StoTherm®ci

Transcription

StoTherm®ci
®
StoTherm®ci
Frame Construction
Series 10.xx
February 2014
ATTENTION
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional,
general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site
inspections, for its products applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent
building components or assemblies, of for other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger
assembly or building may result in serious damage to Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING
OWNERS IN ACCORDANCE WITH STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper
application, clean-up, mixing and other specifications and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
Property of Sto Corp.
All Rights Reserved.
R
StoTherm® ci
Detail No.: 10.00
System Components
Date: June 2014
Notes:
1] Detail shows the
components of a
Supporting structure
Substrate
StoGuard sheathing joint
treatment
Sto Gold Coat
Sto adhesive
Sto insulation
Sto base coat and mesh
Sto finish
StoTherm ci Exteror
Insulation and Finish
System (EIFS) with
StoGuard Moisture
Protection.
2] StoGuard detail
component options:
a) StoGuard RapidFill
b) Sto Gold Fill and
StoGuard Mesh
c) Sto Gold Coat with
StoGuard Fabric
3] StoGuard joint treatment
options:
a) StoGuard RapidFill
b) Sto Gold Fill and
StoGuard Mesh
c) Sto Gold Coat with
StoGuard Fabric
d) StoGuard RapidSeal
with StoGuard Mesh
4] StoGuard door and
window rough opening
options:
a) StoGuard RapidSeal
b) Sto Gold Fill and
StoGuard Mesh
c) Sto Gold Coat with
StoGuard Fabric
StoGuard detail
component
Starter track with
weep holes
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.01
System Components over Masonry
Date: June 2014
Notes:
Detail shows the
components of StoTherm ci
installed over a
CMU substrate.
StoGuard waterproof
air barrier
Sto adhesive
Sto insulation
Sto mesh
Sto base coat
Sto finish
Pre-wrap termination or use
Starter-Track as per Sto
Detail 10.10a
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.03
Aesthetic Reveal
Date: June 2014
Notes:
Substrate
StoGuard with Sto Gold
Coat
Sto adhesive
Sto insulation
Sto base coat and mesh
Sto finish
1] Protect substrate with
StoGuard waterproof air
barrier system with Sto Gold
Coat.
2] Minimum insulation thickness
at any location is 3/4-inch
(19 mm)
3] Slope bottom surface of horizontal reveals minimum 1:2
(27 degrees) to provide
surface drainage.
4] Exercise care when tooling
reveals to avoid cutting mesh
with trowel.
5] Apply mesh and base coat to
reveal and lap onto adjacent
insulation minimum 2.5 inches
(63 mm).
6] Refer to Sto specifications and
product bulletins for detailed
information on substrates and
Sto material options.
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as Sto are
furnished by other manufacturers and are not necessarily installed by trades who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be
installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products applied improperly, or by unqualified persons or entities, or as part of an
improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH STO’S WARRANTY PROGRAMS
WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications and warranties, cautions and disclaimers, please refer to the Sto Corp.
website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.04a
Aesthetic Band/Projection
Date: June 2014
Notes:
Sto Gold Coat
Sto Adhesive
Sto Insulation
Sto Base Coat
Sto Mesh
Sto Flexyl on exposed
surface
Sto Primer Sand over Sto
Flexyl
1] Comply with maximum
allowable foam plastic
thickness per Sto Code
compliance report.
2] The exposed surface must
have a minimum slope of
1:2 (27°). In locations
where ice and snow may
accumulate, increase
slope.
3] See to Detail 1.04b where
the projection is less than
2" (50mm) or where
snow and ice are not
likely to accumulate.
4] Sto cementitious adhesive
may be used as alternate
to Sto Turbostick to
attach shape.
Sto Detail Mesh
Sto Finish
Sto Turbostick®
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm ci
Detail No.: 10.04b
Aesthetic Band/Projection
Date: June 2014
Notes:
1] Comply with maximum
allowable foam thickness
per Sto code compliance
report.
Sto Gold coat
`
Sto Adhesive
Sto Insulation
Sto Base Coat
Sto Mesh
Sto Detail Mesh
2] The expose surface must
have a minimum slope of
1:2 (27°). In location
where ice and snow may
accumulate, increase
slope.
3] See Sto Detail 1.04a
where the projection
exceed 2" (50mm) or
where snow and ice may
accumulate.
4] Sto cementitious adhesive
may be used as alternate
to Sto Turbostick to
attach shape
Sto Finish
Sto Turbostick®
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.10b
Termination at Grade: Sheathing over Foundation
Date: June 2014
Notes:
Supporting structure
1] Protect wall assembly from
rising damp.
Substrate
2] Terminate system a
minimum of 8“ (200mm)
above grade or as
required by code.
StoGuard sheathing joint
treatment
Sto Gold Coat
3] Direct sprinklers away
from the wall.
Sto adhesive
4] Protect the wall from dirt
accumulation by covering
exposed earth where
splash may occur.
Sto insulation
Sto base coat and mesh
Sto finish
StoGuard detail
component
Starter track with weep
holes (note 6)
5] Provide ultra-high impact
resistance (Sto Detail
1.00b) to a minimum
height of 6‘-0” (1.8m)
above finished grade at
areas accessible to
pedestrian traffic and
other areas exposed to
abnormal stress or
impact.
6] Termination of bottom of
wall may be pre-wrapped
or use alternate starter
track to that which is
shown.
