2-0011193-phase iv remedy implementation plan-2000-06
Transcription
2-0011193-phase iv remedy implementation plan-2000-06
SCANNED Phase IV- Remedy Implementation Plan Release Tracking Number 2-11193 Department of Public Works Facility 11 Fletcher Street Northbridge, Massachusetts Preparedfor: Town of Northbridge Town Hall, Memorial Square Whitinsville, Massachusetts 02148 D 3) P Preparedby: Earth Tech, Inc. 196 Baker Avenue Concord, Massachusetts 01742 June 2000 TABLE OF CONTENTS PAGE 1. 2. 1-1 1-1 1-1 1-2 1-4 1 INTRODUCTION 1.1 Objective 1.2 Site Background Summary of the Phase I Initial Site Investigation 1.3 Summary of Phase II CSA Findings 1.4 Phase III Report Recommendations 1.5 List of Relevant Contacts 1.4 Remedy Implementation Plan Organizati 1.5 -6 p REMEDIAL DESIGN Goals of the Remedial Action 2.1 2.2 Status of the Disposal Site 2.3 2.4 Disposal Site Maps Materials to be Managed under the RIP 2.4.1 Characteristics of Material to be Treated or Managed 2.4.2 Quantity of Materials to be Treated or Managed 2.4.3 Location of Materials to be Treated or Managed Conceptual Plan Relevant Design and Operation Parameters 2.6.1 Design Criteria 2.6.2 Expected Effectiveness of the Remedial Actions 2.6.3 Demonstration of the Remedial Actions Ability of Achieve Remedial Goals Spill or Accidental Release Controls Methods for Management or Disposal of OHM Generated as a Result of the Remedial Action Identification of Site-Specific Characteristics that may Affect the Remedial Action 2.9.1 Impacts to Existing Disposal Site Activities or Operations 2.9.2 Drainage Features 2.9.3 Natural Resource Areas, Local Planning and Development Issues 2.9.4 Site-Specific Soil and Groundwater Characteristics Mitigative Measures Inspections and Monitoring During the Implementation of the Remedial Action 2.5 2.6 2.7 2.8 2.9 2.10 2.11 2 2-1 'TLREq:ON 2-1 2-1 2-1 2-1 2-2 2-2 2-2 2-3 2-3 2-4 2-4 2-4 2-4 2-4 2-4 2-5 2-5 2-5 2-6 2-6 3. PLANS & SPECIFICATIONS & PROJECT SCHEDULE Plans & Specifications 3.1 Project Schedule 3.2 3-1 3-1 3-1 4. OPERATION, MAINTENANCE & MONITORING PLAN Person(s) Conducting OMM 4.1 4-1 4-1 Table of Contents Page i N:work\40196\proj~haseivrip.doc 4.2 4.3 5. General Operating Procedures Type, Frequency & Duration of Monitoring & Testing to Ensure Remedial Action Design MISCELLANEOUS IMPLEMENTATION ISSUES 5.1 Site Specific Health & Safety Plan 5.2 Permits, Licenses & Approvals for the Remedial Action 5.3 Property Access Issues Contents of Contents Table Table of Page iiil Page 4-1 4-1 5-1 5-1 5-1 5-1 1: ~workWOJ96kprof phase Mrip.doc N:work\40196prj~phaseMvrip.doc LIST OF APPENDICES U I U I U I Appendix A Comprehensive Response Action Transmittal Form & Phase I Completion Statement (BWSC-108) Appendix B Technical Specifications Appendix C Site Specific Health and Safety Plan Table of Contents Page iii I.twork\40196\pro phase ivrip.doc LIST OF FIGURES Figure 1 Figure 2 Figure 3 Table Table ojtontents of Contents Site Location Map Site Plan RIP Work Plan Page iv Page iv 1: Iwork'4OJ96projlphase Mr:p.doc 1:\ work\I40196proj~phaseivrip.doc 1. INTRODUCTION 1.1 Objective The objective of this Phase IV Remedy Implementation (RIP) is to address the Massachusetts Contingency Plan (MCP) requirements under 310 CMR 40.0870 for the implementation of the selected remedial alternative. This Phase IV RIP addresses pertinent conditions at Northbridge Department of Public Works (DPW) Facility ("the Site"), located at 11 Fletcher Street, Northbridge, Massachusetts toward development of a remedial design; development of operation, maintenance, and monitoring plans; and identification of other contingencies for the implementation of the selected remedial action. The selected remedial action for the site includes the installation of a bituminous concrete pavement cap over the impacted areas and the placement and activity and use limitation (AUL). The selected remedy described in this report is designed to address the petroleum contamination detected in surface and subsurface soil at the site. An original Comprehensive Response Action Transmittal Form (BWSC-108) accompanies this submittal. A copy of form BWSC-108 is included as Appendix A. 1.2 Site Background The current owner of the property is the Town of Northbridge. According to the Town Assessor's Office, the Town of Northbridge has owned and operated the property since 1941, although the property may have been used as a DPW facility before this time. The site is located in a mixed commercial and residential area. The site is bordered to the east by an open area; to the south by private residences and then Fletcher Street; to the west by Douglas Road; and to the north by the Mumford River. The Cotton Mill Apartments are located in an old mill building on Linwood Street, to the north of the site beyond the Mumford River. The downtown area of Whitinsville is located at to the north/northwest of the site along Linwood Street/Main Street. The Alternatives Rehabilitation Center is located to the west of the site on the west side of Douglas Road. Numerous residences are located to the south/southeast of the site along Fletcher Street. The Whitinsville Golf Club is located approximately 0.2 miles southeast of the site on Fletcher Street. Several buildings/storage sheds are located on the site. A brick and concrete block garage houses the DPW office. A large salt storage shed is located at the eastern end of the property. A stucco garage is located on the southwest portion of the site. A wood building, wood garage, and lumber barn are also located on the site. The majority of the remaining portions of the site are either paved or landscaped. The site is fenced on three sides, the fourth of which is bordered by the Mumford River. The topography of the site is generally flat with the northern portion lowering slightly to Introduction Introduction Page 1-1 Page 1-1 1: ~workWOJ96'prof phase iv'rifi doe 1:\work\40196\proj~haseM~rip.doc the Mumford River. A site location plan is included as Figure 1. A site plan is presented as Figure 2. In 1994, while trenching in the area of a 1,000-gallon diesel tank located just west of the Stucco Garage (see Figure 2), DPW employees observed a thin film of oil at the groundwater table. In 1995, the DPW decided to remove all the underground storage tanks (USTs) on site for reasons as follows: it was an alternative to the upgrading required under state/federal regulations; the age of the USTs, environmental concerns, and they were no longer required as a result of the installation of an above ground fuel storage tank (AST). In December of 1995, Earth Tech provided oversight services of the removal of a 500-gallon capacity fuel oil UST located just east of the Stucco Garage, and a 1,000gallon diesel UST, reportedly installed in 1986, located immediately west of the Stucco Garage. A long-time DPW employee reported that waste oils had been routinely disposed of around the building in the past, and this appears to be one source of the oil-stained soils. A 3,000-gallon waste-oil tank was also abandoned in place in December 1995, because half of it was situated beneath the western end of the Brick Garage (see Figure 2). 1.3 Summary of the Phase I Initial Site Investigation The Phase I Initial Site Investigation Report contained the results of past assessment and remedial activities as well as more recent Preliminary Response Actions conducted at the DPW facility. The recent work was conducted pursuant to the requirements of the 1993 MCP and associated revisions, specifically 310 CMR §40.0481. The report was intended to provide sufficient information to facilitate the evaluation and Tier Classification of the DPW site. The information presented below was gathered during the Preliminary Response Actions completed at the site in December 1996. The detailed results of the Preliminary Response Actions are presented in the Phase I Initial Site Investigation Report, dated April 1997. Soil and groundwater samples were collected from the seventeen soil borings and six groundwater monitoring wells located on the property (see Figure 2). Of the analytes detected, the concentrations of total petroleum hydrocarbons (TPH) in samples 82- SI, B8-SI, B9-Sl, Bll-SI, BIl-S2, and B15-S1 exceeded the corresponding reportable concentration (RC) of 500 parts per million (ppm), and the applicable Method I S-l/GW-2 risk-based standard of 500 ppm. The toluene concentration detected in B3A-Sl exceeded the applicable RC of 90 ppm, and the ethylbenzene concentration detected in B3A-S I and 89-SI exceeded the RC of 80 ppm; neither of these analytes was detected in concentrations exceeding Method I risk-based Introduction Page 1-2 1:\work\40196\projlphase ivlrip.doc standards. The total xylenes in B3A-S1 and 89-SI exceeded the applicable RC of 500 ppm, and the applicable Method I risk-based standard of 500 ppm. Detectable concentrations of petroleum were identified in samples collected from groundwater monitoring wells MW-3, MW-7, and MW-8. None of the analytes detected in groundwater were above the applicable RCGW-2 threshold, and none were above the applicable GW-2/GW-3 Method 1 risk-based standards. Based on the results of the Phase I investigation, Earth Tech concluded that: o Releases of petroleum products (including weathered fuel oil, lubricating oils and gasoline) to soil and groundwater have occurred at the facility. These releases probably originated from a leaking UST, overfilling of USTs, and general waste-oil disposal practices over the course of the years. o Groundwater flow at the facility is oriented toward the north-northeast (toward the Mumford River). o The highest concentration of TPH in soil at the site was detected in sample S5 (17,000 ppm) which was collected from the tank grave of the 500-gallon capacity fuel oil UST. o The highest concentration of petroleum in groundwater at the site (38,000 ppb) was detected in sample GW-2, which was also collected from the tank grave of the 500-gallon capacity fuel oil UST. Benzene, toluene, ethylbenzene, and xylenes were detected in groundwater monitoring well MW-3; ethylbenzene and xylenes were detected in MW-7; and toluene and xylenes were detected in MW-8. None of the detected concentrations of TPH or volatile organic compounds (VOCs) exceeded the applicable RCs. o Method 1 risk-based standards were exceeded in a soil sample collected from the former location of the 1,000 gallon capacity diesel oil UST (S2-1000D), two soil samples collected from the tank grave of the 500-gallon capacity fuel oil UST (S-4 and S-5), and one or more soil samples from soil borings B2, B3A, B-8, B9, B-Il, and B-15. Based on these results, three areas of soil contamination were defined as shown on Figure 2 of the ISA. No riskbased standards were exceeded by analyte concentrations in groundwater. There are no Natural Resource Areas such as vernal pools, ponds, lakes, streams, rivers, public drinking water supplies consisting of Zone II areas, Interim Wellhead Protection Areas, Zone A areas, or Potentially Productive Aquifers within 500 feet of the site. There are also no known private wells in the vicinity of the site. Introduction Introduction Page 1-3 Page 1-3 1: hvork~4OJ96~proj1phwe Mrip.doc 1:\1work\ 40196projlphaseivrip.doc 1.4 Summary of Phase 11 CSA Findings Earth Tech completed a Phase iI - Comprehensive Site Assessment (CSA) of the DPW facility in January, February, and March 1999. The objectives of the Phase II investigation were to characterize contamination at the site, identify contaminated media, determine the concentrations and vertical and lateral extent of subsurface contamination, identify contaminant migration mechanisms, and estimate the rate of contaminant migration. The scope of this investigation consisted of subsurface investigations, soil and groundwater sampling, and laboratory analyses, and report preparation. The Phase II field investigation involved collecting surface and subsurface soil samples from eleven soil borings, replacing one monitoring well that had been installed during the Phase I investigation and subsequently damaged, and collecting and analyzing groundwater samples from existing and newly installed monitoring wells to evaluate groundwater quality on-site. During the Phase II investigation, 11 soil borings were advanced on January 29, 1999, February 1, 1999, and March 2, 1999. In general, Earth Tech collected soil samples at the 2 to 4-foot, 5 to 7-foot, and 10 to 12-foot intervals as borings were advanced and field-screened the samples for VOCs using an HNu photoionization detector (PID). One sample from each boring, which had the highest PID reading, was submitted for laboratory analysis for extractable petroleum hydrocarbons (EPH) and volatile petroleum hydrocarbons (VPH). Groundwater samples were collected from each of the existing wells on February 2, 1999 for EPH and VPH analyses. During this investigation, Earth Tech conducted groundwater measurements in the newly installed and existing monitoring wells. The general groundwater flow direction at the site is towards the north-northeast towards the Mumford River. Based on the historical and current sampling results, none of the groundwater exceeds Method 1 Standards for GW-2 or GW-3, and groundwater was therefore not identified as a medium of concern at the site. The three areas of soil contamination were further identified and delineated in the Phase 1I report. Two of the areas are associated with the underground storage tanks that were removed in December 1995: one 500-gallon fuel oil tank to the east of the stucco garage and one 1,000-gallon diesel tank to the west of the garage. The third area of concern identified in the Phase I report is along the DPW driveway in the center portion of the site. The source of the contamination in this third area was not been identified, although it is suspected to be related to general waste oil disposal practices in the vicinity of the driveway area. The results of the soil sampling conducted at the facility indicate that the three areas of soil contamination are still of concern at the facility. Levels of EPH compounds, including diesel polynuclear Introduction Introduction Page 1-4 Page 1-4 1: Iwork~4OJ96\prof phase Mrip. doc I: lwork\401%\proj~phaseMrip.doc aromatics (PAHs) and other target PAH analytes were detected above MCP Method I Standards at several soil boring locations. 1.5 Phase III Report Recommendations In April 1999, Earth Tech prepared and submitted the Phase III Remedial Action Plan that presented three remedial action alternatives (RAAs) that are reasonably likely to achieve a Level of No Significant Risk to health, safety, public welfare or the environment at the site. The goal of the RAAs was to reach a Permanent Solution for the site. A Permanent Solution, as defined by the MCP, is a measure or combination of measures which will, when implemented, ensure attainment of a level of control of each identified substance of concern at a disposal site or in the surrounding environment such that no substance of concern will present a significant risk of damage to health, safety, public welfare, or the environment during any foreseeable period of time. The selected Phase III RAA includes the following measures: o Grading and paving the facility to create an asphalt cap in the areas of concern that are currently unpaved to eliminate any exposure pathway to the contaminated soils; and o The placement of an Activity and Use Limitation (AUL) to restrict the property to non-residential use and reduce potential exposures to OHM for excavation workers. This alternative also includes site inspections and maintenance of the pavement on an annual basis. The selected remedy eliminates the risks of exposure and is the most economically feasible, while providing the site with a Permanent Solution as defined by the MCP. 1.4 List of Relevant Contacts The names addresses and telephone numbers are provided for the Responsible Party (also the persons who will own/operate and maintain the remedial systems during and following construction) and the Licensed Site Professional. Responsible Party: RP's Address: Contact: Contacts Address: Telephone: Introduction Introduction Town of Northbridge Town Hall, Memorial Square, Whitinsville, MA 01588 Mr. Richard R. Sasseville, Director DPW P.O. Box 88, Whitinsville, MA 01588 508-234-3581 Page i-S Page 1-5 1: lworkWOi96iprojlphase Mrip.doc N:work\40196\projlphaseivrip.doc LSP: Address: Telephone: License No.: Company: 1.5 Joseph P. Vitale 196 Baker Avenue, Concord, MA 01742 978-371-4124 6746 Earth Tech, Inc. Remedy Implementation Plan Organization This RIP contains five sections. Section 1 is the introduction to the RIP. Section 2 presents the remedial design for the project and includes twelve subsections, Sections 2.1 through 2.11. Section 3 presents the plans, specifications, and project schedule. Section 4 includes the operation, maintenance and monitoring plans. Section 5 presents miscellaneous implementation issues including a health and safety plan, permits, and property access issues. Introduction Page 1-6 1:work\4096\projphase ivrip.doc 2. REMEDIAL DESIGN 2.1 Goals of the Remedial Action The goals of this remedial action are to achieve a Permanent Solution as defined by the MCP for the site. Achieving a Permanent Solution for this site requires implementation of a measure, or combination of measures, that will attain a level of control of each identified substance of concern at the site such that no substance of concern will present a significant risk to health, safety, public welfare, or the environment during any foreseeable period of time. As presented in the Phase III Remedial Action Plan, a Permanent Solution will be attained by a combination of a bituminous concrete pavement (asphalt) cap and placement of a AUL as presented in RAA No. 1 in the Phase III report. 2.2 Status of the Disposal Site The status of the Site has been presented in the Phase II and Phase III Reports. No new, significant information concerning the status of the Site has been identified, relative to the development of an engineering design for the proposed remedial action. 2.3 Disposal Site Maps The Disposal Site Maps are attached in the Figures section of this report. Figure 2 presents the Site Plan and Figure 3 provides the proposed extents of asphalt caps. The asphalt cap and AUL will be conservatively placed beyond the known limits of soil contamination as shown on the figures. 2.4 Materials to be Managed under the RIP 2.4.1 Characteristics of Material to be Treated or Managed The types of material to be managed at the site are soil and bituminous concrete pavement. As reported in the Phase 11 Report, site soil is primarily four to seven feet of granular fill overlying sandy soil. The soil contains low concentrations of petroleum related contaminants including total petroleum hydrocarbons, EPH, VPH aliphatic and aromatic hydrocarbons, PAHs, and VOCs including BTEX, MTBE, and naphthalene. The concentrations of these contaminants are expected to be within the acceptance criteria for soil recycling for asphalt batching. Soil will be managed and transported in accordance with local, state, and federal regulations. A small volume of bituminous concrete will be generated as a result of the remedial action. Currently, portions of the three areas of concern are covered with asphalt. Remedial Design Page 2-1 1:work40196\projlphase irip.doc The pavement covering these areas will need to be removed prior to the installing the new pavement cap. 2.4.2 Quantity ofMaterials to be Treated or Managed The estimated quantity of contaminated soil to be managed at the site is less than 125 cubic yards. It is assumed the top 6 to 7 inches of soil will need to be excavated from the areas of concern in order to prepare the subgrade and place the dense-graded crushed stone and bituminous concrete layers. The estimated quantity of existing bituminous concrete pavement to be removed and managed at the site is 40 cubic yards. 2.4.3 Location of Materials to be Treated or Managed The locations of the soil to be managed at the subject site are within the limits of impacted soil as delineated on Figure 2. The location of the existing bituminous concrete pavement to be managed at the site is within the proposed limits of pavement shown on Figure 3. 2.5 Conceptual Plan The conceptual plan for this remedial action includes the components/activities listed below: o Install temporary erosion and sediment controls as required by the Order of Conditions by the Northbridge Conservation Committee that will result from the Notice of Intent to be filed shortly. Remedial Design o Excavate the existing bituminous concrete pavement and site soil to within the limits of work as needed prepare the area for the new pavement caps. It is assumed the thickness of existing pavement in the limits of work range from 2 to 3 inches. a Grade and prepare the areas for placement of the sub-base material (dense graded crushed stone). The areas will be graded so the final surface closely matches the existing site elevations. Modifications to grades may be necessary for stormwater drainage improvements. The required improvements will be decided and finalized based upon the needs of the DPW and conditions of the Order of Conditions. o Stockpile the excavated asphalt and any petroleum contaminated soil generated from site preparation. In order to minimize the quantity of petroleum-impacted soil to be excavated and stockpiled, this soil will be reused as grading material within the areas of concern to the greatest extent possible. All stockpiles will be Page 2-2 R D\work\40196\projfphaseivrip.doc located on the DPW facility property in an area(s) that minimize disruption to the DPW operations. All stockpiles of contaminated soil will be covered with polyethylene sheeting to minimize contact with precipitation. Place the sub-base layer and bituminous concrete layers within the areas on Figure 3. The cap from top to bottom consists of 1.5-inches of bituminous concrete wearing course, 2.5-inches of bituminous concrete binder coarse, and 2-inches of densegraded crushed stone. Note the DPW may resurface addition areas of the DPW yard that are beyond the requirements of this remedial action. At a minimum, the three areas of soil contamination will be capped with new bituminous concrete pavement. Dispose and/or recycle the stockpiled bituminous concrete pavement and petroleumimpacted soil in accordance with local, state, and federal regulation. 2.6 Relevant Design and Operation Parameters 2.6.1 Design Criteria The design criteria for the remedial action presented in this RIP are as follows: Design Remedial Design o Cap the contaminated soil with a durable surface that will eliminate the exposure pathway to the soil; o Grade the areas of concern and install stormwater management controls to improve the site drainage and address local and state water quality standards; o Match existing grades where possible; o Protect on-site workers and minimize the disruption to DPW operations; o Place the bituminous concrete pavement in accordance with local and state standards; o Manage contaminated soil and spent bituminous concrete pavement in accordance with all applicable regulations and to minimize disruptions to the DPW operations; o Perform a site survey by a State of Massachusetts Registered Land Surveyor to document the asphalt cap covers the three areas of concern; and, o Place an AUL to restrict current and future site uses to protect on-site workers and future owners of the property from the OHM on the site. Page 22-33 Page lIwork~4OJ96~proj~phase ivlrip.doc N:work\40l96\proj~phaseMvrip.doc 2.6.2 Expected Effectiveness of the RemedialActions The expected effectiveness of the remedial actions for this site is considered high. The placement of bituminous concrete pavement caps over the areas of concern will eliminate the exposure pathway to the impacted soil. The effectiveness of the AUL should is considered high because additional remedial actions would be necessary before the property could be used for certain future uses (e.g., residential use). If the property were to be developed for anything other than its current use that would require disturbing the paved area, further cleanup of the contaminated soils may be necessary. 2.6.3 Demonstration of the Remedial Actions Ability ofAchieve Remedial Goals Capping areas with bituminous concrete to eliminate an exposure pathway to soil contamination is a commonly accepted and used technology. Similarly, the placement of an AUL at the site is also a commonly used property restriction to achieve remedial goals. 2.7 Spill or Accidental Release Controls The MCP considers these controls as design features for control of oil and hazardous materials spills and accidental discharge or system malfunction, including without limitation: containment structures, leak detection devices, run-off controls, pressure valves, by pass systems, or safety cutoffs. The measures listed above with the exception of run-off controls are not applicable to the pavement cap and AUL for the subject site. Run-off controls during construction will most likely include the use of hay bales and silt fence and temporary covers (polyethylene sheeting). Additional stormwater runoff controls may be required for this project as determined in the wetlands permitting process. 2.8 Methods for Management or Disposal of OHM Generated as a Result of the Remedial Action Soil and asphalt materials generated, as a result of the remedial action, will be managed in accordance with all local, state and federal regulations. It is anticipated that both the soil and asphalt generated will meet the acceptance criteria for recycling -at asphalt batching plants. Materials shipped off site will be tracked under the appropriate manifests or bills of lading under direction of the LSP. 2.9 Identification of Site-Specific Characteristics that may affect the Remedial Action 2.9.1 Impacts to Existing Disposal Site Activities or Operations The remedial action will temporarily disrupt the DPW operations at the site. The areas to be covered with pavement are currently used for either storage of equipment or vehicles or within the travel ways of the DPW yard. Equipment and vehicles will Remedial Design Page 2-4 1:\workW0196\proj~phaseivrip.doc need to be moved and temporarily stored off the subject areas until the placement of the bituminous concrete pavement caps are complete. Long term maintenance of the pavement surfaces will not impose any impacts on the site activities or operations. Maintenance of pavement in roadways is a routine task for the DPW; therefore, supplying the equipment, labor and materials to perform the necessary maintenance of the pavement will be performed with minimal effort and difficulties. 2.9.2 Drainage Features The proximity of the site to the Mumford River and the discharge of run-off to the river are being considered for this project. Although the work proposed in this remedial action would improve the water quality of run-off from the site, additional measures may be required to meet local and state water quality standards. Any additional stormwater controls, if necessary, will be decided in the wetlands permitting process. The existing catch basin located to the east of the Stucco Garage will be protected during construction. Haybales will be placed around the catch basin as shown on Detail 2 of Figure 3. 2.9.3 Natural Resource Areas, Local Planning and Development Issues As reported in the Phase II report, there are no Natural Resource Areas such as vernal pools, lakes, rivers, public drinking supplies consisting of Zone II areas, Interim Wellhead Protection Areas, Zone A areas, or Potentially Productive Aquifers within 500 feet of the Site. As stated above in this report, approval by the Northbridge Conservation Committee will be required for this project. A Notice of Intent will be filed for the project. Work will not begin until the Northbridge Conservation Committee issues an Order of Conditions. Stormwater drainage improvements may be required to meet stormwater management standards set forth in the stormwater management policy issued by the State of Massachusetts in May 1997. 2.9.4 Site-Specific Soil and Groundwater Characteristics The Phase I and Phase II investigations identified 01HM in the soil and groundwater. The presence of OHM in the soil and groundwater was considered in the selection of the remedial action. The design, construction, or operation of the selected remedial action alternative will not adversely affect soil and groundwater characteristics. Remedial Design Page 2-5 :\work\40196\projiphaseMrip.doc 2.10 Mitigative Measures Measures to be incorporated into the design, construction, and operation of the remedial action alternative to avoid or minimize impacts on environmental receptors and natural resource areas (including any surface water or wetland) are as follows: o Haybales and silt fence shall be placed around catch basin(s) and in drain ways to minimize soil and silt migration from the work area; o Placement of the bituminous concrete pavement will occur shortly after site preparation is completed to minimize exposure time after the disruption of the current site conditions; o Stockpiles of contaminated soil and old pavement will be located such that stormwater runoff does not run through the piles. Temporary measures including soil berms and ditches may be used to divert water around and away from the stockpiles. o Stockpiles of soil will be covered with polyethylene sheeting to minimize contact with precipitation, and, o Stormwater drainage improvements may be required to meet stormwater management standards set forth in the stormwater management policy issued by the State of Massachusetts in May 1997. Potential measures include, but not limited to, water quality swales, infiltration trenches, deep sump and hooded catch basins, and street sweeping of paved areas. The additional measures, if any, will be decided in the wetlands permitting process. 