pt krakatau steel - Energy Conservation Center
Transcription
pt krakatau steel - Energy Conservation Center
Seminar on Promotion of Energy Efficiency and Conservation (PROMEEC) for Major Industry in Southeast Asia Energy Efficiency and Conservation Best Practices at PT. Krakatau Steel-Indonesia PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id Contents • Company Background • Energy Profile •Energy Issues •Energy Management & Conservation •R & D and Future Planning •Government Programs on EE&C •Conclusions PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id PT. Krakatau Steel State Owned Company (Established: August 31,1970 ) The first integrated steel plant in Southeast Asia Responsible for fulfill the steel demand domestic and abroad As a backbone of industrial development in the country Meet the national and international quality standard such as JIS, ASTM, DIN, ISO9001:2000, ISO 14001, ISO 17025 Production capacity : 2.000.000 MT per year Supported by more than 6000 employees Located in Banten Province, on the westernmost of the Java Island PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id Production Process at PT Krakatau Steel Pellet: Iron ore Slab Steel Plant Hot Rolling Mill (2,000,000 t/y) (2,200,000 t/y) Direct Reduction Plant Billet Steel Plant PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id Wire Rod Mill (600,000 t/y) Cold Rolling Mill (850,000 t/y) DIRECT REDUCTION PLANT IRON ORE CO2 FUEL H2O REACTOR O2 STEAM NATURAL GAS H2O REFORMER WATER GAS HEATER H2O FUEL PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id DRI NATURAL GAS SLAB STEEL PLANT SCRAP DRI ELECTRIC ARC FURNACE SLAB LADLE FURNACE CONTINUOUS CASTING MACHINE HBI PIG IRON RH-VACUM DEGASSING PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id HOT STRIP MILL SLAB REHEATING FURNACE SIZING PRESS HOT ROLLED COIL SHEARING LINE SLITTING/RECOILING LINE SHEET AND PLATE SLITTED AND RECOILED PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id ROUGHING MILL DOWN COILER FINISHING MILL LAMINAR COOLING SKIN PASS MILL RECOILED HOT ROLLED COIL COLD ROLLING MILL BATCH ANEALING FURNACE HOT ROLLED COIL CONTINUOUS PICKLING LINE TANDEM COLD MILL ELECTROLYTiC CLEANING LINE CONTINUOUS ANEALING LINE TEMPER MILL COLD ROLLED COIL COLD ROLLED COIL SLITTING/RECOILING LINE SHEARING LINE PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id SLITTED/RECOILED SHEET PT. K S - Products PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id Product Applications PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id Energy Cost Segmentation at PT. KS 10% 30% 60% Electricity PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id Natural Gas Oil Fuel Energy Cost Structure (Crude Steel) at PT. KS Fix Cost, 12% Others, 12% Energy, 22% Raw Material, 54% PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id Electricity Consumption Segment at PT. KS 18% 6% 76% Iron making Steel Making Rolling Mill Natural Gas Consumption Segment at PT. KS 15% 6% 79% Iron Making PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id Steel Making Rolling Mill Distribusi Daya Listrik PT. KS K D L P L N 87 % 400 MVA Steel Making 95 % PT KS 13 % Others 200 MVA 5% PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id Subsidiary Company Energy Conservation Group Organization President Director Director Director of Planning & Technology Director Director G M Research & Technology Mgr Research & Development of Process & Energy Conservation Mgr Technology Planning. Mgr Research & Development Services Chief Engineer Senior Eng. Energy Conservation Senior Eng. Process Senior Eng. Raw Mat’l & Waste Engineer Energy Conservation Engineer Process Engineer Raw Mat’l & Waste Technicians PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id Technicians Technicians Mgr Product Development Energy Issues: High Energy Price (especially oil fuel) Energy Supply Limitation (Natural Gas) Energy inefficiency Environmental Issue PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id Energy Saving Potential at PT. KS Plants Unit Potential Projects Fuel oil substitution Rolling Slab hot charging (1,5x1011 Kcal/y) Mills Waste Heat Recovery DR Boiler fuel substitution Scrap