sh 289 (preston road) project
Transcription
sh 289 (preston road) project
SH 289 (PRESTON ROAD) PROJECT (Loop 12 to Elderwood Dr.) PROJEC T FACT SHEET T E X A S D E PA R T M E N T O F T R A N S P O R TAT I O N NEED AND PURPOSE: Brookhaven Country Club Northwood Club Valley View Ln. 635 Milling in the northbound direction is complete and operations to repair underlying concrete will commence, weather permitting, the week of Nov. 23 with asphalt overlay finishing Dec. 20, 2015 Southbound milling is scheduled to start April 2016 with repair of underlying concrete in May of 2016. Southbound overlay is scheduled to be complete in June of 2016 75 Restland Memorial Park 635 289 Forest Ln. 635 Elderwood Dr. Royal Ln. 75 Harry Moss Park Walnut Hill Ln. 12 Dallas Love Field Airport University Park 183 DNT White Rock Lake Highland Park 78 75 ra n d 77 Trinity River Greenbelt Park 366 35E Singleton Blvd. 67 30 352 30 352 175 67 W Davis St. N 2 miles Tenison Park Golf Course Fair Park DALLAS 30 30 t H w y. 75 289 35E es e. 77 Nor th w 12 Av 354 356 PROPOSED SCHEDULE: 289 EG PROJECT DESCRIPTION: The project will repair and resurface SH 289 from Loop 12 to Elderwood Drive by milling, repairing the underlying concrete and surfacing with asphalt concrete pavement and new pavement markings Addison DNT ay Estimated Completion: Northbound in December of 2015. Southbound will commence in April 2016 with completion in June of 2016 Richardson Addison Airport Dallas North Tollw PROJECT DETAILS: CSJ: 0091-06-058 Highway: SH 289 Limits: Loop 12 to Elderwood Drive Length: 2.3 miles Cost: $2.3 million Contractor: Silver Creek Construction, Inc. Work Began: August 17, 2015 75 289 Project Limits The project is needed to repair and resurface SH 289 from Loop 12 to Elderwood Drive in order to improve safety and ride quality. 35E NOTE: Highlighted area is not drawn to scale. 45 310 175 William Blair Jr. Park TxDOT graphic Texas Department of Transportation 4777 East Highway 80 Mesquite, Texas 75150-6643 SH 289 (PRESTON ROAD) PROJECT • LOOP 12 TO ELDERWOOD DRIVE • PROJECT FACT SHEET Michelle Releford Public Information Officer (214) 320-4485 [email protected] FALL • 2015 0547_111015 PROJECT CONTACTS