5 - Allegan County
Transcription
5 - Allegan County
Allegan County Board of Commissioners DISTRICT 1 Terry Burns 616-403-0427 tburns@ allegancounty.org DISTRICT 2 Steve McNeal 269-751-7271 smcneal@ allegancounty.org DISTRICT 3 Paul VanEck 616-688-5619 pvaneck@ allegancounty.org DISTRICT 4 Mark DeYoung 616-681-9413 mdeyoung@ allegancounty.org DISTRICT 5 Dean Kapenga 269-751-8586 dkapenga@ allegancounty.org DISTRICT 6 Max R. Thiele 269-673-4514 mthiele@ allegancounty.org DISTRICT 7 Don Black 269-792-6446 dblack@ allegancounty.org DISTRICT 8 Tom Jessup 269-637-3374 tjessup@ allegancounty.org DISTRICT 9 Fritz Spreitzer 269-673-4131 fspreitzer@ allegancounty.org DISTRICT 10 Jon C. Campbell 269-694-4632 jcampbell@ allegancounty.org DISTRICT 11 Larry “Casey” Jones 269-664-5362 lcjones@ allegancounty.org County Services Building 3283 – 122nd Avenue Allegan, MI 49010 269-673-0203 Main Office 269-686-5331 Main Fax http://www.allegancounty.org Larry “Casey” Jones, Chairman Dean Kapenga, Vice Chairman BOARD OF COMMISSIONERS MEETING – AGENDA Thursday, February 25, 2010 – 1:00 p.m. Board Room – County Services Building 1:00 p.m. REVISION #1 CALL TO ORDER: OPENING PRAYER: Commissioner Campbell PLEDGE OF ALLEGIANCE: ROLL CALL: COMMUNICATIONS: APPROVAL OF MINUTES: January 28, 2010 PUBLIC PARTICIPATION: ADDITIONAL AGENDA ITEMS: APPROVE OF AGENDA: PRESENTATIONS: Area Agency on Aging, Tom Czerwinski & Eleanor Nielson PROCLAMATIONS: INFORMATIONAL SESSION: None ADMINISTRATIVE REPORTS: CONSENT ITEMS: 1. Motion to approve reports of claims paid/interfund transfers and to incorporate into proceedings of the Board (2/12/10 & 2/19/10) 2. Personnel Policy 504—adopt revision (68-400) ACTION ITEMS: 1. Administration—approve Jail Architect and Engineering Contract 2. *Transportation—authorize MDOT Project Authorization 2007-0157/Z16 Vehicle Purchase (68-888) DISCUSSION ITEMS: 1. Facilities Management—approve CMH Clinic Renovation Project Budget Adjustment (68-403) 2. Health Department—apply for Michigan Public Health Institute Grant (68-630) 3. Emergency Management—approve 2007 Homeland Security Grant Program Award (66-469) 4. Casino Board representation Mission Statement “The Allegan County Board of Commissioners shall plan, develop, and evaluate the necessary policies and resources to ensure our county continues to progress and prosper” NOTICES OF APPOINTMENTS & ELECTIONS: 1. Brownfield Redevelopment Authority (A): One Representative 3 yr. term–expires 12/31/2009 (SBrooks resigned) 2. Sheriff-Community Relations Advisory Board (A): One MTA Representative 1 yr. term–expires 12/31/2010 (KPotter resigned) 3. Parks & Recreation Commission (E): One Representative 3 yr. term–expires 12/31/2010 (GDoster resigned) 4. Commission on Aging (E): One Senior Representative 3 yr. term–expires 12/31/2011 (GSmeege resigned) 5. Community Mental Health Board (E): One Board Representative 3 yr. term–expires 3/31/2010 Three Representative 3 yr. term–expires 3/31/2010 APPOINTMENTS: None ELECTIONS: None PUBLIC PARTICIPATION: ROUND TABLE: ADJOURNMENT: Next Meeting - Thursday, March 11, 2010 @ 1:00 p.m. @ BOARD ROOM – COUNTY SERVICES BUILDING, COUNTY SERVICES COMPLEX. ALLEGAN COUNTY BOARD OF COMMISSIONERS REPORT OF COMMITTEE ON FINANCE HONORABLE BOARD OF COMMISSIONERS OF ALLEGAN COUNTY, Your committee on Finance has authorized the following claims for February 12th, 2010. The following claims, which are chargeable against the County, were audited in accordance with Section 46.61 to 46.63, inclusive, M.C.L. 1970 as amended and resolutions of the Board. Said claims are listed in the 2010 Claims Report, Liber ___, and Commissioners’ Record of Claims. TOTAL AMOUNT CLAIMED 1010 2080 2110 2150 2210 General Fund Park/Recreation Fund Central Dispatch/E911 Fund Friend of the Court Fund 2300 2450 2455 2630 Palisades Emergency Planning Facility UP 2921 2950 6770 AMOUNT ALLOWED 262,666.63 283.92 224,588.96 285.00 262,666.63 283.92 224,588.96 285.00 Health Department Fund 21,124.41 21,124.41 Transportation Grant 42,507.72 42,507.72 Public Improvement Fund 61,965.94 61,965.94 Public Improvement - Jail 34,114.69 34,114.69 240.10 240.10 Child Care – Circuit/Family 14,587.31 14,587.31 Senior Millage 11,272.08 11,272.08 662,873.75 662873.75 1,336,510.51 1,336,510.51 Self Insurance Fund TOTAL AMOUNT OF CLAIMS Respectfully submitted, COMMITTEE OF FINANCE Chairperson Vice-Chairperson ________________________________________ Attest, A True Copy , Clerk ADOPTED: February 11th, 2010 Oral Report to County Board Finance County Treasurer (Original with Committee Minutes) T:/Finance/Accounts Payable/Claims/Claims Report 01 AMOUNT DISALLOWED ALLEGAN COUNTY BOARD OF COMMISSIONERS REPORT OF COMMITTEE ON FINANCE HONORABLE BOARD OF COMMISSIONERS OF ALLEGAN COUNTY, Your committee on Finance has authorized the following claims for February 19th, 2010. The following claims, which are chargeable against the County, were audited in accordance with Section 46.61 to 46.63, inclusive, M.C.L. 1970 as amended and resolutions of the Board. Said claims are listed in the 2010 Claims Report, Liber ___, and Commissioners’ Record of Claims. TOTAL AMOUNT CLAIMED 1010 2080 2110 2210 General Fund Park/Recreation Fund Central Dispatch/E911 Fund 2450 2455 2560 Register of Deeds Automation Fund 2630 Palisades Emergency Planning Facility UP 2660 Justice Training Fund- P.A. 302, 1982 2790 Grants 2921 Child Care – Circuit/Family 2940 Veterans Trust Fund 2950 6160 6194 6195 6196 6198 6200 8010 AMOUNT ALLOWED 189,760.53 614.30 6.45 189,760.53 614.30 6.45 Health Department Fund 759.55 759.55 Public Improvement Fund 878.16 878.16 Public Improvement - Jail 2012.32 2012.32 37,896.38 37,896.38 897.72 897.72 575.00 575.00 1,012.69 1,012.69 45,183.36 45,183.36 29.62 29.62 162.93 162.93 8,658.75 8,658.75 Delinquent Tax Revolving Fund- 2004 Taxes 111.84 111.84 Delinquent Tax Revolving Fund- 2005 Taxes 561.69 561.69 Delinquent Tax Revolving Fund- 2006 Taxes 100.37 100.37 Delinquent Tax Revolving Fund- 1998 Taxes 295.99 295.99 6,003.10 6,003.10 15,705.87 15,705.87 311,226.62 311,226.62 Senior Millage Delinquent tax Revolving Fund Tax Reversion Drain Fund TOTAL AMOUNT OF CLAIMS Respectfully submitted, COMMITTEE OF FINANCE Chairperson Vice-Chairperson ________________________________________ Attest, A True Copy , Clerk ADOPTED: February 18th, 2010 Oral Report to County Board Finance County Treasurer (Original with Committee Minutes) T:/Finance/Accounts Payable/Claims/Claims Report 01 AMOUNT DISALLOWED 68-400 S T A T E O F M I C H I G A N BOARD OF COMMISSIONERS OF THE COUNTY OF ALLEGAN February 25, 2010 PERSONNEL POLICY 504—ADOPT REVISION BE IT RESOLVED that the Allegan County Board of Commissioners hereby approves the following revised Human Resources Policy as attached, effective immediately: • 504 – Holidays ; and, BE IT FURTHER RESOLVED, that Human Resources will provide copies of the revised policy and post it to the website as necessary to inform all employees. ATTACHMENTS Dates displayed in Eastern Standard Time Work Orders 2/19/2010 1:04:48PM Work Order 68400 Summary Requestor Requestor Call Back Number Department Location Assigned Technician Priority Date Completed Status HR_Revise 504 Holiday Policy Vickie Herzberg 2642 Human Resources Ashley Thomson As soon as possible - Type Asset ID Department Number Date Entered Date Assigned Expected Completion Date Charge Hours Admin / Board RFA 226 2/4/2010 2:15:38PM 2/18/2010 11:18:23AM 2/25/2010 11:18:21AM Work Order Description 2/4/2010 2:42:56PM BBLAINE Requesting Board approval to revise Holiday Policy 504 removing Section 1.1; see attached revised policy. Removing Section 1.1 would require the Health Department to observe Columbus Day and close down. In years prior, to best serve the public and coordinate with the holiday schedule for the Family Independence Agency, Health Department employees did not observe Columbus Day as a holiday and received one floating holiday to be used each calendar year. We have discussed this change with both Rashmi Travis, Health Officer & Susan Bailey Carman, DHS Director and have their support. It is the Executive Team's recommendation to approve this change to create unity throughout all county employment policies and contracts and provide a potential savings in utilities for this building. Technician 2/18/2010 11:18:15AM BBLAINE BOC moved to consent on 2/25/10. 2/18/2010 11:17:55AM BBLAINE Per RSarro move to discussion item on 2/11/10. 2/5/2010 2:22:21PM BBLAINE Placed on 2/11/10 BOC agenda for action. 2/4/2010 4:53:58PM VHerzberg Approved 2/4/2010 3:17:43PM BBLAINE Assigned to VHerzberg for review and approval. Tentatively placed on the 2/11/10 BOC under action. 2/4/2010 2:59:37PM JNANCE Attached draft resolution and assigned to B Blaine. Powered by Track-It! Page 1 of 2 ALLEGAN COUNTY REQUEST FOR ACTION FORM Request Type Department Requesting Submitted By Contact Information Description RFA#: 68-400 Date: 2/4/2010 Routine Items Human Resources Vickie Herzberg 2642 Requesting Board approval to revise Holiday Policy 504 removing Section 1.1; see attached revised policy. Removing Section 1.1 would require the Health Department to observe Columbus Day and close down. In years prior, to best serve the public and coordinate with the holiday schedule for the Family Independence Agency, Health Department employees did not observe Columbus Day as a holiday and received one floating holiday to be used each calendar year. We have discussed this change with both Rashmi Travis, Health Officer & Susan Bailey Carman, DHS Director and have their support. It is the Executive Team's recommendation to approve this change to create unity throughout all county employment policies and contracts and provide a potential savings in utilities for this building. PAGE 1 of 1 ALLEGAN COUNTY EMPLOYEE HANDBOOK Category: Number: Approved: Subject: 1. Employee Benefit Policy 504 February 25, 2010, supersedes prior policy HOLIDAYS HOLIDAYS: The following days shall be recognized as holidays for nonbargaining employees and the Employer shall not normally schedule work on these days: New Year’s Eve Day, New Year’s Day, Martin Luther King Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s day, Thanksgiving Day, the day after Thanksgiving, Christmas Eve Day and Christmas Day. When any holiday falls on Saturday, a full day off will be granted on Friday. When Christmas Eve Day or New Year’s Eve Day falls on a Friday a full day off will be granted on Thursday. When Christmas Eve Day or New Year’s Eve Day falls on Sunday a full day off will be granted on Tuesday. When a recognized holiday falls on Sunday, a full day off will be granted on Monday. 2. ELIGIBILITY: To be eligible for holiday pay under this policy, all employees must be a regular full-time, regular part-time or job-share employee as of the time the holiday occurs. The employee must have worked the last day he or she was scheduled to work prior to the holiday and the next day following such holiday. The only exception is in cases where the employee’s absence on such day or occurred during his/her regularly scheduled PTO or an absence that is excused by the Department head. 1. HOLIDAY PAY: Holiday pay will be paid as follows: Regular full-time employees working eighty (80) hours per pay period will receive eight (8) hours of pay for an observed holiday. Regular part-time employees and job-share employees will receive compensation at their regular straight hourly rate for an observed holiday based on hours they would have been schedule to work. Holidays are not paid during any leave of absence. 4. HOURS OF WORK ON A HOLIDAY: Non-exempt employees required to work on any designated holiday shall receive the overtime rate of pay for the actual hours worked in addition to the holiday pay. 504 - Page 1 of 1 Allegan County Administrative Offices County Services Building 3283 – 122nd Avenue Allegan, MI 49010 269.673.0203 ADMINISTRATOR’S UPDATE to the BOARD OF COMMISSIONERS Thursday, February 25, 2010 Financial Perspective (management of risk, capital, expenditures, revenues, etc.) • MMRMA – we have received Quarterly Reports from our liability carrier which is available electronically for those who would like to review it. It contains the following information to its members: o o o o o Report from the Executive Director Claims Report Risk Management Report Statement of changes in our funds on deposit as of December 31, 2009 MMRMA Unaudited Financial Statement as of December 31, 2009 Please contact Denise if you would like this information emailed to you. • On February 18, we reviewed our budget policy and the process for putting together the budget. There is a lot of excitement toward having an interactive process with regard to establishing goals and prioritizing services which is likely to lead to well thought out decisions with a greater understanding of the impact of our decisions. • West Michigan Regional Planning Commission Annual Request for Projects – Since Allegan County is a member of the CEDS program; the County and its community can apply to the USEDA (U.S. Economic Development Administration) for funding assistance on projects they are considering. WMRPC is currently developing a complete project list for 2012 that will incorporate submissions for 2010 and 2011. The complete packet of information is attached. Administration will be sending this to County departments for their information and possible submission of projects. Internal Resources (internal business and personnel related processes) • A question arose with respect to the status of a Board Retreat. Initially, the retreat was going to focus on goals/planning and/or prioritization of services (mandated, non-mandated, etc.) Goals and planning should be addressed during ADMINISTRATION Robert J. Sarro County Administrator Fax 269.686.5331 [email protected] BUDGET and FINANCE David B. Van de Roovaart Director Fax 269.673.0367 [email protected] HUMAN RESOURCES Vickie Herzberg Director Fax 269.673.0367 [email protected] our Board Planning Sessions. The services discussion will be incorporated into special budget meetings. I plan to meet with the Chairman, Vice-Chairman, and Human Resources Director to discuss their thoughts for the potential focus of a Board Retreat. Services (public [customer based] information) • Jail and Sheriff Administration Building Project – A question was presented during the last meeting as to where we are with potential renovations for the Sheriff’s offices. We are at a point where finalizing a contract with an architect is critical to the next steps of our project. The Board, trying to experience all efficiencies we can in this project, has committed to an aggressive planning process. Until we can embark on that process decisions with regard to any renovations, new construction, etc. are on hold. Given the existence of a contract with a construction manager which is paid in equal monthly payments at this point, and our ownership of a current vacant facility, there is great financial incentive to move forward quickly. • Lakeshore Coordinating Council - On February 19, a meeting took place between the Administrators of Allegan, Berrien, Ottawa and Muskegon counties along with Community Mental Health representation. The discussion focused on the need for Ottawa and Muskegon to pursue an integrated approach to substance abuse and mental health. Their research indicated many clients are not considered “single issue” and believe they can provide integrated services more efficiently directly through their counties. Absent the current ability to create another coordinating agency (CA) designation, the counties are investigating being able to keep the Lakeshore Coordinating Council as the CA but have a delegation agreement for substance abuse funds to go directly to the counties. Ottawa and Muskegon are developing a model for this and will come back with a proposal in the next six weeks. In addition, legacy costs need to be considered as part of that model. Legacy costs also need be considered with respect to Cass and Van Buren counties since their departure. • Allegan County Animal Shelter - On February 18, representatives from the Allegan County Sheriff’s Department, Wishbone Pet Rescue Alliance, and Allegan County Administration met to discuss a model for working collaboratively to ensure the health and wellness of animals while in our care and maintain compliance with all applicable policy and code the County must maintain. The meeting was extremely positive and productive. Through a facilitated discussion, the parties discussed the purpose of each organization, areas of common ground, areas of differences or conflict, and developed next steps designed to capitalize on the common areas and overcome areas of conflict. 2 The parties agreed to the following and will follow-up with another meeting in the next few weeks: 1. The County agrees to provide Wishbone Pet Rescue Alliance (WPRA) volunteers shelter access Monday-Friday from 5 PM to 8 PM, and Saturday & Sunday from 12 PM to 8 PM. (Details are to be determined). 2. The Animal Control Shelter Operation (ASCO) agrees that these (hours listed in item 1) will be a regular schedule and a problem resolution, review and comment process will be developed with internal Shelter staff and WPRA staff. 3. ACSO supports WPRA’s involvement in SCRAB subcommittee – oversight of shelter. 4. County will research security and webcam for shelter. 5. Create a “Draft” for an Agreement between ACSO & WPRA. 6. The ACSO retains management of the shelter. 3 WMRPC WEST MICHIGAN REGIONAL PLANNING COMMISSION 820 Monroe Avenue NW. Suite 214. Grand Rapids. MI 49503. (616) 774-8400. www.wmrpc.org MEMORANDUM To: Region 8 Governmental Units, Development Organizations, and Others From: Dave Bee, Director Date: February 11,2010 Subject: Request for Projects - Comprehensive Economic Development Strategy (CEDS) The West Michigan Regional Planning Commission (WMRPC) is the designated agency under the U.S. Economic Development Administration (EDA) that prepares and submits the' Comprehensive Economic Development Strategy (CEDS) for the Region 8 service area that, includes the counties of Allegan, Ionia, Kent, Mecosta, Montcalm, Osceola, and Ottawa, Through this program, the WMRPC assists local governments in planning and funding economic development projects. The WMRPC has served as the local agency since 1973 aii'd has helped bring over $71 million in EDA investments to Region 8 communities. .. ,":) In 2007 the WMRPC developed its first three-year CEDS, eliminating the need for an annJiliI document and list of projects. But, the WMRPC recognized that issues and goals change lliRl that there were many potential projects not listed in the 2007-2009 CEDS, To provide EDA with a current list projects, the WMRPC submitted a supplemental CEDS in 2008 and 2009. ' The WMRPC will again develop a three year CEDS, but the order is reversed for the next cycle. The WMRPC will develop preliminary lists of projects in 20 I0 and 20 II - and will produce a complete CEDS in 2012. The CEDS Committee and the WMRPC will use 2010 and 20 II to gather projects and will use 2012 to refine and prioritize the gathered projects. All projects submitted to the WMRPC in 2010 and 20 II will be included in two interim CEDS documents that will be forwarded to EDA for consideration (funding is available each of the three years). If your community is interested in applying to EDA for funding assistance, please complete the enclosed submission form and forward it to the WMRPC by May I, 20 I 0 to allow the CEDS Committee time to review the projects at its May 26, 20 I 0 meeting. Please review the two-sided EDA document enclosed with this packet that identifies EDA's six Investment Priorities and EDA's current Investment Programs. Listing projects in the CEDS is the first step in the EDA process, After a project is listed, contact the WMRPC to move projects forward. Communities can file an application for an EDA grant any time during the calendar year and the WMRPC will work closely with applicants to create a successful application. If you have any questions or would like more information, please caIl our offices or contact one of the CEDS Committee representatives from your county. OUR MISSION STATEMENT To assist planning efforts in community and economic development, provide a regional forum for sharing in/ormation and idea.", and promote cooperative solutions to regional issues. PROJECT SUBMISSION FORM FOR SUPPLEMENTAL CEDS REPORT Please return to: West Michigan Regional Planning Commission 820 Monroe NW, Suite 214 Grand Rapids, MI 49503 (616) 774-8400 Fax (616) 774-0808 E Mail: dbeelfl\w~~c.ora Proposed Project Location Location of facility: City, Village, or Township: Applicant: Project Title: Project Contact Person: Teleohone Number: County: Prolect Benefits Project Readiness Projected number ofjobs created: Matching Funds Anticipated number ofjobs retained: How many of EDA's Investment Policy Guidelines does the project address? (see introductory memorandum) 2 _3 4 - 5 - I _Secured _Lacking Engineering & Cost Estimates _Completed _In Progress _Lacking Indicate all available utilities Identify employment impacts of project: _Community _Adjacent Communities _County _Region Puhlic and Private Commitment Project listed in Comprehensive Plan, CIP, or similar document/program? No Previous CEDS Yes Identity Planning Document: _Water _Sanitary & Storm Water Treatment All-season Road Gas Electric _Telephone - Broadband Identify ownership: _Community/public body owns property to be improved or has control/easement of property _Community/public body has option on property - Following secured from affected firms? - Letter of Intent Letter of Commitment _None Project Supported by Adjacent Communities? Yes _No Project Costs: EDA State/Local Public Private Specify Other Total Project Supported by County? Yes No Project Description: (Attach Additional Sheets if Necessary) CEDS PROJECT EVALUATION CRITERIA (Updated Mareh 25, 2009) Recognizing the changes that have occurred in Michigan and in the U.S. Economic Development Administration (EDA), the CEDS Committee revised the evaluation criteria it uses to rank projects. This was listed as a goal of the Committee for the 2009 program year. The process began at the January 28, 2009 meeting and a draft of the criteria Was presented to the Committee at the March 25, 2009 meeting. The new criteria were successfully used in 2009 and will again be used in 2010. The following identifies the evaluation criteria adopted by the CEDS Committee. A. Project Benefits 1. EDA Eligibility (For County In which Proposed Project is Located) (Maximum 5 Points) 24 Month Unemployment Rate is at least I% greater than the national average or the per capita income is not more than 80% of the national average........... 24 Month Unemployment Rate is at least 175% of the national average or the per capita income is not more than 65% of the national average '" 24 Month Unemployment Rate is at least 200% of the national average or the per capita income is not more than 60% of the national average........ 24 Month Unemployment Rate is at least 225% of the national average or the per capita income is not more than 50% of the national average. .. ....... .. ... .... ..... ... .. . 2. Employment (No MaDmum) Projected Number of Full Time Jobs that Address EDNs Criteria Created Within 3 years .. Anticipated Number of Full Time Jobs that Address EDA's Criteria Retained . 3. 2 3 4 5 I Point/20 Jobs I Point/20 Jobs Ratio oC EDA Share oC Project Cost to Number oC Jobs Created and/or Retained (Maximum 5 Points) Greater than $37,500 per job...... 0 $30,001 - $37,500 per job..................................................................... 1 $22,501 - $30,000 per job....................... 2 $15,001 - $22,500 per job..................................................................... 3 $7,501 - $15,000 per job.......... 4 $7,500 or less per job.............. 5 4, Addresses EDA Investment Priorities (see below) (Maximum 5 Points) Meets at least one of EDA's Investment Priorities........................................... Meets at least two of EDA's Investment Priorities............... Meets at least three of EDA's Investment Priorities.... Meets at least four of EDA's Investment Priorities.................. Meets all of EDA's Investment Priorities......... a. b. c. d. e. Investment Priorities Collaborative Regional Innovation PubliclPrivate Partnerships National Strategic Priorities Global Compttitiveness Economically Distressed and Underserved Communities --See handout for additional information on Investment Priorities 1 1 2 3 4 5 S. Impact of'ProJect on Region (Maximum 5 Points) Project would impact community where project located...... Project would impact adjacent communities............................................ Project would impact County-wide Population... Project would impact Region-wide Population......................................... I 3 4 5 B. Project Readiness 1. Matcbing Funds (Maximum 5 Points) Not Secured.. Secured and Account for less than 30 percent of Total Project Cost.................... Secured and Account for 30-39 percent of Project of Total Project Cost.................. '" Secured and Account for 40-49 percent of Project of Total Project Cost. Secured and Account for 50 percent or more of Project of Total Project Cost............ 0 2 3 4 5 2. Engineering and Project Cost Estimates (Maximum 5 Points) Project Engineering Not Started , , .. , . . . Project Engineering In-Progress................................................................. Project Engineering and Cost Estimates Completed ,'" ". 0 2 5 3. Availability of'Utilities (Maximum 7 Points) Site has access to adequate public water, sanitary and storm water treatment, all-season road, natural gas, electricity, telephone, and broadband internet I PointlUtility services ..... 4. Ownersbip (Maximum 5 Points) Public Body has option to purchase property where improvements are proposed '" Public Body owns property where improvements are proposed or has control/easement of property . 2 5 C. PubUc and Private Commitment 1. Member of'WMRPC (Maximum 5 Points) Community or County is member ofWMRPC................................................. 5 2. Project Matches Community Goah (Maximum 5 Points) Project Listed in Previous CEDS Document, but no local Plan...................... Project Listed in Comprehensive Plan and/or Capital Improvements Plan.............. 2 5 3. Private Sector Support (Maximum 5 Points) Letter of Intent from Private Sector Businesses............................................. Letter of Commitment from Private Sector Businesses.,; 3 5 4. Regional Cooperation (MaIimum 5 Points) Support from Community (Project Submission Form) . Letter of Support/Resolution from Adjacent Community or County (CEDS Representative or other).................. Letter of Support/Resolution Adjacent Community ond County.......................... 3 5 2 Eeonomte Development Administration U.S. Department of Commerce EDA's Mission: To lead the federal economic development agenda by promoting innovation and competitiveness, preparing American regions for growth and success in the worldwide economy. EDA targets its investment assistance on attracting private capital investment and creating higher-skill, living-wage jobs in those communities and regions that are suffering from economic distress as described in 13 C.F.R. § 301.3. EDA investments are focused on locally-developed, regionally-based economic development initiatives that achieve the highest return on the taxpayers' investment and that directly contribute to economic growth. EDA is authorized to partner with non-profit organizations and units of local government. EDA Investment Priorities: Within the parameters of a competitive grant process, all projects are evaluated to determine if they advance global competitiveness, create jobs, leverage public and private resources, can demonstrate readiness and ability to use funds quickly and effectively and link to specific and measureable outcomes. To facilitate evaluation EDA has established the following investment priorities: 1. Collaborative Regional Innovation Initiatives that support the development and growth of innovation clusters based on existing regional competitive strengths. Initiatives must engage stakeholders; facilitate collaboration among urban, suburban and rural (including Tribal) areas; provide stability for economic development through long term intergovernmental and public/private collaboration; and, support the growth of existing and emerging industries. 2. PubliclPrivate Partnerships Investments that use both public and private sector resources and leverage complementary investments by other government/public entities and/or non-profits. 3. National Strategic Priorities Initiatives that encourage job growth and business expansion in clean eriergy; green technologies; sustainable manufacturing; information technology (e.g., broadband, smart grid) infrastructure; communities severely impacted by automotive industry restructuring; natural disaster mitigation and resiliency; access to capital for small and medium sized and ethnically diverse enterprises; and, innovations in science, health care and alternative fuel technologies. 4. Global Competitiveness Investments that support high-growth businesses and innovation-based entrepreneurs to expand and compete in global markets. 5. Environmentally-Sustainable Development Investments that encompass best practices in "environmentally sustainable development," broadly defined, to include projects that enhance environmental quality and develop and implement green products, processes, and buildings as part of the green economy. 6. Economically Distressed and Underserved Communities Investments that strengthen diverse communities that have suffered disproportionate economic and job losses and/or are rebuilding to become more competitive in the global economy. EDA Investment Programs: Public Works: Empowers distressed communities to revitalize, expand, and upgrade their physical infrastructure to attract new industry, encourage business expansion, diversify local economies, and generate or retain long-term, private sector jobs and investment. Economic Adjustment: Assists state and local interests in designing and implementing strategies to adjust or bring about change to an economy. The program focuses on areas that have experienced or are under threat of serious structural damage to the underlying economic base. Community Trade Adjustment Assistance: Provides project grants to communities that have experienced, or are threatened by, job loss resulting from international trade impacts. Parlnership Planning: Supports local organizations (Economic Development Districts, Indian Tribes, and other eligible areas) with long-term planning efforts. Trade Adjustment Assistancefor Firms: A national network of eleven Trade Adjustment Assistance Centers to help manufacturers and producers affected by increased imports prepare and implement strategies to guide their economic recovery. Global Climate Change Mitigation Incentive Fund: Finances projects that foster economic development by advancing the green economy in distressed communities. University Centers: A partnership of the federal government and academia that makes the varied and vast resources of universities available to the economic development community. Research and National Technical Assistance: Supports research of leading edge, world class economic development practices and information dissemination efforts. Local Technical Assistance: Helps fill the knowledge and information gaps that may prevent leaders in the public and nonprofit sectors in distressed areas from making optimal decisions on local economic development issues. Economic Development Administration 1401 Constitution Avenue, NW Washington, D.C. 20230 www.eda.gov WEST MICHIGAN REGIONAL PLANNING COMMISSION COMPREHEI i~~!, ,'" iiRE,eIt~_i1< ""'!:~ "",'!i1".,j\\Il!.,,,., ~-F,1iif':ltlrt!l', """,Jl«lh", ·,iif.'.''iC'# "N,,!,~")!!l, '''?f~~,·. ":!i,i ;~~F:~Jjf~!il·l~iQ'i<i, ** Allegan County Nora Balgoyen-Williams Allegan County private sector Cindy Plautz City of Big Rapids City of Big Rapids Neighborhood Services Coordinator 226 N. Michigan Big Rapids, MI 49307 (231) 592-4036 KaraWood City of Grand Rapids Grand Rapids Economic Development Director 300 Monroe Avenue NW Grand Rapids, MI 49503 (616) 456-3196 Julianne Burns Ionia County Economic Development - Cities of Ionia and Belding 114 N. Kidd Street - P.O. Box 496 Ionia, MI 48846 (616) 527-4170 Ionia County private sector Consumers Energy 530W. Willow Lansing, MI 48909-7662 (517) 374-2235 Bill Mrdeza Mecosta County Mecosta County Development Corporation 246 North State Street Big Rapids, MI 49307 (231) 592-3403 David Hamelund Mecosta County private sector 18256 Taft Road Big Rapids, MI 49307 (231) 796-3917 John Johansen Montcalm County private sector 3503 S. Monroe Road Greenville, MI 48838 (616) 754-5375 Robert Schuleit Montcalm County private sector (616) 754-9539 Dan Massy Osceola County Osceola Economic Alliance 441 East Baldwin Lake Drive Greenville, MI 48838 301 W. Upton Reed City, MI 49677 Donald Disselkoen Ottawa County Ottawa County Commissioner 300 Farington Blvd. Holland, MI 49423 (616) 395-9820 James Marek Ottawa Cou nty private sector 16901 Cartson Spring Lake, MI 49456 (231) 724-4320 Tim Cochran City of Wyoming City Planner City of Wyoming P.O. Box 905 Wyoming, MI 49509-0905 (616) 530-7258 Lillian VanderVeen City of Wyoming private sector City of Wyoming (616) 534-3013 RickChapla The Right Place, Inc. The Right Place, Inc. John Miner At-large private sector 2751 Colgate Court SW Wyoming, MI 49519 161 Ottawa NW - Suite 400 Grand Rapids, MI 49503 350 Erin Isle Drive Holland, MI 49424 Howard Hansen At-large private sector 940 Monroe NW - Suite 155 Grand Rapids, MI 49503 Lar~"Casey"Jones Chris Thelen * ** Chairperson * Vice-Chairperson County Commissioner Allegan County Montcalm County Commissioner 258 Golfview Plainwell, MI 49080 (269) 664-5362 2188 - 36th Street Allegan, MI 49010 (269) 686-5079 (231) 832-7397 (616) 771-0325 (616) 298-8257 (616) 988-£469 ext. 1112 Updated Feb-10 S T A T E O F M I C H I G A N BOARD OF COMMISSIONERS OF THE COUNTY OF ALLEGAN February 25, 2010 ADMINISTRATION—APPROVE JAIL ARCHITECT AND ENGINEERING CONTRACT BE IT RESOLVED that the Allegan County Board of Commissioners hereby approves the proposed contract with RQAW Corporation, 10401 North Meridian Street, Suite 401, Indianapolis, IN, 46290 for architect and engineering services for the Jail and Sheriff Department Facility as presented; and BE IT FURTHER RESOLVED that the Board Chairman and/or the County Administrator are authorized to sign the necessary documents on behalf of the County and that the Budget and Finance Director is authorized to make the necessary budget adjustments to complete this action. ATTACHMENT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT 68-888 S T A T E O F M I C H I G A N BOARD OF COMMISSIONERS OF THE COUNTY OF ALLEGAN February 25, 2010 TRANSPORTATION—AUTHORIZE MDOT PROJECT AUTHORIZATION 2007-0157/Z16 VEHICLE PURCHASE WHEREAS, on February 14, 2008 the Board of Commissioners approved Michigan Department of Transportation (MDOT) operating assistance applications for FY2009; and WHEREAS, an awarded copy, dated September 2, 2009, of MDOT Project Authorization 2007-0157/Z16 from the State was received for the purchase of two transit vehicles; and WHEREAS, funds for the purchase of the two transit vehicles were included in the approved 2010 capital budget. THEREFORE, BE IT RESOLVED that the Allegan County Board of Commissioners hereby approves the request from the Transportation Department to approve the purchase of one of the two passenger bus transit vehicles and to authorize the order of one (1) diesel engine bus on a Ford E450 SD Chassis with lift from Coach & Equipment Manufacturing Corporation for an amount not to exceed $65,074.00; and BE IT FURTHER RESOLVED that the Board Chairman and/or the County Administrator are authorized to sign the necessary documents on behalf of the County and that the Budget and Finance Director is authorized to make the necessary budget adjustments to complete this action. Dates displayed in Eastern Standard Time Work Orders 2/23/2010 1:38:25PM 68888 Work Order Summary Requestor Requestor Call Back Number Department Location Assigned Technician Priority Date Completed Status TD_Request Authorization for emergency bus purchase Type Dan Wedge Asset ID 2902 Department Number Transportation Date Entered Human Services Building Date Assigned Becky Blaine Expected Completion Date Emergency / Urgent Charge Hours - Admin / Board RFA 676 2/22/2010 2:46:42PM 2/23/2010 1:38:03PM 2/25/2010 1:38:06PM Work Order Description 2/22/2010 2:46:43PM ALLEGANCOUNTY\DWedge I am requesting emergency authorization to purchase one of two busses. This purchase will be funded with funds from MDOT Contract 2007-0157/Z16. These vehicles are part of the board approved FY2009 MDOT application on 2-14-2008. See Attached. Technician 2/23/2010 1:38:01PM BBLAINE Per DVR place on 2/25/10 BOC agenda under action. 