No.D.4/Tender/Dhulel
2_z-6$
12014
Office of the Chief Engineer,
Public Works Region, Nashik
E-Mail : Nashik. c [email protected]
Date :- )S
tzor4
D
To,
The Superintending Engineer,
Public Works. Circle,
Dhule.
Sub:-
Constructing slab drains, Dhapa Drains & Protection wall on
State Border to Roshmal (Kh) Dhadgaon Kothar Taloda
Road MSH I Km. 7100 to 55/00 (Section-2 km. 13/00 to t6l00
& 17100 to 20100 Ghat section length Tal. Dhadgaon Dist.
Nandurbar. )
Pre-tender conference on 1410312014 at 12,00 Hours
1) The common set
of
Deviation
is
prepared on the basis
of
above
conference and is enclosed herewith.
2) This shall form a pafi
and parcel of the Tender document and shall be
common and applicable to all Tenderers.
3) Aparl from these deviations all stipulations/provisions in the tender
paper shall remain unchanged.
4)
All Tenderers should be apprised of the C.S.D.
6)
Please upload this Common set of deviation on the e-tendering portal
Public Works Department against this work.
and instructed to submit
the same along with their bid.
s) The Tenderers should be parlicularly instructed that they should submit
their offer considering additional facilities provided/ stipulations made
on the basis of the C.S.D. and that their offer shall be unconditional. The
conditional bid shall be summarily rejected.
O.C. Signed by C.E.
Chief Engineer
D.A. :-1) Common set of deviation
gopy forwarded to the Executive Engineer
and necessary action.
\'/ ,."information
D.A. : - l) Common set of deviation
D:\Bagul\C.S.D.Dhule Shahada
dt.l4.3.20l4.doc
of
13
P.W. Division Shahada for
Minutes of the Pre-tender-conference held in the Chamber of the Chief
Engineer, P.W.Region, Nashik on 1410312014 at 12.00 Hours.
Subject
.
Constructing slab drains, Dhapa Drains & Protection wall on
State Border to Roshmal (Kh) Dhadgaon Kothar Taloda Road
MSH 1 Km. 7100 to 55i00 (Section-2 km. 13/00 to 16i00 & 17100
to 20100 Ghat section length Tal. Dhadgaon Dist. Nandurbar. )
Pre-tender conference on 14103/2014 at 12.00 Hours
In response to the notice inviting tender online by e-tendering
process a Pre-tender-conference was.held in Chief Engineer office, Nashik
Following Officers were present :1) Shri. P.B.Bhosale Assistant Chief Engineer,P.W.Region,Nashik
2)Shri. A.B.Gavit, Executive Engineer, P.W. Division, Shahada.
3) Shri. G.C.Jadhav Divisional Accounts Officer, P.W. Division, Shahada.
Following tenderers/their representative were present.
1) Shri. S.Y.Borse, Shahada.
2) Shri. D.G.Chavan, Shahada.
3) Ved Construction Co. Shahada.
At the outset Chief Engineer welcomed all who were present for the prebid conference.
He clarified that the deviations accepted in pre-tender conference shall be
treated as common set of deviation for the all the tenderers who will
download the tender forms.
The Superintending Engineer, P.W. Circle Dhule explained the scope of
work contemplated in the tender document and the purpose of pre-tenderconference.
Al1 intending tenderers were requested to submit their representation
if any, in writing and were informed that the department will consider their
representation and issue an addendum of deviations/ clarifications shortly
which will form a part and parcel of the tender document that the tenderers
should submit their offer based on this Common set
of
deviation I
Clarification
O.C.Signed by C.E.
D:\Bagul\C.S.D.Dhule Shahada
dt.l4.l.20l4.doc l4
)ilry)
S1'-afi,i"f Engineer
The following bidders have sought for clarification on points raised by them.