2.11 Inspections and Monitoring during the Implementation of the Remedial Action Earth Tech anticipates providing oversight during various stages of the project. Assistance will be provided with the initial layout of the areas to be worked on an asneeded basis. Full-time oversight is anticipated during excavation and regrading of existing site pavement and soil. Part-time oversight is anticipated during the placement of the new bituminous concrete pavement surfaces. Inspections by the LSP will occur on an as-needed basis. Remedial Design 6 Page2-6 l:work\4O196\proj\phase ivMrip.doc 3. PLANS & SPECIFICATIONS & PROJECT SCHEDULE 3.1 Plans & Specifications The plans and technical specifications for the work are included in Figures section and Appendix B, respectively. Figure 3 supports the work to be performed as part of the remedial action. Technical specifications for the project that include site preparation, temporary erosion control, earthwork, paving, and hazardous materials management are included in Appendix B. 3.2 Project Schedule Work will not commence until the Northbridge Conservation Committee issues an Order of Conditions. Submittal of a NOI is expected by mid-July. An Order of Conditions is anticipated by mid-August and work will begin shortly after. The construction work should be completed by September 30, 2000. The AUL will be filed upon the completion of the work. The final inspection report will be submitted no later than December 1, 2000. Plans,Spec fications & ProjectSchedule Page 3-1 N: work\40196\proj~phase Mvrip-doc 4. OPERATION, MAINTENANCE & MONITORING PLAN 4.1 Person(s) Conducting OMM The names and telephone number of the persons conducting operation, maintenance and monitoring activities under the proposed remedial implementation plan are presented in Section 1.4. The Town will retain the services of an LSP to conduct inspection services of the bituminous concrete pavement caps. 4.2 General Operating Procedures The selected remedy does not have any generating operating procedures. 4.3 Type, Frequency & Duration of Monitoring & Testing to Ensure Remedial Action Design Site inspections will be performed by both the DPW and a LSP to ensure the integrity of the bituminous concrete pavement caps over the areas of concern. The DPW will perform inspections on a routine basis to determine if any cracks or breaches in the pavement occurs. In addition, a LSP will perform site inspections on a semi-annual basis to inspect the integrity of the pavement caps. One inspection will be performed in the spring after the winter thaw. The other inspection will occur approximately 6 months after the spring inspection. Documentation of each inspection will be submitted to the DPW in the form a letter report. At a minimum, the report will include the items listed below as structured in accordance with 310 CMR 40.0892 (Inspection and Monitoring Reports). o A description of the type and frequency of inspection activities conducted. o A description of any significant modifications of inspections made since the submission of the preceding Inspection and Monitoring Report. o A description of any conditions or problems noted during the inspection period, which are or may be affecting the performance of the remedial action. o A description of measures taken to correct conditions which are affecting the performance of the remedial action; o The name, license number, signature and seal of the LSP. o The date and time of the inspection. The Owner of the property will perform maintenance of the caps, including replacement of pavement and sealing of cracks on an as-needed basis. The Town will submit the results of the inspections to the DEP every 6 months in accordance with 3 10 CMR 40.0874 (3)(d). Plan OM& M OM& MPlan Page 4-1 Page 4-1 liworki4Ol96~proj1phasetAri~.doc /:\ work\40196\projlphaseMrip.doc 5. MISCELLANEOUS IMPLEMENTATION ISSUES 5.1 Site Specific Health & Safety Plan Earth Tech prepared a site-specific health and safety plan (HASP) in accordance with 29 CFR 1910.120. The HASP identified known and suspected chemical and physical hazards at the work site, personal protection monitoring requirements, OSHA levels of personal protection, protection upgrade levels, locations of emergency medical assistance, and emergency phone numbers. The hazardous materials health and safety plan prepared to address construction activities is presented in Appendix C. Workers trained with the 40-hour OSHA Hazardous Waste Operations and Emergency Response Training will perform some of the work activities associated with this project. Workers possessing this training will perform the activities as follows: excavation of existing pavement and soil within the three areas of concern; on site stockpiling of the pavement and soil; and regrading of soil within the areas of concern. Upon the acceptance of the subgrade and completion of site preparation activities for the pavement caps, the installation of sub-base material and bituminous concrete pavement layers can be performed by construction workers who do not have 40-hour OSHA training. 5.2 Permits, Licenses & Approvals for the Remedial Action The Town plans to obtain the Northbridge Conservation Committee's approval for the proposed remedial action activities. Because the work is within the buffer zone of the Mumford River, the Town will file a Notice of Intent (NOI) for the project. The Town will consider the requirements of the March 1997 Stormwater Management Policy prepared by the MA DEP and MA Office of Coastal Zone Management. The final plans for the project will include measures to address the stormwater management standards included in the March 1997 Stormwater Management Policy. Work will not commence until the Northbridge Conservation Committee issues an Order of Conditions. Submittal of a NOI is expected by mid-July. An Order of Conditions is anticipated by mid-August and work will begin shortly after. 5.3 Property Access Issues The site is located upon property owned by the Town of Northbridge. It is the current location of the Northbridge DPW operations. The DPW uses portions of the site for storage of equipment and vehicles that will be temporarily moved for the implementation of the remedial action. There are no property access issues that are relevant to the implementation of the RIP. Implementation Issues Miscellaneous Implementation Miscellaneous Issues S-i Page 5-1 Page I: ~work~4Ol96~proj~phaseiv~rifr doe 1:\twork\40196 proj~haseiv~rip.doc P = P, -gI Figures . r - L 4. 1. I II I a. d. . E A R T H T E C H Source: USGS Topographic Map, Uxbridge, MA quad Figure 1 Site Location Map K:USW\33582\Figure .doc j -/ cit z 0 / / z 0 0 z w zz2 C, 0 0 ob W0.2 IL- o 1o -Q I I- 2 cJz fl Li 4 0+ it C .1 m LU0 Ld 0, in U.' IaL w 50 0 z WwI C4 fti :2, CD II / <I' CL~* dc 0 4 L ~7O f C C '1~ $ I w W5~ m 0 m $ 040 T m Di, rD 4 T(c -... S / U U 3 fl m - - a a - - a - - a a S a - Appendix A Comprehensive Response Action Transmittal Form & Phase I Completion Statement (BWSC-108) Massachusetts Department of Environmental Protection Bureau of Waste Site Cleanup BWSC-108 Release Tracking Number COMPREHENSIVE RESPONSE ACTION TRANSMITTAL FORM & PHASE I COMPLETION STATEMENT Pursuant to 310 CMR 40.0484 (Subpart D)and &40.0800 (Subpart H) D 2 - 11193 A. SITE LOCATION: Site Name: (optional) Street: Northbridge Department of Public Works Fletcher Street City/Town Location Aid: Whitinsville ZIP Code: Memorial Square 01588 Related Release Tracking Numbers that this Form Addresses: Tier Classification: (check one of the following) []Tier IA ]Tier IB DTier IC MTier |1 ENot Tier Classified If a Tier I Permit has been issued, state the Permit Number B. THIS FORM IS BEING USED TO: [] (check all that apply) Submit a Phase I Completion Statement, pursuant to 310 CMR 40.0484 (complete Sections A, B, C, G, H, I and J). Submit a Phase Il Scope of Work, pursant to 310 CMR 40.0834 (complete Sections A, B,C, G, H, I and J). F U Submit a final Phase It Comprehensive Site Report and Completion Statement, pursuant to 310 CMR 40.0836 (complete Sections A, B, C, D,G, H, I,and J). Submit a Phase liI Remedial Action Plan and Completion Statement, pursuant to 310 CMR 40.0882 (complete Sections A, B, C. G, H, I and J). Z Submit a Phase IV Remedy Implementation Plan, pursuant to 310 CMR 40.0874 (complete Sections A, B, C, G, H, I and J). FI Submit an As-Built Construction Report, pursuant to 310 CMR 40.0875 (complete Sections A, B, C, G, H, I and J). U Submit a Phase IV Final Inspection Report and Completion Statement, pursuant to 310 CMR 40.0878 and 40.0879 (complete Sections A, B, C, E, G, H, I and J). Submit a periodic Phase V Inspection & Monitoring Report, pursuant to 310 CMR 40.0892 (complete Sections A, B, C, G, H. I and J). Submit a final Phase V Inspection & Monitoring Report and Completion Statement, pursuant to 310 CMR 40.0893 (complete Sections A, B, C, F, G, H, I and J). You must attach all supporting documentation required for each use of form Indicated, Including copies of any Legal Notices and Notices to Public Officials required by 310 CMR 40.1400. C. RESPONSE ACTIONS: Check here if any response action(s) that serves as the basis for the Phase submittal(s) involves the use of innovative Technologies. (DEP is interested in using this information to create an Innovative Technologies Clearinghouse.) Describe Technologies: D. PHASE || COMPLETION STATEMENT: Specify the outcome of the Phase Il Comprehensive Site Assessment: D Additional Comprehensive Response Actions are necessary at this Site, based on the results of the Phase l1Comprehensive Site Assessment The requirements of a Class A Response Action Outcome have been met and a completed Response Action Outcome Statement (BWSC-104) will be submitted to DEP. The requirements of a Class B Response Action Outcome have been met and a completed Response Action Outcome Statement (BWSC-104) will be submitted to DEP. Rescoring of this Site using the Numerical Ranking System is necessary, based on the results of the final Phase Il Report. E. PHASE IV COMPLETION STATEMENT: Specify the outcome of Phase IV Comprehensive Site Assessment: Phase V operation, maintenance or monitoring of the Comprehensive Response Action is necessary to achieve a Response Action Outcome. (This site will be subject to Phase V Operation, Maintenance and Monitoring Annual Compliance Fee.) U of a Class A Response Action Outcome have been met. No additional operation, maintenance or monitoring is necessary to requirements The ensure the integrity of the Response Action Outcome. A completed Response Action Outcome Statement (BWSC-1 04) will be submitted to DEP. The requirements of a Class C Response Action Outcome have been met. No additional operation, maintenance or monitoring is necessary to ensure the integrity of the Response Action.Outcome. A completed Response Action Outcome Statement (BWSC-1 04) will be submitted to DEP. SECTION E IS CONTINUED ON THE NEXT PAGE Revised 3/30/95 ,, Supersedes Forms BWSC-010 (in part) and 013 Do Not Alter This Form Page 1 of 3 Massachusetts Department of Environmental Protection Bureau of Waste Site Cleanup COMPREHENSIVE RESPONSE ACTION TRANSMITTAL FORM & PHASE I COMPLETION STATEMENT Pursuant to 310 CMR 40.0484 (Subpart D) and & 40.0800 (Subpart H) BWSC-108 Release Tracking Number EI~Z1193 - E. PHASE IV COMPLETION STATEMENT: (continued) The requirements of a Class C Response Action Outcome have been met. Further operation, maintenance or monitoring of the remedial action is necessary to ensure that conditions are maintained and that further progress is made toward a Permanent Solution. A completed Response Action Outcome Statement (BWSC-1 04) will be submitted to DEP. Indicate whether the operation and maintenance will be Active or Passive. (Active Operation and Maintenance is defined at 310 CMR 40.0006.): 0 Active Operation and Maintenance 0 Passive Operation and Maintenance (Active Operation and Maintenance makes the Site subject to a Post-RAO-Class C Active Operation and Maintenance Annual Compliance Fee.) F. PHASE V COMPLETION STATEMENT: Specify the outcome of Phase V activities: The requirements of a Class A Response Action Outcome have been met and a completed Response Action Outcome Statement (BWSC-104) will be submitted to DEP. U The requirements of a Class C Response Action Outcome have been met. No additional operation, maintenance of monitoring is necessary to ensure the integrity of the Response Action Outcome. A completed Response Action Outcome Statement (BWSC-1 04) will be submitted to DEP. The requirements of a Class C Response Action Outcome have been met. Further operation, maintenance or monitoring of the remedial action is necessary to ensure that conditions are maintained and that further progress is made toward a Permanent Solution. A completed Response Action Outcome Statement (BWSC-104) will be submitted to DEP. Indicate whether the operation and maintenance will be Active or Passive. (Active Operation and Maintenance is defined at 310 CMR 40.0006.): 0 Active Operation and Maintenance 0 Passive Operation and Maintenance (Active Operation and Maintenance makes the Site subject to a Post-RAO Class C Active Operation and Maintenance Annual Compliance Fee.) G. LSP OPINION: I attest under the pains and penalties of perjury that I have personally examined and am familiar with the information contained in this transmittal form, including any and all documents accompanying this submittal. In my professional opinion and judgment based upon application of (i) the standard of care in 309 CMR 4.02(1), (ii) the applicable provisions of 309 CMR 4.02(2) and (3), and (iii) the provisions of 309 CMR 4.03(5), to the best of my knowledge, information and belief, > if Section B indicates that a Phase I, Phase 11,Phase III, Phase IV or Phase V Completion Statement is being submitted, the response action(s) that is (are) the subject of this submittal (i) has (have) been developed and implemented in accordance with the applicable provisions of M.G.L. c. 21E and 310 CMR 40.0000, (ii) is (are) appropriate and reasonable to accomplish the purposes of such response action(s) as set forth in the applicable provisions of M.G.L. c. 21 E and 310 CMR 40,0000, and (iii) complies(y) with the identified provisions of all orders, permits, and approvals identified in this submittal; > if Section B indicates that a Phase If Scope of Work or a Phase IV Remedy Implementation Plan is being submitted, the response action(2) that is (are) the subject of this submittal (i) has (have) been developed in accordance with the applicable provisions of M.G.L c. 21E and 310 CMR 40.0000, (ii) is (are) appropriate and reasonable to accomplish the purposes of such response action(s) as set forth in the applicable provisions of M.G.L. c. 21E and 310 CMR 40.0000, and (iii) complies(y) with the identified provisions of all orders, permits, and approvals identified in this submittal. > if Section B indicates that an As-Built Construction Report or a Phase V Inspecton and Monitoring Report is being submitted, the response action(2) that is (are) the subject of this submittal (i) is (are) being implemented in accordance with the applicable provisions of M.G.L c. 21 E and 310 CMR 40.0000, (ii) is (are) appropriate and reasonable to accomplish the purposes of such response action(s) as set forth in the applicable provisions of M.G.L. c. 21E and 310 CMR 40.0000, and (iii) complies(y) with the identified provisions of all orders, permits, and approvals identified in this submittal. I am aware that significant penalties may result, including, but not limited to, possible fines and imprisonment, if I submit information which I know to be false, inaccurate or materially incomplete. Check here if the Response Action(s)on which this opinion is based, if any, are (were) subject to any order(s), permit(s) and/or approval(s) issued by DEP or EPA. If the box is checked, you MUST attach a statement identifying the applicable pr ' LSP Name: Joseph Vitale LSP #: 6746 Telephone: (978) 371-4000 Ext.: 4124 FAX: (optiornal) (978) 371-2468 Stamp: Signature: Date: Revised 3/30/95 / 1o0o Supersedes Forms SWSC-010 (in part) and 013 Do Not Alter This Form Page 2 of 3 I BWSC-108 Massachusetts Department of Environmental Protection Bureau of Waste Site Cleanup U Release Tracking Number COMPREHENSIVE RESPONSE ACTION TRANSMITTAL FORM & PHASE I COMPLETION STATEMENT u Pursuant to ,310 M fR 40.0 484 (ubpa 2 rtD) and &40.0800 (u pa rI H) - 1193 H. PERSON UNDERTAKING RESPONSE ACTION(S): Town of Northbridge Name of Organization: Name of Contact: Mr. Richard Sasseville, P.E. Title: Director of Public Works State: MA P.O. Box 88 Street: City/Town: Telephone: Whitinsville Ext.: (508) 234-3581 FAX: (optional) ZIP Code: 01588' (508) 234-0807 Check here if there has been a change in the person undertaking the Response Action. I I.RELATIONSHIP TO SITE OR PERSON UNDERTAKING RESPONSE ACTION(S): RP or PRP r] Specify: 0 Owner 0 Operator 0 Generator (check one) 0 Transporter Other RP or PRP: Fiduciary, Secured Lender or Municipality with Exempt Status (as defined by M.G.L. c. 21E, s. 2) Agency or Public Utility on a Right of Way (as defined by M.G.L. c. 21 E, s. 5()) Specify Relationship: Any Other Person Undertaking Response Action J. CERTIFICATION OF PERSON UNDERTAKING RESPONSE ACTION(S): , attest under the pains and penalties of perjury (1)that I have personally examined and am Richard Sasseville familiar with the information contained in this submittal, including any and all documents accompanying this transmittal form, (ii) that, based on my inquiry of those individuals immediately responsible for obtaining the information, the material information contained inthis submittal is, to the best of my knowledge and belief, true, accurate and complete, and (iii) that I am fully authorized to make this attestation on behalf of the entity legally responsible for this submittal. I/the person or entity o whose behalf this submittal is made am/is aware that there are significant penalties, including, but not limited to, possible fines and imprisonment, for illfully submitting false, inaccurate, or incomplete information. 1, Title: By: Director of Public Works (signature) For Town of Northbridge (print name of person or entity recorded in Section H) Date: Q tV Enter address of the person providing certification, if different from address recorded in Section H. Street: State: City/Town: Telephone: Ext.: ZIP Code: FAX: (optional) YOU MUST COMPLETE ALL RELEVANT SECTIONS OF THIS FORM OR DEP MAY RETURN THE DOCUMENT AS INCOMPLETE. IF YOU SUBMIT AN INCOMPLETE FORM, YOU MAY BE PENALIZED FOR MISSING A REQUIRED DEADLINE. Revised 3130/95 Supersedes Forms BWSC-010 (in part) and 013 Do Not Alter This Form Page 3 of 3 I I I I U' U U U I, I I I I I I I I U I a Appendix B P 4 Technical Specifications TABLE OF CONTENTS TECHNICAL SPECIFICATIONS 01025 02100 02210 02220 02230 02503 Measurement and Payment (not included in this submittal) Site Preparation Temporary Erosion Control Earthwork Excavation and Management of Hazardous Materials Paving END OF SECTION SECTION 02100 SITE PREPARATION PART I GENERAL 1.01 SCOPE A. The work of this section includes all labor, equipment, tools, and materials necessary for the performance of all operations in connection with clearing and grubbing, and the removal of pavement, curbing and all incidental and appurtenant work pertaining thereto, as specified herein, and as shown on the drawings. MEASUREMENT AND PAYMENT 1.02 A. Measurement and payment for the work described in this section will be made in accordance with the provisions of SECTION 01025, MEASUREMENT PAYMENT. 1.03 SUBMITTALS (NOT USED) 1.04 PRODUCT HANDLING (NOT USED) 1.05 SPECIAL REQUIREMENTS 40196 AND A. Prior to the performance of any work of this section or any related work required by other sections of the specifications, the Limit of Work Line shall be laid out and staked in the field by the Contractor, according to the drawings. The Contractor shall be responsible for maintaining the Limit of Work Line during the construction operation. B. At all times throughout the duration of this contract, the Contractor shall be responsible for the appearance and condition of the area within and surrounding the project site. The Contractor shall repair or replace, at no additional expense to the Owner, any structures, either natural or man-made such, as but not limited to, utilities, trees, plants, water bodies, and pavements that are damaged or destroyed by any actions or sequences of events related to the Contractor's operations. C. Any existing plant materials designated to be saved, protected and/or undisturbed, that are cut or damaged without prior approval of the Engineer, shall be replaced in kind and size by the Contractor, at no expense to the Owner. If the Engineer agrees that tree replacement is impossible or impractical, the Contractor shall pay the Owner monies at a rate of $400.00 per inch of the tree trunk diameter, This diameter measurement will be taken at a height of two feet six inches up from the average natural grade around the base of the tree. D. Disposal of waste/surplus materials may involve securing permits, licenses, or approvals, which may vary according to the type of material to be disposed of prior to the start of construction. The Contractor shall apply for these, as they may be required by the various governing agencies and pay all required fees. The Contractor shall have sole responsibility for the legal disposal of all waste surplus material of this project excluding 02100-1 OHM. The Owner will coordinate disposal of OHM materials. The Contractor shall be responsible for any and all fines due to any illegal activity with regards to the disposal of waste/surplus materials. PART 2 PRODUCTS (NOT USED) PART 3 EXECUTION 3.01 GENERAL REQUIREMENTS A. All graded areas, and all areas within the Limit of Work Line on which proposed work is to be completed, shall be cleared and grubbed as may be needed and as indicated on the drawings. B. The Contractor shall be careful to note any areas that may be designated on the drawings to receive only selective clearing and thinning. 3.02 CLEARING, GRUBBING, TREE AND STUMP REMOVAL A. Trees 1. Preparation of the site shall include the complete removal of all trees within the Limit of Work Line, except in those areas where selective clearing and thinning is required. 2. Any trees within the Limit of Work Line not to be removed shall be protected from damage during clearing and construction operations by barriers or by such other methods as conditions may require. No construction materials or debris shall be stored or stockpiled, or vehicles parked or operated within the limits of the branch spread of the trees to be saved. 3. Clearing operations shall be performed in a manner which will prevent damage by falling trees to trees left standing or to structures under construction, and by methods which will provide for the safety of employees and other persons. 4. Limited clearing and thinning shall be performed in areas identified on the drawings, as required or as directed by the Engineer. This work will involve the removal of brush, small trees, dead, damaged and/or diseased trees. The Engineer will tag or otherwise mark and designate trees and brush to be saved, 5. Where branches of trees which are to be saved interfere with the work, limbs and branches shall be trimmed off neatly and cleanly close to the bole of the tree or to main branches. Cut surfaces shall be painted with a tree wound paint. Pruning shall be done only by persons experienced with this work, with the work conforming to the latest revisions of the National Arborist Association "Pruning Standards for Shade Trees". 6. 40196 All trees which are designated to be removed shall become the property of the Contractor to be disposed of by sale or otherwise, provided that such material shall be removed from the property of the Owner before the completion of the 02100-2 site clearance work. The Owner assumes no responsibility for the protection and safekeeping of such materials. The Contractor shall be responsible for all taxes, if any, incurred in the sale of materials. B. 3.02 Grubbing shall consist of the grubbing up, removal and disposal of all stumps, roots larger than 6 inches in diameter, and matted root formations from the designated areas. All rocks or boulders near the existing surface grade, which may interfere with planned construction operations, shall be removed and disposed of as surplus/waste material, (or used as fill, where specifically permitted by the Engineer.) DISPOSAL OF WASTE MATERIALS A. Disposal of Cleared and Grubbed Materials 1. B. 3.03 No burning of combustible material will be permitted. Remove all cleared material from the work site and dispose of it in accordance with local laws, codes, and ordinances. All waste materials shall be satisfactorily and legally disposed of off site by the Contractor. SEDIMENT AND EROSION CONTROL A. The Contractor shall take such actions as may be required to ensure that his construction activities do not interfere with or adversely impact the hydraulic characteristics or aesthetic qualities of any natural or manmade watercourse or drain. B. The Contractor shall provide acceptable siltation control devices such as haybale sediment control devices or permanent or portable control basins for the settling or filtering of fine sands, silts and clay resulting from rainfall runoff or dewatering operations. Any natural areas or manmade structures which have been affected by siltation or erosion due to construction activities shall be restored to their preconstruction condition by the Contractor at no additional cost to the Owner. C. For more specific requirements for control of erosion and siltation, refer to SECTION 02210, TEMPORARY EROSION CONTROL. 3.04 40196 PROTECTION A. Before site preparation begins, protect trees and areas to remain uncleared with snow fencing to the approximate diameter of foliage to prevent damage to the trunk, foliage and root system by construction equipment and procedures. Fencing shall be maintained by the Contractor. B. The Contractor shall mark the limit of the work area as shown on the drawings by accurate field survey and shall meet with the Engineer prior to beginning site preparation. Prepare only areas affected within the contract limits, except trees and structures designated to remain. Adjust limits as directed by the Engineer. 02100-3 C. Conduct operations with a minimum of interference to public or private accesses and facilities. Maintain access and egress at all times and clean or sweep any roadways daily or as required by the governing authority. At such times as deemed necessary by the Engineer, dust control shall be provided with sprinkling systems or equipment provided by the Contractor. D. During the work, protect bench marks, property corners and all other survey monuments from damage or displacement. If a marker needs to be removed, it shall be referenced by a licensed land surveyor and replaced, as necessary, by the same. E. During the work, the Contractor shall protect existing groundwater monitoring wells, trees, shrubbery, and other vegetation and structures not designated for removal from damage resulting from the work. Cut and remove tree branches only where, in the opinion of the Engineer, such cutting is necessary to effect construction operation. Remove branches other than those required to effect the work to provide a balanced appearance of any tree, as approved prior to removal. Scars resulting from the removal of branches shall be treated with an approved tree sealant. F. The Contractor shall be responsible, at his cost, to repair or replace immediately any damage to existing trees or root systems that are to remain. The Contractor shall hire a licensed arborist to determine the repair and replacement needs and methods. G. Replace damaged trees and shrubs designated to remain with the same size and species. H. Keep roads and walks free of dirt and debris at all times. I. Protect existing utility lines and structures to remain. Notify the Engineer immediately of damage to or an encounter with an unknown existing utility line or structure to remain. The Contractor shall be responsible for the repair of damage to existing utility lines or structures to remain that are indicated or made known to the Contractor prior to the start of clearing operations. END OF SECTION 40196 02100-4 SECTION 02210 TEMPORARY EROSION CONTROL PART I GENERAL 1.01 SCOPE A. 1.02 Section Includes: 1. The work of this section includes the furnishing of all labor, materials, tools, equipment, accessories and appurtenances necessary to satisfactorily complete the installation of temporary erosion control measures, primarily silt fence and haybales, not specified elsewhere, and all incidental work pertaining thereto within the limits c f the work indicated or required as specified herein and as directed by the Eng ineer. 