2/23/2010 8:14:02AM JNANCE Per DVR this will require future Board action. Will attach a draft resolution asap. 2/23/2010 8:10:42AM JNANCE Replaced previous Z16 attachment signed by C. Jones. Attached fully executed copy of Z16 and the Budget Adjustment No. 1 document that was received with it. Please note that the dollar amounts did not change. The change made was the State funding source. It was changed from : 2002/9702 to 2002/9702 2009/7520 2/22/2010 $41,450 $16,250 $25,200 5:06:22PM DSTAN Placing on ET agenda 2/23 for discussion follow through. 2/22/2010 3:31:11PM JNANCE Assigning directly to DVR per his request. 2/22/2010 3:09:04PM JNANCE As per conversation, attached Z16 project authorization signed by C. Jones. Requester talked with Rob and DVR regarding this item. Approval was needed same day as a result of funds and vehicle just becoming available. Requester received a call and was told that if he was not able to obtain same day approval that they would have to offer it to someone else on the waiting list for the diesel vehicles. Resolution Powered by Track-It! Page 1 of 2 2/23/2010 1:38:26PM Work Order 2/22/2010 3:45:15PM 68888 DVANDEROOVAART Recommend approval. 2/22/2010 2:46:44PM ALLEGANCOUNTY\DWedge Administrative Time- .25 hours Powered by Track-It! Page 2 of 2 ALLEGAN COUNTY REQUEST FOR ACTION FORM Request Type Department Requesting Submitted By Contact Information Item(s): Purchases - Capital Budget Transportation Dan Wedge, Transportation Director Dan Wedge Ex4729 RFA#: 68-888 Date: 2/22/2010 Select a Request Type to reveal and complete required form. Purchase one (1) diesel engine bus on a Ford E450 SD Chassis with lift from Coach & Equipment Manufacturing Corp. Total Bid Price $65,074.00 Budgeted? No. Bids Sent Yes No No. Bids Received Prebid or Qualifications: This purchase is eligible for purchase of the MDOT State contract. I am requesting emergency authorization to purchase one of two busses. This purchase will be funded with funds from MDOT Contract 2007-0157/Z16. These vehicles are part of the board approved FY2009 MDOT application on 2-14-2008. Recommendation of Award: Purchase off State Contract (MiDeal) It was my intent to submit an RFA for the purchase of two buses off the State Contract (MiDeal) from Coach & Equipment Manufacturing Corp. in January 2010. The two buses are budgeted for FY2010. On January 18th the state put a hold on bus purchases as the State contract for buses had reach the total quantity. MDOT sought approval for an extension of the current State bus contracts. On February 14th MDOT issued permission to once again to purchase from the state contract. Diesel chassis have not been available as new emissions laws have gone into effect January 2010. This created a difficulty for the bus being funded by a "Congestion Mitigation & Air Quality Grant" (CMAQ) which is for the purchase of one clean diesel bus. It was thought that there no more diesel chassis available but, on Friday February 19th the bus manufacture was able to locate a diesel chassis, but needs a confirmed order by Tuesday February 23, or it will be sold to the next in line. New diesel chassis will not be available for possibly 1-2 years. This will create a hardship for the County's transit operations. Both vehicles to be replaced with this year bus orders have meet their useful life and have been removed from service. One has been disposed and one soon to be for sale on Ebay. It would not be in the best interest to wait for this replacement vehicle. We are still down one bus less due to the accident last year. The remaining Gas engine bus will be requested under the normal BOC process with a new RFA. See attached support. Equipment / Service / Supplies: Where it was advertised REMINDER - Include Tabulation Sheet PAGE 1 of 1 Bus Order #1 - Unit #23 BUS TITLE AND DELIVERY INFORMATION February 22, 2010 DATE________________ Allegan County Transportation TRANSIT AGENCY______________________________________________ 071B9200172 CONTRACT NO.________________________ 38-1914307 FED I.D. # ____________ TITLE INFORMATION Allegan County Transportation Name of City, County, or Agency 3283 122nd Ave Street Address (Post Office Box Not Acceptable) Allegan MI 49010 City Zip Code DELIVERY ADDRESS Allegan County Transportation Name of Operating Transit Agency 750 Airway Drive Street Address (Post Office Box Not Acceptable) Allegan City MI 49010 Allegan Zip Code County Dan Wedge 269-686-4529 Contact Person Telephone Number 16 Bus Order #1 - Unit #23 NEW VEHICLE ORDER FORM – PAGE 1 Small Bus 18 Passenger Nonlift Bus Lift Bus with Alternate Seating 7 Years/200,000 Miles I. Allegan County Transportation Transit Agency Name:________________________________________________________________________ Dan Wedge Contact Name:______________________________________________________________________________ 269-686-4529 Phone Number:________________________ II. [email protected] E-mail:_____________________________________________ Contract and Funding Information CMAQ Program ___________________________ Body Manufacturer: Coach & Equip. Manufacturing Corp. 2007-0157/Z16 Agency Contract # ___________________ Vendor Contract #: 071B9200172 Vendor Name: Shepard Bros., Inc. III. Vehicle Information/Seating Chassis Manufacturer: Ford E450 SD Body: Steel cage with combination of fiberglass reinforced plastic and 18 gauge steel exterior panels Group A-D: Passenger seats with Vinyl seat covers Qty Capacity _____ Ea A. 18 Passenger bus without lift _____ Ea B. 11+1 Passenger bus with front passive lift _____ Ea C. 8+2 Passenger bus with front passive lift _____ Ea D. 4+2 Passenger bus with rear passive lift Group E-H: Passenger seats with Fabric seat covers Qty Capacity _____ Ea E. 18 Passenger bus without lift 1 Ea F. 11+1 Passenger bus with front passive lift _____ _____ Ea G. 8+2 Passenger with front passive lift _____ Ea H. 4+2 Passenger bus with rear passive lift $ $ $ $ Unit Price 43,774.71 47,278.67 47,077.53 48,592.39 Total $___________ $___________ $___________ $ ___________ $ $ $ $ Unit Price 44,020.68 47,485.22 47,243.80 48,811.79 Total $___________ $___________ 47,485.22 $___________ $___________ 47,485.22 Subtotal $___________ Vehicle Colors: None Base ___________________________________ Stripe _______________________________ White Top_____________________________________ Width___________________ White Seating: Gray Color (Tan or Gray) ______________________ Gray Flooring: Color (Tan or Gray) ___________ Comments: Options – Alternate Quote Prices on Page 2 17 Bus Order #1 - Unit #23 NEW VEHICLE ORDER FORM - PAGE 2 IV. Options Qty _____ Ea 1 Ea _____ _____ Ea _____ Ea _____ Ea _____ Ea 1 Ea _____ _____ Ea _____ Ea _____ Ea 1 Ea _____ _____ Ea _____ Ea _____ Ea _____ Ea _____ Ea _____ Ea _____ Ea _____ Ea 1 Ea _____ 1 Ea _____ _____ Ea _____ Ea _____ Ea _____ Ea _____ Ea 1 Ea _____ _____ Ea _____ Ea 1 Ea _____ _____ Ea _____ Ea _____ Ea _____ Ea 1 Ea _____ _____ Ea _____ Ea _____ Ea _____ Ea _____ Ea _____ Ea _____ Ea _____ Ea 1 1 1 Ea Ea Ea Item 1a. Air conditioning system skirt mount 1b. Air conditioning roof mount 2. Manual entrance door (deduct) 3. Diesel engine 6.0, minimum 4a. Auxiliary air heater system-gas 4b. Auxiliary air heater system-diesel 5. Power seat base for driver’s seat 6. Destination Sign 7. Ceiling Handrails 8. Engine shutdown system 9. Donation box 10. Farebox electrical prep 11. Rear emergency exit window 12a. Paint – One strip 12b. Paint – Roof second color 12c. Paint – Different full body 13. Folding platform passive lift 14. Rear five place passenger seat 15. Two-way radio prep package 16. Smooth anti-slip flooring 17. Entrance stepwell heater 18. Mirrors Heated Remote Control (remote standard) 19a. Tire/Wheel – Spare Tire & Wheel (shipped in bus) 19b. Tire/Wheel – Painted Wheels (six) 19c. Tire/Wheel – Stainless Steel Wheel Inserts 20. Fog Lights 21a. Radio – AM/FM/CD w/speakers (2) 21b. Radio – PA/AM/FM/CD w/speakers (2) 21c. Public Address System Only 21d. Extra Speakers (total of four) 22. Raised Floor Option (no wheel wells) 23a. Restraint – Q’Straint Pocket System – Per Location 23b. Restraint – Additional Systems 23c. Restraint - Q’Straint Storage Under Foldaway Seat Wheelchair Position 24. Driver’s Side Running Boards *25. Extended Bus Body & Chassis (176” wheelbase) **26a. Seating – Forward Facing Standard Double Seat **26b. Seating – Forward Facing Double Fold-A-Way **26c. Seating – Freedman Double w/Single ICS **26d. Seating – Freedman Double w/Two ICS (38” wide) **26e. Seating – Cloth Seat Covers per Passenger **26f. Seating – Seatbelts per passenger **26g. Seating – Grab Handles $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Unit Price 5,808.15 6,594.87 (633.88) 7,735.12 2,239.64 2,239.64 374.00 3,030.94 327.96 84.99 (650.02) 31.43 (450.34) 310.24 603.21 2,321.64 233.88 321.04 208.69 455.66 169.41 450.00 400.00 450.00 475.00 850.00 600.00 950.00 900.00 200.00 950.00 385.00 845.00 85.00 $ 395.00 $ $7,000.00 $ 475.00 $ 745.00 $ 837.00 $ 1,186.00 $ 27.00 $ 63.00 $ 39.00 OEM Cruise Control 595.00 Double lift Door 123.00 Options Subtotal Set of 4"LED Lift Hazard light 201.00 Page 1 Subtotal TOTAL V. Authorized Signature: Draft Order Date: 18 Total $___________ 6,594.87 $___________ $___________ 7,735.12 $___________ $___________ $___________ 374.00 $___________ $___________ $___________ $___________ -650.02 $___________ $___________ $___________ $___________ $___________ $___________ $___________ $___________ $___________ 455.66 $___________ 169.41 $___________ $___________ $___________ $___________ $___________ $___________ 600.00 $___________ $___________ $___________ 200.00 $___________ $___________ $___________ $___________ $___________ 395.00 $___________ $___________ $___________ $___________ $___________ $___________ $___________ $___________ $___________ $919.00 16,669.04 $___________ 47,485.22 $___________ $____________ 65,073.26 Page 1 of 1 Dan Wedge From: Jim A. Adams [[email protected]] Sent: Saturday, February 20, 2010 9:03 AM To: Dan Wedge Subject: Ford Diesel Hello Dan: I wanted to follow up with you regarding a brief window of opportunity that might be of interest to you. I recall you mentioning to me within the last week or two that you were considering ordering a couple of buses and that you were grappling with the issue that one of your funding sources for these new bus purchases was from CMAQ money for a “diesel” bus. As we both know, Ford and GM both are not offering diesel chasses right now because of the new federal emission standards that went into effect on January 1, 2010. Ford hopes to be able to offer a diesel chassis once again sometime in 2011. GM keeps telling us that they plan to offer a diesel chassis sometime later this summer 2010, but each time we ask GM for a price they keep delaying/pushing the date and tell us they are not quite ready yet. To meet these new emission standards, from everything we read, both Ford and Gm plan to use UREA. UREA is a liquid that will be stored on board the vehicle in a smaller tank and mixed in the fuel stream with the diesel fuel in the vehicles fuel delivery system. Yes, it will add to the purchase price, the operating costs, and the complexity of transportation operations; but this UREA diesel fuel mixture will reduce emissions. Until both Ford and GM figure out this new technology or come up with a different technology to meet emission standards the industry does not have a diesel offering in this class of bus. With that bad news out of the way, there is a glimmer of hope. Our bus manufacturer, just alerted me to the fact that due to some changes in customer orders for 2009, we now have some left over 2009 diesel chasses available, but I am sure wont be available for long, because everyone is going to want to grab the few that are left over. In our inventory we have the following diesel chasses: 1 – 176” wheelbase 2 – 158” wheelbase [ordered/committed 2/19/10 by TRANSPO, South Bend, IN] 1 – 158” wheelbase [ordered/committed 2/19/10 by Dial-A-Ride, Niles, MI] 2 – 158” wheelbase [ordered/committed 2/19/10 by Van Buren, MI] 1 – 158” wheelbase [Allegan County Transit on hold awaiting decision] This will exhaust all of our diesel chasses remaining in inventory. I can wait for your decision a day or two, but the factory will not want to wait beyond 1 – 2 days, if a bona fide order is presented from another customer. I hope this helps you decide. There isn’t any time really and sorry for the pressure/rush; but wanted you to know this opportunity was available. Thanks, Jim Jim A. Adams Shepard Bros., Inc. 942 Surrey Way Cincinnati, Ohio 45245 Office: [513] 752-1311 Fax: [513] 752-4992 Cell: [513] 464-7707 Email: [email protected] www.shepardbrosinc.com 2/21/2010 Dan Wedge Subject: Allegan County CMAQ FY2009 -----Original Message----From: Sandra Cornell-Howe [mailto:[email protected]] Sent: Monday, February 22, 2010 9:36 AM To: Dan Wedge Subject: Re: Allegan County CMAQ FY2009 HI Dan If at all possible, it would be best to purchase the diesel bus that was described in your original application and worksheet. Several steps would need to be completed to change the approval to a different type of bus. We will need to resubmit the CMAQ worksheet and application to request a new eligibility determination from FHWA. Please, let me know if you have any questions or how I can be of assistance. Sandra Sandra M. Cornell-Howe Transportation Planner Statewide Planning Section (517) 335-2971 >>> "Dan Wedge" <[email protected]> 2/19/2010 4:27PM >>> Sandra, My FY2009 CMAQ grant is for 1 clean Diesel bus. I have been told neither Ford or Chevy are in production of Diesel Chassis and most likely will not have anything until 2012. What are my options if I can not located a diesel bus chassis? I vendor off the state contract has one if I can purchase by Tuesday, but I'm not sure I can meet the local purchasing requirements on such short notice. Please provide and suggestion or options I may have to purchase a bus and still meet the CMAQ requirements. I would be ok with a Gas engine if necessary. badly need a vehicle. Please advise. Sincerely, Dan Wedge Transportation Director Allegan County Transportation 750 Airway Drive Allegan, MI 49010 269-686-4529 1 We DRAFT S T A T E O F 68-403 M I C H I G A N BOARD OF COMMISSIONERS OF THE COUNTY OF ALLEGAN February 25, 2010 FACILITIES MANAGEMENT—APPROVE CMH CLINIC RENOVATION PROJECT BUDGET ADJUSTMENT WHEREAS, the original project specifications for the Community Mental Health Clinic renovation were changed to include the installation of carpeting in an additional four rooms, and the removal and relocation of a wall to make the reception area more functional. THEREFORE BE IT RESOLVED that the Allegan County Board of Commissioners hereby approves a budget adjustment in the amount of $2,575 from contingency fund ____.___.___.00.00 to expense 2450.268.976.00.00 to cover the additional costs necessary to complete the project; and BE IT FURTHER RESOLVED that, as per the repayment guidelines established with the initial funds budgeted and approved for this project, Community Mental Health has agreed to repay the County for the additional funds appropriated for the project; and BE IT FINALLY RESOLVED that the Budget and Finance Director is authorized to make the necessary budget adjustments to complete this action. Dates displayed in Eastern Standard Time Work Orders 2/19/2010 3:24:50PM Work Order 68403 Summary Requestor Requestor Call Back Number Department Location Assigned Technician Priority Date Completed Status FM_Adjust budget for CMH renovation project to pay for change order Type Bob Wakeman Admin / Board RFA Asset ID 2662 Department Number Facilities Management 265 Date Entered 2/4/2010 2:58:28PM County Services Building Date Assigned 2/19/2010 3:02:49PM Ashley Thomson Expected Completion Date 3/11/2010 4:39:42PM As soon as possible Charge Hours - Work Order Description 2/4/2010 2:58:29PM ALLEGANCOUNTY\BWakeman Additional funding needed to pay for carpet replacement in four rooms not included in original contract but found necessary when furniture was removed for project and carpet was not suitable to reuse ($2335). Also includes cost of removing and relocating a wall that made the space unusable ($220). Technician 2/19/2010 3:02:44PM AThomson Per David place on 2/25/10 Board agenda under discussion. 2/9/2010 9:25:23AM DSTAN Assigned to DBV for his review and recommendation; please notify me if you need to have placed on an ET agenda for discussion. 2/8/2010 4:39:36PM BBLAINE Tentatively placed on 2/25/10 BOC meeting under discussion. Assigned to DStan for ET review if needed. 2/5/2010 4:20:05PM JNANCE B Wakeman confirmed. He advised CMH of the amount of the overage and they are willing to add that to their repayment plan and schedule. Assign to B Blaine for ET review and Board agenda discussion item. 2/5/2010 3:12:43PM JNANCE Attached copies of Board action 7/30/09 regarding the CMH renovation bid award and budget. Attached draft resolution for this budget adjustment. Sent email to requester to confirm verbiage regarding CMH agreement to repay the County for the additional funds appropriated for the project. Resolution 2/19/2010 1:59:35PM DVANDEROOVAART recommend approval. 2/4/2010 2:58:30PM ALLEGANCOUNTY\BWakeman Administrative Time- .25 hours Powered by Track-It! Page 1 of 2 ALLEGAN COUNTY REQUEST FOR ACTION FORM Request Type Department Requesting Submitted By Contact Information RFA#: 68-403 Date: 2/4/2010 Budget Adjustments or Transfers Facilities Mgmt Bob Wakeman Ext.2662 Revenue Expense Fund, Activity, Account: Mental health Building renovation project # 09-268-02, Account #245.9-268-976 $2,575.00 Amount Explanation / Description: Need to adjust budget for project to pay for change order # 001 which pays for carpeting for four rooms( $2355.) that were not included in original contract and $220 to remove wall and relocate to make the reception area more functional. FROM: TO: Contingency Account: Fund Balance Account: . . . . Amount PAGE 1 of 1 . . . . DRAFT 68-630 S T A T E O F M I C H I G A N BOARD OF COMMISSIONERS OF THE COUNTY OF ALLEGAN February 25, 2010 HEALTH DEPARTMENT—APPLY FOR MICHIGAN PUBLIC HEALTH INSTITUTE GRANT BE IT RESOLVED THAT the Allegan County Board of Commissioners hereby approves the request from the Health Department to apply for a grant in an amount not to exceed $10,000.00 offered through the State of Michigan Public Health Institute to fund a Quality Improvement Project in the Sexually Transmitted Disease Program; and, BE IT FURTHER RESOLVED that in-kind services, as per the project budget, will provide the local match; and, BE IT FINALLY RESOLVED that the Board Chairman and/or the County Administrator are authorized to sign the necessary documents on behalf of the County and that the Budget and Finance Director is authorized to make the necessary budget adjustments to complete this action. Dates displayed in Eastern Standard Time Work Orders 2/19/2010 2:18:10PM Work Order 68630 Summary Requestor Requestor Call Back Number Department Location Assigned Technician Priority Date Completed Status HD_Review and Approve MLC-3 Grant Type Rashmi Travis Asset ID 4735 Department Number Health Dept - Administration Date Entered Human Services Building Date Assigned Denise Stan Expected Completion Date Scheduling required Charge Hours - Admin / Board RFA 2/12/2010 11:19:42AM 2/19/2010 2:06:58PM 2/25/2010 12:03:19PM Work Order Description 2/12/2010 11:19:42AM ALLEGANCOUNTY\RTravis Please review the attached grant proposal and budget. The grant application must be submitted by March 3rd. Technician 2/19/2010 1:47:58PM JNANCE Revised resolution as per DVR. 2/16/2010 3:21:12PM DSTAN Assigned to DBV for his review and recommendation. Please note the time sensitivity of this request. Since we haven't met this week, if you have questions, let's get Rob's attention to it ASAP. 2/16/2010 12:03:24PM AThomson Tentatively placed on BOC Agenda under discussion. Assign to Denise for ET review if needed. Please note time sensitivity. 2/16/2010 10:23:32AM JNANCE Per requester: The 7-page document is what is required to complete the application. "There is no dollar match required. We just have to indicate that we apply some in-kind services as match." Sent email to ask for clarification regarding the amount of in-kind services required for the match. Is it a percentage or a dollar amount? Attached draft resolution that will need revision following receipt of the match information. Brought this workorder to the attention of D. Stan and B. Blaine on 2/12/10 because of the 3/3/10 grant submission deadline. Assign to A. Thompson to forward to ET for review and Board agenda discussion item 2/25/10. 2/12/2010 4:10:23PM JNANCE This is a request for a new grant. Per threshold it will require Board discussion. Will draft a resolution to attach pending response from requester. Please note that requester states grant submission deadline is 3/3/10, so this would require Board approval on 2/25/10. 2/12/2010 4:07:55PM JNANCE Sent email to requester regarding grant application. Is it the 7 page document? Does she have documentation about the grant that specifies or lists the percentage or dollar amount of the match requirement? Powered by Track-It! Page 1 of 2 2/19/2010 2:18:10PM Work Order 68630 Resolution 2/19/2010 2:06:54PM DVANDEROOVAART reviewed with rashmi t, recommend approval to go to BOC as discussion for the application only. 2/12/2010 11:19:43AM ALLEGANCOUNTY\RTravis Administrative Time- .25 hours Powered by Track-It! Page 2 of 2 RFA#: ALLEGAN COUNTY REQUEST FOR ACTION FORM Request Type Department Requesting Submitted By Contact Information Date: Grant Health Rashmi Travis, MPH, CHES/ Health Officer ext 4735; [email protected] Name of Grant: Michigan Multi-State Learning Collaborative-3: The Sexually Transmitted Disease Survey Process! Changing the Process; Improving Cultural Awareness and Client Satisfaction in the Program. Summary of Grant: The purpose of this grant is to improve our customer satisfaction survey for the STD program. Our return rate on STD surveys are currently low. This grant proposal will help identify areas where we can be more culturally sensitive in providing services and where we can improve in our STD service operations. If we are awarded this grant, we will need to sign a contract with the Michigan Health Institute (MPHI) within a month of being awarded the money. Attached is our proposal and budget. Grant Submission Deadline Date March 3rd, 2010 APPLICATION ACCEPTANCE New Renewal Continuation Amount (Not including local match) $10,000.00 Source of Grant Funds (% of allocation) 100% MPHI Funding Type of Match Cash Inkind Amount / Description / Source of Match: In-kind contributions will be provided through the services of our translators and administrative staff who will assist in putting together culturally-sensitive documents. Term of Grant April 15, 2010- February 15, 2011 Does it involve personnel? No Yes Does it involve ongoing Operational Activities (recoverable?) No Yes Part of the Grant funds will be used to partially cover the wages/salaries of members of the Team listed in the grant. The other part of the funds will be used to design a new STD survey. Admin Fees $0.00 Equipment / Ongoing Costs 0 Does it effect other operations? Yes No By improving the customer survey process in the STD program, we can apply the same concept to other programs in the Health Dept. PAGE 1 of 2 Michigan Multi-State Learning Collaboratives-3 RCP- MLC-3The Sexually Transmitted Diseases Survey Process! Changing the Process; Improving Cultural Awareness and Client Satisfaction in the Program Allegan County Health Department 3255 122nd Avenue, Suite 200 Allegan, MI 49010 Contact: Angelique Joynes, RN, BSN Director of Personal Health [email protected] Tel: 269-686-4553 Submitted to: MPHI, Michigan Multi-State Learning Collaborative- 3 Team Date: February 10, 2010 1 Section 1 A. Organizational Overview Allegan County Health Department (ACHD) is located in southwest Michigan in a rural agricultural county. There are approximately 110,000 persons residing in Allegan County; residents can access healthcare services at the ACHD. There is a large population of Hispanics seeking services in the county. The last census noted 6.7 percent, which is about 2.5 percent above the State average. In addition, the county has the largest agriculture economy in the state, employing a large number of migrant workers who seek services. This special population has not been measured in the census because of the seasonal nature of employment. There are approximately 16,740 persons with disabilities living in Allegan County. Moreover, education levels are challenging with 82.3 percent of people 25 or older with a high school diploma level of education or less; this is one percent less than the state average. Allegan County Health Department has four sections, which consist of Administrative, Personal Health, Environmental Health, and Health Promotions. The Personal Health Section of the Health Department consists of Immunization, Sexually Transmitted Diseases (STDs), Communicable Diseases, Tuberculosis, HIV, Maternal Infant Health Program, Children’s Special Healthcare Service, and Hearing and Vision Programs. For the last ten years, the quality improvement (QI) measures for Personal Health programs have been chart audits and client satisfaction surveys. The primary purpose of the survey was to: • Describe clients’ level of satisfaction with core features of personal health services. • Describe clients’ perceptions of the effectiveness of case managers/nurses in helping with client needs. • Determine whether there are systematic differences in how clients experience care based on client characteristics like race, gender, or geographic location. This process is being evaluated because the return rate on the surveys is extremely low and limited sampling cannot be extrapolated with confidence and the limited data collected has no statistical significance. The clients with the lowest surveys return rate is seen in the Sexually Transmitted Disease (STD) Program. The assumptions for the low return rate are as follows: • There is such a stigma associated with STDs so the client wants to complete the appointment and leave the facility as soon as possible. • The survey is too long. • The survey is not culturally appropriate and at the appropriate educational level, in the appropriate language, or written gender appropriate. In this proposed QI project, the STD program would assess two target areas, customer satisfaction and culturally appropriate services. The project would evaluate the effectiveness of using achievable benchmarks to enhance typical performance feedback and improve delivery of care. These benchmarks and other types of comparative data will provide a means of identifying quality improvement opportunities. Because of the diverse 2 population in Allegan County, the survey needs to be culturally appropriate to ensure the highest possibility of return and valid data collection. If modifying the current survey process increases the amount of surveys returned, the data collected could be evaluated with a level of confidence and would lend to statistical significance. Moreover, program changes could occur related to client input and data thus possibly increasing client satisfaction and program efficiency. In addition, the STD program would incorporate cultural sensitivity methodologies, if indicated in a new survey and delivery of care. B. Current STD Customer Satisfaction Process The current instrument used in the STD program to measure customer satisfaction and delivery of care is the client satisfaction survey. The support staff dispenses the client a survey with other initial paperwork during the check in process. There is not a standard process for how the surveys are collected or how the instruments are introduced and addressed during the visits with the STD nurses. Moreover, there is not any standard follow-up activity as well. This process has been in place for five years. C. Current STD Process to Provide Culturally Appropriate Services The current process to meet the language needs of ACHD’s Hispanic population is a Family Planning’s support staff person who will provide translation services when available. The other option is translation via the telephone, which has to be initiated in advance. The first obstacle in this process is the large amount of walk-in clients when the translator from Family Planning is not available. The second obstacle is that the surveys are not available in Spanish. This process to be able to communicate with the Hispanic population has been in place for five years. In the last two years, the Health Department has hired two bi-lingual staff members to assist with Spanish translation when scheduled in the facility and not out in the field. This appears to help serve these clients with greater competency. The STD program currently does not have the survey in any other language, any gender specific surveys and have been evaluated for literacy appropriateness. The survey utilized in the STD program has not been updated in five years. D. Opportunity for Improvement Allegan County’s STD program recognizes the great need to evaluate the current survey process. To be able to make programmatic changes based on client input and need; the rate of survey return has to increase to be sampled at a confidence level. Last year, the program had approximately 190 client visits, which yielded eight returned surveys. The new Director of Personal Health understands that improvement starts with greater survey return rate. The first step would be to evaluate the survey instrument in the level of cultural competence and explore different methods to complete the survey, such as, paper survey or computer survey. In addition, evaluate how the survey is introduced to the client; discussed during the visit, and collected after care. The second step would put in place a QI team to implement a new survey and process that is standardized yet culturally individualized for each client. Then, reevaluate the return rate of the surveys and data collected at quarterly intervals. The QI team will either adopt the current process as the standard or implement a new process, if indicated. When statistically significant data is collected the team can make programmatic changes that correlate with client input and needs thus increasing client satisfaction. 3 E. Allegan County Health Department’s Capacity to Carry out this QI Project The QI team for this project will be interdepartmental. It will include the Director of Personal Health, Health Educator and Health Officer who have working backgrounds in QI and QA processes, and the STD program staff. The new Director of Personal Health along with team members has been evaluating the current “QI” and “QA” processes. The consensus is that the processes are not collecting the data that the programs need to become more efficient and effective. A Plan-Do-Study-Act (PDSA) cycle has recently been implemented for immunization. The Director of Personal Health plans to implement the PDSA cycle for all personal health program surveys with a starting point being the STD program. The two bi-lingual staff members along with the Health Educator would develop surveys in different languages to ensure the clients can understand the survey. The Health Educator will research the gender and educational appropriate approach and educate the team members so that a culturally appropriate survey or surveys will be developed and implemented. The other team members are not as familiar with PDSA cycle and require additional training in this method. The team members prior to that had not utilized the PDSA cycle or had limited training on QI implementation and measurements. In addition, the team members who work in STD program work in other personal health programs; this is because of staffing and time constraints. The advantage of these perceived limitations is staff would take experience from this proposed project and transfer their newly acquired QI knowledge and experience into other Personal Health Programs. F. The Impact of this Project on the Public Health of Allegan County By implementing this project and increasing the amount of surveys returned, programmatic changes can occur in the STD program to reach the target population in a more effective manner. By tailoring the program’s visits, survey process, and educational opportunities, the client might be more open to education and prevention. If the client realizes and understands the importance of treatment, adhere to the treatment plan, know the signs/symptoms of common STDs, and modify behaviors to decrease transmission; then the outcome would be lower incidence of re-infections. This would increase the efficiency of the program with a decrease in case-investigations. There would be less incidence of Pelvic Inflammatory Disease, possible abdominal adhesions, urinary tract infections and many other illnesses that correlate with untreated STDs. The reduction of these infections in Allegan County would lower health care expenses for the individual or insurance companies involved. ACHD does not refuse STD services to only those with the ability to pay. By implementing this QI project, the cost of unpaid services could decrease. In summary, the efficiency of the program would increase and more outreach would occur because there will be less time spent doing case investigations. More outreach and education provides primary prevention and less actual infections. The additional health care costs related to untreated STD infections, the potential risk to unborn children would be reduced, and true population health would be reinforced. 