Presentacion para la reunion de lanzamiento del proyecto
Transcription
Presentacion para la reunion de lanzamiento del proyecto
EUROGIA2020 – SPAIN Info Day ACCIONA ENERGIA’s involvement in EUROGIA & Some examples of development through collaborative projects Eugenio Guelbenzu [email protected] Madrid 18-February-2015 1 © ACCIONA – Proprietary and confidential information 1 Why EUROGIA2020 and Reasons 2 © ACCIONA – Proprietary and confidential information ACCIONA’s Hystory in EUROGIA2020 ACCIONA ENERGIA is a BOARD member of the EUROGIA Cluster since 2008, appointed as the National Representative in the Cluster, and being the chairman of the cluster from May 2011 to March 2013. The EUROGIA Cluster is considered as the most appropriate way to promote and develop core technology projects (R&D) with need to crystallize in short term and with high impact in the business areas, as we are well covered by the White Book (Low Carbon Conventional Fossil Fuels technologies and Renewable Energy). Participation ACCIONA ENERGIA is as follows: 9 Projects presented to PO (WIFI, ADVOCAT (Cantabria presence), ILIS, CSPIMP, FLOATMET, W2POWER, WINDMELT, EasyToConnect, V4WT) with 4 projects lead by ACCIONA 5 Projects Labelled and 4 approved for FPP 50% of Projects with other Board Members. Total ACCIONA budget of labelled projects 4M€ Various Themes: Wind On/Offshore, PV, Materials and Composites, … 3 © ACCIONA – Proprietary and confidential information Why EUROGIA2020 and Reasons : • Easy preparation of documentation and access for questions and help to the Secretariat. • Easy and understandable process for evaluation that gives the choice to explain FtF • Industry Driven and so we feel comfortable. • Short Time from IDEA (PO) to Start of Funded Project (Label FPP and funding). • Easy Contract, Consortium Agreement, and IPR Discussions (Short number of partners). • Easy to Manage, due to low number of partners. • You work only with the one you want with and not with a group due to balancing and photo. • Follow up and access to partnerships and knowledge. Strong support from CDTI and other authorities (EC,..) to EUROGIA 2020 4 © ACCIONA – Proprietary and confidential information Submission process Always a 2 stage process: 1. PO – Project Outline Complete and submit a Project Outline. The project coordinator is invited to present it through an oral presentation in front of the Technical Committee. 2. FPP – Full Project Proposal Applicants will be invited to fill in and submit a Full Project Proposal. Following the evaluation, the Technical Committee will give its recommendations to the eurogia+ Board, who in turn will decide to label the project. With this label, project participants can apply for funding in their respective countries. PROJECT RUNNING & FUNDED NATIONAL FUNDING 5 © ACCIONA – Proprietary and confidential information Submission process Always a 2 stage process: Good Idea / Project / Eureka Criteria* 1. PO – Project Outline 2. FPP – Full Project Proposal Project Outline, ¿? Evaluation and Assessment TECHNICAL COMMITTEE MEETING: • Comprise of Research and Academia Members & Industry + PAs (Observers) • Face to Face* Meeting divided in 3 sections: 1. Project Details presentation (Project description, Budget,…) 2. Questions and Answers (Questions from TC Members + PAs) 3. TC members Consensus and Assessment (Filling the Evaluation and Propose Action: Go for FPP With/Without Recommendations; New PO; Rejected). Also Recommendations are made during the FtF Presentation and Mentors could be assign to help the development and structuring of the project FPP and Project overview. 6 © ACCIONA – Proprietary and confidential information Submission process Always a 2 stage process: 1. PO – Project Outline 2. FPP – Full Project Proposal Good Idea / Project / Eureka Criteria* Project Outline - Approved FPP TECHNICAL COMMITTEE MEETING: • Comprise of Research and Academia Members & Industry + PAs (Observers) • Revision of FPP and Recommendations (if made) and fulfillment of all criteria • TC members Consensus and Assessment (Filling the Evaluation) • Propose Recommendation to Board: Label Project, Conditional Label, Reject / New FPP. 7 © ACCIONA – Proprietary and confidential information Submission process Good Idea / Project / Eureka Criteria* Always a 2 stage process: 1. PO – Project Outline Project Outline - Approved 2. FPP – Full Project Proposal FPP BOARD MEETING: • Looks to the TC evaluation and recommendations • Take final decision on: Label Project, Conditional Label, Reject / New FPP. • Assign Project Mentor / Reviewer: Link between Cluster and Project during its life to follow the project and assist if needed. • Send Letter with final decision to Coordinator and request Project Consortium Agreement (PCA) to be sign between partners. • Inform Public authorities (MS and ESE) and Liaise to facilitate funding. 