PUBT.flC WORKS REGTON, }SASH$K
Transcription
PUBT.flC WORKS REGTON, }SASH$K
I PUBT.flC WORKS REGTON, }SASH$K No.D.4/Tender/Dhulel 2_z-6$ 12014 Office of the Chief Engineer, Public Works Region, Nashik E-Mail : Nashik. c [email protected] Date :- )S tzor4 D To, The Superintending Engineer, Public Works. Circle, Dhule. Sub:- Constructing slab drains, Dhapa Drains & Protection wall on State Border to Roshmal (Kh) Dhadgaon Kothar Taloda Road MSH I Km. 7100 to 55/00 (Section-2 km. 13/00 to t6l00 & 17100 to 20100 Ghat section length Tal. Dhadgaon Dist. Nandurbar. ) Pre-tender conference on 1410312014 at 12,00 Hours 1) The common set of Deviation is prepared on the basis of above conference and is enclosed herewith. 2) This shall form a pafi and parcel of the Tender document and shall be common and applicable to all Tenderers. 3) Aparl from these deviations all stipulations/provisions in the tender paper shall remain unchanged. 4) All Tenderers should be apprised of the C.S.D. 6) Please upload this Common set of deviation on the e-tendering portal Public Works Department against this work. and instructed to submit the same along with their bid. s) The Tenderers should be parlicularly instructed that they should submit their offer considering additional facilities provided/ stipulations made on the basis of the C.S.D. and that their offer shall be unconditional. The conditional bid shall be summarily rejected. O.C. Signed by C.E. Chief Engineer D.A. :-1) Common set of deviation gopy forwarded to the Executive Engineer and necessary action. \'/ ,."information D.A. : - l) Common set of deviation D:\Bagul\C.S.D.Dhule Shahada dt.l4.3.20l4.doc of 13 P.W. Division Shahada for Minutes of the Pre-tender-conference held in the Chamber of the Chief Engineer, P.W.Region, Nashik on 1410312014 at 12.00 Hours. Subject . Constructing slab drains, Dhapa Drains & Protection wall on State Border to Roshmal (Kh) Dhadgaon Kothar Taloda Road MSH 1 Km. 7100 to 55i00 (Section-2 km. 13/00 to 16i00 & 17100 to 20100 Ghat section length Tal. Dhadgaon Dist. Nandurbar. ) Pre-tender conference on 14103/2014 at 12.00 Hours In response to the notice inviting tender online by e-tendering process a Pre-tender-conference was.held in Chief Engineer office, Nashik Following Officers were present :1) Shri. P.B.Bhosale Assistant Chief Engineer,P.W.Region,Nashik 2)Shri. A.B.Gavit, Executive Engineer, P.W. Division, Shahada. 3) Shri. G.C.Jadhav Divisional Accounts Officer, P.W. Division, Shahada. Following tenderers/their representative were present. 1) Shri. S.Y.Borse, Shahada. 2) Shri. D.G.Chavan, Shahada. 3) Ved Construction Co. Shahada. At the outset Chief Engineer welcomed all who were present for the prebid conference. He clarified that the deviations accepted in pre-tender conference shall be treated as common set of deviation for the all the tenderers who will download the tender forms. The Superintending Engineer, P.W. Circle Dhule explained the scope of work contemplated in the tender document and the purpose of pre-tenderconference. Al1 intending tenderers were requested to submit their representation if any, in writing and were informed that the department will consider