4 Section 2 The QI team for this proposed project will consist of Angelique Joynes/Director of Personal Health, Rashmi Travis/Health Officer, Kathy Yonkers-Wright/Health Educator, Cindy Stiles STD Coordinator and RN, Jackie Skelton STD RN, and Vicki Weaver STD support staff. A. Project Leader Angelique Joynes, RN, BSN is the Director of Personal Health at Allegan County Health Department. As Director, she provides leadership for a team of five nurses, a social worker, a hearing and vision technician, and support staff to provide public health education and services to the residents of Allegan County. Personal Health Services at Allegan County Health Department includes Hearing and Vision, Immunization, STD/HIV, Communicable Disease, Tuberculosis, Maternal Infant Health Program, and the Early Head Start nursing component. She is currently a fellow for this year’s 2009/2010 MARPHLI fellowship associated with the University of Illinois. From 20012005 she played a leadership role as a Lieutenant in the Naval Nurse Corp. She was stationed in Bremerton, WA at the Family Practice Center. Providing leadership as a nurse manager in a family practice center, which was similar to a civilian community health center, she supervised approximately 100 persons. The center provided outreach screenings and education to a population that included newborns to geriatrics, military dependents to military retirees. Many clinics were a part of this center including an immunization clinic, diabetic clinic, postpartum care clinic, and family practice clinic. Angelique served on the Performance Improvement team while stationed in Bremerton. Her focus was to improve health culture by primary prevention including education. A Navy Achievement and Army Achievement Award were two of many awards that Angelique received for her leadership abilities during her military service. B. Health Officer Rashmi Travis, MPH, CHES, is currently the Health Officer for the Allegan County Health Department. Ms. Travis has worked in that capacity, overseeing a staff of approximately 30 public health professionals for 9 years. She possesses a dual bachelor’s degree in Microbiology and Communications and holds a Master’s of Public Health Degree with a concentration in Behavioral and Community Health Sciences from the University of Pittsburgh. Ms. Travis also has a certification as a Health Education Specialist (CHES). Prior to her administrative leadership position at the health department, Ms. Travis worked for the American Cancer Society of Pennsylvania interpreting and developing cancer control reports. While in graduate school, Ms. Travis designed programs addressing a variety of women’s social, emotional, and health issues for residents at a homeless shelter. This project earned her at the Catherine Cartier Ulrich Service to the Underserved award through the University Of Pittsburgh School Of Public Health. Additionally, she has conducted research projects at both the University of Michigan Medical School and Karmanos Cancer Institute conducting cancer research. Her work experience in the research, medical, and social work arenas has enabled her to gain an expansive view of the public health sector. Ms. Travis is a scholar of the 2007 Mid-American Regional Public Health Leadership Institute (MARPHLI) and is currently serving as a mentor for the Michigan team of the 2010 class. 5 C. STD Coordinator Cindy Stiles, RN is coordinator for the Communicable Disease program and the HIV/STD program at Allegan County Health Department. She has 12 years experience as a registered nurse; six of those years are in public health. Cindy recognizes the importance of public health outreach, initiating collaboration with CARES, a local HIV Case Management organization. Working together on weekends, STD/HIV education and testing offsite at a local gay resort and a predominately-gay campground were offered. Cindy also initiated special after hour’s clinics and outreach clinics for administration of Guardasil vaccine, to meet the needs of young women who work or attend school during normal business hours. Cindy has also taken a leadership role in forming a regional STD discussion group that is attended by public health professionals from seven surrounding counties. This group meets quarterly to discuss best practices, host informational speakers to increase knowledge and to act as a bridge between local health and state health departments in the STD departments. This group has been in existence for almost three years and Cindy continues to facilitate. D. STD Support Staff Vicki Weaver has been employed by ACHD for over 20 years. Her role is Special Programs secretary, support staff, in the programs of STD, HIV, Communicable Disease, Maternal/Infant Health and Immunizations. Currently 70% of her time is designated toward the STD, HIV and Communicable Disease programs. Within the STD, HIV and CD programs, Vicki’s duties include greeting clientele, presenting, and instructing them on completing paperwork necessary to insure them of a comprehensive visit while obtaining services from the Health Department. CD (Hepatitis C and Varicella) and STD (GC & CH) follow up with physicians has been a part of her duties along with properly preparing paperwork and specimens (on a typical STD clinic day), accurate data entry into logs, MDSS, HIV reporting system, assembling charts and maintaining appropriate filing procedures. Other duties include fielding telephone calls and scheduling clients for various HD services. Vicki is an active team player within programs she serves. E. Health Educator Kathy Yonkers-Wright, RDH, MS holds two undergraduate degrees from Michigan Universities, one in Dental Hygiene Science (Ferris State University) & the other in Interdisciplinary Health Studies (Western Michigan University). Ms. Yonkers-Wright earned a Master of Science, with Highest Distinction from Ferris State University in 1986. She has served as a university professor, college educator, healthcare consultant, clinician and continuing education presenter. Ms Yonkers-Wright is credential as an advance clinical researcher and she earned a post-graduate certificate in Health Care Evaluation through The Center of Health Care Improvement. These health care studies encompassed two areas, health service research (HSR) and health economics (HE). Kathy has taught Health Services Administration core courses at the university level; these classes included healthcare management, quality assurance, risk management, regulations, economics, and cultural issues in health care. In her current position as the health educator for Allegan County Health Department, she implements and facilitates population health education and health promotional activities. In those activities, her goal is to improve the health and wellness of Allegan County’s residents through health 6 promotion, collaborative initiatives, environment changes and policy development; these activities primarily address health disparities and secondary conditions. Through these improvements, she wants to have a positive effect on Allegan County’s economy and health care services. In addition, Kathy focuses on public health emergency preparedness, especially in the areas of pandemic influenza planning, risk communication, and bioterrorism response. F. STD/HIV Nurse Jackie Skelton RN, BSN is a Public Health Nurse involved in the Immunization, STD/HIV, Communicable Disease and Tuberculosis programs at the Allegan County Health Department. As a Public Health Nurse, she provides residents of Allegan County with immunizations, STD/HIV testing/treatment/counseling and information on communicable diseases. As TB coordinator Jackie is responsible for following up on residents with positive TB Skin Tests as well as providing followup/treatment/education/contact investigations for active TB cases. Recently the role of H1N1 Coordinator has been added to her list of duties. She has been responsible for dispersing H1N1 vaccine to county providers, working with a team to set up public clinics and participating in clinics in various locations/settings. She has over 3 years of Public Health experience. Section 3 A. Commitment Statement Allegan County Health Department STDs program will ensure that this proposed QI project is completed in accordance with all tasks detailed in the grant RFP. The Health Officer is part of this QI team and states she will support all team member’s time and funding commitments to complete this proposed project. The administrative team will work with the County Commissioners to enter into a contract, which will release funds as needed during this proposed project period. After the STD Survey project is completed, the team will submit the required reports as outlined by MPHI and report back to the Health Officer and County Administrator. This team will ensure that this project is completed per MPHI and the proposal by the date as required. 7 BUDGET FOR LOCAL HEALTH SERVICES Page MPHI QI TEAM PROJECT Local Agency Name 1 ALLEGAN COUNTY HEALTH DEPARTMENT 3255 122ND AVE, SUITE 200, ALLEGAN, MICHIGAN 49010 Report Period: 1 Date Prepared FED TAX I.D. 38-1914307 2/5/2010 Agreement Period: FINAL From: EXPENDITURE CATEGORY: of Thru: From: BUDGET 3/1/2010 CURRENT BILLING 9/30/2010 Thru: YTD EXPENSES BUDGET BALANCE 1 Salaries and Wages $ 3,900.00 $ - $ - $ 3,900.00 2 Fringe Benefits $ 298.00 $ - $ - $ 298.00 3 Capital Expenditures for Equipment and Facilities $ - $ - $ - $ - $ - $ - $ - 4 Contractual (Secondary-Recipient or Organization) 5 Other Expenses: 6 Supplies & Materials $ 244.00 $ - $ - $ 244.00 7 Travel $ 1,250.00 $ - $ - $ 1,250.00 8 Communications $ - $ - $ - $ - 9 County / City Central Services $ - $ - $ - $ - 10 Space Costs $ - $ - $ - $ 11 All Others (Promotional Items) $ 3,200.00 $ - $ - $ $ 8,892.00 $ - $ - $ 8,892.00 $ 1,108.00 $ - $ - $ 1,108.00 $ 10,000.00 $ - $ - $ 10,000.00 $ - $ $ - $ - $ - $ $ - $ - $ - $ - $ - $ - 12 Total Direct Expenditures 13 Admin. O/H Cost Rate #1 14 Admin. O/H Cost Rate #2 25.8 % 3,200.00 % 15 Total Direct & Admin. Expend. 16a Other Cost Distributions: b c - d e 17 TOTAL EXPENDITURES $ 10,000.00 10,000.00 REVENUE: 18 $ - $ - $ - 19 20 21a b c 22 23 24a MPHI GRANT $ 10,000.00 $ - $ - $ 10,000.00 $ 10,000.00 $ - $ - $ 10,000.00 b c d Translation service and Administrative FTE's will be e used as the in-kind match to complete the project. f g h I j 25 26 Total Revenue: CERTIFICATION: I certify that I am authorized to sign on behalf of the Local Agency and that this is a true and correct statement of expenditures and collections for the report period. Appropriate documentation is available and will be maintained for the required period. Signature Title Jane Waanders Director of Agency Support Date 2/8/2010 SALARIES 27,058 FICA HOSPITAL, DENTAL, VISION INSURANCE RETIREMENT LIFE INSURANCE WORKMENS COMPENSATION INSURANCE DISABILITY INSURANCE OTHER FRINGE BENEFITS 2,070 14,112 1,805 110 925 340 36 19,398 OFFICE SUPPLIES POSTAGE ADMINISTRATIVE FEES/INDIRECT TELEPHONE (OFFICE & CELL) TRAVEL (ROUTINE) TRAVEL (ROOM & MEALS) TRAVEL (REGISTRATIONS) LIABILITY INSURANCE BUILDING RENTAL MISCELLANEOUS 50 150 3,450 660 600 50 50 468 9,160 100 61,194 REQUIRED 20% MATCH 12,239 GRANT FUNDED 48,955 DRAFT S T A T E O F 66-469 M I C H I G A N BOARD OF COMMISSIONERS OF THE COUNTY OF ALLEGAN February 25, 2010 EMERGENCY MANAGEMENT—APPROVE 2007 HOMELAND SECURITY GRANT PROGRAM AWARD WHEREAS, on August 14, 2008 the Allegan County Board of Commissioners approved the 2007 Homeland Security Grant Program Intergovernmental Funding Agreement effective from July 1, 2007 through March 31, 2010, between the County of Van Buren and the County of Allegan, and the 2007 Homeland Security Grant Budget as presented; and WHEREAS, that resolution stated that grant funds awarded in an amount less than $10,000 for an individual project must be approved by the County Administrator, and that any grant funds of $10,000 or more awarded for an individual project must be approved by the Board of Commissioners; and WHEREAS, at the November 18, 2009 meeting of the 5th District Regional Homeland Security Planning Board grant funds in the amount of $45,000 were approved for the purchase of a Prime Mover Vehicle for Allegan County; and WHEREAS, the vehicle will be used to transport equipment, personnel and trailers to and from emergencies/disasters, and for emergency/disaster training purposes; and ATTACHMENTS DRAFT 66-469 WHEREAS, the vehicle will delivered to Allegan County as per the terms of the Transfer of Ownership Agreement executed with the 2007 Homeland Security Grant Program Intergovernmental Funding Agreement; and THEREFORE BE IT RESOLVED the Allegan County Board of Commissioners hereby accepts the grant program award for the purchase of the Prime Mover Vehicle and approves the Memorandum of Understanding with the City of Plainwell to store the vehicle indoors at the Plainwell City Fire Station; and BE IT FURTHER RESOLVED that the Board Chairman and the County Administrator are authorized to sign the necessary documents on behalf of the County, that no County funding is necessary, and that the Budget and Finance Director is authorized to make the necessary budget adjustments to complete this action. ATTACHMENTS Dates displayed in Eastern Standard Time Work Orders 2/19/2010 1:40:16PM Work Order 66469 Summary Requestor Requestor Call Back Number Department Location Assigned Technician Priority Date Completed Status EM_Accept Prime Mover (Truck) 2007 DHS Grant Surplus Type Scott Corbin Asset ID 2401 Department Number Emergency Management Date Entered Dumont Date Assigned Ashley Thomson Expected Completion Date 4 - within 5 business days Charge Hours - Admin / Board RFA 426 12/9/2009 12:17:40PM 2/9/2010 12:02:19PM 3/11/2010 10:04:26AM Work Order Description 2/11/2010 2:31:58PM ALLEGANCOUNTY\SCorbin David called and left message to call, I return a call and left a message. 2/9/2010 3:06:01PM ALLEGANCOUNTY\SCorbin County Administration, Please see the information you have requested regarding the regional response trailers. SC -------------------------------------------------------------------------------From: Thomas Miller [mailto:[email protected]] Sent: Tuesday, February 09, 2010 2:46 PM To: Scott Corbin Subject: Fwd: Re: trailer weights >>> Paul Baker 2/9/2010 2:29 PM >>> The Regional Trailers are pushing 10 to 15K and Yes Allegan's Prime Mover will need to be able to tow them as it's a Regional Asset. If Allegan isn't going to allow Scott to be available to tow Regional Equipment then we have a problem. We have found that 3/4 ton trucks are not working well. Paul ______________________________ Lt. Paul R. Baker, Director Office of Emergency Management Kalamazoo County Sheriff's Office 1500 Lamont Ave., Kalamazoo, MI 49048 >>> Thomas Miller 2/9/2010 2:23:03 PM >>> Paul, We are have some issues in Allegan on the Prime Mover purchase as to why we are asking for a one ton truck. Medical trialers are 10,000 to 12,000+ lbs. Are other regional trailers more weight? And would Allegans prime mover need to cover hauling those? Powered by Track-It! Page 1 of 6 2/19/2010 1:40:17PM Work Order 66469 Thomas J. Miller Regional Planner Office of Emergency Management Kalamazoo County Sheriff's Department 1500 Lamont Ave. Kalamazoo, MI 49048 2/9/2010 12:29:02PM ALLEGANCOUNTY\SCorbin Here you go David... Eight Documents were attached 2/5/2010 1:00:24PM JNANCE Scott, thank you for the information it is very helpful. A couple of follow up questions: 1. Where are each of the trailers located? See Below. 2. Which trailers exceed the towing capacity of the Emergency Management truck? One of ours it very close to limits, but there are many regional trailer that will ,depending on the resource. 3. Fixed Asset management purposes what is the approximate value of each trailer and its contents? See below 4. I'm assuming that Allegan County is the owner of record. Yes, all but Red Cross Allegan County (7) Hazmat Trailer - Hazardous Materials Response - Decontamination and Containment< Graafscrap FD$50,000.00 RACES Trailer - Communications< Allegan Bus Garage $20,000.00 Red Cross Trailer - Mass Sheltering and Feeding<Allegan EMS Mass Casualty Trailer - Medical Equipment<Ganges FD $35,000.00 Light Trailer - Scene Light and Generator<FennvilleFD $25,000.00 RAD Trailer - Radiological Detection and Monitoring<GunPlain FD $100,000.00 CERT Trailer - Volunteer Management Resources<Dorr FD $15,000.00 2/5/2010 12:57:24PM JNANCE _____________________________________________ From: Jim Hull Sent: Thursday, February 04, 2010 9:13 AM To: Scott Corbin Subject: Scott, I spoke to David about the Prime Mover. He would like the following information: What is a Prime mover and how is it used? A prime mover identified by the Federal Emergency Management Agency is assigned to deploy trailers. It will be used only for the deployment of local, regional or state assets. There might come a time in which it would be deployed out of state to support a large scale disaster/emergency if requested under MEMAC or EMAC. The vehicle will also deploy assets in support training and exercise efforts. Why is the Vehicle going to be stored in Plainwell? This will be stored in Plainwell because they have on-call staff to respond, by activation through dispatch. Being stored at Plainwell is strategically located for deployment and in addition they have space to house it indoors in a secure Powered by Track-It! Page 2 of 6 2/19/2010 1:40:17PM Work Order 66469 location. What will be the five year cost of the vehicle? $225.00 per year for lube and oil changes totaling $1,125.00 over a 5 year period. This could be done cheater through the ACSO Garage. $500.00 tires ( 5th year) $300.00 Annual Fuel Cost Total estimated cost: $3,125.00 Why can't your vehicle be used as the Prime mover? The EOC truck is used as a prime mover for most of Allegan County response trailers, however throughout the regional there are very large trailers including some in our fleet that exceeds the maximum towing capacity of the Allegan County EOC Truck. This makes our ability to move these assets safely especially under emergency conditions, difficult terrain or inclement weather conditions. In addition to move these trailers in most cases multiple trailers need to response simultaneously, because they support on another. Specifically what trailers will be pulled with the Vehicle? How many trailers do we have in Allegan County for EM,? List what each trailer is used for : Allegan County (7) Hazmat Trailer - Hazardous Materials Response - Decontamination and Containment RACES Trailer - Communications Red Cross Trailer - Mass Sheltering and Feeding Mass Casualty Trailer - Medical Equipment Light Trailer - Scene Light and Generator RAD Trailer - Radiological Detection and Monitoring CERT Trailer - Volunteer Management Resources Regionally Mobile Hospitals - 52 Bed Hospital COW- Communications on Wheels Portable Generators What other trailers in the Region might we have to get with the vehicle? I don't believe were slated for any additional trailers or equipment at this time other than a light trailer for Fennville Fire Department. This could change based on on-going assessments being conducted by the Region and the strategic placement of equipment. Anything else you can think of that would help would be appreciated. Because Holland City in both 5th District and 6th District is possible that will support them on their emergencies, training and exercises. This benefits all Allegan County First Responders and NGO's. Thanks Jim 2/2/2010 2:07:12PM ALLEGANCOUNTY\SCorbin UPDATE on Timeline Judy, 1) February 11, 2010 5th District Regional Board, Investment Chairs meet to discuss outstanding projects. They will make recommendations to redirect funds for projects that can’t be accomplished by the grant deadline. 2) February 22, 2010 a local decision on surplus funds for prime mover purchase should be made. 3) February 23, 2010 Regional Board will decide on projects that have not been approved at local level and Powered by Track-It! Page 3 of 6 2/19/2010 1:40:17PM Work Order 66469 consider redirecting funds. 4) March 1, 2010 Prime Mover should be ordered, may take up to 90 days for delivery and construction. 5) June 1, 2010 everything must be delivered and invoiced to VanBuren County. 6) June 30, 2010 Regional Fiduciary (VanBuren) must have all grant documentation submitted to state. (grant dealine) 2/2/2010 2:03:05PM ALLEGANCOUNTY\SCorbin Scott, At this time with our performance period ending June 30, 2010 we would need all purchases paid and equipment delivered so that I have enough time to submit the reimbursement. June 1st is the deadline. Mark 2/2/2010 12:06:33PM ALLEGANCOUNTY\SCorbin Judy, 1) February 11, 2010 5th District Regional Board, Investment Chairs meet to discuss outstanding projects. They will make recommendations to redirect funds for projects that can’t be accomplished by the grant deadline. 2) February 22, 2010 a local decision on surplus funds for prime mover purchase should be made. 3) February 23, 2010 Regional Board will decide on projects that have not been approved at local level and consider redirecting funds. 4) March 1, 2010 Prime Mover should be ordered, may take up to 90 days for delivery and construction. 5) June 1, 2010 everything must be delivered and invoiced to VanBuren County. 6) Regional Fiduciary (VanBuren) must have all grant documentation submitted to state. -------------------------------------------------------------------------------From: Judy Nance Sent: Tuesday, February 02, 2010 8:31 AM To: Scott Corbin Subject: RE: Prime Mover? Scott, I just forwarded your message to David. Will you please ask for the specifics on the time frame. What are the deadlines, and are they for getting vehicles ordered, or funds distributed, or??? And let us know the details. Thanks. Judy 2/2/2010 8:21:53AM ALLEGANCOUNTY\SCorbin Judy, Please note the region is asking about the prime mover approval. SC -------------------------------------------------------------------------------From: Mark Zirkle [mailto:[email protected]] Sent: Tuesday, February 02, 2010 7:36 AM To: Scott Corbin; Thomas Miller Subject: Prime Mover Hi Scott and Tom, Could you advise your status on your prime mover acquisition. Getting tight on time. Mark Sgt. Mark S. Zirkle Powered by Track-It! Page 4 of 6 2/19/2010 1:40:17PM Work Order 66469 Office of Domestic Preparedness 5th District Regional Fiduciary 205 S. Kalamazoo Street Paw Paw, MI. 49079 TX (269) 657-3101 ext 296 Fax (269) 657-5161 2/1/2010 9:09:02AM ALLEGANCOUNTY\SCorbin Could you please let me know the status of this request? 12/9/2009 12:17:41PM ALLEGANCOUNTY\SCorbin Allegan County Emergency Management has been awarded $45,000.00 from the surplus of the 2007 Department of Homeland Security Grant. This has been approved by the 5th District Regional Board (see attached minutes). This request is to accept a vehicle purchased by the Regional Fiduciary (VanBuren County) and delivered to us under the terms outlined under the “Transfer of Ownership Agreement” already signed by Allegan County. This vehicle will be purchased from a pre-existing award under a competitive bid process. The vehicle is a four door truck with a service body. The service body will hold tools and accessories to support various types of responses. The vehicle will also include the Emergency electronics and lighting equipment. This vehicle will be licensed, insured and maintained by Allegan County. Because the vehicle is under manufactures warranty, and used only as a “prime mover” the cost of maintaining this vehicle will be minimal, and limited to routinely scheduled items. The vehicle will be stored at the Plainwell Office of Public Safety. This vehicle will be deployed by the Plainwell Office of Public Safety at the request of Allegan County Emergency Management. The Emergency Management will enter into a Memorandum of Understanding with the City of Plainwell on this arrangement (see attached, MOU). In speaking with our insurance provider (Mr. Keith Potter) we have adequate coverage for this type of arrangement. Technician 2/11/2010 10:04:20AM AThomson Clarified with David to place on 2/25 board agenda under discussion. Notified J Hull via telephone. 2/9/2010 12:02:21PM DSTAN ET Review - place on the 2/11 BOC agenda for discussion. Assign to AT to place on agenda; make sure requestor or undersheriff is present at meeting to respond to any questions. 2/5/2010 8:56:52AM DSTAN placed on 2/9 ET for review as requested. 2/4/2010 5:12:44PM DVANDEROOVAART Would like to review at next ET meeting. 2/3/2010 4:36:57PM DVANDEROOVAART Jim H. will provide additional information about the need for the truck and how this will work into the Sheriff Department fleet of vehicles. 1/29/2010 9:32:27AM DSTAN Assigned to DBV for his review and recommendation; also, placed on 2/2 ET meeting for review. Powered by Track-It! Page 5 of 6 2/19/2010 1:40:17PM Work Order 1/29/2010 9:15:13AM 66469 JNANCE Talked with DVR regarding this workorder. Explained that I had lost track of it and not forwarded it in a timely manner. Per discussion with DVR and review of some of the documents, he requests D. Stan put this item on next ET agenda. 1/26/2010 2:37:51PM JNANCE Board action 8/14/08 approved the 2007 Homeland Security Grant Program Intergovernmental Funding Agreement, the 2007 grant budget presented, and the Transfer of Ownership Agreement that accompanied the funding agreement. The resolution stipulated " that any grant funds of $10,000 or more awarded for an individual project must be approved by the Board of Commissioners." Appropriate documentation : the Board action, the executed grant agreement and the Transfer of Ownership Agreements, are attached for reference, in addition to other support documents pertaining to the Prime Mover Vehicle to be purchased. Assign to B Blaine for ET review. No County funds will be used for the vehicle purchase. The purchase is under $100,000 so following ET review and approval of the documents (MOU) this item may be appropriate for BOC agenda action. Attached draft resolution. Attached draft resolution Resolution 12/9/2009 12:17:43PM ALLEGANCOUNTY\SCorbin Administrative Time- .25 hours Powered by Track-It! Page 6 of 6 ALLEGAN COUNTY REQUEST FOR ACTION FORM Request Type Department Requesting Submitted By Contact Information RFA#: 66-469 Date: 12/9/09 Grant Emergency Mgmt (EOC) Scott Corbin ext. 2401 Scott Corbin ext. 2401 Name of Grant: 2007 Homeland Security Grant Program Intergovernmental Funding Agreement Summary of Grant: Allegan County Emergency Management has been awarded $45,000.00 from the surplus of the 2007 Department of Homeland Security Grant. This has been approved by the 5th District Regional Board (see attached minutes). This request is to accept a vehicle purchased by the Regional Fiduciary (VanBuren County) and delivered to us under the terms outlined under the “Transfer of Ownership Agreement” already signed by Allegan County. This vehicle will be purchased from a pre-existing award under a competitive bid process. The vehicle is a four door truck with a service body. The service body will hold tools and accessories to support various types of responses. The vehicle will also include the Emergency electronics and lighting equipment. This vehicle will be licensed, insured and maintained by Allegan County. Because the vehicle is under manufactures warranty, and used only as a “prime mover” the cost of maintaining this vehicle will be minimal, and limited to routinely scheduled items. The vehicle will be stored at the Plainwell Office of Public Safety. This vehicle will be deployed by the Plainwell Office of Public Safety at the request of Allegan County Emergency Management. The Emergency Management will enter into a Memorandum of Understanding with the City of Plainwell on this arrangement (see attached, MOU). In speaking with our insurance provider (Mr. Keith Potter) we have adequate coverage for this type of arrangement. APPLICATION ACCEPTANCE New Renewal Continuation Amount (Not including local match) $45,000.00 Source of Grant Funds (% of allocation) 100% from grant source Type of Match Cash Inkind Amount / Description / Source of Match: Term of Grant Grant period starts July 1, 2007 and ends March 31, 2010 Does it involve personnel? No Yes Does it involve ongoing Operational Activities (recoverable?) No Yes Ad i F PAGE 1 of 2 Admin Fees $0.00 Equipment / Ongoing Costs $500.00 annually Does it effect other operations? Yes No Disposition: Changes in Grant: RFA#: 66-469 Date: 12/9/09 5th District Regional Homeland Security Planning Board February 28, 2008 2006 Projects to be Funded Name of Agency Submitting Project: Allegan County – Fire Fighters Assoc. Person Submitting Project: Scott Corbin – Harold Schumacher Name of Project: RAD57- Carbon Monoxide Detection Estimated Cost of Project: $ 87,500.00 Investment Project this would come from: #2 Regional Response Plan Describe the Project: (Use only listed space) This would purchase 37 units to be Distributed throughout the Region, for the detection of dangerous levels of Carbon Monoxide in The blood stream of first responders. Describe how this project benefits the region as a regional project: (Use only listed space) This could be purchased for department throughout the region to include EMS providers, Will help in giving early warning of harmful levels of CO2 in the bloodstream without transporting first responders to hospitals, this could also be located in the Regional Rehab. Unit. Submission DEADLINE is March 12, 2008. Please email theses forms to me, thank you. Paul. U:\Grant Request-Local Projects\Projects ideas from Locals\Allegan County Fire Association CO2 Regional Project Request.doc 5th District Regional Homeland Security Planning Board February 28, 2008 2006 Projects to be Funded Name of Agency Submitting Project: Allegan County Emergency Mgt. / 911 Person Submitting Project: Scott Corbin – Jan Goswick Name of Project: ACU1000 Estimated Cost of Project: $50,000.00 Investment Project this would come from: #4 Interoperable Communication Plan Describe the Project: (Use only listed space) This would allow Allegan County to link MaComm Radio 800mhz radio system to the MPSC radio system together to include additional VHF and UHF radio systems. Describe how this project benefits the region as a regional project: (Use only listed space) This would allow for direct communication paths to our regional partners as a permanent Gateway inside our dispatch console. Submission DEADLINE is March 12, 2008. Please email theses forms to me, thank you. Paul. U:\Grant Request-Local Projects\Projects ideas from Locals\Central Dispatch -ACU1000 Regional Project Request.doc ACU-1000 Interoperability NOW . TM TM With a growing focus on protecting our infrastructure, both domestic and abroad, a coordinated command and control response has become a top priority for governments around the world. From homeland security to local public safety, from mission critical military applications to the latest commercial requirement, the Raytheon JPS ACU interoperability technology offers a robust and proven communications solution for incident command management. BENEFITS ■ Backward compatibility with existing ACU-1000 units. ■ VoIP/RoIPTM Compatibility ■ Browser-based configuration ■ Network Connectivity ■ Enhanced Remote Control ■ Easier Setup JPS’ signature product, the ACU-1000 Interconnect System has just gotten better. Known for providing interoperability between multiple radio systems operating on different frequencies, the ACU can now seamlessly link radios, SATCOM, cellular, WiFi and landline phones directly and over IP networks to provide remote incident management. With the addition of VoIP connectivity, the ACU-1000 provides many key enhancement features including: easier setup and configuration, expansion capabilities via network connectivity, and a more powerful operating system. ■ WAISTM Enabled ■ P-25 Compatible To protect the investment of our existing customers, the enhanced ACU is completely backward compatible; the new modules are interchangeable with existing modules providing a plug and play upgrade. This flexible design offers a growth path for incorporating new technologies while allowing users to select their desired features. ACU-1000 Intelligent Interconnect System CAPABILITIES For more than fifteen years Raytheon JPS Communications has developed technology to link mobile radios, cell phones, SATCOM, and regular phones in a single real-time communication system. We are one of the only suppliers to implement VoIP/RoIPTM interoperability systems in the U.S. and other parts of the world. Because of JPS’ systems, police officers, firefighters, EMS, security teams, government officials, and military units are communicating seamlessly and efficiently in crisis situations. This makes them more effective as first responders and defenders of homeland security. JPS’ design experience, networking expertise and proven technology allow our customers to implement an interoperability solution quickly and affordably using existing infrastructure and radio equipment. JPS offers a variety of system configurations to meet the demanding needs of first responders. Transportable, fixed site, mobile or wide area, JPS can configure a system to meet your needs, whether it’s nationwide, statewide, metropolitan, or rural. Primary application categories are: ■ ACU-1000: All of JPS’ interoperability products have a common building block: the fieldproven, unsurpassed ACU1000 technology. The ACU interfaces the requsite RF, landline telephone, and mobile phones by cross-connecting their respective baseband audio into the ACU. By converting communications signals into transmit/receive audio and its accompanying control signals, the ACU offers a rich set of operational features and wide scale adaptability with virtually any audio device, existing, new and future. To further extend the capabilities of the ACU technology, JPS has integrated its line of VoIP/RoIPTM technology into the ACU. The new available modules packetize the communications channels and transport them across a widearea IT backbone through the use of VoIP/RoIPTM technology. This state-of-the-art technology provides the means for regional, state, multi-state, and national interoperability systems to be linked together. ■ Local Interoperability At a local level, first responders