8 © ACCIONA – Proprietary and confidential information 2 Case Examples 9 © ACCIONA – Proprietary and confidential information Case Examples: WIFI WIFI-Wind Farm Installation Vessel + © ACCIONA – Proprietary and confidential information 10 Case Examples: WIFI E+ Label on the 16th of March 2009 New concept of barge for the installation of offshore in-one-piece wind turbine catamaran barge / float over method Leader French Partner (Subcontractor for Technip) Norwegian Partner Spanish Partner BUDGET € Technip France ACCIONA DNV TOTAL Duration PARTNERSHIP Technip France Project Management and Engineering Oceanide Basin tests DNV Acciona Rules, regulation and validation Wind Turbine Total Cost Self funded National Funding 350.000 260.000 90.000 1 344.512 June 2009 to March 2011 + © ACCIONA – Proprietary and confidential information 11 Case Examples: WIFI New vessels and installation procedures: o Wet Tow avoiding some HLV usage and do commissioning onshore o Marine operations based on floating vessels (DP2) and be independent of water depths. Wind Farm Installation Vessel* Initial Concept • • • • • • Final Concept Use of DSIV Elevating capacity = 20,000 t (96 pinions) Hulls = 142.5m x 25m x 12m Displacement = 28,000 t Rear door to operate Not really fit for purpose ! • • • • • • Barge = 87 m x 18 m x 9 m, Draft = 4.60 m One central linking beam : 66 m x 30/16 m x 20 m Dynamic Positioning during installation Vertical handling of WTGs (heave compensation) Square Leg 16 m x 16 m x 84 m Really fit for purpose ! + © ACCIONA – Proprietary and confidential information 12 NUEVOS CONCEPTOS: WIFI PROJECT-OBJETIVOS Y ALCANCE Case Examples: WIFI + © ACCIONA – Proprietary and confidential information 13 Case Examples: ADVOCAT ADVanced Composite Repair Tooling for Wind Turbine Blade Maintenance - ADVOCATPhotos 3 & 4 : monolitic Laminate Repair - Workshop + © ACCIONA – Proprietary and confidential information 14 Case Examples: ADVOCAT Participants Name(s) ACCIONA BLADES (Coordinator) ACCIONA ENERGIA Competences & Role in the Project Type SPAIN LE Coordinator Blade repairs technology definition and implementation LE Renewable Company Blade repair engineering design and technology implementation GMI SME LZH I TECMECA SME FRANCE GERMANY Aerospace composite repair technology development Laser technology developer Steel and aluminium structures design and fabrication Type: LE (Large Enterprise), SME (Small & Medium Sized Enterprise), I (Research Institute), U (University) Total Costs: 2,692 M€ 1,377 M€ Expected Public Funding: 0,894 M€ 0,282 M€ + © ACCIONA – Proprietary and confidential information 15 Case Examples: ADVOCAT + © ACCIONA – Proprietary and confidential information 16 Case Examples: ADVOCAT + © ACCIONA – Proprietary and confidential information 17 Case Examples: FLOADMET + © ACCIONA – Proprietary and confidential information 18 Case Examples: FLOADMET Total Costs Duration 6,05 M€ 2,02 M€ 2012 (feb.) to 2014 (march ) + © ACCIONA – Proprietary and confidential information 19 Case Examples: FLOADMET + © ACCIONA – Proprietary and confidential information 20 Case Examples: ILIS Innovative Lithium-Ion System Total Costs Duration Management design for MW Solar Plants 5,82 M€ 2,36 M€ 2010 to 2012 + © ACCIONA – Proprietary and confidential information 21 Case Examples: ILIS It’s very useful to optimize the PV and Battery system in each project in relation with the specific grid code requirements for the countries. + © ACCIONA – Proprietary and confidential information 22 Case Examples: ILIS Electrical grid requirements + Energy Storage Management (SOC) + Weather - Power Forecast Power Generation Smoothing Power Generation to operator set-points Frequency & Voltage Regulation 5 x 10 7 6.5 Epv Ebat 6 5.5 5 4.5 4 3.5 3 Grid Ebat 2.5 2 4.68 4.7 4.72 4.74 4.76 4.78 4.8 4.82 4.84 4 x 10 + © ACCIONA – Proprietary and confidential information 23 Case Examples: ILIS + © ACCIONA – Proprietary and confidential information 24 Case Examples: ILIS + © ACCIONA – Proprietary and confidential information 25 Case Examples: ILIS Products as Results of the Project PV plant controller: Power Dispatcher SCADA to control power output of PV inverters to fulfil different Grid specifications by performing grid support services. Allows also the efficient hybridization with other technologies like diesel generators PV + Storage plant controller: SunDispatcher SCADA to control power output of PV plant in combination with an electric energy storage system (ESS) in order to create a dispatchable solar plant . + © ACCIONA – Proprietary and confidential information 26 ¡¡ Thank you very much !! Muchas Gracias [email protected] 27 © ACCIONA – Proprietary and confidential information