pre-heating Oxygen lancing (9x107 Kwh/y) Dedusting Optimation EAF 5&6 (1,5x107 Kwh/y) EAF Power Plant Fuel oil substitution Waste heat Recovery PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id Countermeasures Energy efficiency and conservation programs Energy diversification / substitution Sufficient NG supply security Plant improvement and modification Cleaner production program PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id Energy Conservation Activities at PT KS 1. Examples of Options Successfully Implemented Burner Control System in Ladle Drying and Preheating Steam Traps & Leaks Survey, Repair and Replacement Neuro Furnace Controller implementation Partial Oxidation 2. Examples of Options Potentially Implemented Electricity Saving by Power Reduction of Recirculating Pumps Generate Power from Excess High Pressure Natural Gas through Turbine Expansion & Electrical Generator. Recovering Waste Heat through Billet & Slab Transportation System Modification (Hot Charging) 3. Examples of Options Others Succesfully & Potentially Implemented Implementation Network ECC Fuel Oil Substitution PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id Burners Control System for Ladle Drying and Preheating Process in Slab Steel Plant Otomation in LADLE & TUNDISH HEATING SYSTEM Save Natural Gas : 9 Nm3/Ton (56%) EAF 09 ò ø EAF 10 Signal Power On Time Before: 16 Nm3/Ton After : 7 Nm3/Ton òSignal Power On Time ø 2 heat treatment periods of the Ladle & Tundish : 1. Preheating 2. Drying Result: Natural Gas MMI + Monitoring PLC LD 01 LD 02 EAF: Electrical Arc Furnace TDH 01 LP 01 LD : Ladle Drying LP 02 TDH 02 LP : Ladle Preheating TDH : Tundish Heating PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id Shorter heating time, reduce fuel consumption significantly from 1244 NM3 / heat to 499 NM3/heat. Slabs Hot Charging Basic Concept Cold Charging ± 30 oC RHF Hot Charging Potential Saving: 1.5 x 1011 Kcal/year PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id ± 530 oC RHF Recovering Waste Heat through Billet Transportation System Modification BILLET STRAND CASTER 350 cm CUTTER T = 900 °C Billets 150 cm Mechanical Transport System 1 st COOLINGBED T = 450 °C CUTTER t = 1 Hour COOLING BED PIPE 25 cm 8 cm V = 6 m/s, RH = 65% 2nd COOLINGBED CUTTER T = 130 °C AIR: T = 39 °C Insulation Refractory Goal : to minimize heat loss during transferring time from BSP to WRM by performing modification / optimation on Billet Transportation System PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id DRPLANT COKEOVEN PANT CDQP ANT EAF (SSP1&2) KDL EAF (BSP) PLN (PowerPlant) KDL HEADCOMPUETER (gasstation Design of Energy Control Centre Network PRODUCTION-LAN ECC CONFIGURATION STEELPLANT SINTERING PLANT (fuelgasholder) ENERGYCONTROLCENTER BLAST FURNACE incl.PCI (ECCforthenetworkof water, steam, fuelgases,technicalgases, electricity,compressedair, observingtheenergy–contract) MixGas Station Optimizing APPLICATION Controlling Analyzing Reporting Aplication-BUS Energy Cont rol –and I nf ormat I on Syst em WAN–Connectionto remoteSystem HUB2 BOF PLANT Substitute fuelgasses station Server1 Archive CONTROL HSM Monitor6 Monitoring Controlling Monitoring Controlling Compressed Air CRM Monitor2 Monitor1 Monitoring Controlling DataTrans Emergency Gateway Redundant Control SystemBusses HUB2 Technical Gasses (O2,Ar,N2) WRM WATER TREATMENT STEAM BLOCKS MeteringGas Station Pgi& PERTAMINA AirLiquid HUB1 Gateway1 DATA ACQUISITION Gateway2 DataTransmission DataTransmission PLC-BUS ECC COMUNICATION SYSTEM PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id concentrator concentrator concentrator concentrator concentrator PLC 1 PLC 2 PLC 3 PLC 4 ToPLcin productionplant ToPLcin productionplant ToPLcin productionplant ToPLcin productionplant PLC 5 Neuro Furnace Controller (Reduce Electricity Consumption at the Steel Making Plant) Before : 669 Kwh/TLS After : 634 Kwh/TLS Save : 35 Kwh/TLS ( 5 %) PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id HyL-3 Partial Oxidation Process (Save Natural Gas) 48,000 Ton/h water N.G. Iron Ore cooler CO2 T1 = Before Inject O2 T2 = After Inject O2 H2O absorber Cap.: 1,5x106 T/y 20,000 Nm3/h CO H2 OXYGEN FLOW : fuel