The clarifications on their points are as follows:
Clarification
constructing slab drains, Dhapa Drains & protection wall on
state Border to Roshmal (Kh) Dhadgaon Kothar Taloda Road
MSH 1Km.7l00to 55/00(section-2 km. 13/00 to 16/00 & 17i00 to
Subject
20100 Ghat section length Tal. Dhadgaon Dist. Nandurbar. )
Pre-tender conference on 14103/2014 at 12.00 Hours
Sr.
No.
l)
I
Points Raised by bidders
Clarification
SATPUDA CONSTRUCTION, LONKHEDA
\r*-ur g{HT srrrErd y eS tqsii t zd- orsr.it qdt q uffir Security Deposit for 4Yo. Out
lp{fu*. g{er q;il-{a EnI{ dnqrd arel. e-4tro q effiT +.mrn of this I o/o initiaL And 3 %
r+q A-mq, Wa
shall be recovered
m-n-fr Eifu,f"fr.
form
R.A.Bil1.
2
J
2)
q
qfdi T{q s-clqrf, sil'dEii urt mW sTqili
E{a R?
qki 3rfl* sT{ur sd qTi fqfrqo: srq"fi q-r"rA ed-o q frffi
naTqi-*. qrH or€-dr frh-qT es-suqTql eikq aTis qq.y.?oqy
oT{fr s{d EnTi sTqfi srqtiq entvr qrtrrord: ghoqr plez-eT
slrdq-sqra (trt-+. q.tfqT fr.q€nlslE} errqn +iteiqr orsEaT {
erwnr) sTqt{E snisT frE yr.Fdrd e Bil-E-rc qrt o-<uqrs wm
\rs-s qk-{r Eurqi t qqq frE {rsnt q gd qrq-s.|-a-r d.lT-di.
qrq{l-d{lrf, sicfr qrq q-ru] arvrw er-i nr1
FcqT s-{i-f,
3rg-s"ilsT liqn o-t_{ 6rqrs1 gro tR qki aETsl El fui-fr.
5ro
A
s<r
sd
sis-fr"d{uT'd
erq{ fiTqTqi ds
fusTirT
ffi
(D.L.P.) fisd-+tc qi qlqqTq g-ffi-*.ra ftrd--d-eT frlrmqiqc
QlqidqrfiElfu-fr.
The Time limit allowed 9
(Nine) months including
monsoon . instead of 6 (Six)
months.
As per N.LT.
VED CONSTRUCTION CO. SHAHADA.
Tco A qiid qIq q.-{oq-fl err-ffir eTr}. d-dqq} sTqrql Tqo n
qki emrqi *rqq mi mri
siq-fr srurn eilto q f,,tq
qr+srdqrg quqT-d at'io q q-{gra-qrf, sie-fr sTq oru} ersrqq
ffio:
ert, ofr pqqT qd-f, st-ssiisT filqT{ qq,{' sTqT* T{d
tslelE1is-{fr.
q
?
qki
O.C.Signed by C.E.
D:\Bagul\C.S.D.Dhule Shahada
dt.l4.3.20l4.rloc l5
The Time limit allowed 9
(Nine) months including
monsoon . instead of 6 (Six)
months.
hief Engineer
Common Set of Deviation
Subject
Constructing slab drains, Dhapa Drains & Protection wall on
State Border to Roshmal (Kh) Dhadgaon Kothar Taloda Road
MSH 1Km.7l00to 55/00 (Section-2 km. 13/00 to 16/00 & 17100 to
20100 Ghat section length Tal. Dhadgaon Dist. Nandurbar. )
Pre-tender conference on 1410312014 at 12.00 Hours
Points which need clarification from the department and are acceptable to the
department are covered under this common set of deviations. This will form a part
and parcel of agreement. All other points raised by the contractors may be
considered as not acceptable to the department and will remain as per NIT.
1)
Security Deposit for 4o/o. Out of this
I o/o initial. And
3 % shall be recovered
form R.A.Bill.
2)
The Time limit allowed 9 (Nine) months including monsoon .instead of 6 (Six)
months.
O.C.Signed by C.E.
D:\Bagul\C.S.D.Dhule Shahada