2. Temporary erosion control measures designed to control erosion and sediment transport during and immediately after the Work associated with these Contract Documents. MEASUREMENT AND PAYMENT A. 1.03 Measurement and paymer.t for the work described in this section will be made in accordance with the provisions of Section 01025, MEASUREMENT AND PAYMENT. SUBMITTALS A. Prior to the start of the construction, the Contractor shall submit to the Engineer for acceptance his written schedules for accomplishment of the temporary and permanent erosion and sediment contr->l work, as are applicable, for clearing and grubbing, grading, structures at water courses, and construction. No work shall be started until control schedules and methods of operations have been accepted by the Engineer. B. Submittals required under 1his section includes, but are not limited to, the following: I. 1.04 40196 Silt Fence. RELATED SECTIONS A. Section 02100 - SITE PREARATION B. Section 02220 - EARTH WORK 02210-1 1.05 REFERENCES A. ASTM: American Society for Testing and Materials: I. ASTM D3786: Test Method for Hydraulic Bursting Strength of Knitted Goods and Nonwoven Fabrics: Diaphragm Bursting Strength Tester Method. PART 2 PRODUCTS 2.01 HAY BALES A. 2.02 Baled hay shall be at approximately 14 by 18 by 30 inches, or equivalent, securely tied to form a firm bale. Stakes for hay bales shall be standard 1/2 inch reinforcing steel rods, steel pickets, least 2-inch by 2-inch wood stakes, or approved equal. SILT FENCE A. Mirafi Envirofense, Amaco 1380 Silt Stop, Linq GTF- 180 or approved equal. B. Posts: C. I. Either hardwood posts or steel posts may be used. 2. Hardwood posts shall be straight, at least 54 inches long and at least 1-% inch by 1-MA inch. 3. Staples shall be of No. 9 wire. 4. Steel posts shall be at least 5 feet long and have projections for fastening wire to the fence. Reinforcing Cord (required): I. The top 32 inches of the fence shall be supported reinforcing mesh or shall have at least 6 horizontal wires. If wires are used, vertical wires shall be spaced no more than 6 inches apart. The top and bottom wires shall be at least 10 gage; all other wires at least 12 gage. D. Silt Fence Fabric: 1. 40196 The geotextile fabric and components shall be made from polypropylene, polyester, polymide or other chemically stable material and be resistant to ultraviolet radiation degradation. Apparent opening size (U.S. sieve number equivalent) of 20 based on ASTM D4751. Silt retention capacity shall be no less than 75 percent. The fabric shall have a Mullen bursting strength of no less than 200 pounds per square inch (ASTM D3786). Roll width of the fabric shall be no less than 36 inches. 02210-2 PART 3 EXECUTION 3.01 GENERAL A. 3.02 Sediment and erosion control measures shall be installed, maintained, and constructed in accordance with these Contract Documents and as directed by the Engineer. HAYBALES A. B. Haybales shall be installed at the following locations, as directed by the Engineer and as shown on the Contract Documents. 1. Toe of slope of embankment construction. Baled hay barricade is to filter all off-site discharges. 2. Toe of temporary earthwork stockpiles as directed by the Engineer. 3. Across construction ditches prior to entry into drainage system or waterway. 4. Each side of completed drainage inlets and catch basins. 5. Other locations shown on the Contract Drawings or designated by the Engineer. Tightly abut hay bales to form a continuous barrier. Secure bales in place with two stakes per bale. The bales shall be trenched 4 inches into the ground, and shall be staked with 1-4 inch by 1-% inch wood stakes. Work shall be conducted only on the upslope sides of the bales. Deteriorated, destroyed, or rotted bales shall not be used and shall be replaced immediately. Sediment shall be removed and disposed of periodically from behind the hay bales; in no case shall the accumulated sediment be allowed to rise above the mid-height of the bale. All sediment shall be removed and disposed of in an approved manner at the completion of the Contract. Hay bales and appurtenances shall be removed and disposed of at the completion of the Contract unless directed otherwise by the Engineer. 3.03 40196 SILT FENCE A. Silt fence shall be installed before any excavation, filling, grading, clearing, or Work specified in Section 02220 begins. B. Silt fence shall be installed as shown on the Contract Documents. C. Supporting posts shall be placed with a maximum spacing of 4 feet on center, and driven at least two feet into the ground. D. Fabric shall be anchored in a 4-inch-deep trench dug on the upslope side of the posts. The trench should be at least 6 inches wide. The fabric is to be laid in the trench, and the trench backfilled and compacted over the fabric. E. Fabric rolls shall be spliced only at fence posts. At splice locations, fabric shall be overlapped 6 inches, folded over, and securely fastened to the fence posts. 02210-3 F. 3.04 Silt fences are to be inspected immediately after construction, after each run-off event, and at least daily during prolonged rainfall. DUST CONTROL A. 3.05 The exposed soil surface should be moistened periodically, or as directed by the Engineer, with adequate water to control dust. The use of calcium chloride will not be allowed. MAINTENANCE AND EVALUATION OF MEASURES A. 3.06 The erosion control devices and measures shall be inspected at least weekly, after each storm event, and more often if necessary, to assure continuous effectiveness. All deficiencies shall be corrected immediately by the Contractor. Maintain devices and measures during periods of suspension or until otherwise directed by the Engineer. REMOVAL OF DEVICES A. When no longer needed, material and devices for temporary erosion control shall be removed or may be left in place and dispersed over the adjacent area, as directed by the ' Engineer. B. When dispersed over adjacent areas, the material shall be scattered to the extent that it causes no unsightly conditions nor creates future maintenance problems. Dumped stone shall be dispersed or covered in such a manner that it will not interfere with future mowing operations. C. When removed, such devices may be reused in other locations provided they are in good condition and suitable to perform the erosion control for which they are intended. END OF SECTION 40196 02210-4 SECTION 02220 EARTHWORK PART ] 1.01 A. 1.02 A. 1.03 GENERAL SCOPE The work of this section includes the furnishing of all labor, materials, tools, equipment, accessories and appurtenances necessary to satisfactorily complete all stripping of topsoil, excavation of earth and rock, stockpiling, removal of unsatisfactory materials, backfilling, filling, compaction, and grading not specified elsewhere, and all incidental work pertaining thereto within the limits of the work indicated or required as specified herein. MEASUREMENT AND PAYMENT Measurement and payment for the work described in this section will be made in accordance with the provisions of SECTION 01025, MEASUREMENT AND PAYMENT. SUBMITTALS A. Shop drawings and brochures shall be submitted for all items to be furnished in accordance with the provisions of the DOCUMENT 00700, GENERAL CONDITIONS. B. Submittals required under this section includes, but are not limited to, the following: 1. Materials Testing Results 2. Materials Brochures 1.04 PRODUCT HANDLING - NOT USED 1.05 PROTECTION OF WORK A. The Contractor shall prosecute the work so that no damage occurs to adjacent utilities, structures, property, or any other installation located in or adjacent to work areas. Damaged utilities shall be repaired with similar or better materials of the same size and to the requirements of the utility owner. The Contractor shall have on site the necessary manpower, materials and equipment such as pumps, piping, and the like as required to protect and maintain uninterrupted flows in existing utilities during construction. B. Excavations shall be kept free from water, snow and ice during construction. Bedding and backfill material shall not be placed in water. Water shall not be allowed to rise upon or flow over bedding and backfill material. C. The Contractor shall maintain all benchmarks, monuments and other reference points and, if disturbed, shall replace them at no additional cost to the Owner. D. Excavating equipment shall be of such size and type, and used in a manner, that will not damage existing items such as but not limited to paved surfaces, utilities, structures, trees. E. The finished subgrade shall not be disturbed by traffic or other operations and shall be maintained by the Contractor in a satisfactory condition until the finished surfaces are placed. Until the subgrade has been observed by the Engineer, no pavement materials shall be installed thereon. F. The Contractor shall take whatever steps necessary to prevent catch basins and drain lines from receiving silt and sediment washed from project work areas. The Contractor shall clean out catch basins and drain lines that have not been successfully protected. 40196 02220-1 PART 2 2.01 A. PRODUCTS MATERIALS Fill materials, meeting the following requirements, shall be used in the areas shown on the drawings or where specified herein. Fill materials may be obtained from either on-site excavations or from off-site sources as appropriate. 2.02 A. COMMON FILL Common fill shall be granular material, consisting of hard, sand and gravel with less than 35 percent passing the No. 200 sieve, when tested in accordance with ASTM C136 and ASTM C1 17 and shall be free of organic matter, trash, roots or other deleterious material. B. 2,03 Common fill material shall contain no stone measuring greater in any dimension than two-thirds of the loose lift thickness or 12 inches whichever is smaller. Common fill material shall be capable of forming a firm, stable base when spread and compacted. In addition, the common fill shall be non-plastic (plasticity index zero, defined as liquid limit minus plastic limit). Any materials, excavated from the site, not conforming to this common fill specification, shall be legally disposed of by the Contractor and replaced with approved material, as required, at no additional cost to the Owner. GRAVEL FILL (Not required) A. Gravel fill shall consist of hard, durable gravel and sand, free from trash, organic matter and clay, surface coatings, and other deleterious materials. B. Gravel fill shall have a maximum stone size of two thirds of the loose lift thickness or 8 inches whichever is smaller. Gravel fill used for pipe bedding shall have a maximum stone size of 2 inches. That portion passing the 4 inch sieve shall meet the following gradation requirements, as determined by ASTM C136 and ASTM Cl 17: 2.04 U.S. Sieve Size Percent Passing 4 inch 1/2 inch No. 40 No. 50 No. 200 100 50-85 34-75 8-28 0-10 SELECT FILL (Not required) A. Select fill shall consist of hard durable sand or sand and gravel, free from trash, organic matter, clay, surface coatings and other deleterious materials. B. Select fill placed between the mid-height of a pipe and 12 inches above a pipe shall have a maximum stone size of 4 inches. Select fill used for other purposes shall have a maximum stone size of two thirds of the loose lift thickness and that portion passing the 4 inch sieve shall meet the following gradation requirements, as determined by ASTM C136 and ASTM C 117: 40196 U.S. Sieve Size Percent Passing 4 inch No. 10 No. 40 No. 200 100 30-100 0-70 0-15 02220-2 2.05 CRUSHED STONE A. Crushed stone shall consist of clean, crushed, non-porous rock, or crushed gravel, uniformly blended. B. Crushed stone shall meet the following gradation requirement as determined by ASTM C136 and ASTM C117. PART 3 3.01 A. B. 3.02 A. 40196 U.S. Sieve Size Percent Passing 1 inch 3/4 inch 1/2 inch 3/8 inch No. 4 No. 10 100 90-100 20-55 0-15 0-5 0-2 EXECUTION PREPARATION Stripping 1. Prior to any excavation, filling, or grading operations, all topsoil and subsoil or similar organic soils found within the Limit of Work line shall be stripped to their full depth in the area of all structures and in all areas required to be filled, excavated or graded. 2. Stripped materials suitable for re-use as loam shall be stockpiled. Stockpiles shall be kept separate and not mixed with other materials. Excess stripped materials and unacceptable materials shall be legally disposed of off-site by the Contractor unless otherwise specified. Pavement Cutting 1. Where excavations are to be made in paved or surface treated areas, the pavement shall be cut with a pavement saw or wheel cutter prior to excavation unless otherwise noted. 2. In areas where the trench width is greater than the original cut, the pavement shall be re-cut prior to paving. EXCAVATION General 1. Excavation shall consist of the removal of soil, rock, and other materials to the limits shown on the drawings, specified herein, and as required to provide firm bearing. No structures, pavements, utilities or fill materials of any kind shall be placed in, or upon excavated areas until such areas have been observed by the Engineer. 2. Rippable rock shall be considered earth excavation. Rippable rock is defined as rock which can be excavated using a single tooth hydraulic ripper pulled by a D8 Dozer or equivalent equipment. 3. Excavated materials meeting the requirements for the various fill materials specified herein shall be stockpiled for reuse. Unsuitable or Excess suitable materials shall be legally disposed of off-site by the Contractor unless otherwise specified. 4. Excavation shall be to the limits as necessary to install foundations, utilities, pavement or other facilities unless otherwise specified. Excavation of unsuitable material beyond the limits necessary shall only be performed as authorized by the Engineer. 02220-3 B. C. 5. The proposed contour lines and spot grades shown on the drawings are finish elevations. Excavation to subgrade shall be the distance below these elevations as may be required by the size and thickness of pavements, structures, utilities and surface treatments as shown on the drawings, details and sections, or as specified herein. 6. Over-excavation beyond the specified or detailed limits shall be backfilled and properly compacted by the Contractor and at no additional cost to the Owner. 7. No spread foundations shall be founded partially on rock and partially on soil. In this event the rock shall be excavated to a minimum depth of 12 inches below the bottom of foundation and compacted gravel fill placed to the bottom of foundation unless otherwise shown on the drawings. 8. Excavating equipment shall be of such size and type, and operated in a manner, that will not damage items such as, but not limited to, existing paved surfaces, utilities, structures and trees. 9. The Contractor shall, at his own expense, be responsible to make excavations under guy wires, along side of poles, buildings, and other objects as necessary to complete the work. This may require the Contractor to perform hand excavation. The Contractor has the full responsibility for this work for which there shall be no special compensation unless otherwise noted herein. The relocation of utility poles, and the like, shall be done at the Contractor's expense, Trench Excavation 1. Trench excavation shall consist of the removal of all materials encountered. Excavations shall be made to accommodate the elevation, depth of cover, or detail shown on the drawings or specified. Trench widths shall be kept to the minimum practicable but shall be at least three feet wide or two feet plus the diameter of the pipe, whichever is greater. The bottom of the trenches shall be firm and free of water and shall be accurately graded and shaped to allow placement of required bedding beneath the bottom of all barrels, bells or couplings of all pipes installed. 2. Design criteria require that pipe be laid in trench conditions, therefore trenches for utilities in fil areas shall be excavated after all fill materials have been placed, spread and compacted to an elevation at least one foot above the top of the proposed utility. This requirement is necessary to fulfill design criteria and should not be construed as a dictation of the Contractor's means and methods of construction. 3. If, through the Contractor's error, the excavations are carried beyond the specified limits, or if inadequate dewatering causes softening of the subgrade which necessitates removal, backfill shall be with gravel fill, placed and compacted as specified hereinafter under Trench Backfilling. Backfill shall be performed at no additional cost to the Owner. 4. When trenching occurs around trees to remain, the tree roots shall not be cut but rather, the trench shall be tunneled under or around the roots by careful hand digging and without injury to the roots. Excavation in Graded Areas I. D. Excavation of Unsuitable Foundation Materials Below Trench Grade and/or Subgrade 1. 40196 Excavation in graded areas shall be performed as necessary to bring such areas to proper subgrade or finish grade.. Existing soils, which are considered unsuitable foundation materials by the Engineer, shall be removed to the limits directed by the Engineer. The lateral limit for the excavation of unsuitable material beneath structures shall be defined as the intersection point, with suitable subgrade material, of an imaginary line drawn downward at a 45 degree angle from the outside edge of the foundation. 02220-4 2. G. H. 3.03 A. 40196 The exposed subgrade shall be compacted and the area backfilled with gravel fill. The Engineer shall be present during the excavation of all unsuitable soils in order to permit verification of the limits of and volume of material removed. Experimental Excavation I. The Contractor shall make excavations at locations authorized by the Engineer, for the purpose of confirming the location and depth of existing utilities or structures. 2. Additional experimental excavations shall be requested by the Contractor to precisely locate utilities and underground structures which may be affected by his work. The Contractor shall backfill the experimental excavations with materials meeting the specification for common fill, unless directed otherwise by the Engineer. Backfill of experimental excavation shall be compacted in accordance with the requirements for Trench Backfilling. Temporary Stockpiles 1. Soil shall be stockpiled in a location approved by the Owner that does not prohibit any construction and/or operations on the site. Stockpiled soil shall be covered with polyethylene sheeting with a thickness no less than 20 mils. 2. Removed bituminous concrete shall be stockpiled in a location approved by the Owner that does not prohibit any construction and/or operations on the site. Stockpiled bituminous concrete shall be covered with polyethylene sheeting with a thickness no less than 20 mils. 3. Slopes of stockpiles shall be maintained in a stable condition and shall, so far as practicable, be graded reasonably smooth. The stockpile area shall be graded to allow free drainage, to minimize erosion and to minimize to the extent practical, the infiltration of water into the stockpile. Adequate drainage pathways shall be provided around the areas. During wet weather and immediately prior to periods when work will cease for more than 24 hours, the Contractor shall roll the surface to reduce the infiltration of water. 4. The Contractor maintains the responsibility of ensuring the stockpile is covered by polyethylene sheeting until proper disposal to a licensed recycling or disposal facility. 5. At the completion of the stockpiling the area shall be graded, as required, to provide a safe and neat appearance. GRADING General 1. The areas to be graded shall be raked or machine-graded to remove stones and other unsatisfactory material and then shall be compacted as specified. Any depressions which occur during the compaction operation shall be filled with additional suitable material and the surface then regraded and compacted until true to line and grade as required. 2. The work includes all grading required including shaping, trimming, compacting and finishing of the surfaces. The grading of shoulders and sloped areas may be done by machine methods. Up to 2 inches in 10 foot tolerance will be permitted on slopes over 2 percent, and 1 inch in 10 foot on slopes under 2 percent provided the slopes are uniform in appearance and without abrupt changes. All ruts shall be eliminated. The maximum deviation from finished grade shall be plus or minus one inch. 3. Grading of subgrades for paved areas shall be finished at the required depth below and parallel to the proposed surface with 1/2 inch in ten foot tolerance. 4. Stones larger than four inches in largest dimension shall not be present in the upper six inches of fill. Grading operations shall be completed after the buildings have been finished, the utilities installed, the site improvements constructed, and all materials, rubbish and debris removed from the site. 02220-5 B. Finish Grades 1. Finish grades shall be as indicated, and unless otherwise specified, excavations and fills shall be carried to proper subgrade levels below finish grades and contours shown, to allow for finish work. 2. The subgrade for areas on which pavement is to be placed shall be finished to the required depth below and parallel to the proposed pavement surface, after any pipes in the paved area are in place and tested. I. The grading of the slopes and other areas to be loamed may be done by machine methods and a tolerance will be permitted in slopes as specified above, provided the slopes are uniform in appearance and without abrupt changes. Grading Around Trees C. 1. 3.04 Where excavating, filling or grading is required within the branch spread of trees that are to remain, the work shall be performed as noted below: a. When the existing grade at the tree is below the new finished grade, and fill not exceeding sixteen inches is required, crushed stone shall be placed directly around the tree trunk. The stone shall extend out from the trunk on all sides a minimum of 18 inches and finish approximately two inches above the finished grade at tree. New earth shall not be left in contact with the trunks of any trees requiring fill. b. Existing trees in areas where the new finished grade is to be lowered, shall have regrading work done by hand to elevation as indicated. Roots as required shall be cut cleanly three inches below finished grade and scars covered with tree paint. CLEAN-UP A. Where hardened surfaces or roadways, driveways, or walls are dug up or interfered with, special attention shall be given to the refill and the consolidation before its resurfacing and it shall be done and redone as may be required to make the premises safe at all times and to give the required result. B. The Contractor shall continually provide street sweeping on roadways used by his vehicles in order to reduce dust, siltation and nuisance problems. END OF TEXT 40196 02220-6 SECTION 02230 EXCAVATION AND MANAGEMENT OF HAZARDOUS MATERIALS PART I 1.01 GENERAL WORK INCLUDED A. The work covered by this section consists of furnishing all labor, equipment, and materials; and performing all operations in connection with excavation of hazardous materials, transportation and storage. The work also includes monitoring air quality, determining and providing worker health and safety protection for all contractor personnel during the construction of the work and particularly upon exposure or excavation of contaminated soil or water that may be present onsite. B. Work covered by this section includes earthwork. 1.02 A. 1.03 RELATED SECTIONS Section 02220 - Earthwork REQUIREMENTS A. The Contractor's attention is directed to the fact that the work site is located in area where soil contaminated with hazardous material may be encountered during excavation and earthwork for this project. B. The Contractor is required to (monitor, observe) working conditions at all times during construction and, if it is found to be necessary, to provide appropriate protective clothing, equipment and facilities for personnel, and to establish workplace procedures to ensure their safety, and to enforce the use of these procedures, equipment and facilities in accordance with the requirements listed in the Referenced Standards. 1.04 REFERENCE STANDARDS A. NIOSH/OSHAJUSCG/EPA: "Occupational Safety and Health Guidance Manual for Hazardous Waste Site A'ctivities," October 1985, DHHS (NIOSH), Publication 85-115. B. Occupational Health and Safety Administration (OSHA) Standards and Regulations Title 29 CFR 1910 and 1926. C. Mass. DEP: Policy WSC - 400-89 "Management procedures for Excavated Soils Contaminated with Virgin Petroleum Oils." A copy of this policy is included in the Appendix of this Project Manual. D. Mass. General Laws: 1. 2. 40196 C.21C, Mass. Hazardous Waste Management Act C.2 I E, Oil and Hazardous Material Release Prevention and Response Act 02230-1 E. Code of Mass. Regulations (CMR): 1. 2. 1.05 310 CMR 40.000, (MCP) Mass. Contingency Plan 310 CMR 30.00, Hazardous Waste Regulations TRANSPORTATION OF EXCAVATED MATERIAL A. The transportation of excavated material from this project for temporary storage does require a bill of lading and an approval from the regional DEP Office or the use of licensed hazardous waste transporters. B. The transportation of excavated material from this project site or temporary storage area to its final destination does require a bill of lading and an approval from the Regional DEP Office. 1.06 A. PART 2 2.01 PART 3 3.01 A. TEMPORARY STORAGE OF EXCAVATED MATERIAL Temporary storage of excavated material from this project shall be in conformance with the industry standards and as directed by the Owner and Engineer. PRODUCTS Refer to Section 02220 Earthwork PRODUCTS EXCAVATION OF CONTAMINATED SOILS In accordance with the Department of Environmental Protection's "Management Procedures for Excavated Soils Contaminated with Virgin Petroleum Oils, Policy #WSC-400-89," the Contractor shall be required to provide for the transportation, storage, treatment and disposal, or reuse of excavated soils contaminated with virgin petroleum oils. Sampling of excavated soils will be done by the Engineer (2 portable Photoionization detector, PID, readings per pipe length in accordance with DEP Jar Headspace Analytical Screening Procedure) to determine the disposition of excavated soils. B. When the excavated soils concentrations are greater than 10 ppm, but less than 100 ppm total headspace volatiles, the Contractor shall be required to excavate the top half of the trench depth and segregate. The Contractor shall then remove the bottom half of the trench depth and segregate. C. When the excavated soils concentrations are greater than 100 ppm total headspace volatiles, the Contractor shall be required to have the excavated soils transported to an approved petroleum soil treatment/disposal facility or landfill. 3.02 BACKFILL WITH CONTAMINATED SOILS A. In accordance with the Department of Environmental Protection's "Management Procedures for Excavated Soils Contaminated with Virgin Petroleum Oils, Policy #WSC-400-89," the Contractor shall be required to provide for the storage, treatment and disposal, or reuse of excavated soils contaminated with virgin petroleum oils. Sampling of excavated soils will be done by the Engineer (2 portable Photoionization detector, PID, readings per pipe length in accordance with DEP Jar Headspace Analytical Screening Procedure) to determine the disposition of excavated soils. B. When the excavated soil concentrations are less than 10 ppm total headspace volatiles, the excavated soil may be reused as backfill in accordance with the above specifications. C. When the excavated soils to be used in backfilling have PID concentrations greater than 10 ppm, but less than 100 ppm total headspace volatiles, the Contractor shall backfill the trench using the 40196 02230-2 top half of the excavated soil as the bottom half of the trench depth backfill and the bottom half of excavated soil as the top half of the trench depth backfill. All backfilling shall be in accordance with the above specifications. D. At a location to be designated by the Engineer, the Contractor shall backfill using soil located in designated storage area if accordance with Section 3.03, E, 3. END OF SECTION 40196 02230-3 SECTION 02503 PAVING PART I 1.01 A. 1.02 A. GENERAL SCOPE The work covered by this section of the specifications includes furnishing all labor, equipment, tools, and materials, and in performing all operations in connection with roadway pavement overlay, and the replacement of existing paved surfaces, tack coat installation of [granite curbing] [precast concrete curbing], [bituminous concrete curb], [bituminous concrete berm], cement concrete sidewalks, bituminous concrete sidewalks, guard rails, pavement markings, and all incidental work pertaining thereto as indicated on the drawings and as specified herein. MEASUREMENT AND PAYMENT Measurement and payment for work described in this section will be made in accordance with the provisions of SECTION 01025, MEASUREMENT AND PAYMENT. 1.03 SUBMITTALS A. Shop drawings and material reports shall be submitted for all items to be furnished in accordance with the provisions of DOCUMENT 00700, GENERAL CONDITIONS. B. Submittals required under this section include, but are not limited to the following: 1. Material reports for bituminous concrete pavement job mix formula and tack coat. 2. Material report (job mix formula) for cement concrete. 1.04 PRODUCT HANDLING - NOT USED 1.05 ENVIRONMENTAL CONDITIONS A. Permanent paving shall be placed only when the underlying surface is dry, when the atmospheric temperature in the shade is above 40 degrees F, and when the weather is not foggy or rainy, provided, however, that the Engineer may permit, in case of sudden rain, the placing of mixture then in transit from the plant, if laid at proper temperature and if the roadbed is free from pools of water. Such permission shall in no way relax the requirements for quality of the pavement and smoothness of surface. B. No material shall be laid upon a frozen base course or when wind conditions are such that rapid cooling will prevent satisfactory compaction. No load shall be sent out so late in the day that spreading and compaction cannot be completed during daylight. PART2 2.01 A. 2.02 40196 PRODUCTS GENERAL All materials shall conform to the requirements of "The Commonwealth of Massachusetts Highway Department (MHD), Standard Specifications for Highways and Bridges", latest edition (hereinafter referred to as the "State Specifications") and as specified herein. CALCIUM CHLORIDE 02503-1 A. 2.03 Calcium Chloride shall conform to the requirements of Section M9.01.0 of the State Specifications. BASE COURSE A. Gravel base course shall conform to the requirements for gravel fill in SECTION 02220, EARTHWORK, except that the maximum size of stone in the gravel shall be 3 inches. B. The base course shall consist of approximately 2-inches of dense graded crushed stone. The dense graded crushed stone base course shall conform to the requirements of Section M2.01.7 of the State Specifications. 