HERS Verification Procedures
HERS Verification Procedures
CMFNH 2010-12 Program
September 19, 2012
2
HERS Providers
The structure of the HERS industry in California
CEC
California Energy
Commission
CalCERTS
HERS and HERS II
provider
Raters
New and Retrofit
CBPCA
HERS and HERS II
provider
Raters
Retrofit
HERS Certification Requirements
 Buildings that are 3 stories or less can have a
HERS rater that is certified for Residential only
 When buildings are 4 habitable stories or more
the HERS rater must also be certified for
Non-Res
What HMG Will Provide to HERS Rater
 Site superintendent’s name and phone
number
 Energy Measure Summary sheet so you
know what Energy Measures are required
per Title 24
Energy Measures Summary
Energy Measures Requirements for CMFNH Program
Project:
Builder:
Date:
Name
Address
Climate Zone - ??
Name
Contact
Phone #
??
Building Type
Square Footage
Number of Dwelling Units
Number of Stories
Building Orientation
Insulation - Minimum Values
Attic insulation
Attic insulation at Furnace
Radiant Barrier
Cool Roof
Exterior Wall Continuous Insulation
Exterior Wall Cavity (2x4)
Exterior Wall Cavity (2x6)
Knee Wall
Garage Wall (2x4)
Garage Wall (2x6)
Floor Over Garage/Exterior/Crawlspace
Raised Slab Floor Insulation
Air Retarding Wrap
3 Plex All Elev.
4,306
3
3
Cardinal
6 Plex All Elev.
8584
6
4
Cardinal
R-30
----R-13
----R-19
---
R-30
----R-13
----R-19
---
Energy Measures Summary
Glass - Double Pane Non-Metal LowE2 - Typical All Plans
Anderson/Milgard
U-Value
U-Value
Vinyl Low-E 2
Vinyl Low-E 2
Operable
0.38
0.38
Fixed
0.38
0.38
Sliding Glass Door
0.38
0.38
French Door
0.38
0.38
Glass - Double Pane Non-Metal LowE2 - Typical All Plans
Anderson/Milgard
SHGC
SHGC
Vinyl Low-E 2
Vinyl Low-E 2
Operable
0.42
0.42
Fixed
0.42
0.42
Sliding Glass Door
0.42
0.42
French Door
0.42
0.42
0.92
0.92
HSPF / COP (Heat Pump)
--
--
Hydronic Heating
--
--
SEER (AC Unit)
13.0
13.0
HVAC - Minimum Efficiency
AFUE (Furnace)
EER (AC Unit)
--
--
Duct Insulation
R-4.2
R-4.2
Duct Location
attic
attic
--
--
Water Heating Energy Factor or RE
--
--
Quantity
--
--
Tank Capacity in Gallons
--
--
Storage Tank Insulation
--
--
Hot Water Pump (Qty 1)
--
--
Premium Efficiency
--
--
Ventilation for Highrise
Space Heating Boilers/Water Heater
Energy Measures Summary
CMFNH HERS Verification Requirements
 Every individual plan
 A total of 15% of building (sampling OK)
 Title 24 Energy Efficiency Measures Verified
Title 24 Energy Measures Requiring Verification






Windows and glass doors: verify NFRC sticker
Insulation pre-sheet rock: verify R-value of wall and attic insulation
HVAC equipment efficiencies: verify model numbers and efficiency
Water heating efficiencies: verify model numbers and efficiency
Pumps and miscellaneous efficiencies
Storage tanks: verify that there is insulation and the water storage
capacity
 Garage ceiling insulation: podium floor
Note: these verification protocols are in addition to any HERS
measures called out on your Title 24 documentation for compliance
purposes.
HERS Verification Procedure
 Schedule site visits with site superintendent
 Always check in at project site office and talk to site
manager before you do any verifications
 Verify insulation and glazing first
 Verify mechanical (HVAC) model numbers & efficiencies
 Verify boilers, pumps and storage tank insulation &
capacity
 Look at garage insulation if any
Insulation Efficiency Pre-sheet Rock
Insulation Efficiency Pre-sheet Rock
Windows & Glass Doors
Windows & Glass Doors
Windows & Glass Doors
HVAC Equipment Efficiencies
HVAC Ducting R-Value
Water Heating Efficiencies
Water Heating Efficiencies
Pumps and Miscellaneous Efficiencies
Pumps and Miscellaneous Efficiencies
Storage Tanks
Garage Ceiling Insulation
Labeling Pictures
 Get a set of floor plans from builder to write down picture
numbers and information gathered
 Name each picture so you can identify where picture was
taken from your set of floor plans
 Example: Plan1A_Unit 200_R-19 Wall
 Enter all information from each site visit into a project HERS
folder
Example Plan Mark-Ups
Example Plan Mark-Ups
When Installed Measures Differ from Expected
 If installed measures differ from Energy Measure Summary
 Mark up sheet with the differences and e-mail to HMG
 HMG will work with the Energy Consultant to revise the Title 24 with
as built information
 HMG will load into registry the as built CF-1R to CMFNH multi-plan
before HERS rater completes project
HMG Verification
 To ensure QC of inspection process
 Spot check of some buildings, sometimes with the
rater
 In addition to the QC activities of the HERS
Provider
 QC is primarily the HERS Providers’ responsibility
CalCERTS
 We are now going to talk about converting EnergyPro
models from high-rise residential to multi-family low-rise
 Show everyone what reports are needed while loading a
project, and how to fill out those reports
Additional Energy Features
Click Here
Additional Energy Features
Result
Where to load PERF-1C and
Percentage
Percentage Here
Where to load PERF-1C and
Percentage
PERF-1C Here
Load Building
Change to Yes
Load Building
Load Building Information
Add Bldg Name
Add Permit Number
Change to Tier 1
Load Building Information
Load Building Information
Load Building Information
Load Building Information
Load Building Information