are responsible for ensuring real time communication across multiple platforms with a moments notice. They require an interoperable communications system that provides day-to-day insurance along with meeting the demands of large scale incident management. The ACU technology meets this requirement by providing a fast, reliable and easy-to-use solution that can be deployed to any on-scene incident. With increased functionality added to the Digital Signal Processor (DSP) and a more simplified audio setup, first responders can arrive on the scene and within minutes coordinate their response efforts with the surrounding agencies. This rapid deployment capability, paired with the means for expansion, makes the ACU-1000 the preferred interoperability solution for local first responders. ■ Regional Interoperability JPS recognizes that emergencies are never predictable, a routine call can escalate at any moment to a multi-county or multi-state incident. An interstate car chase, a forest wildfire, or a widespread hurricane can simultaneously affect multiple agencies in multiple jurisdictions. During these situations, a response plan must be in place to protect citizens and first responders. To solve the most recognized problem plaguing incident command and control, first responders rely on the most frequently deployed interoperable communications solution - the ACU-1000. The ACU-1000 has incorporated IP technology to accomplish a coordinated response regardless of the geographical and territorial boundries. The added functionality of the integrated VoIP/RoIPTM features allow an ACU-1000 to be monitored and controlled from a remote location, via an Ethernet connection. The easy-to-use WAIS Controller software provides an user interface to make and break audio connections seamlessly via a new or existing IP network. ■ National Interoperability During times of national emergencies resulting from acts of coordinated terrorism or other catastrophic events such as large-scale natural disasters, homeland security officials should have the ability to communicate with and control onsite first responders, local and federal law enforcement, and other federal and state resources. With the introduction of the ACU enhancements, which allow disparate radio systems to be cross-connected and routed over wide area networks, it is possible for federal agencies to remotely coordinate disaster response efforts with multiple organizations without compromising efficiency. A coordinated response could be easily performed from a central, secure location using real time networks that sufficiently cover the United States as well as its territories and key strategic interests throughout the world. ACU-1000 Intelligent Interconnect System ■ Tactical: For smaller, transportable solutions, the ACU-T (Patent Pending) has much of the functionality of the ACU-1000 but in a smaller, more compact design. This 8-pound portable unit sets up in minutes, features quick-lock tool-less connectors for each of its six interconnect modules. The LED display provides an indication of current connections on each of the nets for simplified communication management in the field. Much like the ACU-1000 interoperability systems, the ACU-T can be customized to include any combination of radio and phone modules and is fully functional with VoIP/RoIPTM technology. Unlike competitive products, the ACU-T comes standard with audio delay, DTMF control, digital signal processing and other features such as multiple nets and a flexible configuration. The ACU-T provides all of the features that are available with the ACU-1000, but in a small rugged package that is suitable for tactical or vehicular use and rapid deployment. It also provides drip-proof controls to ensure reliable operation in challenging environments, and features two DC inputs, allowing operators to quickly change batteries without a loss in power. Typical applications for the ACU-T range from everyday emergency response to more tactical applications such as chemical spills, storm power outages or any incident where a fast, rugged interoperability solution is needed. The ACU-T also provides smaller organizations with a means to affordably achieve interoperability without the complexity of a larger system. ■ Fixed Site: Applications requiring a comprehensive interoperability Our most versatile configuration option, the TRP-1000 features an ACU-1000 with 12 audio devices packaged in a ruggedized case that can be easily deployed for on-scene requirements. ■ Mobile: JPS’ mobile kits feature a fully self-contained interoperable communication package that can be integrated into virtually any mobile platform, including vans, buses, trailers, and Humvees. Designed to aid first responders in establishing effective incident command, these kits combine the proven ACU-1000 with state of the art cellular, radio, satellite, software and Internet technology into a versatile and easy to use package. system in a permanent installation maybe best served in a full-scale fixed site implementation. Typically installed to achieve regional interoperability, the fixed site node, paired with existing base stations and high powered radios, provides interoperability for a wider coverage area. Due to this dual chassis design, the fixed site also has the capacity to provide interconnect capability for up to 24 audio devices. ■ Transportable: The JPS mobile communications kit is a new emergency response paradigm developed in conjunction with incident command veterans. The MCK1000 is a first-on-the-scene incident command suite designed to solve extraordinary and ordinary emergency/command problems. Easily integrated into any mobile platform by any vehicle integrator, the mobile kits provide the communications interoperability needed to effectively meet the demands of on-scene incident management. The TRP family offers superior versatility, fast installation, and easy transportability to remote locations around the world. This mobile configuration offers three installation options including the MCK1000, MMK-1000, and the standard ACU-1000. ■ Wide Area Interoperability System (WAIS): Building on the industry standard radio interoperability gateway, the JPS ACU-1000 Intelligent Interconnect System, WAIS uses Voice Over IP (VoIP/RoIPTM) technology to interconnect radio users in widely separated areas. From any point on the network a user may configure, control and monitor any of the ACU-1000 units in the system. Via this standard IP network technology, JPS supports wide area communications requirements, including intra-state, state-to-state, and coast-to-coast interconnectivity and control. Controlled by the JPS WAIS Controller software, this configuration is designed to seamlessly connect JPS interoperability systems over local area networks (LAN), wide area networks (WAN) or the internet. This enables users of JPS’ ACU-1000 interoperability modules to interconnect between other JPS modules to create WAIS networks such as statewide interoperability systems. WAIS Controller gives users of local JPS interoperability systems an opportunity to link with other networks on demand. Using existing infrastructures, including the Internet, interoperable radio signals can be connected around the world, as if they were right next door, without incurring user fees. ACU-1000 Intelligent Interconnect System ACU-1000 Architecture INTERCONNECT OPTIONS ■HF Radios Chassis Houses the PSM-1A, HSP-2, CPM-4, and has space for 12 interface modules. Second chassis connects to first and provides space for 12 interface modules. PSM-1A Module Provides power for the chassis and modules. AC Mains and 12 VDC power input. HSP-2 Module Provides voice prompts, front panel audio I/O, manual programming via keypad. CPM-4 Module Provides ACU control. Network interface for remote control and programming. ■UHF Radios DSP-2 Module Radio and network interface module. ■800 Trunked PSTN-1 Module Provides a telephone line interface. LP-1 Module Provides a local telephone set interface. ■ VHF Radios ■APCO P25 ■Digital cell phone HSP-2 Specifications Front Panel Handset jack, Headphone jack, Speaker, Volume and Speaker On/Off. ■Nextel Voice Prompts English language standard, others available. 80 messages typical, 254 possible. ■STU-III phones Keypad Provides manual ACU-1000 programming and system control. CPM-4 Specifications Handset Interface RJ-12 Connector: Microphone input, Earphone driver, PTT input. Module Compatibility DSP-1, DSP-2, RDI-1, PSTN-1, HSP-2, LP-1. Serial Interface Async Full Duplex RS-232, Baud rates 300 bps to 115.2 kbps. Network Interface RJ-45 Connector; 10/100Base-T Ethernet; three audio vocoder types. Processing Power TI 5409A DSP; RISC Processor: 32-bit Coldfire 5272. Prog and Control Ethernet (built-in web page), Telnet, RS-232, ACU Controller, WAIS Controller. ■STE phones ■Landline PSTN DSP-2 Specifications Audio Input Balanced or Unbal 600 ohms or Hi-Z; -46dBm to +12dBm levels; 100Hz to 3200Hz. Audio Output Balanced or Unbal 600 ohms; -26dBm t +12dBm levels; 100Hz to 3200Hz Digital I/O COR/Squelch and AUX inputs, PTT and AUX outputs; E&M input/output. Serial Interface Async Full Duplex RS-232, Baud Rates 300bps to 115.2kbps. Network Interface RJ-45 Connector, 10/100Base-T Ethernet; three audio vocoder types. Processing Power TI 5409A DSP; RISC processor: 32-bit Coldfire 5272 CPU. Config Programming Ethernet (built-in web page), Telnet, RS-232. Algorithms VOX or VMR Voice Detection; TD-Mode Noise Reduction; DTMF; Audio Equalizer; Tx and/or Rx Audio delay; Peak Limiter; COR Sampling; TX Keying Tones. PSTN-1 Specifications Phone Line RJ-11 Connectors (2); -24 dBm to 0 dBm levels. Processing Power TI 320xx DSP Algorithms DTMF Detection and Generation; DSP Adaptive Hybrid, DSP VOX. LP-1 Specifications Phone Set Interface RJ-11 Connectors (2); -20 mA loop Current; On/Off Hook detection; ring generator. Call Progress Tones Dial, Busy, and Ringback tones. Algorithms DTMF Detection; Adjustable-level VOX, Audio Delay. ACU-1000 General/Environmental Specifications JPS Communications, Inc. 5800 Departure Drive Raleigh, NC 27616 AC Input Power 115 to 230 VAC +/- 15% 47-63Hz, 80 VA Typical, 100 VA Maximum. DC Input Power +11 to +15 VDC @ 4A Nominal. Battery Charger 1A Output Maximum; Tapered charge circuitry for a lead-acid battery. Size 5.25” x 19” x 11” HWD (13.3 x 48.3 x 28 cm). Temperature Operating: -20 to +60 degrees C. Storage: -40 to +85 degrees C. Humidity Up to 95% @ 55 degrees C. Specifications subject to change without notice. ACU-1000™ is a trademark of JPS Communications. ACU-T is Patent Pending. Copyright © 2003 JPS Communications. All rights reserved. Shock MIL-STD-810D, method 516.3, procedure VI Ver.2 Vibration MIL-STD-810D, method 514.3, category I. Phone: (919) 790-1011 Fax: (919) 790-1456 E-Mail: [email protected] Web: www.jps.com 3/04 DS-ACU-02 5th District Regional Homeland Security Planning Board February 28, 2008 2006 Projects to be Funded Name of Agency Submitting Project: Allegan County – Fennville FD Person Submitting Project: Scott Corbin - Brent VanOss Name of Project: Portable Light Set Estimated Cost of Project: $ 16, 375.00 Investment Project this would come from: Project # 12 Nuclear/Radiological Response Describe the Project: (Use only listed space) The problem area on the top of the list appears to be the lack of a light source to illuminate an area large enough to support a large scale mass casualty or decontamination incident. the acquisition of a mobile light tower. A 20 kW trailer mounted generator with a 30 foot light tower supporting 4 1000 watt metal halide lights and a fuel capacity to provide 24 hours of continuous service before refueling. Describe how this project benefits the region as a regional project: (Use only listed space) This equipment will provide a much needed resource to all jurisdictions inside and outside Allegan County for disasters natural or made-made. Submission DEADLINE is March 12, 2008. Please email theses forms to me, thank you. Paul. U:\Grant Request-Local Projects\Projects ideas from Locals\Fennville - RAD Mobile Lighting Regional Project Request.doc FROM: Brent VanOss, Deputy Fire Chief, Fennville Area Fire Department. SUBJECT: Equipment request for radiological & disaster response. Mr. Corbin, The Fennville Area Fire Department would like to submit this request for your consideration. We (fafd) have provided the congregate care response for the Palisades nuclear power plant for approximately 20 years and in that time we have identified some limitation in our ability to provide the most affective response in the event of a radiological release. The problem area on the top of the list appears to be the lack of a light source to illuminate an area large enough to support a large scale mass casualty or decontamination incident. We (fafd) have research several options and the most cost effective and user friendly would be the acquisition of a mobile light tower. A 20 kW trailer mounted generator with a 30 foot light tower supporting 4 1000 watt metal halide lights and a fuel capacity to provide 24 hours of continuous service before refueling. This tool can provide illumination to a large area (5-7 acre’s) and still provide power for additional equipment necessary to an incident. The proposed project equipment and cost are as follows: 1 Magnum Light Tower- MLT 4200 IMH with equipment upgrades $16,375.00. This includes all of the following: freight, setup, delivery, training, quick disconnect light cord, electric mast winch, and galvanized mast. This equipment will provide a much needed resource to all jurisdictions inside and outside Allegan County for disasters natural or un-natural. The Fennville Area Fire Department is committed to this project and if awarded will provide storage, care, and necessary transportation of this unit to jurisdictions in need of this resource. Thank you for your consideration Brent VanOss/ Deputy Chief, Fennville Area Fire Department Empowering Real People Magnum Light Tower - MLT 4200 IMH, Specifications ENGINE x Isuzu 4LE1-PV 05, 4 cylinder diesel o 34.5 HP @ 1800 RPM Standby o 31.5 HP @1800 RPM Prime o Fuel consumption at prime power is 2.1 gallons (4.6L) per hour x High quality industrial engine exhaust system x 250 Hour oil change interval x Rubber vibration dampers isolate engine/generator from frame x Radiator is sized to allow continuous operation in 120 F temperatures x Dry paper type cartridge air filter x 56 gallon fuel tank ENGINE CONTROLS x x x Durable engraved aluminum control panel 4 position keyed switch (glow plug to preheat, off, run, start) 100 Amp Start Limit Main Breaker (assures no load condition exists before starting) x Hour meter x Automatic low oil/high temperature shut down system 215 Power Drive . Berlin, WI 54923-2420 . Phone: 800-926-9768 . Fax: 920-361-2214 www.m-p-llc.com Page 1 of 5 06/07 MLT 4200 MMH Specifications Continued: GENERATOR x Marathon brushless generator x 20 kW generator x 120/240 VAC 167/83 amps prime x +/- 1% electronic voltage regulation ELECTRICAL SYSTEM AND CONTROLS x Individual floodlight circuits with 15A breakers x Ballast indicator lights x 4 individual ballast boxes (galvanized steel) x Individually serviced ballast parts for ease of repair/service x Manual holder with operating instruction manual/wiring diagrams x Standard individually breakered convenience outlets: x o (2) 120 VAC 20 Amp GFCI duplex outlets (Nema 5-20R type) o (2) 240 VAC 30 Amp twistlock outlets (Nema L6-30R type) o (2) 125 / 250 VAC 50 Amp 3 pole 4 wire twistlock (Non Nema 6369) 720 CCA wet cell battery FLOODLIGHTS x Four light fixtures – metal halide hard wire o Reflector o 1000 watts each x Tempered glass lens x Silicone gaskets for moisture and dust protection x Individual floodlight On/Off switches WIRING x All wiring is sized to the amperage draw required x AC & DC wiring diagrams provided x 30’ maximum extension, 3- section, tubular steel x Plastic guides on all sides of mast tubes x Industrial black powder coat finish x Automatic locking system in down position for travel x Automatic locking system in fully raised position x 360o rotation with locking system once positioned x Coiled mast cord x Manual winches ergonomically located, one-person operation x Equipped with lifting eye and fork pocket guides on top side MAST 215 Power Drive . Berlin, WI 54923-2420 . Phone: 800-926-9768 . Fax: 920-361-2214 www.m-p-llc.com Page 2 of 5 06/07 MLT 4200 MMH Specifications Continued: TRAILER x Mast support: 3” square tube, ¼” wall x Removable tongue 48” long x Frame: tubular steel, 3/16” wall x Four 2000 lb. adjustable leveling jacks: one on tongue, one on the rear frame, and two side outriggers extended from the middle of the trailer x All jacks transport and lock in horizontal position for storage x Side outriggers to have 11’ 8” span x Safety chains with hooks x 2” ball hitch x Single wall (FLEX) plastic fenders x Tail, side, brake, and directional lights meet DOT standards. Rear lights are recessed x Axle: 2500 lb. with leaf springs. 49” track width between tires x Tires, ST175/80D13, tubeless x Body, 14-gauge steel x Stainless steel hinges on doors x Engine Mounts: 5”x 2” x 3/16” fabricated channel iron x Magnum brand decals on enclosure x License plate holder with light METAL TREATMENT x Durable, fade resistant, baked on polyester powder paint. Color: white WARRANTY x 1 year unlimited hours / 2 years 2000 hours limited warranty on unit x 1 year unlimited hours / 2 years electrical / 5 years 5000 hours major components engine warranty from Isuzu 215 Power Drive . Berlin, WI 54923-2420 . Phone: 800-926-9768 . Fax: 920-361-2214 www.m-p-llc.com Page 3 of 5 06/07 Empowering Real People Magnum Light Tower – MLT 4150 MMH, Specifications ENGINE x Mitsubishi S4L2, 4 cylinder diesel o 24.7HP @ 1800 RPM Standby o 22.0 HP @1800 RPM Prime o Fuel consumption at prime power is 1.2 gallons (4.6L) per hour x High quality industrial engine exhaust system x 250 Hour oil change interval x Rubber vibration dampers isolate engine/generator from frame x Radiator is sized to allow continuous operation in 120 F temperatures x Dry paper type cartridge air filter x 56 gallon fuel tank ENGINE CONTROLS x Durable engraved aluminum control panel x 4 position keyed switch (glow plug to preheat, off, run, start) x 70 Amp Start Limit Main Breaker (assures no load condition exists before starting) x Hour meter x Automatic low oil/high temperature shut down system 215 Power Drive . Berlin, WI 54923-2420 . Phone: 800-926-9768 . Fax: 920-361-2214 www.m-p-llc.com Page 1 of 5 06/07 MLT 4150 MMH Specifications Continued: GENERATOR x Marathon, brushless generator o 14kW (standby) 13kW (prime) o 120/240 VAC 125/63 amps prime o +/- 1% electronic voltage regulation ELECTRICAL SYSTEM AND CONTROLS x Individual floodlight circuits with 15A breakers x Ballast indicator lights x 4 individual ballast boxes (galvanized steel) x Individually serviced ballast parts for ease of repair/service x Manual holder with operating instruction manual/wiring diagrams x Standard individually breakered convenience outlets: x o (2) 120 VAC 20 Amp GFCI duplex outlets (Nema 5-20R type) o (2) 240 VAC 30 Amp twistlock outlets (Nema L6-30R type) o (2) 125 / 250 VAC 50 Amp 3 pole 4 wire twistlock (Non Nema 6369) 440 CCA wet cell battery FLOODLIGHTS x Four light fixtures – metal halide hard wire o Reflector o 1000 watts each x Tempered glass lens x Silicone gaskets for moisture and dust protection x Individual floodlight On/Off switches WIRING x All wiring is sized to the amperage draw required x AC & DC wiring diagrams provided x 30’ maximum extension, 3- section, tubular steel x Plastic guides on all sides of mast tubes x Industrial black powder coat finish MAST x Automatic locking system in down position for travel x Automatic locking system in fully raised position x 360o rotation with locking system once positioned x Coiled mast cord x Manual winches ergonomically located, one-person operation x Equipped with lifting eye and fork pocket guides on top side TRAILER x Mast support: 3” square tube, ¼” wall 215 Power Drive . Berlin, WI 54923-2420 . Phone: 800-926-9768 . Fax: 920-361-2214 www.m-p-llc.com Page 2 of 5 06/07 MLT 4150 MMH Specifications Continued: x Removable tongue 48” long x Frame: tubular steel, 3/16” wall x Four 2000 lb. adjustable leveling jacks: one on tongue, one on the rear frame, and two side outriggers extended from the middle of the trailer x All jacks transport and lock in horizontal position for storage x Side outriggers to have 11’ 8” span x Safety chains with hooks x 2” ball hitch x Single wall (FLEX) plastic fenders x Tail, side, brake, and directional lights meet DOT standards. Rear lights are recessed x Axle: 2500 lb. with leaf springs. 49” track width between tires x Tires, P205x75R15, tubeless x Body, 14-gauge steel x Stainless steel hinges on doors x Engine Mounts: 5”x 2” x 3/16” fabricated channel iron x Magnum brand decals on enclosure x License plate holder with light METAL TREATMENT x Durable, fade resistant, baked on polyester powder paint. Color: white WARRANTY x 1 year unlimited hours / 2 years 2000 hours limited warranty on unit x 1 year unlimited hours / 3 years 3000 hours / 5 years major components engine warranty from Mitsubishi 215 Power Drive . Berlin, WI 54923-2420 . Phone: 800-926-9768 . Fax: 920-361-2214 www.m-p-llc.com Page 3 of 5 06/07 GENERATOR SALES • SERVICE • RENTALS • PARTS March 3, 2008 Quote Number: TW08-115 Brent Fennville Fire Department Cell: (616) 836-4653 [email protected] Subject: Light Tower Quote Wolverine Power Systems is pleased to submit the following proposal for your consideration and approval. MLT4150……………………………………………………………$13,700 MLT4200……………………………………………………………$14,800 Mast/Light Options: Quick Disconnect Light Cords………………………………$ 210 Electric Winch……………………………………………………$ 945 Galvanized Mast…………………………………………………$ 420 (4) 1000W High Pressure Sodium Lights………………$ 840 SERVICES ALSO INCLUDED: 1. 2. 3. Freight charges. Start-up of your equipment by a Factory Trained & Certified technician per specifications. Training is available at our normal hourly rates during normal business hours of 8:00am to 5:00 pm., Monday through Friday, the cost of which has not been included in this quote. Corporate Office 3229 80th Ave Zeeland, MI 49464 Gaylord Office 615 Expressway Court Gaylord, MI 49735 Phone: (616) 879.0040 Fax: (616) 879.0045 Toll Free: (800) 485.8068 Phone: (989) 705.8000 Fax: (989) 705.8008 GENERATOR SALES • SERVICE • RENTALS • PARTS WARRANTY: Each piece of equipment is under an exclusive warranty furnished by the manufacturer. TERMS OF PAYMENT: 30% down payment; 60% upon factory shipment date; 10% after start-up and commissioning. *** Please note that items WILL NOT be shipped without a signed “Absolute Guaranty of Payment” agreement on file with Wolverine Power Systems. Our terms are net 30 days (with approved credit) from date of invoice *** All quotes are subject to TAX if applicable. A minimum of 90% must be made to Wolverine Power Systems, Inc. prior to start-up. The 10% balance is due 10 days after engine start-up by Wolverine Power Systems Service Department, BUT not more than 30 days from the date of delivery, whichever comes first. DELIVERY: The factory is currently quoting 1 to 3 weeks for delivery. Because of world wide and domestic events, Wolverine Power Systems cannot be responsible for deliveries beyond present published lead times. NOTES: 1) The price as quoted DOES NOT include piping, wiring, storage, fuel, or installation other than as noted above in the bill of material. Customer is responsible for the off- loading and assembly of the generator and associated equipment at delivery time. 2) Should you wish to ship the ATS – Automatic Transfer Switch ahead of the generator, there will be additional trucking charges. 3) If the specifications are written around competitive equipment, we are offering standard Generac designed equipment that meets or exceeds the functional intent of the specification. There may be some small discrepancies between proposed equipment and the specifications. If this quotation is based on your specifications, it is your responsibility to insure equipment complies with all applicable codes and applications. 4) Fuel Tanks Meet Michigan DEQ Requirements (if applicable). 5) All Engines Meet EPA Emission Standards (as required). 6) NETA Testing (if required) is not included in this quote. VALIDITY: This quote is valid for Thirty (30) days from date of this quotation. Please consult us beyond this date. We hope that you find our offer acceptable and we look forward to serving you. ACCEPTED BY: (This serves as your purchase order and compliance w/all aforementioned terms & conditions when signed.) Sincerely, Tim Wiltse/Inside Sales Guy LeMonnier/Sales Engineer Wolverine Power Systems Signature / printed name Date_______________________________ Requested Delivery Dates____________________________ Page 2 of 2 Corporate Office 3229 80th Ave Zeeland, MI 49464 Gaylord Office 615 Expressway Court Gaylord, MI 49735 Phone: (616) 879.0040 Fax: (616) 879.0045 Toll Free: (800) 485.8068 Phone: (989) 705.8000 Fax: (989) 705.8008 5th District Regional Homeland Security Planning Board February 28, 2008 2006 Projects to be Funded Name of Agency Submitting Project: Allegan County – Graafschap Fire Department Person Submitting Project: Scott Corbin – Cal Haverdink Name of Project: Track Vehicle Estimated Cost of Project: $64,400.00 Investment Project this would come from: Project #1 Regional Response Plan, Project #13 Mass Medical Response Describe the Project: (Use only listed space) Utility Vehicle, Trailer and Tow Vehicle This project has the potential to cross over many of the projects listed in our strategic plan. This piece of equipment could provide the region with a tremendous amount of flexibility for response. Details of this project follows…. Describe how this project benefits the region as a regional project: (Use only listed space) After conducting a FSE this past summer it was determined getting access to the shore line to remove victims, deploy public safety and equipment becomes difficult with traditional Equipment. This could also support the region with damage assessment and Heighten Security Alerts near critical infrastructure. Submission DEADLINE is March 12, 2008. Please email theses forms to me, thank you. Paul. U:\Grant Request-Local Projects\Projects ideas from Locals\Graafscrap-ATV Regional Project Request.doc PROJECT This request for funding assistance would allow Graafschap Fire Department to purchase a UTV, (off road utility vehicle) truck and trailer. This unit will be used for wild land / urban interface fire suppression, off-road medical emergencies and search and rescue operations. This funding assistance will also allow us to purchase a thermal imaging camera and an AED. DESCRIPTION The Graafschap Fire Department is seeking funds to purchase a UTV. This unit will be fully equipped for wild land / urban interface firefighting and any type of off-road medical emergency & search and rescue. The UTV will be all wheel drive with tracks. A metal roof will be installed to keep hot embers off the occupants. In the rear of the UTV will be a dual purpose skid unit. The skid unit will consist of a water tank, foam system and 2 high volume electric water pumps. Integrated into the unit will be EMS equipment consisting of stokes basket, backboard, oxygen and all other medical supplies necessary for any off-road medical emergency. We will also be purchasing a trailer to carry this unit safely to and from each incident. The trailer will also be used to carry wild land firefighting equipment and also be equipped as a rehab/command trailer. Because heart attacks are one of the leading causes of fire fighters deaths, and to also utilize at medical emergencies, we would like to purchase an AED. We would also like to take advantage of new technology and purchase a thermal imaging camera for the UTV. This will assist us in locating hot spots helping to protect very expensive homes along the lakeshore. A lot of these homes have dune grass growing right up next to the homes. This camera will be invaluable in search and rescue operations. In the last 5 years we have had 30 calls alone to the Saugatuck Dunes State Park trails for lost or injured hikers. FINANCIAL NEED Over the last 7 years our residents have greatly supported us. We moved into a new station that replaced a 50 yr. old facility, and we purchased a frontline engine. The payments on these two purchases make up nearly 30% of our yearly budget, and will stretch out for the next 13 and 10 years respectively. Our area has had a population increase of 10% and a loss of state revenue sharing by 20% over the last 5 years. These factors restrict us from making any additional large purchases for the foreseeable future. COST / BENEFIT We believe the UTV Project is a well thought out and economical package. The UTV will enhance our response capabilities during the winter months, and to the remote locations in our area, mutual aid and throughout Region 5. We will get more people on scene safer and better equipped to carry out the mission. The combination UTV with tracks, fire suppression / patient transport skid, truck and trailer and equipment is going to be a package that not only makes us more effective, but will also make us a safer fire department. It will also provide our citizens in Region 5 with a community specific piece of equipment. Using the UTV on these calls will reduce the maintenance cost associated with our aging fleet, freeing up funds for other things. We have also included funds for training before this unit is put into service. The Graafschap Fire Department will train, operate, insure and maintain the UTV. This unit will be available for fire and law enforcement emergency incidents in Region 5. STATEMENT OF EFFECT Graafschap Fire Department covers six miles of eastern Lake Michigan shoreline. This area is primarily sand dunes covered with beach grass and forest. Many homes have been built within the dunes creating a very difficult wild land / urban interface situation. As proven on 07/08/07 when we had a fire that destroyed 40 acres of wild land and three homes totaling close to 6millon dollars Until recently there has not been an economical vehicle on the market that had the power, capacity, versatility and most importantly the safety features to access these areas. (Especially during the winter months when all of our current off-road vehicles are useless in the snow). In addition to the wild land / urban interface we cover The Saugatuck Dunes State Park a 1000 acre preserve with no roads but miles of hiking trails. We have a total of 5 parks in our service area 1315 acres with 20 miles of trails. Laketown and Fillmore townships are primarily rural with large areas not accessible with road vehicles. We also mutual aid with departments that cover the Allegan State Game Area that is 50,000 acres, where fire fighters must walk in to most fires. As of now we fight off road fires with two World War II era Jeep Wiley’s and a ¾ ton 1985 GMC pickup truck with limited effect. The jeeps with the manual transmission and manual brakes are very dangerous to drive on roadways with the added weight of the water tank. They are unreliable causing a drain on our budget. The truck will be used primarily to tow the UTV trailer. We currently run Off-road medicals with a 1997 Polaris quad and a converted lawn wagon for patient transport. With the UTV we can put personnel in a Roll Over Protected System and seat belted position. They will also be protected from hot embers and the elements, and the patient and attendant will not get sprayed with sand or mud as they do now in the lawn wagon. The tracks will assist with movement up and down the sand hills, through mud and expand our off road capabilities in the winter when we can move like a snowmobile. We included in this request a thermal imaging camera, with this we will be able to locate hot spots during fires and assist locating persons during search and rescue operations. We would also like to outfit the UTV with an AED because of the difficult terrain that hikers, hunters and fire fighters encounter on remote fire scenes away from fast medical care. Our intent is to utilize this UTV to safely transport personnel to remote locations better equipped to complete the mission, whether it is transporting a patient or getting to the wild fires before they damage property. PROJECT¶¶This r Graafschap Fire request for funding assistance UTV UTV tracks UTV cab accessories skid unit medical equipment trailer wild land firefighting gear 10,000 5,500 2,000 1,500 5,000 4,000 8,000 1,000 Total #1 37,000 Tow vehicle Thermal Imaging Camera 17,000 10,400 Total #2 27,400 Total 1&2 64,400 Thank You for your consideration of this project GRAAFSCHAP FIRE/RESCUE 5th District Regional Homeland Security Planning Board February 28, 2008 2006 Projects to be Funded Name of Agency Submitting Project: Allegan County – Plainwell Office of Public Safety Person Submitting Project: Scott Corbin – Bill Bomar Name of Project: Radiological Prime Mover Estimated Cost of Project: $ 44,400.00 Investment Project this would come from: Nuclear Response Plan Describe the Project: (Use only listed space) This would be to purchase a prime mover to move radiological detection, decontamination and communications equipment. This will be stored at the Plainwell Department of Public Safety located near our radiological detection trailer issued by the State of Michigan Emergency Management. Describe how this project benefits the region as a regional project: (Use only listed space) The radiological response equipment is used to support the Nuclear Power plants within the region and throughout the state of Michigan. Submission DEADLINE is March 12, 2008. Please email theses forms to me, thank you. Paul. U:\Grant Request-Local Projects\Projects ideas from Locals\Plainwell- RAD Prime Mover Regional Project Request.doc Allegan County would like to apply for a prime mover on behalf of the Plainwell Department of Public Safety (PDPS). Plainwell Department of Public Safety is in close proximity to (two) Allegan County Emergency Management (ACEM) response equipment trailers. This pickup would be housed at the Plainwell Fire Department, 115 West Bridge St. and would be available for an on-call response throughout the region to support a radiological emergencies or training exercise as directed by Allegan County Emergency Management. Plainwell Office Public Safety offers to house and maintain such equipment. Prime Mover Estimates for Plainwell Sirens Emergency Lighting Scene Lighting Radios Graphics Service Body Truck $500.00 $2,500.00 $200.00 $3,500.00 $200.00 $5,500.00 $32,000.00 Total $44,400.00 2008 THE NEW F-SERIES SUPER DUTY F-250/F-350/F-450 PICKUPS ® TOUGH MOVES MOUNTAINS Since the concept of heavy-duty trucks took shape at Ford, F-Series Super Duty pickups have had one mission: to be the toughest, most capable pickups in the nation. So every vehicle system is designed toward the goal of effortlessly hauling the biggest payloads and towing the heaviest trailers, while maintaining optimum control of those huge loads. And now, the mighty new F-450 pickup is the most capable Super Duty of them all. Record-Breaker: New F-450 Best-in-class* 5th-wheel towing up to 24,500 lbs.