2.04 BITUMINOUS CONCRETE PAVEMENT A. The placement of bituminous concrete shall consist of two layers; a binder coarse measuring approximately 2.5-inches in thickness, and a top coarse measuring approximately 1.5-inches in thickness. The binder and top courses for Class I, Type 1-1, bituminous concrete pavement shall conform to the requirements of Section M3.1 1.00 of the State Specifications. B. The general composition limits of materials, which makes up the Job Mix Formula, shall conform to columns entitled "Binder Course" and ["Top Course"] ["Modified Top Course"] as listed in Section M3.11.03 of the State Specifications. No bituminous concrete pavement shall be placed until the Engineer approves the job mix formula. PART 3 3.01 EXECUTION DUST CONTROL A. Calcium chloride shall be applied to control dust. No calcium chloride will be allowed where runoff will enter water bodies or wetlands. B. Calcium chloride shall be uniformly applied at the rate of 1-1/2 pounds per square yard. 3.02 A. 40196 PREPARATIONS FOR BITUMINOUS CONCRETE PAVING Subgrade Preparation 1. All trenches shall be backfilled and compacted as required under the SECTION 02220, EARTHWORK. The edges of all pavements along the line of the trench shall be cut back from exposed edges thereof, a sufficient distance to form a clean, sharp straight edge essentially parallel to the centerline of the trench. The minimum lateral cut back to be allowed will be 12 inches. Cut back pavement shall be carefully removed to minimize any disturbance to foundation materials. The exposed surface of the foundation material shall then be rolled, wetting the surface as necessary to obtain a firm, even surface. Any depressions or uneven areas shall be regraded and re-rolled until the surface is smooth and satisfactorily compacted. 2. All surfaces to receive pavements shall be examined by the paving subcontractor to see that they are in proper condition to receive paving. Starting work in any area shall constitute acceptance of that surface. Sub-grade shall be maintained in satisfactory condition and properly drained until surface improvement is placed. All defects resulting from use of unaccepted surfaces shall be corrected by the Contractor at no additional expense to the Owner. 02503-2 B. The Contractor shall raise all Owner drain and sewer manhole frames and covers, catch basin frames and grates and gate boxes to the established grades [as shown on the attached plates or drawings] before paving is applied. C. Prior to submitting his bid, the Contractor shall contact the other utilities so as to gain their requirements concerning any possible adjustment of gate boxes and other such structures. If the utility wishes the Contractor to raise these boxes it shall be in accordance with the utilities requirements. If the utility wishes to adjust their own gate boxes the Contractor shall give the utility adequate notice ofhis paving schedule. D. If the gravel base course is disturbed by the adjustment of utilities, the disturbed base material shall be carefully removed and replaced with Portland cement concrete. 3.03 A. 3.04 A. 3.05 DRIVEWAYS Where trenches are dug through existing bituminous concrete paved driveways, the trench shall be resurfaced with a 1-1/2 inch binder course of bituminous concrete followed by a I112 inch top course over the full width of the existing paved driveway. The limits of the overlay course shall be as defined by the Engineer. LEVELING COURSE Where specified or directed by the Engineer, the Contractor shall install a leveling course of bituminous concrete to the depths as required and as approved by the Engineer. The leveling course shall be installed utilizing bituminous material as specified above for a top course. TEMPORARY SURFACING A. Temporary surfacing shall be placed over trenches in hard surfaced streets and roads, and other areas where directed and shall be of bituminous concrete base course as specified herein before, laid in one course, 1-1/2 inches thick. Backfill at top of trench shall be removed to allow for placing temporary surfacing. B. Contractor shall maintain temporary surfacing in good condition. Trenches shall be inspected at least once a week and also immediately after each storm. Holes and settlements shall be promptly refilled with bituminous mixture. 40196 02503-3 Appendix C Site-Specific Health & Safety Plan SITE-SPECIFIC HEALTH AND SAFETY PLAN Northbridge DPW Facility 11 Fletcher Street Northbridge, Massachusetts Prepared by: Earth Tech, Inc. 196 Baker Avenue Concord, MA 01742 June 7, 2000 TABLE OF CONTENTS Page Section .............. ... --...... .......... ..... 1-1 ................................... 1.0 G EN ERA L .................... 2.0 ASSIGNMENT OF HMH&SP RESPONSIBILITY........................................2-1 2.1 2.2 2.3 2.4 - 1 Health & Safety Specialist (HSS).................................2 -1 Site Safety & Health Officer (SSHO).--............................2 -2 2 ........................ ..... ... ...-..... Licensed Site Professional (LSP) ......... 2 - 2 Field Personnel...................................... 3.0 SITE HISTORY AND BACKGROUND.......................................................... Location, Site History, and Background -.......................... 3.1 4.0 HAZARD ASSESSMENT 4.1 4.2 5.0 6.0 .... -.............. ........ ....... Basic Training Required ..................................... ................. . Site-Specific Training .............. .....- Safety Briefings ..................... 5.4 5.5 .............. Safety Audits......... First Aid and CPR......................... Emergency Medical Treatment . ..... SITE CONTROL MEASURES ... ....... ..... -........ ....... - 1 1 5- 2 5-2 6-1 ..... ...... 5 5 ...... 5-2 ..................... ............. ... ..-........ 4- 1 4-2 4-3 4 -4 ..... 5-1 .......... ..... ....-.. MEDICAL SURVEILLANCE PROGRAM ............................. 7.1 7.2 7.3 7.4 7.5 7.6 7.7 8.0 ............... ... - ............... W aste Description/Characterization .... Degree of Hazard --.......................................... ......... ........ ....... 4.2.1 Confined Space Entry ......- .. - ...... ......... ............. ..... ..... - -........ 4.2.2 Spill Containment ...... 5.3 6.1 7.0 4- 1 ............................................. TRAINING REQUIREMENTS ...... ...... 5.1 5.2 3-1 3- 1 ...... ....... 6 - 1 ...... 7-1 7-1 .......... ........... 7 - 2 .............-...-........... Exclusion Zone .......... .... ....... Contamination Reduction Zone ..... Support Zone......................-.........7.-.2.......7-2 ............ 7 - 3 ........ - -... ........ Modification to Site Control.. - 3 Personnel and Small Equipment Decontamination.......--..............7 7-3 Heavy Equipment Decontamination Area .......................... 7 -3 Site Visitors..................................-.......... 1 PERSONAL PROTECTIVE EQUIPMENT.............................88-1 General................................................ 8.1 ............. 8 - 1 Anticipated Levels of Protection for Site Operations....... 8.2 Table of Contents Page -i L:\WORK\40196\PROJpas dhsoc TABLE OF CONTENTS (Cont.) Page Section 9.0 AIR MONITORING...................................................................................... ... .. .... General.................................................................................... 9.1 9.2 9.3 9.4 10.0 DECONTAMINATION PROCEDURES............................................................... 10.1 10.2 10.3 10.4 11.0 Personnel and Small Equipment .................................................................... H eavy Equipm ent........................................................................................ 10.2.1 Decon Pad Design............................................................................. 10.2.2 D econ W ater ........................................................................................ 10.2.3 Decon Water Disposal ..................................................................... 10.2.4 Decon Pad Disposal ...................................................................... Contamination Prevention ............................................................................. D isposal Procedures...................................................................................... 1 9- 1 9 -2 - 10-1 10 - 1 10 - 1 10 - 2 10 -2 10 - 2 10 - 3 10 - 3 10 - 5 GENERAL SAFE WORK PRACTICES AND COMMUNICATIONS....... 11 - 1 . ....... Safety Equipm ent ............................................................................. Communications .............................................................................................. Safe Work Practices.................................................................................... Excavation/Trench Hazards .......................................................................... Machinery and Mechanized Equipment ....................................................... Hazardous M aterials ..................................................................................... Miscellaneous Hazards ........................................ 11 -1 11 - 1 11 -1 11 - 2 11 - 3 11 - 4 11 - 5 EMERGENCY PREPAREDNESS .......................................................................... Emergency Coordinator .................................... 12.1 12.2 Emergency Services Contacts.................................................................. .......................................... Im plementation ................ .. ............................ 12.3 ... ...... ......................................... 12.4 Fire or E xplosion................................... .......................................... Injury 12.5 Personal 12.6 Overt Chemical Exposure ................................... 12.7 Adverse Weather Conditions .................................................................. 12.7.1 Heat Stress ........................................ . .......... ........... .......................... 12.7.2 C old Exposure......................... .............................................. 12 .8 Poison Ivy ....................... ............................. ...... ......................................... Snakes and Ticks....................................... 12.9 12.9.1 Snake Bite Prevention and First Aid................................................. 12.9.2 Tick Bite Prevention and First Aid ................................................... 12.10 Spill Containment and Countermeasures Plan ........................................ Emergency Response Contractors ................... 12.10.1 12-1 12 - 1 12 - 1 12 -2 12 - 2 12 -2 12 - 3 12 - 3 12 -3 12 - 4 12 - 6 12 - 6 12 - 6 12 - 6 12 - 7 12 - 7 11.1 11.2 11.3 11.4 11.5 11.6 11.7 12.0 Exclusion Zone and Exclusion Zone Perimeter............................................9 Fence Line Monitoring ...................................... Action Levels.................................................................................................. 9-1 9- 1 Table of Contents Page -ii- L:\WORK\40O96PROJphaseivlhasp.doc TABLE OF CONTENTS (Cont.) Page Section AUTHORIZATIONS AND FIELD TEAM REVIEW .......................................... 13.0 13.1 13.2 Authorized Personnel.................................................................................... 13 - 1 Field Team Review...................................................................................... 13 - 2 RECORDKEEPING................................................................................... 14.0 13-1 ......... 14-1 LIST OF FIGURES Figure 3-1 Site Location Map 12-1 Hospital Route Map LIST OF TABLES Table 4-1 4-2 9-1 9-2 10-1 Exposure Limits Based on Human Health Criteria - Contaminants of Concern Physical Hazards Air Monitoring Plan for Worker Protection in Exclusion Zone and Perimeter: Summary of Action Levels and Respiratory Protection Requirements Air Monitoring Plan for General Public and Other Off-Site Receptors: Summary of Action Levels at the Fence Line Minimum Decontamination Layout For Level C Protection and Equipment APPENDICES Appendix A B C D Material Safety Data Sheets Respirator Program Health and Safety Field Forms Backup Calculations for Action Levels Contents Table of Contents Page -iiiPage-iii- WORK~4OJ 96 "ROJ\phase Mhasp. doe L:\WORK\40196PROJAphase ivhasp-doc 1.0 GENERAL This site-specific Health And Safety Plan (HASP) has been prepared by Earth Tech, Inc. (Earth Tech) for the environmental work to be conducted at 11 Fletcher Street in Northbridge, Massachusetts (the Site). This HASP was prepared in accordance with the regulatory requirements of 29 CFR 1910.120, "Hazardous Waste Operations and Emergency Response". This HASP is for use by Earth Tech personnel and their subcontractors. In accordance with 29 CFR 1910.120, this plan establishes the procedures and protocols necessary for protecting workers and the general public from potential chemical and physical hazards associated with the following activities related to the Fletcher Street activities: o Removal of small amount of bituminous concrete; o Excavation of contaminated soil and pavement; o General environmental evaluations. This HASP summarizes the project organization and responsibilities; establishes Standard Operating Procedures for preventing accidents, injuries, and illnesses; identifies hazards; discusses the personal protective equipment that may be used at the site; identifies personnel health and safety training requirements; summarizes the monitoring techniques to be used; establishes emergency procedures; describes the medical surveillance program; identifies the appropriate first aid equipment that is available; provides for accident recordkeeping; and establishes a schedule for safety inspections. This HASP does address construction-related safety and health issues/activities/tasks. Constructionrelated safety issues during work tasks are the responsibility of the subcontractor(s) performing these activities. The HASP will be implemented by the Health & Safety Specialist (HSS), the Site Safety & Health Officer (SSHO), and the Licensed Site Professional (LSP) during site work in the area(s) of concern. All issues associated with any excavation and management of contaminated soils encountered during construction shall be the responsibility of the LSP. Compliance with this HASP is required of all personnel who enter this site. Using the Modification Form presented in Appendix C, the content of this plan may change or undergo revision based upon additional information made available to health and safety personnel, monitoring results, or changes in the technical scope of work. Any changes proposed must be approved by the SSHO, the HSS and/or the LSP. General Page 1-1 Page 1-1 WORK4OJ961PROJJphaSe MA hasp. doe L:\tWORK401961PROJ~phase iv thasp.doc 2.0 ASSIGNMENT OF HASP RESPONSIBILITY The following describes the health and safety designations and general responsibilities, which will be implemented for the activities to be conducted at the site. 2.1 Health & Safety Specialist (HSS) The Health & Safety Specialist (HSS) has overall responsibility for preparation, review and approval of this HASP. The HSS is responsible for the implementation and oversight of this HASP. The HSS or designee shall approve any changes to this plan due to modification of procedures or newly proposed site activities. Health and safety-related duties and responsibilities will be assigned only to qualified individuals designated by the HSS. Before personnel may work on site, a current medical examination and acceptable health and safety training must be approved by the HSS and/or SSHO (refer to Section 2.2). Rick Denham will serve as the HSS for the 11 Fletcher Street project. 2.2 Site Safety & Health Officer (SSHO) The HSS shall direct the site health and safety efforts through a SSHO. The SSHO will be responsible for implementing the HASP on-site, evaluating risks, safety oversight, determining levels of personnel protection required and performing any required monitoring at the Site. The SSHO may direct or participate in on-site activities as appropriate when this does not interfere with primary SSHO responsibilities. The SSHO has stop-work authorization, which he/she will execute upon determination of an imminent safety hazard, emergency situation, or other potentially dangerous situations, such as detrimental weather conditions. Authorization to proceed with work will be issued by the SSHO and HSS in conjunction with the LSP after such action. The SSHO will select the proper levels of protection based on the details of this plan. The SSHO will be trained and certified in First Aid, CPR, and bloodborne pathogens, and have been provided the opportunity to receive the Hepatitis B vaccination series. The SSHO shall be responsible for preparing, maintaining and signing daily Health & Safety site logs (Appendix C). At a minimum this log shall include a description of weather conditions, levels of personnel protection being employed, monitoring data and any other information relevant to on-site safety conditions. Patrick McNabb will serve as the SSHO for the 11 Fletcher Street project. Assignment of HASP Responsibility Page2-1 L:\WORK\40196PROJiphaseivhasp.doc 2.3 Licensed Site Professional (LSP) The LSP will be responsible for issues associated with the completion of soil borings and installation of groundwater monitoring wells as well soil sampling during the soil boring and monitoring well drilling/installationactivities .The LSP shall be a hazardous waste consultant, as defined in M.G.L. C 21A paragraph 19, holding a valid license assured by the Board of the Registration of Hazardous Waste Site Cleanup Professionals pursuant to M.G.L. C 21A, paragraph 19-19J. Joseph P. Vitale, LSP will serve as the LSP for the Fletcher Street project. 2.4 Field Personnel This HASP was prepared for all of Earth Tech's representatives and subcontractors. Field personnel will take direction regarding safety and health issues from the SSHO and/or HSS. All field personnel who will work with or adjacent to hazardous materials will provide to the SSHO proof of having at a minimum a 40-hour OSHA certification, 24-hour "on the job" training, up-to-date 8-hour refresher course, and annual medical monitoring by an occupational physician. All subcontractors shall comply with the requirements outlined in this HASP and in accordance with OSHA 29 CFR 1910 and 29 CFR 1926; but, in all cases, subcontractors shall be responsible for site safety related to or affected by their own field operations (e.g. heavy equipment operations). Responsibility HASP of H Assignment of Assignment ASP Responsibility Page 2-2 Page 2-2 L. ~WORKl4OJ96~PROJ~phaseMhasp.doc L:\ORK\40196PROJAphase ivhasp.doc 3.0 SITE HISTORY AND BACKGROUND 3.1 Location, Site History, and Background The Site is located at 11 Fletcher Street in Northbridge, Massachusetts. Work included at the North Street project includes the: o Removal of small amount of bituminous concrete; o Excavation of contaminated soil; and o Site survey Past releases at the Site have likely occurred as a result of petroleum operations formerly conducted at the Site. Based on Earth Tech's current knowledge of the Site and surrounding area, and past uses of the Site, the following materials may be expected to be encountered during the site investigation activities: Petroleum Hydrocarbons Fuel oil Gasoline Background and Background Histoiy Site Site H istory and 3-I 3-1 LA WORK14OI96~PROJ~phaseiv~hasp.doc L: IWORK140196\PROJAphase iv hasp.doc FIGURE 3-1: SITE LOCATION MAP Source: USGS Topographic Map, Uxbridge, MA quad Site History and Background 3-2 A::WorthbridgeDPW.doc 4.0 HAZARD ASSESSMENT 4.1 Waste Description/Characterization The following chemical information is presented in order to identify the types of materials that may be encountered at the facility. The detailed information on these materials was obtained from: o o o ACGIH, 1997 Threshold Limit Values and Biological Exposure Indices. Material Safety Data Sheets. NIOSH Pocket Guide to Chemical Hazards - 1997. The following is a list of chemicals and compounds that may be potentially found on-site based on previous investigations. Material Safety Data Sheets (MSDS) and/or toxicity summaries for each compound listed below, providing information such as the chemical's characteristics, health hazards, protection and exposure limits, are presented in Appendix A. These chemicals include: o Heavy metals Waste Types: Characteristics: Liquid Sludge Solid Semi-Solid Corrosive Explosive Radioactive Flammable Volatile Inert Other X X Gas Other X X Toxic Earth Tech personnel should not enter the immediate work area around the drill rig during operations. Exposures to environmental media will be minimized by the use of personal protective equipment and good housekeeping practices. Exposure limits for the materials of concern are presented in Table 4-1. The American Conference of Governmental Industrial Hygienists (ACGIH) Threshold Limit Values (TLVs) for the work environment are given for airborne exposures. Three TLV standards are presented, if available, for each chemical. The Time Weighted Average (TWA) is the time-weighted average concentration for a normal 8-hour day and a 40-hour work week, to which nearly all workers may be repeatedly exposed, day after day, without adverse effect. The Short-term Exposure Limit (STEL) is a 15minute time-weighted average exposure that should not be exceeded at any time during a work day even if the 8-hour TWA is within the TLV. Exposures above the TLV-TWA up to the STEL should not be longer than 15 minutes and should not occur more than four times per day. There should be at least 60 minutes between successive exposures in this range. The ceiling limit (CEIL) values refer to the maximum exposure concentration for any duration. Also presented are the OSHA Permissible Exposure Limits (PELs). The PEL values are presented either as an 8-hour TWA, 15-minute STEL, Hazard Assessment Page 4-1 L: WORK40196PROJlphase ivhasp.doc or CEIL. The CEIL indicates the upper limit acceptable excursions above the TWA. The immediately dangerous to life and health (IDLH) value represents a maximum concentration from which one could escape within 30 minutes without any escape-impairing symptoms or any irreversible health effects. Other relevant health-based information that applies to this health and safety plan or to the employee's right to know is discussed in the Material Safety Data Sheets for the chemicals of concern in Appendix A. 4.2 Degree of Hazard On-site hazards include physical and chemical hazards. No radiological, biological, or laboratory wastes are suspected on-site. Potential contaminants of concern at the site (e.g., heavy metals) can affect the body if they are inhaled, come in contact with the eyes or skin, or are ingested. These materials may be released during soil intrusive activities and contact with contaminated groundwater. The primary concern is for skin exposure and inhalation exposure to contaminated soils (and groundwater if encountered). Exposure to these substances by inhalation of suspended particulates (in the breathing zone) is not anticipated based on the activities being conducted during this project. Atmospheric monitoring for vapors, however, will be conducted in the Breathing Zone to define the level of respiratory protection needed. Soil excavation activities may provide the potential for encountering buried hazards. All utilities will be "cleared" before intrusive activities begin. This includes location of overhead utilities. This will be the responsibility of the subcontractor(s) performing these activities. If encountered, field activities will be stopped, and the SSHO and the HSS must be notified. Physical hazards that may be encountered at the site during field activities include overhead and tripping hazards associated with heavy construction equipment operations. Excessive noise may be generated from air compressors, heavy construction equipment, etc. As a precaution, hearing protection will be available to be worn when working around constructionrelated equipment or deemed necessary. In areas where sound levels prohibit normal speech and where personnel will spend extended time (>1 hour) hearing protection will be required. Depending on seasonal weather conditions, there is some potential for workers on-site to be affected by heat stress if site activities are scheduled for the summer months or cold exposure if activities are conducted during winter months. The SSHO will monitor for heat stress or cold exposure in accordance with Section 12.7 of this HASP. A summary of physical hazards is presented in Table 4-2. Air monitoring and Action Levels are presented in Section 9.0 of this HASP. Assessment HazardAssessment Page 4-2 Page 4-2 L: ~WORId4OJ96PROJ\phaseivlhasp.doc TROJAphase iv 1hasp.doc L:\ WORK\40196P 4.2.1 Confined Space Entry A confined space is defined as a space which has any one of the following characteristics: limited opening for entry and exit; is large enough to be bodily entered; and is not designed for continuous worker occupancy. A permit-required confined space is a confined space that contains or has the potential to possess a recognized hazard to personnel (e.g., a hazardous atmosphere, engulfment potential, etc.). This may include excavations as part of this project. Where a location is determined to be a permit-required confined space, all Standard Operating Procedures for permit-required confined space entry will be performed in accordance with the applicable OSHA Standard 29 CFR 1910.146 (Permit Required Confined Space Entry). For all permit-required confined space entries performed during the project, a written permit system which evaluates conditions and assures safe entry procedures are followed shall be implemented by the SSHO. A copy of the Confined Space Entry Permit is located in Appendix C. The entry permit will remain in the area until the work has been completed. The permit will be retained and reviewed by the SSHO to assure the appropriate procedures have been implemented. Training in confined space entry procedures must be obtained by all personnel prior to working on a project task requiring entry into permit-required confined space. Prior to entry, the atmosphere throughout the space shall be monitored for oxygen deficiency, combustible gases, hydrogen sulfide, carbon monoxide, and any other toxic substances expected. Safe air quality is air quality that meets each of the following requirements. o Oxygen content of 19.5% to 23.5% o Hydrogen sulfide content of <10 ppm o Combustible gas content of <10% of the lower explosive limit (LEL); and o Carbon monoxide content <25 ppm o Exposure level for any toxic substance determined or suspected to be present which is below the PEL-TWA or TLV-TWA for any substance specified by the OSHA or ACGIH. Based on monitoring, if the concentration levels are within safe air quality limits specified above, entry may proceed. If air quality falls outside any of the limits specified above, personnel will not enter the space without consulting the SSHO, or if air quality falls outside these limits while in a space, they will exit the space immediately and contact the SSHO. All air quality readings will be recorded on the Confined Space Entry Permit. An employee entering vertically into a permit-required confined space shall wear a full body harness secured to a lifeline. The lifeline shall be secured in such a manner that if a rescue must be made, the above ground end of the lifeline can be attached to a winch. Entry without this equipment will only be allowed where it can be demonstrated that the presence of the equipment would not assist Assessment HazardAssessment Hazard Page 4-3 Page4-3 WOPJC4OI 96PROJ\phase iv~hasp. doe L: IWORK\4096PROJ~phaseiv ihasp.doc in the rescue of personnel or would increase the hazard of the entry. PPE will be used as specified in Section 8.0 and will typically be Level D unless air monitoring detects elevated vapor concentrations or dangerous oxygen levels. When entering a confined space or other areas where safe air quality does not exist, a trained attendant must be present at all times to assist and observe worker(s) in the confined space. The attendant will handle the safety line, observe traffic, and react to any emergency situations. The observer will at all times keep in contact with the employee(s) in the confined space and will order them out when ill effects (e.g., unsteadiness, unusual behavior, drowsiness, spasms, etc) are observed or hazardous conditions exist. Throughout the confined space entry, a trained rescue service will be available and a means of communication with them will be established. All confined entries will be conducted in accordance with the contractors SOP. 4.2.2 Spill Containment Prevention of spills and vapor releases is a primary concern during all planning and work activities. Spill control and countermeasures are discussed in Section 12.10 of this HASP. Assessment HazardAssessment Hazard Page 4-4 Page 4-4 L: W'ORKWOJ96~PRO.Aphase iv~hasp.doc L:\tWOR K\40196\PROJAphaseiv~hasp.doc -I A e a a . .4. -1 '3.0 .0 a -o- Ca *- Co o en Ca 0 o U 0) C C.) u U 0 0 .0 Cu 2 0 U 4.. a Cu 0 0~ a-o C) -s . C C C 44 = I>4 Ed L) N C Cu C)- I- C en eN 4o) 0 C C) -v a TABLE 4-2 Physical Hazards TASK(S) HAZARD DESCRIPTION PREVENTION/MONITORING TECHNIQUES All tasks Sampling Slip, trip, falls From various debris on Ensure buddy system awareness and ground, cluttered conditions, equipment, slippery footing good housekeeping practices. Pinch points, From "tight" spaces and Ensure clear work area, good sharp corners, clearances; objects and housekeeping, move unnecessary restricted components equipment, utilize buddy system, place guards on machinery, wear gloves where movement t appropria e. Drilling, Heat Associated with protective Ensure adequate work/rest schedule; excavation, Stress/Cold garment use, respiratory buddy system; dress appropriately for sampling, Stress protection and exposure weather. Drilling, Struck by From heavy equipment Drill rigs, backhoes, dump trucks, and excavation, Equipment during construction activities other equipment equipped with backup decon alarms. Employees remain clear of swing backfilling radius and rotating parts of equipment. Excavation, Collapse of From improperly shored or backfilling, excavation sloped excavations confirmation walls No employees allowed in excavated area unless protection methods in place and authorized by competent person. Samples sampling from the bottom of excavation will be collected from the backhoe bucket. All tasks Assessment HazardAssessment Inclement High winds, lightning, hail, Restrict work in exposed areas, seek weather etc. shelter, terminate work activities. Page 4-6 Page4-6 LA WORKl4OI96PRO.Aphase iv~hasp.doc L:\IWORK\40196\PROJAphase Mhasp.doc 5.0 TRAINING REQUIREMENTS 5.1 Basic Training Required Personnel who are required to work in areas where the potential for toxic exposure exists shall complete training or have site experience conforming to the requirements of 29 CFR 1910.120(e). The required 40-hour course (and 24-hours of "on the job" training) provides training on procedures for working at hazardous waste sites. Personnel are also required to have received 8 hours of refresher training annually thereafter. In addition, all supervisory personnel (e.g., the SSHO, project superintendent) are required to have 8 hours of additional specialized training for managing hazardous waste operations. Subcontractors shall provide written documentation that these training/experience requirements have been met. All personnel shall also be trained in the contents of Appendix B, "Respiratory Protection Program." 