StoGuard Transition
Membrane (See detail
20.10b)
Foundation waterproofing
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.10c
Termination at Grade: Concealed Starter Track
Date: June 2014
Notes:
Supporting structure
Substrate
StoGuard sheathing
joint treatment
Sto Gold Coat®
Vertical ribbons of
Sto adhesive
Sto insulation thickness
as per project
specification
Sto insulation and 1"
(25 mm) starter track
Sto base coat,
reinforcing mesh and
finish
Prewrapped Sto
insulation bonded to face
of starter track and
insulation
StoGuard detail
component
Seal between StoGuard
and foundation
waterproofing
Property of Sto Corp. All Rights Reserved.
ATTENTION
1] Minimum thickness of
insulation at the
termination feature is 2"
(50 mm).
2] Install Sto Guard™ and
1" (25 mm) starter track
as per Sto Specifications.
3] Install 1" (25 mm) thick
by 12" (305 mm) high
(approximate) Sto
insulation board into the
starter track.
4] Prewrap a piece of
insulation so that a
minimum of 2.5" (65
mm) of base coat and
mesh laps onto the back
and face of the insulation.
The height should match
the piece installed in the
starter track. The
thickness, when applied
to the piece in the starter
track, should match the
thickness of insulation
specified for the project.
Stagger board joints.
5] Install EIFS above installed
termination feature and
lap base coat and mesh
over the prewrapped
insulation to the bottom
edge.
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.11
Termination at Protected Sidewalk
Date: June 2014
Notes:
Supporting structure
Substrate
StoGuard sheathing joint
treatment
1] Restrict the use of this
detail to weatherprotected walls.
2] Provide a positive slope
of sidewalk away from
the wall.
Sto adhesive
3] Protect wall assembly from
rising damp.
Sto insulation
4] Provide ultra-high impact
resistance (Sto detail
1.00b) to a minimum
height of 6‘-0” (1.8m)
above finished grade at
areas accessible to
pedestrian traffic and
other areas exposed to
abnormal stress or impact.
Sto base coat and mesh
Sto finish
Sto Gold Coat
StoGuard detail
component
Maintain 1“ (25mm)
clearance
5] Termination at bottom of
wall may be pre-wrapped
or use alternate starter
track to that which is
shown.
Starter track with weep
holes (note 5)
Barrier membrane
Sidewalk sloped to drain
away from wall
Compressible filler
Foundation waterproofing
Foundation
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.15
Termination w. Uni-Track
Date: June 2014
Notes:
1] Protect wall assembly from
rising damp.
Supporting structure
Substrate
StoGuard sheathing
joint treatment
Sto adhesive
Sto insulation
Sto base coat and
mesh
Sto finish
2] Terminate system a
minimum of 8“ (200mm)
above grade or as
required by code.
3] Direct sprinklers away
from the wall.
4] Protect the wall from dirt
accumulation by covering
exposed earth where
splash may occur.
5] Provide ultra-high impact
resistance (Sto Detail
1.00b) to a minimum
height of 6‘-0” (1.8m)
above finished grade at
areas accessible to
pedestrian traffic and
other areas exposed to
abnormal stress or
impact.
Sto Gold Coat®
StoGuard detail
component
Uni-Track (Universal
Starter Track)
Sto base coat and
mesh prewrapped
around insulation prior
to installation
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.16
Termination w. Uni-Track:
Combustible Construction
Date: June 2014
Notes:
Supporting structure
Substrate
1] Restrict the use of this
detail to combustible
construction
2] Protect wall assembly from
rising damp.
StoGuard sheathing
joint treatment
3] Terminate system a
minimum of 8“ (200mm)
above grade or as
required by code.
Sto adhesive
4] Direct sprinklers away
from the wall.
Sto insulation
Sto base coat and
mesh
Sto finish
Sto Gold Coat®
StoGuard detail
component
5] Protect the wall from dirt
accumulation by covering
exposed earth where
splash may occur.
6] Provide ultra-high impact
resistance (Sto Detail
1.00b) to a minimum
height of 6‘-0” (1.8m)
above finished grade at
areas accessible to
pedestrian traffic and
other areas exposed to
abnormal stress or
impact.
Uni-Track (Universal
Starter Track)
Sto base coat and
mesh wrapped
onto track flange
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.23a
Preparation of Rough Opening
with Sto Gold Fill and StoGuard Mesh
Date: June 2014
Step 1
Wrap inside corners
with 2“ (50mm) wide strip
of Sto Guard® mesh
lapping onto face of wall
Step 1
Step 2
Step 2
Wrap sill with 9” (230mm)
wide Sto Guard® mesh
returning up the jambs a
minimum of 4” (100mm)
Embed minimum 4“
(100mm) wide detail
mesh in Sto
Gold Fill® at all sheathing
joints
Step 3
Step 3
Notes:
1] Prepare opening prior to
the installation of the
window or mechanical
equipment.
2] Incorporate flashing as
illustrated in 10.23b and
10.23c or as per other
details where flashing is
shown (e.g. 10.25).
3] The complete installation
of window or mechanical
equipment should include
an airseal between the
object and the StoGuard
protection inbound of the
outer sealant joint.
4] See additional material
options in the following
Sto details:
20.20R, 20.20F, 20.20FT,
20.20T, 21.20R, 21.20G
Wrap jambs with
minimum 9”(230mm) wide
Sto Guard® mesh, lapping
minimum 2.5“ (64mm)
over extension from sill,
then wrap head. Apply
Sto Gold Fill to complete
cover mesh.
Step 4
Coat the entire
surface of the wall and
into rough opening with
Sto Gold Coat®
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.24b
Commercial Window Head with Fillet Perimeter Seal
Substrate
Supporting structure
StoGuard rough
opening protection
Sto Gold Coat
Seal between flashing
and EIFS. Include
weeps
Air seal
Fillet seal
Flashing over window
folded over window
jamb-head interface
Window frame
Fillet seal with backerrod or appropriate bond
breaker. (See note 5.)