** • Best conventional towing up to 16,000 lbs.** • Best maximum payload up to 6120 lbs.** *Class is Full-size Pickups over 8500 lbs. and up to 16,000 lbs. GVWR. **Maximum capability when properly equipped. See your Ford Dealer for specific equipment requirements and other limitations. Vehicles throughout this document may be shown with optional and aftermarket equipment. fordvehicles.com BOLDMOVES Only From Super Duty • Best-in-Class Gas Horsepower and Torque 6.8L Triton® V10 • Winner – 2007 Truck of Texas, Texas Auto Writers Association, F-250 Super Duty Crew Cab 4x4 • All-New 6.4L Power Stroke® 32-Valve V8 Turbo Diesel • New F-450 Pickup • New PowerScopeTM Power-Telescoping & Folding Trailer Tow Mirrors Option • New Tailgate Step Option • New Stowable Bed Extender Option • New Rapid-Heat Supplemental Cab Heater Option • New Quiet Steel® in Dash Panel • Standard Box-Rail Moldings • Standard Built Ford Tough® Hitch Receivers on All Models 1 S P E CIF ICAT ION S F-SERIES LINEUP & AVAILABILITY BY MODEL XL F-250 SRW F-350 SRW F-350 DRW F-450 DRW XL Regular Cab — — — — — Regular Cab 8' box SuperCab 63/4' box SuperCab 8' box Crew Cab 63/4' box Crew Cab 8' box 4x2 4x4 XLT F-250 SRW F-350 SRW F-350 DRW F-450 DRW XLT SuperCab — — — — — Regular Cab 8' box SuperCab 63/4' box SuperCab 8' box Crew Cab 63/4' box Crew Cab 8' box 4x2 4x4 FX4 F-250 SRW F-350 SRW F-350 DRW F-450 DRW FX4 SuperCab — — — — — — — — — — SuperCab 63/4' box SuperCab 8' box Crew Cab 63/4' box Crew Cab 8' box 4x2 4x4 LARIAT F-250 SRW F-350 SRW F-350 DRW F-450 DRW LARIAT SuperCab — — — — SuperCab 63/4' box SuperCab 8' box Crew Cab 63/4' box Crew Cab 8' box 4x2 4x4 Available — Not Available 2008THE NEW F-250/F-350/F-450 SUPER DUTY® Vehicles shown may include optional equipment. 2 STANDARD FEATURES SAFETY/SECURITY 4-wheel power disc brakes with Anti-lock Brake System (ABS) Airbags* — Driver and right-front passenger Alert chimes — Headlamps-on, key-in-ignition and door ajar Belt-Minder® safety belt reminder Brake/shift interlock (with automatic transmission) Child-safety seat top tether anchors (Regular Cab front passenger and all rear seating positions) Fuel pump inertia shutoff switch Height-adjustable safety belts — Front outboard Locking tailgate Passenger airbag deactivation switch (Regular Cab, SuperCab) Safety belt energy-management retractors — Front outboard positions Side-intrusion door beams Spare tire/wheel lock MECHANICAL 5.4L 3-valve SOHC Triton® V8 engine (F-250, F-350) 6.4L OHV 32-valve Power Stroke® V8 Turbo Diesel engine (F-450) 6-speed manual overdrive transmission 100,000-mile tune-up interval** (gas engines) Battery saver Fail-safe engine cooling system (gas engines) Fuel tank — 30.5-gallon capacity with 6 3/4' box, 38-gallon capacity with 8' box Manual 4-wheel-drive system with manual locking hubs (4x4 models only) Power steering Quick-release tailgate with Tailgate AssistTM Spare tire/wheel/jack — Conventional with underframe carrier (crank-down type) Stabilizer bar — Front Stabilizer bar — Rear (DRW only) Stainless steel exhaust system (major components) Stationary Elevated Idle Control (SEIC) † Steering damper Styleside box INTERIOR Assist and ride handles Coat hooks — 1 (Regular Cab), 2 in rear of cab (SuperCab and Crew Cab) Dome light (front and rear with Crew Cab) Flip-open rear quarter windows (SuperCab) Message center with odometer, trip odometer, engine-hour meter and warning messages Power points — 2 on instrument panel (including lighter) Steering wheel — Black urethane EXTERIOR Bumpers — Front step and rear step Cargo box lamp — Integrated with center high-mounted stop lamp Cargo box — Partitionable and stackable Cargo box rail and tailgate top moldings Cargo box stake pockets Cargo tie-down hooks — 4 in 6 3/4' box, 6 in 8' box Solar-tinted glass Tow hooks — 2 in front Trailer hitch receiver — 12.5K (2") Built Ford Tough® (SRW/F-350 DRW 5.4L) Trailer hitch receiver — 15K (21/2") Built Ford Tough (F-350 DRW 6.8L/6.4L only) Trailer hitch receiver — 16K (21/2") Built Ford Tough (F-450 only) Trailer tow — 7-/4-pin connector and trailer brake wiring kit (in-cab, no controller) Windshield wipers — Intermittent *Always wear your safety belt and always deactivate the passenger airbag when using a rear-facing child-safety seat with Regular Cab and SuperCab models. Always wear your safety belt and always secure children in the rear seat in Crew Cab models. **Under normal driving conditions with routine fluid and filter changes. †Final-stage manufacturer must supply control switches. ††TBC verified to be compatible with electric-actuated drum brakes only. FEATURES & OPTIONS XL XLT FX4 LARIAT — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — 2008THE NEW F-250/F-350/F-450 SUPER DUTY® — — — Comparisons based on 2007 competitive models, publicly available information and Ford certification data at time of printing. Some features discussed may be optional. Vehicles shown may contain optional equipment. Features shown may be offered only in combination with other options or subject to additional ordering requirements or limitations. Dimensions and capacities shown may vary due to optional features and/or production variability. Following publication of the catalog, certain changes in standard equipment, options and the like, or product delays may have occurred which would not be included in these pages. Your Ford Dealer is the best source for up-to-date information. Ford Division reserves the right to change product specifications at any time without incurring obligations. — — — — — — — — — — — — — — MECHANICAL 5.4L 3-valve SOHC Triton V8 engine (not available on DRW Crew Cab) 6.8L 3-valve SOHC Triton V10 engine (standard on F-350 DRW Crew Cab) 6.4L OHV 32-valve Power Stroke V8 Turbo Diesel engine (standard on F-450) TorqShift® 5-speed automatic overdrive transmission with Tow/Haul Mode Electronic Shift-On-the-Fly (ESOF) 4-wheel-drive system with auto/manual locking hubs (4x4 models only) 17" argent-painted steel wheels — 5 (F-250); 5 (F-350 SRW) 17" argent-painted steel wheels — 7 (F-350 DRW) 17" chrome-clad steel wheels — 4 (F-250) 17" forged polished-aluminum wheels — 4 (F-350 DRW) 18" argent-painted steel wheels — 4 (F-350 SRW) 18" premium chrome-clad steel wheels — 4 (F-250/F-350 SRW) 18" forged polished-aluminum wheels — 4 (F-250/F-350 SRW) 18" premium forged polished-aluminum wheels — 4 (F-250/F-350 SRW) 18" chrome-clad steel wheels — 4 (F-350 SRW) 19.5" forged polished-aluminum wheels — 4 (F-450) 20" forged polished-aluminum wheels — 4 (F-250/F-350 SRW 4x4 only) LT245/75R17 all-season BSW tires — 5 (F-250) LT245/75R17 all-terrain BSW tires — 5 (F-250) LT265/70R17 all-season BSW tires — 5 (F-250) LT265/70R17 all-season OWL tires — 4 (F-250) LT265/70R17 all-terrain BSW tires — 5 (F-250) LT265/70R17 all-terrain OWL tires — 4 (F-250) LT265/70R17 all-season BSW tires — 5 (F-350 SRW) LT265/70R17 all-terrain BSW tires — 5 (F-350 SRW) LT275/65R18 all-season BSW tires — 5 (F-250 4x2) LT275/70R18 all-season BSW tires — 5 (F-250 4x4) LT275/70R18 all-terrain BSW tires — 5 (F-250 4x4) LT275/70R18 all-terrain BSW tires — 5 (F-350 SRW 4x4) LT275/70R18 all-terrain OWL tires — 4 (F-250/F-350 SRW 4x4) LT275/65R20 all-terrain BSW tires — 4 (F-250/F-350 SRW 4x4) LT275/65R20 all-terrain OWL tires — 4 (F-250/F-350 SRW 4x4) LT275/65R18 all-season BSW tires — 5 (F-350 SRW 4x2) LT275/70R18 all-season BSW tires — 5 (F-350 SRW 4x4) LT245/75R17 all-season BSW tires — 7 (F-350 DRW) LT245/75R17 all-terrain BSW tires — 7 (F-350 DRW) LT245/75R17 all-terrain OWL tires — 4 (F-350 DRW) 225/70R19.5 all-season BSW tires — 7 (F-450) 225/70R19.5 traction tires — 4 (F-450) Advanced Security Group — Includes autolamp, autolock (auto. trans. only), illuminated entry system, remote keyless-entry system with 2 key fobs and driver door entry keypad Alternator — Single, extra-heavy-duty 200-amp (diesel engine only) Alternators — Dual, 320-amp total (diesel engine only) Engine block heater (standard in 10 cold-weather states) Higher-ratio rear axle (excludes diesel-equipped SRW models) Limited-slip rear axle Power TakeOff (PTO) provision — Automatic transmission (included with man. trans.; PTO obstructed by catalyst placement on 5.4L and 6.8L engines) Reverse Vehicle Aid Sensor (n/a with pickup box delete) SecuriLock® passive anti-theft ignition system TowCommand Integrated Trailer Brake Controller †† (standard on F-450) Traction Control SEATING Front reclining seat — HD vinyl Front reclining seat — HD cloth Front reclining seat with integrated armrest — HD vinyl Front reclining seat with integrated armrest — HD cloth Front seat — 40/20/40 split with armrest, cupholders and storage (XL — HD vinyl or cloth, XLT — cloth, FX4 — FX4 cloth, LARIAT — leather-trimmed) Front bucket seats — HD vinyl or HD cloth Front cloth captain’s chairs with center console Front leather-trimmed captain’s chairs with center console Rear folding bench seat (SuperCab and XL Crew Cab) Rear FlexFoldTM 60/40 split fold-flat seat, steel loadfloor, bag hooks, dual integrated cupholders and tray, and 2 outboard head restraints (Crew Cab) Heated seats — Driver and front passenger, 2 settings (requires leather trim) Lumbar support — Driver and front passenger Power 6-way driver seat (and front-passenger seat on SuperCab and Crew Cab) 3 FEATURES & OPTIONS — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — XL XL XLT XLT FX4 FX4 LARIAT LARIAT INTERIOR Accessory delay for power features* Air conditioning — Manual Air conditioning — Dual-zone Electronic Automatic Temperature Control (EATC) AM/FM stereo/digital clock with 2 speakers AM/FM stereo/single-CD player with MP3 capability, digital clock and 4 speakers AM/FM stereo/6-disc in-dash CD changer with MP3 capability, digital clock and 4 speakers (leather-wrapped steering wheel with audio controls on XLT and FX4) Audiophile® AM/FM stereo/6-disc in-dash CD changer with MP3 capability, digital clock and 8 speakers with subwoofer (leather-wrapped steering wheel with audio controls on XLT and FX4; n/a with Navigation System) DVD-based Navigation System with Audiophile AM/FM stereo/6-disc in-dash CD changer with MP3 capability, digital clock and 8 speakers with subwoofer SIRIUS Satellite Radio (requires CD system, not available on Regular Cab) Auxiliary audio input jack Radio delete Cruise control (requires tilt steering wheel) Enhanced message center — Message center, plus trip computer with compass, distance to empty, average fuel economy, autolamp configuration, status system check and language selection Floor covering — Black vinyl Floor covering — Color-coordinated carpet Floor mats — Color-coordinated carpet Floor mats — Black all-weather Carpet delete (n/a with all-weather floor mats on XLT) Instrument cluster — Black with black gauges Instrument cluster — Metallic-faced with chrome-ringed gauges Instrument cluster — Metallic-faced with cream gauges Mirror — Day/night rearview Mirror — Auto-dimming rearview Overhead console — Includes sunglasses storage and garage door opener storage Power-adjustable brake and accelerator pedals (with auto. trans. only) Power door locks* Power windows with one-touch-down driver-side feature* Rapid-Heat Supplemental Cab Heater (requires diesel engine with air conditioning, alternator upgrade and TorqShift transmission) Steering wheel — Black leather-wrapped Steering wheel — Color-coordinated leather-wrapped with secondary audio/climate controls Steering wheel — Tilt (requires cruise control) Universal Garage Door Opener Upfitter switches (4) — Located on instrument panel Visors with passenger mirror Visors with driver and passenger mirrors Visors with illuminated driver and passenger mirrors** Woodgrain-style instrument panel accents EXTERIOR (continued) Moonroof — Power-sliding (Crew Cab only) †† Pickup box delete (requires 8' box, n/a with 6.8L engine), late availability Privacy glass (rear doors and rear window, XLT and FX4 require sliding rear window) Roof clearance lamps (standard on DRW) Skid plates — Transfer case and fuel tank Sliding rear window — Manual Sliding rear window — Power Stowable bed extender (F-250/F-350 SRW only) Tailgate Step — Includes step, Tailgate Assist and grab bar Two-tone paint — Lower accent Wheel-lip moldings — Dark Shadow Grey on FX4, optional accent color on LARIAT with two-tone paint (SRW only) — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — Bodyside moldings — Body-color (SRW only) Bumpers — Black-painted with grained top cover Bumpers — Chrome-steel with grained top cover † Bumpers — Dark Shadow Grey with grained top cover Cab steps — Black molded Cab steps — 4" chrome tubular (Regular Cab only) Cab steps — 5" chrome tubular (SuperCab and Crew Cab only) Fog lamps Grille — Black-painted Grille — Chrome surround with Medium Platinum insert Grille — Body-color surround with billet-style Medium Platinum insert Headlamps — Sealed-beam halogen Headlamps — Dual-beam jewel-effect † Lamp — Underhood engine compartment † Mirrors — Manual sideview Mirrors — Power sideview* Mirrors — Manually telescoping trailer tow with 2-way fold and manual glass Mirrors — Manually telescoping trailer tow with 2-way fold, power/heated glass, manual spotter mirrors and integrated clearance lamps and turn signals Mirrors — PowerScopeTM power-telescoping/folding trailer tow with power/heated glass, manual spotter mirrors and integrated clearance lamps and turn signals 2008THE NEW F-250/F-350/F-450 SUPER DUTY® — — — — — — — — — — — — — — — EXTERIOR — — — — — — — — — — — — — PACKAGES 10,000-lb. GVWR Package (F-350 SRW) 4x4 OFF-ROAD Package — Includes transfer case and fuel tank skid plates; 4x4 OFF-ROAD box decals (requires 4x4, limited-slip rear axle and all-terrain tires) Camper Package — Includes front springs upgrade (unless maximum springs have been computer-selected as included equipment); rear stabilizer bar (SRW); slide-in-camper certification; auxiliary rear springs Driver Memory Package — Includes memory for trailer tow mirrors, power driver seat and power-adjustable pedals (SuperCab and Crew Cab only, requires power-adjustable pedals) Heavy-Service Suspension Package — Includes front springs upgrade (unless maximum springs have been computer-selected as included equipment) High-Capacity Trailer Tow Package (F-450) — Includes upgraded 4.88 limited-slip rear axle and increased GCWR to 33,000 lbs. KING RANCH® — Includes two-tone paint with Pueblo Gold lower accent, bumpers, wheel-lip moldings and grille insert; Driver Memory Package; KING RANCH branded wheel-center caps, fender badges and floor mats; PowerScope trailer tow mirrors with body-color mirror caps; unique 18" forged painted-aluminum wheels (SRW); 17" forged-aluminum wheels (F-350 DRW); 19.5" forged-aluminum wheels (F-450); heated front seats; KING RANCH branded Chaparral leather-trimmed quad captain’s chairs, and front and rear center console lids; Chaparral leather-wrapped steering wheel; and more Power Equipment Group — Includes power door locks, sideview mirrors and front windows (plus rear on Crew Cab) with one-touch-down driver-side feature and accessory delay (requires air conditioning on XL) Rear-Seat DVD Entertainment System — Includes roof-mounted DVD system with 8" video screen, 2 sets of wireless headphones and a remote control (n/a with power moonroof; Crew Cab only) Snow Plow Prep Package — Computer-selected springs for snow plow application; 200-amp. alternator and unique fan clutch with diesel engine (4x4 only) Stabilizer Package — Includes heavy-service front springs and rear stabilizer bar (available on SRW; n/a with Heavy-Service Suspension Package or Camper Package) TowBoss Package — Includes 4.30 limited-slip rear axle, increased GCWR to 26,000 lbs. (F-350 DRW only; requires 6.4L diesel engine, automatic transmission and TowCommand System) TowCommand System (requires TorqShift automatic transmission) — Includes TowCommand Integrated Trailer Brake Controller for electric-actuated drum brakes; manually telescoping trailer tow mirrors with manual glass (XL); manually telescoping trailer tow mirrors with power/heated glass and integrated clearance lamps and turn signals (XLT); PowerScope power-telescoping/folding trailer tow mirrors with power/heated glass and integrated clearance lamps and turn signals (FX4 and LARIAT) XL Décor Group — Includes chrome bumpers; dual-beam jewel-effect headlamps; bright chrome hub covers and center ornaments (SRW only); underhood engine-compartment lamp XLT SPORT Package — Includes monochromatic exterior; bodyside moldings; trailer tow mirrors; privacy glass; sliding rear window; fog lamps; 5" chrome tubular step bars; chrome exhaust tip; 40/20/40 split Medium Stone two-tone cloth front seat; front and rear Black all-weather throw-in rubber floor mats; Black leather-wrapped steering wheel; Ebony carpet and interior accents; Platinum instrument panel appliqué and interior trim accents; and more (F-250 and F-350 SuperCab and Crew Cab only; requires TorqShift automatic transmission and Advanced Security Group) Standard Select Availability Optional — Not Available *Included as part of Power Equipment Group on XL. **Forced on XLT and FX4 with moonroof. † Included as part of the XL Décor Group. Requires Advanced Security Group on XLT; not available with Rear-Seat DVD Entertainment System. †† 4 S P E CIF ICAT ION S MECHANICAL SPECIFICATIONS FRONT SUSPENSION Type WHEELS Twin-I-Beam (F-250/F-350 4x2); solid Twin-Coil Monobeam axle (F-250/F-350 4x4, F-450 4x2 and 4x4) 5250 lbs. (F-250/F-350 4x2); 6000 lbs. (F-250/F-350 4x4); 7000 lbs. (F-450) Coil 13/8" gas type Standard Axle (rating @ ground) Springs Shock absorbers Stabilizer bar REAR SUSPENSION Type Axle (rating @ ground) 17" Argent-Painted Steel 18" Argent-Painted Steel 17" Chrome-Clad Steel 18" Chrome-Clad Steel 18" Forged Polished-Aluminum 18" Premium Chrome-Clad Steel 18" Premium Forged Polished-Aluminum 18" KING RANCH® Painted Forged Polished-Aluminum 20" Forged Polished-Aluminum 20" KING RANCH Premium Painted Forged-Aluminum 17" Forged Polished-Aluminum 17" KING RANCH Forged Polished-Aluminum 19.5" Forged Polished-Aluminum 19.5" KING RANCH Forged Polished-Aluminum Solid axle 6200 lbs. (F-250); 7280 lbs. (F-350 SRW); 9000 lbs. (F-350 DRW); 11,000 lbs. (F-450) Leaf 13/8" gas type Standard on DRW pickup; optional in package on SRW pickup Springs Shock absorbers Stabilizer bar STEERING Assist Overall ratio Power 20.16:1 (F-250/F-350 4x2); 20.38:1 (F-250/F-350 4x4); 17.8:1 average (F-450) BRAKES Type Front (rotor diameter) Rear (rotor diameter) 4-wheel disc ABS (standard) 13.66" (F-250/F-350); 14.53" (F-450) 13.39" (F-250/F-350); 15.35" (F-450) WHEELS Type Size Number of studs Bolt-circle diameter Steel (standard); chrome-clad steel or aluminum (optional) 17" (standard); 18" or 20" (optional F-250/F-350 SRW); 19.5" (F-450) 8 (F-250/F-350); 10 (F-450) 6.7" (170-mm) SRW; 7.87" (200-mm) F-350 DRW; 8.85" (225-mm) F-450 POWERTRAINS ENGINE 5.4L 3-Valve Triton® SEFI V8 6.8L 3-Valve Triton SEFI V10 6.4L Power Stroke® V8 Turbo Diesel 4x4 TRANSFER CASE 2-speed 2-speed 2-speed 6-SPEED MANUAL 5-SPEED AUTOMATIC Standard Optional ENGINES Type Fuel injection Engine control system Induction system Battery Alternator 5.4L 3-VALVE TRITON V8 SOHC Sequential Electronic 6.8L 3-VALVE TRITON V10 SOHC Sequential Electronic Electronic Specially tuned Electronic Specially tuned 12-volt; 650-CCA/72-amp 115-amp 12-volt; 650-CCA/72-amp 115-amp Cooling system Pressurized series flow Cylinders 8 Cylinder-head material Aluminum Block material Cast iron Valve operation Hydraulic roller Camshaft drive Variable cam timing Bore 3.55" Stroke 4.16" Compression ratio 9.8:1 Horsepower (hp @ rpm) 300 @ 5000 Torque (lb.-ft. @ rpm) 365 @ 3750 Recommended fuel Unleaded Pressurized series flow 10 Aluminum Cast iron Hydraulic roller Silent chain 3.55" 4.16" 9.2:1 362 @ 4750 457 @ 3250 Unleaded 6.4L POWER STROKE V8 TURBO DIESEL OHV (32-Valve) High-Pressure Common-Rail Electronic Series Sequential Turbochargers, intercooler Dual 12-volt; 750-CCA/78-amp 135-amp (Single 200-amp or dual combined 320-amp opt.) Pressurized series flow 8 Cast iron Cast iron Push rod/rocker arms Gear 3.86" 4.13" 16.7:1 350 @ 3000* 650 @ 2000* Ultra-Low-Sulfur Diesel * Governed at 325 hp @ 3000 rpm and 600 lb.-ft. of torque @ 2000 rpm on F-450 with 6-speed manual, or on F-450 with automatic transmission and 4.88 rear axle. 17" Argent-Painted Steel 2008THE NEW F-250/F-350/F-450 SUPER DUTY® 5 S P E CIF ICAT ION S DIMENSIONS E A D B C F H G J K I REGULAR CAB EXTERIOR 4x2/4x4 A. Height — F-250 SRW (w/o options) 75.9"/79.2" A. Height — F-350 SRW (w/o options) 76.0"/80.2" A. Height — F-350 DRW (w/o options) 76.1"/79.4" A. Height — F-450 DRW (w/o options) — B. Overall width — SRW (excl. mirrors) 79.9" B. Overall width — with standard mirrors 99.6" C. Ground clearance — F-250 SRW 7.0"/7.8" C. Ground clearance — F-350 SRW 7.1"/7.8" C. Ground clearance — F-350 DRW 7.1"/7.5" C. Ground clearance — F-450 DRW — D. Loadfloor height — F-250 SRW 33.9"/34.4" D. Loadfloor height — F-350 SRW 34.0"/37.2" D. Loadfloor height — F-350 DRW 34.4"/35.0" D. Loadfloor height — F-450 DRW — E. Cargo box height 20.1" F. Overall length 227.0" G. Overhang — rear 52.4" H. Wheelbase 137.0" I. Overhang — front 37.6" J. Angle of departure — F-250 SRW 16.4°/17.3° J. Angle of departure — F-350 SRW 16.6°/20.3° J. Angle of departure — F-350 DRW 17.0°/17.9° — J. Angle of departure — F-450 DRW K. Ramp breakover angle — F-250 SRW 13.7°/18.1° K. Ramp breakover angle — F-350 SRW 14.3°/20.2° K. Ramp breakover angle — F-350 DRW 13.8°/18.8° — K. Ramp breakover angle — F-450 DRW L. Angle of approach — F-250 SRW 21.0°/30.3° L. Angle of approach — F-350 SRW 21.1°/29.6° L. Angle of approach — F-350 DRW 20.9°/30.2° — L. Angle of approach — F-450 DRW SUPERCAB SWB LWB 4x2/4x4 4x2/4x4 76.4"/79.4" 76.2"/79.4" 76.5"/80.6" 76.3"/80.4" — 76.5"/79.0" — — 79.9" 79.9" 99.6" 99.6" 7.0"/7.8" 7.0"/7.8" 7.1"/7.8" 7.1"/7.8" — 7.1"/7.5" — — 33.9"/34.5" 33.9"/34.5" 34.1"/37.3" 34.0"/37.2" — 34.4"/35.1" — — 20.1" 20.1" 231.8" 248.0" 52.4" 52.4" 141.8" 158.0" 37.6" 37.6" 16.4°/17.3° 16.2°/17.3° 16.5°/20.2° 16.3°/20.2° — 16.8°/17.9° — — 13.1°/17.7° 11.6°/15.9° 13.6°/19.3° 12.0°/17.0° — 13.2°/15.5° — — 21.1°/30.3° 21.2°/30.3° 21.1°/29.7° 21.3°/29.7° — 21.0°/30.2° — — CREW CAB SWB LWB 4x2/4x4 4x2/4x4 77.2"/79.9" 76.7"/79.9" 77.0"/81.0" 76.8"/80.9" 77.1"/80.2" 77.0"/80.1" — 79.8" 79.9" 79.9" 99.6" 99.6" 7.0"/7.8" 7.0"/7.8" 7.1"/7.8" 7.1"/7.8" 7.1"/7.5" 7.1"/7.5" — 7.8" 33.8"/34.5" 33.7"/34.5" 34.0"/37.3" 33.9"/37.2" 34.4"/35.1" 34.3"/35.1" — 35.1" 20.1" 20.1" 246.2" 262.4" 52.4" 52.4" 156.2" 172.4" 37.6" 37.6" 16.3°/17.4° 16.2°/17.4° 16.4°/20.2° 16.3°/20.2° 16.8°/18.0° 16.7°/17.9° — 17.9° 11.8°/15.9° 10.9°/14.4° 12.1°/17.2° 11.0°/15.6° 12.1°/15.9° 11.0°/14.4° — 15.2° 22.4°/30.3° 21.2°/30.3° 21.2°/29.7° 21.3°/29.8° 21.0°/30.2° 21.1°/30.2° — 29.2° L INTERIOR M N N Front Head room Shoulder room Hip room Leg room 41.4" 68.0" 67.6" 41.0" 41.4" 68.0" 67.6" 41.0" 41.4" 68.0" 67.6" 41.0" 41.4" 68.0" 67.6" 41.0" 41.4" 68.0" 67.6" 41.0" Rear Head room Shoulder room Hip room Leg room — — — — 38.4" 68.1" 67.3" 31.8" 38.4" 68.1" 67.3" 31.8" 41.4" 68.0" 67.3" 41.8" 41.4" 68.0" 67.3" 41.8" CARGO BOX Volume (cu. ft.) M. Width at floor (maximum) N. Length at floor O. Width at wheelhouse SRW = single rear wheel DRW = dual rear wheel REGULAR CAB 4x2/4x4 77.4 69.3" 98.0" 50.9" SUPERCAB SWB LWB 4x2/4x4 4x2/4x4 64.4 77.4 69.3" 69.3" 81.8" 98.0" 50.9" 50.9" SWB = short wheelbase (6 3/4' cargo box) CREW CAB SWB LWB 4x2/4x4 4x2/4x4 64.4 77.4 69.3" 69.3" 81.8" 98.0" 50.9" 50.9" LWB = long wheelbase (8' cargo box) O 2008THE NEW F-250/F-350/F-450 SUPER DUTY® 6 CONVENTIONAL TOWING — Maximum Loaded Trailer Weight Ratings (lbs.) MANUAL TRANSMISSION ENGINE 5.4L 3-Valve Triton® V8 AXLE RATIO 3.73 4.10 6.8L 3-Valve Triton V10 4.10 4.30 6.4L Power Stroke V8 Turbo Diesel ® 3.73 4.10 4.30LS 4.88LS REGULAR CAB GCWR (LBS.) 15,000 17,000 17,500 20,000 20,500 22,000 22,500 23,000 23,500 23,500 27,000 28,000 AUTOMATIC TRANSMISSION ENGINE 5.4L 3-Valve Triton V8 6.8L 3-Valve Triton V10 6.4L Power Stroke V8 Turbo Diesel SUPERCAB CREW CAB F-250/ F-250/ F-250/ F-250/ F-250/ F-250/ F-350 F-350 F-350 F-350 F-350 F-350 F-350 F-350 F-350 F-350 F-450 F-350 F-350 F-450 SRW 4x2 DRW 4x2 SRW 4x4 DRW 4x4 SRW 4x2 DRW 4x2 SRW 4x4 DRW 4x4 SRW 4x2 DRW 4x2 DRW 4x2 SRW 4x4 DRW 4x4 DRW 4x4 9100 — 8600 — 8800 — 8400 — 8700 — — 8100 — — 11,100 — 10,600 — 10,800 — 10,400 — 10,700 — — 10,100 — — — 11,100 — 10,700 — 10,700 — 10,300 — — — — — — 12,500 — 12,500 — 12,500 — 12,500 — 12,500 — — 12,500 — — — 14,000 — 13,500 — 13,600 — 13,100 — 13,600 — — 13,000 — 12,500 — 12,500 — 12,500 — 12,500 — 12,500 — — 12,500 — — — 15,000 — 15,000 — 15,000 — 15,000 — 15,000 — — 15,000 — 12,500 — 12,500 — 12,500 — 12,500 — 12,500 — — 12,500 — — — 15,000 — 15,000 — 15,000 — 15,000 — 15,000 — — 15,000 — — 15,000 — 15,000 — 15,000 — 15,000 — 15,000 — — 15,000 — — — — — — — — — — — 16,000 — — 16,000 — — — — — — — — — — 16,000 — — 16,000 REGULAR CAB SUPERCAB CREW CAB F-250/ F-250/ F-250/ F-250/ F-250/ F-250/ AXLE GCWR F-350 F-350 F-350 F-350 F-350 F-350 F-350 F-350 F-350 F-350 F-450 F-350 F-350 F-450 RATIO (LBS.) SRW 4x2 DRW 4x2 SRW 4x4 DRW 4x4 SRW 4x2 DRW 4x2 SRW 4x4 DRW 4x4 SRW 4x2 DRW 4x2 DRW 4x2 SRW 4x4 DRW 4x4 DRW 4x4 3.73 16,000 10,100 — 9600 — 9800 — 9400 — 9700 — — 9100 — — 4.10 18,000 12,100 — 11,600 — 11,800 — 11,400 — 11,700 — — 11,100 — — 18,500 — 12,100 — 11,700 — 11,700 — 11,300 — — — — — — 4.10 21,000 12,500 — 12,500 — 12,500 — 12,500 — 12,500 — — 12,500 — — 21,500 — 15,000 — 14,500 — 14,600 — 14,100 — 14,600 — — 14,000 — — 12,500 — 12,500 — 12,500 — 12,500 — — 12,500 — — 4.30 22,500/23,0001 12,500 23,000 — 15,000 — 15,000 — 15,000 — 15,000 — 15,000 — — 15,000 — 3.73 23,000 12,500 — 12,500 — 12,500 — 12,500 — 12,500 — — 12,500 — — 23,500 — 15,000 — 15,000 — 15,000 — 15,000 — 15,000 — — 15,000 — 4.10 23,500 — 15,000 — 15,000 — 15,000 — 15,000 — 15,000 — — 15,000 — 2 4.30LS 26,000 — 15,000 — 15,000 — 15,000 — 15,000 — 15,000 — — 15,000 — 4.30LS 29,000 — — — — — — — — — — 16,000 — — 16,000 4.88LS3 33,000 — — — — — — — — — — 16,000 — — 16,000 5TH-WHEEL TOWING — Maximum Loaded Trailer Weight Ratings (lbs.) MANUAL TRANSMISSION ENGINE 5.4L 3-Valve Triton V8 AXLE RATIO 3.73 4.10 6.8L 3-Valve Triton V10 4.10 4.30 6.4L Power Stroke V8 Turbo Diesel 3.73 4.10 4.30LS 4.88LS REGULAR CAB GCWR (LBS.) 15,000 17,000 17,500 20,000 20,500 22,000 22,500 23,000 23,500 23,500 27,000 28,000 AUTOMATIC TRANSMISSION ENGINE 5.4L 3-Valve Triton V8 AXLE RATIO 3.73 4.10 6.8L 3-Valve Triton V10 4.10 4.30 6.4L Power Stroke V8 Turbo Diesel 3.73 4.10 4.30LS2 4.30LS 4.88LS3 GCWR (LBS.) 16,000 18,000 18,500 21,000 21,500 22,500/ 23,0001 23,000 23,000 23,500 23,500 26,000 29,000 33,000 SUPERCAB CREW CAB F-250/ F-250/ F-250/ F-250/ F-250/ F-250/ F-350 F-350 F-350 F-350 F-350 F-350 F-350 F-350 F-350 F-350 F-450 F-350 F-350 F-450 SRW 4x2 DRW 4x2 SRW 4x4 DRW 4x4 SRW 4x2 DRW 4x2 SRW 4x4 DRW 4x4 SRW 4x2 DRW 4x2 DRW 4x2 SRW 4x4 DRW 4x4 DRW 4x4 9100 — 8600 — 8800 — 8400 — 8700 — — 8100 — — 11,100 — 10,600 — 10,800 — 10,400 — 10,700 — — 10,100 — — — 11,100 — 10,700 — 10,700 — 10,300 — — — — — — 13,900 — 13,500 — 13,700 — 13,200 — 13,500 — — 13,000 — — — 14,000 — 13,500 — 13,600 — 13,100 — 13,600 — — 13,000 — 15,900 — 15,500 — 15,700 — 15,200 — 15,500 — — 15,000 — — — 16,000 — 15,500 — 15,600 — 15,100 — 15,600 — — 15,000 — 16,100 — 15,700 — 15,900 — 15,400 — 15,700 — — 15,200 — — — 16,200 — 15,700 — 15,800 — 15,300 — 15,700 — — 15,200 — — — 15,200 — — 16,200 — 15,700 — 15,800 — 15,300 — 15,700 — — — — — — — — — — 18,500 — — 18,000 — — — — — — — — — — 19,500 — — 19,000 REGULAR CAB SUPERCAB CREW CAB F-250/ F-250/ F-250/ F-250/ F-250/ F-250/ F-350 F-350 F-350 F-350 F-350 F-350 F-350 F-350 F-350 F-350 F-450 F-350 F-350 F-450 SRW 4x2 DRW 4x2 SRW 4x4 DRW 4x4 SRW 4x2 DRW 4x2 SRW 4x4 DRW 4x4 SRW 4x2 DRW 4x2 DRW 4x2 SRW 4x4 DRW 4x4 DRW 4x4 10,100 — 9600 — 9800 — 9400 — 9700 — — 9100 — — 12,100 — 11,600 — 11,800 — 11,400 — 11,700 — — 11,100 — — — 12,100 — 11,700 — 11,700 — 11,300 — — — — — — 14,900 — 14,500 — 14,700 — 14,200 — 14,500 — — 13,900 — — — 15,000 — 14,500 — 14,600 — 14,100 — 14,600 — — 14,000 — 16,400/ — 16,000/ — 16,200/ — 15,700/ — 16,000/ — — 15,500/ — — 16,8001 16,3001 16,6001 16,1001 16,4001 15,9001 — 16,500 — 16,000 — 16,100 — 15,600 — 16,100 — — 15,500 — 16,100 — 15,700 — 15,900 — 15,400 — 15,700 — — 15,200 — — — 16,200 — 15,700 — 15,800 — 15,300 — 15,700 — — 15,200 — — 16,200 — 15,700 — 15,800 — 15,300 — 15,700 — — 15,200 — — 18,700 — 18,200 — 18,300 — 17,800 — 18,200 — — 17,700 — — — — — — — — — — — 20,500 — — 20,000 — — — — — — — — — — 24,500 — — 24,000 Maximum capabilities shown are for properly equipped vehicles with required equipment and a 150-lb. driver. Weight of additional options, equipment, passengers and cargo must be deducted from this weight. For additional information, see your Ford Dealer. Conventional Towing Notes: This information also applies to models with Pickup Box Delete option (66D). Trailer tongue load weight should be 10-15% of total loaded trailer weight. Make sure that the vehicle payload (reduced by option weight) will accommodate trailer tongue load weight and the weight of passengers and cargo added to the towing vehicle. The addition of trailer tongue load weight, and the weight of passengers and cargo cannot cause vehicle weights to exceed the rear GAWR (Gross Axle Weight Rating) or GVWR (Gross Vehicle Weight Rating). These ratings can be found on the vehicle Safety Compliance Certification Label. For F-250/F-350 SRW models, F-250 trailer weights are shown; F-350 trailer weights are within 200 lbs. Check with your sales consultant. 2008THE NEW F-250/F-350/F-450 SUPER DUTY® 5th-Wheel Towing Notes: This information also applies to models with Pickup Box Delete option (66D). Trailer kingpin weight should be 15-25% of total loaded trailer weight. Make sure that the vehicle payload (reduced by option weight) will accommodate trailer kingpin weight and the weight of passengers and cargo added to the towing vehicle. The addition of trailer kingpin weight, and the weight of passengers and cargo cannot cause vehicle weights to exceed the rear GAWR (Gross Axle Weight Rating) or GVWR (Gross Vehicle Weight Rating). These ratings can be found on the vehicle Safety Compliance Certification Label. For F-250/F-350 SRW models, F-250 trailer weights are shown; F-350 trailer weights are within 200 lbs. Check with your sales consultant. Conventional and 5th-Wheel Towing Footnotes: 1Available with F-350 SRW model only. 2 Available with TowBoss Package only. 3 Available with High-Capacity Trailer Tow Package only. 7 INTERIORS GVWR RATINGS MEDIUM STONE F-Series Super Duty® models maintain near-maximum payload capacity even when a larger cab or engine is selected. XL/XLT Oxford White Pueblo Gold Metallic Red Forest Green Metallic Dark Toreador Red Metallic Dark Blue Pearl Metallic Silver Metallic Dark Shadow Grey Metallic Dark Stone Metallic Black XL/XLT (DRW Crew Cab 63/4' box) Oxford White Black XLT TWO-TONE Oxford White/Pueblo Gold Metallic Oxford White/Silver Metallic Forest Green Metallic/Pueblo Gold Metallic Forest Green Metallic/Silver Metallic Dark Toreador Red Metallic/Pueblo Gold Metallic Dark Toreador Red Metallic/Silver Metallic Dark Blue Pearl Metallic/Pueblo Gold Metallic Dark Blue Pearl Metallic/Silver Metallic Black/Pueblo Gold Metallic Black/Silver Metallic XLT SPORT PACKAGE Oxford White Red Dark Blue Pearl Metallic Dark Shadow Grey Metallic Black LARIAT Oxford White Pueblo Gold Metallic Red Forest Green Metallic Dark Toreador Red Metallic Dark Blue Pearl Metallic Silver Metallic Dark Shadow Grey Metallic Dark Stone Metallic Black LARIAT TWO-TONE Oxford White/Pueblo Gold Metallic Oxford White/Silver Metallic Pueblo Gold Metallic/Black Forest Green Metallic/Pueblo Gold Metallic Forest Green Metallic/Silver Metallic Dark Toreador Red Metallic/Pueblo Gold Metallic Dark Toreador Red Metallic/Silver Metallic Dark Blue Pearl Metallic/Pueblo Gold Metallic Dark Blue Pearl Metallic/Silver Metallic Dark Shadow Grey Metallic/Black Dark Stone Metallic/Pueblo Gold Metallic Black/Pueblo Gold Metallic Black/Silver Metallic KING RANCH PACKAGE (Chaparral seats) Oxford White/Pueblo Gold Metallic Forest Green Metallic/Pueblo Gold Metallic Dark Blue Pearl Metallic/Pueblo Gold Metallic Black/Pueblo Gold Metallic Dark Copper Metallic/Pueblo Gold Metallic MAXIMUM PAYLOAD CAMEL MAXIMUM PAYLOAD WEIGHT RATINGS (LBS.) — MODEL/WHEELBASE (WB) Camel Vinyl Medium Stone Vinyl Camel Cloth Medium Stone Cloth Camel Premium Cloth Medium Stone Premium Cloth Camel Leather Medium Stone Leather Medium Stone Two-Tone Cloth Chaparral Leather (KING RANCH) FX4 Cloth FX4 Leather NOTE: Fabric patterns and colors are subject to change or substitution without notice. REGULAR CAB MAX. GVWR (LBS.) F-250 SRW 4x2 8800 9000 9200 9400 9600 9800 10,000 F-250 SRW 4x4 9000 9200 9400 9600 9800 10,000 F-350 SRW 4x2 10,100 10,200 10,300 10,400 10,600 10,700 10,800 11,000 11,200 F-350 SRW 4x4 10,500 10,600 10,700 10,800 11,000 11,100 11,200 11,400 11,500 F-350 DRW 4x2 11,800 12,000 12,200 12,400 12,600 12,800 13,000 F-350 DRW 4x4 12,000 12,200 12,400 12,600 13,000 F-450 DRW 4x2 14,500 F-450 DRW 4x4 14,500 137.0" WB 30601 31302 — 27003 — — — 28001 28602 — 24403 — — 42201 /40902 — — — — 38603 — — — 41601 — 42202 — — 38003 — — — 56101 56702 — 52503 — — — 53401 54102 — 49803 — — — SUPERCAB 141.8" WB — 30101 30702 — 26503 — — — 27501 28102 — 23903 — 39701 — 40402 — — — 37103 — — — 40101 — 40702 — — 36503 — — — — — — — — — — — — — — — — 158.0" WB — — 30801 31502 — 27303 — — — 28201 28802 — 24603 — — — 41501 42102 — — 37903 — — — — 40801 41402 — — 37203 — — — 56301 56902 — 52703 — — — 53701 54302 50103 — — CREW CAB 156.2" WB — — 30301 31002 — 26703 — — — 27701 28302 — 24103 — — — 40901 41602 — — 37403 — — — — 40301 40902 — — 36703 — — — — 56402 — 52203 — — — — 53802 49603 — — 172.4" WB — — — 31101 31702 — 27503 — — — 28401 29102 22803 — — — — 41701 — 42302 — 38103 — — — — 41001 — 41702 — 36403 — — — — 57202 — 52903 — — — 52502 48303 61203 57203 1 5.4L/6-speed manual. 26.8L/6-speed manual. 36.4L/6-speed manual. MEDIUM STONE MEDIUM STONE WITH BLACK FX4* (Black seats) Oxford White Red Dark Blue Pearl Metallic Silver Metallic Black FX4 TWO-TONE* (Black seats) Oxford White/Dark Shadow Grey Metallic Red/Dark Shadow Grey Metallic Dark Blue Pearl Metallic/Dark Shadow Grey Metallic Silver Metallic/Dark Shadow Grey Metallic Black/Dark Shadow Grey Metallic *New for 2008. 