their representation and issue an addendum of deviations/ clarifications shortly which will form a part and parcel of the tender document that the tenderers should submit their offer based on this Common set of deviation I Clarification O.C.Signed by C.E. D:\Bagul\C.S.D.Dhule Shahada dt.l4.l.20l4.doc l4 )ilry) S1'-afi,i"f Engineer The following bidders have sought for clarification on points raised by them. The clarifications on their points are as follows: Clarification constructing slab drains, Dhapa Drains & protection wall on state Border to Roshmal (Kh) Dhadgaon Kothar Taloda Road MSH 1Km.7l00to 55/00(section-2 km. 13/00 to 16/00 & 17i00 to Subject 20100 Ghat section length Tal. Dhadgaon Dist. Nandurbar. ) Pre-tender conference on 14103/2014 at 12.00 Hours Sr. No. l) I Points Raised by bidders Clarification SATPUDA CONSTRUCTION, LONKHEDA \r*-ur g{HT srrrErd y eS tqsii t zd- orsr.it qdt q uffir Security Deposit for 4Yo. Out lp{fu*. g{er q;il-{a EnI{ dnqrd arel. e-4tro q effiT +.mrn of this I o/o initiaL And 3 % r+q A-mq, Wa shall be recovered m-n-fr Eifu,f"fr. form R.A.Bil1. 2 J 2) q qfdi T{q s-clqrf, sil'dEii urt mW sTqili E{a R? qki 3rfl* sT{ur sd qTi fqfrqo: srq"fi q-r"rA ed-o q frffi naTqi-*. qrH or€-dr frh-qT es-suqTql eikq aTis qq.y.?oqy oT{fr s{d EnTi sTqfi srqtiq entvr qrtrrord: ghoqr plez-eT slrdq-sqra (trt-+. q.tfqT fr.q€nlslE} errqn +iteiqr orsEaT { erwnr) sTqt{E snisT frE yr.Fdrd e Bil-E-rc qrt o-<uqrs wm \rs-s qk-{r Eurqi t qqq frE {rsnt q gd qrq-s.|-a-r d.lT-di. qrq{l-d{lrf, sicfr qrq q-ru] arvrw er-i nr1 FcqT s-{i-f, 3rg-s"ilsT liqn o-t_{ 6rqrs1 gro tR qki aETsl El fui-fr. 5ro A s<r sd sis-fr"d{uT'd erq{ fiTqTqi ds fusTirT ffi (D.L.P.) fisd-+tc qi qlqqTq g-ffi-*.ra ftrd--d-eT frlrmqiqc QlqidqrfiElfu-fr. The Time limit allowed 9 (Nine) months including monsoon . instead of 6 (Six) months. As per N.LT. VED CONSTRUCTION CO. SHAHADA. Tco A qiid qIq q.-{oq-fl err-ffir eTr}. d-dqq} sTqrql Tqo n qki emrqi *rqq mi mri siq-fr srurn eilto q f,,tq qr+srdqrg quqT-d at'io q q-{gra-qrf, sie-fr sTq oru} ersrqq ffio: ert, ofr pqqT qd-f, st-ssiisT filqT{ qq,{' sTqT* T{d tslelE1is-{fr. q ? qki O.C.Signed by C.E. D:\Bagul\C.S.D.Dhule Shahada dt.l4.3.20l4.rloc l5 The Time limit allowed 9 (Nine) months including monsoon . instead of 6 (Six) months. hief Engineer Common Set of Deviation Subject Constructing slab drains, Dhapa Drains & Protection wall on State Border to Roshmal (Kh) Dhadgaon Kothar Taloda Road MSH 1Km.7l00to 55/00 (Section-2 km. 13/00 to 16/00 & 17100 to 20100 Ghat section length Tal. Dhadgaon Dist. Nandurbar. ) Pre-tender conference on 1410312014 at 12.00 Hours Points which need clarification from the department and are acceptable to the department are covered under this common set of deviations. This will form a part and parcel of agreement. All other points raised by the contractors may be considered as not acceptable to the department and will remain as per NIT. 1) Security Deposit for 4o/o. Out of this I o/o initial. And 3 % shall be recovered form R.A.Bill. 2) The Time limit allowed 9 (Nine) months including monsoon .instead of 6 (Six) months. O.C.Signed by C.E. D:\Bagul\C.S.D.Dhule Shahada dr.l4.3.20l4.doc 16