location: Illinois USA Provided detailed engineering, material specification, material lists and design for a water injection system. This included design of a 75,000 gallon atmospheric storage tank, 110 HP water injection pump with associated filtration equipment and water gathering system piping including 6”, 4” and 2” piping. Client: Ameren Project Description: Project Title: Location: M&R Facilities for Gas Storage Shanghai Ultrasonic Meter Project Illinois USA Provided detailed design & drafting, material specifications, and material lists for three (3) separate storage field locations. Each meter facility consisted of a dual run ultrasonic meter and associated run-switching valves and piping. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 52 of 102 Recently Completed Projects - Storage Projects Client: Ameren Project Description: Project Title: Location: Design Replacement of Gas Gathering Lines Emergency Gathering System Project Sciota, Illinois USA Provided detailed design for replacement of 1000’ of 8” / 4” gathering line. This project involved detailed elevation profiles and unique drip design to ensure that fluids would be disposed of properly. Client: Ameren Project Description: Project Title: Location: Design Replacement of Gas Gathering Lines Glasford Gathering System Illinois USA Provided detailed design for the upgrade of an existing 12” gathering line at the Glasford storage field. Work included replacements of various key isolation valves and the writing of an uprate procedure for the client. Client: Ameren Project Description: Design H2S Removal System Storage Facility Project Title: Hillsboro H2S Treatment System Location: Illinois USA Provided detailed engineering, material specification, material lists and design for eight sulfa-treat vessels for removal of H2S from storage gas. This involved design of the process flow including valving, separation, and product interaction to ensure market quality gas. Project scope also included extensive foundation design and chemical disposal facilities. Client: Project Description: Project Title: Location: Ameren Design a 10,000 gallon scavenger chemical tank Hillsboro Scavenger Tank Illinois USA Designed a 10,000 gallon scavenger chemical tank and associated foundation and containment area. Ensured the design was in accordance with all applicable codes including NFPA 30, UL 142 and Illinois State Fire Marshall regulations. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 53 of 102 Recently Completed Projects - Storage Projects Client: Project Description: Project Title: Location: Ameren Storage Field Assessment Lincoln Storage Field Assessment Illinois USA Completed a detailed facility assessment for the Lincoln Storage Field to ensure compliance with DOT 192, NFPA 30, NFPA 37, NFPA 54, and NEC. Scope of the assessment included gathering system piping, compressor yard piping, mechanical facilities, electrical facilities, and cathodic protection facilities. Client: Project Description: Project Title: Location: Ameren Design & Specifications For Dehydration Facilities at Storage Fields Dehydration Projects Illinois USA Provided preliminary design & drafting, material specifications, and material lists for four (4) separate storage field locations. Facility design consisted of fully redundant systems to Ameren’s existing dehydration facilities, including glycol regeneration skids, contact towers, and pump & piping systems. Client: Nicor Project Description: Cost Estimates & Designs for Various Pipeline Infrastructure Project Title: Ongoing Storage Design Projects Location: Illinois USA Completed 32 design projects in 2008 and 2009. Projects included cost estimates and design for regulators, reboilers, generator after coolers, gate valve replacements, ultrasonic meters, flow control, scrubbers, wellhead water knockout vessels, laterals, gathering line replacements with pig launchers, etc. Average project size was $590,000 total installed cost. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 54 of 102 Recently Completed Projects - Storage Projects Client: Kinder Morgan Project Description: PLC and ESD System Automation Compressor Station and Gas Storage Facility Project Title: Station 204 Automation Location: Columbus Junction, Iowa USA Design, programming and commissioning of a PLC based compressor station control system and emergency shutdown system for an expansion of an existing compressor station / gas storage facility. The system is designed to provide monitoring and control of 7 gas fired reciprocating compressors, 75 yard valves and 5 gas storage fields. The control system functionality includes flow and pressure control and monitoring, remote control of satellite compressor station and 99 operator configurable flow modes. The station control system is based on the Allen Bradley ControlLogix platform with Wonderware HMI software. The ESD system is based on the Siemens 545 PLC platform. The project scope included the integration of the new control system with existing flow computers, an upgrade of the existing PLC-based ESD system, control panel design and fabrication, PLC and HMI programming and on-site commissioning services. Client: Project Description: Project Title: Location: Kinder Morgan PLC and ESD System Automation Compressor Station and Gas Storage Facility 214 Automation Columbus Junction, Iowa USA Design, programming and commissioning of a PLC based compressor station control system and emergency shutdown system for a grass roots compressor station. The control system is based on the Allen Bradley ControlLogix platform with Wonderware HMI software. The system was designed for remote, unattended operation and provides automatic station start capability and pressure setpoint control. Project scope included control panel design and fabrication, PLC and HMI programming and on-site commissioning services. Client: Project Description: Project Title: Location: Kinder Morgan PLC Control System For Gas Cooling and Separation 308 Control System Upgrade Longview, Texas USA Design, programming and commissioning of a PLC based control system for gas cooling and separation equipment which was installed at this existing facility as part of a storage capacity expansion project. The control system is based on the Allen Bradley ControlLogix platform with Wonderware HMI software. Project scope included control panel design and fabrication, PLC and HMI programming, integration of the new control system into the existing station control system and on-site commissioning services. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 55 of 102 Recently Completed Projects - Storage Projects Client: Project Description: Project Title: Location: Central New York Oil & Gas Control System Upgrade and Horsepower Addition Stagecoach Storage Facility Owego, New York USA Assessment and optimization of control systems for a compressor station and gas storage field. Control systems for station yard valves, the station ESD system, three electric motor driven centrifugal compressor units, a dehydration plant, and the gas measurement/control system are being reviewed and upgraded as part of this project. All of these systems are based on the Allen Bradley PLC5 platform. The project also includes programming and start-up of Omni flow computers for injection and storage wells. ENE is also serving as the control system consultant to facilitate integration of a new compressor unit control system with existing station and ESD control systems for the horsepower expansion project. The scope of services includes assessment and analysis, control system troubleshooting, modification of existing PLC programs, flow computer programming and on-site commissioning services. Client: Project Description: Project Title: Location: Kinder Morgan Unit Control System Upgrade For Compressor Station 201 Herscher, Illinois USA Design, programming and commissioning of a PLC based control system for an engine driven reciprocating compressor unit (Cooper Bessemer 10W330). The control system is based on the Siemens 545 PLC with a touch screen PC running Wonderware Intouch as the HMI. Control system functionality includes all start/stop sequencing, shutdown and alarm functions, speed control, air/fuel ratio control, ignition timing control and automatic load control. Calculations included fuel torque, compressor torque, horsepower, capacity, flow, loadstep and compressor efficiency. Client: Project Description: Project Title: Location: Nicor Gas Unit Control System Upgrade For Compressor Station 80 Unit Control System Upgrade Ancona, Illinois USA Design, programming, control panel fabrication and commissioning of PLC based control systems for three engine driven reciprocating compressor units. The control systems are based on the Allen Bradley ControlLogix PLC with a Panelview touchscreen PC running RSView ME as the HMI. Control system functionality includes all start/stop sequencing, shutdown and alarm functions, speed control, air/fuel ratio control, ignition timing control and automatic load control. Calculations include fuel torque, compressor torque, horsepower, capacity, flow, loadstep and compressor efficiency. Units automated included one White Superior 12GT-825, one Enterprise HV8-C4 and one Enterprise HV12-C4. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 56 of 102 Recently Completed Projects - Storage Projects Client: Project Description: Project Title: Location: Nicor Gas Unit Control System Upgrade For Compressor Station 70 Unit Control System Upgrade Pontiac, Illinois USA Design, programming, control panel fabrication and commissioning of PLC based control systems for two engine driven reciprocating compressor units. The control systems are based on the Allen Bradley ControlLogix PLC with a Panelview touchscreen PC running RSView ME as the HMI. Control system functionality includes all start/stop sequencing, shutdown and alarm functions, speed control, air/fuel ratio control, ignition timing control and automatic load control. Calculations include fuel torque, compressor torque, horsepower, capacity, flow, loadstep and compressor efficiency. Units automated included two Clark HRA-8Ts. Client: Project Description: Project Title: Location: Louisville Gas and Electric Unit Control System Upgrade For Compressor Unit Control System Upgrade Magnolia, Kentucky USA Design, programming, control panel fabrication and commissioning of PLC based control systems for three engine driven reciprocating compressor units. The control systems were based on the Allen Bradley ControlLogix PLC with FlexIO and a Panelview touchscreen PC running RSView ME as the HMI. Control system functionality included all start/stop sequencing, shutdown and alarm functions, speed control, air/fuel ratio control, ignition timing control and automatic load control. Calculations include fuel torque, compressor torque, horsepower, capacity, flow, loadstep and compressor efficiency. Units automated included five Cooper Bessemer GMV8s. Client: Project Description: Project Title: Location: Louisville Gas and Electric Unit Control System Upgrade For Compressor Unit Control System Upgrade Muldraugh, Kentucky USA Design, programming, control panel fabrication and commissioning of PLC based control systems for three engine driven reciprocating compressor units. The control systems were based on the Allen Bradley ControlLogix PLC with FlexIO and a Panelview touchscreen PC running RSView ME as the HMI. Control system functionality included all start/stop sequencing, shutdown and alarm functions, speed control, air/fuel ratio control, ignition timing control and automatic load control. Calculations include fuel torque, compressor torque, horsepower, capacity, flow, loadstep and compressor efficiency. Units automated included two Cooper Bessemer GMV10s. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 57 of 102 Recently Completed Projects - Storage Projects Client: Project Description: Project Title: Location: Kinder Morgan Unit Control System Upgrade For Compressor Station 184 Unit Control System Upgrade Sayre, Oklahoma USA Retrofit of new PLC-based unit control panels on three TCV Clark engine/compressor units. The project scope included the reverse engineering of the existing OEM pneumatic control panels, and defining functional requirements, design, fabrication, installation, and commissioning of the new control panels. ENE also designed, installed and commissioned a new fiber optic Ethernet control network for the compressor station. The engine governor, the air manifold pressure & temperature, the ignition timing, gas cooler discharge temperature and all water and oil cooling PID control loops are integrated into the PLC’s. Each unit control panel is equipped with a dedicated touchscreen HMI operator interface running Wonderware for local control, operating data, statuses and alarm histories. Client: Project Description: Project Title: Location: Kinder Morgan Unit Control System Upgrade For Compressor Station 286 Unit Control System Upgrade St. Elmo, Illinois USA Detailed design, programming and commissioning of the software for a new retrofit unit control panel for a Cooper-Bessemer engine/compressor unit with gas cooling at a natural gas storage facility. The engine governor, the air manifold pressure & temperature, the ignition timing, gas cooler discharge temperature and all water and oil cooling control loops are integrated into the PLC. The unit control panel is equipped with a dedicated touchscreen HMI operator interface running Wonderware for local control, operating data, statuses and alarm histories. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 58 of 102 Recently Completed Projects – LNG & Propane Air Plant Projects Client: Duke Energy Project Description: Project Title: Location: Liquid Propane Facility Vaporizer Design Eastworks Vaporizer Project Cincinnati, Ohio USA Project included design for installation of (4) new liquid propane vaporizer units on a green field site. Scope encompassed mechanical, civil, structural, and electrical design for all facilities. Design challenges included overhead aerial pipe bridge, thermal pipe stress analysis, new heat trace system, transfer of service from existing units, and overall project management of an accelerated schedule. Client: MidAmerican Energy Project Description: Propane-Air Plant Risk Analysis and Review Project Title: Propane-Air Plant Upgrades Location: Des Moines, Iowa USA Project scope included the preparation of a Fire Risk Analysis and plant hazardous location drawings, a detailed process review, redesign of the vaporization pressure relief system and control room modifications as a result of a class location change. CONFIDENTIAL CLIENT Client: CONFIDENTIAL CLIENT Project Description: Peak Shaving Plant Condition Assessments Project Title: CONFIDENTIAL Location: USA Conducted a Material Condition Assessment with a four man team of engineers (mechanical, electrical, process and metallurgical) of a Propane-Air Plant and a LNG Plant. The assessment checklist was developed with input from the owner’s engineering and operations personnel and the final report was reviewed in detail with the owner’s senior management. Client: Southern Star Central Gas Pipeline Project Description: Propane-Air Plant Cost Estimate Project Title: N/A Location: Midwest USA Developed a cost estimate and major equipment list for a 25 MMSCF/D Propane Air Plant with 14 - 90,000 gallon storage tanks. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 59 of 102 Recently Completed Projects – LNG & Propane Air Plant Projects Client: MidAmerican Energy Project Description: LNG Plant Upgrades Project Title: Waterloo LNG Plant Upgrades Location: Waterloo, Iowa USA Project scope included new regeneration system valve skid; mixed refrigerant liquefaction system optimization model; new LNG pump skid (3 LNG pumps); hot and cold piping thermal stress analysis; insulation specifications; new standby generator, nitrogen generator and air compressors; new LNG tank level gauges; fire study and risk analysis; new fire and gas detection system; operating and maintenance procedures; software functional testing and as-built drawings. Client: MidAmerican Energy Project Description: LNG Plant Upgrades Project Title: Des Moines LNG Plant Upgrades Location: Des Moines, Iowa USA Project scope included vapor dispersion study and sub-impoundment design; refrigerant compressor dry seal conversion; insulation specifications; new LNG tank level gauges; fire study and risk analysis; new fire and gas detection system; operating and maintenance procedures; software functional testing; as-builts and instrumentation tagging. Client: Northern Natural Gas Project Description: LNG Plant Risk Assessments Project Title: N/A Location: USA Performed Risk Assessment Inspections for two LNG plants by four man teams of engineers at each site. The work scope, facility checklists and report format were developed jointly by Northern Natural and EN Engineering. Issues requiring action were tagged by the team and observations requiring further action were included in each site report. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 60 of 102 Recently Completed Projects - Liquid Projects Client: Project Description: Project Title: Location: Enbridge Energy Pump Station Capacity Increase N/A Indiana USA Project management, project scoping, preliminary design and detailed cost estimate to increase the delivery capacity from the terminal to a connecting carrier. Project included detailed station hydraulic study, redesign of the central manifold, manifold relief, three 900 hp vertical can booster pumps, sump system, custody transfer meter skid for 400mbpd, sampling skid, electrical control building, terminal electrical load study and interconnection to a connecting carrier pump station. Final design is in progress and the work includes, project management, detailed design material specifications and construction support. Client: Project Description: Project Title: Location: BP Pipelines Pump Station Capacity Increase N/A Indiana USA Project management, project scoping, preliminary design and detailed cost estimate to increase the pipeline delivery capacity. Project included grass roots 10,000 hp VFD drive pump station including two 5000 hp pumping units with plans for a future unit, sump system, 24-inch launcher, electrical control building. The project included modifications to the pump station including pipeline repairs, addition of a mainline MOV, replacement of relief system, new receiver and a mile 22-inch pipeline replacement, and pipeline hydrotest. Final design is in progress and the work includes project management, detailed design, procurement and construction support. Client: Project Description: Project Title: Location: Enbridge Energy Grass Roots Pump Stations and Terminal N/A Illinois and Wisconsin USA Project management, engineering design, construction support for two grass roots pump stations, launcher receiver site and origin terminal for a refined products system. The grass roots pump stations consisted of two 2000hp mailing pumps, sump pump electrical and control building, and modifications to substations. The origin terminal included 3 custody transfer meter skids, prover loop sample building three 250,000 tanks, three 2000 hp VFD drive pumps, sumps, fire protection system, office building, electrical and control building. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 61 of 102 Recently Completed Projects - Liquid Projects Client: Project Description: Project Title: Location: Enbridge Energy Meter Facility N/A Minnesota USA Project management, detailed design, preparation of material lists and construction documentation for a 900,000 bpd custody transfer meter system, interconnect to 7 headers in the existing central manifold, connection to third party terminal and a new electrical and control building. Client: Project Description: Project Title: Location: BP Convert Crude Pipeline to Refined Products Pipeline Milan to Wood River Pipeline Reactivation Missouri and Illinois USA Provided the project management, design, preparation of all construction documents, and construction coordination to convert and reactivate a 95 mile pipeline system from crude oil to refined products. The project included pipeline cleaning, hydrotesting, installation of a new 1,000 hp pump station, modifications to 4 terminals, and the upgrade of 4 custody meter facilities. Client: Project Description: Project Title: Location: TEPPCO Rebuild Refined Products Terminal P-35 Refined Products Pipeline Expansion Project Indiana USA Provided project management, detailed design, and preparation of material lists and construction documents for the rebuilding of a refined products terminal including: new manifold, replacement of tank lines, new 150,000 barrel floating roof tank with geodesic dome, retrofit of six existing external floating roof tanks with geodesic domes, and the addition of internal floating roofs to existing cone roof tanks. Client: Project Description: Project Title: Location: Enbridge Energy Redesign Crude Terminal To Accept 42 in Pipeline Terminal Re-Design Illinois, USA Re-design of an existing crude oil terminal to accommodate a new incoming 42inch pipeline. The facilities included a 42-inch multiple pig launcher, relief systems, control valve, a new 42-inch central manifold, addition of 42-inch tank lines to existing tanks, and crude quality monitoring systems. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 62 of 102 Recently Completed Projects - Liquid Projects Client: Project Description: Project Title: Location: Enbridge Energy Redesign & Construction Management for Crude Terminal Expansion Indiana USA Designed and provided construction management to interconnect two 36-inch crude lines between two terminals. The work included hydraulic analysis of the new pipelines and terminal, connection of the pipelines to two manifolds, modifications to the existing central manifolds, addition of two new headers, interconnection to a third party pipeline, and the addition of a vertical can booster pump. Total footage was 1.5 miles. Client: Project Description: Project Title: Location: Enbridge Energy Interconnection of Crude Oil Pipeline To an Existing Terminal Line 64 Station Interconnect Indiana USA Provided all engineering design for the interconnection of a crude oil pipeline to an existing terminal. The facilities included 1,800 feet of 24-inch pipeline, a receiver, gravitometer, ultrasonic line balance meter, control valve, relief system, interconnections to the tank manifold, modifications to the manifold and new electrical and control building. Client: Project Description: Project Title: Location: Enbridge Energy Crude Oil Pump Station and Terminal Expansion Pump Station Illinois USA Provided project management, detailed design, preparation of material lists, and construction documentation for a terminal origin 18,000 hp pump station, multiple pig launcher, and ultrasonic mainline metering, electrical control building and substation design. Client: Project Description: Project Title: Location: AuxSable Propane Terminal Interconnect Design Propane Terminal Connection Illinois USA Designed the interconnection between a pipeline terminal and connecting carrier. The project included two miles of new 6-inch pipeline, conversion of 35 miles of pipeline from natural gas to propane, design of a 4-inch custody meter facility on each end of the pipeline, the interconnection of the two pipelines, and the connections to the manifolds and propane caverns. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 63 of 102 Recently Completed Projects - Liquid Projects Client: Project Description: Project Title: Location: TEPPCO Design New Refined Products Pump Station P-35 Refined Products Pipeline Expansion Project Phase II Indiana USA Design and preparation of material lists and construction documents for a new refined products 3,500 hp pump station. Client: Project Description: Project Title: Location: TEPPCO Project Management and Design For Custody Transfer Metering Facilities P-35 Refined Products Pipeline Expansion Metering Project Indiana USA Project management and engineering design including preparation of material lists and construction documents for the three new custody transfer metering facilities.. Client: Project Description: Project Title: Location: AuxSable Propane Terminal Interconnect Modifications N/A Illinois USA Design-build project for the modification of two pipeline connections at each of two propane terminal manifolds. Included was the installation of two pig launchers, one pig receiver, and modifications to the station piping. Client: Project Description: Project Title: Location: Wolverine Pipeline Terminal Meeting System N/A Indiana USA Project management, detailed design, preparation of material lists and construction documentation for a 10-inch custody transfer products meter facility and modifications to the terminal manifold system. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 64 of 102 Recently Completed Projects - Liquid Projects Client: Project Description: Project Title: Location: BP Pipelines Existing Pipeline Lowering N/A Iowa and Indiana USA Provide project management, engineering to lower various pipelines ranging in size from 6-inch to 24-inch. Included lowering calculations, lowering procedure and required drawings. Lowering projects were required to prevent third-party damage in existing agriculture areas. Client: Project Description: Project Title: Location: Enbridge Energy Tankage Additions at Terminal N/A Indiana USA Project management, detailed deism, and construction support for the addition of one 650,000 barrel and 250,000 storage tank at an existing terminal new 36-inch tank lines, interconnection to the central manifold and associated electrical and controls work. Client: Project Description: Project Title: Location: BP Pipelines Pipeline Relocations For Public Improvement N/A Various Locations in the Midwest USA Provided project management, detailed design, preparation of material lists, and construction documentation for the relocation of pipelines ranging from 6-inch to 20-inch throughout the company's pipeline system for public improvements. Client: Project Description: Project Title: Location: West Shore Pipeline Relocation of 12 in & 16 in Products Pipelines N/A Illinois USA Project management, engineering design and construction management for the relocation of one mile each of a 12-inch and 16-inch pipelines paralleling railroad rights-of-way. The project included negotiating an acceptable agreement between the railroad and West Shore for the location of the pipeline relocation. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 65 of 102 Recently Completed Projects - Liquid Projects Client: Project Description: Project Title: Location: West Shore Pipeline Relocation of 16 in Pipeline for Public Improvements N/A Illinois USA Engineering design for the relocation of a half mile of 16-inch pipeline for public roadway improvements. Client: Project Description: Project Title: Location: BP Pipelines Crude Oil Pipeline Purge N/A Midwest USA Project management, detailed design, and preparation of construction documentation for the purging of 330 miles of 22-inch crude oil pipeline from Missouri to Indiana. Client: Project Description: Project Title: Location: Buckeye Pipeline As-Built Drawing Development N/A Ohio USA As-built various pipeline stations and terminals. Scope of the services performed consisted of field survey of the stations, physical measurements of all piping and equipment, updating and redrawing the station drawings to meet the current company drafting standards. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 66 of 102 Recently Completed Projects - Liquid Projects Client: Enbridge Project Description: System Expansion Project Title: Eastern Access Location: Illinois, Indiana, Michigan Project management, project scoping, cost estimates, and detailed design. The facilities included the following: Expansion of terminal for receipts and delivery of over 1 MMbpd heavy crude oil. Including 6 new 400,000 bbl tanks, new tank lines, manifold, addition/replacement of vertical can booster pumps and addition/replacement of mainline pumping units, hydraulic analysis for the terminal and surge analysis for rapid pump shutdown. Two grass roots pump stations including 3 – 3000hp VFD pumping units, line balance metering, pump building, ESB and VFD buildings, electrical infrastructure and tie-ins to an existing pipeline. Replacement of existing terminal including new manifold, new tank lines, multiple sets of vertical can booster pumps, transfer lines and associated electrical substation and electrical switchgear building, hydraulic analysis for terminal and surge analysis for rapid pump shutdown, relief system for multiple pipelines and transfer lines. Origin pump station for a pipeline including four 6000 hp mainline pumps, line balance metering, pump building, 36-inch multi-pig launcher, launcher building, new substation, new electrical switchgear building, VFDs, densitometer, relief system and other required infrastructure. Replacement of two mainline pump stations. New facilities include three 6000hp mainline pumps, line balance metering, pump building, new substations, new electrical switchgear building, VFDs and other site development requirements. Replacement of 160 miles of pipeline with 36-inch pipeline paralleling the existing pipeline corridor. Replacement of existing terminal including new manifold, replacement of tank lines, vertical can booster pumps, 6000 hp mainline pump station. Pump building, 36-inch multi-pig receiver, pig receiver building and pig repair facility, 20-inch launcher, electrical switchgear buildings, VFDs, hydraulic analysis for terminal and surge analysis for rapid pump shutdown, relief system for multiple pipelines station facilities. New 37 miles of 20-inch pipeline Pipe receiver and launcher site Custody transfer meter facility, including two 12-inch meters, prover, flow computer, pipeline interconnects, launchers and receivers, electrical switchgear building, and power for the facility. 10 mainline valve sites including power and automation for the valve sites. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 67 of 102 Recently Completed Projects - Liquid Projects Client: Sunoco Project Description: Blending butane into gasoline at products trucking terminals Project Title: Butane Blending Location: Texas, South Carolina, Georgia, Michigan, Virginia At multiple terminals provided project management and design of Butane blending systems. The work including interfacing facilities with existing product trucking terminals. The facilities included truck offloading, butane bullet tanks, blending skid, metering, analysis skid, new roads and infrastructure, electrical, PLC programing and commissioning. Client: Texon Project Description: Bio-diesel blending at a products terminal Project Title: Bio-diesel Blending Location: Texas Project management, design of a bio-diesel blending system at a products terminal. The facilities included 10,000 bbl tank, truck unloading, measurement facilities, blending system for the injection of bio-diesel into pipeline transporting diesel. Client: Project Description: Buckeye Revamp existing meter station to allow proving with portable prover. Project Title: Upgrade Meter Facility Location: Illinois Project management, detailed design and field coordination to rebuild a meter facility to allow for meter proving. The facilities included addition of double block and bleed valves, portable prover connections, revamp of electrical to include the new block valves, pressure and temperature transmitters. Client: Buckeye Project Description: Addition of provers to existing metering facilities Project Title: Meter Prover Projects Location: Indiana At multiple locations provided project management and engineering for the detailed design of the addition of new small volume provers on a products pipeline meter station. The work included the addition of double block and bleed valves, small volume prover, electrical system upgrades, programing of Omni flow computer and commissioning. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 68 of 102 Recently Completed Projects - Liquid Projects CONFIDENTIAL CLIENT CONFIDENTIAL CLIENT Client: Confidential Project Description: Preliminary engineering and cost estimate for terminal Project Title: Pipeline Terminal Expansion Location: Midwest Preliminary design and detailed cost estimate for the addition of 1MMbbl of crude oil storage. The project included new tanks, tank lines, manifold expansion, pipeline interconnects, vertical can booster pumps, expansion of fire water system and associated expansion of the electrical infrastructure. Client: Project Description: Confidential Preliminary design and detailed cost estimate for a new crude oil terminal Project Title: New Crude Oil Terminal Location: Midwest Preliminary design and detailed cost estimates for a new grass roots terminal. Facilities included tankage, booster pumps, site development, new sub-station, custody transfer metering, transfer lines and pipeline interconnects, associated electrical infrastructure, relief systems and fire protection system. Client: Project Description: BP Pipelines Revamp custody transfer metering system on a products pipeline system to meet the company’s custody transfer metering standards. Project Title: Custody Transfer metering. Location: Indiana, Michigan Project management and detailed design for the upgrade of 5 metering facilities. The project included replacement of turbine meters, addition of pressure and temperature transmitters, modification of pipe systems, access to sites from main access roads, revamp of drain system. CONFIDENTIAL CLIENT Client: Project Description: Confidential Preliminary design and detailed cost estimate for CO2 Pipeline form a coal gasification plant. Project Title: CO2 Pipeline Study Location: Midwest Project management, preliminary design and detailed cost estimate for options to move CO2 from a coal gasification plant to underground storage or injection into existing oil fields for enhanced recovery. The project evaluated multiple pipeline routes ranging from 100 to 290 miles. The faculties included the pipeline, launchers and receivers, pipeline interconnects, custody transfer metering systems, substation, pump stations and other associated facilities. In addition, provided a table top evaluation of the environmental permitting, and associated risks of each route. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 69 of 102 Recently Completed Projects - Liquid Projects Client: OneOk Project Description: Detail Design to install a spare mainline pump. Project Title: Lemont Terminal Mainline Pump Location: Illinois Detailed design to install a new 1250 hp Mainline Pump in parallel with the existing one along with piping modifications to allow more pumping flexibility. Project included the specifying of automated valves, instrumentation and electrical equipment. Client: Buckeye Project Description: Installation of new vertical can booster pump Project Title: New Booster pump Location: Indiana Project management and engineering design for the installation of a new 300 hp booster pump. The project included a detailed terminal and pipeline hydraulic analysis, new 300 hp vertical can booster pump, VFD, piping modifications, associated electrical upgrades. Client: Buckeye Project Description: Installation of a drain system at a terminal to keep the terminal facilities dry to high water table and large rain storms. Project Title: Drainage System Location: Indiana Project management and detailed design for the installation of a drainage system to remove surface water from a terminal manifold area to prevent water accumulation. The system included drain tile, water oil separator, lifter pumps and discharge piping. Client: OneOk Project Description: Install a second canned gasoline pump Project Title: Lemont Terminal Gasoline Pump Location: Illinois Detail design to specify and install a new 125 HP canned gasoline pump in parallel with the existing pump to get more capacity and pumping flexibility. Project will relocated the existing pump to create room for the new one. DEC 2012 Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] Page 70 of 102 Recently Completed Projects - Corrosion Service Projects Client: Project Description: Project Title: Location: Nicor Gas Corrosion Control & Integrity Management Services N/A Illinois USA Multi-year contract providing corrosion control, cathodic protection and integrity management services since 2001. Primary responsibilities are corrosion services and system integrity programming for Nicor’s transmission and underground storage system facilities. Other responsibilities include ECDA and ICDA work; providing integrity management regulatory support; and cathodic protection design and troubleshooting on distribution system facilities. Client: Project Description: Project Title: Location: Ameren Services Company Internal Corrosion Testing Plan Development N/A Illinois USA Development of an internal corrosion testing plan for natural gas storage fields. ENE conducted a site audit and followed with the development of a monitoring plan. Client: Project Description: Project Title: Location: Enbridge Energy Corrosion Control Engineering Support N/A USA and Canada Multi-year contract to provide corrosion control engineering support and annual compliance survey services for all of Enbridge’s northern U.S. petroleum and natural gas transmission pipelines. Support includes: corrosion control and cathodic protection engineering, troubleshooting, repair, and design; construction and maintenance inspection services; corrosion procedures development and review; and specialty corrosion surveys. Client: Project Description: Project Title: Location: Empire Pipeline Survey & Design of Corrosion Control & Stray Current Mitigation N/A New York USA Field survey and design of corrosion control and stray current mitigation for new 77 mile high pressure transmission pipeline. Work involved field survey including aggregation and evaluation of data highlighting suspected anomalies for client. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 71 of 102 Recently Completed Projects - Corrosion Service Projects Client: Project Description: Project Title: Location: Bonneville Power Cathodic Protection Assesment N/A Montana USA Performed cathodic protection assessment at their sub-station. Field work and testing included: soil sampling, soil resistivities, electrical grid corrosion assessment, and ground level atmospheric corrosion survey on above grade structures. The review also included a report with an overall summary of the cathodic protection system and recommendations. Client: Project Description: Project Title: Location: Citgo Corrosion Control Engineering Support and Direct Assessment Services West Shore Pipeline Illinois, Indiana and Wisconsin USA Provide corrosion control engineering support and direct assessment services for a multi-year contract. This includes: corrosion control and cathodic protection engineering and design; construction and maintenance inspection services; troubleshooting and repair of CP systems; specialty corrosion surveys; corrosion procedures development and review; and atmospheric surveys of above ground storage tanks and pipeline facilities. Client: Project Description: Project Title: Location: We Energies Troubleshoot & Repair CP Reads N/A Wisconsin USA Work with utility to trouble shoot and repair backlog of down reads. Project involved short locating and current requirement testing as well as identifying corrective actions for each location identified. Client: Project Description: Project Title: Location: Integrys / Wisconsin Public Service Field Survey And Design of Corrosion Control and Stray Current Mitigation N/A Wisconsin USA Field survey and design of corrosion control and stray current mitigation for 80 miles of new high pressure transmission pipeline laterals from the main pipeline to WPS town border stations. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 72 of 102 Recently Completed Projects - Corrosion Service Projects Client: Project Description: Project Title: Location: Valero/Premcor Interference Testing and Evaluation of Existing Cathodic Protection System N/A Indiana USA Performed interference testing on a 20” pipeline. Also evaluated the existing cathodic protection system to determine if a new system was required, including design and installation of the new system. Performed a close interval survey of the line to verify the new system was providing adequate protection. Client: Project Description: Project Title: Location: Enbridge Atmospheric Corrosion Evaluations & Survey N/A Ohio USA Atmospheric corrosion evaluations were performed at 33 above grade locations on a 16” diameter pipeline. The purpose of the survey was to document locations that do not meet the federal requirements for atmospheric corrosion. Once found, evaluations were performed to identify, assess and document current conditions, based on risk rank. Client: Project Description: Project Title: Location: Alliant Energy Evaluation and Design of Cathodic Protection System N/A Iowa USA Evaluation and design of a cathodic protection system for a 5 mile long, 10” gas line sharing a right-of-way with high voltage power lines. Evaluation included soil resistivity analysis, identification of AC sources and their maximum operation capacity, and of existing cathodic protection rectifiers. A cathodic protection system was designed to adequately protect the line. Client: Project Description: Project Title: Location: Alliant Energy Engineering Services For A/C Mitigation Study N/A Iowa USA Provided engineering support and services for an A/C mitigation study for a 13 mile stretch of 20” natural gas pipeline. This study included the field survey, data analysis, predictive modeling and recommendations for mitigation and decoupling designs. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 73 of 102 Recently Completed Projects - Corrosion Service Projects Client: Project Description: Project Title: Location: West Shore Pipeline Atmospheric Corrosion Evaluations N/A Illinois and Wisconsin USA Atmospheric corrosion evaluations were performed at 30 above ground storage tanks. The purpose of the survey was to document locations that do not meet the federal requirements for atmospheric corrosion. Once found, evaluations were performed to identify, assess and document current conditions, based on risk rank. Client: Project Description: Project Title: Location: Nicor Gas Atmospheric Corrosion Evaluations N/A Illinois USA Performed atmospheric corrosion surveys at 3 underground gas storage fields for a total of 411 surveys of above-grade facilities. The purpose of the survey was to document locations that do not meet the federal requirements for atmospheric corrosion. Once found, evaluations were performed to identify, assess and document current conditions, based on risk rank. Client: Project Description: Project Title: Location: Enbridge Atmospheric Corrosion Evaluations N/A Oklahoma USA Atmospheric corrosion evaluations were performed at 93 above grade locations on a 10” diameter pipeline. The purpose of the survey was to document locations that do not meet the federal requirements for atmospheric corrosion. Once found, evaluations were performed to identify, assess and document current conditions, based on risk rank. Client: Project Description: Project Title: Location: NIPSCO Engineering Services For A/C Mitigation Study N/A Indiana USA Provided engineering support and services for an A/C mitigation study along an 8.0 mile stretch of 16-inch and 12-inch diameter natural gas pipeline. This study included the field survey, data analysis, predictive modeling and recommendations for mitigation and decoupling designs. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 74 of 102 Recently Completed Projects - Corrosion Service Projects Client: Project Description: Project Title: Location: Valero/Premcor Stray Current Analysis From D.C. Traction Rail Lines N/A Indiana USA Performed stray current analysis from D.C. traction rail lines and provided recommendations to mitigate the D.C. on a 12” steel line. This included installation of a temporary bond with a foreign pipeline company. Client: Project Description: Project Title: Location: Valero/Premcor Close Interval Survey N/A Indiana USA Performed a close interval survey on a 12” pipeline. Report included conclusions and recommendations. Client: Project Description: Project Title: Location: Valero/Premcor Stray Current Mitigation N/A Indiana USA Designed, installed, and tested a reverse current drainage switch to mitigate stray current on an 8” line. This also included coordination with METRA to install an impedance bond. Client: Project Description: Project Title: Location: Valero/Premcor Atmospheric Corrosion Evaluations N/A Indiana USA Performed an atmospheric survey on above grade facilities in 4 areas of Valero’s system. Client: Project Description: Project Title: Location: Valero/Premcor Diagnostics Test on Terminal Cathodic Protection Rectifiers N/A Indiana USA Performed diagnostics test on 12 Hammond Terminal cathodic protection rectifiers. These rectifiers are protecting 26 above ground storage tanks and 2 10” lines approximately 2,000’ long. Report included conclusions and recommendations. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 75 of 102 Recently Completed Projects - Corrosion Service Projects Client: Project Description: Project Title: Location: Valero/Premcor Stray Current Analysis From D.C. Traction Rail Lines N/A Indiana, USA Performed stray current analysis from D.C. traction rail lines and provided recommendations to mitigate the D.C. on an 8” steel line. Client: Project Description: Project Title: Location: USG Field Survey & Design of Corrosion Control And Stray Current Mitigation N/A Washingtonville, Pennsylvania USA Field survey and design of corrosion control and stray current mitigation for new 18 mile high pressure transmission pipeline. Client: Project Description: Project Title: Location: Vectren Energy Internal Corrosion Analysis N/A Indiana, USA Conducted inspection of a 24” pipeline for internal corrosion including analysis of solid material and fluids collected from the pipe interior. Client: Project Description: Project Title: Location: Bonneville Power Cathodic Protection Assessment N/A Washington, USA Performed cathodic protection assessment at their sub-station. Field work and testing included: soil sampling, soil resistivities, electrical grid corrosion assessment, and ground level atmospheric corrosion survey on above grade structures. The review also included a report with an overall summary of the cathodic protection system and recommendations. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 76 of 102 Recently Completed Projects - Corrosion Service Projects Client: Project Description: Survey (Task 15) Project Title: Location: DuPage Water Corrosion Control Monitoring Program – Close-Interval N/A Chicago Metro, Illinois, USA ENE performed a close-interval survey of both unprotected and cathodically protected line segments encompassing 16.1 miles of water transmission main. Approximately 11.6 miles of the transmission main is comprised of steel pipe, with the remainder being PCCP. Work involved identification of areas of potential interference, and the design of 2 impressed current ground beds to bring protection levels to NACE standards. Client: Project Description: Project Title: Location: We Energies Corrosion Troubleshooting N/A Wisconsin, USA A multi-year project to investigate and determine the cause of non-compliant corrosion control measurements. Project involved multiple teams working closely with utility staff to analyze pipe segments, determine control points, correct shorted insulators, and clear metallic shorts. Work included re-analysis of segments after completion of maintenance activities and recommendations for further maintenance work where needed. Client: Project Description: Project Title: Location: Ameren Internal Corrosion Testing Plan Natural Gas Storage Fields N/A Illinois USA Plan included an initial site audit at several fields and an ongoing monitoring plan for water corrosivity, solids analysis, gas sampling and corrosion coupons. Coordinated the fitness for service evaluation of wellhead separators which included the ultrasonic testing of vessels for wall loss. Evaluated the gathering systems liquids handling capability for placement of corrosion coupons. Developed and implemented annual sampling program to identify areas with high likelihood of corrosion occurring. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 77 of 102 Recently Completed Projects - Corrosion Service Projects Client: Project Description: Project Title: Location: Dominion Internal Corrosion Risk Assessment Program for Existing Pipeline Drips N/A Pennsylvania USA Program considered contributing factors from historical test data on coupon wall loss, reactive gas component sampling, water content, age and material, and solids sampling. Program generates a relative risk ranking to identify locations with a high probability of internal corrosion. Risk ranking is used to effectively deploy limited capital for pipe replacement programs. Conducted audit assessment of cathodic protection interference between compressor facilities and storage well facilities due to the application of independent cathodic protection programs by discipline (storage, pipeline, station). Client: Project Description: Project Title: Location: Nicor Ongoing Testing and Evaluation Program for Natural Gas storage Fields N/A Illinois USA Program includes annual monitoring of water corrosivity, solids analysis, gas sampling and corrosion coupons. ENE coordinates the fitness for service evaluation of wellhead separators which included the ultrasonic testing of vessels for wall loss. Evaluation of the gathering systems liquids handling capability for placement of corrosion coupons. Coordinated historical data management using ProActive software to identify areas with high likelihood of corrosion occurring. Developed a Risk ranking of pipelines in the gathering systems and presented the corrosion issues identified on color coded facility map for quick reference. Client: Project Description: Project Title: Location: Exxon Mobil Cathodic Protection N/A Chicago, Metro Area, IL, USA EN Engineering performed annual cathodic protection survey for above ground storage tanks and liquid pipelines. Troubleshoot, adjust, and provide recommendations for cathodic protections systems Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 78 of 102 Recently Completed Projects - Corrosion Service Projects Client: Project Description: Project Title: Location: Nicor Atmospheric Corrosion Survey N/A Illinois USA The atmospheric corrosion evaluation included a visual inspection of the abovegrade facilities. This evaluation consisted of obtaining site photographs which depicted the area in question as well as recording observations and coating thickness measurements, if necessary. Inspections occurred at well-head structures and vessels, pipe bodies, pipe supports, pipe fittings, below-grade to above-grade pipe transitions, and valve and valve bodies. Project management, analysis, review and recommendations for internal wellhead casing tool testing and cathodic protection profile (CPP) programs. Programs are often used to better design the cathodic protection at the air to water zone within a well casing assembly or identify potential issues related to corrosion (external or internal to the annulus). Conducted cathodic protection current distribution survey and assessment in order to identify spread, impact and density of current throughout each storage field. Cathodic protection design of wellhead facilities and associated piping including surface and semi-deep and deep anode groundbed systems over a gas supply bubble. Client: Project Description: Project Title: Location: Kinder Morgan Liquids Terminal Corrosion Control N/A Chicago Metro, Illinois, USA EN Engineering performed annual cathodic protection surveys on cathodically protected above ground storage tanks, and on liquids pipeline, including system troubleshooting, repair, and adjustments. Client: Project Description: Project Title: Location: Kinder Morgan Liquids Terminal DC Stray Current Testing and Evaluation N/A Chicago Metro, Illinois, USA EN Engineering performed cathodic protection testing to determine source and magnitude of DC stray current interference, and provided recommendations for cathodic protection design to mitigate interference on liquids line. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 79 of 102 Recently Completed Projects - Corrosion Service Projects Client: Dupage Water Commission Project Description: Project Description Here Project Title: Project Title Here Location: State, Country DC interference testing, design, installation inspection and commissioning of a DC drainage switch for the 90-in water main. Client: Bonneville Project Description: Project Description Here Project Title: Project Title Here Location: State, Country DC interference testing and CP design for an electrical substation, including design, inspection of installation and commissioning. Client: Valero Project Description: Project Description Here Project Title: Project Title Here Location: State, Country CP design with horizontal linear anode system for a 20-in pipeline, included design, inspection of installation and commissioning. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 80 of 102 Recently Completed Projects - Metallurgical Services Projects CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT 80% SMYS Special Permit Upgrade CONFIDENTIAL New York USA Provide pre-assessment and design consultation for DOT / PHMSA waiver request to operate a section of the proposed pipeline at 80% SMYS in a Class I location. Project involved review of pipe design, material specification, welding procedures, application and interaction with regulatory agencies. CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT Girth Weld Engineering Critical Analysis (ECA) CONFIDENTIAL Texas USA Engineering Critical Analysis (ECA) of 42" girth welds made with automatic welding per API 1104 Appendix A, 20th edition for weld defect acceptance criteria. Analysis combined axial stress analysis of pipeline during construction, testing, and operation; welding procedure qualification including CTOD testing; and weld defect sizing with AUT. CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT Design Review of Crude Oil Transmission Pipeline CONFIDENTIAL South Dakota USA Provided design review of proposed interstate liquids line for public utility commission. Work involved review of design considerations used, evaluation of 80% SMYS waiver application to PHMSA and preparation of direct testimony for certificate hearing. CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT Automatic Welding Specification Review CONFIDENTIAL Louisiana and Texas USA Review and provide revisions to pipe welding specification, welder qualification including material and construction related specifications for double joint and automatic welding. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 81 of 102 Recently Completed Projects - Metallurgical Services Projects CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT Weld Crack Investigation CONFIDENTIAL Texas USA Root cause failure analysis of weld cracks during construction of 42", X-70 pipeline. Metallurgical samples provided allowed analysis of weld sequence and fracture characteristics to determine cause. CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT Pipe Mill Qualification CONFIDENTIAL India Qualify India pipe mills and SAW pipe mills as pipe suppliers. Provide specification and construction related specifications for double joint and automatic welding during construction. CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT HDD Weld Failure Investigation CONFIDENTIAL Louisiana USA Review and metallurgical analysis of a weld failure during a horizontal directional drill operation. Work involved field inspection of the failure, mechanical stress evaluation of drill operation, metallurgical evaluation of failed weld specimen and review of welder qualification and welding procedures. CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT Pipe Specification and Weld Procedure Update CONFIDENTIAL Louisiana USA Performed a review and modification of pipeline specifications with regards to welding procedures, welder qualification and automatic welding methods for all grades of pipe and for X70 and X80 in particular. An additional contract was executed to review one of the pipe mills to ensure the mill’s compliance with company standards and criteria. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 82 of 102 Recently Completed Projects - Metallurgical Services Projects CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT 80% SMYS Special Permit Support CONFIDENTIAL Louisiana USA Technical assistance and support for DOT waiver petition request to operate a new pipeline at an 80% stress level in a Class I location. CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT Re-Establish Weld Procedure CONFIDENTIAL Connecticut USA Assisted a major distribution company in the Eastern U.S. in re-establishing a welding procedure to verify the procedures adequacy for joining pipes with unequal yield strength. The work allowed the company to use welds performed in the field while maintaining stress levels below 20% SMYS, thus classifying the line as distribution piping rather than as a transmission line. CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT Hydrotest Over Pressurization Investigation CONFIDENTIAL Texas USA Performed failure analyses of pipe failure during commissioning hydrotest. Pipe was determined to be over pressurized causing tensile failure in the pipe and excessive deformation. CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT 80% SMYS Special Permit Metallurgical Support CONFIDENTIAL Texas USA Provided metallurgical technical support at the Jindal Saw Pipe Mill in Baytown, TX. Reviewed and revised the Client Pipe Specification, particularly in regards to meeting requirements for the 80% stress level. CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT Pipe Axial Stress Analysis for ECA CONFIDENTIAL Texas USA Performed stress analysis of pipe during construction, testing and operation of a 170 mile, 42" X70 line in support of Engineering Critical Analysis for weld procedure acceptance criteria. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 83 of 102 Recently Completed Projects - Metallurgical Services Projects CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT Liquid Knock-Out Separator Corrosion Investigation CONFIDENTIAL Iowa USA Investigated corrosion of separator vessel and meter run piping including chemical analysis of liquid and solid samples and corrosion morphology. CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT Cracked Girth Weld Analysis at Road Casing CONFIDENTIAL Kansas USA Investigated casing design in support of cracked girth weld failure at a rail crossing including load transfer through soils and vibration analysis. CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT Hydrotest of Vintage Girth Welds CONFIDENTIAL Kentucky USA Hydrotest and metallurgical examination of vintage pipe girth welds for pipeline integrity evaluation. CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT Corrosion Leak at Storage Field Drip Elbow CONFIDENTIAL Illinois USA On site examination and metallurgical analysis of failed elbow and associated piping in storage field drip. CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT Pipe Mill Qualification and Inspection CONFIDENTIAL Gujarat, India Pipe mill inspection to evaluate pipe manufacturing process and inspection of pipe production at a mill in Anjar, Gujarat, India Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 84 of 102 Recently Completed Projects - Metallurgical Services Projects CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT Training Program for Design Standards CONFIDENTIAL Nevada, Arizona and California USA Developed an engineer training and development program to cover SWG design standards. These standards covered the entire company system from mains and services, to material selection and testing. CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT Metallurgical Support for Mill Line Pipe Production CONFIDENTIAL Alabama, IL ENE acted as Client’s liaison on site at American Steel Pipe’s mill in Birmingham, Alabama during production to ensure compliance with the Client’s pipe specifications. Additionally, ENE ensured conformance with mechanical and composition issues previously raised in the pipe advisory. Work included metallurgical and technical support during both the pre-production conference and through production. Activities included coordination between the pipe mills, third party inspectors, and the Client; observation of the pipe inspection and mechanical testing work; gathering and reviewing the Client’s required documentation of test results ensuring compliance with specifications; and communication of any issues to the Client. CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT Metallurgical Investigation of Pipe Defect CONFIDENTIAL Virginia, USA Witnessed and documented the results of an inspection and performance test on a pipe segment containing an anomaly identified during construction of a 24 inch pipeline. ENE advised the need for additional testing in order to determine the probable source of the anomaly, and the potential impact the defect would have on pipe operation. Investigation warranted visits to coating sites based on findings at the American plant. ENE’s report conveyed the findings and conclusion regarding the source/cause of the defect. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 85 of 102 Recently Completed Projects - Metallurgical Services Projects CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT Review of Pipe Property Data in Response to PHMSA Low Yield Strength Advisory CONFIDENTIAL Reviewed Client’s mechanical property, chemical composition, and manufacturing procedure data for pipe produced in relation to the Advisory. The work included a thorough review of the manufacturing procedure specification of pipe produced at the SAW Pipe Mill in Baytown, Texas; review of the inspection and quality control records during pipe production; review of the mechanical test reports, including chemical composition data for the pipe heats; and organization of the data in a format for easy record retrieval. CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT Pipe Mill Production/Metallurgical and Technical Support for 675 Mile Pipeline CONFIDENTIAL USA & India EN Engineering provided metallurgical and technical support for a 675 mile pipeline project to ensure compliance with pipe procurement specifications and the 80% SMYS alternative pipeline design requirements. ENE acted as the Client’s on-site liaison at the Berg Spiral Pipe Mill in Mobile, Alabama; the Welspun Spiral Pipe Mill at Little Rock, Arkansas; the Welspun spiral pipe mills located in Anjar, India; and the Welspun straight seam mill in Dahej, India. ENE’s role included coordinating activities between the mills, third party inspectors, and the Client. Activities included observing pipe inspection and mechanical testing work, gathering and reviewing required documentation, metallurgical and technical assistance, and reviewing inspection and test results to ensure compliance with specifications, and bringing any issues to the attention of the Client’s Laboratory Services. CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT 80% SMYS Special Permit Metallurgical Support CONFIDENTIAL CONFIDENTIAL Provided metallurgical technical support to pipe mill rolling pipe for the client. Reviewed and revised the Client’s existing pipe specification, particularly in regards to meeting the 80% SMYS stress level requirements. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 86 of 102 Recently Completed Projects - Metallurgical Services Projects CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT Gas Explosion Investigation/Litigation CONFIDENTIAL CONFIDENTIAL Pipe failure and metallurgical testing to support an incident investigation and subsequent litigation work. CONFIDENTIAL CLIENT Client: CONFIDENTIAL CLIENT Project Description: Elbow Fitting Rupture Investigation Project Title: Location: Illinois Root cause failure analysis of a ruptured elbow fitting. Cause was traced to an overpressure event through fracture surface analysis, metallurgical analysis, and 3D finite element analysis. Load contributions of pressure, temperature, and assembly misalignment contributed to the failure CONFIDENTIAL CLIENT Client: CONFIDENTIAL CLIENT Project Description: Project Title: Pipe Lamination Assessment Location: State, Country A summary report of the formation of lamination in line pipe and the integrity and stress state implications of laminations was prepared for the client. A fitness-forservice assessment following the procedures in API 579 was performed demonstrating that a large lamination would not require repair or removal for continued safe operation. CONFIDENTIAL CLIENT Client: CONFIDENTIAL CLIENT Project Description: Helical Pipe Mill Qualification Project Title: Project Title Here Location: Gemlik, Turkey A comprehensive review of the pipe mill quality program, training records, and pipe and coating manufacturing procedures was performed on site at the pipe mill. A report of all findings was provided to the client for review. CONFIDENTIAL CLIENT Client: CONFIDENTIAL CLIENT Project Description: Seam Leak Investigation – 4 inch ERW Pipe Project Title: Project Title Here Location: Iowa Investigation of a 4 inch ERW seam leak concluded that an existing lack-of-fusion manufacturing defect was responsible for the leak condition. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 87 of 102 Recently Completed Projects - Metallurgical Services Projects CONFIDENTIAL CLIENT Client: CONFIDENTIAL CLIENT Project Description: Fitting Manufacturer Qualification Project Title: Location: Texas Performed a comprehensive quality audit of a fitting manufacturer process for qualification. CONFIDENTIAL CLIENT Client: CONFIDENTIAL CLIENT Project Description: 30 inch Check Valve Casting Inspection Project Title: Location: Canada NDE procedures and results were inspected to determine if 30 inch check valves were acceptable for shipment and installation on a time critical construction project. CONFIDENTIAL CLIENT Client: CONFIDENTIAL CLIENT Project Description: Steel Mill Rolling Inspection and Audit Project Title: Location: Indiana Rolling process parameters were monitored on site at 2 steel mills for coils as part of an X70 grade pipe order. CONFIDENTIAL CLIENT Client: CONFIDENTIAL CLIENT Project Description: Stress Corrosion Crack (SCC) Burst Tests Project Title: Location: Illinois Hydrostatic burst tests were performed on 6 individual 30 inch pipes removed from service with SCC colonies. Maximum burst pressure was determined while monitoring the pressure –volume behavior of the pipe. Diameter expansion was measured after the test. Fracture surfaces were examined to determine ne failure origin. The fracture process was captured using high resolution video. CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT 4130 Steel Weld Procedure Development Houston, TX A welding procedure was successfully developed for 4130 steel flanges for a storage well application. The procedure required controlled heat inputs and slow cooling techniques to avoid weld cracking. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 88 of 102 Recently Completed Projects - Metallurgical Services Projects CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT In-Service Weld Procedure for High Yield Pipe Louisiana An in-service welding procedure was developed using API 1104, Appendix B procedures to ensure a high yield pipe grade could be successfully hot tapped for branch connections. CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT - 50° F Welding Procedures Utah Low temperature welding procedures were developed to ensure adequate impact toughness of construction girth welds in demanding cold weather environments. Charpy impact toughness tests confirmed toughness requirements were met for this application. CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: CONFIDENTIAL CLIENT Sour Gas Weld Procedures Texas Developed weld procedures to be used in sour gas service in shale play areas to ensure resistance to hydrogen induced cracking (HIC). Delayed tensile testing demonstrated suitability of the procedure. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 89 of 102 Recently Completed Projects - Consulting Service Projects Client: Project Description: Project Title: Location: Nicor Gas Corrosion Control, Cathodic Protection & Integrity Management N/A Illinois USA Multi-year contract providing corrosion control, cathodic protection and integrity management services since 2001. Primary responsibilities are corrosion services and system integrity programming for NICOR’s transmission and underground storage system facilities. Other responsibilities include ECDA and ICDA work; providing integrity management regulatory support; and cathodic protection design, troubleshooting, and construction coordination and oversight on distribution system facilities. Client: Project Description: Project Title: Location: United States Gypsum (USG) System Integrity and Management N/A USA Provide system integrity support including development of standards, procedures, forms and IMP documents. Performed an ECDA assessment. Provided complete support of all aspects of DOT 49 CFR Part 192. Developed and implemented an Operator Qualification program which included providing OQ training, and data management of their employee training records and recertification documentation. Perform faculty audits and mock emergency exercises. Client: Negev Natural Gas Project Description: Distribution System Project Title: N/A Location: Negev Region, Israel Engineering Consultant providing engineering and design support for the development of the first natural gas system in Israel. Services include guidance with the development of specifications and standards for engineering and construction. Feasibility studies, hydraulic modeling, and system forecasting for the regions planned growth were completed. Detailed engineering design plans were reviewed and completed. Construction field support of the distribution system was provided. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 90 of 102 Recently Completed Projects - Consulting Service Projects Client: Project Description: Project Title: Location: Alvord, Burdick & Howson Cathodic Protection Analysis & Design Water Pipeline N/A Illinois USA Performed a multi-year contract to provide cathodic protection analysis and design for large diameter water pipeline transmission mains. The contract included corrosion control monitoring and testing including test point readings, continuity testing, Panhandle Eastern Testing and close-interval survey. Testing was performed after installation at 6 months and 12 months. Client: Project Description: Project Title: Location: GE Energy External Corrosion & Direct Assessment Oil Pipeline N/A Villahermosa, Mexico Provided field and engineering assistance to Mexico's oil company (PEMEX Company) for the completion of external corrosion direct assessment (ECDA) and customized training services related to indirect inspection equipment for client's personnel. Client: Midwest Energy Association (MEA) Project Description: DIMP Guidance Plan Project Title: N/A Location: MidWest USA Worked with the Midwest Energy Association to develop a sample Distribution Integrity Management Program. Leveraging ENE’s experience and participation in the GPTC DIMP Guidance work, the Sample Program is intended to be used as a template to create a client- specific integrity plan that will be required for gas distribution companies in order to conform to new regulations. Client: Project Description: Project Title: Location: Texas A&M University Natural Gas Pipeline Selection & Routing N/A Texas, USA Project involved the review of alternate gas supply laterals from three potential shippers to provide fuel to a new high pressure combustion turbine/generator. Work involved selecting pipeline routes, designing facilities to meet increased delivery pressure requirements, estimating cost to construct, negotiating with suppliers to procure an advantageous long-term gas supply contract, and completing an economic evaluation of the best alternative for the campus. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 91 of 102 Recently Completed Projects - Consulting Service Projects CONFIDENTIAL CLIENT CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: Client Confidential Transmission Integrity Management Program Review N/A Confidential ENE was retained by the Client to complete an internal audit of the companies Transmission Integrity Management Program in their efforts to ensure compliance with 49 CFR Part 192 Subpart O. The project involved the review of specific aspects of the clients existing practices, tools and procedures for compliance with Subpart O, and industry best practice. ENE considered 49 CFR Part 192 Subpart O, ASME B31.8S, NACE RP0502, PHMSA Frequently Asked Questions, PHMSA Protocol documents, best practices, information learned during public meetings, along with ENE’s extensive experience during the review. ENE also reviewed the internal TRIMP organizational structure to determine project management effectiveness. As a deliverable, ENE provided a written report with specific recommendations on actions to improve compliance. Client: Client Confidential Project Description: Due Diligence – Interstate Pipeline Acquisition Project Title: N/A Location: Confidential Assisted private equity investor with the review of operating and maintenance practices and forecast capital expenditures related to expansion of a major interstate transmission pipeline holding company and its subsidiaries. Facilities were located in the United States east of the Rocky Mountains. CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: Client Confidential Due Diligence – Gathering System Acquisition N/A Confidential Assisted private equity investor with the review of natural gas gathering and transmission system. Activities included assessment of attached production, evaluation of system capacity, market assessment and pipeline integrity evaluation. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 92 of 102 Recently Completed Projects - Consulting Service Projects Client: Project Description: Project Title: Location: Pacific Gas and Electric Automatic Shut Off and Remote Control Valve Assessment N/A California USA Performed a review of the use of Automatic Shut-off Valves (ASV) and Remote Control Valves (RCV) including industry nest practice, alternatives and merits of available technologies. In addition to reviewing pertinent industry literature and regulations, conducted a survey of natural gas transmission and distribution companies regarding their experiences with ASVs and RCVs. Reviewed client’s historical, current, and proposed deployment of ASV and RCV equipment. Identified individual valve segments within the transmission system and prioritized based on factors including but not limited to population density, potential impact radius and blowdown time. Client: Project Description: Project Title: Location: Pacific Gas and Electric ASV/RCV Valve Estimating N/A California USA Developed unit cost approach to create project estimates for installation, replacement, or automation of existing valves in support of system upgrade initiative. Selected optimal valve locations based on defined program scope. Identified scope of work required to isolate each line segment and developed estimates for approximately eighty valve automation projects. Provided work scope and cost estimate documentation as basis for engineering design work as well as inclusion in Public Utility Commission rate case filing. Client: Project Description: Project Title: Location: Pacific Gas and Electric Cathodic Protection Record Stabilization N/A California USA Managed cathodic protection record stabilization team centralizing over 30,000 test points into single SAP database from paper records. Managed a team building Pipeline Feature Lists for MAOP Validation program. This team focused on customer and regulator meter sets, crossovers, blowdowns, and other non-mainline pipe segments Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 93 of 102 Recently Completed Projects - Consulting Service Projects CONFIDENTIAL CLIENT Client: Project Description: Project Title: Location: Client Confidential Corrosion Control Monitoring Program – Transmission Line Assessment N/A Classified Performed preliminary review of construction data and operating information including leak history for water transmission mains. Work included field testing and data gathering in order to design a cathodic protection system for the steel portions of each line. Tests conducted included current requirement testing, soil resistivity testing, and continuity testing along the pipeline right of way. Specific ground bed locations utilizing the existing easements were identified. ENE’s preliminary design report included test results, data analysis, written description of proposed cathodic protection system, bill of materials, and cost estimate for construction phase. ENE’s design drawings included ground bed locations, installation details, and typicals. Additionally, provided assistance to Client in obtaining permits, development of technical specifications for bidding, construction contract documents, and bid evaluations/recommendations. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 94 of 102 Recently Completed Projects - Peak Shaving Power Projects Client: MidAmerican Energy Project Description: Propane-Air Plant Risk Analysis and Review Project Title: Propane-Air Plant Upgrades Location: Des Moines, Iowa USA Project scope included the preparation of a Fire Risk Analysis and plant hazardous location drawings, a detailed process review, redesign of the vaporization pressure relief system and control room modifications as a result of a class location change. Client: Exelon PECO Project Description: Peak Shaving Plant Condition Assessments Project Title: N/A Location: Philadelphia, Pennsylvania USA Conducted a “Material Condition Assessment” with a four man team of engineers (mechanical, electrical, process and metallurgical) of PECO’s Propane-Air Plant and LNG Plant located near Philadelphia, Pa. The assessment checklist was developed with input from PECO’s engineering and operations personnel and the final report was reviewed in detail with PECO and Exelon senior management. Client: Southern Star Central Gas Pipeline Project Description: Propane-Air Plant Cost Estimate Project Title: N/A Location: Midwest USA Developed a cost estimate and major equipment list for a 25 MMSCF/D Propane Air Plant with 14 - 90,000 gallon storage tanks. Client: MidAmerican Energy Project Description: LNG Plant Upgrades Project Title: Waterloo LNG Plant Upgrades Location: Waterloo, Iowa USA Project scope included new regeneration system valve skid; mixed refrigerant liquefaction system optimization model; new LNG pump skid (3 LNG pumps); hot and cold piping thermal stress analysis; insulation specifications; new standby generator, nitrogen generator and air compressors; new LNG tank level gauges; fire study and risk analysis; new fire and gas detection system; operating and maintenance procedures; software functional testing and as-built drawings. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 95 of 102 Recently Completed Projects - Peak Shaving Power Projects Client: MidAmerican Energy Project Description: LNG Plant Upgrades Project Title: Des Moines LNG Plant Upgrades Location: Des Moines, Iowa USA Project scope included vapor dispersion study and sub-impoundment design; refrigerant compressor dry seal conversion; insulation specifications; new LNG tank level gauges; fire study and risk analysis; new fire and gas detection system; operating and maintenance procedures; software functional testing; as-builts and instrumentation tagging. Client: Northern Natural Gas Project Description: LNG Plant Risk Assessments Project Title: N/A Location: USA The “Risk Assessment Inspections” for two LNG plants was completed by four man teams of engineers at each site. The work scope, facility checklists and report format were developed jointly by Northern Natural and EN. Issues requiring action were tagged by the team and observations requiring further action were included in each site report. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 96 of 102 Recently Completed Projects - Pipeline Integrity Services Projects Client: Project Description: Project Title: Location: Southern Star Central Gas Pipeline Corrosion Control & Integrity Services N/A Midwest & Mid Continent Regions, USA Providing corrosion control and system integrity services since 2004. Development of standards, procedures, forms and IMP documents. Provided project management oversight of ECDA Inspections. Assisted in the implementation of their Integrity Management Plan. ENE was also present and provided support for their jurisdictional IMP audit with PHMSA. Provided training to field personnel on their integrity management program. Performed a risk-based remote control valve study of their transmission system based on system pressures, size, MAOP, and % SMYS. Client: Project Description: Project Title: Location: Vectren Energy Integrity Management Program Support for Gas and Liquid Lines N/A Upper Midwest USA An ongoing multi-year contract to provide Integrity Management Program support for both gas and liquid lines including: integrity management plan and procedure revisions, data gathering and research, MAOP origination studies and regulatory guidance. Performed a risk-based remote control valve study of their transmission system based on system pressures, size, MAOP, and % SMYS. Client: Project Description: Project Title: Location: DTE Energy Company External Corrosion Direct Assessment Project Management Support N/A Michigan USA Provided External Corrosion Direct Assessment project management support. This included project planning, technical guidance, data analysis and development of paperwork necessary for regulatory review. ENE also provided, as a part of this contract, project management for Internal Corrosion Direct Assessment. ENE developed company Direct Assessment procedures; reviewed and recommended changes of their existing Integrity Management Plan; and performed a risk-based remote control valve study of their transmission system based on system pressures, size, MAOP, and % SMYS. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 97 of 102 Recently Completed Projects - Pipeline Integrity Services Projects Client: Project Description: Project Title: Location: Dominion Transmission N/A West Virginia USA Developed a risk assessment framework and model to rank over 1000 drip tanks located along transmission lines and in storage fields. Project involved identifying critical factors contributing to internal corrosion and using commercially available software to generate a relative risk model for targeted inspection and effective use of capital. Client: Project Description: Project Title: Location: Ameren Services Company N/A Illinois USA Direct Assessment of excavated pipelines within their system. At the excavation site, ENE evaluated the condition of the pipe; obtained samples to determine the existence of MIC, pH of the soil, pH of water if present; condition of coating; wall loss if any; extent of any corrosion or damage; and the general condition of the pipe. Client: Project Description: Project Title: Location: Ameren Services Company N/A Illinois USA Ongoing multiyear program for internal corrosion monitoring for which includes: gas, liquids, coupons/probes, non-destructive evaluation, as well as direct and visual examinations as needed. Client: Project Description: Project Title: Location: Aux Sable Liquid Products N/A Midwest USA Contract to provide integrity management, corrosion and cathodic protection support. Provided Integrity Management Plan support including: plan facilitation; standards, procedures and forms development and review; development of IMP documents; and risk algorithm and risk modeling. Developed Operations and Maintenance Manual, Operator Qualification Manual, and Public Awareness Plan. Provided project management support and inspection services related to in-line inspection. Cathodic protection annual surveys, close-interval surveys and troubleshooting. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 98 of 102 Recently Completed Projects - Pipeline Integrity Services Projects Client: Project Description: Project Title: Location: We Energies External Corrosion Direct Assessment (ECDA) N/A Wisconsin USA Performed external corrosion direct assessment (ECDA) for We Energies. The assessment included pre-assessment confirmation, indirect inspection including project management, and technical oversight and assistance with Direct Assessment. Client: Project Description: Project Title: Location: Mid American Energy Close Interval, Depth Cover and ECDA Survey N/A Iowa USA Close interval, depth of cover and ECDA survey of 150 miles of pipeline located in rural and urban areas throughout Iowa. Client: Project Description: Project Title: Location: Mid American Energy Cathodic Protection & AC Mitigation Design N/A Iowa USA Provided engineering support and services for cathodic protection design and A/C mitigation along a 12.9 mile stretch of 16-inch natural gas pipeline. This work included: cathodic protection and A/C mitigation field survey, data analysis, cathodic protection design, and A/C mitigation and decoupling recommendations. Client: Project Description: Project Title: Location: Oklahoma Natural Gas IMP Support N/A Oklahoma USA Provided technical expertise and development of IMP support documents, preventative mitigation and response documents, and third-party review of company integrity management plans. Also performed evaluation of current data reporting process as it relates to IMP risk management data. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 99 of 102 Recently Completed Projects - Pipeline Integrity Services Projects Client: Tyson Foods Project Description: Project Title: Location: Due Diligence & Evaluation Inactive Line N/A Kansas USA Due diligence evaluation and assessment of inactive line prior to sale transfer. Work involved pre-assessment of existing records, CIS, DCVG survey and confirmation of identified anomalies, which resulted in a hydrotest of 10 miles of 8" pipeline. Client: Project Description: Project Title: Location: Laclede Gas Company External Corrosion Direct Assessment N/A Missouri USA Performed external corrosion direct assessment (ECDA) for Laclede Gas Company, which is a natural gas utility. Client: Project Description: Project Title: Location: Ameren Services Company Integrity Assessment Including External Corrosion Direct Assessment N/A Illinois USA Performed integrity assessment of 2 pipelines. This assessment included ECDA surveys, excavation for direct examination, and recommendations on the findings. Client: Enbridge Project Description: Project Title: Location: ACVG Coating Defect Survey N/A Illinois, USA An ACVG survey was conducted by EN Engineering on the 45 mile Streator – Manhattan Line to determine the location and severity of coating defects. This work was completed to assess the “as-installed” condition of the pipeline coating. ENE performed data analysis, integration, and prioritization of identified coating defects. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 100 of 102 Recently Completed Projects - Pipeline Integrity Services Projects Client: Project Description: Project Title: Location: Florida Gas Transmission QC Manual N/A Florida USA EN Engineering reviewed the Client’s existing manuals for compliance to the Alternative MAOP Section 192.112 of CFR Part 192 -Transportation of Natural and Other Gas by Pipeline: Minimum Federal Safety Standards along with other requirements requested by PHMSA. As part of the project, a Gap Analysis report highlighting areas of non-compliance with current requirements was prepared. Based upon the review, a recommendation for revisions to the construction manuals in order to achieve compliance was included. Client: Project Description: Project Title: Location: Nicor Gas Corrosion Control, Cathodic Protection & Integrity Management N/A Illinois USA Multi-year contract providing corrosion control, cathodic protection and integrity management services since 2001. Primary responsibilities are corrosion services and system integrity programming for NICOR’s transmission and underground storage system facilities. Other responsibilities include ECDA and ICDA work; providing integrity management regulatory support; and cathodic protection design, troubleshooting, and construction coordination and oversight on distribution system facilities. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 101 of 102 Recently Completed Projects - Automation Projects (Electrical Utility & Power) Client: Project Description: Project Title: Location: AT&T High Density Utility Relocation Wacker Drive Relocation Phase II Chicago, Illinois USA Provided detail analysis and design for Wacker Road improvement. Project required reviewing conflicts, negotiating with developers, municipalities and State DOT’s to avoid relocation of facilities and designing relocations as necessary. Responsible for preparation of design plans, cost estimates, material lists and permit applications. Client: Project Description: Project Title: Location: Kentucky Data Link (Windstream) / AT&T Design Fiber Optic Underground Install Route #59 Project West Chicago, Illinois USA This project involved designing fiber optic installation for approximately a 1,700’ total length design along IL Route 59 from Main Street to Washington Street in West Chicago, Illinois. This project connected the McLeodUSA handhole splice at IL Route 59, south of Main Street, to the AT&T manhole at the intersection of Route 59 and Washington Street in West Chicago, Illinois. Client: Project Description: Project Title: Location: Kentucky Data Link (Windstream) Design Fiber Optic Underground Install & Permit Skokie School District #69 Project Skokie, Illinois USA Provided detail design of a fiber optic installation for Illinois School District #69. This project connected Madison Elementary School to Edison Elementary School in Skokie, Illinois. Developed a detailed construction drawing package and initiated the process for permitting from the city. This project involved designing a fiber optic installation for approximately a 1 mile length run. This included approximately 2,000 feet underground fiber optic cable installation and 2,750 feet of aerial cable. Client: Project Description: Project Title: Location: Kentucky Data Link (Windstream) Design Fiber Optic Underground Install & Permit Washington Street Project Naperville, Illinois USA Provide detail design of a fiber optic installation for 2 mile underground cable installation in the vicinity of 75th Street and Washington St. in Naperville, Illinois. This project included providing engineering services as well as permitting assistance field surveying and construction support. Note: Inclusion in this list does not imply any endorsement of EN Engineering. Companies wishing to be removed from this publication may contact EN Engineering at: [email protected] DEC 2012 Page 102 of 102