Rate : 800 NCMH, Press. = 14 Bars Before: 360 Nm3/Ton After : 340 Nm3/Ton Save : 20 Nm3/Ton (5,5%) PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id O2 Nat. Gas Injection Process Gas Temperature Before Inject O2 (T1): 933 C DRI After Inject O2 (T2) : 980 C Total Energy Saving Natural Gas (saving from: Partial Oxidation, Steam leaks reparation and Ladle & Tundish Heating Automation): = 60 x 106 Nm3 /y = US$ 5,610,326 / y Electricity (saving from: Neuro Furnace Controller and others): = 80 x 106 Kwh /y = US$ 3,804,347 / y Total Saving PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id = US$ 9,414,674 / y PARTNERSHIP PROGRAM ON EE&C FOR INDUSTRY AND COMMERCIAL BUILDING Partnership program is the government program on energy conservation focused on energy efficiency improvement for energy intensive industries and commercial buildings Government support e.g. Energy Audit (Free of Charge); Training; Technical Assistance and Seminar/ Workshop Parties involved in the program which started in 2003 are Government, State-owned Electricity Company, Financial Agency, Industry and Commercial Building PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id PARTNERSHIP PROGRAM ON EE&C FOR INDUSTRY AND COMMERCIAL BUILDING In 3 years committed industries and buildings report to government every 6 (six) month about the progress implementation of the energy audit recommendation. In this year, there are 32 industries and building participate in partnership program Energy Audit in industries and buildings will be expanded to almost 250 objects (industries and buildings) next year under government budget. PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id ENERGY AUDIT RESULT - INDUSTRY INDUSTRY ENERGY SAVING POTENTIAL (%) US$/Year Ispatindo, Ispatindo, East Java 6.76 2,080,441 Roda Mas Baja Inti, Inti, South Sulawesi 10.75 11,280 20.6 9,745 2.6 272,554 IRON AND STEEL Barawaja, Barawaja, South Sulawesi TEXTILE Roda Vivatex – West Java Bhineka Karya Manunggal 1 - West Java 15.74 64,385 Bhineka Karya Manunggal 2 - West Java 3.99 493,250 Vastex Prima - West Java 7.58 69,200 Indah Jaya Textile – Banten 13.74 77,921 FLOUR MILLS Berdikari Sari Utama, Utama, West Java PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id 22.2 195,179 ENERGY AUDIT RESULT - BUILDING BUILDING ENERGY SAVING POTENTIAL (%) US$/Year COMMERCIAL BUILDING ¾ Graha Pangeran, Pangeran, East Java 9.83 18,386 ¾ Sarana Jaya, Jakarta 10.10 43,400 ¾ Dharma Niaga, Niaga, Jakarta 10.86 14,109 ¾ Bimantara, Bimantara, Jakarta 11.09 49,225 ¾ Plaza Permata, Permata, Jakarta 15.08 33,386 ¾ Ina Bali Beach Hotel, Bali 10.74 113,692 ¾ Fantasi Mall, East Kalimantan 19 30,967 GOVERNMENT OFFICE ¾ Bank of Indonesia, South Sumatera 1.92 34,875 ¾ R&D Oil and Gas, Jakarta 0.7 848 ¾ Training Center MEMR, Jakarta 9.71 5,041 ¾ DGEEU, Jakarta PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id 24 13,120 OVERSEAS COOPERATION ON EE&C I. GREENHOUSE GAS EMISSION REDUCTION from INDUSTRIES in ASIA and PACIFIC (GERIAP) – UNEP Enhancing energy efficiency improvement for mitigating GHG emission Energy Audit for intensive energy industry : - Cement - Fertilizer II. - Pulp & Paper - Iron & Steel PROMOTION on ENERGY EFFICIENCY and CONSERVATION (PROMEEC), ASEAN – ECCJ/METI JAPAN Promoting energy saving implementation for industry and building in ASEAN region Energy Audit/Energy Management, Database, Benchmarking for industry and building : - Industry (2005) - Commercial building (2004) PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id : Pulp & Paper Mills, Spinning : Hotel - 2 (two) five star class Conclusion • The energy conservation efforts have reduced energy consumption rate and production cost and at the same time contribute to create better environmental condition. • Supported by the management and all employee, these efforts have been implemented succesfully and continuously. PT KRAKATAU STEEL Cilegon-Indonesia www.ks.co.id
Similar documents
HE EAT - HeatTreatMart
NoNo--Man Modular Vacuum Furnace line, with LPC, LPN & HPQ, upto 3T No V Vaccum m Dual D l-Chamber DualCh mb Integral Int l Gas G s Quench Q n h (20 bar) b )C Carburizing b i in lin line Automatic ...
More information