Air seal continuous
around interior
perimeter of window
Sto Gold Coat
StoGuard rough
opening protection
Date: June 2014
Notes:
1] Provide a mock-up
installation and test
using materials and
subtrades associated with
the project.
2] Provide flashing installed
over the window to direct
water away from the
window. Verify
requirements for head
flashing with local codes
and window manufacturer.
If not required, seal
between window head
and EIFS.
3] Protect rough opening
against water penetration
with StoGuard rough
opening treatment.
4] Provide continuous air
barrier connection around
the perimeter of the
window to reduce leaking,
condensation related to
air movement and sound
and insect intrusion.
5] Verify suitability of fillet
seal configuration.
Consult sealant and
window manufacturer.
Sto insulation
Sto base coat and
mesh
Sto finish
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.25a
Commercial Window Jamb
Date: June 2014
Supporting structure
Substrate
Sto insulation
Sto base coat and mesh
Back-wrap termination
Sto finish
Air seal continuous
around interior perimeter
of window
Sealant with backer-rod
Window insert
Sto Gold Coat
StoGuard rough opening
treatment
StoGuard lapped over
end dam of flashing to
direct water to the exterior
Notes:
1] Provide a mock-up
installation and test
using materials and
subtrades associated with
the project.
2] Protect rough opening
against water penetration
with StoGuard. Direct any
water penetration to the
exterior at or above the sill
pan flashing. (Refer to Sto
details 10.24a and
10.26a).
3] Provide continuous air
barrier connection around
the perimeter of the
window to reduce:
leaking, condensation
related to air movement
and sound and insect
intrusion.
4] Provide window insert to
optimize sealant
configuration.
Window frame
Pan flashing
Sealant
Back-wrap termination
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.25b
Commercial Window Jamb with Fillet Perimeter Seal
Supporting structure
Substrate
StoGuard rough opening
treatment
Sto Gold Coat
Air seal continuous
around interior perimeter
of window
Fillet seal with backerrod or appropriate bond
breaker. (See note 4)
StoGuard lapped over
end dam of flashing to
direct water to the exterior
Date: June 2014
Notes:
1] Provide a mock-up
installation and test
using materials and
subtrades associated with
the project.
2] Protect rough opening
against water penetration
with StoGuard. Direct any
water penetration to the
exterior at or above the sill
pan flashing. (Refer to Sto
details 10.24b and
10.26b).
3] Provide continuous air
barrier connection
around the perimeter of
the window to reduce:
leaking, condensation
related to air movement
and sound and insect
intrusion.
4] Verify suitability of fillet
seal configuration.
Consult sealant and
window manufacturer.
Window frame
Pan flashing
`
Sealant
Back-wrap termination
Sto insulation
Sto base coat and mesh
Sto finish
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.26a
Commercial Window Sill
Date: June 2014
Notes:
Supporting structure
Substrate
StoGuard rough opening
treatment
Sto Gold Coat
Air seal continuous
around interior perimeter
of window.
Sealant with backer rod
Window insert
Window frame
Pan flashing with end
dam. Set pan flashing in
compatible sealant.
Drip edge of flashing
Sealant
Back-wrap termination
Sto insulation
1] Provide a mock-up
installation and test
using materials and
subtrades associated with
the project.
2] Protect rough opening
against water penetration
with StoGuard. Direct any
water penetration to the
exterior at or above the
sill pan flashing. (Refer to
Sto details 10,24a and
10.25a).
3] Provide continuous air
barrier connection
around the perimeter of
the window to reduce:
leaking, condensation
related to air movement
and sound and insect
intrusion.
4] Provide leak-proof sill pan
flashing with end and
back dams to catch any
water penetration and
direct it to the
exterior of the wall assembly.
5] Provide window insert to
optimize sealant
configuration.
Sto base coat and mesh
Sto finish
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.26b
Commercial Window Sill with Fillet Perimeter Seal
Date: June 2014
Notes:
Supporting structure
Substrate
StoGuard rough opening
treatment
Sto Gold Coat
Air seal continuous
around interior perimeter
of window.
Fillet seal with backerrod or appropriate bond
breaker (See note 5.)
Window frame
Pan flashing with end
dam. Set pan flashing in
compatible sealant.
Drip edge of flashing
Sealant
Back-wrap termination
Sto insulation
Sto base coat and mesh
1] Provide a mock-up
installation and test using
materials and subtrades
associated with the
project.
2] Protect rough opening
against water penetration
with StoGuard. Direct any
water penetration to the
exterior at or above the
sill pan flashing. (Refer to
Sto details 10.24b and
10.25b).
3] Provide continuous air
barrier connection
around the perimeter of
the window to reduce
leaking, condensation
related to air movement
and sound and insect
intrusion.
4] Provide leak-proof sill pan
flashing with end and
back dams to catch any
water penetration and
direct it to the exterior of
the wall assembly.
5] Verify suitability of fillet
seal configuration.
Consult sealant and
window manufacturer.
Sto finish
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.27
Flanged Window Head
Date: June 2014
Top of EIFS feature
sloped minimum 1:2
(Sto detail 1.04)
GoldGuard (See Sto
details 10.23a and
10.23b)
Window flange set in
sealant
Sealant with backer rod
and weeps
Air seal continuous
around interior perimeter
of window
Window frame
Head flashing folded
over window head-jamb
interface
Sealant with backer rod
Sto finish
Sto base coat and mesh
Air seal
Window flange set in
sealant
Back-wrap termination
Sto insulation
Supporting structure
Substrate
Property of Sto Corp. All Rights Reserved.
ATTENTION
Notes:
1] Provide a mock-up
installation and test using
materials and subtrades
associated with the
project.
