saltaire market redevelopment project
Transcription
saltaire market redevelopment project
SALTAIRE MARKET REDEVELOPMENT PROJECT BOARD OF TRUSTEE MEETING 7 -5-14 AT 9:00 AM PRESENTATION OBJECTIVES WHO IS INVOLVED HOW WE GOT HERE & WHERE WE STAND SCHEDULE MOVING FORWARD DESIGN CONSTRAINTS, OBJECTIVES, AND SCHEMATICS PROPOSED vs EXISTING DEVELOPMENT PROJECT COST FINANCING OPTIONS AND POTENTIAL TAX IMPACT QUESTIONS DESIGN TEAM Village Project Management Team Mayor Cox, Trustee Zaccaro, Administrator Posillico Trustee Connolly – Concept Committee Aaron Malinski, Tracey Zabar, Dan Rappaport, Matt Sirovich, Karen Frome Commercial Needs of Village: 1) 2014 and 2) Long Term Interior Design Committee Aaron Malinski, Tracey Zabar Optimum Layout for New Commercial Market Architectural Design Committee Nat Oppenheimer, Bob Mayers, Jeff Murphy, Karen Frome, Nick Petschek, Ken Larson, Jennifer Sage Oversight of Project Design based on Commercial Parameters of Project Professional Consultants Butler Engineering, Land Use Environmental RENOVATE OR REBUILD? DECISION FACTORS Regulatory Compliance State Building Code Flood Protection State/County Health Codes Building Layout: Does it Adequately Meet Village Needs? Cost Cost of Renovation exceeds Cost to Rebuild SALTAIRE MARKET PRE-CONSTRUCTION CRITICAL PATH FOR SUMMER 2015 OPENING PRE-JUNE CONTRACT Terms of Agreement Board Authorization Contract(s) Execution Environmental Testing Contract Closing DESIGN Commence Schematic Design Determine Maximum Capacities Program Uses (Village) Develop Site Plan/Layouts/Elevations Quote MEP Firms Modify Schematic design based on DEC/DOH Public Presentation of Schematic Design Board Approval - Schematic Design Commence Construction Docs (CD) Board Approval of CD & Commence to Bidding PERMITTING SCDOH Intial Application Update Survey Exisitng Sanitary Anaylis Submit Revised Site Plan to DOH Submit DEC/ACE Joint Application DEC/DOH Coordination Verbal Indication DEC/DOH Final Approval from DOH/DEC - No Board of Review Final Approval from DOH/DEC - With Board of Review BIDDING/CONTRACT Advertise/Create Bid Documents Bid Documents Available Bid Opening Board Approval Execute Contract Mobilization Start of Construction JUNE 1 2 3 JULY 4 1 2 3 AUGUST 4 1 2 3 SEPT 4 1 2 3 OCTOBER 4 1 2 3 4 REGULATORY CONSIDERATIONS Environmental – NYS DEC Freshwater Wetlands Tidal Wetlands • Height of Grease Trap and Septic Tank Above Ground Water – Minimum 2 Feet • Sanitary System Proximity to both Tidal and Fresh Water • Rain Water Shedding and Collection Health - SCDOH Pollution Control Abandonment of Existing Septic System Waste Water Sanitary System Design Dimensions of Grease Trap and Septic Tanks set by NYS Regulations Annual Audit Oversight by Federal EPA Drinking Water Minimum Distance from Pubic Drinking Source – 150 Feet Optimum Food Operation NYS Agriculture and Markets REGULATORY CONSIDERATIONS (Con’t) Building Safety and Fire Control NYS Commercial Building Code Fire Separations o From Property Lines o Between Interior Spaces Sprinkler System FEMA Flood Control Standards Minimum Height Requirements Department of Justice ADA Requirements Ramps and Entrances Interior Elevators Required for All Interior Second Floor Spaces PROPOSED SITE PLAN ELEVATION PERSPECTIVE ELEVATION PERSPECTIVE REQUIRED FIRST FLOOR HEIGHT - NEW NEW CONSTRUCTION (REGARDLESS OF SIZE OF BUILDING) Mean Sea Level Above Grade FEMA Elevation 7 Feet Above Sea Level 7.0 MSL 4 AG New York State 1 Foot of Freeboard 8.0 MSL 5 AG 9.6 MSL 6.5 AG DOH & DEC Regs 1.5 Feet Added for Septic Requirements All Sanitary Components - Minimum 2 Foot Above Groundwater Minimum 5 Feet Height on Grease Trap and Septic Tank Per NYS Regulations audited by Federal EPA Height Above Broadway (Proposed Height