geosea - Offshore Wind Scotland
Transcription
geosea - Offshore Wind Scotland
GEOSEA November 2015 DEME - OFFSHORE WIND ORGANISATION • • • Soil Investigation EPCI Foundations Wind Turbines Transport & Installation • Cable Installation • Scour Protection • Rock Dumping • Dredging Works • Infill of gravitybased foundations • Heavy Lifts • Installation of Offshore Substations • Maintenance & Services Leading flag in Offshore Wind = GeoSea • Investment & partnering: • New Technologies: DEME Concessions, Power@Sea High Wind, Flidar 2 INTRODUCING GEOSEA - Company based in Zwijndrecht, Belgium - Over 300 Employees (most of whom Engineers) - Providing geotechnical and offshore solutions to Customers - 100% subsidiary to the DEME group - Working around the globe - Turnover 2011 / 2012 / 2013 : € 163 / € 180 / € 545 Mio Protected by Patent Applications by DEME group GEOSEA IN A NUTSHELL • A DEME member: reliable, stable and • • • • • • • • financially strong First-class offshore contracting From design to full lifecycle management In-house design and engineering Cost-efficient and client-centered State-of the-art technology Continuous innovation Experts from around the world Offshore wind, wave and tidal 4 OFFSHORE WIND – OUR SERVICES ) projects • Transport and Installation of wind • • • • turbines, foundations, met masts and offshore substations. Engineering, Procurement, Construction and Installation (EPCI) projects Full Life Cycle Management: • Repair • Maintenance • Logistics Installing Offshore Wind Farms since 2002 Installed to date: • 164 WTGs and counting…. • 638 foundations and counting… 5 OFFSHORE WIND: OUR EXPERIENCE More than 35 referenced projects 6 GEOSEA FLEET • New build vessel – preparations started – “Apollo” (end 2016) Protected by Patent Applications by DEME group WIND TURBINE INSTALLATION • Alpha Ventus – 6 * 5MW Senvion • • • • WTGs Thornton Bank 1 – 6 * 5MW Senvion WTGs Thornton Bank 2 & 3 – 48 * 6MW Senvion WTGs Northwind – 72 * 3MW V112 Vestas – MHI WTGs Kentish Flats Ext – 15 * 3.3MW V126 Vestas-MHI WTGs • Also; Baltic II - under JV with Hochtief and Global Tech I - Innovation used to install turbine rotors Belgium | Thorntonbank Ph I: 5 MW / Ph II & III : 6.15MW 8 FOUNDATION INSTALLATION MPs, Jackets, GBFs and Suction Buckets Baltic 2; Westermost Rough; Borkum West II; Thornton Bank Phases 1-3; Walney I & II; Ormonde; Alpha Ventus; Beatrice 9 OHVS – EPCI AND T&I 10 Godewind 1 & 2 Germany 550 MW Offshore Wind farm Amrumbank Germany 288 MW Offshore Wind farm Butendiek Germany 288 MW Offshore Wind farm Lincs Offshore Windfarm UK 270 MW Offshore Wind farm Humber Gateway UK 240 MW Offshore Wind farm Walney I & II UK 2 x 185 MW Offshore Wind farm Ormonde UK 150 MW Offshore Wind farm Gemini NL 2*300 MW (220 kV) Offshore Wind farm West Duddon Sands UK 389 MW Offshore Wind farm Thornton BE 325 MW Offshore Wind farm London Array UK 630 MW Offshore Wind farm Belwind I BE 330 MW Offshore Wind farm Luchterduinen NL 132 MW Offshore Wind farm Protected by Patent Applications by DEME group DESIGN & ENGINEERING Operations Engineering • Vessel Analysis • Offshore Operations (positioning, jacking, lifting...) • Meteorology (metocean data) • Wave loads • 4D-Modelling • Motion Analysis Design Management • Foundation Engineering • Structural and Offshore Engineering DEME: Creating land for the future Geological Engineering • Soil Investigation and Analysis • Drive-ability • Leg Penetration Fabrication Engineering • Temporary Works • Permanent Works Research & Development • Analysis and Measuring • Fundamental R&D • Applied R&D All rights reserved - © D.E.M.E. NV 11 CURRENT PROJECTS Project Name GOC Scope Construction Start Status Galloper (UK) Design, fabrication and installation of 56 steel monopiles End 2016 Some main contractors selected, rest of the process is just starting Race Bank (UK) T&I Foundations + scour protection + met mast decommissioning 2016 Port discussions underway, in design phase. NNG (UK) EPCI foundations (WTGs and offshore substation) + WTG installation 2017 Design phase only Merkur (Germany) EPCI Balance of Plant First half, 2016 Design phase Nordsee 1 (Germany) T&I WTG Foundations December 2015 Construction to commence soon Rentel (Belgium) EPCI Balance of Plant Undisclosed EPCI Foundations 2017-2018 • Plus GeoSea is actively tendering for several projects slated for construction by 2020. 12 SUB-CONTRACT SERVICES Overall Project Fabrication Transport of Foundations Preparation, mobilization and installation Inspection and Maintenance • • Pile fabrication • Jacket fabrication • Monopile fabrication • Transition piece fabrication • Cable manufacturing • Secundary steel fabrication • Seafastning Fabrication • Crane & SPMT hire • Storage area • Quay wall • Port services • Fabrication (temporary steel works) • Electrical services (temporary/permanent) • Hydraulics installation (temp) • SPMT and crane services • Port services/facilities (incl agents, bunkering, chandlers, laydown areas) • Vessels (supply vessels / crew vessels / helicopter) • ROV and diving services • Grouting services and supply • Hydraulic hammer • Large diameter drilling • Generators/compressors • Small tools/hardware • Electrical services (Temporary electrical set-up) • Hydraulics (Temporary set-up) • Vessel hire • Electrical services (Temporary electrical set-up) • Skilled and semi-skilled labour • Vessels • Port services • Accommodati on • Engineering services • ROV/diving • Hydrographic survey • • • • • • • Engineering works (temporary and permanent design) Skilled and semiskilled labour Engineers Inspectors Admin/secretarial Accommodation on shore Office space (short and long term) Taxi/shuttle services 13