modular substations
Transcription
modular substations
Products Vol. 01 modular substations contents The Modular Substations The systems within Design, Engineering and 3D Load Out and Transportation technical data -- ------ - - - - - - - - - --------------------------- - - - - - - - - - - ---- - - - - - - - - -- - - - - - -------------------------------------- - - - - - - - - - 10 14 16 18 20 04 05 01. EDG Emergency Diesel Generators Kashagan Project | Kazakhstan 06 Skema’s Modular Substations can be used for a wide variety of applications including LV/MV/HV packaged substations, local equipment rooms, control rooms, generator power plant rooms, personnel refuges and as general process or utility buildings. They are fully assembled and rigorously tested within Skema facilities before being shipped to site, by land, sea or air, ready for rapid installation and commissioning. 07 02. 02. Local equipment room – Fabrication yard | Ravenna Italy 03. 04. 08 09 03. Modular substations Karachaganak Project | Kazakhstan 04. Process utility buildings Fabrication yard | Atyrau Kazakhstan 05. Modular substation Hannibal Sour Gas Project | Tunisia 05. 06. 06. Local equipment rooms Fabrication yard | Ravenna Italy The Modular Substations 10 One of the most important and distinctive features of Skema’s Modular Substations is the opportunity they afford to create a unique and fully CUSTOMIZABLE solution, in accordance with each client’s individual specifications, the environmental requirements, the environmental conditions and the project-specific transport sport size limitations. Skema’s Modular Substations can be designed with fire ratings as per the client’s requirements, and with the capacity to withstand both seismic and blast events. They are suitable for ambient temperatures of between -40°C and +50°C, resistant to harsh environmental condi- tions and supplied with special paint coating cycles that are appropriate for each specific application. Skema’s Modular Substations are space-efficient, highly reliable and fully integrated, and equipped with the latest state-of-the-art technology for Oil & Gas applications. They are designed to work safely in harsh, potentially explosive and chemically contaminated environments, and are intended for both onshore and offshore Oil & Gas / petrochemical plants. A modular approach is key to creating large-scale structures, taking due account of the transit constraints or any potentially problematic conditions (weight limits, road or railway transport, presence of nearby structures, etc.). Turnkey Solutions During the project, Skema acts as an EPC contractor, managing, co-ordinating and monitoring every aspect of the project: detailed design, project management, scheduling, procurement and expediting, QA/HSE management, documentation, fabrication, all multidisciplinary installation activities (architectural, mechanical, E&I, HVAC, etc.), and testing and pre-commissioning at Skema’s fabrication yards. 07. 08. 11 In addition, Skema can transport the equipment onto seagoing vessels, and can also provide transportation to site and full installation and commissioning, as well as operational support and maintenance for the life cycle of the installation. 09. 07. HVAC and monitoring room Kashagan Project | Kazakhstan 08. Modular substations Kashagan Project | Kazakhstan 09. Modular substation Hannibal Sour Gas Project | Tunisia 10. Switchroom Kashagan Project | Kazakhstan 10. 11. 12. 12 13 11. Modular substation Kashagan Project | Kazakhstan 12. Modular substation Karachaganak Project | Kazakhstan 13. Fabrication yard Atyrau Kazakhstan 13. 14. 14. Fabrication yard Atyrau Kazakhstan The systems within Skema’s modular substations afford the opportunity to create a complete and fully CUSTOMIZABLE substation allowing for any internal configuration of the switchgear to be installed. Suitability for the specific conditions of service is also assured. 14 In order to support the primary internal equipment (LV/MV/HV switchgear or DCS) the following typical systems are supplied: >> Insulation for energy conservation, using non-combustible materials with type-tested fire resistance (fire-resistant up to 120 minutes) >> Special painting cycles and internal anti-skid floors >> Heating Ventilation and Air Conditioning (HVAC) system engineered to guarantee the ambient operating conditions >> Pressurization system including airfiltering systems for contaminants and toxic or corrosive substances >> Gas, smoke, heat and fire detection system, conventional or addressable, with monitoring panels that can interface with DCS and field control systems >> Transformer bay or equipped rooms >> Coating systems and corrosion protection for rust prevention even in extremely corrosive hot/humid environments subject to the presence of dust, salt and corrosive gasses >> Lighting and small power distribution system >> Equipment rated for hazardous areas as per the AtEx 94/9/EC directive 15. 