5.2 Site-Specific Training Site-specific training to employees to minimize on-site hazards will be provided that will address the activities, procedures, monitoring and equipment for the field operations. This training will include identifying the names of personnel and alternate personnel responsible for site safety, and facility layout. In addition, this training, at a minimum, will include the following: I. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. Site description and history. Project activities, including coordination with other contractors. Hazard evaluation. On-site safety responsibilities. Site control and work zones (WZ). Personnel training. Medical monitoring. Atmospheric monitoring. Personal protection, clothing, and equipment. Decontamination procedures. Emergency procedures. Review of site-specific material safety data sheets (MSDSs). Safe work practices. Other elements covered in this site-specific HASP. This training will also allow field workers to clarify anything they do not understand and to reinforce their responsibilities regarding safe operations. Training must include emergency preparedness, location of assembly areas, proper entry and exit procedures for Exclusion Zone (EZ), warning systems, location of emergency equipment, and route to hospital. Site safety meetings shall be documented using the Site Safety Meeting Form presented in Appendix C. TrainingRequirements 5-1 L: WORK\40196\PROJ\phase ivihasp.doc Evidence of this training and training performed under the requirements of 29 CFR 1910.120(e) will be presented to the HSS and/or SSHO, if requested. 5.3 Safety Briefings Project personnel will be given briefings by the SSHO on a daily or as-needed basis to further assist site personnel in conducting their activities safely. Briefings will be provided when new operations are to be conducted, changes in work practices must be implemented due to new information made available, or if site or environmental conditions change. Briefings will also be given to facilitate conformance with prescribed safety practices when performance deficiencies are identified during routine daily activities or as a result of safety audits. 5.4 Safety Audits The HSS, as deemed necessary, will conduct regular safety audits of field operations and subcontractor performance to review for compliance with health and safety policies and procedures. Daily operations will adhere to the protocols outlined in this HASP and will be enforced by the SSHO. 5.5 First Aid and CPR At least one individual shall be trained and qualified to administer first aid and CPR. The HSS will identify the individual requiring this training in order to ensure that emergency treatment is available during every workshift from a person qualified in first aid and CPR. These courses will be consistent with requirements of the American Red Cross and/or American Heart Association. Individuals who may administer First Aid and CPR are also required to have completed training in Bloodborne Pathogens and have had the opportunity to receive the Hepatitis B vaccination series. Training Requirements 5-2 L: WORK\4OJ96\PROJlphaseivhasp.doc 6.0 MEDICAL SURVEILLANCE PROGRAM All personnel performing field work in areas where the potential for toxic exposure exists will be required to have passed a pre-assignment and/or periodic medical examination that is consistent with 29 CFR 1910.120(f). A release for work will be confirmed by the HSS and/or the SSHO before an employee can begin hazardous site activities. Additional medical testing may be required in consultation with the company physician if an overt exposure or accident occurs, or if other site conditions warrant further medical surveillance. Subcontractors will maintain the medical records for their own employees but shall also provide written documentation certifying that each employee at the site has met the requirements of the Medical Surveillance Program. This documentation will be provided before the first day of work for each employee assigned to the site. The pre-assignment and annual examinations are essentially the same in content and will include: o o o o o o o o An updated medical and occupational history A screening physical examination Blood and urine laboratory tests Chest x-ray Electrocardiogram Pulmonary function tests Audiometry Visual acuity test The physician has the authority to include other tests. 6.1 Emergency Medical Treatment Provisions for emergency medical treatment shall be integrated with the overall Site Emergency Plan (see Section 12) and shall include: o o o o At least one individual per shift qualified to render first aid and CPR. First aid kits in compliance with OSHA requirements and emergency first aid stations in the immediate work vicinity. Universal precautions shall be used for all first aid operations. Conspicuously posted phone numbers and procedures for contacting ambulance services, fire department, police and medical facilities. Maps and directions to medical facilities. Surveillance Program Medical Surveillance Medical Program 6-1 6-1 WORKI4OIP6L'-'RO.Aphase iiAhasp. doc L:\WORK\40196\PROJAphase iv~hasp.doc 7.0 SITE CONTROL MEASURES The purposes of the site control measures discussed in this section are to maintain order at the site and to minimize chemical and physical hazards to on-site personnel, visitors, and the public. Site organization and control will be established and maintained according to the recommendations set forth in EPA's "Standard Operating Safety Guide," October 1985 and the NIOSH/OSHA/USCG/EPA publication "Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities," October 1985. Three general areas of operation shall be established as necessary to reduce the risk of personnel exposure to hazardous substances. The three areas are: o Exclusion Zone (Zone A) o Contamination Reduction Zone (Zone B) o Support Zone (Zone C). The decision to establish these control zones, as well as the dimensions of each area and the safe working distances between each area, shall be established by the SSHO and balanced against practical work considerations and existing field conditions. The extent and relative positions of the control zones will change during progressive stages of the project. The limits of these control zones will be adjusted as site-specific conditions relative to contaminant conditions are better defined. These changes from the original defined field parameters will be documented. 7.1 Exclusion Zone The Exclusion Zone (Zone A) is the area containing or suspected of containing contaminated materials. The Exclusion Zone is generally defined as the area immediately surrounding the tank area, soil boring, well hole, or the area that is contaminated or will be unavoidably contaminated by site operations. Since this area shall be considered contaminated, all personnel within the area must use the prescribed levels of personal protection. The Exclusion Zone may be marked with caution tape or other similar temporary barricade system (e.g., barricade fences) to allow for adjustments to the size and location due to changing site conditions. Access and egress from the Exclusion Zone will be through the Contaminant Reduction Zone following the procedures described in Section 10.0 of this HASP. The Exclusion Zone boundary (hotline) is based on observations and/or measurements of air contaminant concentrations. Any change in the protection level specified by the HASP shall be approved by the SSHO and the HSS before being initiated. As defined in the HASP, there may be some areas where the use of respiratory protection is not required during normal work activities. Respirators will be immediately available for use, however, should a potential hazard become evident. Areas where respirators are not required are identified by the following characteristics: Site Control Measures Page 7-1 L:\WORK\40O96\PROfphase ivhasp.doc no known airborne hazards are present; and - there is little or no potential for being impacted by the release of hazardous airborne contaminants. Because of the nature of field operations, Tyvek suits, disposable gloves, and shoe coverings should be available for use in the Exclusion Zone and Contamination Reduction Zone as a general rule. Hard hats, steel toe/shank boots, safety glasses and work clothes are required in all cases. Any item taken into the Exclusion Zone shall be considered to be contaminated until carefully inspected and/or decontaminated. All vehicles, equipment, instruments, and materials taken into the Exclusion Zone shall remain in the zone until no longer needed or until they need repair. Work Zone (Exclusion Zone) Entry and Exit Logs are to be completed on a daily basis. An example of this log is presented in Appendix C. 7.2 Contamination Reduction Zone The Contamination Reduction Zone (Zone B) shall be placed at the Exclusion Zone perimeter and will provide a physical separation of the Exclusion Zone and the Support Zone. The Contamination Reduction Zone is intended to prevent the spread of contaminants from work areas. All decontamination procedures shall be conducted within this area. A portable eye wash, first aid kit, towels, plastic bags, fire extinguisher and decontamination supplies are required in this area. The Contamination Reduction Zone will provide an entry for personnel and equipment into the Exclusion Zone and an exit area for decontamination personnel, materials and equipment from the Exclusion Zone. Personnel entering this area will wear the PPE prescribed by the Action Levels. The Contamination Reduction Zone may be surrounded with a suitable temporary barricade system (e.g., caution tape, barricade fence, etc.) to allow for adjustments to the size and location due to changing site conditions. Decontamination details are provided in Section 10 of this HASP. 7.3 Support Zone The Support Zone (Zone C) is considered the uncontaminated area and will be identified by the SSHO when field activities begin. The support zone shall be upwind of the Exclusion Zone, and within the limits of the construction boundaries, but away from areas containing hazardous materials. It will contain the Command Post, which will provide for team communications and emergency response. A mobile telephone is generally located in this area. Appropriate sanitary facilities, safety, medical, and support equipment will also be provided in this area. Any personnel not fully trained for work with hazardous materials will be required to remain in the Support Zone. Boundaries for the Support Zone may be separated from public access through the use a suitable temporary barricade system (e.g., caution tape, barricade fence, etc.). Site Control Measures Page 7-2 L:\WORK\40196\PROJphase ivhasp.doc 7.4 Modification to Site Control Less stringent site control and decontamination procedures may be utilized based upon field activities and results of monitoring data. However, any modifications must be authorized by the HSS and the SSHO. 7.5 Personnel and Small Equipment Decontamination Personnel and small equipment decontamination areas will be established on-site. Personnel will decontaminate and/or dispose of soiled protective clothing (i.e. disposable boots and gloves, etc.) in the Contamination Reduction Zone established next to the Exclusion Zone. Refer to Section 10.1 for ftrther decontamination procedures. 7.6 Heavy Equipment Decontamination Area To prevent off-site transport of contamination, construction equipment and vehicles will, as necessary, be decontaminated at a fixed temporary decontamination area before exiting the Contamination Reduction Zone immediately after exiting the Exclusion Zone. This location will be selected by the SSHO prior to startup of field activities. Heavy equipment (drill rig, backhoes, etc.) and other construction equipment will be steam-cleaned and/or decontaminated via dry brushing at the fixed decontamination area, as necessary. Decontamination liquids will be collected and disposed of in accordance with all applicable Federal, State and local regulations. Refer to Section 10.2 for further decontamination procedures. 7.7 Site Visitors Visitors are requiredto report to the SSHO prior to accessing the site, although none are anticipated. The SSHO will determine the purpose of individual visits, and will document decisions regarding their access to the site. If granted limited access, visitors must sign in and out under the SSHO's direction daily for the duration of their approved visit. Under no circumstances will visitors be allowed to interfere with or participate in operations within the scope of the field investigation. As needed, the SSHO will establish a designated Level D area as an observation point for visitors during intrusive activities. This designated area will be located to offer proximate viewing of site operations, and positioned such that visitors in no way may inhibit site access, logistics, or general operations. Further, the SSHO will locate the viewing areas such that visitors present are at minimal risk of exposure to site hazards. Prior to gaining access to designated viewing areas described above, visitors must provide the SSHO with documented compliance with Section 5 of the HASP, comply with other applicable sections, and satisfy additional conditions placed on them as deemed appropriate by the SSHO to assure visitor safety. Site visitors will be escorted throughout the site by the SSHO. Measures Control Measures Site Control Site Page 7-3 Page 7-3 L: \WORKl4OJ96PRO.Aphase ivlhasp.doc L:\WORK40196\PROJAphase ivhasp.doc 8.0 PERSONAL PROTECTIVE EQUIPMENT 8.1 General Personal protective equipment (PPE) for general operations will be consistent with the requirements of 29 CFR 1910 Subpart I, "Personal Protective Equipment." Basic levels of protection for hazardous waste operations will be selected in accordance with the provisions of 29 CFR 1910.120(g)(3), "Personal Protective Equipment Selection," and 1910.120 Appendix D, "General Description and Discussion of the Levels of Protection and Protective Gear." Modification to basic PPE ensembles may be necessary for specific operations. In these cases, further definition will be provided by review of specific hazards, conditions, and proposed operational requirements and by conducting monitoring at the particular operation. Protection may be upgraded or downgraded, as deemed appropriate by the SSHO and verified by the HSS. 8.2 Anticipated Levels of Protection for Site Operations o o Soil excavation, boring, screening and sampling operations General environmental evaluations D/C D/C Level D personal protective clothing and equipment includes: o Work clothes. o Tyvek disposable coveralls - required when splashing by contaminated liquids is a possibility and/or significant contact with contaminated soils is expected. o Polycoatededisposable tyvek coveralls - required when splashing by contaminated liquids is expected to be heavy and/or significant contact with contaminated soils is expected to be heavy. o Hardhat. o Safety glasses or goggles. o Steel toe, steel shank boots. Protective Equi~men: PersonalProtective Equipment Page 8-1 Page 8-1 WORKWOI961PROJ\phase ivlhasp. doc L:\tWORK\40196)PROJAphase ivithasp.doc o Disposable latex gloves - required when collecting soil samples and when splashing by contaminated groundwater is a possibility. o Outer nitrile gloves - required when splashing by contaminated liquids is expected to be heavy and/or when significant contact with contaminated soils is likely. o Disposable outer boots - required when splashing by contaminated groundwater is possible and/or when significant contact with contaminated soils is expected to be heavy. o Noise protection - as warranted. Level C protective clothing and equipment includes: o Full-face air-purifying respirator (NIOSH/Mine Safety Health Administration (MSHA) approved) fitted with acid gas/organic vapor/High Efficiency Particulate Air filter (HEPA) cartridges. o Hard hat. o Disposable tyvek coveralls. o Polycoated disposable tyvek coveralls - required when splashing by contaminated liquids is expected to be heavy and/or significant contact with contaminated soils is expected to be heavy. o Disposable latex inner gloves. o Nitrile outer gloves. o Steel toe, steel shank boots. o Disposable outer boots. Level B PPE, although not anticipated, includes the above Level C clothing with the addition of a self-contained breathing apparatus (SCBA) or supplied air-line respirator in place of an air-purifying respirator. If action levels are exceeded, and based on evaluation of the conditions, if Levels C or B respiratory protection is deemed necessary, work activities will be halted and the HSS contacted immediately before upgrading the levels of protection other than allowed by the Action Levels established in this HASP. The use and care of respiratory protection will be in accordance with the protocols described in Appendix B. Action levels used to determine the need to upgrade or downgrade the levels of protection are described in Section 9.4 of this HASP. PersonalProtective ProtectiveEqz4vmera Equipment Page 8-2 Page 8-2 L. ~WORK~4OJ96~PROAphase iv~hasg doe L:\WORK\40J96\PROJAphaseivihasp.doc 9.0 AIR MONITORING 9.1 General Atmospheric conditions will be monitored during soil sampling activities providing potential exposures to contaminated soils, and to determine the possible need to upgrade the personal protection of on-site workers and to identify potential emergency conditions. In areas contaminated with hazardous materials, the atmosphere in the worker breathing zone, at the Exclusion Zone perimeter, and at the fence line of the Site shall be monitored. When atmospheric monitoring is occurring, instrument readings shall be documented using the Atmospheric Monitoring Log presented in Appendix C. All air monitoring equipment shall be maintained and calibrated according to the manufacturer recommendations. Maintenance and calibration data will be recorded and included in the Atmospheric Monitoring Log presented in Appendix C. 9.2 Exclusion Zone and Exclusion Zone Perimeter Activities in the Exclusion Zone shall be initiated in Level D protection with the contingency to upgrade the level of protection based on the action levels. Monitoring for VOCs shall be performed continuously in the Exclusion Zone during soil sampling, test boring activities. A photoionization detector (PID) shall be used to monitor the Breathing Zone and all geological samples upon their retrieval for the presence of VOCs. All soils and soil piles, if any, from an excavation shall also be monitored using a PID to detect any volatiles. The Exclusion Zone perimeter will be continuously monitored (i.e., every 30 minutes) for VOCs and particulates (visible dust) at an upwind and downwind location. Vapor suppression activities (i.e., minimize or stop soil disturbance and application of vapor suppression materials) will be utilized when necessary to minimize the presence of gases and vapors. Dust suppression activities (i.e., water trucks, water mist over excavation) will be utilized when necessary to minimize the generation of particulate aerosols (i.e., visible dust). Refer to Table 9-1 for a summary of Action Levels and respiratory protection requirements for particular activities and contaminants detected. 9.3 Fence Line Monitoring Level D protection will be utilized by personnel conducting fence line monitoring with the contingency to upgrade the level of protection based on the action levels presented in Table 9-2. In most cases, the fence line will also serve as the Exclusion Zone perimeter. The PID shall be used to monitor fence line for VOCs during all soils sampling, test boring/monitoring well installation and sampling, and soil stockpiling/disposal activities. Vapor suppression (i.e., minimize or stop contaminated soil disturbance and/or application of vapor suppression materials) and dust suppression activities (i.e., water trucks, water mist over excavation) will be utilized when necessary to minimize the generation of vapors and/or particulate aerosols (i.e., visible dust). Monitoring Air A ir Monitoring Page 9-1 Page 9-1 WORK~4OJ96lPRO.Aphase iiA hasp. doe L:\WORK\40196\PROJAphase ivlhasp.doc 9.4 Action Levels Instrumentation may include the PID for total volatile organic compounds. The Action Levels in this HASP will apply to all site work during the duration of activities conducted at 328 North Street in the areas of concern (refer to Section 3). Action Levels for direct-reading instruments are provided in Table 9.1 (worker protection in the Exclusion Zone and at Exclusion Zone perimeter) and Table 9.2 (general public/off-site receptors at the fence line). The backup calculations and justifications for these Action Levels are provided in Appendix D. A ir Monitoring Page 9-2 L: t WORK40196\PROfiphase iv hasp.doc cu j 9- - 'S 44* -o x oZ ..-. - e, 1. o - C.g. "Pco t, gzL. C SC C6 5 0 m 6m *"0 10% '-4 c~4 4'g .. 2 2 2 V I~. -eo 4- *0 o6. A = C 6 c aX0 0 'n u 40 C-)- I oo o PC - oc A V -o a ,u.A -- e - ~H 0. o 1== . A ?'8Co U, C g 4o5* 4- 4 ) en o-6C o -o V7 4? &E 53 $i u.2 U 8-E3)-0 u.2&i -5 -j E u 8 a C. ii x a 4? OS p C < *C e2 0 .- t4 0 D E y u .~g .3 ' > 0 0 3g L4C> .0 a0 S Ei x = 0 O - --- -0 22 32 . o oDo 0 0 t;2 Eu0 C E. U a C C -- 0 8.-- o cona, 0 rn 0, ~0 '4OD v U 0 rL a -' y E. CO 0 CI) - - oH os -0 -a aS N - nm a . - .- o. 0 E - 's:C > EWE CU e a '4- ON 0 cc U C- 0: e A-a 0 .. =5 Ctw eU C.- oa -c 2B C C * 6 r = g 2 C o .C g m ao o C .0 . E*_- - 8 - - C ab -O +- o=ce& a'uEta g ~e- U : U-, U) C --' Co C 11 C 0 10.0 DECONTAMINATION PROCEDURES The SSHO shall determine the level of decontamination necessary based on the evaluation of specific work activities and the potential degree of contamination encountered. Temporary Contamination Reduction Zones shall be established as necessary. 10.1 Personnel and Small Equipment Personnel will perform decontamination in the personal decontamination area upon entering the Contamination Reduction Zone. Decontamination of personnel in Level D will consist of closure and disposal of coveralls (when worn), disposable boots (when worn), and gloves. A minimum decontamination layout for Level C protection and equipment is presented in Table 10-1. Decontamination of personnel using Level C protective equipment will consist of: o Removal and disposal of boot covers. o Removal and disposal of coveralls. o Removal and disposal of outer gloves. o Removal, cleaning, and storage of respiratory equipment. o Washing boots or other non-disposable protective equipment (i.e., hard hat, safety glasses/goggles, etc.) suspected of being contaminated using soap solution followed by potable or distilled water rinse. o Removal and disposal of inner gloves. Contaminated wash solutions and PPE will be disposed of at an appropriate and licensed disposal facility. Hand tools and other small equipment will be decontaminated as needed by washing in decontamination basins, or if possible, by dry decontamination. 10.2 Heavy Equipment Prior to exiting contaminated areas that are being excavated, equipment and transport vehicles may be decontaminated by washing if the equipment potentially came in contact with contaminated materials. Heavy equipment may be dry decontaminated, if possible. It should be noted that, if possible, clean areas/corridors that either eliminate or minimize any decontamination washing will be utilized. Efforts will be made to unload, use and load transport equipment in a manner that prevents contact of the vehicles with impacted materials and, therefore, decontamination will not be necessary. DecontaminationProcedures Page 10-1 L:\WORK\40196\PROJphase ivlhasp.doc 10.2.1 Decon Pad Design The decon pad will be portable and readily assembled/disassembled to insure that it does not interfere with traffic control provisions. A typical decon pad design is as follows: - Typical decon pad dimensions will be 50 feet (length) by 15 feet (width); a The decon pad will slope toward a center low point sump to allow for collection of decontamination water; o The pad will be constructed of 60 mil high density polyethylene (HDPE) liner material overlain by a geotextile, and a minimum of 12 inches of clean sub-angular stone will be back filled over the HDPE liner and geotextile; o A 12-inch high containment berm constructed of clean sub-angular stone will be placed around the perimeter of the decon pad; and 0 The decon pad will be equipped with 3-feet high splash guards dropped inside the bermed pad to prevent over spray. 10.2.2 Decon Water Equipment and vehicles exiting established Exclusion Zones will be washed down, as required, using a high pressure water and steam system. Decon water will drain toward the center of the decon pad. A 6-inch diameter perforated HDPE pipe (SDR 17 or equal) will be located at the low point of the pad which will collect and drain decon water into a 55-gallon sump or equivalent. Water collected in the sump will be pumped into a 5,000-gallon storage (poly) tank or equivalent. Flexible hose and/or piping will serve as the connection between the decon pad sump and the poly tank. 10.2.3 Decon Water Disposal Poly tanks that are at or near capacity will be transported to a fully operational, licensed facility that is in compliance with all Federal, State, and local regulations, which is capable of decon water recycling or disposal. Earth Tech will prepare all hazardous waste manifests, bills of lading, and all other documentation in order to transport and dispose of decon water. The Client will be designated as generator and will sign all manifests. motion Procedures L~econtam Procedures Decontamination Page 10-2 Page 1 0-2 L:IWORK~40J96PRO.Yphase ivlhasp.doc L:\IWORK\40196\PROJAphase iv hasp.doc Documentation certifying that all decon water was transported to, accepted, and disposed of, will be submitted to the Client. The documentation will include, but is not limited to the following: - A record of each load from the site to the disposal/recycling facility, including all manifests, bills of lading, and all other documentation as applicable. - All documentation for each load shall be tracked by the original manifest document number that was assigned at the site. It should also be noted that decon water will not be transported off-site until all disposal/recycling facility documentation has been reviewed and approved by the Client or their representative. Transportation of the decon water from the site to the disposal/recycling facility will be in accordance with all U.S. Department of Transportation, U.S. EPA and MADEP regulations. Decon water hauler(s) will be licensed in all states affected by the transport. Chemical analyses shall be performed on behalf of the Client, as necessary, to fulfill any disposal/recycling testing requirements of the approved facility. The decontamination water will be sampled at the frequency specified by the disposal facility and for the parameters required for waste acceptance at the facility. A copy of all chemical analyses results will be submitted to the Client after receipt of the laboratory report. 10.2.4 Decon Pad Disposal Once contaminated soils excavation activities within the Exclusion Zones have been completed, the decon pad(s) will be disassembled and each component handled properly. The stone base will be tested to determine the most appropriate end use or disposal method. The HDPE liner will be pressure washed. It is anticipated that both materials will be reused and/or disposed in a lined landfill. The geotextile will be properly disposed at a lined landfill. 