texaco petronius
Transcription
texaco petronius
ENGINEERING FACT SHEET Customer Focused, End-to-End Engineering CONCEPTUAL FEED DETAIL ENGINEERING INSTALLATION ENGINEERING Conceptual Engineering - Early planning delivers significant benefit-to-cost results. We employ a systematic engineering process to optimize economic value during the life of a field by studying all project stakeholder perspectives, reviewing economic return and focusing on functional requirements rather than a preconceived configuration. This holistic approach requires a team with a broad perspective of all potential issues expected during the field’s life, from the reservoir to the point of sale. Front End Engineering Design (FEED) - It is imperative to design it right, from the beginning. Our in-house, multi-disciplined fabrication and installation engineers have more than 60 years of knowledge and experience worldwide. As a result, our cost estimates are based on decades of market data from our procurement and vendor network and our designs reflect proven construction and installation practices to ensure reliable, efficient, quality project delivery, lower costs, and faster FEEDs. COMPLETIONS Completions - Meticulous planning and engineering deliver quick and reliable operations. As a turnkey EPCI company, we deliver end-to-end solutions for our customers. We integrate our completions team with engineering to provide clear system / sub-system definitions for preparation of operational test procedures for dynamic system commissioning. Using our established systematic processes and our extensive experience, we execute projects by ensuring mechanical completions and commissioning are conducted efficiently and on-time. Detail Design - First class design deliverables and documentation for construction. Drawing on decades of experience, knowledge management, constructability and best practices, we meet the industry’s demand for competitive pricing, high quality facilities, increasingly complex products and aggressive delivery schedules. At the cornerstone of this practice is the effective coordination of design partners and multi-disciplined design teams. Installation Engineering - Precisely engineered, safe offshore operations ensure success. We are experts at carrying out the modeling and analysis required for any type of installation methodology, for any structure, anywhere in the world. We work closely with engineers across our marine and fabrication groups globally, as well as other specialist contractors, to enable fully engineered installation solutions that are cost efficient, optimized and above all, safe to ensure smooth operations offshore. ENGINEERING FACT SHEET | 1 | BROWNFIELD CONVENTIONAL OFFSHORE F L O AT I N G FA C I L I T I E S SURF We help bring offshore exploration into production. M C DERMOTT INTERNATIONAL A HISTORY OF ENGINEERING FIRSTS 1947 First offshore platform in the Gulf of Mexico. (Kerr-McGee) 1998 World’s deepest tripod jacket and heaviest dual lift in the Gulf of Mexico. (Shell Cinnamon) 2004 First mid-line electrical connector assembly for hydrate mitigation of two electrically heated pipe-in-pipe flowlines. (Shell Habanero) 2014 First TLWP in Brazil. One of Offshore Magazine’s Top-5 Projects in 2014 (Petrobras P-61 Papa Terra) 1978 First deepwater structure to be built in 3 pieces and first use of underwater pile driver. Recognized with achievement award from ASCE (Shell Cognac field) One of Offshore Magazine’s Top-5 Projects in 2008. (Reliance KG-D6) World’s first non-guyed compliant tower. (Chevron Texaco Petronius) 1996 1981 2008 1998 World’s first production Spar platform. (Oryx Neptune) World’s tallest single-piece jacket. Innovative methods resulted in jacket less than half the weight of the 1978 3-piece jacket with similar water depth (Cerveza) Largest ever subsea structure. Ichthys project Riser Support Structure (RSS). 2003 2011 2003 We bring innovative ideas to reality. World’s deepest dry-tree Spar production platform. (Dominion Devil’s Tower) First use of umbilical hi-reeling in 3,100 ft of water. (BP Aspen) 1955 2014 One of Offshore Magazine’s Top-5 Projects in 2011. (Maersk Peregrino) First use of skirt piles on an offshore Gulf of Mexico platform. Discipline Experts Our experienced engineers deliver all phases for fixed platforms, floating facilities and SURF projects for shallow water, deepwater and harsh environments, including extending life-of-field services through Brownfield engineering, as well as onshore refinery modules. Located in Al Khobar, Chennai, Dubai, Houston, Kuala Lumpur, London, Mexico City and Perth, our engineers are ready to make your project a success. 160630—10 © 2016 McDermott International, Inc. All Rights Reserved The information contained herein is provided for general information purposes only and is not intended or to be construed as a warranty, an offer, or any representation of contractual or other legal responsibility. McDermott has a policy of continuous improvement of its products and services and reserves the right to change information including specifications and processes without notice.