2] Provide flashing installed
over the window to direct
water away from the
window. Verify
requirements for head
flashing with local codes
and window
manufacturer. If not
required, seal between
window head and EIFS.
3] Protect rough opening
against water
penetration with
StoGuard. Direct any
water penetration to the
exterior at or above the
sill pan flashing. (Refer to
Sto details 10.28 and
10.29)
4] Provide continuous air
barrier connection
around the perimeter of
the window to reduce
leaking, condensation
related to air movement
and sound and insect
intrusion.
5] Coordinate Sto Gold
Guard installation with
window installer.
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.28
Flanged Window Jamb
Date: June 2014
Supporting structure
Substrate
Rough window opening
wrapped with StoGuard
prior to installation of
head flashing (Refer to
Sto detail 10.23a)
Air seal
Window frame
Window flange set in
sealant
Sto insulation
Sto base coat and mesh
Sto finish
Notes:
1] Provide a mock-up
installation and test using
materials and subtrades
associated with the
project.
2] Protect rough opening
against water penetration
with StoGuard. Direct any
water penetration to the
exterior at or above the
sill pan flashing. (Refer to
Sto details 10.27 and
10.29).
3] Provide continuous air
barrier connection
around the perimeter of
the window to reduce
leaking, condensation
related to air movement
and sound and insect
intrusion.
4] Coordinate Sto Gold
Guard installation
sequence with window
installer and other
related trades.
Back-wrap termination
StoGuard System (Refer
to Sto Detail 10.23a and
10.23c)
Starter track with weep
holes
Sealant with backer rod
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.29
Flanged Window Sill
Date: June 2014
Supporting structure
Substrate
Rough window opening
wrapped with StoGuard
prior to installation of
head flashing (Refer to
Sto detail 10.23a)
Window flange set in
sealant
Sto insulation
Sto base coat and mesh
Sto finish
Air seal
Sealant with backer rod
Window frame
Back-wrap termination
Sill window flange not set
in sealant (see note 5)
StoGuard System (Refer
to Sto Detail 10.23a and
10.23c)
Notes:
1] Provide a mock-up
installation and test
using materials and
subtrades associated with
the project.
2] Protect rough opening
against water penetration
with StoGuard. Direct any
water penetration to the
exterior at or above the sill
pan flashing. (Refer to Sto
details 10.27 and 10.28).
3] Provide continuous air
barrier connection
around the perimeter of
the window to reduce
leaking, condensation
related to air movement
and sound and insect
intrusion.
4] Coordinate StoGuard
installation sequence with
window installer and
other related trades.
5] Do not set window sill
flange in sealant unless
approved by window
manufacturer.
Starter track with weep
holes
Sealant with backer rod
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.30
Unvented Insulated Soffit
Date: June 2014
Notes:
Supporting structure
Substrate
Sto Gold Coat™
Sto insulation
Sto base coat and mesh
1] Where wall/soffit are
subject to differential
movement provide a joint
at the inside corner.
2] StoGuard detail
component options:
a) StoGuard RapidFill
b) Sto Gold Fill and
StoGuard Mesh
c) Sto Gold Coat with
StoGuard Fabric
Sto finish
StoGuard detail
component
Starter track with weep
holes
Sealant with backer rod
Back-wrap termination
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.30a
Vented Uninsulated Soffit
with Sto Drip Edge Profile
Date: August 2015
Notes:
1] Insulation board must be
minimum 4 inches (102 mm) thick
to achieve proper overlap of Sto
Mesh (or Sto Detail Mesh) with
Sto Drip Edge Profile along
terminating edge of insulation
boards. Where thinner sections of
insulation boards are used refer to
Sto Detail 10.31.
Substrate Treated with
StoGuard® with Sto
Gold Coat®
StoTherm® ci
Vented air space
2] See Sto Detail Series 20.xx for
further information regarding
proper installation of StoGuard®.
3] Soffit board comply with
ASTM C-1177.
4] See Sto Detail Series 14.xx for
further information regarding
Sto Drip Edge Profile
(embedded in Sto base
coat)
proper installation of Sto Quik®
Gold Finish System for Soffits.
5] Pre-apply Sto reinforcing mesh,
embedded in Sto base coat to
bottom edge of insulation board
to be placed above the soffit.
Leave sufficient mesh hanging
free from the bottom of the
insulation board to permit lapping
it onto the bottom of the board
after installation of the Sto Drip
Edge Profile.
Sto Mesh or Sto Detail
Mesh (pre-applied to
back of insulation and
embedded in Sto Base
Coat to overlap Sto Drip
Edge Profile mesh)
Nominal 1/4 inch gap
6] Embed Sto Drip Edge Profile mesh
into Sto base coat at bottom
outside corner of insulation board.
StoGuard joint treatment
with Sto Gold Coat
overlap
7] Overlap Sto Drip Edge Profile mesh
completely with Sto reinforcing
mesh embedded in a separate
layer of base coat.
Soffit vent
8] Metal strip lath shown as drainage
strip for use in noncombustible
construction. Plastic strip lath
may be used in combustible
construction.
Sto Quik® Gold Finish
System for Soffits
StoTherm® ci
9] Refer to Sto specifications and
product bulletins for detailed
information on substrates and Sto
material options
.
Sto Drip Edge Profile
ATTENTION
Property of Sto Corp. All Rights Reserved.
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.31
Vented Uninsulated Soffit
Date: June 2014
Notes:
1] Prevent communication
of vented air space with
conditioned interior air to
reduce the likelihood of
condensation.
Supporting structure
Substrate
Vented air space
Sto Gold Coat™
Sto Adhesive
2] Soffit board must meet or
exceed requirements of
ASTM C-1177.