10.3 Contamination Prevention One of the most important aspects of decontamination is the prevention of contamination. Good contamination prevention should minimize worker exposure and help ensure valid sample results by precluding cross-contamination. Procedures for contamination avoidance include: Personnel o Know the limitations of all PPE being used. o Do not walk through areas of obvious or known contamination. o Do not handle or touch contaminated materials directly. Do not sit or lean on potentially contaminated surfaces. DecontaminationPrnredures Page 10-3 L: IWORKl40196\PROJ~phaseMvhasp.doc 0 Make sure all PPE does not have any cuts or tears prior to donning. o Fasten all closures on suits, covering with tape, if necessary. o Take particular care to protect any skin injuries. o Stay upwind of airborne contaminants. o Do not carry cigarettes, gum, food, or candy into contaminated areas. o Do not smoke, eat, or drink in contaminated areas. o Shower at the hotel or home, immediately upon arrival, at the end of the work day. SamplingfMonitoring o Cover instruments with clear plastic, leaving openings for sampling ports, sensor points. o Bag sample containers prior to placement of sample material into containers. Heavy Equipment o Limit the surface area of equipment that comes into contact with contamination. General 10.4 o If contaminated tools are to be placed on non-contaminated equipment for transport to the decontamination pad, use plastic to keep the non-contaminated equipment clean. o Place spoils from subsurface work so as not to be in the expected paths of individuals. o Keep any excavated soils out of the way of workers. Disposal Procedures Discarded materials, waste materials, field equipment and supplies will be handled to preclude the potential for spreading contamination, creating a sanitary hazard, or causing litter to be left on site. Potentially contaminated materials, e.g., clothing, gloves, etc., will be bagged or drummed with appropriate labeling affixed as regulated, and disposed of and shipped with other hazardous materials. Non-contaminated materials shall be collected, bagged, and disposed of as simple nonhazardous solid waste. t'econtarrnnaton Procedures DecontaminationFroceaures 10-4 rage Page 10-4 L:1WUKAI4UJYOkrWJJ~pflOSe ivinasp.aoc L:\WORK40196(PUPhs inapdoc Table 10-1 Minimum Decontamination Layout For Level C Protection and Equipment Station 1 Station 2 Station 3 Station Station 5 4 Decon Procedures Equipment Drop PPE and Other Equipment Wash PPE and Other Equipment Rinse PPE Disposal Hand and Face Wash Equipment needed to perform decontamination Station 1: Plastic Sheet Station 4: 20-30 Gallon Trash Can, Disposal Bag Station 2: Wash tub, Decon Solution, Long-handled soft-bristled scrub brush Station 5: Field table, wash tub, 5 gal. water cooler or carboy, soap, towels Station 3: Wash tub, rinse water, longhandled soft-bristled scrub brush Procedures Decontamination DecontaminationProcedures Page 10-5 Page 10-5 L:IWORIC40J96~PRO.Aphase ivlhasp.doc L:\IWORK\40196PROJAphase iv Ihasp.doc 11.0 GENERAL SAFE WORK PRACTICES AND COMMUNICATIONS 11.1 Safety Equipment Basic emergency and first aid equipment will be available at the Support Zone and/or the Contamination Reduction Zone. as appropriate. This shall include communications equipment, first aid kit, emergency eye wash, fire extinguishers, and other safety-related equipment. 11.2 Communications Walkie-Talkies: Hand-held units shall be used as much as possible by field teams for communication between downrange operations and the Command Post basestation. Telephones: A mobile telephone will be located in the Command Post area in the SZ for communication with emergency support services/facilities. Hand Signals: Hand signals will be used by downrange field teams in conjunction with the buddy system. These signals are very important when working with heavy equipment. They shall be known by the entire field team before operations commence and reviewed during site-specific training. 11.3 Signal Meaning o Hand gripping throat Out of air; can't breathe o Grip partner's wrist Leave area immediately; no debate o Hands on top of head Need assistance o Thumbs up OK; I'm all right; I understand o Thumbs down No; negative Safe Work Practices The following safe work practices will be implemented during site operations: o Prior to the start of work, this HASP will be reviewed and placed in a conspicuous location. Emergency phone numbers will be posted next to the on-site telephone. Emergency phone numbers will include hospital, ambulance, fire, and police. o Only properly trained and equipped personnel will be allowed to work in potentially contaminated areas. General Safe Work Practicesand Communications Page 11- L:WORK\40196\PROJ.phaseivhasp.doc o The number of personnel and equipment in the sampling areas will be kept to a minimum, consistent with safe site operations. o Workers shall adhere to the "buddy system" while working downrange and in designated exclusion areas. Radio contact shall be maintained between pairs on-site in order to assist each other in case of emergencies. o Workers shall not exit exclusion areas until soiled equipment and clothing have been removed and decontaminated or properly disposed of. o Eating, drinking, chewing gum or tobacco, smoking, or any practice that increases the probability of hand-to-mouth transfer, ingestion, and inhalation of potentially contaminated materials is prohibited. 11.4 o As necessary, personnel will thoroughly wash their hands and faces upon leaving the investigation areas. o Contact with potentially contaminated materials and surfaces shall be avoided. Personnel shall comply withtcontamination control measures. o Personnel with facial hair or other facepiece seal obstructions will not be permitted to work where respirators are required. o Work shall only be conducted if adequate illumination is provided, i.e., visual observation is not impaired due to loss of daylight conditions. o Sampling personnel shall not work near heavy equipment. Excavation/Trench Hazards Sloughing of trench sidewalls may occur during excavation and trenching activities. Safety related to any excavation or test pitting activities shall be the responsibility of the contractor/subcontractor performing such work. Actions to be taken to minimize the potential for hazards related to these activities are the responsibility of the contractor and include: o Locate all underground utilities (call Dig Safe) prior to excavation o All trenching activities will be in accordance with OSHA 29 CFR 1926 Subpart P. o Lay back slope to a stable pitch. Sloping must be inspected by a competent person (generally the contractors on-site supervisor). o Utilize shoring if necessary. All shoring systems must be approved by a registered Professional Engineer. and Communications Practicesand Work Practices General Safe Work Communications Page 11 2 Page 1 1-2 L:\WORK~4OJ96~PRO.Aphase t'Ahasp.doc L:\WORK\40196\PROJAphase Mvhasp.doc 11.5 o Equipment and excavated material shall be placed no closer than 5 feet from the edge of the excavation. o Heavy equipment not required for work activity will be kept away from the excavation. o Personnel will not be permitted to enter the excavation unless it is approved by a competent person, as defined by OSHA. o A means of egress from the trench excavations that are 4 feet or more in depth will be provided. This can be accomplished by the use of ladders, ramps or stairway, and must be placed so as to require no more than 25 feet of lateral travel for employees. o Entry of personnel shall be carefully monitored by a competent person. Daily inspections of any excavations, adjacent areas, and protective systems will be made by a competent person for evidence of a situation that could result in possible caveins, hazardous atmospheres, or other hazardous conditions. Any excavation will be monitored for oxygen, potential explosive conditions, and toxic vapors prior to and during entry. An inspection will be conducted by the competent person prior to the start of work and as needed throughout the shift. Inspections will also be made after every rain storm or other hazard increasing occurrence. These inspections are only required when employee exposure can be reasonably anticipated. o Appropriate Personal Protective Equipment will be worn by personnel entering the excavation trench. Machinery and Mechanized Equipment Actions to be taken to minimize the potential for hazards related to the operation of machinery and other mechanized equipment include: o Operation of machinery will be only performed by experienced operators. o Machinery will be inspected daily before use. o Safety features such as belts, harnesses and warning lights/alarms will be used throughout these activities. o Guide ropes will be used when lifting items. o All electrical equipment will be locked out and tagged out prior to conducting repairs or maintenance. Lock/tag will only be removed by the person who placed it. o Equipment capable of stopping, lowering and holding at least the full test load shall be provided. o Riding on load, hoods, hammers, buckets, material hoists, etc. not meant for GeneralSafe Work Practicesand Communications Page 11-3 L:WORK\401961PROJlphase ivhasp.doc personnel is prohibited. o The operator of hoisting equipment will not perform any other work or leave his/her position at the controls until the load has been safely landed or returned to ground level. o Adequate clearance shall be maintained between moving or rotating parts of the equipment and fixed objects to allow for passage of personnel. 11.6 Hazardous Materials Actions to be taken to minimize the potential for hazards (refer to Section 4.0) related to personnel who may come in contact with hazardous materials include: 11.7 o Hazardous materials expected to be on-site will be discussed at the morning safety meeting. The HASP, including MSDS copies or toxicity summaries, will be kept onsite. o Appropriate Personal Protective Equipment will be used by workers for each phase of work, as described in Section 9.0. o Monitoring of worker exposure will be performed to ensure an adequate level of protection. o Standard Operating Procedures will be followed for loading and sealing containers and trucks that may contain hazardous materials. o Control zones will be established as described in Section 7.0. o The directives of the SSHO shall be followed for emergency supplies, response and spill cleanup procedures, as described in the Site Emergency Plan (see Section 12). o If spills occur, the area will be sampled and tested to assure complete cleanup. Miscellaneous Hazards Actions to be taken to minimize the potential for hazards associated with on-site activities not previously addressed (e.g., operation of power tools, vehicular traffic control, etc.) include: o Only trained personnel are to use power tools. Operation of power tools will be as specified by the manufacturer. Safety glasses and protective guards will be employed. Ground fault circuit interrupters will be used on all electrical equipment used outdoors. o D.O.T. approved containers will be used to store all fuels. o Shut down of engines will be performed prior to any fueling/refueling or servicing GeneralSafe Work Practicesand Communications Page 11-4 L: WORK\40196PROJ phase ivlhasp.doc activities. Electrical equipment will be disconnected when not in use. o An appropriately rated fire extinguisher will be on hand in each work area. o Open flames will only be allowed in designated work areas. o Equipment will be inspected, removed from service and tagged to indicate it is not in good working condition. o The SSHO will warn employees of all potential traffic hazards before starting activities involving exposure to traffic. Communications and Communications Practicesand Work Practices Safe Work General GeneralSafe Page 11-5 Page 11-5 L. ~WORK~4Ol96~PROJ\phase iv~hasp.doc L:\IWORK\40196\PROJ~phaseMvhasp.doc 12.0 EMERGENCY PREPAREDNESS 12.1 Emergency Coordinator The SSHO shall be the Site Emergency Coordinator and implement the emergency action plan as outlined (29 CFR 1910.38). Although the following five items are typically more applicable to operating facilities, they will be implemented to the extent possible when applicable. (These shall be determined prior to site work by the SSHO and presented during the site initiation meeting.) o Emergency escape procedures and routes. o Procedures to account for employees after evacuation. o Rescue and medical duties. o Preferred means of reporting fires and emergencies. o Names, job titles, or departments to contact for additional information of duties. These items will be discussed during each site orientation meeting conducted on-site by the SSHO. 12.2 Emergency Services Contacts The SSHO or a designee will act as the Site Emergency Coordinator and shall verify appropriate emergency contacts and make contact with them before beginning work on-site. The Emergency Coordinator will inform the emergency contacts about the nature and duration of work expected on the site and the type of contaminants and possible health or safety effects of emergencies involving these contaminants. Also at this time, the Emergency Coordinator and the emergency response contacts shall make arrangements to handle any emergencies that might be anticipated. EMERGENCY PHONE NUMBERS: Police Department Fire Department 911 911 Hospital Emergency Room Hospital Address National Response Center Poison Control Center LSP (Joseph Vitale) Health & Safety Specialist (Rick Denham) SSHO (Patrick McNabb) Earth Tech Medical Director (Dr. David Barnes) .Emergency Preparedness Page 12-1 508-234-8792 Whitinsville Medical Center 18 Granite Street Whitinsville, MA 800-424-8802 800-542-4225 978-371-4124 978-371-4326 978-371-4227 800-229-3674 L: WORK40196\PROJ\phaseivlhaspdoc A Hospital Route Map is presented in Figure 12-1. Once the Support Zone is established, and before field activity start-up, the Site Emergency Coordinator shall drive the route to the hospital, post directions and/or a map to the hospital, post emergency phone numbers, and set up the first aid station, 10-pound Type A/B/C fire extinguisher, and other emergency equipment. 12.3 Implementation The Site Emergency Coordinator shall implement the emergency action procedures whenever conditions at the site warrant such action. The Site Emergency Coordinator will be responsible for coordinating the evacuation, emergency treatment, and emergency transport of site personnel as necessary, and for notification of emergency response units and the appropriate management staff The following conditions may require implementation of emergency action procedures: o Fire or explosion on-site. o Serious personal injury. o Release of hazardous materials, including gases or vapors at levels greater than the maximum use concentrations of respirators. o Unsafe working conditions, such as inclement weather. The following alarm system(s) will be used to alert employees to evacuate the danger area: ( )Air hom ( ) Radio/Telephone (X) Direct Verbal Communications (10 Employees or less) ( ) Other 12.4 Fire or Explosion If an actual fire or explosion has taken place, emergency steps will include 1) evacuation of work area and venting, and 2) notification of the fire department and other appropriate emergency response groups if necessary. 12.5 Personal Injury Emergency first aid will be administered on-site as appropriate. Then, the individual will be decontaminated if possible, depending on the severity of the injury, and transported to the nearest medical facility, if needed. Preparedness Emergency Emergency Preparedness Page 12-2 Page 12-2 LA WORKI4OI96PROJ~phaseivlhasp. doe L: IWORK\ 40196PROJAphase ivhasp.doc 12.6 Overt Chemical Exposure Typical response procedures include: SKIN CONTACT: Use copious amounts of soap and water. Wash/rinse affected area thoroughly, then provide appropriate medical attention. An eye wash will be provided on-site at the CRZ and/or support zone as appropriate. Eyes should be rinsed for at least 15 minutes upon chemical contamination. INHALATION: Move to fresh air and/or, if necessary, decontaminate/transport to hospital. INGESTION: Decontaminate and transport to emergency medical facility. PUNCTURE WOUND OR LACERATION: Decontaminate and transport to emergency medical facility. The SSHO will provide medical data sheets to medical personnel as requested. 12.7 Adverse Weather Conditions In the event of adverse weather conditions, the SSHO will determine if work can continue without endangering the health and safety of field workers. Some items to be considered before determining if work should continue are: o Potential for heat stress and heat-related injuries. o Potential for cold stress and cold-related injuries. o Treacherous weather-related working conditions. o Limited visibility. o Potential for electrical storms. 12.7.1 Heat Stress The SSHO shall continuously visually monitor personnel to note for signs of heat stress. In addition, field personnel will be instructed to observe for symptoms of heat stress and methods on how to control it. One or more of the following control measures can be used to help control heat stress: Emergency Preparedness Emergency Preparedness Page 12-3 Page 12-3 L. ~WORKI4OJ96~PROJ\phaseiv~hasp.doc L:\WORK\40196PROJ~phaseivhasp.doc o Provision of adequate liquids to replace lost body fluids. Employees must replace water and salt lost from sweating. Employees must be encouraged to drink more than the amount required to satisfy thirst. Thirst satisfaction is not an accurate indicator of adequate salt and fluid replacement. o Replacement fluids can be commercial mixes such as Gatorade. o Establishment of a work regime that will provide adequate rest periods for cooling down. This may require additional shifts of workers. o Cooling devices such as vortex tubes or cooling vests can be worn beneath protective garments. o All breaks are to be taken in a cool rest area (77* F is best). o Employees shall remove impermeable protective garments during rest periods. o Employees shall not be assigned other tasks during rest periods. o Employees shall be informed of the importance of adequate rest, acclimation, and proper diet in the prevention of heat stress. The heat stress of employees on-site may be monitored by the Wet Bulb Globe Temperature Index (WBGT) technique when workers are not wearing protective coveralls (i.e. Tyvek). This method will require the use of a heat stress monitoring device. Monitoring of personnel wearing impervious clothing shall commence when the ambient temperature is 70 *F or above. This will be performed by a person with a current first aid certification and who is trained to recognize symptoms of heat stress. 12.7.2 Cold Exposure If the field activities occur during a period when temperatures average below freezing, the following guidelines will be followed. Persons working outdoors in temperatures at or below freezing may be subject to frostbite. Extreme cold for a short time may cause severe injury to the surface of the body, or result in profound generalized cooling of the body core, resulting in coma and death. Areas of the body which have high surface area-to-volume ratio such as fingers, toes, ears, are the most susceptible. Two factors influence the development of a cold injury; ambient temperature and the velocity of the wind. Wind chill is used to describe the chilling effect of moving air in combination with low temperature. For instance, 10*F with a wind of 15 miles per hour (mph) is equivalent in chilling effect to still air at - 8*F. Emergency Preparedness Emergency Preparedness Page J2-4 Page 12-4 L: ~WORK~4OJ961PROJlphase hA hasp. doe L:\WORK\401961PROJ~phaseivlhasp.doc As a general rule, the greatest incremental increase in wind chill occurs when a wind of 5 mph increases to 10 mph. Additionally, water conducts heat 240 times faster than air. Thus, the body cools suddenly when chemical-protective equipment is removed if the clothing underneath is perspiration-soaked. Local injury resulting from cold is included in the generic term frostbite. There are several degrees of damage. Frostbite of the extremities can be categorized into: o Frost nip or incipient frostbite: Characterized by suddenly blanching or whitening of skin.- o Superficial frostbite: Skin has a waxy or white appearance and is firm to the touch, but tissue beneath is resilient. o Deep frostbite: Tissues are cold, pale, and solid; extremely serious injury. Prevention of frostbite is vital. Keep the extremities warm. Wear insulated clothing as part of one's protective gear during extremely cold conditions. Check for symptoms of frostbite at every break. The onset is painless and gradual--you may never know you have been injured until it is too late. To administer first aid for frostbite, bring the victim indoors and rewarm the areas quickly in water between 39C and 41*C (102"F to 105*F). Give a warm drink-not coffee, tea, or alcohol. The victim should not smoke. Keep the frozen parts in warm water or covered with warm clothes for 30 minutes, even though the tissue will be very painful as it thaws. Then elevate the injured area and protect it from injury. Do not allow blisters to be broken. Use sterile, soft, dry material to cover the injured areas. Keep victim warm and get immediate medical care. After thawing, the victim should try to move the injured areas a little, but no more than can be done alone (without help). o Do not rub the frostbitten part (this may cause gangrene). o Do not use ice, snow, gasoline, or anything cold on frostbite. o Do not use heat lamps or hot water bottles to rewarm the part. o Do not place the body part near a hot stove. Systemic hypothermia is caused by exposure to freezing or rapidly dropping temperature. Its symptoms are usually exhibited in five stages: 1) shivering; 2) apathy, listlessness, sleepiness, and (sometimes) rapid cooling of the body to less than 95*F; 3) unconsciousness, glassy stare, slow pulse, and slow respiratory rate; 4) freezing of the extremities; and, finally, 5) death. Preparedness Emergency Preparedness Emergency Page 12-S Page 12-5 L. ~WORIO4OI96\PRO.Aphcne iv~ha.~p.dou L:\WORK\40196PROJAphase ivhasp.doc Effects arising from cold exposure will be minimized by providing workers with insulated clothing when the equivalent chill temperature is less than 30*F. At minimum, workers exposed to temperatures below -10* F with wind speeds of more than 5 miles per hour shall be medically certified by the Physician as suitable for such exposure. The ultimate responsibility for delaying or curtailing work at a site due to inclement weather rests with the SSHO. 12.8 Poison Ivy If someone should come in contact with poison ivy, the individual should immediately wash the affected area with the Ivy Cleaner provided in the first aid kit. If a rash develops, it should be treated at a medical facility as soon as possible. 12.9 Snakes and Ticks 12.9.1 Snake Bite Prevention and First Aid On project sites, precautions against the possible presence of snakes should be taken when walking through overgrown vegetation and when moving debris (i.e. lumber, scrap metals, etc.). If someone is bitten by a snake, and the snake bite occurs in a location that is within a I-hour drive of a medical facility, a conservative approach is safest. Keeping the victim quiet, lying or sitting and reassuring him/her is all that is required. He/she should be transported safely (no speeding) to the nearest medical facility. In North America, death from snakebite to healthy adults is very rare. Many bites, even from known poisonous snakes, do not result in a significant amount of venom being injected. Even when significant envenomation occurs, symptoms develop slowly over many hours and can be controlled with appropriate treatment. Field treatments advised against include ice, cutting, and suction around the wound, and tourniquets. Studies indicate that ice leads to increased tissue destruction. Cutting and sucking out the wound can be shown to offer some help if it is done with the correct technique and equipment and if the victim has received a large dose of venom. In light of the damage that can be done, the risk of such a procedure is too high. It is best to transport the person immediately to a medical facility. 12.9.2 Tick Bite Prevention and First Aid Routinely check for ticks after being outdoors. Remove ticks as soon as possible before they embed. To minimize exposure, wear light-colored clothing so ticks can be detected. Tuck pants into boots or socks and wear longsleeved shirts. Apply tick/insect repellent to clothing. When a tick is found embedded, remove it by grasping it with a tweezers as close to the skin as possible and gently pull it straight out. Do not twist or jerk the tick because the head may remain embedded. Once the tick is removed, wash the bite area and your hands with soap and water and apply an antiseptic to the bite. Save the tick in a jar labeled with the date and the place where the tick was acquired. A physicianmay find this information and the tick specimen helpful in diagnosis if an infection results. Emergency Preparedness Emergency Preparedness Page 12-6 Page 12-6 L: WORK~4O1961PRO.Aphase iv~hasp. dcc L:\WORK\40196\PROJAphase ivhasp.doc 12.10 Spill Containment and Countermeasures Plan As indicated in this HASP, all work on potentially hazardous materials will occur in controlled work zones. Further, there will be no significant quantities of hazardous substances, such as solvents, involved in site activities. All vehicles and equipment will be properly maintained to minimize the potential releases of oil, gasoline and other materials The SSHO should be familiar with the notification requirements outlined in this HASP. In addition, all subcontractor personnel can recognize spills, and know the links of communication for notification. Once a spill has been recognized and appropriate notifications have been made, the SSHO will institute appropriate spill control and countermeasure measures. The following response principals apply: 1. Follow contingency and evacuation procedures in this plan. 2. For spills less than 10 gallons, contain the spill to the smallest area possible, through the use of adsorbents and site equipment to build berms. Prevent to the extent possible, the migration of spills to nearby sewers, drainage structures, open waters, and other sensitive human and environmental receptors. 3. Conduct and complete the response in accordance with all applicable local, state and federal regulations. Seek assistance in determining the extent and completeness of the spill response from the Client and appropriate authorities. 4. For spills 10 gallons or greater, contain the spill to the smallest area possible, as noted above. Notify the appropriate emergency response contractor. Coordinate with the Client the methods to be employed in collection, storage, and the ultimate disposal of all contaminated materials. All applicable hazardous waste regulations will be adhered to. 12.10.1 Emergency Response Contractors Listed below are three Emergency Response Contractors. These contractors are experienced in the removal and disposal of oils, contaminated soils, hazardous chemicals, and asbestos pipelines and appurtenances. The telephone numbers for these contractors are also provided. 1. Enpro Services, Inc. (508) 465-1595. 2. CYN Environmental Services (800) 242-5818. 3. Clean Harbors, Inc. (800) 645-8265; (800) OIL-TANK. Emergency Preparedness Emergency Preparedness Page 12-7 Page 12-7 Li WORKi4OI96~PRO.Aphase iv~hasp.doc L:\WORKi40196\PROJ~phaseivhasp.doc FIGURE 12-1 - HOSPITAL ROUTE MAP Directions 1. 2. Start out going South on MA-122 by turning right. Turn RIGHT onto CHURCH ST. o199 WpQuestco, Miles 1.9 0.7 Inc.: o1999 GDT. Inc. Full Route Preparedness Emergency Emergency Preparedness Page 12-8 Page 12-8 A: WorthbridgeflPW doe A:WorthbridgeDPW.doc 13.0 AUTHORIZATIONS AND FIELD TEAM REVIEW 13.1 Authorized Personnel Personnel authorized to enter the areas of concern while field activities are being conducted must be authorized by the HSS or a designee. Authorization will involve completion of appropriate training courses and medical examination requirements as required by OSHA 29 CFR 1910.120, current fit-testing, and review and signing of this HASP. All personnel must be escorted by appropriately trained personnel, and check in with the Field Team Leader at the Command Post. PERSONNEL AUTHORIZED TO PERFORM WORK ON-SITE: 1. Earth Tech Personnel 2. Earth Tech Subcontractors 3. 4. OTHER PERSONNEL AUTHORIZED TO ENTER SITE: 1. 2. 3. 4. 