16. 17. >> Automatic fire-fighting systems: total flooding, clean agent, environmentally friendly >> Emergency Diesel Generators >> Security, IT and Telecoms including PA/GA system to allow personnel to monitor and control normal activities >> Battery and Uninterruptible Power Supply (UPS system) 18. 15. Switchroom Hannibal Sour Gas Project | Tunisia 16. PSA 1 “Complex D” HVAC and monitoring room Kashagan Project | Kazakhstan 17. LSA “Complex D” HVAC and monitoring room Kashagan Project | Kazakhstan 18. LSA IBEEV utility shelter “Complex D” control room and HVAC room Kashagan Project | Kazakhstan 19. LSA IBEEV utility shelter “Complex D” control room and HVAC room Kashagan Project | Kazakhstan 19. 15 Design, engineering and 3D 16 Skema utilizes a comprehensive computer-based design system dedicated to carrying out engineering calculations relating to structures, lifting and loadout. The system makes it possible to conduct three-dimensional analysis of building structures, space optimization, clash avoidance and safety tolerances; to study static and dynamic loads for lifting, transportation, blast and seismic loads; to create innovative designs and building components. A complete 3D model of the building can be created by Skema’s specialists during the engineering phase. The model features all of the systems and auxiliaries, and is used for the following purposes: >> To avoid clashes between everything that is to be installed within the building >> To optimize space and cable routing >> To determine the installation sequence for each system >> To verify the required space for the installation and the removal of major pieces of equipment 20. 21. 17 >> To verify expansion potential (free space for installation of future equipment, or equipment installed by others) 22. 20. Process utility building 21. LV and MV modular substation 22. Clashes investigation 23. Skidded drilling center 23. Load Out and Transportation 18 The know-how it has acquired over many years of accumulated experience, assembling structures of different dimensions and weights, has allowed Skema to develop skills and expertise in relation to various types of lifting, handling and transportation operations. tion and certificates, custom duties or special requirements for each type of transport such as: Skema’s Engineering team is accustomed to dealing with the problems of international shipping, documenta- Skema can deal with SPMT handling, lifting and transport operations under exceptional conditions, >> >> >> >> Road transportation Barge or ship Airfreight Rail transport. as well as barge dressing and setting. Skema can also provide the following additional engineering services for load out and transport: grillage and sea-fastening calculations, ballasting calculations, mooring details, sea transport analysis and load out manuals, offshore lifting calculations, handling temporary equipment, dimensioning and lifting, checking of lugs/spreader bars, general arrangements and details of temporary structures for transport. 24. 26. 24. Lifting operations of local equipment rooms Fabrication yard | Ravenna Italy 25. Air cargo transport of packaged substation Kashagan Project | Kazakhstan 26. Barge transport of local equipment rooms Kashagan Project | Kazakhstan 27. Handling operations of local equipment rooms Fabrication yard | Ravenna Italy 25. 19 27. technical data ENVIRONMENTAL CONDITIONs Operating temperatures - 40°C ÷ + 50°C Relative humidity Up to 95% Climate range Hot desert climate ÷ Cold arctic climate Wind velocity Up to 40 m/s (140 km/h, cyclonic wind) Snow loads Up to 1 meter of snow Seismic loads (PGA) Specific to site, up to 0.18 g Hazardous areas (AtEx) Customizable also for installation in Zone 1 BUILDING CONSTRUCTION 20 Air tightness weatherproofing << 0.25 m3/h/m2 @ 50 Pa On request, continuously welded construction Ambient Overpressure Adjustable up to 150 Pa Insulation U-value < 0.5 W/m2/K Ingress Degree of protection for enclosures Up to IP65 Fire Resistance (offshore) A, H, B constructions with up to 120 minutes’ fire resistance as per IMO SOLAS - Type-tested in compliance with FTP code Structural Fireproofing (offshore) Jetfire J15 Blast-resistance building design Low damage up to 2.5 bar peak overpressure (capability for lab testing of blast barriers) Rust and corrosion protection Zinc-rich painting cycle with 275 μm dry coat Hot dip galvanizing - Tropicalization Winterization Heat tracing - Space heaters Noise and vibration - 35 dB acoustic insertion loss Anti-vibration mountings on rotating or vibrating parts for mitigation at source. IAQ (Indoor Air Quality) Dust and particle filtration customized up to HEPA filtering class Up to G1 air-purity class as per ISA s71.04 SIL class (Safety Integrity Level) Available SIL2 for safety equipment 21 © Skema Milan - Italy www.skemaq.it