2008THE NEW F-250/F-350/F-450 SUPER DUTY® 8 EXTERIORS Oxford White Pueblo Gold Metallic* Red Forest Green Metallic* Dark Toreador Red Metallic Dark Blue Pearl Metallic* Silver Metallic Dark Shadow Grey Metallic Dark Stone Metallic Black Dark Copper Metallic** XLT shown with optional equipment. Ford uses clearcoat paint for beauty and protection. Colors shown are representative only. Not all colors are available on all models. See your dealer for actual paint/trim options. *New for 2008. **KING RANCH only. New Vehicle Limited Warranty We want your Ford Super Duty® ownership experience to be the best it can be. So under this warranty, your new vehicle comes with 3-year/36,000-mile Bumper-to-Bumper Coverage, 5-year/50,000-mile Safety Restraint Coverage, and 5-year/unlimited-mile Corrosion (Perforation) Coverage — all with no deductible. Please ask your Ford Dealer for a copy of this limited warranty. For more assurance: There’s now a 5-year/60,000-mile powertrain limited warranty that’s fully transferable, with no deductible — diesel engine warranty is 5 years/100,000 miles — on select engine components. Plus, Roadside Assistance is extended to 5 years or 60,000 miles, so you have the security of knowing that help may be only a phone call away should you run out of fuel, lock yourself out of the vehicle, or need towing. Your Ford Dealer can provide complete details on all of these advantages. Get the ride you want. Whether you plan to lease or finance, you’ll find the choices that are right for you at Ford Credit. Ask your Ford Dealer for details, or check us out at www.fordcredit.com. Get Ford Motor Company quality in your auto For a purchase or lease, the Ford insurance. Our program offers industry-leading Extended Service Plan (ESP) gives you benefits and competitive rates. Call 1-877-367-3847, “Peace-of-Mind” protection designed to or visit us at www.fordvip.com for a no-obligation quote. Insurance cover key vehicle components and protect offered by American Road Services Company (in CA, American Road you from the cost of unexpected repairs. Ask your dealer for an ESP, the Genuine Ford Accessories are designed and Insurance Agency), a licensed agency and subsidiary of Ford Motor Company. only service contract backed exclusively by Ford and honored at all Ford engineered specifically for Ford vehicles. Visit our Lincoln Mercury dealerships. website at www.fordaccessoriesstore.com to use the Accessorizer, and to learn about complete accessory details and purchase instructions. 2008THE NEW F-250/F-350/F-450 SUPER DUTY® ©2006 Ford Motor Company 08FSDPDFSPEC 9 Specification Sheet for AC-EMD Truck Purchase Plainwell Public Safety Chassis • • • • • • • • 1 Ton V-8-large-Gas 4-door Crew Cab 4-wheel Drive 18” All Season tires Tow package Heavy duty suspension Auto Transmission Utility Service Body • • • • • • Ladder Rack (35’, 24’, 14’) (2) Shovels (2) SCBA Air Packs Hitch Bars & Balls First Aid Kit Tools Box • • • • • • • Large fuel Tank AC Radio AM/FM Vinyl floor covering Front Buckets Cloth Cab-Steps Sliding Rear Window • • • • Portable Radio Bank Rescue Ropes Flashlight Bank Cribbing Emergency/Electronic Lighting Equipment (Requested Quote from C-Comm) • 800 MHz Radio (Allegan Co) • VHF Radio • Grill lights • Headlight/taillight Strobes, • Siren- amp/speaker • Power Pack • Radio Council • MCT Mount Bill Bomar, Director Plainwell Public Safety 269.685.9858 (bus) 269.685.5460 (fax) or Scott Corbin, Allegan Co Emergency Management 269.673.5071 Memorandum of Understanding (MOU) On this day, ____________________2009, the County of Allegan and the City of Plainwell have entered into this Memorandum of Understanding. This is an agreement between Allegan County via Emergency Management (primary contact) and the City of Plainwell which states and permits Allegan County Emergency Management to store an emergency response vehicle indoors at the Plainwell City Fire Station. This vehicle was purchased with Department of Homeland Security funding as a “prime mover”. This means the vehicle can be used for transporting equipment, trailers and personnel to and from emergencies/disasters and used for training purposes. This agreement also acknowledges that Allegan County has insured the vehicle and all items inside which belong to Allegan County that are being stored at such site, and will not hold the City of Plainwell liable for any damages or theft that may occur. The City of Plainwell will make proper arrangements for access to the site by Allegan County Emergency Management personnel for training, maintenance, and emergency response capabilities. If an emergency/disaster should occur which requires the use of said vehicle Plainwell Department of Public Safety will allow access for an Allegan County Emergency Management employee or volunteer who has prior approval by ACEM to access said vehicle. Plainwell Department of Public Safety employees will assist in its deployment and or transportation as directed by Plainwell Public Safety command staff and as resources permit. This memorandum of understanding will remain in effect for five (5) years or __________________________until such time either party decides to withdraw from this agreement in which both parties agree to notify the other in writing thirty (30) days in advance. This agreement will go into effect on ___________________________. Plainwell City Manager Allegan County Administrator Prime Mover Log Purpose: People or Equipment Movement Date Pupose Starting Miles Ending Miles Response/Training Prime Mover Log Purpose: People or Equipment Movement 5th District Regional Homeland Security Planning Board Step 6 Sub-Committee reviews & makes recommendation to Regional Board Step 5 Investment Committee Chair assigns to Sub-Committee Step 1 Local project is developed and researched Regional Flowchart Process for Local Projects Step 4 Regional Chair assigns to Investment Chair Step 3 Regional Chairman assigns to Regional Meeting Agenda Version 1 November 26, 2006 C:\Documents and Settings\athomson\Application Data\Track-It!\BUCKEYE\FileAttachmentsCache\Project flowchart 112606.doc Step 2 Project sent to Regional Chairman 2006 Homeland Security Grant – Leftover Funding Projects The following list was collected as an effort to prepare a list in the event additional funding becomes available after the completion of Regional Projects. These items are not listed in any order or priority to their needs. I received19 different requests. The requested total is $ 1,289,068.17 Investment Projects: Project Qty Governance 9 1 12 1 Item Red Cross Equipment Trailer Prime Mover Expense Request $ 5,000 $ 39,900 Regional Response 5 1 Track Vehicle / Trailer / Tow Vehicle 3 37 RAD57 – Carbon Monoxide Detection $ 64,400 $ 87,500 Mass Medical Response 18 1 Morgue Trailer $ 9,000 Nuclear Response Plan 4 1 Radiological Prime Mover 1 1 Portable Light Set $ 44,000 $ 16,375 Interoperable Communications Plan 2 1 ACU1000 6 1 FEMA Trailer for RACES 11 1 EOC Interoperable Communications 13 1 Interoperable Communications 19 1 Emergency Operations Center Communications Work Center & Tower Enhancement 20 1 Central Dispatch Radio Console Critical Infrastructure 7 1 Forensic 3D Laser Scanning System 8 9 Vital Information for Crime Enforcement and Security 14 9 TIER II Reporting 15 1 Law Enforcement ROIT Equipment 16 10 Region lifecycle replacement of APR’s . Fusion Center 11 21 Regional Data Sharing $ 50,000 $ 10,000 $ 29,407.12 $ 7,780.80 $ 9,569 $ 200,000 $ 156,090 $ 285,000 $ 45,000 $ 18,506.25 $ 141,840 $ 69,700 C:\Documents and Settings\athomson\Application Data\Track-It!\BUCKEYE\FileAttachmentsCache\Project Leftovers List 031908.doc 1 Item No. 1. QTY 1 Item Portable Light Set Total Cost $ 16,375 2. 1 ACU1000 $ 50,000 3. 37 RAD57 – Carbon Monoxide Detection $ 87,500 4. 1 Radiological Prime Mover $ 44,000 5. 1 Track Vehicle / Trailer / Tow Vehicle $ 64,400 6. 1 FEMA Trailer for RACES $ 10,000 7. 1 Forensic 3D Laser Scanning System $ 156,090 8. 9 $ 285,000 9. 1 Vital Information for Crime Enforcement and Security Red Cross Equipment Trailer $ 5,000 Project Request Lack of light source to illuminate an area large enough to support a large-scale mass casualty or decontamination incident. The acquisition of a mobile light tower. A 20 KW trailer mounted generator with a 30 foot light tower supporting 4 – 1000 watt metal halide lights and a fuel capacity to provide 24 hours of continuous service before refueling. This would allow Allegan County to link MaCom Radio 800 MHz radio system to the MPSC radio system together to include additional VHF and UHF radio systems. Purchase 37 units to be distributed throughout the Region, for the detection of dangerous levels of Carbon Monoxide in the blood stream of first responders. Purchase a Prime Mover to move radiological detection, decontamination and communications equipment. This will be stored at the Plainwell Department of Public Safety located near out radiological detection trailer issued by the Station of Michigan Emergency Management. Utility vehicle, trailer and tow vehicle. This project has the potential to cross over many of the projects listed in our strategic plan. This piece of equipment could provide the region with a tremendous amount of flexibility for response. Battle Creek Emergency Services will be Obtaining a FEMA trailer for use by the RACES group. The funds being requested will outfit the trailer with amateur radio communications equipment in support of local and district operations. In addition, VHF, UHF and 800 Megahertz radio equipment will be added for interoperability. The system rapidly captures a scene in vivid 3D. Post-event Forensics will allow mapping the scene in vivid detail, indoor / outdoor in any lighting condition. Of sight and ballistics trajectories. Allows Homeland Security programs to perform modeling, Simulation, and analysis of critical infrastructure and high threat areas. Core Tech. – Integrated System for Electronic Retrieval of Vital Information for Crime Enforcement and Security This trailer would enhance disaster response Capability. The trailer would be stocked with cots, blankets, and shelter and nursing kits for activating a shelter. This “grab and Go” trailer will enhance the response capabilities of the Chapter. The Calhoun County Chapter has mutual aid agreements with all Chapters in Michigan as well as northern Indiana. C:\Documents and Settings\athomson\Application Data\Track-It!\BUCKEYE\FileAttachmentsCache\Project Leftovers List 031908.doc Regional Justification This equipment will provide a much-needed resource to all jurisdictions inside and outside Allegan County for disasters natural and man-made. Requested Allegan County This will allow for direct communications paths to our regional partners as a permanent gateway inside our dispatch console. This could be purchased for department throughout the region to include EMS providers, will help in giving early warning of harmful levels of CO2 in the bloodstream without transporting first responders to hospitals, this could also be located in the Regional Rehab Unit. The radiological response equipment is used to support the Nuclear Power Plans within the region and throughout the State of Michigan. Allegan County After conducting a FSE this past summer it was determined getting access to the shoreline to remove victims, deploy public safety and equipment becomes difficult with traditional equipment. This could also support the region with damage assessment and Heighten Security Alerts near critical infrastructure. This trailer and equipment will be available to the region in support of any major emergency / Disaster that should occur in the district. Allegan County Allegan County Allegan County Battle Creek Can be used for vulnerability and threat assessments as well as a terrorist incident or major crime scenes. Battle Creek Police will respond under the 5th District Mutual Aid Agreement to assist any agency requesting the detail mapping of any scene or location. Battle Creek This would be provided to all Law Enforcement Agencies in the 5th District. This trailer and equipment will be available immediately to Branch, Barry and Calhoun counties and immediately to other jurisdictions in the 5th district upon request. Battle Creek Battle Creek 2 Priority 10. No. 21 Item Regional Data Sharing Total Cost $ 69,700 $ 29,407.12 11. 1 EOC Interoperable Communications 12. 1 Prime Mover 13. 1 Interoperable Communications 14. 9 TIER II Reporting 15. 1 Law Enforcement ROIT Equipment 16. 10 Region lifecycle replacement of APR’s $ 141,840 17. 3 Law Enforcement SWAT Equipment $ 44,670 18. 1 Morgue Trailer $ 9,000 $ 39,900 $ 7,780.80 $ 45,000 $ 18,506.25 Project Request Berrien County is comprised of 21 individual Police departments with individual record keeping systems making systematic data sharing difficult. Core Talon Technology would allow all law enforcement agencies in Berrien County the infrastructure needed to share pertinent information within and in neighboring counties. A breakdown equipment/software needs are available at my office if needed. Install 8 computers in EOC, network with a printer, projector and LCD enabling use of E-Team and other electronic communications. Purchase MPSCS radios for regional communications. Purchase a Prime Mover vehicle and equipment (vhf/800/amateur radios, antennas, brake controller, towing equip, overhead lights, equipment (vhf/800/amateur radios, antennas, brake controller, towing equip, overhead lights, siren & decals) to tow enclosed Incident Command, Communications, Mass Casualty, and Decon trailer previously purchased from homeland security and local funds. This project is designed to greatly enhance the inter-operational communication with regards to Calhoun County Emergency Management response vehicles. This is basic radio equipment to provide adequate ability and communications. Purchase of the TIER II Manger Software for all 9 counties where TEIR II are reported. This allows all business reporting to do this on- line directly to the state; local programs can download this information for a copy. Regional Justification By linking all 21 individual departments together utilizing Core Technologies, Berrien County could then share this information with the rest of the region and Fusion Centers. This request would strengthen criminal and possible security information around the critical infrastructures located in and around Berrien County. Requested Berrien County This project allows Branch County EOC to communicate with other EOC’s within the region and state using similar technology. Computers will be laptops and router will be portable if needed for regional use. Prime Mover would be available for use regionally and statewide as needed or available. Branch County This radio equipment will allow for proper communication coordination within the 5th District for all under-equipped response vehicles. Calhoun County Allow all reporting to be done without the local EM’s having the paperwork coming to them, also It’s noted that when reporting is done using this method then more people report and our numbers increase which allows the region higher numbers for funding consideration. Kalamazoo County Increase the ROIT Equipment regionally purchased up to all levels of 200 each. Currently some areas are lower. 100 Scott 40mm Canister Adapters, 25 CBRNE 3M APRs, 75 Helmets, 120 Gear Storage Belts and 36 Knee Protectors. This would replace the reported ARP under the Lifecycle project. This will only replace those who have reported during that project. Reporting are: Allegan 149, St. Joe 52, Kalamazoo 300, VanBuren 123, Berrien 185, Battle Creek 77, Barry 61, Branch 57 and Cass 106. Protective Gear matching the equipment already regionally purchased for Berrien County’s TRU (SWAT) team. Kalamazoo City Team is 25 persons, Portage City Team is 9 persons, and Battle Creek City is 25 Persons. The Regional Equipment Trailer will be stocked with a full 200 sets of ROIT Gear to equip 200 Police Officers. Kalamazoo County Replacement of the APR’s because of the CBRNE compliance. Kalamazoo County These SWAT teams are working with VanBuren County SWAT to be used during an event at the Palisades Nuclear Plant. Portage is primary a back up for Kalamazoo City while Kalamazoo City responses direct. Kalamazoo County This trailer would allow us to transport an already newly purchased 3-person morgue freezer anywhere in the region. Originally this was purchased to go inside the Kalamazoo County Morgue as a second freezer for body storage. Kalamazoo County 7 x 16 ft Enclosed Trailer to house a 3-person Morgue freezer. (Freezer already purchased) C:\Documents and Settings\athomson\Application Data\Track-It!\BUCKEYE\FileAttachmentsCache\Project Leftovers List 031908.doc Cass County 3 Priority 19. 20. No. 1 Item Emergency Operations Center Communications Work Center & Tower Enhancement Total Cost $ 9,569 Project Request This project will add tower height to the existing 20 ft tower that supports some of the added radios for the ACU 1000 and 800 MHz radios that have been added to the Emergency Operations Center. Currently, there are four radios in the EOC located on a table plus the EAS Computer. The workstations work clean this area up and make it more functional. 1 Central Dispatch Radio Console $ 200,000 This project would replace 4 entire radio consoles now operating in Currently, the system in place in no longer supported by 911central dispatch and completely update the 800 MHz radio the manufacture. Used replacement parts are running out. system for all users. MSP 5th District Regional Dispatch will be closing this year. As for critical infrastructure the region has two nuclear power plants and an oil tank farm. A sustainable radio system will be needed to support the MSP closure and for critical infrastructure protection. C:\Documents and Settings\athomson\Application Data\Track-It!\BUCKEYE\FileAttachmentsCache\Project Leftovers List 031908.doc Regional Justification The Emergency Operation Center has expanded to the point with technology and radios that it makes it difficult to function when all radios are busy. Communications can be lost when the noise level escalates. There is also a lack of antennas for all radios to work at once. Requested St. Joe County VanBuren County 4 2009 5th District Regional Homeland Security Strategic Plan (RHSSP) 5th District ‐ Regional Strategic Planning Task Force (RSPTF) 7/28/2009 Table of Contents Credits and Composition..…………………………………………………………………….…2 5th District Regional Description…………………………………………………….….…….3 Section I Vision………………………………………………………………………………………………………3 Purpose……………………………………………………………………………………………….....3 Focus……………………………………………………………………………………………………….3 Coordination……………………………………………………………………………………………4 Effort……………………………………………………………………………………………………….4 Description of Region………………………………………………………………………….…..4 Mutual Aid Agreements……………………………………………………………………………5 Section II Goals, Objectives, Implementations………………………………………………………….5 Success Metric Timeline……………………………………………………………………………7 Section III Evaluation of Plan……………………………………………………………………………………..8 Annexes Description of Annexes……………………………………………………………………………..9 Annex A – Scenario 1 Radiological Terrorist Event…………………………………….10 Annex B – Scenario 2 Natural Disaster (Weather) Event……………………………16 Annex C – Metric Charting………………………………………………………………………..22 Annex D – 5th District Strategic Planning Task Force Chart………………………..23 Annex E – 5th District Strategic Planning Task Force Roster……………………….24 Annex F – 5th District Regional Board Roster……………………………………………..25 Page 1 Credits Companies and Organization that contributed to the plan were as follows: • Kellogg’s Co., Battle Creek, MI • ITC, Energy Co., Wayland, MI • L. Perrigo Co. Pharmaceutical Products, Allegan, MI • Pfizer Pharmaceutical Products, Kalamazoo, MI • National Weather Service, Grand Rapids, MI • Michigan Department of Environmental Quality, Lansing, MI • Post Cereal’s, Battle Creek, MI Composition Planning Task Force Members: • Law Enforcement • 45% Emergency Management 40% • Fire Service 30% • Emergency Medical 20% • Tribal Government 5% • Public Works 10% • Public Health 25% • NGO’s 5% • Hazardous Materials 35% • Agriculture 5% • Military 10% • Local Government 10% • Planners 30% Page 2 5th District Regional Homeland Security Strategy (RHSS) Description of the Region The majority of the Region is rural with Cattle, Dairy and Crops as the main resource. The Counties of Berrien and Van Buren have many fruit and vegetable growers and vineyards. Kalamazoo County is known for its Greenhouse Bedding Plant Industry, animal research industries and Metropolitan Areas. Allegan County leads in Cattle, Dairy and Poultry farms. Battle Creek in Calhoun County has Kellogg’s Cereal Company that uses grains to produce Breakfast Cereal’s and other products. The major business and industry in District 5 ranges from food processing, chemical production, medical research, drug manufacturing, and auto parts manufacturing. Some of the larger companies are Pfizer (Animal Research and Medical Drugs), Kellogg’s (Cereal), Eaton (Auto and Truck Parts), Hayworth (Office Furniture), Whirlpool (Appliances), and Transportation (Railroad, Trucking). The Extremely Hazardous Substance (EHS) facilities in Region 5 are: Allegan 72, Barry 11, Berrien 117, Branch 32, Calhoun, Cass 30, Kalamazoo County 46, St. Joe 16, and Van Buren 64. These total 366 in the 5th District Region. There are two Nuclear Power Plants in Region 5. Berrien County has the Cook Nuclear Power Plant, located on Lake Michigan near Bridgman, MI. Van Buren County has the Palisades Nuclear Power Plant, near Covert, MI. The Region 5 counties of Branch, St. Joseph, Cass and Berrien border Indiana to the South. Dealing with issues of Mutual Aid Agreements, and communications between these bordering states and Indiana’s counties, is an ongoing process. To the West, Berrien, Van Buren and Allegan Counties border Lake Michigan which creates special needs to mitigate for those counties. Security issues with shipping and ports need to be planned for Homeland Security vulnerability. Large weather systems that develop and come inland from the Lake take Mitigation, Response and Recovery Planning on a year‐round basis. Environmental Issues such as pollution and erosion are a problem that needs to be addressed on a constant basis throughout the Region, and especially along the Lake Michigan shoreline. Pollution enters the Lake from the Cities and homes along the shore and also from the boats, ships and freighters that dump waste and ballast in the Lake. Large storms cause erosion from wave action. Section I: Vision, Purpose, Focus Areas A. Vision: Actively create a Regional blueprint addressing mitigation, prevention, protection, response and recovery efforts in every community. B. Purpose: Ensure our regional blueprint synchronizes our capabilities, program shortfalls, and objectives; focusing on an “all‐hazards” approach which includes natural, manmade, and terrorist events. C. Focus Areas: • • • • • • • • • Expand Risk Assessment efforts comprehensively (validation and priorities). Sustain perishable training, exercise and equipment to ensure readiness. Prepare a regional coalition of governmental structures that sustains homeland security and emergency management activities. Prepare a structure that sustains Homeland Security and emergency management activities. Create transparent Public Awareness (Emergency Planning). Public Service Announcements Standardization to promote Regional public awareness (Cultural). Best Practices of what was done best and lessons learned to respond for the next response and Mitigation of what works in counties. Expand on Interoperable Region‐wide communications. Page 3 D. Coordination of this RHSS: The 5th District Strategic Planning Task Force consists of a Chair, Vice Chair, Coordinator, Four Regional Planners and Thirteen Task Force Disciplines consisting of: Executive • Task Force Chair ‐ Scott Corbin, Allegan County EM Director • Task Force Vice Chair ‐ Al Sviple, Van Buren County EM Director Planners • • • • • Task Force Coordinator ‐ Erin Yingst, 5th District Grant Coordinator Planner ‐Tom Miller, Kalamazoo / Allegan County Planner ‐ Jim Gorka, Kalamazoo/Barry County Planner ‐ Connie Gibson, Calhoun County Mass Medical Planner ‐ Bob Hale, 5th District Medical Control • • • • • • • • • Law Enforcement ‐ Ron Bush, Berrien County Sheriff’s Office Fire Service ‐ Chief Roger Caris, Hastings Fire Dept. HazMat ‐ Steve Barnell, Sturgis Fire Dept. Public Health ‐ Don Haneckow / Jennifer Zordan, Allegan/Van Buren County Health Dept. NGO’s ‐ Tom Sivak, Director of Emergency Services, Red Cross Public Works ‐ Jeff Mitchell, Van Buren County Road Commission Tribal ‐ Karen Jako, Quality Specialist, Pokagon Band of Potawatomi Indians Agriculture ‐ Ann Nieuwenhuis, MSU Extension Municipality ‐ Jim Zoss, EM Director, Rick Frantz, Battle Creek • • Ret. Col. Berri Meyers, Lansing, MI ‐ Senior Homeland Security Planner – MSP Lt. Barry Reber, Paw Paw, MI ‐ Emergency Management 5th District Coordinator – MSP Disciplines Facilitators E. Effort The Board of Commissioners of each County has appointed a Regional Planning Task Force (PTF) to deal with Homeland Security issues. The PTF consists of a Chair, Vice Chair, four Regional Planners, and the Regional Planner Coordinator. The Regional Planning Task Force draws on the expertise from the PTF’s and other representatives of multi‐disciplined and multi‐agency/jurisdictional regional subject matter experts personnel to serve on its committees. This Task Force has reviewed the Regional Targeted Capabilities, set Goals and developed a Scenario based Strategic Plan for the 5th District Region. Members met bi‐monthly, over a three month period, on the design of each Scenario. These members contributed to the development of this plan by identifying the goals, objectives, and implementations which would generate the Scenario’s success. Each of these members worked diligently to ensure each of the Scenario’s was completed on time. The roster of those who have contributed to this plan is listed on Annex E. F. Descriptions of Jurisdictions within Region Regional District 5 consists of nine counties in the Southwest corner of the State of Michigan. The counties of Allegan, Barry, Berrien, Branch, Calhoun, Cass, Kalamazoo, St. Joseph, Van Buren, City of Battle Creek and 5th District Medical Coalition are voting members. There are 37 Major Cities and Towns of 1,500 and up in 5th District. The County Seats are Allegan (Allegan County), Hastings (Barry County), St. Joseph (Berrien County), Coldwater (Branch County), Battle Creek (Calhoun County), Cassopolis (Cass County), Kalamazoo (Kalamazoo County), Centerville (St. Joseph County), Paw Paw (VanBuren County). The total 2008 estimated population of the 5th District is 949,063. The larger Cities in the Region are Kalamazoo with a population of 72,700, Battle Creek with 53,364, and Portage with 45,277. Other large cities are Holland, Allegan, Benton Harbor, Coldwater, Hastings, Niles, St. Joseph, South Haven and Three Rivers. Page 4 G. Mutual Aid Agreements within Region The 5th District has mutual‐aid agreement between the above stated jurisdictions. This agreement has allowed for administrative support. Over the past few years, these jurisdictions have since obtained response equipment which could be deployed in support of a large scale emergency or disaster. The 5th District Regional Planning Board has adopted a mutual aid agreement September 27, 2007. Section II Goals, Objectives & Implementation Steps 1. Goal #1 ‐ Provide a sustainable source of personnel and equipment. 1.1. Direct 50% in annual HSGP grant funding to continue Regional planning activities. 1.1.1. Create regional projects to support the Regional Strategy and determine the number of planners needed to support project areas. 1.1.2. Provide for performance reviews of the regional planners assigned to each project area. 1.1.3. Obtain Authorized Cost Justification (ACJ) approval to hire or contract planners to support project activities. 1.2. Annually update the existing emergency response equipment database to include at least 85% of the 319 Emergency Services from all 232 jurisdictions with the Region. 1.2.1. Develop a self‐populated online application (form) to collect data, which includes self‐percentages of participating agencies entering information within the region. 1.2.2. Report data back to the Regional Board to substantiate future purchases, and/or distribution of regional assets. 1.3. Identify and secure annual funding on or before September 30th of each year for recurring maintenance costs associated with Homeland Security grant‐purchased equipment. 1.3.1. Collect information from regional partners on grant purchased equipment and use that data to prioritize equipment maintenance costs. 1.3.2. Identify available funding through the State Homeland Security Grant Program (SHSGP) and Law Enforcement Terrorist Training Program (LETTP) grant award, estimate funds required and recommend a funding solution to the Regional Board members for a financial commitment. 1.4. Secure at least 10% in annual HSGP grant funding for standardized CBRNE equipment acquisitions by September 30th of each year. 1.4.1. Develop equipment Gap Analysis based on current assets and the Planning Scenarios selected in the Regional Strategy. 1.4.2. Identify available funding through the SHSGP and LETTP grant award, estimate funds required and recommend a funding solution to the Regional Board member for a financial commitment. 1.4.3. Secure commitment by a Regional partner (county or city) for receipt and a commitment for long‐term sustainability; recommendations will be made to the Regional Board on distribution of equipment. 1.5. Increase the existing number of volunteers to 1% of the regional population for Citizen Corps groups (e.g. VIPS, CERT, Fire Corps, Michigan Volunteer, Medical Reserve Corps, RACES), through public outreach campaigns. 1.5.1. Establish a Regional Citizen Corp Council and one in each SEMGP district. 1.5.2. Write a plan, which directs volunteers to a central volunteer database and creates consistent PSA’s for the Communities. 1.5.3. Report back to the Board on the percentage of volunteer enrollment. 2. Goal #2 ‐ Identify and Regionalize standard capabilities. 2.1. Standardize capabilities using the Emergency Management Accreditation Program (EMAP), not later than September 30, 2014. 2.1.1. Evaluate current program capabilities using EMAP. 2.1.2. Develop Gap Analysis. 2.1.3. Focus Corrective Action Plan base on funding and risk assessment. 2.2. Create a regional standardized method of personnel credentialing and accountability by September 30, 2013. 2.2.1. Identify platforms currently utilized throughout region. 2.2.2. Evaluate systems (both in place and potential/novel systems) for regulatory /NIMS compliance. 2.2.3. Affect transition to regional system. Page 5 2.3. Create a system for strategically staging regionally purchased equipment, by not later than September 30, 2011. 2.3.1. Conduct risk based assessment of counties to determine potential need/callout likelihood for regionally purchased equipment. 2.3.2. Determine strategic placement of equipment to best address Region 5 disaster needs. 2.3.3. Evaluate potential hosting agency’s ability to respond with equipment (qualified personnel, interoperable c communications, operational policies, etc). 3. Goal #3 ‐ Develop plans to Mitigate, Prepare for, Respond to, and Recover from incidents of Regional importance. 3.1. Complete Regional Agriculture Security planning by September 30, 2013. 3.1.1. Establish and train all 9 counties in groups of three in the process of Agriculture Preparedness. 3.1.2. Combine the Agriculture Preparedness Plans within Region 5 into a Region‐based Agriculture Preparedness Plan. 3.1.3. Evaluate (e.g., exercise, review) and update the Region 5 Agriculture Preparedness Plan. 3.2. Develop a mutual information sharing process for Michigan Intelligence Operations Center (MIOC) products by September 30, 2012. 3.2.1. Establish an Intelligence Liaison Team (ILT) representing each of the 9 counties within Region 5. 3.2.2. Develop and implement a region‐based process for two‐way information sharing; and implement it. 3.2.3. Evaluate the effectiveness of MIOC information. 3.3. Develop decontamination plan for domesticated animals in the region by September 30, 2012. 3.3.1. Research/Identify and obtain approved Decontamination Procedures for pets. 3.3.2. Identify the resources needed to decontaminate most likely pets to be addressed under these procedures. 3.3.3. Identify and train volunteer groups which would commit to conducting the decontamination of pets. 3.4. Develop a template for county plans to meet the federally‐mandated (HSPD‐21) requirements of addressing special needs populations, by September 30, 2012. 3.4.1. Identify and obtain benchmark and/or legislated processes for Special Needs Populations. 3.4.2. Integrate Census‐2010 demographics with process. 3.4.3. Develop and circulate the adopted template. 3.5. Implement and coordinate a Regional Homeland Security Strategy (RHSS) by August 30th 2010. 3.5.1. Regional Board appoints Planning Task Force Representatives. 3.5.2. Publish RHSS. 3.5.3. Coordinate RHSS throughout Region 5. 4. Goal #4 ‐Develop a regional approach to training, exercising, and evaluation. 4.1. Train public officials within the region on Crisis Communications and PA 390 responsibilities by April 30, 2011. 4.1.1. Develop and adopt a regional Public Act 390 training course. 4.1.2. Identity critical partners (e.g., Office of Emergency Management, Chief Elected Officials, Public Information Officers, Chief Administrative Officers, Non‐Governmental Organizations, Michigan Association of Counties, and Michigan Townships Association). 4.1.3. Provide training to critical partners on the use of the template. 4.2. Develop and adopt an annual all hazards public information campaign throughout the region. 4.2.1. Define “all hazards” public information. 4.2.2. Develop and adopt a campaign schedule to be implemented by all emergency management programs. 4.2.3. Implement the schedule. 4.3. Create regional incident management teams by April 30, 2012. 4.3.1. Define scope of incident management teams. 4.3.2. Determine requisite training and qualifications. 4.3.3. Identify and train candidates. 4.4. Implement radiological preparedness training for first responders throughout the region by April 30, 2013. 4.4.1. Define scope of training. 4.4.2. Create and adopt training programs to be implemented. 4.4.3. Develop training schedule for all counties. Page 6 4.5. Conduct an assessment of training needs and develop a regional training matrix by September 30. 2011. 4.5.1. Create and adopt an assessment tool to define scope of needs. 4.5.2. Analyze assessment products/data. 4.5.3. Prioritize and implement training schedule. 4.6. Create a Region 5 Critical Infrastructure/Key Resources (CI/KR) assessment team by September 30, 2010. 4.6.1. Create an assessment tool to define scope of needs. 