5. Team Review Field Team and Field Authorizations and Review Page 13-1 Page 13-1 L. ~WORK~4OJ96~PROJ\phaseivlhasp.doc L:\ WORK\40196PROJAphase ivithasp.doc 13.2 Field Team Review Each field team member shall sign this section after site-specific training is completed and before being permitted to work on site. Ihave read and understand this Site Inspection Health and Safety Plan. I will comply with the provisions contained therein. Site/Project: Northbridge DPW 11 Fletcher Street Northbridge, MA Name Printed Ii _____ and Field Authorizations and Field Team Team Review Review Signature [ Date I _____ Page 13-2 Page 13-2 Ii WORK~4OJ96~PROPphaseiv~hasp. doc L:\tWORK40196\PROJ~phase Mvhasp. doc 14.0 RECORDKEEPING The following records and reports will be established and kept as appropriate for the 11 Fletcher Street project: o o Accident/Incident Reports Daily Sign In/Sign Out Log o o Air Monitoring Records Sample Manifest/Transmittal (Chain of Custody Form) o Employee Training Certificates Employee Exposure Record Site-Safety Orientation Log Health and Safety Audit Reports Instrumentation Calibration Logs Material Safety Data Sheets/Chem Data Sheets or Hazardlines Medical Data Sheets (to be sent with injured personnel to hospital) Medical Examination Reports (Physician's Written Opinion) Respirator Fit Test Records Respirator Inspection Records o o o o o o o o o A blank Medical Data Sheet is included in Appendix C of this HASP. A Medical Data Sheet will be completed for each person working at the site. Recordkeeping Page 14-1 LtWORK\40I96\PROAphase hvhasp.doc APPENDIX A MATERIAL SAFETY DATA SHEETS MaterialSafety DataSeeft Coilection: 3 - Genlum Publishing Corporation -iP 1145 Catalyn Street Schenectady. NY 12303-1836 USA (518)377-8854 Sheet No- 316 Benie: 1 Issued: I Ing Revision: E, 8/90 Section L Material Identircation 'Bemnn (C,) Despi gasoline. catalytic e a solvent Derived by fretiocal distianion of coal tar, o peoleum, andtrnneai-ylaiouoetoaeby a large number of macnas scha i reacin Used as inks, oils, and fas; in teroe aagr dodeylbenxne iort m OW10 - PdhdaFChen, psubber, of boinene or Pyrolysis of R I 1 4 S 2* -32 32 NFPA K 4 n iaoua.oil cloth, varnshe, and-lacquer for printing and gphy in denigin s extraction and r-ie uyand in factones. Benene has been baned as an use and is no longer usedn edes"ingaudiet i products intended for Other Designation CAS No. 0071-43-2, bear, cabon oil, coal napbh, eyclohexabiene, mn!a napda, nitation beirnae hn. h L. Cide, hrobenerl ashte ditclatest CaSICCIwCC BMCn'GfWS' 1 forea suppliers list. Mamufacturos~~~~~~~ oriupicdslbm Ar0ro [OIWS H 3 F 3 ppPt0 #el * A Cations: Ben s a conimed hasna cacinotaby the IARC. Cronic L-lkevd epores m ar c nr(etmia)amdbowe Ansrow darzge,with noy to bood-fr=ingdat- it is also a dangerous fire hazrd when exposed to heat or flame : Section 2. Ingredients and Occupational Exposure Linits enDeae, ca 100%e 1989 OSHA PELA (29 CFR 1910.1000, Table -1-A) 8-brTWA:1 ppm.3 mg/ms 15-min STEL 5 FIm. 15 mym' 1989-90 ACGIH TLV-TWA: 10 ppm, 32 ngn' (29 CFR 1910.4000, Table Z-2) 8-Ir TWA 10 ppm Acceptable Ceiling Concentration: 25 ppm Acceptable Maximum Pea 50 ppm (10 min)t TWA:0.1 ppm, 0.3 mrng/m Ceiling ppm 3 mnm 1988 NIOSH REa - 1985-g6 Toxicity Datit Manoral, Il: 50 mg/kg no toxic effect noted Man. inhain, T,.: 150ppm inhaled intermiuently over I yr in a number disrete, separate doses ffc the blood (other changes) and nuitifonal and gross metaboEzra (bodymaFcasI) ,ipah Rabbis, eye 2mg administerd ov 24 rpmduc sever irritaion 1910.4000, Scbpu2.Sates dardie arun bene andadin29 C 1910.1023appraesto alon a~a inday stem exposre are cacady under die acion level 0,., dsibutic and ale of fuel, ted oil sad gs ddling and provdca emna gas Pe-"ig and the prenate adn for liquid mixture): for die ~ * OSHA29 Ct sinhegmos Table -2 appy. t A abl -e air peak abov&e eacceptable celing o-~enwtion foran i-hr shift t Seet OSH, RIC3 CYl40W00), for additonal iuntive, nuatiive, reproductive, tomodgenic, and touicity dam. topo bnene exept in soe and piplies cote proMac utaubnsegments, the bez mits innsir Section3. PhysicalData -5 BiigPoint176' 'T Molecular Weight 78.11 MetagPoint42'F (D Sine Grvt (15 'C/4 C:0g787 YQwDPruL 100mtHIat7 9 '(26.1 WaterSoll0g1gofpat 25'C) C) %Volatle by~ounO EVaportio(At =):.7 I Ey~aradon (Ether=-1):2.Vhosity O.6468 mPa at 20C Appearance and Odor: Acoledess liquid with acharactedstic sweer, aa odor.be odor recognition threshold (100% ofpanel)isaroximnsey 5 ppm (unfatigued) inair. Odor is no an adquate warning of aard, Section 4. Fire and Explosion Data - Flash Point 12'F (-11.1 'C), CC Autoignito. Temperature:928' (498'C) ILELC 1.3%Yv UELU7.1% l Eztlnguishing Medi Use dry emnical, foam, orcabon dioxide to extinguish benzene fir.Water may be ineffective as an exingmising agent since it can sear and spread the fire. Use water tmcool fireexposed continers, flush spills away frm exposures, dispose benzne - UalFmna o? Hazards: hsa lB flammabe likquid. A eoucconation cweding3250 ppms is cnsiered a poential fiae explosion Bennsvapor is heavier than air and can colleet in low lyn reas or trave to an igtion"source and flash losivew and famable bearsne vapor-air mixtures caa easily form at toom tempatre. Emtne .a ignition soncee where beaens is used, or stored. entry.Since firs nay produce toxic futmeswa a self-contained breathing Special e4gting Procedares:solate bzard area and (r A) wi h afuU facepiece o in tprts$raei e ldor p .mad r and d e g Snturl mc n D otelese0 f te stay aut of low areas. Beaware o rcannCtW ghess protctive elod&ing provides rr ' sewrsc waways.. Runoff to sewer can create polution, fire, and explosion bazard. Section 5. Reactivity Data Stab~ity/PolymerzatLou: Benrene is stable at room temperature in closed containers under normal stooge and handling conditions. Hazardous plymerzzation cannot occur. Emkllz37 ncomptbties: Beazene explodes on cntect with diberate, permangaic acid, bromine pentafluoride. pcroxodisfic acid, and pcroxomoaosulfuric acid. Is *nites on contact with dioxn difluoride. dioxygenytetrafluoobre iodine bep'luonde, and sodium perxide 1.ni mtne + water. Benzene foam sensative, explosive mixtr wi iodine petafluoride, omne, liquid oxygen. silver padranitry pacd acid, and arsenic pentaluoride + potassium meuthxide (explodes above 30 *). A viorous or incandescent racion occurs wi bromine trifluorde, uranium hexafluoride, and hydrogen + Raney nckel (above 410 *(210 C)J. Beazene is icomnpatibk with oxidizing matcrials. Conditions to AvoidS Avoid heat and ignition sources. Hnzrdous Products of Decomposition: Thermal oxidative decomposition of benzene can produce toxic gases and vapors such as carbon monoxide. Oa-re- -a-l3-9 - NU-- a r o.316 Car juf *Benzene &/90 tion . Health Hazard Data oedty: The ACGIH. OSHA, and JARC list he=ne as. -pvely.a supeced human Carcnogen. a caer- huzaud, and, bad o a human and ammal evidence, a human careoge. (Group I).. - of Rsks: Prolonged skin aenae or ccessive inhina of ear e vapor my cause headache, wealess. a 'e o and fatigue, mst "oau health hazards are cancer (leukemia) and bone marrow damage with injury to Wood-foaming tissue chro lw-le Hi vel exposures may irrtate the respirtory trc and cause cen-'al nervous system (CNS) depression. Medical Conditions Aggravated by Long-Term Exposur: Exposure may won ailmenm of he ear, bangs. Ever. kidneys. Wood. and CNS. U Brav central nens system, bone marrow. eyes. upperrespiratry tract, and *in. try Routes: Inhalation, skin cota ectecdw Symptoms of acute overexposum include irritation of the eyes, nose, and respiratngy tract, bmatalesness, cuphowianause, s. headachec dizziness. and intoxncatno. Severe cposure may lead to convulsions and -ncosciosness. Skin contact may cause a J rash (dermatiis). c Effects: Lang-term chronic exposure may resaut in many blood disorders ranging from aplastic anemia (an inability to faon blood cells) 1 ary AMD -CGently lift the eyelids and flush imo~tyand ontinuously wit flooding =aonts atwater until transported toloneeecy mdical c onsl a physician inumediately. remove contamineated clohing Immedi=ey rinse with flooding amountsof water for atleas 15 min. Forseddened or bisteed tconsut a physician. Wash affecMe"aea wit soap and water titm: Remove exposed pe to fresh air. Emergency personel should against inhalation exposur. Provide CPR to support or cialation as necessary. awake and !ns to a medical i IngesoNever ve anything mou to an uneoascioue a convulsing peon. in do arinduce vouairngsince aspiration may be firtapp a rprite platparameicor commune tedlaIlupr h *idn' Not: Evaluate chronie exposure swth aCC~ pheloage maydbe udfor igns f yr *c.Poexws1n ±alindicators of leukemia with a bone marrow biosyno'l= conugtsOay sdfo0iloiaCmntrigasettexoue Atemenagement is primarily supportive for CNS dersin on 7. Spill, Leak, and Disposal Procedures : -.. p wnwlad0e nmrareplan (SCCP). Notify safty personnel, evacuate all unecearmy '"O"t e!"nmn all beat ad ignition soures, and provide adequate ventilation. against vapor Ihaadon eye and skin absorption. Absorb as mach benzene as pobe with a inert, naoerias. For l spils, d ar abiad of spill tpUU " Designandprcca be a cootain liquid. Use nonsparking tools to place wastt liquid or absorbent into cloable cornais for disposaLee wate outf confned ces such as sewers, waersheds, and waterways bec=us of d -losion Foger iallow applicable OSHA regulations (29 CFR 1910.20 Disposak Contact your supplier or a licensed contractor for recondations. Folow applicable FeraL state, ad localreguladon. ~ADesignations pdas a RCRA Hazardous Waste (40CFR 26133), Hazardous WasteNo.U019 as a CERCLA Hazardous Subsanc (40 CFR 3024), Reportable Quantity (RQ): 1000 lb (454 kg) ( per Clean Water Ad.Sec.307(o),311 1I2 and per RCRA, Sec. 3001) SARA HazardousSubstance(40C=R3S5):Notlsted as SARA Toxic Chemical (40 CFR 37265) -HADesgations as an Air Con'minant(29 CFR 1910.1000. Tables Z-l-A aod Z-2) r Section & Special Protection Data -.- Wear protective eyeglasses or chemical safetygoggl per OSHA eye-- ad faco-protection regulat (29 CFR 191043)3 rator Seek professional advice r to scspkair ~n ctio ad us. Follow OSHA respirator regulations (29 CR191034) and,if meeswear a NIOS-approved respira.For nergency orwwoutie operations (cleaning spils, ractot vessels, or strage tanks) wan CB W 3wainqgIAbr-p uinrespirardo not prtectwarkerisagas-d4Jcieabnaphra Mpe Wear impervious gloves, boots apcons, and gaunets to prevent skin contact. Pfotdde*general and local cxploslon-cofwudran systems to maintain airborne oncutio atleast below wOSHA PEIa Lcalhast ventlation is pcetumed sic itptei ent,, ar.minntdispersion Into the wo ar bycotrolg it at its source.cu t EMs Make available in the work an emergency eyewash stations, safetyfluk- ch shower:, an washing faeiies. abntamited Equipment: Never wear s lasts in the work ar. softhases may absorb, all nses concnrae, rnitan. Remove this froan shoes and equipmenr andcoaminned dothing before weaing. , ea, drink, or smoke in work arasPcie good personal hygiene after using is maetea=, especially before caing, drnig anonthe tid, or applying coscs- iection 9. Special Precautions and Conmnents 2 : - - Rn Stre itightly closed containm in acooL dq. well-ventilated aa away from all heat and ignitin souces mad E mIinateriais.Cazstio BOMe tpWr aaayflrat m os inurerin air.To prevent static sparks, eleercly ground and bond all d equipment used ' shipping,receiving. a fnin g operations in praducion and storage reas. Whenopening arelosing czene containers, use tools.Keep fire extinguiers readiy available. . Controls: Because sp eicinly regulatesbenme (29 CR 19104028), educate wodrs about its potential hazards and Minmize all possible exposures to acinogens. If possile, substinute less toxi solvents fhr beene- use dhis masat with e and only if absolutely essentiaL Avoid vapor inhalatin ad sin and eye contat Use only with adequate venile and appote snal protc g .Institute a rs ry poto prow tht incudes regular trining, ane ,inspect,' and cvinadan ksignate regulated aas of benzecne use (sce legend in the box below) and label ben-ne cesiner with "DAN . CNTANS BENZEN, Prtions:Provide preplacement and periodic medical xaminrations with emphasis on a history of blood diseaseor previous exposure. Transportation Data (49 CFR 172.101,.02) IOT Shipping Naue Benzcc (boaolo )OT Hazard Clas Flammable liquid No.: U11114 Labe: Fammabk liquid IMO Shipping Name: Beaene IMO Hazard Class:3.2 ID No.: UNI1l4 IMO Label: Flammable liquid T Packaging Exceptions 173-118 lOT Packaging Requirements: 173.119 IMDG Packaging Group: U DANGR CANCER HAZARD SMOGGO FLAMMAIEF AUrHORIZED PERSONNELONY RESPIRA-OR REQURE CIFD cI-. Refer"ees:.12. 12.26 73.U4-94.100101.103, 109, 124,124 127. 132,134,134 13. 139. 143 by: M1 Alison. 8S: Industri. Hylcene Rcvlew: DI Wlmn. CMH Medkal Revkw: M3 Upfal. MD. MPH; Edfted by: JR Sun. MS r my" so e .car ibircm o.,b udmaw to 9,, c~mte rwbvm~ rp awcv w~ dfim MaterialSafety Data Shees Collection: Genium. Publishing Corporation 1145 Catayn Stree' Scbenectady, NY 12303-1836 USA (518)377-854 Sheet No. 757Coal Tar Creosote Issued: 7/91 Section 1. Material Idendfcadon Coal Tar Creosoe noecular tonania "im with pudty) DesedAdMe:Thee main dedvadoet by dislluion of coal p caatrc Cfbonidion of bitminous coat by mxin strained naph e oil. wash oil. and strained or light anthracene oiL as a by-ptoduct of conventional coal cokIng It typically contains up to 160 chsmicals, mainy aromatic compounds such as pheol andpyridine.Used mainly as a wood preservative for railroad ties, *fe ceposs manne pings. and oedr for outdoor use aa wer-proofing agent iOil o05erment mecagent for mir se araio.a hp derian and lubdeant for die molds in mfacdng oheicals: and in as an ntsepic disinfectaan, ,apyre tac. ger, *H'and Other Designations CAS No. 001-584-. Awp. bdck oil. N coal tar oil, &SO, coste OI ceosonmn, cresylic creosoteheavy oiL l onil en-oiPreserv.o sore, salkesotcomr oil, wash oil Manufacturer Cnactyour supplier . Consuk latest CIe1wal WeekBuyr'GuiddU fli a supplies list. Cano= lammable, liquid coal tar creosote is toxic by Inualadon Iniesion and skin contact. The ARC and NTP tar todifld by hiH4 classify it as a rena n rSkia absorpmion with phenol, a MajorcponeqoM 34 R I 3 K 1 N-A 4 4V 2 \ "skin absotic 12 P 2 F 2 Mat t Sc. a Sec.ge8 of coal tar crese= Section 2. Ingredients and OccupatIonal Exposure Lmits Coal tar ceoso, ca 100% 1990 OSRA PEL 8-hr TWA: 0.2 mg/mt 1990-91 ACGIR TLV TWA: 0.2 mg * 198546 Tohicl Datat R. oral, LD 7 r toxic efects not yet reviewed Dog oral. 600 k toxic effects not yet reviewed R04 a'gadai d dnuig 91 dys pior to matng exractable prodcason falopiantubes and ovaries M Os ski, : 99 Ugkg produces wnnors in dn and appendages 1M9 ILH Level 19 NOS REL 70ormin- 0.1 mg/u (cyhme portio - pnred vod.oeo RECS(GFS0). eAs coaitr t See NS. Section 3. Physieal Boiling foradcdson ami rpcodnetn. riio. nd otastit dt - Data e dia: 381 to? 52 f (194 to 400'c Molecular Weg t. vares fih purity Dat on Rang e: 6 to 554 fT (230 to 290T'C) Denslay/Spefic Gravityl1.07 to 1.08 at 6 s (20 'C) Buat of Co E osiona2.5t Blab -Water Solubility: Sightly soluble Keos Vaporizati:, looBtu ab Appearance and Odor: Pure coal tr cresoto is colodess. but the industrial product is a yeulw to black oiy liquid with an aromatic smoky smer and a buing c ade so. Section 4. Fire and ExLosion Data PShb Point:u165.2'F(74C), CC c Anteiton t1peare 67'F( C )e c I LELe Normspore sa d U lE gondtponed er regular tom For Imai w,efog or regula rfoam. Since ExdneIshing Media:Forsmal fires.use dry chial.e carbon dioxide(W wat is least effective, use Itas an extingisin agent only when the pref=6 measures are unavailable. Howeve. use wate spry to cool aire- Uanausol ymrExplosion Hazards:V my avel to an 'Gon scur and nash bac. Cnnaies may explode in bog of JIM Cod sr do tur Since fit amy podue toxic fumes wear a sel-cotait nedwppeasr)ihfoflca Oaado inpreuo-desand or posdoe-prmal ' od. Also, ear pUl pmotdicve caohro. Stay an r ends of tanks. rnd tiV fie i Wag area use mionitor d=1i or u nnnd= h Ose hodr;If impossile withdraw from area and let firnbum Imnwdimy leave aem If youaro a riang sound from venting safety device or nodice any firc-caused tank discoloration. Isolat aroa for V/2 mil in all dircops if rec In vocs tawk, mail car or tan uck. Be aware of runoff from fire control methds. Do no Pelease to sewers or watewaysL My dieroamninate or properly d3sposa of personal protective clothing. oindorsndwehooso Cecalot In nasiiltexpCoso a idin ls edcn.nrcue niceseI eprtr n rsue Section S. Reactivity Data Coal tar creosote is stable at room tiemaure in closed containers under normal storae and handlin conditions. =Stability/Polymerisation: Hzruly miztocantcur Chemieal nciaties:ti Creosote oil mixed with clorosulonic acid in a closed contane causes an increas in temperature and pressre Condition to Aod: Avoid excessive het wA contat with chlorosulfonic acid.Hazardous Products of Decomposition: Thermal oxidadve decomposicion of coal car creosoto can produce oxides of cabon and thick, black, acrid smoke. cofyddait 0 199 W Nb Oenin An co~mrerraJ us or rcducon . keTf Irepe c OsAq Witoub e pubicher rminion K pretMed. aection 6. HeaIth Hazard Dat Carcinogeictr In 1990 reports. the MRC. NIP. and OSHA lisr coal tar creMosoe as a ' Swmaiy of Rtkc Coa tot aaoso by a inge~stion and skin contact. It contans avariety of boebos such as sha Wn potycyclc anrmti hydiocarboos suchIsastoic benzo(a n wAdrvtvs h Vo~xct efu dM ~sr COnctatiauc. amont. ad duraton Effects may 1f,"rn b40 Medica Condib-ons Aggravated by Leag-Term Exposure: chronic repi atrskin diseases. ganm Eyes. s.bladder, kidneys, and respiratoy systm Fnmnsry inke* and akin contact I - Acute Skin conct may case i bundig. t ne , pigment changes. da is (a rash of remdes and sma bun bums. Phorosenasitizadon (w o fnm rash With es r eccr r may beh contact may cause cojuinenhvicis of the eye'a (corneal inmmaion), Or bumWs i rsul m omsc, vonunag am discss. and shock. Systemic absorption by any rute (Tc a cston Epsue doses (parcucflajy by inge tion)ay beW dinine, headac nous e vomiting salivatio and Chronk Efec: Dermatis, skin encer, and b cadre nag - I 3 or may y: endylift the elids and flush immedately and condnuoudy wit fooin amounts of water ul transported to an mergenay medial facihty Dor wet victim tubes or k 1idm Qstc y remove contamiated Wa consul a physician. -- em fihl osed anntl a py .W eced ama with soap = rfim tnly. flooding amounts of water for at least 15 min. For reddened or Remo exposed peson to fresh al and supp breahing as needed. Nev give, mouth to anunconscumor convulsing p Ifon. Ifingested. have that consciow person drink I to 2 glasses of After fir d, get a a isn. or comunity mediel support Note to flqsuda- &eSo b Inurne. Section 7. Spil, Leak, and Disposal Procedures Siilu Notify personel. Isoa hazard are, f~~~mesm inhzr ra S S p esne hud protect en try, and Sy upwin Of sIs. Shut off all Ignitiotn soursm ffizes vj~aporih be used to reduce vapor but it may not prevent I ad nneZnom ta ter and i ab=e1comnas for laer plicable OSHA Enviromuental Degradaton: Coal cre 6o) nue Of creosote an coal ar D W: your supplier or a * (29 CFR 1910.120). oln. or on and skin or eye contact If possible with no risk, stop=ek. ate For small spills. take up with eart. sand, vermicuite. or other Plor large spills. dike far ahead of liquid spil forlater I: godsh (Camsurrsau s), 3.51'ppn24 hr wir nlns). 1.260 ppm/S Sys (604) mixture of creosote and coal tar. reco ndauions.Follow applicabe Federal, state, and local regulations. i foulng to Mrshoreline. Ecotoxiciky values are bob whir qu (ComH isted sa RCRA Hazardous Waste (40 CFR 261.33). Hazardous Material No.U051 I SARA Jstedas a CERCLA Hazardous Substanc* (40CFR302.4 ,rt Quantity (RO): 1 lb (0A54 kg) Extremy Hazardous Substance (40 CFR 355): Not [O per RCRA. See. 3001]* Listed as aSARX Toxic Chemical (40 CFR 372.65) OSHA Designations Listed (as coa tr pitch voletiles) as an Air Contahinant (29 CFR 1910.1000, Table Z-1-A) Section& Special Protection Data Goggle Wear protective creglasscs or chemical safety goggles. perOSHA eye- and face-protecdon regulations (29 CFR 1910.133). Since * conta~t lens use in industry is controversial, estblish you own polc. Respirator: Seck poessional advice prior to spr or selection duse. Follow OSHA respirator regulations (29 CFR 1910.134) and, if S , wpt NIQSH-agd pinsor For eineigency or o ue ions (ciesung spills. eaco vessels, or stomge tanks), wea an 3mA anMtI Air-punhnn rapnar do notpf0Arwr= i n.yameffw ans~rs Other Wear i %o the oves.boots, po and ganaes to prevent skin contact. A a layer of petroleum jelly or lanolin castor oil ceduces vapor contact ard penetration through akin. Frequent chango o protective garment is an addidonal protective Vendiiom Provide gents and local exhaust veniladoay mnns aqqnp wie hNgh-efllcieay particulate an toaintain aimne con.enstations below t.e OSHA PE (Sec. 2). Ioeal exhas ndton is perre since it prvevcns conaminant dispeion into de work are by oonholng i ait sourco~l Safety Si-tie- Make available she In work area emergency eycwashsai.safeWnquick-drechhowrns. and washing haczies. Contamnnated Equipment: Take particular cae to avoid any conamination of drains or vcntlation duct Remove this material foM your shoes and eqwipment. I aner contaminated clohng before wearing. I Conints: Never eat, drink, or smoke in wort areas. Pradicegood personal hygiene after using this material especially before eag Smokng, usin the oilet, or applyin c smetics drekinkilg, Section 9. Special Precautions and Comments Storage Rulrementt Avoid physical damage to container. Store in a cool, dry, well-ventilated area. Store coal tar crcosote as close to area of use as , to ninimize transporing distance. Engineering Controlsa Use engineenng controls to keep airbome concetrations below the OSHA PEL Institte a respiratory protection program that nles regular training. maintenance. insp'ction, and evaluaton. Always perforni synthesis and purificadon procedures under a verWca ventilation hood and make regular operational safety chccks. Label doors to rooms where coal tar crcosoweis produced, used. or stored as c ocate ency equipment at nil-marked and clearly identified stations in casc emergen escape is necessary. Other Prcud :and Periodic medical examinations of exposed workers e 'wjadzng respiatory, skin, liver. and kidney disordersincluding comprbcnsive work and medical history, physical eainiation. CXR. s. urinalysis L. and spunmm cytology as the atrending physician considers appropriate. Educate workers about coal tar creasore's carcinogenicity and proper handling procedures to avoid I - Commens- Caution is In order when handling or sawing old creosoce-zrested lumber since it crtains a considerable portion of creosote for up to 25 to 30 ycars. Transportation Data (49 CFR 172.101) DOT Shipping Name: Creosote DOT Hazad Class: Flammable liquid ID No.: UN 1136 DOT Label: Flammable liquid MSDSCfSC-o~ud Refercnccs; 26. 73. 100, 101. 103,124.126. 127, 132, 133. 136, 138, 139. 140, 142, 143. 146. 148. 153. 159 PrePared by: M Oannon. BA; Industrial Hygie Revtiew: Di Wilson, Ct; Medical Rrencw: Mark Upfal. MD. MPH; Edited by: JRiSuan. MS -wu1 ICI.±CS mos,.AIhgfn.bktfl 0hc hn bk";s Wc. . prn.0.. .Lne biawnk'. Ocaa ru .bcw 5 Co~pcto. remc -- a~m.a . 36 "0poffpnt 15* sfiaaIsp- IG - --- %X444%666- - -s - - Sheet No.470 Diesel Fuel Oil No. 2-D 1145 CatalynStreet Schenectady. NY 12303-1g36 USA (518)377-854 Issued: 10/8 Revision: A. 1I/90 -1331A Section 1. Material Identification Diesel Fad On No.2-D Descrpti Diesel fuel is obtained from the middle distila in petroleum separation; a distillate R oi of low sulfur content. It is composed chiefly of unbraced paflins. Diesel face is available in various grades. one of- I which is synonymous with fuel oil No. 2-D. This diesel fuel oil requires a mini-- Cetae No. (efficiency rating for diesel fulomoparable to octane number ratings for gasoing) of 40 (ASM D613) Used as a fue for trucks. ships other automotive engines; as mosquito control (coating on breeding waters); and for driling muds.,. Other Designations: CAS No. 68334-30-5, diesel fuel. Manufacturer Contact your supplier or distributor. Consult the latest CAanicatamWkBuyer/Guidd# for a suppliers list, I NFPA - 9d 2 HMIS H R 0 PPG' Caudons Diesel fuel oil No.2-1 is a skin irritant and central nervous deprssant wish high mist coocentrations. It is neviimecW hazard andmoderate fire ris.Sc. Section 2. Ingredients and Occupational Exposure Limits U Diesel fuel oil No. 2-D* 1990-91 ACGIH TLV -1U NIOSH REL 989 OSHA PEL Nose established 1985-86 ToxIcity Data* Rat, oral, LD,: 9 g/kg produces gasoinfstia (hypermoility. diarrhe) effects None established Mineral Oil Mist TWA:5 mglm't 10 mg/m 3 -*- SmE. I Diead fad No.2-D Seads to be law i amontaics and high in parainfica:Iis thet ili comnx i of: 1) >95% paraffinic.olcem-ud, mlarb and (<100ppu* (A low benelevelsd cscasenogeie Rist. roel oils ca beex-anp undertbe hydrocbos, 2) sulfur (.%). aind 3) ba bene smtndard 09 CR 1910.IO28). Alhough low in the fuel itsel beaene c-oncMatin HWy to be much hiber in procesng area. Assaplek by avnaper-conectg metbod. * Mouitor~OCSH. RfT30QZ130000), forrure taticity data. acsic I Section3. Physical Data A ! - Rolnng Polnt7Range 340 to 675 T (171 to 358 ') Vscostr 1.9 to4.1 centistoke at 104 ' (40 T) Speci-Cc Grvlty:<tJ6 Water SolubltyIJnsoluble i 'Utff:y .- Appearance and Odor Brown, slightly viscous liquid. Section 4; Fire and:Explosibn DataY ij UEL 7.5% V& dxe, orfoamto fight f.Use a r spray to cool fie exposed entainers Do not use a Ry Extiguising Medic Use d chemicarboc fcedwat wqay decdyon burig oi since this wills-anrthf fire.Use asmotdg technique forextinguising fir Unasuaflmeor Exlosonasraeds Dieselfuel oRNo.3-D i aOSEHA Clas cmassibequid.Rtvs tMy is nneto that ofgas 0i1. Flas Nt:125*F(S2'C)i . . Astolgniton Temperature: 500 T(932 ') LEL: 0.6% v Vaposmay travel to a source of Ignitinn and flash back. Special Fre-flghdng Procedures: Moat 1hard aea and deny cny. Since fe may produce toxic fmes, wear a selfkoantin breathing dn crposiie-psure mode and full protective odthg. If faibe, apparatus(SCA) wit a ful facepiece operated in theptesure remove containers from fire. Be aware of runoff from fire control nedods Do not release to sewers or waterways due to pollution and fire or explosionazard. Section5;. Reciiy<ta + s M i j g MM :-li Stablity/Polymerization: Diesel fael oi No. 2-D3 is stabe sroom temperature in closed cnntains undernormal sorage and handlgcoaditions. Hzardous polymerization cannot occur. Chemical Incompatlbiltest t is incompatible with strng oxidizing agents; heain greatly increates the fire hazard. Conditions to Avoid: Avoid heat and ignitioc sources. Hazardous Products of Decomposition: Thermal oxidative deconiposition of diesel fuel oil No 2-D can produce various hydrocarbons and hydrocarbon derivatives, and other partial oxidation products such as caton dioxide. carbon monoxide, and sulfur dioxide- 0o moc=..mi.xMn caes - arcnogenlcy Altho fa an e ILARC has not assigned an ovral evaluation to diesel fuc as a roupk has evaluated occupationaln probable human ercimogen (Group 2A). It has evaute-d isa (lght) diesel ala not clasabe rS h inra amary Risks: Q Although diesel fuers toxicologic cffects should resemble keosine's, t arc somewhat more prouanced due Io additives cha sulfuuned esers. Excesve inhalation of aerosol or tist ean cause respirtory nract rntation. headache dinnc nasea, vomitingand m ofcooreinaioa,.depending oa covcemtration and exposure te. When removd from area, affected prsoans nsally recover "T'ayIf vomiting occurs after ingestion and if oil ,s aspirated into the lungs. and pulmonary edema. progressin to renal inIeCment and chermcal pneumonitis, may result. A comparative ratio of oral to aspirated lehal doses may be I pt vs.5. . ration may also suit in bansuat CNS depression or excitement. Secodmany effects may include bypoxia (nsufficient oxygen in body cells),' ection puesmao1C (ormatino, and chronc lung dysfunction. Inhalt may result pr cardiac d mias, respirary arss and CNS oict Soonged or repeated skin contact may irritate hair folicls and block glands. ' a ra of acne pimples and spots, usually an UI a Coeditions A rvated by Ln-Term Exposure: None reported.krget O sa: C n erVous system, . and mucous memubranes. knary Etry Routes: efnfasfn ingestion hi Systeeffcs from gesUo inud gastronestinan irritation, vomiting. dianbeA, ad in severe cases central nervoussem progressmg to coca rdeath. Inhalan of aerosols or mists may result in icreased rate of respirato, tachycardia (excessiv id beatand cyanosis (dark purplish discoloration of die skin and amcous membranes caused by defieient blood oxygenation). nloe eets: Repeaed contact with the sin causes dermatitis. ltthe eylids and flus immediately and continuously with flooding amoant of water untifil trnsported to an emergency medic Vemove cona a *. Rinse with mounts of water rat least 15 min. If large areas of the body have been persists, r get medicahe ash affected area wit soap and water. aation: Remove exposed pesn to fresh azr and support hinasneeded. s rmmothtan by on-anas or convul'ig perso. If ingested, do ow induce vomiring due to aspiration hazard. terurt get proa n-lant,parashedlcor communItymedicalspport. 4e to ne lavage is contraindicated due to aspiration hazard. Prefcared antidotes are charcoal and mil In cases of sevee 3rnn """e"v"l consid.nnioring aneial blood gases to ensure adequate ventlation. Observe the patient for 6 br. If vital signs become Wor symptom%develop, obtain a chiest x-ray. 9? a physician immediately. f ction7. Spill, Leak and Disposal Procedures -7 . m otif safety personnel, evacat area fore spills remove all heat and ignition sources, and pmvide maxinu ep m uier Mso esold a vrtcta portinhalation and liquid contact 4Cea up spills promptly to reduce fire orvapor . aanl 'upsmaabsorbealnp spills orresidues For lgels, dike far ahead to coutn. Pick up liquid foredamadrsposal. Do not release to sewers or waterways due to health and fire and/or o bawd. Folow applicable reguarins (29 ~R 1910.120). Diesel fuel oil No. 2-D spils may be environmental hazards. Report tact your supplier or a licensed contractor for de-iled reeommcnc s 01l6W applcablc Federal, state, and local regulations. Wate (40 CFR 261.21): Igntable waste HSazardousSbstance (40 CFR 3024): Not listed .RA Extremely Hazardous Substance (40 355): Not listed Toxie Chemica (40 CFR 372.65): Not listed A Desinaons Cootaananan (29 CFR 1910.1000 Subpart Z): Not listed ction & Special Protection Data K or chemical nfety goggles, per OSHA= and face-protection regulato (29 CFR 1910.133). ad=Weepoor to respirao setion and use.F OSHA respiatoir regnlarin (29 CER 1910.134) Ad if neces r steetivae ln o wih a s fibrer and orgaV= vapor enaridge. Foremergency or omotin en (clea g spil ctorves or s to ks weranSCA.Wrng Air-pu fyfag reqhando noprcrworkmrin yxwm-dfcieaonospher. S Wearlnpervious goeboa ~Si f r. Rowad gaun-det bprven skin contact kide labl a invenda I~nal snt edmn"is aioni e n drtinsthaworker safety ad sinc it prvnssystemi maintain iprsa -dm~n nothe bodeMar at fts son~or= areag g e sh san, safetyfliclk-drecch showers, washing ides an u d Egaipment: Never wear contact n the w areasofflenses er may absor. and all Senses concen , frandtn.Ramve ts dfiom ourdi and equipment. Landerennremiboe clothing before ang ca, nk, or smoke in work reas. Practice gdod personal bygiLne after using this mteda, especialy before cadng drinng Pa Ma Equipme la: In we usigbe tolecrapplying conieis.