3] StoGuard detail
component options:
a) StoGuard RapidFill
b) Sto Gold Fill and
StoGuard Mesh
c) Sto Gold Coat with
StoGuard Fabric
Sto insulation
Sto base coat and mesh
Sto finish
Drainage Strip
Pre wrapped insulation
Sto Quikgold for Soffits
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.31a
Vented Uninsulated Soffit
Date: June 2014
Notes:
1] Prevent
communication of vented
air space with conditioned
interior air to reduce the
likelihood of condensation.
Supporting structure
Substrate
2] Soffit board must
meet or exceed
requirements of
ASTM C-1177.
Vented air space
3] StoGuard detail
component options:
a) StoGuard RapidFill
b) Sto Gold Fill and
StoGuard Mesh
c) Sto Gold Coat with
StoGuard Fabric
Sto Gold Coat®
Sto Adhesive
Sto insulation
Sto base coat and mesh
.
Sto finish
StoGuard detail
component
Pre wrapped insulation
Sto Quikgold for
Soffits
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.33
Unvented Insulated Soffit
Date: June 2014
Notes:
Supporting structure
Substrate
Sto Gold Coat®
Sto adhesive
Sto insulation
Sto base coat and mesh
Sto finish
StoGuard detail
component
Drainage strip
Sto insulation
prewrapped with base
coat and mesh
1/4" drainage gap
Back-wrap termination
Property of Sto Corp. All Rights Reserved.
ATTENTION
1] Where wall/soffit are
subject to differential
movement provide a joint
at the inside corner.
2] For multistorey buildings
of noncombustible
construction verify
conformance of detail
with fire testing criteria.
3] Install EIFS on soffit with
back wrap edge in line
with fascia substrate.
4] Prewrap insulation for
bottom edge of the
fascia so a minimum of
2.5" (65 mm) of base
coat and mesh will
overlap the wall surface.
5] Install insulation over
vertical ribbons of
adhesive so a 1/4"
(6 mm) +/- drainage gap
is created.
6] StoGuard detail
component options:
a) StoGuard RapidFill
b) Sto Gold Fill and
StoGuard Mesh
c) Sto Gold Coat with
StoGuard Fabric
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.40
Floor Line without Joint
Date: June 2014
Notes:
Supporting structure
Substrate
Sto Gold Coat™
1] Restrict the use of this
detail to low or medium
rise construction with no
floor line deflection.
2] The maximum allowable
sheathing span at the floor
line is 8“ (200mm) or as
recommended by the
sheathing manufacturer.
3] Offset sheathing joints
from floor line minimum
8” (200mm).
Sto insulation
Sto base coat and mesh
Sto finish
Floor slab
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.41
Floor Line with Joint
Date: June 2014
Supporting structure
Substrate
Sto insulation
Sto base coat and mesh
Sto finish
Sto Gold Coat™
StoGuard detail
component
Starter track with weep
holes
Sealant with backer rod
StoGuard Transition
Membrane (See detail
20.51TM)
Notes:
1] Do not attach upper
sheathing to nested track.
Only attach lower
sheathing to nested track.
2] The maximum allowable
sheathing span at the
floor line is 8“ (200mm)
or as recommended by
the sheathing
manufacturer.
3] A barrier membrane is
installed over the joint in
the sheathing to provide
air barrier continuity and
secondary weather
protection at the joint
location.
4] Provide a minimum 3/4”
(20mm) joint to
accommodate deflection
of the floor slab.
5] StoGuard detail
component options:
a) StoGuard RapidFill
b) Sto Gold Fill and
StoGuard Mesh
c) Sto Gold Coat with
StoGuard Fabric
Back-wrap termination
Nested track assembly
Floor slab
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.41b
Floor Line with Joint: Noncombustible Construction
Supporting structure
Substrate
Sto adhesive
Sto insulation
Sto mesh
Sto base coat
Sto finish
Sto Gold Coat™
StoGuard detail
component
Lath
Pre-wrap base coat
and mesh
Optional sealant with
weeps
Flashing
StoGuard Transition
Membrane (See detail
10.51TM)
Sealant with backer rod
Back-wrap termination
Nested track assembly
Floor slab
Property of Sto Corp. All Rights Reserved.
ATTENTION
Date: June 2014
Notes:
1] Pre-wrap the insulation
board with base coat
and mesh prior to
installation. Rasp back of
insulation to ensure the
pre-wrapped insulation
board will fit over the
lath and permit water to
drain freely.
2] Do not attach upper
sheathing to nested track.
Only attach lower
sheathing to nested track.
3] The maximum allowable
sheathing span at the
floor line is 8“ (200mm)
or as recommended by
the sheathing
manufacturer.
5] Install StoGuard
Transition Membrane at
floorline joint in
accordance with Sto Detail
20.51a.
6] Install metal flashing to
drain outbound of the
cladding and integrate it
into the Sto Guard.
7] Install a 6" (150mm) strip
of expanded metal lath
8] Provide a minimum 3/4”
(20mm) joint to
accommodate deflection
of the floor slab.
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.41c
Floor Line with Joint: Noncombustible Construction
Supporting structure
Substrate
Sto adhesive
Sto insulation
Sto mesh
Sto base coat
Sto finish
Sto Gold Coat™
StoGuard detail
component
Pre-wrap base coat
and mesh
Starter track with weep
holes
StoGuard Transition
Membrane (See detail
10.51TM)
Sealant with backer rod
Date: June 2014
Notes:
1] Pre-wrap the insulation
board with base coat
and mesh prior to placing
into the starter track. Rasp
face and back of
insulation to ensure the
pre-wrapped insulation
board will fit into the track
and permit water to drain
freely.
2] Do not attach upper
sheathing to nested track.
Only attach lower
sheathing to nested track.
