RT 15 ( Girard Avenue) Light Rail Renewal Program
Transcription
RT 15 ( Girard Avenue) Light Rail Renewal Program
RT 15 ( Girard Avenue) Light Rail Renewal Program SEPTA’s RT 15 Girard Avenue Renewal Program • Infrastructure – Rehabilitate and upgrade 8.2 miles of line infrastructure – Overhead power line replacement – Upgraded power supply and distribution systems – Island platforms for passenger loading – Traffic control striping and signage – Traffic signalization enhancement – Streetscape improvement – Building improvement at Callowhill Shop •Vehicle Procurement – Remanufacture 18 1947 PCC Cars – Capital Spares – Publication and Training – Diagnostic Test Equipment Girard Avenue Light Rail Infrastructure Renewal Program History of Rt. 15 Route 1859: Horse car service commenced along portions of the line 1894-95 WW II Route electrified and extended to 9.5 miles 82 cars scheduled in rush hour 1955 One person operation initiatited 1992 Diesel buses replaced PCC fleet 2004 PCCII fleet replaced buses Girard Avenue Light Rail Infrastructure Excavation and removal of existing track and rail along Girard Avenue Girard Avenue Light Rail Infrastructure Installation of New Rail Girard Avenue Light Rail Infrastructure Concrete encasement of rail structure Girard Avenue Light Rail Infrastructure Pedestrian Island Construction Girard Avenue Light Rail Infrastructure Rotary 1890’s Converter at Mt. Vernon Substation replaced Girard Avenue Light Rail Infrastructure COST Infrastructure Signalization Streetscapes Subtotal Construction $45.7 mil. $6.4 mil. $0.5 mil. $52.6 mil. The Original Plan for New Streetcars Breda Skoda Comparison of New ALRV and Remanufactured PCC Cost per Car (millions) Total Cost (millions) Vehicle Life (years) Seats per Vehicle Cost Per Seat (thousands) Number of Vehicles Flexibility ALRV PCC $3.2 – 3.5 $38.6 – 42 30+ 70 45.7 – 50.0 12 All Routes $1.2 $21.6 15+/46 26 18 Route 15 Only Alternative Option z Remanufacture of PCC Cars to Year 2000 Standards PCC II Remanufacture PCC Car waits its turn for remanufacture PCC II Remanufacture Project Highlights z z z z z z z z z z z Extensive Shell Reconstruction New Door Panels, Rebuilt Door Motors New Wheelchair Lift New HVAC Refurbished Interior Lighting Refurbished Seating New Auxiliary Power System New Trucks New AC Propulsion New Interior Linings New Cab Console PCC II Remanufacture Typical roof-to-side structure damage PCC II Remanufacture Side wall cross brace supports were added prior to removing the old carlines. PCC II Remanufacture Typical high levels of corrosion was also found in the step well area PCC II Remanufacture Grit blasting was performed 100% PCC II Remanufacture A welder attaches the carline to the roof - rail PCC II Remanufacture Welder works on repairs to contoured roof section. PCC II Remanufacture First half of the roof is applied to the side of the car. PCC II Remanufacture First half of the roof is in place. PCC II Remanufacture With the roof in place, carbody repairs continue PCC II Remanufacture Modifications for securing new equipment boxes is worked out. PCC II Remanufacture Propulsion Inverter is getting ready to be installed PCC II Remanufacture With structural repairs complete, the carbody gets its first water test. PCC II Remanufacture Interior work starts with floors, insulation and wiring. PCC II Remanufacture Interior lining being installed PCC II Remanufacture Interior lining with air diffusers PCC II Remanufacture Ducts, interior linings and seats are added. PCC II Remanufacture Electric locker subassembly is prepared for installation PCC II Remanufacture Propulsion Computer (Vossloh Kiepe) installed in Electric Locker PCC II Remanufacture New trucks are fabricated, assembled and await installation. PCC II Remanufacture Fresh out of the paint booth and back in the shop for final assembly. PCC II Remanufacture Completed Pilot Car at Brookville Equipment Corporation PCC II Remanufacture Pilot car 2320 arrives at Elmwood Depot. PCC II Remanufacture Proud two person drive team after successful unloading off trailer. PCC II Remanufacture Not everything goes as planned (Pilot car at 40th & Girard Island) PCC II Remanufacture Wheelchair lift in Operation PCC II Remanufacture Interior View