HERS Verification Procedures
Transcription
HERS Verification Procedures
HERS Verification Procedures CMFNH 2010-12 Program September 19, 2012 2 HERS Providers The structure of the HERS industry in California CEC California Energy Commission CalCERTS HERS and HERS II provider Raters New and Retrofit CBPCA HERS and HERS II provider Raters Retrofit HERS Certification Requirements Buildings that are 3 stories or less can have a HERS rater that is certified for Residential only When buildings are 4 habitable stories or more the HERS rater must also be certified for Non-Res What HMG Will Provide to HERS Rater Site superintendent’s name and phone number Energy Measure Summary sheet so you know what Energy Measures are required per Title 24 Energy Measures Summary Energy Measures Requirements for CMFNH Program Project: Builder: Date: Name Address Climate Zone - ?? Name Contact Phone # ?? Building Type Square Footage Number of Dwelling Units Number of Stories Building Orientation Insulation - Minimum Values Attic insulation Attic insulation at Furnace Radiant Barrier Cool Roof Exterior Wall Continuous Insulation Exterior Wall Cavity (2x4) Exterior Wall Cavity (2x6) Knee Wall Garage Wall (2x4) Garage Wall (2x6) Floor Over Garage/Exterior/Crawlspace Raised Slab Floor Insulation Air Retarding Wrap 3 Plex All Elev. 4,306 3 3 Cardinal 6 Plex All Elev. 8584 6 4 Cardinal R-30 ----R-13 ----R-19 --- R-30 ----R-13 ----R-19 --- Energy Measures Summary Glass - Double Pane Non-Metal LowE2 - Typical All Plans Anderson/Milgard U-Value U-Value Vinyl Low-E 2 Vinyl Low-E 2 Operable 0.38 0.38 Fixed 0.38 0.38 Sliding Glass Door 0.38 0.38 French Door 0.38 0.38 Glass - Double Pane Non-Metal LowE2 - Typical All Plans Anderson/Milgard SHGC SHGC Vinyl Low-E 2 Vinyl Low-E 2 Operable 0.42 0.42 Fixed 0.42 0.42 Sliding Glass Door 0.42 0.42 French Door 0.42 0.42 0.92 0.92 HSPF / COP (Heat Pump) -- -- Hydronic Heating -- -- SEER (AC Unit) 13.0 13.0 HVAC - Minimum Efficiency AFUE (Furnace) EER (AC Unit) -- -- Duct Insulation R-4.2 R-4.2 Duct Location attic attic -- -- Water Heating Energy Factor or RE -- -- Quantity -- -- Tank Capacity in Gallons -- -- Storage Tank Insulation -- -- Hot Water Pump (Qty 1) -- -- Premium Efficiency -- -- Ventilation for Highrise Space Heating Boilers/Water Heater Energy Measures Summary CMFNH HERS Verification Requirements Every individual plan A total of 15% of building (sampling OK) Title 24 Energy Efficiency Measures Verified Title 24 Energy Measures Requiring Verification Windows and glass doors: verify NFRC sticker Insulation pre-sheet rock: verify R-value of wall and attic insulation HVAC equipment efficiencies: verify model numbers and efficiency Water heating efficiencies: verify model numbers and efficiency Pumps and miscellaneous efficiencies Storage tanks: verify that there is insulation and the water storage capacity Garage ceiling insulation: podium floor Note: these verification protocols are in addition to any HERS measures called out on your Title 24 documentation for compliance purposes. HERS Verification Procedure Schedule site visits with site superintendent Always check in at project site office and talk to site manager before you do any verifications Verify insulation and glazing first Verify mechanical (HVAC) model numbers & efficiencies Verify boilers, pumps and storage tank insulation & capacity Look at garage insulation if any Insulation Efficiency Pre-sheet Rock Insulation Efficiency Pre-sheet Rock Windows & Glass Doors Windows & Glass Doors Windows & Glass Doors HVAC Equipment Efficiencies HVAC Ducting R-Value Water Heating Efficiencies Water Heating Efficiencies Pumps and Miscellaneous Efficiencies Pumps and Miscellaneous Efficiencies Storage Tanks Garage Ceiling Insulation Labeling Pictures Get a set of floor plans from builder to write down picture numbers and information gathered Name each picture so you can identify where picture was taken from your set of floor plans Example: Plan1A_Unit 200_R-19 Wall Enter all information from each site visit into a project HERS folder Example Plan Mark-Ups Example Plan Mark-Ups When Installed Measures Differ from Expected If installed measures differ from Energy Measure Summary Mark up sheet with the differences and e-mail to HMG HMG will work with the Energy Consultant to revise the Title 24 with as built information HMG will load into registry the as built CF-1R to CMFNH multi-plan before HERS rater completes project HMG Verification To ensure QC of inspection process Spot check of some buildings, sometimes with the rater In addition to the QC activities of the HERS Provider QC is primarily the HERS Providers’ responsibility CalCERTS We are now going to talk about converting EnergyPro models from high-rise residential to multi-family low-rise Show everyone what reports are needed while loading a project, and how to fill out those reports Additional Energy Features Click Here Additional Energy Features Result Where to load PERF-1C and Percentage Percentage Here Where to load PERF-1C and Percentage PERF-1C Here Load Building Change to Yes Load Building Load Building Information Add Bldg Name Add Permit Number Change to Tier 1 Load Building Information Load Building Information Load Building Information Load Building Information Load Building Information Questions? Keith Sage 916-962-7001 ext.41034 [email protected]