3] The maximum allowable
sheathing span at the
floor line is 8“ (200mm) or
as recommended by the
sheathing manufacturer.
4] Install StoGuard Transition
Membrane at floorline
joint in accordance with
Sto Detail 20.51a.
5] Provide a minimum 3/4”
(20mm) joint to
accommodate deflection
of the floor slab.
Back-wrap termination
Nested track assembly
Floor slab
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm
®
ci
Detail No.: 10.41d
Floor Line with Joint:
Noncombustible Construction
Date: June 2014
Supporting structure
Substrate
Sto adhesive
Sto insulation
Sto mesh
Sto base coat
Sto finish
Sto Gold Coat®
StoGuard detail
component
Pre-wrap base coat
and mesh
Optional sealant with
weeps
Flashing
StoGuard Transition
Membrane (See detail
20.21TM)
Sealant with backer rod
Notes:
1] Pre-wrap the
insulation board with base
coat and mesh prior to
installation. Rasp back of
insulation to ensure the
pre-wrapped insulation
board will permit water to
drain freely.
2] Do not attach upper
sheathing to nested track.
Only attach lower
sheathing to nested track.
3] The maximum allowable
sheathing span at the floor
line is 8“ (200mm) or as
recommended by the
sheathing manufacturer.
5] Install StoGuard Transition
Membrane at floorline
joint in accordance with
Sto Detail 20.51a.
6] Install metal flashing to
drain outbound of the
cladding and integrate it
into the Sto Guard.
7] Provide a minimum 3/4”
(20mm) joint to
accommodate deflection
of the floor slab.
Nested track assembly
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.42A
Horizontal Joint at Dissimilar Material
Date: June 2014
Notes:
Supporting structure
Substrate
Sto Adhesive
`
Sto insulation
Sto base coat and
mesh
Sto finish
Sto Gold Coat™
StoGuard detail
component
Flashing
Starter track with
weep holes
Alternate cladding
assembly
1] Do not attach upper
sheathing to nested
track. Only attach lower
sheathing to nested track.
2] The maximum allowable
sheathing span at the
floor line is 8“ (200mm)
or as recommended by
the sheathing
manufacturer.
3] Provide flashing minimum
4” (100mm) behind the
Sto EIFS and project
beyond the face of the
alternate cladding below.
4] Consider the amount of
movement in the
alternate cladding
material, especially if a
different structural
support system exists for
that cladding. Position
flashing to accommodate
movement and ensure
drainage to the exterior.
5] Determine installation
sequence in advance of
construction.
StoGuard Transition
Membrane
Nested track assembly
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.42B
Horizontal Joint at Dissimilar Material
Date: June 2014
Notes:
Supporting structure
Substrate
1] Do not attach upper
sheathing to nested
track. Only attach lower
sheathing to nested track.
2] The maximum allowable
sheathing span at the
floor line is 8“ (200mm)
or as recommended by
the sheathing
manufacturer.
Sto Adhesive
Sto insulation
Sto base coat and
mesh
Sto finish
Sto Gold Coat™
StoGuard detail
component
Flashing
Starter track with
weep holes
Alternate cladding
assembly
3] Provide flashing minimum
4” (100mm) behind the
Sto EIFS and project
beyond the face of the
alternate cladding below.
4] Consider the amount of
movement in the
alternate cladding
material, especially if a
different structural
support system exists for
that cladding. Position
flashing to accommodate
movement and ensure
drainage to the exterior.
5] Determine installation
sequence in advance of
construction.
StoGuard Transition
Membrane
Nested track assembly
`
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.50
Vertical Joint at Dissimilar Material
Date: March 2014
Notes:
Supporting structure
Substrate
Sto Gold Coat™
Sto adhesive
Sto insulation
Back-wrap termination
1] Determine installation
sequence in advance of
construction. Coordinate
subtrades to ensure the
proper installation of
materials.
2] Barrier membrane
isolates the potentially
wet environment behind
the alternate cladding
from the EIFS.
3] Provide minimum 3/4“
(20mm) joint between
the EIFS and the a
lternate cladding. Provide
drainage for the joint
assembly.
Sto base coat and mesh
Sto finish
StoGuard Tape
Sealant with backer rod
Alternate cladding
assembly
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.50A
Vertical Joint at Dissimilar Material
Date: June 2014
Notes:
Supporting structure
Substrate
Sto Gold Coat™
Sto adhesive
Sto insulation
Back-wrap termination
1] Determine installation
sequence in advance of
construction. Coordinate
subtrades to ensure the
proper installation of
materials.
2] Barrier membrane
isolates the potentially
wet environment behind
the alternate cladding
from the EIFS.
3] Provide minimum 3/4“
(20mm) joint between
the EIFS and the a
lternate cladding. Provide
drainage for the joint
assembly.
Sto base coat and mesh
Sto finish
StoGuard Tape
Sealant with backer rod
Alternate cladding
assembly
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.51
Vertical Joint at Inside Corner
Date: June 2014
Notes:
Supporting structure
1] Install StoGuard Transition
Membrane in accordance
with Sto Detail 20.53.
2] Provide minimum 3/4“
(20mm) joint width.
Substrate
3] Provide drainage for joint
assembly.
Sto Gold Coat™
StoGuard Transition
Membrane (See detail
10.53TM)
Sealant with backer rod
Back-wrap termination
Sto insulation
Sto base coat and mesh
Sto finish
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.54
Outside Corner
with Sto Mesh Corner Bead
Date: August 2015
Notes:
Supporting structure
1] Install StoGuard with Sto Gold
Coat on prepared substrate. See
Sto Detail Series 20.xx for further
information regarding proper
installation of StoGuard®.