of 5 MSL) 4.6 Feet Above Broadway COMPARISONS Existing Market First Floor 4.8 MSL 2.0 AG Security/Doctor’s Office – First Floor 6.5 MSl 3.5 AG Village Hall – First Floor 6.0 MSL 3.0 AG Well House - First Floor 8.5 MSL 5.5 AG OVERLAY EXISTING VS PROPOSED EXISTING CONDITIONS SETBACKS Building Deck West Side (Rear) 0 Feet 0 Feet North Side 0 Feet 0 Feet Broadway South Side 17.5 Feet (Roof Overhang) 28 Feet 0 Feet 25 Feet LOT COVERAGE Roofed-Over Area 6,900 S.F. First Floor Height Deck Area 3,600 S.F. Roof Elevation Total Coverage 10,500 S.F. 2.0 Above Grade (AG) 24.4 AG PROPOSED VS EXISTING DEVELOPMENT SETBACKS (Building) Existing Proposed Market Only Proposed Total Project West Side (Rear) 0 Feet 10 Feet 10 Feet North Side 0 Feet 16 Feet 16 Feet Broadway 20 Feet 8 Feet 8 Feet South Side 25 Feet 40 Feet 10 Feet Roofed-Over Area 6,900 S.F. 4,040 S.F 5,794 S.F. Deck/Ramp Area 3,600 S.F. 6,525 S.F. 6,525 S.F. Total Coverage 10,500 S.F. 10,565 S.F. 12,319 S. F. GROSS SALES AREA 2,550 S.F. 2,900 S. F. LOT COVERAGE MARKET SALES AREA OPTIMUM MARKET LAYOUT COST OF CONSTRUCTION BUILDING PARAMETERS AND COST DRIVERS ADA Requires Elevators in All Second Floor Spaces that are Built with Public Funds Fire Code Requires Fire Separations and a System Sanitary System to Meet State & County Health Requirements – No Fire Island Alternative Prevailing Wage Applies to All Aspects of Construction Wicks Law Applies to the Project - Must be Bid out in 4 Separate Contracts General Contracting Mechanical Electrical Plumbing COST OF CONSTRUCTION (Cont’d) BUDGET ESTIMATE RANGE - $400 - $700 per Square Foot (Subject to Final Design)* Current Estimate - $550 per Square Foot for Entire Project Inclusive of Design/Engineering & Regulatory Compliance Demolition Site Development Building Cost Mechanical and Equipment *MODULAR CONSTRUCTION COULD REDUCE COST AND SCHEDULE COST OF CONSTRUCTION (Cont’d) Market Building – Phase 1 Land Acquisition $ 850,000 6,390 Square Feet x $600/s.f. = $3,835,000 TOTAL Phase 1 $4,685,000 Municipal Building – Phase 2 3,000 Square Feet x $425/s.f. = $1,275,000 Total Project Cost: $5,960,000 FINANCING OPTIONS Long Term Bonds Asset Financing – Land Sale One Time or Multiple Year Assessment LONG TERM BONDS TERM: 20 YEARS PROJECTED INTEREST RATE: 3.5% Village Recently Upgraded to AAA by S&P (May Help with Improved Rate) ANNUAL DEBT SERVICE FOR EACH $1,000,000 OF BOND: $75,000 For Market Phase 1 – Annual Debt Service: $325,000 For Total Project - Annual Debt Service: $420,000 ANNUAL DEBT SERVICE PROJECTIONS $1,200,000 $1,000,000 $800,000 $600,000 $400,000 $200,000 $13-14 14-15 15-16 16-17 17-18 18-19 2005 Dock 19-20 2008 Beach 20-21 Market FEMA 21-22 22-23 23-24 24-25 25-26 PROJECT IMPACT ON AVERAGE TAX PAYER Phase 1 Full Project Market Debt Service $325,000 $420,000 Projected Concession Fee $100,000 $100,000 Net Increase to Debt Service $225,000 $320,000 Total Village Assessment 39,000,000 $39,000,000 Project Cost per $1,000 of Assessment $5.76 $8.20 Average Home Assessment $85,000 $85,000 Average Increase Tax Bill Cost per Home $490 $697 After 2008 Beach Bond Off the Books (2019) ($109) $98 POTENTIAL DEBT SERVICE MITIGATION Land Sale Each $1,000,000 of Land Sale will: Reduce Village Debt Service by $75,000 Per Annum for 20 Years Reduce Average Household Tax Impact by $165 Per Annum for 20 Year Example of a $1M Land Sale Phase 1 Full Project Average Increase Tax Bill Cost per Home $490 $697 After $1M Land Sale $325 $532 After 2008 Beach Bond Off the Books (2019) ($274) ($67) NEXT STEPS Board Approval of Schematic Design – July 5 Produce Construction Documents – August DEC & DOH Official Approval, Go Out To Bid – August 5 Public Bid Opening – August 30 Award Contract – September 5 Start Construction – October 1