Marine Renewable Energy
in Basse Normandie
Géraldine MARTIN
West Normandy Marine Energy
Associate Director
Where marine energy is harnessed
1) The marine energy potential
2) The grid
3) The harbours
4) The french calls for tenders
5) WNME organisation and work
1
The offshore wind
energy potential
Offshore wind: french potential and calls for
tenders
2 calls for tenders
6 farms: 450 to 700 MW
A total of 3,5 GW
5
Source Times Online.co.uk
2
The tidal energy
potential
The Blanchard Race: an exceptional natural
resource
No.1
In France for
hydrokinetic potential
50%
of Europe’s hydrokinetic
potential
FRENCH TIDAL STREAM POWER :
A 7,5 GW potential
› Blanchard Race: 6 GW incl. 3 GW in the Channel islands
› Barfleur Race: 1 GW
› Fromveur: 0,5 GW
3
The grid
THE 400 KV GRID PROVIDES
A HIGH CAPACITY FOR NEW GENERATION
IN NORTHERN COTENTIN
The 400kV grid provides a high capacity for
new generation in northern Cotentin
The next step
The “FAB” Interconnection project
France-Alderney-Britain (FAB)
An interconnection project with Britain,
which has the evacuation potential of
Alderney tidal power
> HVDC link
> maximum power of 1400 MW
> 220 km (170 in the English Channel)
> Connection in 2022
> Project of Community Interest
4
The harbour of Cherbourg
The harbour of Cherbourg
•
•
•
•
•
Available land: 44 hectares that can be put to use immediately
Firm ground ideal for heavy loads and for building specific installations
Accessible 24/7, with no locks or air space constraints
13 metres of water guaranteed all year round
A favourable environment: accessible from land, existing industrial fabric,
experience with major construction projects
The harbour of Cherbourg
Projected extension to harbour land
CHERBOURG
A port for Industry and Logistics
Building of industrial plants 4th
trimester 2014 / mid 2015
Building of harbour extension
mid 2014 / mid 2016
AN AMBITIOUS PROGRAMME…
›
100M€ capital investment
›
Almost 100 hectares dedicated to the activity
›
A specialised quay – dedicated berths
›
Five years of work
5
The french calls for tenders
The french calls for tenders
Technological steps: AMI Briques technologiques
from the 13th of may 2013 to the 31 of october 2013
Tidal pilot farms: AMI Fermes pilotes hydroliennes
from 1st of october 2013 to the 16th of may 2014
120M€
2 areas: Raz Blanchard (6 areas) and Raz Fromveur (1area)
4 to 10 turbins
>2500MWh/year/turbine
Results: end of 2014
20
The french calls for tenders
Source DCNS
Source ALSTOM
Source Siemens
Source VOITH
Source Tidalys
Source HYDROQUEST
Hydrolien: AMI fermes pilotes
23
6
WNME:
Supporting the
development
of MREs in
Basse-Normandie
WNME: Supporting the development of
MRE in Basse Normandie
TERRITORY :
Cluster and
acceptability
PARTNERSHIPS
AND NETWORK
WNME
A political ambition
Cluster:
3 working groups
NETWORK
SER
FEM
CMF
Supply chain
Research and innovation
Industrials Utilities
Learning and skills
ALSTOM
France regions
DCNS
Scotland
SIEMENS
Channel Islands
VOITH
Canada
GDF SUEZ
Japan
EDF
Chili
Partnerships
Eole Res UNITe
…
25
Bill Millin - 6th of june 1944 – Sword beach
27
www.west-normandy-marine-energy.com
Géraldine MARTIN
[email protected]
Where marine energy is harnessed