Substrate Treated with
StoGuard® with Sto Gold
Coat®
2] Embed Sto Mesh Corner Bead in
Sto base coat along outside
corners. Fully embed Sto Mesh
Corner Bead and allow to dry.
Sto EPS insulation
Sto Mesh Corner Bead
embedded in Sto base coat.
3] Embed Sto Mesh in base coat on
the entire exterior surface of the
insulation in accordance with Sto
specifications.
Sto Mesh embedded in Sto
Base Coat and overlapping
Sto Mesh Corner Bead
4] Apply Sto Primer (optional) and
Sto Finish
Sto Primer (optional)
5] Refer to Sto specifications and
product bulletins for detailed
substrate and Sto material options
information.
.
Sto Finish
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.57
Joint Intersection
Date: June 2014
Substrate (Frame or CMU)
StoGuard
Backer rod
StoGuard Transition
Membrane (See detail
10.51TM)
Joint drainage plane
Backer rod and sealant
Drainage gap
Sealant returned to
barrier membrane
StoTherm® NExT®
Notes:
1] Detail illustrates the
intersection of a two
stage drained vertical and
horizontal joint.
2] Install StoGuard Transition
Membrane in accordance
with Sto Detail 20.51TM.
Install Vertical StoGuard
Transition Membrane first
and provide “loop” into
joint to allow for
movement.
3] Install closed-cell backer
rod and low-modulus
sealant as per sealant
manufacturer’s
instructions.
4] In the vertical joint, below
the horizontal joint, leave
a gap in the sealant.
Return the sealant below
the gap to the barrier
membrane to allow
drainage (blue arrow).
5] At horizontal joint
corners, seal the cavity
between the sealant joint
and StoGuard to prevent
‘wind-wash’.
6] Detail is for low to midrise construction with
minimal floor line
deflection. Provide
flashing at floor line as
determined by design
professional. (Refer to Sto
Detail 10.41d)
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.60
Termination at Parapet Cap
Date: June 2014
Notes:
Waterproof cap flashing.
Barrier membrane
Blocking to support cap
flashing
Drip edge to direct water
away from surface of wall
Face-wrap termination
over wood blocking
Fillet Seal
1] Provide a barrier
membrane over the
parapet and integrate it
with the roofing or deck
waterproofing assembly.
This provides air barrier
continuity over the
parapet and secondary
weather protection under
the cap flashing.
2] Provide minimum 2.5“
(65mm) overlap of
flashing over face of EIFS.
Increase overlap with
building height.
3] Install StoGuard over the
parapet supporting
structure lapping onto
compatible sheathing.
Sto Gold Coat™
StoGuard detail
component (see 10.00)
Supporting structure
Substrate
Sto insulation
Sto base coat and mesh
Sto finish
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.64
Roofing Termination at Parapet
Date: June 2014
Notes:
Cap flashing
Flexible membrane
Blocking
EIFS cladding
StGuard®
Waterproofing/Air Barrier
StoGuard detail
component
Structure
1] Detail shows the
termination of Sto EIFS
over a roof membrane on
the back side of a
parapet.
2] Maintain a continuous
plane of air tightness
between the vertical
elements of the Sto
Guard® and the roof
membrane with a
roofing tie-down bar
or other method as
recommended by the roof
membrane manufacturer.
3] StoGuard detail
component options:
a) StoGuard RapidFill
b) Sto Gold Fill and
StoGuard Mesh
c) Sto Gold Coat with
StoGuard Fabric
EIFS cladding
StoGuard detail
component
Tie-down bar
Roof membrane
Roof structure
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.65a
Gold Guard Installation Prior to Saddle Flashing
Date: June 2014
Notes:
Substrate
Sto Gold Coat™
1] Provide StoGuard System
over lower and higher
wall prior to the
installation of saddle
flashing and Sto EIFS.
2] Use one of the following
for StoGuard detail
Component:
a) StoGuard RapitSeal
b) Sto Transition
Membrane embedded
in StoGuard coating
c) Sto Gold Fill and
StoGuard mesh
3] Refer to Sto detail 10.65b
for assembly of saddle
flashing.
StoGuard detail
component (Sto Detail
10.00)
4] Refer to Sto detail 10.65c
for integration of EIFS
with saddle flashing and
parapet cap flashing.
Lower wall to receive Sto
EIFS on both sides with
parapet cap over
(Sto Detail 10.60)
Sto Gold Coat™
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.65b
Saddle Flashing Assembly
Date: June 2014
Notes:
S te p 1
A
B
1] Pieces ‘A’ and ‘B’ are
folded as shown and are
mirror images of the other.
The flat top portions are
designed to overlap over
the parapet wall and flat
against the higher wall.
The turnouts are to match
the thickness of the
insulation plus 1/4“
(6mm).
Turn out flanges to match
thickness of insulation
plus 1/4“ (6mm)
C
2] Piece ‘C’ is designed to
straddle the parapet
wall. The upturned flange
is placed behind the flat
flanges of ‘A’ and ‘B’ and
the two down turned legs
interlock over the lower
portions of ‘A’ and ‘B’ in a
shingle fashion.
Gold Guard System
S te p 2
Gold Guard System
applied over parapet
3] The assembled pieces are
installed against Gold
Guard System (Sto detail
10.65a) and into sealant.
4] Provide EIFS as shown in
Sto detail 10.65c
S te p 3
5] Provide cap flashing as
shown in Sto detail 10.60.
Sto EIFS installed after
saddle flashing
Cap flashing installed last
.
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.65c
Saddle Flashing at Lower to Higher Wall Abutment
Date: June 2014
Notes:
Substrate
Sto Gold Coat®
Sto Insulation
Sto base coat and mesh
Sto finish
StoGuard detail
component (Sto detail
10.00)
Saddle flashing assembly
(Sto detail 10.65b)
1] Install Sto EIFS over Sto
Guard Air/Moisture
Barrier (see Sto Details
10.65a & b).