4.6.2. Analyze assessment products/data. 4.6.3. Activate CI/KR team. Success Matrix for the timeline of Implementation Steps Implements Fiscal Years Steps FY 10 FY11 FY12 FY13 FY14 FY15 1.1 1.2 1.3 1.4 1.5 2.1 2.2 2.3 3.1 3.2 3.3 3.4 3.5 4.1 4.2 4.3 4.4 4.5 4.6 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Page 7 Section III ‐ Evaluation Plan for the HSSP Regional Homeland Security Planning Board (RHSPB) is responsible to monitor the progress, compile key management information, track performance trends and achieve the stated Goals and Objectives of this Regional Homeland Security Strategy (RHSS). The RHSPB is responsible to advice and report this RHSS status and progress to the Michigan Homeland Security Protection Board (HSPD), or their designated representative, as requested. RHSS Objectives will be achieved more quickly than RHSS Goals and are measured separately. The RHSPB will determine when all Objectives are achieved for any Goal. Continuous and proactive monitoring of RHSS Objectives will allow the identification of Goal achievement and illuminate necessary resource adjustments (Planning, Organizing, Equipping, Training and Exercising). A balanced and comprehensive Evaluation Plan will consist of: • A performance metric will be developed for each RHSS Objective to monitor progress towards the stated Objective. • Performance Metrics will be updated at least every four months. Upon review of each performance metric additional information will be added if delayed, stalled, referred to sub‐committee, etc. • All Homeland Security exercise results will be discussed in RHSPB meetings and these results will be blended into RHSS Objective metric assessments. Written After‐Action Reports, for all Homeland Security exercises within the Region, will contain demonstrated performance results and will be included in RHSPB meeting minutes. • RHSPB meetings will include a mandatory review of all RHSS Objectives to determine progress, resource adequacy and Goal achievement. The status of this review will be included in RHSPB minutes. This review will identify each RHSS Objective by number. The RHSPB will review the completeness and progress of this RHSS annually (during the month of January) and advise the Michigan HSPD, or their designated representative, immediately upon completion of this review. This annual review will include a review of all RHSS Objective performance metrics to ensure the correct measures are being used to determine preparedness status. The RHSPB may revise this RHSS as dictated by annual review and monitoring of RHSS Objectives. Close and continuous management of performance metrics will lead to resource, training and exercise adjustments in the most effective and responsive manner. Page 8 ANNEXS Annex A ‐ Planning Scenario #1 ‐ Radiological Event Radiological Release Incident from a hostile action by terrorist. Developed by Ron Bush, Regional Planner, Berrien County Office of Emergency Management Annex B ‐ Planning Scenario #2 ‐ Natural Disaster Event This is a severe weather incident beginning with ice storm, followed by heavy snow and torrential rains. The scenario was developed by Tom Sivak, American Red Cross / Erin Yingst, 5th District Grant Coordinator / Tom Miller, Regional Planner, Kalamazoo & Allegan Counties. Reviewed and verified by Jamie Beilinski, National Weather Service, Grand Rapids, Michigan. Specific information received from DNR web site, Perigo’s, Loss Managers from Pfizer, Kellogg’s, Wal‐Mart / Target Distribution Centers. Annex C – Metric Charting This is an example of the charting method used to track the progress of the objectives being completed. This progress will be reported to the Regional Board. Annex D ‐ 5th District Regional Strategic Planning Task Force Organizational Chart This Organizational Chart with Task Force Chairs, Facilitators, Regional Planners, and Discipline Representatives shows the structure of the Task Force. Annex E – Regional Planning Task Force List of Task Force members with work titles, representation and contact information. Annex F – 5th District Regional Planning Board Roster List of Regional Board members and planners with titles, representation and contact information, as of July 31, 2009. Page 9 Annex A ‐ Planning Scenario #1 Hazard: Hostile Action Radiological Release Incident Counties of Allegan, Barry, Berrien, Branch, Calhoun, Cass, Kalamazoo, St. Joseph, Van Buren, The City of Battle Creek and 5th District Medical Coalition Potential Magnitude (percentage of the Jurisdiction that can be affected): Catastrophic (more than 50%) Allegan, Berrien, Van Buren Counties. Critical (25 to 50%) Cass, Kalamazoo Counties Limited (10 to 25%) Barry, Branch, Calhoun, and St. Joseph Counties □ Negligible (less than 10%) Frequency of Occurrence: Seasonal Pattern: □ Highly Likely (near 100% probability in the Early summer weather consistent with normal June temperatures of 65 to 75 degrees and light to variable winds. next year) □ Likely (between 10 and 100% probability in the next year, or at least 1 chance in the next 10 years) Possible (between 1 and 10% probability in the next year, or at least 1 chance in the next 100 years) □ Unlikely (less than 1% probability in the next 100 years) Areas Likely to be Affected Most: The counties of Allegan, Berrien, and Van Buren will be affected most as they are within the 10 mile radius of the nuclear plants. Probable Duration: The event including attack, emergency response and immediate recovery would include environmental and health issues which would span over approximately three weeks. Potential Speed of Onset (Probable amount of warning time): Minimal (or no) Warning. Existing Warning Systems: Sirens within the 10 mile Emergency Planning Zone, EAS, Reverse 911 in some areas. Does a Vulnerability Analysis Exist: Yes __X__ No _____ Each EMPG program within 5th District has completed and approved an all hazard mitigation plan which identifies probability versus severity and estimated loss. Scenario reviewed and approved by the 5th District Regional Planning Task Force Members. Signed by: Project Chair Scott Corbin – Allegan County Emergency Management Signature Date Page 10 Section I ‐ Scenario Overview: Hostile Action at a Nuclear Power Plant General Description – In this scenario, members of a terrorist cell plan to attack a nuclear power plant (NPP) by both land and water assaults. Their goal is to take control of, or at least damage sufficiently to cause an uncontrolled release of radiation into the environment. A diversionary attack is planned on a large gasoline and petroleum distribution point for the state to divert needed resources and attention away from the NPP. Detailed Attack Scenario – Over the past 6 months, there have been several non‐specific threats received to the electrical distribution system in the country. These threats have been investigated, but could not be substantiated. The local police in a neighboring county have received sporadic reports of small explosions near a farm, but no additional leads were ever developed. Members of this terrorist cell have purchased 2 mini‐vans and a used fuel delivery truck. They painted the fuel delivery truck to indicate that it belongs to a local fuel delivery service. The cell has stolen four shallow draft 4‐6 person boats and trailers from other counties. They have acquired various types of small arms weapons and have spent several years slowly acquiring a large quantity of prilled ammonium nitrate (NH4NO3) to build several improvised explosive devises (IED) including a large vehicle borne improvised explosive device (VBIED). They have been able to collect and store this material at a safe house located in a rural area in a neighboring county. There had been several instances of a low flying single engine aircraft near the NPP in the past year. Along with this, there have been several reports of a small boat seen just outside of the NPP boundary taking photographs. In both of these cases, the identity of the individuals or the reasons for their actions has not been determined. A message has been received by the terrorist cell indicating the date and time of the attack. A dry run of the route for the fuel deliver truck for the diversionary attack and the 4 boats and 2 mini‐vans to the NPP is made during Monday morning traffic to ensure the timing of the attack. At 7:00 a.m. on Tuesday morning, the IED is loaded into the fuel delivery truck and will be driven by a suicide bomber. The device is set with three ignition circuits; a manually activated detonator to be carried by the driver, a timer set to go off at 9:15 a.m. and a booby trap set to go off should anyone try to open the container holding the IED. The terrorists on the four boats used a local river’s access point to embark and enter into Lake Michigan. The 2 teams in the mini‐vans leave the safe house and are in route to the NPP. Each team is equipped with small arms weapons and several IEDs. By 08:50 a.m. the four boats and crews are waiting a short distance away from the NPP. The teams in the 2 mini‐vans are waiting in the area surrounding the NPP. At 9:00 a.m. the fuel delivery truck enters a gasoline loading dock of the large gasoline and petroleum distribution point for the state. The VBIED is detonated causing a large primary and several secondary explosions. This destroys the gasoline loading dock and damages several oil and gasoline pipelines. The explosions start several fires and breaches several fuel and oil storage tanks. At 9:15 a.m. as the response continues to this attack, the four boats make their way onto the beach as the 2 ground teams simultaneously begin their assault on the NPP. They make their way onto the NPP property and are met by the plant’s security forces. Off‐site LE is requested to assist. Prior to LE arrival, the plant’s security forces are able to stop the attack and neutralize the terrorists but not before several IEDs are detonated causing damage to their infrastructure. Plant security and LE are initially unable to account for all of the terrorists. The attack did not cause an immediate release of radiation. However, damage from the attack causes cascading events which results in a probable uncontrolled release of radiation into the environment unless sufficient repairs are made and any potential release stopped. This will require all off‐site radiological emergency preparedness response procedures to be initiated. Section II ‐ Planning Considerations: Geographic Considerations/Description – The gasoline and petroleum distribution point is surrounded by a business district and residential properties along with several special needs populations including a school. The main scenario identifies an attack on a civilian electrical generating NPP. The topography around the plant consists of a combination of dunes and forested land on three sides and Lake Michigan on the forth. The contamination region would include a business district, a water treatment facility, residential housing, crowded shopping areas, nursing homes, several schools and numerous agricultural farms and several livestock and poultry farms. Variable winds of 5 to 15 miles per hour would carry the radioactive particles throughout areas in the 5 mile emergency planning zone (EPZ) around the NPP. Complex rural wind patterns coming off of Lake Michigan could carry the Page 11 contamination in unpredictable directions, leaving highly variable contamination deposition with numerous hot spots created by shifting wind patterns. Radioactivity concentrations in several of these zones would most likely be well above the State’s allowable exposure limit. In any contaminated areas, vehicular traffic after the initial release, would re‐suspend and transfer contamination hours afterward until the initial contamination area could be effectively controlled and cordoned. This would lead to additional contamination spread beyond the 5 mile EPZ into the 10 EPZ. People in the deposition zone would also take contamination home with them in their hair and clothing. Timeline/Event Dynamics – The two separate attacks have no advance notice or intelligence that indicates their possibility. The simultaneous multiple prong attack at the NPP is well coordinated following the diversionary attack on the large gasoline and petroleum distribution point. This initial attack is not immediately recognized as terrorism, thus other critical infrastructure sites are not placed on alert. The probable release of radiation into the environment could occur following the attack due to damage sustained at the plant. This will require all off‐site emergency response procedures to be put in place. Meteorological Conditions – There is no precipitation. There are light, variable winds of 5 to 15 miles per hour, out of the west.. The temperature is 65º Fahrenheit (F). Assumptions – • • • • • • • • As a result of this probable release, radioactive particles would be carried by winds away from the plant into the 5 mile EPZ. The particles fall to the ground as the plume dissipates moving farther from the plant contaminating the ground and vegetation, open water sources, and structures. The entry point of the fuel loading area through which the VBIED was driven is not designed or staffed to verify driver credentials or fuel loading orders. The acquisition of bomb‐making materials does not draw the attention of law enforcement. There is no sharing of information from county to county regarding the stolen boats, reports of small explosions near a farm, or of the several instances of apparent intelligence gathering at the NPP. Initial responders will be quickly overwhelmed and will require outside assistance to mitigate both scenes and to provide protective measures to the public. This includes establishing security at various centers and access control points around both incident sites. Fire resources will be insufficient to extinguish several large fires and to perform rescue operations at the gasoline and petroleum distribution site along with providing fire protection services at the NPP. There will be a need for additional fire service personnel and equipment to respond to the NPP. Additional resources will also be needed to establish Public Reception and Decontamination Centers and Emergency Worker Centers and to assist with evacuations including special needs populations. EMS resources will be limited due to the number of injuries at the initial site and their ability to triage and transport potentially contaminated victims from the NPP. The normal assistance for services from the general public (i.e., police, fire, EMS) will still be needed and most likely increase due to the evacuations. Mission Areas Activated – Prevention and Deterrence: Prevention efforts should include such law enforcement goals as sharing of criminal investigative information, detection of the plot, review of security measures at both sites, protection and deterrence measures taken at the sites before and during the attack. The gasoline and petroleum distribution point is not equipped with explosives detection equipment or systems to verify the identity of fuel delivery drivers coming on site. Emergency Assessment/Diagnosis: The explosion at the gasoline and petroleum distribution site would not be immediately recognized as a terrorist attack until responding units arrive and were able to determine the cause of the truck explosion. This would lead to a delay in notification to other critical infrastructure sites and the raising of the Homeland Security Advisory System’s threat levels and would not have been discovered before the primary target was attacked. The attack on one NPP will have rippling effects on the rest of the industry causing other NPPs to institute additional security measures which will place a strain on existing LE resources and their availability for other activities. The Homeland Security Advisory System’s Threat Level will most likely be increased to Red at the State level and most probably at the Page 12 Federal level requiring Federal, State, and local jurisdictions to institute additional security measures around their own critical infrastructure sites limiting available resources to assist with this response. The release of radioactive particles would be a significant hazard and could cause extended local and regional disruption. Actions of incident‐site and Emergency Operation Center (EOC)/Joint Field Office (JFO) personnel tested during and after the attack include (1) providing personnel dispatch and accountability; (2) assessing the extent of physical damage, including assessments of the gasoline and petroleum delivery system and containment capabilities of the NPP; (3) assessing medical response needs; (4) providing personal protective equipment for the responders of the NPP attack; (5) establishing and preserving the sites for crime scene analysis; (6) collecting site data and information; (7) making hazard assessments and predictions for responders and the public; (8) coordinating preliminary radiation monitoring, surveying, and sampling operations; (9) providing trained personnel to staff Public Reception and Decontamination Centers and Emergency Worker Centers; (10) providing accurate and timely information and direction to the public; (11) ensuring an orderly evacuation from and providing security for the affected areas; and (12) identifying additional first responder resources (LE, FD, EMS) to keep in reserve. Emergency Management/Response: The 2 incidents result in 20 fatalities, 65 injuries, extensive environmental contamination, evacuation of thousands of individuals, and thousands of potentially exposed individuals in the downwind zone. Actions of EOC/JFO personnel required after the attack include (1) mobilizing and operating incident command; (2) overseeing victim triage; (3) stabilizing the sites; (4) cordoning the sites and managing and controlling the perimeters; (5) providing notification and activation of special teams; (6) providing traffic and access control; (7) providing protection of at‐risk and special populations; (8) providing resource support and requests for assistance; (9) providing public works coordination; (10) providing direction and control of critical infrastructure mitigation; (11) providing public information, outreach, and communication activities; (12) resolving the problems associated with evacuated citizens whether planned or spontaneous; and (13) the 911 system being overtaxed and rendered non‐functional due to the onslaught of 911 calls either requesting assistance, reporting what had occurred, or requesting information on what had occurred. Because first‐responder assets (e.g., LE, FD, and EMS personnel) were promptly dispatched to the initial petroleum distribution site along with mutual aid resources to assist, the NPP site is requesting additional outside response assets as other responders are needed to establish access control points and staff various shelters and centers after the attack on the NPP. Hazard Mitigation: Actions of incident‐site personnel required include (1) securing both incident scenes and defining the hazard areas, (2) building stabilization around the gasoline and petroleum distribution point, (3) containment of the gasoline and oil released (4) providing fire suppression at both locations, (5) conducting debris management, (6) preparing for radioactive and hazardous contamination mitigation, (7) planning for the decontamination of responders and equipment, (8) conducting local site contamination control, (9) planning for the decontamination of local citizens, and (10) identification of the 50‐mile exclusionary zone around the NPP. Evacuation/Shelter: Sheltering and/or evacuation of downwind populations will be required around the NPP and possibly around the gasoline and petroleum site. This must occur promptly and in an orderly fashion, but may not be completed around the NPP before the radioactive plume might be released. Actions taken by local EOC/JFO personnel performed after the attacks include (1) developing protective action recommendations and communicating them to the public (e.g., to evacuate the affected area and/or shelter‐in‐place and self‐decontamination, as appropriate for the site); (2) providing management of evacuation, whether ordered or spontaneous; (3) protecting special populations, hospital, schools, and day care centers; (4) establishing temporary sheltering alternatives and provision of basic necessities for evacuees; and (5) offering veterinary services for pets. Victim Care: Injured responders at the NPP may require some decontamination in the course of medical treatment prior to hospital admission. Thousands more may need superficial decontamination, and both short‐term and long‐term medical follow‐ups. Actions of incident site, local area, hospital, and EOC/JFO personnel tested after the attacks include (1) conducting search and rescue; (2) providing triage, emergency aid, treatment, and stabilization; (3) decontaminating victims (ambulatory and non‐ambulatory); (4) establishing relief stations, decontamination centers, and site access portals; (5) preparing to screen, monitor, and decontaminate evacuees (numbers are expected to be up to 80,000); (6) conducting victim/evacuee data and information collection and management; (7) making radio‐protective pharmaceutical decisions and efficiently providing protective and/or therapeutic drug administration; (8) conducting patient status tracking and reporting; (9) providing patient transport; (10) treating emergency room (ER) walk‐in contamination victims; (11) providing hospital care; (12) Page 13 providing collection, decontamination, and cataloging of human remains and personal effects; and (13) providing next‐of‐ kin notification. Investigation/Apprehension: Actions of law enforcement personnel tested after the attacks include (1) dispatching and accounting for personnel, (2) conducting site cordoning and control, (3) collecting field data, (4) conducting witness interviews, and (5) performing tactical deployment and apprehension of suspects. Recovery/Remediation: Decontamination/Cleanup: The extent of contamination would be a major challenge due to the prevailing winds, vehicle traffic and response personnel in the area. An approximate 5 mile radius from the NPP could be contaminated to varying degrees with areas of limited contamination in the 10 mile radius. Contamination would settle on streets, sidewalks, building surfaces, farmland and crops. Building interiors would become contaminated due to ventilation systems, doors, windows (because negative building pressure can draw contaminated particles in through very small openings), and foot traffic. Personal property – including vehicles and items inside buildings – would also become contaminated, but many items can be adequately decontaminated for free release. The extent of damage to the gasoline and petroleum distribution point will be difficult to determine until the clean up of the hazardous materials are complete allowing repair crews to inspect the damage. Distribution lines (gasoline and oil) will need to be repaired along with several fuel and oil storage tanks. The residential and business structures around the site may need to be repaired or demolished. Site Restoration: Several buildings (those most damaged) will be torn down and eventually rebuilt around the gasoline and petroleum site. Decontamination activities around the NPP would be undertaken for ground and farmland, building exteriors and interiors, streets, sidewalks, and other areas. Federal, State, and local officials and stakeholders hold numerous public meetings to evaluate current and future land use goals, dose/risk goals for the site, and the possible use of institutional controls if decontamination is unsatisfactory. Economic and tax incentives may need to be instituted, and Federal, State, and local governments might start a “save our city” campaign to build community support to reclaim and revitalize the area. (A heated debate is likely to ensue in public meetings and the press over the adequacy of site restoration goals and the resultant risks to the public, presenting major communication and negotiation challenges to local, State, and Federal officials.) Section III ‐ Implications Secondary Hazards – Small fires from ruptured gas and oil lines occur in the vicinity of the blasts at the gasoline and petroleum distribution point. An uncontrolled release of gas and oil is in progress from the damaged pipelines and tanks. Unstable building facades, rubble, and broken glass create physical hazards for rescue workers. Airborne contaminates are a concern for responders and the public. Human remains present a biohazard, and there is a possibility of secondary devices or additional explosions from the leaking transmission lines or ruptured tanks. There is a concern for secondary devices and booby traps on the captured/deceased terrorists at the NPP site. Other hazardous chemicals are present on site and pose a risk to responders. Human remains present a biohazard, and some of these may be contaminated. Special Populations require emergency responders to assist in evacuations and special health care needs and supplies. Evacuation sites for these populations will need supplies and professional staff to care for their various needs. Special Needs Population Plans will need to be implemented across the region to evacuate, shelter, and provide special professional care. Those with acute health issues will need to be provided equipment, medicines, and specific health care according to their needs. Issues with the farm and domestic animals need to be addressed. Animal handlers, animal transport, and animal shelter personnel and facilities put into service to evacuate and care for these animals. If shelter in place is possible, the feeding and care of the animals need to be addressed. Fatalities / Injuries – At the initial site, the blast results in 15 fatalities and about 30 injured requiring medical care. The attack at the NPP site resulted in 5 fatalities and about 35 injured requiring medical evacuation and treatment. In addition, up to 10,000 individuals in the 5 mile EPZ have the potential to have detectable superficial radioactive contamination. Thousands of people located downwind could have minor contamination and would require monitoring and medical surveillance. Page 14 Property Damage – In the initial attack, the main gasoline terminal, gasoline and oil storage tanks are destroyed (i.e., not salvageable), and several pipelines and other terminals suffer varying degrees of structural damage. The NPP attack results in the probable radioactive contamination at varying levels deposited on agricultural and farm land as well as inside of buildings, building exteriors, streets, sidewalks, people, and personal property over the 5 mile EPZ. Minor contamination may be an issue further downwind into the 10 mile EPZ as investigators perform more thorough surveys. Over the long term, decontamination efforts would be expected to be effective, but some property owners choose demolition and rebuilding. Many farms will be unavailable to grow or produce for several years until remediation is completed. Service Disruption – Transportation is severely hampered around the gasoline and petroleum distribution point and the NPP. Ground and air transport routes around the NPP are altered, and officials build highway checkpoints to monitor incoming traffic for potential contamination and upgraded security measures. The entire contaminated zone would be closed to all traffic for an extended period (though peripheral areas and some thoroughfares are opened within several weeks for limited use). Hospitals in the area, already at maximum capacity with injuries from both attacks, are inundated with up to 10,000 “worried well,” most of whom were not in the initial attack or potential release pathway but are concerned about health issues (despite special relief stations established by the incident command for contamination monitoring and public outreach). The local sewage treatment plant would be quickly contaminated as a result of people showering and decontaminating personal effects. In the 5 mile EPZ surrounding the NPP, several businesses and numerous farms would be closed for an extended duration while radioactive contamination is remediated. Local tax revenues plummet, as business are closed due to the evacuation. The schools in the contamination zones would be closed and students meet in alternate locations. Nearby towns and cities close their doors to residents of the impacted areas for fear of the spread of contamination. If one of the events occurred near a border, there would be a need for intense communication and cooperation between the two border governments. The attack on the NPP causes other NPPs in the country to either go off line or severely increase their security procedures to remain in service. This causes a strain on the electrical distribution system nationwide. Economic Impact – This gasoline and petroleum distribution point brings up to 70% of the fuel into the state. The loss of the gasoline and petroleum distribution point for the state will cause a major decrease in supplies and a sharp increase in the cost of these fuels until the pipelines, tanks and depots can be repaired. Although technologies exist to decontaminate areas, these technologies were designed for smaller, isolated areas, and the process may take some time. Decontamination, destruction, disposal, and replacement of lost infrastructure will be costly (i.e., hundreds of millions of dollars). Economic losses in the area due to lost business productivity, tax revenue, and property will be significant. The entire contaminated area may be economically depressed for years. Additionally, an overall national economic downturn may occur in the wake of the attack due to a loss of consumer confidence. The NP industry in the county will require a massive restructuring to protect their facilities from any type of future attack. Some residents will show no signs of willingness to resettle their former domiciles. Schools may permanently relocate. Some businesses may relocate to an unaffected zone, or another city/county altogether. The 10 mile area around a NPP may become undesirable land due to the perceived risk of either working or living in an EPZ around a NPP. Long‐term Health Issues – Summary • • • • No one will suffer acute radiation syndrome. Approximately 15,000 individuals living in the 10 mile EPZ could become externally contaminated. Low‐level contamination may enter food and water supplies, and may be consumed at projected doses below EPA Protective Action Recommendations. The sum of the cumulative exposures results in an increased lifetime cancer risk proportionate to the dose. All potentially exposed individuals could require additional monitoring for health concerns. Many individuals, including those close to, but not within, the affected area may require mental health counseling. First responders make up a unique group often in need of mental health services. Page 15 Annex B ‐ Planning Scenario #2 Hazard ‐ Severe Weather Incident Counties of Allegan, Barry, Berrien, Branch, Calhoun, Cass, Kalamazoo, St. Joseph, Van Buren, The City of Battle Creek and 5th District Medical Coalition Potential Magnitude (percentage of the Jurisdiction that can be affected): Catastrophic (more than 50%) Allegan, Barry, Berrien, Cass, Kalamazoo, St. Joseph and Van Buren Counties. Critical (25 to 50%) Branch and Calhoun Counties □ Limited (10 to 25%) □ Negligible (less than 10%) Frequency of Occurrence: Seasonal Pattern: □ Likely (near 100% probability in the Late winter weather in Mid‐March with temperatures varying between 20 and 45 degrees. Storms develop in the Gulf states with the jet stream taking them north. Artic Cold fronts from Canada are carried down into the northern states and combine with the tropical storms from the Gulf. next year) Likely (between 10 and 100% probability in the next year, or at least 1 chance in the next 10 years) □ Possible (between 1 and 10% probability in the next year, or at least 1 chance in the next 100 years) □ Unlikely (less than 1% probability in the next 100 years) Areas Likely to be Affected Most: All counties of the 5th District will be affected as the storm area covers northern Indiana to the Mid‐state area of Michigan including the southern part of the 6th District. Probable Duration: The weather system will last approximately seven days changing from ice storm to snow and, as temperatures rise, back to heavy rainfall. The total amount of waterfall expected from this system is between 10 and 23 inches, including the ice storm, snow and rain. Potential Speed of Onset (Probable amount of warning time): 24 Hours Existing Warning Systems: Storm warning sirens, NWS, NOAA Weather Radios, Media, EAS, Reverse 911. Does a Vulnerability Analysis Exist: Yes __X_ No ____ Each EMPG program within 5th District has completed and approved an all hazard mitigation plan which identifies probability versus severity and estimated loss. Scenario reviewed and approved by the 5th District Regional Planning Task Force Members. Signed by: Project Chair Scott Corbin – Allegan County Emergency Management Signature Date Page 16 Section I ‐ Scenario Overview: Severe Weather Incident General Description The National Weather Service issues a winter storm watch on Thursday morning stating that a strong low pressure system may cause severe weather and possible ice storm in Northern Indiana and Southwest Michigan. This is followed by a ice storm changing to heavy snow warning, issued late Friday afternoon by the National Weather Service, covering an area from Northern Indiana up through the Central Michigan region. Freezing rain is expected, producing a significant and possibly damaging accumulation of ice. Up to or over than an inch of ice is expected to accumulate in the area. Power lines and trees may be damaged, and travel may become extremely hazardous. Temperatures will fall from 34 degrees down to 26 degrees with the freezing rain changing to heavy snow. High winds between 35 and 50 mph are also expected as the storm passes through. Saturday morning starting at 8:00am, freezing rain begins and continues though Saturday with totals of 1” to 1 ½“ across the Northern most counties of Indiana and Southwest Michigan. Starting late Saturday night freezing rain changes to snow, accumulating 10” to 12” over Southwest Michigan, crippling travel within the state. Sustained High winds of 30 to 35 mph continue, gusting to 55 mph, with blizzard conditions experienced throughout the southwest region. Following the late season ice storm and blizzard, another low pressure system brings torrential down‐pours that plague the area over the next few days. Ground water is now at the highest it has been in 28 years. The rain, followed by the rapid snow melt, has swollen rivers and streams, straining hydro electric dams throughout the 5th District. As the rains continue to fall and the rivers and streams rise, hydro electric dams in the eastern part of the 5th District begin to fail, thus taxing all available local and regional resources due to a high rate of water rushing downstream quickly. All aspects of life are at risk including human health and safety, agricultural health and safety, in conjunction with the loss of life and power throughout the region. Freezing rain is liquid rain that falls when surface temperatures are at or below 32 degrees Fahrenheit. The