TAKREER – CARBON BLACK DELAYED COKER PROJECT – ABU
Transcription
TAKREER – CARBON BLACK DELAYED COKER PROJECT – ABU
TAKREER – CARBON BLACK DELAYED COKER PROJECT – ABU DHABI – UNITED ARAB EMIRATES ALE successfully discharged M/V Dongbang Giant No.1 at Abu Dhabi Freeport. The largest equipment – Propylene-Propane Splitter weighing 1531 tons and with a length of 115,4 meters is the longest equipment ever receiving by ALE in the United Arab Emirates and also the longest equipment Mina free port has ever received. Project: CARBON BLACK DELAYED COKER PROJECT Project location: RRE INDUSTRIAL AREA – RUWAIS – UNITED ARAB EMIRATE Equipment: Class-300 BARGE - SPMT Weights: Up to 1531t A.L.E. Middle East LLC, P.O. Box 52875, Abu Dhabi, United Arab Emirates Tel: +971 (0) 2 5508741 Fax: +971 (0) 2 5508742 Note: All contracts are subject to our normal terms and conditions. Paid up capital Dhs. 150, 000, C.R. No. 47626 Web: www.ale-heavylift.com Page 2 of 2 SPMT trailers are inserted underneath the 1531t weighing equipment for load in / roll off operation. The largest equipment – Propylene-propane Splitter offloaded in Abu Dhabi Free Port Project: ZUBAIR OILFIELD Location: ZUBAIR-HAMMAR-RAFIDIYA,BASRA-IRAQ