2] Lap EIFS over the
flashing assembly at the
top by a minimum of 2“
(50mm) and terminate
with 1/2” (13mm) joint
around the perimeter.
3] Refer to Sto Detail
10.65b for assembly of
saddle flashing.
4] Provide parapet cap
flashing. (Refer to Sto
detail 10.60 for
termination at a parapet
cap flashing.
Parapet cap flashing
assembly (Sto detail
10.60)
Sealant with backer rod
Back-wrap termination
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.70
System Prepared for Penetration
Date: June 2014
Notes:
Supporting structure
Substrate
Sto Gold Coat™
StoGuard detail
component (Sto Detail
10.00)
Sto insulation
Sto base coat and mesh
Back-wrap termination
Sto finish
Sealant with backer rod
1] Detail assumes pipe is
installed prior to the EIFS
or that its location has
been identified.
2] Prepare an opening in
the EIFS with a joint of
1/2“ (13mm) around the
penetration and provide
sealant with a closed
cell backer rod. Provide air
seal around the interior
side of the penetration to
reduce the pressure difference across the outside
sealant.
3] Provide StoGuard
Transition Membrane in
lieu of Sto Gold Fill at
penetration where joint
between sheathing and
penetrating element
exceeds 1/8” (3mm). See
Sto Detail 20.52 for
Details of StoGuard
Transition Membrane at
pipe penetration.
Pipe penetration
Air seal
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.75
Scupper Penetration
Date: June 2014
Notes:
Supporting structure
Substrate
Sto insulation
Sto base coat and mesh
Sto finish
1] Provide leakproof
scupper assembly and
installation to direct water
away from the wall
surface.
2] For Transition from
Sheathing to Scupper use:
• StoGuard RapidFill
• StoGuard RapidSeal
• Sto Gold Fill of
StoGuard Mesh
• StoGuard Transition
Membrane
Sto Gold Coat™
StoGuard detail
component
Back-wrap termination
Sealant with backer rod
Scupper assembly
Waterproof membrane
Roof or deck assembly
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.81a
Structural Connection to Substrate
Date: June 2014
Notes:
Supporting structure
Substrate
Sto Gold Coat™
1] Fasten structural element
to the structure over an
application of Sto Gold
Coat.
2] Terminate the EIFS 1/2“
(13mm) away from the
structural element to
allow for the installation
of sealant and backer rod.
Sto insulation
Sto base coat and mesh
Sto finish
3] StoGuard detail
component options:
a) StoGuard RapidFill
b) Sto Gold Fill and
StoGuard Mesh
c) Sto Gold Coat with
StoGuard Fabric
Sealant with backer rod
Fastening system
Structural element
StoGuard detail
component
Sto Gold Coat
Back-wrap termination
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.82
Sign Attachment
Date: June 2014
Notes:
Substrate
StoGuard
Sto insulation
Sto base coat and mesh
1] The sign, or other
attachment, is normally
installed after the EIFS
installation is complete.
2] Blocking or other
structural support required
for non-structural
substrates and heavy
objects.
Sto finish
Hole drilled in EIFS and
lined with sealant
PVC sleeve installed
against blocking through
hole. Excess sealant
tooled around PVC
PVC sleeve lined with
sealant and bolt assembly
installed to fasten sign
Blocking
Bolt assembly
Sign
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.82
Sign Attachment
Date: June 2014
Notes:
Substrate
StoGuard
Sto insulation
Sto base coat and mesh
1] The sign, or other
attachment, is normally
installed after the EIFS
installation is complete.
2] Blocking or other
structural support required
for non-structural
substrates and heavy
objects.
Sto finish
Hole drilled in EIFS and
lined with sealant
PVC sleeve installed
against blocking through
hole. Excess sealant
tooled around PVC
PVC sleeve lined with
sealant and bolt assembly
installed to fasten sign
Blocking
Bolt assembly
Sign
Property of Sto Corp. All Rights Reserved.
ATTENTION
IMPORTANT: Components not identified as
Sto are furnished by other manufacturers
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.
R
StoTherm® ci
Detail No.: 10.84
Awning Attachment
Date: June 2014
Notes:
1] Install blocking behind the
sheathing to support the
awning attachment.
2] Drill a hole through the
StoTherm ci cladding to
the blocking. Make the
hole slightly larger than
the PVC support sleeve.
Sheathing
StoGuard™
StoTherm ci
Awning structural support
Awning mechanical
attachment
Blocking
PVC sleeve
Sealant around sleeve
and in sleeve as per Sto
Detail 10.82
3] Cut a PVC sleeve
adequate length so that
when inserted in the hole
it will project a minimum
1/8" (3 mm) beyond the
wall finish.
4] Line the hole with a
compatible, neutral-cure
silicone sealant and insert
the PVC support sleeve.
Tool excess sealant around
the sleeve.
5] Line the PVC sleeve with
compatible sealant. Install
awning structural support
by fastening through the
PVC sleeve into the wood
blocking. Tighten the
fastener so that the PVC
sleeve absorbs the
compressive forces
without damaging the
StoTherm ci.
IMPORTANT: Components not identified as
. Sto are furnished by other manufacturers
Property of Sto Corp. All Rights Reserved.
ATTENTION
and are not necessarily installed by trades
who install the Sto products. Refer to project specific contract documents.
www.stocorp.com
Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto’s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products
applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for
other construction activities beyond Sto’s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to
Sto products, and to the structure of the building or its components.
STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH
STO’S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications
and warranties, cautions and disclaimers, please refer to the Sto Corp. website, www.stocorp.com.