rain freezes upon impact with objects and the ground creating a layer of ice. When the layer of ice accumulates to at least one half inch thick the weight of the ice can down tree limbs, power lines and communication towers as well as cause widespread impact to mass transit. This defines an ice storm. However, it must be noted that only a trace of freezing rain can product a glaze over roads, which can cause significant impact to mass transit: especially if it occurs during rush hour. (Source: NWS). Dam failures are of particular concern because the failure of a large dam has the potential to cause more death and destruction than the failure of any other man‐made structure. This is because of the destructive power of the flood wave that would be released by the sudden collapse of a large dam. One of the most common causes of dam failures is the overtopping of embankment dams due to inadequate spillway discharge capacity to pass flood waters. This is one of the most common causes of dam failures and has nothing to do with the geology of the dam site. Any embankment dam will fail if the spillway is too small and flood waters rise high enough to flow over the top of the dam wall. The estimation of the size of the maximum flood a dam will have to survive during its life is a science which has undergone continuing evolution over the last century with the result that many dams built decades ago may now be judged to have inadequate spillways even though the spillways were designed to standards of safety which were accepted as adequate at the time of construction of the dam. (Source: DNR) Section II – Planning Considerations Geographical Area The majority of the 5th District region is rural, with cattle, dairy and crops as the main resource. The counties of Berrien and Van Buren have many fruit and vegetable growers and vineyards. Kalamazoo County is known for its greenhouse bedding plant industry, animal research industries, and metropolitan areas. Allegan County leads in cattle, dairy and poultry farms. The City of Battle Creek in Calhoun County has Kellogg’s Cereal Company that uses grains to produce breakfast cereals and other food products. Time Frame/Event Dynamics Ice Storm Warning issued on an early spring Friday evening for southwest Michigan, followed by a snow event which begins on a Saturday night and continues for two days, dumping 10” to 12” on southwest Michigan. This freezing rain/snow event is immediately followed by a rapid warm spell, with torrential downpours for three days. Saturday – Beginning at about 8:00am an ice storm pummels area throughout the day. By nightfall, one inch of ice blankets the region, with up to an inch and a half total in some of the communities. Winds pick up to sustained 30 to 35 mph and Page 17 gusting to 50 mph. Many trees, limbs and power lines are down. Some power transmission line towers have collapsed under the weight of the ice. Power outages are widespread throughout the region. Sunday – By Sunday morning, temperatures drop and the freezing rain has changed over to snow, quickly blanketing ice‐ covered areas. High winds continue with drifts building up to 3 feet by Sunday midnight. Monday – thirteen inches of snowfall by 4:00am. Major roads are passable but becoming treacherous. Drifted snow and low visibility from blowing snow is causing many accidents and multiple car pile‐ups on I‐96 near Benton Harbor. Tuesday – Another one to five inches of snow has fallen on the region. Winds of 35 mph, gusting to 50 mph continue. Local governments are requesting citizens stay home and off roads except for cases of emergency. Wednesday – Temperature rises 34 degrees during the morning hours. Snow turns to rain. Low‐lying areas start to show signs of potential flooding. Farms start moving livestock to higher ground. Residents along rivers and streams are advised to prepare for possible evacuation. The heavy snow on roofs is becoming saturated from the rain and some flat roofs are collapsing. Thursday – Heavy rains continue. Moderate flooding experienced throughout the region. Dam failure is a potential and residents and farmers are urged to take proactive measures to protect infrastructure and their livestock. Power is out and businesses are impacted. Hospitals are preparing for a catastrophic flood event. Friday – Torrential rains continue through the end of the day. Dams begin to fail and dam failure is imminent. Residents are urged to evacuate and taxes all resources within the 5th district. Meteorological Conditions As a strong low pressure weather system comes from the south, temperatures rise to 33 degrees with a large amount of precipitation with it that brings rain changing to freezing rain. Winds pick up to 35 mph. Behind the low pressure system, temperatures drop to 18 degrees and high winds continue, gusting to 55 mph. The freezing rain changes over to heavy snow with total accumulations to a foot of snow in the region, with low visibility and drifting over the next 48 hours. As this system passes by temperatures rise to 34 degrees and snow changes to torrential rainfall totaling up to 5” over the next three days. Rapid snow melt will happen with nearly all snow gone by the end of the storm. Assumptions Responders throughout the region will be quickly overwhelmed, and will require assistance outside of the region. Ice conditions, fallen trees, downed power lines, etc. will create hazards that make it difficult (if not impossible) for responders to get to citizens in need of assistance. EMS resources will be limited due to the number of citizens requiring assistance, and their ability to triage and transport patients will be strained. The Special Populations will need specialize supplies and professional care according to what issues are involved. These may range from elderly, mentally impaired, physically impaired, inmates, etc. The normal assistance for services from the general public (i.e. police, fire, EMS) will still be needed and will most likely increase due to the flooding evacuations. Mission Areas Activated Protection As a result of Friday’s National Weather Service (NWS) Ice Storm Warning, 5th District Emergency Managers will call for a conference with the EOC Executive Group to discuss plans for a partial activation. As new information is received, decisions will be made as to the extent of EOC operations that will be needed. Public information will be conducted through a regional Joint Information Center (JIC). As the storm develops, EOC staff will coordinate efforts between responding agencies. The Red Cross will begin to set up shelters and evacuation points, contacting all volunteer organizations to assist. 5th District RACES groups will set up communications with a regional reporting headquarters. Special Needs Population Plans will need to be implemented across the region to evacuate, shelter, and provide special professional care. Those with acute health issues will need to be provided equipment, medicines, and specific health care according to their needs. Issues with the farm and domestic animals need to be addressed. Animal handlers, animal transport, and animal shelter personnel and facilities put into service to evacuate and care for these animals. If shelter in place is possible, the feeding and care of the animals need to be addressed. Page 18 Response All public services will be put on high alert and respond with equipment for clearing and de‐icing roads. Law Enforcement will respond only to critical incidents, using all wheel drive vehicles if available. Fire Services will man stations with as many personnel as available, again only responding to emergency incidents. EMS will station units at various locations to respond as needed. Hospitals will prepare Emergency Departments for influxes of victims. Recovery Emergency Management will coordinate recovery efforts, contacting private services to assist Road Commissions and DPW’s in debris removal. Mutual Aid agreements will be activated to assist agencies unable to respond to storm‐damaged areas. Contamination and cleanup would be a major challenge due to the flooding, vehicle traffic accidents in the area, and wind/ice damage on trees, power lines and buildings. Many of the farms, homes and business along the Kalamazoo River basin could be contaminated to varying degrees, with areas of limited contamination in the other flooded areas from PCB’s, fuels, septic waste and chemical contamination that would settle on streets, sidewalks, building surfaces, farmland and crops. Building interiors would become contaminated due to ventilation systems, doors, windows and foot traffic. Personal property – including vehicles and items inside buildings – would also become contaminated. The extent of damage to the gasoline and petroleum distribution facilities will be difficult to determine until the clean‐up of the hazardous materials are complete and repair crews can inspect the damage. Distribution lines (gasoline and oil) will need to be inspected and repaired along with several fuel and oil storage tanks. The residential and business structures around the site may need to be repaired or demolished. Power grids will need repair and inspection before being put back into service. Mitigation Early warning systems, continuity of operations plans, emergency phone trees, and response equipment should be reviewed and updated as appropriate. Stand‐by generators should be installed at critical facilities including those serving at‐risk communities such as nursing homes, assisted living and persons relying on oxygen. A regional emergency plan developed for special populations should be developed for EOC’s for each facility with information to include staff contact lists, type of residents/health conditions served, total number of residents, type of building construction, proximity to hazardous zones, continuity of operations plan, evacuation plans, and roster of employees, residents and family members. Additionally, most gas stations have no backup power which could result in an immediate shortage of fuel for emergency vehicles, home generators, and power equipment. A plan and policy needs to be developed to mitigate this issue. Section III ‐ Implications Secondary Hazards The ice storm has taken down power lines throughout the region with at least 80% and in some counties 100% without power. Only Branch and Calhoun Counties have lesser damage with 10 % to 30% without power. The ice has also taken down many trees and limbs which are blocking many of the roads in the region. A main power transmission line tower North of Plainwell has collapsed from the ice. Three main power line towers collapsed from the Cook Nuclear Plant because of ice buildup and winds. The power lines from Palisades Nuclear Plant are in danger of collapse and power has been cut. The heavy snowfall has blocked roads with many shut down from vehicle accidents. These accidents are difficult to reach for emergency responders because of the conditions. The I‐94 Interstate has been closed from New Buffalo to Watervliet due to drifted snow and low visibility. A 52 car, semi‐truck pile‐up has occurred just west of the I‐94 / US31 interchange on I‐94. Dairy farms in areas that roads are blocked cannot get milk trucks in to pick up and have to dump the milk as storage is at capacity. The majority of farms in the Region have issues with the livestock for feed and sheltering. Communications via phone, two way radios, and TV and radio broadcasts have been greatly reduced because of the power outages. With many cell towers damaged, cell phone coverage has been limited. The heavy rain has washed out many roads, bridges and dams. This is affecting the ability to respond with emergency equipment. Large amounts of water washing down stream from the dam breakages or releases has flooded homes, businesses, and washed out roads and bridges in the region. Thursday afternoon, the Berrien Springs dam ruptured and sent a large wall of water down stream, washing out trees, buildings, bridges and vehicles. This debris has dammed up Page 19 against the river overpass of US 31 with the North bound bridge partly washed out and one section collapsed. The dam at Paw Paw is holding but is at the limit and could overflow the banks. The West Michigan Ave. road bridge over Paw Paw dam spillway is closed. The Sturgis dam north of Centerville has collapse sending wall of water into the wooded area below the dam and washing debris down stream to the dam in Three Rivers. The Marrow Dam in Kalamazoo County suffered a breach in the earthen portion just north of the dam gate releasing the backwaters downstream. North St., Patterson St. and Mosel St. Bridges are closed because of surge damage, ice and debris building under them. Bronson Hospital basement and tunnels are flooded, Vine St., Burdick St. & Lovell St. flooded on east end. Rail bridges in Kalamazoo and Parchment appear to have suffered damage. Kalamazoo City Water Reclamation Facility is significantly damaged and without power. The Lakewood, Comstock and part of Parchment areas are flooded and without power. Many small bridges are damaged or out throughout Kalamazoo County. Because of possible collapse M‐89 is closed at the bridges west of Otsego, in Plainwell and in Allegan. Any road that goes over a dam or next to a dam is closed throughout the region. Fire and Police Departments in the Cities of Allegan & Plainwell are flooded, and buildings are not functional. The Allegan & Plainwell City Water Reclamation Facility is destroyed, and open sewage is flowing into river. In Barry County the Thornapple River is 4 feet over flood stage, flooding across all the lower lying areas of farms, villages and cities, within a half to one mile distance from river. All dams along this stretch are in danger of collapse. The Special Needs Populations in all regional counties are unable to evacuate or receive need care in areas that are inaccessible due to the blocked roads and flooding. These vulnerable persons are unable to get needed medicines and supplies. The kidney disease patients cannot get to dialysis facilities. Nursing home and adult care facilities are without power and running short on water and food. Wal‐Mart Distribution Warehouse at Coldwater cannot get product out to stores because of road conditions and employees are unable to get to work so they are short staffed. In all counties work staff is unable to get to or from work as most roads have blockage from trees, washouts, or flooding. Kellogg’s has shut down production because of employees unable to get to work. Interstate I‐94 is open in Calhoun County, with traffic moving slowly. All slide offs have been left with the drivers/passengers taken to shelters. Calhoun and Branch Counties have less ice and snow and most have power. The Fort Custer Military Base and many other shelters in schools and churches are being opened in these counties in preparation to take in people from neighboring counties. Fatalities/Injuries 45,000 injuries expected. As many as 950 to 1,000 fatalities are possible with 912 confirmed and as water subsides more are expected to be found. There are 100 plus reported as missing. Hundreds of slip and fall injuries as well as heart attacks are being reported as people try to remove snow and ice. People are becoming dehydrated due to lack of water, and hunger is causing confusion among the population, as well as other health issues. Reports of hypothermia and frost bite are also pouring in. People are running out of their prescription medications, and reports of diabetes‐related issues are also on the rise. Property Damage Local Emergency Management offices throughout the region have activated their Emergency Operations Centers (EOC) and damage assessment teams have been deployed. The State of Michigan Emergency Operations Center (SEOC) has also been activated. Due to the roadway and power issues, damage assessment teams will be working with the Civil Air Patrol. The Civil Air Patrol will conduct flyovers of each county and provide photograph evidence of the damage. As roadways become cleared, the teams will start doing ground assessments. Up to 40% of homes and businesses throughout the region have sustained severe damage. Most rural roads are impassable due to downed trees and snow/ice accumulation. Metropolitan areas are closed due to downed power lines and power outages. Many city roadways are blocked by downed trees limbs and/or wires, and many secondary roads washed out in places. Landline telephones are operating in only about 20% of the region, and completely out in flooded areas. Cell Phones are about 15% functioning due to downed towers. Flooding and dam failure has caused portions of I‐94, I‐196, US 31, and US 131 to be closed because of questionable safety of bridges, due to erosion. Page 20 Fire has broken out in the downtown Paw Paw and has spread to engulf one block. The fire department is shorthanded and running low on fuel. However, they have the fire contained to the one block area. Main Transmission lines coming into the area south of Plainwell are down and towers are destroyed because of flood and debris damage after dam broke. The region is virtually without supplied electrical power. Service Disruption Much of the power is out and roads impassable over the region causing shortages in supplies of food, water, fuel and medications. Businesses and government agencies are unable to function in full capacity and employees are unable to get to work. Clearing roads of debris and repairing washouts will take up to three weeks. Major roads will be opened first and any roads to critical areas and business facilities. Power outages will last for minimum of two weeks to two months in many areas. Rebuilding the damaged roads, bridges and other infrastructure will take up to four months. Damaged and collapsed dams will take up to a year to rebuild. Economic Impact Throughout the region there are hundreds of millions of dollar loss from property damage, medical costs and lost business costs. Approximately 40% of the regions homes and business have been severely damaged from ice, wind, with heavy snow buildup and flooding. Nearly 70% of all businesses have had to close from one to six weeks because of the storm and power outages. This has resulted in losses of up one million dollars per day for some of the larger business. Examples of these are: • L. Perrigo’s in Allegan County closed for 8 days, with losses that range in the millions dollars. • Pfizer in Kalamazoo County, close for 3 days, and 50% reduced production for 12 days, with a loss of millions of dollars. • Target and Wal‐Mart distribution warehouses each are unable to get product out and have a large dollar loss per day. They have not been able to transport product for six days so the stores are running low on product. • Loss of tax revenue will impact local and state government from the lost income in business. Waste water treatment systems that fail would cause major dollar loss through the region. In Kalamazoo alone, the dollar loss from the waste water treatment plant failure is estimated at 17 million dollars per day in community damages. Along most creeks and rivers in the region is a loss of crop land from washouts and pollution in flooded areas with sewage, chemical, and root rot. The in‐place PCB contaminated sediments in the Kalamazoo River have washed into the surrounding flood plain causing the land to be unusable or in need of hazardous cleanup. The long term cost of monitoring these areas for contamination would last for years. The replacement and rebuilding of infrastructures of roads, bridges, power grids, waste water systems and railroads will alone cost many millions of dollars. Long‐Term Health Issues With the severe flooding of many homes and businesses, mold has become an issue. This must be monitored as health problems of lung infections, skin irritations, and persons with asthma, allergies or suppressed immune systems in greater danger of health problems. Drinking water supplies from both public and private systems have been compromised from the flooding and may cause severe health problems from the various contaminates in the water. The many injuries from vehicle accidents, falls and strains cause long –term issues both of health and economic loss. These injuries range from severe trauma taking long term care and rehabilitation to shorter term recovery from broken bones and strains. Mental health issues of dealing with depression, material loss, and death or injury of loved ones will take counseling from crisis intervention personnel and psychological services. The PCB’s washed out of the Kalamazoo River is a long term health hazard for those living along the river. This population must be monitored over a long period of time for any related health issues. In the long term the damage of the trees, creates a hotter environment for the lakes and fish and will create a different outcome for that eco system along with a greater problem for heat of humans with the loss of shade also. Lack of food and water for livestock is also becoming an issue, and the loss of so many trees is predicted to alter the ecosystem by creating a hotter environment in the region. Possible health issues from this environment change may include skin cancer and asthma. Page 21 Annex C – Metric Charting Example Explanation of Charts: The 3.5 Objective Chart above is and example of measuring the Regional Homeland Security Strategy. The chart measures the elements by weight, time of completion, and percent of work accomplished. A total of 19 charts covering the objectives are to be used to measure the progress of the objectives by the Project Chair/Planner, the Regional Board, and the State. Page 22 Annex D ‐ 5th District Regional Strategic Planning Task Force (PTF) Organizational Chart Page 23 Annex E – 5th District Regional Planning Task Force (PTF) Roster 5th District Regional Planning Task Force (PTF) Directors, Facilitators, Coordinator Name Task Title Organization Phone Mobile Email Represent Scott Corbin Al Svilpe Col. (Ret) Berri Meyers Barry Reber Erin Yingst Chair Vice Chair Facilitator Asst. Facilitator Coordinator Allegan County EM Van Buren County EM Homeland Security Planner 5th District Coord. MSP 5th District Grant Coord. 269 673 0571 269 657 7786 517 322 0182 269 657 6081 269 383 8763 269 218 2533 269 377 4080 269 330 3487 [email protected] [email protected] [email protected] [email protected] Allegan County Van Buren County State of Michigan MSP th 5 District Jim Gorka Tom Miller Connie Gibson Bob Hale Minutes Planning Planning Planning Regional Planner Regional Planner Regional Planner Regional Planner [email protected] [email protected] [email protected] [email protected] Barry County Allegan County Calhoun County 5th District [email protected] Regional Planners 269 383 8740 269 383 8795 269 969 6439 269 337 6607 269 377 7199 616 516 5111 Task Force Disciplines Name Discipline Organization Phone Ron Bush Chief Roger Caris Steve Barnell Tom Sivak Ann Nieuwenhuis Jeff Mitchell Karen Jako Jim Zoss Rick Frantz Don Haneckow Law Enforcement Fire Service Hazardous Mat. Non Govern Org. Agriculture Public Works Tribal Municipal Municipal Public Health Berrien County Sheriff Hastings Fire Sturgis Fire American Red Cross MSU Extension Van Buren Road Comms. Pokagon Band Battle Creek EM Battle Creek EM Allegan Health 269 983 7111 269 945 5384 269 467 9045 269 353 6180 269 567 0983 269 674 8011 269 782 4141 269 966 3550 269 966 3550 269 686 4580 Mobile Email 269 876 0002 [email protected] [email protected] 269 625 6711 [email protected] 269 330 2138 [email protected] [email protected] 269 377 1463 [email protected] [email protected] [email protected]‐creek.mi.us [email protected] [email protected] Represent Berrien County Barry County St. Joseph County Red Cross 5th District Van Buren County Indian Nation Battle Creek Battle Creek Allegan County Page 24 Annex F – 5th District Regional Planning Board Roster 5th District Regional Planning Board Roster Agency Name Title Office # Cellular # Allegan County Jim Hull (P) Bruce LaBrie (A) Jim Yarger (P) Vacant Mike Bradley (P) Chris Corteville (A) Tim Miner (P) Kurt Spalding (A) Durk Dunham (P) Al Byam (A) Dave Smith (P) Patti Kolden (A) Paul Baker (P) Bob Hudson (A) Jim Barnes (P) Gene Alli (A) Al Svilpe (P) Dale Gribler (A) Jim Zoss (P) David Headings Dr. Bill Fales (P) Erin Yingst (A) Barry Reber Bob Dievendorf Kim Richmond Tim Lee Mark Zirkle Undersheriff Road Commission EM Director 673-1408 616-218-2571 945-1412 Capt. / EM Coordinator Deputy EM Coordinator 911 Director EM Director Sheriff EM Director Regional Planner Lt. / EM Director Deputy Fire Chief Capt / EM Coordinator Regional Planner Lt. / EM Director Sheriff EM Director Police Chief Medical Director 5th District Grant Coordinator Lt. / Coordinator Regional Coordinator Planner Lt. / Planning Section Fiscal Coordinator 983-7111 ext7216 983-7111 ext7297 Barry County Berrien County Branch County Calhoun County Cass County Kalamazoo Co. St. Joseph County Van Buren County At-Large Seat Battle Creek At Large Seat MSP 5th District OPHP Regional EMDHS – Tech EMDHS – Tech Fiscal Agent Agency Name Title Allegan County Barry County Berrien County Calhoun County Cass County Kalamazoo Co. Kalamazoo Co. Kalamazoo Co. St. Joseph County St. Joseph County Van Buren County 5th Dist. Medial Tom Miller Jim Gorka Ron Bush Connie Gibson Bob Smith Dave Schneider Jim Gorka Tom Miller Gene Alli Steve Barnell Tom Loudenslager Bob Hale Regional Planner Regional Planner Regional Planner Regional Planner Regional Planner Regional Planner Regional Planner Regional Planner Regional Planner Regional Planner Regional Planner Regional Planner 517-278-9020 969-6430 969-6450 445-1460 445-1217 383-8712 329-4539 467-9045 Ext 233 467-9045 Ext 244 657-7786 657-2006 966-3550 966-3306 337-6494 269-383-8763 657-6081 337-6549 517-333-5041 517-333-5996 657-3101 Ext 296 Regional Planners Office # 383-8795 383-8740 983-7111 ext7274 969-6429 782-7509 383-8744 383-8740 383-8795 467-9045 Ext 244 467-9045 Ext 244 657-2006 ext268 337-6549 Pager # Email 838-5421 272-0133 [email protected] [email protected] [email protected] 208-4175 208-2531 807-0241 428-1801 [email protected] [email protected] 317-7718 260-336-1710 462-2138 744-6934 217-6756 506-1716 535-1501 377-4080 569-3636 317-4285 680-6420 390-9368 998-2167 330-3487 720-7757 413-0257 Cellular # Pager # [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] 616-516-5111 377-7199 876-0002 462-1911 377-3590 377-7199 535-1501 625-5711 720-2111 212-0519 212-0494 212-0185 Email [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] Page 25 Page 26 5th District Regional Homeland Security Planning Board Minutes th November 18 , 2009 ~ 9:00 am ~ Kalamazoo County EOC 1. Meeting called to Order at 9:00 AM by Board Chair Paul Baker 2. Roll call of Board Members. Board Members Allegan Barry Berrien Branch Calhoun Cass Kalamazoo St. Joseph Bruce LaBrie Jim Yarger Chris Corteville Tim Miner, Brett Pehrson Durk Dunham David Smith, Rick Behnke Paul Baker, Mark Barnes Jim Barnes, Gene Alli Van Buren Battle Creek 5th Med Coalition Regional Executive Grant Coordinator 5th District Coordinator OPHP Rep. Federal Homeland Security Rep Red Cross Al Svilpe, Dale Gribler Jim Zoss Dr. Bill Fales Erin Yingst Lt. Barry Reber Absent Absent Tom Sivak Absent Jim Hull, Mike Bradley, Al Byam, David Headings, Bob Dievendorf, Mike Moll 3. There is a Quorum of the board. 4. Minutes for approval from 10/27/09 meeting, voice vote motion passed. 5. Presentation ~ First Warn Weather Program. 6. Executive Grant Coordinator Report by Erin Yingst - Erin provided handout and general overview of recent activities. Quarterly Planners meeting was held on Friday, November 13th, all Regional Planners were in attendance. Erin is working with Planners on FY2008 Grant Project Assignments, Narratives, and Milestones. Erin is updating the planner evaluation process. Next quarterly Planners meeting is Friday, February 5, 2010. Financial Business: a. Financial Report by Mark Zirkle - Mark provided handout and general financial overview: FY2007 HSGP - $615,299.85 in grant funds available. FY2007 Citizen Corps Grant – Very little expenditure to date with the exception of Berrien County, programs need to get their expenditures in. FY2007 PSIC Grant – $158,577.00 in grant funds available. Chair Baker recommend for Erin Yingst to draft a letter concerning the 800MHz communication system capacity issue. The Regional Board will sign and forward to send to Michigan’s Appropriations Chair of the House and State, and the Governor, and CC to DIT and our Regional Representatives. FY2008 HSGP – Mark needs new contract agreements by January 1st, 2010 for any planners under contract agreement. Fall Conference – Please get reimbursement request turned in as soon as they are processed, do not wait to the end of the quarter. Reimbursement and Report deadlines must be met. Quarterly reports are due on the 10th of the month following a quarter’s end. NEXT DEADLINE IS JANUARY 10TH, 2010. Mark is working on RFP’s for the Talon project. b. Purchase Process Lt. Paul Baker – Paul provided handout and overview of the Regional Homeland Security Board “Purchase Process”. Per Mark Zirkle when working with State contract make sure the State contract number is on the ACJ. If not dealing with a State contract then you need three quotes. Chair Baker and Erin stressed Planners should be completing PJ’s and ACJ’s. 7. c. d. e. f. g. h. i. j. k. l. 2008 CERT Grant Award amounts to Jurisdictions – Mark Zirkle provide handout and Lt. Baker provided overview on FY2008 Citizen Corps Fund Appropriations. 2007 Grant Funds – Regional Purchase Request First 2 Warn Software Purchase Request Motion Jim Zoss, seconded Jim Yarger to approve FY2007 HSGP funding in the amount of $10,000 to purchase 10 “First 2 Warn” software programs, one for each Emergency Management program in the 5th District. Discussion – In depth discussion, several Board member commented that PSAP’s need to be involved in the discussion. Roll call vote – 3 Yes, 8 No, 0 Abstain, Motion Failed Doc Fales expressed optimism that discussion on this project may be re-visited in the future. Portable Light Tower Purchase Request Motion Jim Yarger, seconded Bruce LaBrie to approve FY2007 HSGP funding to purchase 10 Terex RL4000 Portable Light Towers, one for each Emergency Management program in the 5th District. Discussion Roll call vote – 11 Yes, 0 No, 0 Abstain, Motion Passed Communication On Wheels (2nd COW) Purchase Request Motion Jim Barnes, seconded Dale Gribler to approve FY2007 HSGP funding to purchase a second Communication on Wheels (COW) unit for the 5th District. Discussion – In depth discussion Roll call vote – 3 Yes, 7 No, 1 Abstain, Motion Failed 2007 Grant Funds – Individual Purchase Request Prime Mover Purchase Request – Allegan County Motion Dale Gribler, second Jim Yarger to approve FY2007 HSGP funding in the amount of $45,000.00 to purchase a Prime Mover Vehicle for Allegan County. Discussion Roll call vote – 11 Yes, 0 No, 0 Abstain, Motion Passed Prime Mover Purchase Request – Barry County Motion Doc Fales, seconded Chris Corteville to approve FY2007 HSGP funding in the amount of $43,671.32 to purchase a Prime Mover Vehicle for Barry County. Discussion Roll call vote – 10 Yes, 0 No, 1 Abstain, Motion Passed Prime Mover Purchase Request – Kalamazoo County Motion Jim Barnes, seconded Mark Barnes to approve FY2007 HSGP funding in the amount of $74,588.00 to purchase a Prime Mover Vehicle for Kalamazoo County. Discussion Roll call vote – 9 Yes, 2 No, 0 Abstain, Motion Passed Break 10:46 AM to 10:54 AM Branch County Technical Rescue / CBRNE Detection Equipment Motion Jim Zoss, seconded Bruce LaBrie to approve FY2007 HSGP funding in the amount of $58,018.20 to purchase CBRNE Detection, Technical Rescue and PPE equipment for Branch County. Discussion Roll call vote – 10 Yes, 0 No, 1 Abstain, Motion Passed SWAT Vest Purchase Request – Battle Creek City Motion Jim Barnes, seconded Durk Dunham to approve FY2007 HSGP funding in the amount of $31,105.00 to purchase 20 PTS-100 Pro-Tech Rapid Response Vest for Battle Creek City. Discussion Roll call vote – 11 Yes, 0 No, 0 Abstain, Motion Passed Thermal Eye Camera Purchase Request – Battle Creek City Motion Jim Barnes, seconded Mark Barnes to table vote on Thermal Eye Camera project purchase until next Regional Board meeting on December 15th, 2009 Discussion – Good project, something everyone could be a part of. Roll call vote – 10 Yes, 0 No, 1 Abstain, Motion Passed ***Note: Programs need to submit a list of how Thermal Eye Cameras they need to Erin Yingst by 12/09/09 m. n. o. p q. Trailer Purchase Request – Barry County Motion Dale Gribler, seconded Jim Barnes to approve FY2007 HSGP funding in the amount of $8,289.00 for an Enclosed Equipment Trailer for Barry County. Discussion Roll call vote – 11 Yes, 0 No, 0 Abstain, Motion Passed Portable Message Board Batteries Purchase Request – Van Buren County Motion Durk Dunham, seconded Jim Zoss to approve FY2007 HSGP funding to purchase batteries for Van Buren County portable message board. Discussion Roll call vote – 11 Yes, 0 No, 0 Abstain, Motion Passed Communications Purchase Request – Cass County Motion Brett Pehrson, seconded Mark Barnes to move Cass County’s Communications project from under FY2007 HSGP funding consideration, to consideration under the PSIC Grant for possible funding. Discussion Roll call vote – 10 Yes, 0 No, 1 Abstain, Motion Passed Mobile Command Center Purchase Request – Van Buren County Request withdrawn by Sheriff Gribler PCIS Grant Funds Branch County Request – Tim Miner Motion Jim Zoss, seconded Durk Dunham to approve FY2007 Public Safety Interoperable Communications (PSIC) grant funds in the amount of $158,169.64 for Branch County’s Communications project. Discussion Roll call vote – 10 Yes, 0 No, 1 Abstain, Motion Passed Motion Dale Gribler, seconded Mark Barnes to approve FY2007 HSGP funding in the amount of $128,327.00 for Cass County’s Communications Project, provided Cass County secures 20% match funding by the next Regional Board meeting on December 15th, 2009. Discussion Roll call vote – 10 Yes, 0 No, 1 Abstain, Motion Passed 8. Communications to the Board: a. MPSCS Newsletter – Chair Baker provided handout b. Tier III Workshop – Chair Baker provided handout 9. Un-Finished Business: a. Board Packet Dates – Chair Baker provided handout and overview on 2010 Regional Homeland Security Meeting dates and Board Deadline dates. New Business: 10. None. Tom Sivak introduced Zack Cahalan as his replacement with the American Red Cross. Bob Hale will send a letter to all PSAP’s informing them of the “Warming Vehicle” as a regional resource. 11. Meeting adjourned 12:00 PM Next meeting Tuesday, December 15th, 2009 @ 9:00am @ Kalamazoo County EOC.
Similar documents
08 Super Duty - Thoroughbred Ford
An optional DVD-based Navigation System can map routes anywhere in the U.S. or Canada, and guide you with audible instructions. It also includes the Audiophile® Sound System with MP3 capability. A ...
More information