Waterschap Brabantse Delta Boerengezinsdag ZLTO Rucphen 26
Transcription
Waterschap Brabantse Delta Boerengezinsdag ZLTO Rucphen 26
Waterschap Brabantse Delta area Sand and clay Core figures 810.000 inhabitants 24.000 companies Total area 171.000 hectares Water safety: 402 kilometers of dikes Clean water: 17 sewer water purification stations Control of quantities of surface water. Important for agriculture… … nature… … and urban area’s Using locks… …and pumping stations Climate change: floods and shortage The Netherlands: delta of Europe • Average discharge at Lobith: 2.200 m3/s • Highest dscharge recently measured: 12.000 m3/s • 1:1250 year discharge: 16.000 m3/s 1993 and 1995: gave us a serious warning 250.000 evacuees National room for the River Programma More than 30 measures 2.3 billion euros Finish: 2015 More information? www.ruimtevoorderivier.nl National room for the River Programma Topographic map Overdiepse Polder Farmers Initiative Mount concept (terpen plan)bedrijven Goals project Overdiepse Polder • Increased water safety of urban areas upstream of the polder • In times of extreme high water a decrease of the water levels in the Bergsche Maas of 27 cm. Flooding of the polder occurs approximately 1/25 years • Saving the polder for agricultural activities and improving the agricultural structure • Improving ecology • Improving recreational infrastructure • Budget 111 million euros • Deadline: 1 November 2015 Process: organisation Ministry of Infrastructure and environment Spatial planning Real estate Province North-Brabant Realisation agreement Waterschap Brabantse Delta UAV-GC contract Constructor The director of the contractor and the director of the waterboard sign a agreement Contract Consultant Process: large amount of actors • 2 ministries • Dutch parliament • 2 municipalities (licensing authority, law enforcement, local politics, interested inhabitants) • Room for the River programme organisation • Waterboard • Province • Farmers individually • Farmers organisation Overdiepse polder • Regional farmers association • Environmental NGO’s • Regional/ national press • …. Steering group, working group, stakeholder group Present situation Usual water level High water level Event every year in winter time Future situation Usual water level Extremely high water Event approximately 1/125 year Project outline Process: farmers compensation • Government has bought all of the farms from the farmers at market price + compensation for any loss • Farmers will be compensated by the government every time flooding occurs • All of the farmers invest in larger, more sophisticated farms • Enforced purchase by court ruling was possible, but will hopefully be unnecessary • Parcels from leaving farmers will be offered to the ones who stay to buy or lease. Planning • 2011: 3 mounts ready for start construction farms • 2012: all of the mounts ready for construction farm, 5 farmers have moved into their new houses • 2013: start adapting the polder water system, start construction ecological zones • 2014: all of the farmers have moved to their mount or moved out of the polder. Finishing the new primary dike and start lowering the old dike. • 2015: Finish of the project Algemene contractvorm • • • • • In dit geval: Engineering & Construct Meer verantwoordelijkheid bij de aannemer Ook risico’s bij de aannemer Opdrachtgever meer op afstand Aannemer moet aantonen dat hij aan de eisen voldoet en het juiste maakt op het juiste moment Arts impression Rudolf Das Situation in a normal water Situation at a high water January 2011: placing the building chain February 2011: construction of the temporary road April 2011: demolition of the first farm May 2011: laying cables and pipelines June 2011: the sand to increase the mounts is delivered by ship 1st of july 2011: the first mount is ready! July 2011: the construction of the other mounts are on schedule August 2011: peasant life goes on September 2011: the open day attracts 2000 visitors October 2011: work from the air 27 october 2011: the drilling of the first pole Dec. 2011: the construction of the first farm is on schedule by the mild weather July. 2011: the construction of the first farm is on schedule by the mild weather Thank you for your attention. Are there any questions?