- ction 9$ Special Ptctutionsiand Cdmments r.,.tg. t nr s<a geRinewnts: We and stoag conditions should be suitable forna OSHA Class U Combustible li'quid. Store in closed container inna ZFS arewa from hea and Ignition sources amd strong ozidii apeoMs proect containers from physical damage. To prevent static I~~ntt and bond all conainen and equipment used in shipping. teceiving, or transferring operations. Use nonsparkng tools equipment No smoig in s e or use areas. trols: Avoid vap or mist inhalation and p skin ntt Wear protective rubber gloves and chemical safety glasses rwthii gh stconcentration may occur. sab etional otecve clotg may be required dependin on working "*stte a resp protectiont that includes regular *i maintenanee t and evaluation Practice good hgeeand housekeeping w uesk ) not wear oil contanated loin.Al least wekylaundering oftwork clothes is reom- elecuicalWy Cdon IPackaging Lred Mid. Ionot put oily rags m porckes When working with this material, wear gloe or use barir creant- Data (49 CFR 172.101)- ShppngNme: Fuel oilHandClass: Combustible liquid 4.: NA 1993 Label: None viedr. ;ICj rcye sigusr qWhenof e ain nIO resa wad as meoc: saa~k' =we, Exceptions: 17318i2 tk Doppw (49 1d2-101 cthis m Wo a or oi. a ed aeriw=.in a red= qykingwit Packaging Regninments: None nwe l u d er Z ren vesog.Ar a~e we rt aff cmnanan.laan coFq.. ri goe.k l t e i e o )S Ceffedafefeneesz1.47 12.73. ,101. 103, 126. 127 132 133, 136.143, 146 by: MI Allisco. BS; Industd~al Hygiene Review: Dl Wilson. CiH; MedkcAl Revdew: AC Dadtington. MD: Edrced by: JR Stuarn MS .. r....r.C......r..r..---.-' ...-------.'..........-..-.----- ,............--........n.mM .. pta. No. 385 Materia- Safety Data Sheet from Gcnium's Reference Colection ETHYL BENZENE Genium Publishing Corporation 1345CatalStreetU -183USA S ady, N (518)377-8855 SECTION (Revision A) Issued: August 1978 Revised: November 1988 u"'"e cona """ 1. MATERIAL IDENTIFICATION 27 Material Name: ETHYL BENZENE Description (Origi/Uses): Used s a solvent nd as an intermediate in the production of stywne monomer. Other Designations: Pbenyledan; Ethylbenzol; CACH,; CAS No.0100-41-4 Manfacturer Contact your supplier or distibutor. Consult the Buyers' Guide (Genium ref. 73) for a list of suppliers. NFPA RI HMIS H 2 est edition of de ChcAscuwek - F 3 R 0 13 PPG* *See sect.8 SECTION 2. INGREDIENTS AND HAZARDS % -EXPOSURE LIMITS Ca 100 Ethyl Benzane, CAS No. 0100-41-4 K 4 OSHA PEs -HrTWA: 100 ppm, 435 tng/mn 15- Min SIT: 125 ppm, 545 mg/n ACGIH TLVs, 198g-9 TLV-TWA: 100 ppm. 435 mgh' TLV-STEL 125 ppm, 545 mghn' Toxicity DataHuman, Inhalation, TC,, 100 ppm (8 Hrs) Rat Oral, LD; 3500 mgtkg *Se NIOSH. RTECS (DA0700000), for additional data with references to reproductive, irritative, and mutagenic effects. SECTION 3.. PHYSICAL :DATA.2 - Boing Point: 277"F(13C) Melting Point -139F (-95) Vapor Pressure: 7.1 Tou at 687 (20'C) Vapor Density (Air = 1) 3.7 % Volatile by Volume: Ca 100 Molecular Weight: 106 GramsvMole Solubity in Water (%): Slight Specife Gravity (,0 = 1): 086258 at77'F (25'C) Appearance nad Odor A clear, colorless, flammable liquid; chacteristic momaic hydrocarbon odor. SECTION 4. FIRE AND EXPJLOSION -DATA Flash Point and Method 647 (IC) CC AUtoigniion Tempemnr 8107 (432.22'C) ILEl 1%vtv UEL 6.7%v/v Eztinguishing Media: Use foam, dry-chencal, orcarbon dioxde to puteethyl benfire A water spray may be ieffectve inextinguishing de ft, because itcan scaier and spread the buring liquid. Use water spray to cool fiu-caposed containes ofethyl benze4 to it 'is dispere ethyl benzene vpor and to protect personnelhanempting to stop an edhy benn let Unusual Fle or Explosion E liquid can Cadily form explosive vapor-ar sham es, especialy when hestd. Etyl benzen vapor Is heavier than air and may nave aeonsiderable an to a low-tying soarce offnitin and flash beek to its oigin. Sped.! Fre4gbdng Procedures: Wear a self-coataned b:athing apparams (SCRA) with a fNl facepiece operated in the pessureeman- orpositiw-presse mode. SECTION -5. REACTIVITY§DATA T.- :-T7' - StabliltyiPolymerizaton: Ethyl beanme is stable in eloed containets during routine operations. Hatardous polymerizaioo cannot occur. ' Chemical Incompatibtlldes: Hazardous chemical reactions can occur between ethyl benzene and stong oxidizing agents, acids, nn and bases. Conditions to Avoid Avoid any exposure to sources of ignition such as heat, spaks, open fame, and lighted tobacco products, etc., and to inconpatible chemicals. Use caution when enteing confined spaces, particulady low-lying ares where explosive concentrations of ethyl benzene vapor may be pesent. Provide good ventlation to such =as so prevent the conceuration of tis vapor. Hazardous Prodncts of Decomposition: Thermal-oxidative degradation can include toxic gases such as carbon nmooxide md/r aromatic hydrocarbon gases. SECTION 6. HEALTH HAZARD INFORMATION :- Carcinogenlity: Ethyl benzene is not listed as a carcinogen by the NTP. IARC. or OSHA Summary of Risks Ethyl benzene vapor is severely iritating to the eyes and to the mucous membranes of the respiratory system. Sus tained inhalation of excessive levels can cause depression of the central nacrus system (CNS) characTized by dizziness, headache. narcosis and com& Skin contact with liquid ethyl becne causes irritation dermatitis and defatting can also develop. The acute Ma! toxicity of ethyl bezene is low; however, ingestion of it presents a serious aspiration hazard. Aspirating even a small amount into the lungs can resultin extensive edema (ungs filled with fluid) and hemorrhaging of the lung tissue. No systemic effects are expected at the levels that produce pronounced, unignorable, disagrecable skin and eye irriaton. The TLVs cited in section 2 ar set to prevent this intolerable iritation. Medical Conditions Aggravated by Long-Term Exposure: None reported Target Organs: Skin, eyes, respiratory system. and CNS. Primary Entry: Inhalation, skin contact Acute Effects: Irritation of the skin, eyes, and respiratory system. Also, cardiac-rhythm dis- tnrbance due to sensitization; acute bronchitis, broochospasm, pulmonary and laryngeal edema; cuphoia; headache; giddiness; dizziness; and incoordination, as well as possible depression; confusion; and coma. Chronic Effects: None reported. First Aid: Eyes. Immediately No. 385 ETHYL BENZENE 11/88 SECTION 6. HEALTH HAZARD INFORMATION, con. E flmsh cyes. including under the eydids. gently but thoroughly with flooding amounts of running water for at least 15 riinates Skin. Rinse the affected wra with plenty of watcr, then wash it with soap and waor. Inhalation. Remove the exposed person to fresh ai; restore andler support his or her breathing as needed. Have qurredmedical personnel administer oxygen as required. Ingesdon U.cltly. Should this type of exposure occur :he aspiratioc h:srd sst be consdered. Do mot induce vomiting unless directed to do so by a physician. To prevent aspiration by spontaneous vomiting, keep the victim's bead low (between his or her knees). Get medical help (to plant, parmedc, community) for al exposures. Sock prompt medical assistance for uIner reiman, observation. and support after rust aid. Note to Physician Professional judgafet is reqeired as so whether or not to indce vomiting because of the possibility of aspiration. A gastric lavage may be administerri, followed by saline caharsis, if this procedure is appropriate to the specific incident. Moniutor cazdic and puhnouary unctions. SECTION 7. SPILL, LEAK, AND DISPOSAL PROCEDURES SpN/Lenlc Notify safety personnel, evacuate nnccesuy personnel, elimina2e all sources of ignition immediately,and provide afequate aplosi-proof ventilation. Clienup personnel need ponection against skin or eye contact with this liquid as well as inhalation of its vapor it with an inert material-such as sandparth, or vermiculite. Use nonsparking isorb (se sect. g). Contain Lage spills and collect waste or tools to p-ae waste iquid or absorbent into closable containers for disposal Keep waste out of sewers, watersheds, and waterways. Waste Disposal: Cnaet your supplier or a licensed conractor for detailed recommendations. Follow Federal, stat, and local regulations. 05S1A Designadens kIed man AirCnobtinne (29 CFR 1910.1000 Subpat Z). EPA Deguthais (40 CFR 302.4) CElC.A lanado Subsme, Repotable Quaytity: 1000 lbs (454 kg). per tO Cea Water Act (CWA), i 311 (b)(4) and 307 (a). SECTION & SPECIAL -PROTECTION INFORMATION Goggles: Always wear protective eyeglasses or chemnil safety goggles. Where splashing is possible, wear a full fa shield. Follow OSHA eye- and face-protaioo regulations (29 CFR 1910133). Rspirator Wear a NIOSH-approved respirator per Genine reference 88 forlhe matism-se concentraticns adlor the exposurelimits cited in section 2. Folow OSHA respirator regulations (29 CFR 1910134). For enesgency or nouroutine operations (spils or ceaning reactor vessels and storage tanks), wear an SCBA. Warnin Ar-purifying espia s Wl or protect workers in oxygen-deficient asnospheres. Other: Wear impervious gloves, boots, aprons, and gauntlets, etc., to prevent prolonged or repeated skin contact with this materiaL Ventdlatiom Install and operate general and local maximun explosion-proof Verlann system powerful enough to mitain airbome levels of this material below the OSHA PEL standard citwd in section 2. Local e"aust ventilation is preferred became it prevents dispersion of the contaminant into the general work ar by eliminating it at its source. Cosult the Intest edition of Cenium reference 103 for detailed recommendations. Safety Stations: Make emergency eyewash statons, safety/quick-drench showers, and washing facilities available in work aeas. Contaminated Equipment: Contact lenses pose a special hazard; soft lenses may absorb irritants, and all lenses concentrate them. Do nor wear contact leases in any work area. Remove contnminaedcohnand ander it before tearng it again;clean this material from shoes and equipment. Comments: Practice good personal hyie; always wash thoroughly after using this marial and before eating, drinking smoking using the toilet, or applying cosmetics Keep it off your clothing and equipment. Avoid transfening it from your bands to your mouth while eating, drinking, or smoking. Do nor c2r drink, or smoke in any work area. Do not inhale ethyl benzene vapor. SECTION 9. -SPECIAL: PRECAUTIONS AND COMMENTS SETIONeregatio: C yl benz in closed containers in a coo dy weD-ventilated are away from sourc of ignition and fif lage quantities ofethyl benenIe.ste bult storage areas from acute fire hards. Engineering Catls: Make sure all engineering systems (producion, nransportation) ae of maim explosion-proof design. To prevent static sparks, electricaly ad bood al containers, pipelines, etc. used in shipping. tnsft ring, reacting. production. and sampling operations. Other: Use safety c for rasfeing small amounts of ethyl benzene. D=aptionDat (49 CFR 172.101-2) DOT Sipping Name Ethyl Benzene DOT Hazard Cas Flammable liquid IDso.UmN7 DOT Labe Flammtable Liquid DOT Packaging Exceptionst 49 CFR 173.118 DOT Packaging Requirements: 49 CFR 173.119 LMO Shipping Noac Ethylbeazene IMO Hazard Class 3.2 IMO Labek Flammable Liquid IMDG Packaging Group: II References: 1. 26,3.84-94,. 100, 1.-117.120, M22. A"1n a tothenntatay ofnnf.a. bar fr ~oC~~2ily pwdunmea ncpm'ry.Theadro:Mut aa P..Me§p *"o' Monp. ''f 'cP kroP1.i h -~a '" a-cam sanCa2. Wends m*. no CpC%--t- -dM=Ma nosrupocnibaky =ccury ormsniwty er'such nruramc raicatia to . of is p.,da'es- a~ pupom orror C-~r-~er as to ac 7E2 - -- - .- 4,mt .... Prepared by PJ Igoe, BS Industrial Hygiene Review- DJ Wilson, CIH. Medical Review: W Silverman, MD - Genium Publishing Corporation 1145 CalWyU Saeet - - Sheet No.467 Automotive Gasoline, Lead-free Schenecdy. NY 12303-1836 USA (51g)377:s54 . Material Safety Data Sheet Collection: 10/8i ksnte&. 10/81 kW '&cttoniA~N~atera&al d Automotive Gasoline, A 9/91 Revision: A 0101 Revidnn- ad-ftee, Descripdam: A mixtue of volatile hydrocaboos coiposed mainly of branched-chain PsfrIns, cyclopsafmis, olefats, nsphthens, and smouba In general. gasole is produced from petrlcum, shale OIL Athabaa tar sands, and coal. Motor gasolines are made chiefly by cracingp0o--sses, which couver heavier petrolCUm fractos mio mote volatile fractious by themal or catalytic decompositioo. Widely used as fuel in internalnncombesdon engines of the speat-gnited, reciprocating type.-Aumwave gasoline has anuo nenumberoF approximary 90 A higb eonat of armatde hydroeabons and a consequent high toxicity we also anociatd wit a high Octane raing.Some gno e sold in the US contain a minor pmportion of eseracahytlead, which is added in cownenuanw not ceding 3 of per gation to preven engine "knoc However, methyI-en-btyI eher (MMBE) has alma canpietely seplaced R t S K I 2 Rirti NFPA 2* 4. absoti HMIS H 2 F 3 R I pPGt Other Desigadons CAS No.8006-61-9, benzin, gasohne. gasolene, notor spirits, nanaagaso&e, pctpl. Manufacurer o'an aryour supplierardisutbuwor.mConellatest ChanicdWeek Rayrs'Gedet" fora suppirs. tsc.S Cautions Inhalation of attomotive gasolne vaprs can came intense burning tout and lugs central cervons system (CNS) depeessioc. and possible (9at pulMO"-y edema. Gasoine is a dangerous fire and explosion haMad when exposed to heat and Darne. 1990 OSHA PELS 8-br TWA 300 ppm. 900 rggr 1985-6 Toxicity Data0 1990-91 ACGIH TLVs TWA 300 ppm, $90 mghrn srEL50ppm, 1480 mgrW 15-sciSISEO:500ppm, 1500 Mwgm Man, inhalation, TCj: 900 ppmf 1; 1990 NIOSH REL None established *Atypicalmodem aone~co"pDriis W% paaffins,14% amade, and 6%oeGas." infmr pboqorus. and MBE t 5ccNIosMfJrasDC300 for-ajroariitdna. .. Boling Point Initialy, 1027 (39 'C; after 10%died, 140 $ (60 Cx after 5 distilled, 230'F(110 *C) after 90%distlled, 338F (170';C finalboiing poin399 *(204'q Vapor Density (alr=I):3Ato 4. (-43*q Astoi Tem he men ben actenis appriely II.Odxcraddisiminclide DeAsityISpeflc Graavty:0.72 to 0.76 *60' Water Soblbity: Insonble Appearance and Odor A clear (gasoHne may be coloted with dye), mobile lash Ponut:-45' toxic effects include sense ergans and special senses (oxjunctiva iritation). behaviora hafu-idnadane, distoted perceptions), bags. thorax, or reepinua (-00gh) Human, eye: 140 ppm/8 lr; toxic effects include mild rritation Rat inhalation, LC; 300 g1/3 ain (156C) liqid with a characteristic cdorrecogizable at about 10 ppm in air. 536 sL537(80 s456'C) LEL, Lc3% w I UU6.0S v/t Extinguking Medt Use dry chemicaL carbon dioxlde, cral hl foam as extinguishing media. Use of water may be ineffective t extinguish re, but use war spray to knock down vapors and to cool fie-cxposed drus and tanks to prevent pcssuic ruptre. Do not use a Solid steam of water sc itmay spread theL e. Unusual Mre or Explosion Hazards Automobile gmsoline san CSA Class IB M liquid and adangeos fir and elosion hazard wen exposed to hea and neeriring Vapomcan fow toan ignition soee and Vi Bashe. Aumnnobile gasoline can ai teactviOnty wi at. Special Fire-fighting Procedures: isolate ard ar and deny city.Since fi e may produce toxic fumes wear a self-confh breating apparnahs (SCA) with a fu facepiece operated in por pirive-pressre mnode, and fM protective coddn. When he fire is exting"uihed use nonsparking tools for cleanup. Be awat of rnoff from fire cannt mehods. Do not dlease to sewers orwaways. Sbhlty/Polymerizatiow Automotive gasoline is stable stroom teratersne in closed cnninee undr normal storage nd hnazxing conditions. Hazardous polymertiniou cannot occur. Chemical Incompatibilties Automotive gasoline can rea with oidizing materials such as peroxides uitric acid, and pechlorates. Conditions to Avoid: Avoid heat and ignition source. I Hazardous Prod ucts of Decompostdon Thermal oxidative decomposidoa of autmotive gasoline can produce oxides ofcarbon and partially oxidizcd hydrocarbons. Copyriht 01992 on hing Crpra A.cmni..e a rgqncu .fle.ram p 9 wref1 r-c- W&a. 9/91 Automotive Gasoline. Lad-free o.467 'on 6. Health Hanrd Data 'arcnogencldr In990 reports, the IARC list gasoline asaposible human eacinogec (Group 2B)A tho the LAC has-assigued a overall withs group ia u im evidence). umary of Rlsks: Gasoline vapors ame considered moderately Vapor inhalation cause nervous system(CNS) depression End mucos m rcane and respirtory tract iritation. BEn = of high concaios can cause a fatal moa dema.Reported to ppm causes eyenose, 3ftto gasolin vapOr eeetons are160 to 270 ppm causes eye and tUat ititaion in several hornS0 tnhesa inaioandosicin rn2000cppmx cmild n e i 30 min. coucentrations ar suaca g in 42.10 'ol Iffla areas of stia are exposd to 2SlgcOmamount be absorbd. sici oarecue dermatits. valuatio to gasoline it has not assigned an ovaRievaluaion to specific subsranre ind ' lsmaydevlopcaM cause deresin aistion can tasesVer o sIn aduls maygesto by 50 gpodu c seerest tedical Conditions Aggravted by oneot centaInervoussyereme : S Orans: Skin, eye, respi krlma 7 Entry Routes Inhalation. e skinenact ects: Acute inhalation produces intense nose, throat, and bung irritban heese bluned V'3,o' conjunctivitis; nof the fc ene inebriatio( and somned nes wit cnvulsins. tl confusion; ' wgait; sarnd cased bylack membrane eeos and of coloration purplish to dark and cyanosis (a blue diznes er. >f as-!-e eobn4ug cMSCc o' ughkhrns of brieah, increased te 46f repiaton Vrebvl rpid heartbeat, fewer, khen ,hr ad symptom fo~wig acute exposwt inidcut cChroni auladoc resuls in p -treities followed by -otor weaksstinexposu :as b ii drying. and lesons. 'loss,nasea, hemorrbagei of te pacs weight loss.insonia fatty 4eeration of t ier and kidnes, and unesual sensitivityh) the distal lift the elidsand flush Imdiatcly and continuously with Gooding amunts of water until tasponed to an emergency.nniea remove contaminted - Rinse with flooding amounat of water for at lent 15 min. Forreddened or blistered skin, consukt a War. affected rea with soa Reno" exposed p to fres air and as needed. 'r o Never give inythg by mouth to an ifnc'ous or donor induce wvoinkbg due to aspiration bazd. conscious victim a iue of(2 tablespoons of acdvated charcoal In g e ate to dtink Consulta physcian immedistity. After flst aid, get appropriate la-piant, paramedl. or connalty medile support 0 p iLeslk:Notify safety pesnwneLca alc all unnecessay r should protect against vapor othernen I adsorbent. Dike storage areasto oleats qutie Toxkdty: Blueill, feshwater. supplieror Contact tion sonute, and provide maximum ezplodoa-proof remove heat and and liquid contact Use f tools. Take up small V wit sand or and spills. Folow app regulations (29 CFR 19 0.120). pp96r contractor for detailed mdatonFoflow applicable Federal, state, and locaregulations. azardious Waste (40 CFR 261.21): Characteistic of Ignhabuity CERCLA Hazardous Substane (40 CFR Not listed ,AAExtremely Hazardous Substance (0 355):Nottlistcd ARA oxirheden (4 C~t37.65):Not listed as eminant(29 CFR 1910.4000, Table ZL-A) Wear rotective eyeglasses or chemical st goes, OSHA eye- and face-pro~-tion regulations (29 CFR 1910.133). Since lens use m idusy u controversial, establishy ownp VSect a advice prior 1o rese.m s tFollow OSHA respirator rguais (29 CFR1910.134) dif necessry, t a aSH- Vs T re a no specific MOSH m am However, forvaporoncenions not m dangeous to life orb a use c artridgerespiratoreqipped with organic vapor ctid rsM a upped-aireslat oroperations(cleaning spills, e ar Wee" rww polyiylucmeewllugod t c* bot cMwd Povide general and local Ic cL exhaustveuation is prere nate acorvessels,orsaxrage ta),wrw an SCB m Ar-parug For reprsonranor ttt prcupw iged ornupeated sin cono=c Materials soch as nwpten or c ?rmcetv dtn. oe Resistance of specific material can vayhfom produtto p exhast ventiltWin systems to==intain airborne nnatio since itpevents eumiLA nrdAirpmon into the work xica by coou Make avalable in ework ea emergency Equipment: Remve this material from your below t OSHA it at Its somsco Stat, and Nee catdrink, or smoke in work areas. Practice good -using the toier, orapplyingenosmtics.- *nnlrespneed clohn iea ing hygiene aftyrsing hi materaspecialybeforc a in PE3s dinking. ng nehlizbg Orage RequIrements Store in closed containers in a cool, dry, wdl-ventilated rea away from beat and nitnn satns and a or Protect containers from physcal dmage. Avoid dueetsunlight Storage must meet Requiremenat of OSHA Class IB iquid. errin progran taincludesregalertranin inhaationnod skior eye co te Considerurespiratory rsAvoid vapors. Only use to rave evenlanon ati ndoor use of this material requires exploss-proof 'nspctio and line as a fwsore due to its volatility and fammhblerexplosive nate. Practice good personal hygiene and housekeeping procedures. Wear Wrk cldoting daily. Transportation Data (49 CFR 172101,.102) er.e Nasn: IMO Shp casing-hadaminaraia) N eGasoline (incug DOTShlppi Enneen OT Hazard ID No- UN1203 n-Flammabe liquid IMO Hz 3.2 ID No.: UN1203 IMO LabeL Flammable liquid DOT Labeh Flammable liquid DOT Packaging Exceptocs 173.18 IMDG PackngLng Group: H DOT Packaging RequIrerents 173.119 SDS ceCtau on Rcreaces: 26.73.39.00.10I,103.124.126. 17. 132.133. M 133.14. 143.146. 153.159 Edited by JR Susu.MS Prepred by: M Allison. BS; Industril Hygise Review Di Wilsca. CIM: Medicl Revkw: W Silvarman. MD; yif -r-a-.r e .wdt-e rpred- a.fp MIanbCa99or lot. .raum cy bd..dn cor p Geniun Publishing Corporaton Sbeet No.735 1145 Caalynsoeot Methyl Terary Buty! Ether Schncctad.NY 12303-1836 USA (515)3774-685 I L ds nw especially in I boosmiavy gsihW o a ls of sp ta % y cat2meat dkiaesacworngradpi alment bM, JOB I a ldeakin oxyge combsdiacy4by n99a8n MIBE d chYs I C; ad medC fcta 'S- Sn. 4h di i peMib and MT E oneftd p50coahpoduce yused ineAM ione ndispi cemntly aned inSbom 10% of ft nsdons ga=00n- As eaded gasoine is phased ot this percentag =sePole to $ thtehe, 2,. =py OtherDesigations:CAS W,164-44MX medy13.1-A=fmkayle ytemr (2,-Mneig-2p AK Manfetuer Cstesyo rqplie ar distbutrConsu dhostt hmn caneek Bayerw*Gado for Asupplier list eCan-Ema~srflansoaurMBis a wd mad akdaritat mmaycssdhwnedszcffvifeadoeirnh1 Hnrae "a', e sa. a Mehi etAry betylther Ca100% 7 U 7990H sa NIos,RTZ (KNS25000. 1985-8Tokty Date Rat ora%LDx;:4g/kg Ra, imadIn,.,2 23,576 ppml4 br 198MOSEREL None tmaded D9W0 9ACGI TLY EL NoneehmMNowe WMAS' forsdtioaa nicty data sonin ramem v~s -c)MiENta weOiight- l meltg Pobnt:-166F(-110 Y.) Specini Gravity (20 'C4 C):.0.7405 Vapor Pressurc 245 mmHg at 77 7(25 'C) Water SolubihtyI4.8 g/100g Appearance mid Oder. A clea, colodess liquid with asliht hydrocarbon odor with. mild mint or izpen-lik odor. Flashm on:-I2A *P(28*C) Anoandn epesm:85P(3*C ~ 6%v/v | UEL:8A% vir ExtingI idgMedie Use dry ceimles cuboc diwxde, bale., war pay, or lcohol foams saextshingWedia. cHasis:tBE is xtly n ammblet Is vapors muy explode if Ignited In a wciod arca or travel to a mu UnmasnalFre or Explodon of ignitom ad flash back. At tenesm shor Aow Bashpoint, MIBE ca ekass vapor matifmflamme mixtum. Special Plre-Ofghtn Procedurm Since fEn may prodc* vxi feomes, worn a self-cotainoed breamg apparats (SCB) with a fun faceplce opecded a tbeIaa o essu---n orpoidvo usue aode and sppopriate, rcqwd chemical promeive cloddg (mobading oggcs, rubber ovweom gloes, and boots). If eAsibk rem - containe om fiedAisaes. Merwise use waterspray o cool fi-exposed-mo ewar of runoff from me contr! mtdodL Do not release toencwla se et, ws or warways due to the potntial explosion and healt IhasalJMTBEpresents. USmE MIs stahe at room tmpmte In Closed enniue mnde normal stanga and hOIAFng ennUOZI MI-B Is "men i acd a-MaEkHzados polymeriztioncannotoccur VaMg, ,*m nngaM am MUBB does not mfwith watror oma madwral. Itis inompauible and unstab with stoogxcddg snoog acids cmsties, -mi,aldhds =z-nn a=d chlorinatd compovfd Cndtom to Avokt Avoid n heat d ignition rces. 'Hazardos Products of Dccoapostoon: Tbnal ouidative dccomposidon oflMIBE en produce carbon dioxide (CO) a4 war Tar. and metbyl tadicL If prenc in suffcient -butyl kormn , acetone, foracid, Incompletb combesdon can produco carbon monxi, concentrations. these product of partial oxdaion can pose serious heath hazards. 3 I wet mOpmw~w m-C H 2 P. I W 1-1Oct- j-1 $r5"806--53POU ?JST CU'(STD ENGR)Prariopgekictr The IY and IARC do not list M as a o Ofld- Data on MTEigeao nand kehaledan amkiy snibased ot niMutditIkS.Haman expowes aeSepodpmwldtry wiM gall bladder us by directitnsioa Thexcports reval MTBW StgasEno-MTBE minl ci and wit use of MTBE n aynesthcde effect on th centraleroas sysem (CS). A ofuansa, vomirrng. and sedabo followed bygeneralanedai is dodwb inceasig . A wam or bummig seuInoa is whaD al aiustinatim. Elevaod livert feion iedies, duodenal Uamnnuiou, ideo y I blood cell hemolsi, and foal odor ae Aso noted with his pcedm. Animal sdies DOM imty iritation to mn'ous nkanmes of the nose. An , and con Aspiration of gasolino-MThE vilrftsma case haag pmenMnmis lCacdonAgrvated byo Ezpoem-nrc rpotd Eetes tna resin.- ccCae with the eyesa ork akin cause cae may na and Effecs: Cronieinh ei' (cnra erosjyt q adcgenrl muirtmne). in at high concentatiocs. Inhaaion may resultin mesa momiting, krr atnn infam or burning n depresoa).Inagesdioc of M~TBB masy rsak in aspiration pneumonlits es Geday lift the eyelids and flusb immdIatey and ccadanousty with flooding aounts of water until uranspoted to an emergency .ra~wphysician isiaitly, rm ovlan affected area wid coing ee wi flooding mounts of wate for at has 15 min. Porreddenod or blistered skin, consult a ap W . by wndth to an p nu Never give pdaeontheaiskof ' ear n .o medicstp- ? .n- f MCTh sigus.If exp as needed or ' person. If igested, conslt a physician Lmmdistely. Do o indcer if individualis coughing or chokinge apertn may have sheady occured; trnsportto an a wial facty. rirs Ald, Set pprrainparamedico 6ee -Atoae c-------reomene fo-neto nydeopetf medica ne Rmam exposed pamon to hes *W and ashli - occured,on xmr cmchs exwfad x-ray:, and supportive cueby be nee ay fMTiRa- poor -ee Syu o1 Carbg Is reirmayb rnspiraion expoucrs. ~e wyWobsene tom in an alert folowing 'Leak: pen~ane acu iE uoneocasy personnet rmove allheat and ignition aouroes, and provide mnwm*pleooV~efldan paanneshould protect against vapor haaladno and skin or eye contact. Take up spilled meterial with aoncombudible xbcn mateuial and losed areas in eppropiate containcrs for disposal.r lage spI s, dilm far ahead of spill to contain. Do not allow &M to eater (posa)or waterways. iBiE is moto watr soluble than othergasoline components, so ther may be a higher MBTR conce- ea a spil ofgasolinc iBB mixures. It also has a modera to ' O nbllity In soiL MBB Is poody biod.in acivated sludge. Cleanup of gundwatr eoutamhani IsdifficL. high air-o-water radon a used, air can reamoe MTBE. Products of ar"opmiei degradadon include t-butyl formate., aone, and e"thyl radicals. Follow appirgUt1Cinn (29 CPR 1910.120). t d wdhenc Wy M IC contact j Z supplier or a licesd coutractorfr detaled reemomendadons. Folow applicable PederaL sate, and loeairegulations. et Waste (40 CFR 26133: Not listed EafzdarO* Substance (40 CPR 02.: Not listed A ExmxHazardous Substce (40 CR 355) Not listed as a U Toxic Chemic(40 CPR 372.5) (29 CPR 1910.1000, SnbpartZ):Notlisted -andfj, ~ M~w P1~v~yOR~rM91=PerUS&WH novreopor - ad PS reactor vessels, or storage a&e), wear . Oerarscpirator.Forergcyrnaroetinopeadn(1-anoa fWWbnfprv So IStlowUPv& U regulaios 1VCF 113). -re ( C 190134) and, if nece- boots; qapos, and Ctanfica to provcprlogeor repeatedd nontact. general and local "poanpof ventilation syse a ani a-rneconcentrations atlevels thatpromote woaker yATWA ofup to ppinin oddo madvetueffeci deu at ARCO's MTBE ties. cd atn is prefered since itpvenw coainiser into the wodk area by coUtzulling it at its sot=P j M ake available in Me wodc rea cme =ewas staions, afay/quik-4rench shower, and washing facices. wodtrecsofteaca may tbsob, and all lensesconcnrte, rritan.Rems this Equpmnt:Neverweawmharlenses in Mimy oes wand eqipm a-une conta ted ting before warn. ii cat, din. or smC in work areas. Praede good personalhygine aer osing thin mreial especly before eating, drinking ng.ausing t toilet, or applying coamis Rcquiemmat Strin Ughv closed onuane in a coolweZ-veonwatd ara away frm aR boat and * so re Outsid or bed sag may be p Vefed, c cnraines agamst damae To prevent sbt spa, ground and bod all ndq Anmente' s receivingr roi ' and torage areas Avodvapors and coa wi eyes. respiratory protredon program that ine nu "" inption, and alua Avoid heat and ignition aowues. Practice g personal bygiene and houeckepng utesansportation Data (49 CFR 17±102) Nane: Mehlcr-butylether M:UN298 Zbeh Fi2umule liqui ;Pacaing Group: ? VPcmReferences73, 103,124, M36 150, 151 Bygne RevIew DI Wson. CIH Medcal Xei'ew: W Sitcanan, 1M. by Als. BS: lndusl f *mflflflr~w~ ft& kfmM ZcoFwh.siw to be rFa astpqc arccmeqnam of~w RAied by: JR Stua, MS oan 317 MATERIAL SAFETY DATA SHEET TOLUENE CORPORATE RESEARCH & DEVELOPMENT Revision C SCH ENECTADY, N.Y. 12305 Phone: (518) 385-4085 DIAL CO. 8*235-4085 I Date August 1979 SECTION I. MATERIAL IDENTIFICATION TOLUENE OTHER DESIGNATIONS: Toluol 3 Methylbeazene, Phenyluethane, CH3 C6 E5 , GE Material D5Ifl, ASTM D 62 and D841, CASU 000 108 883 MANUFACTURER: Available from many suppliers, including Shell Chemical Co. and Sun Oil Co. mATERIAL NAME: SECTION II. INGREDIENTS AND HAZARDS roluene ACGIT ca 100 (1978); HAZARD DATA I (skiiL) notation indicates a potential cOn- tribution to overall exposure via skin absorption. OSHA/ NIOSH (1976) proposed an 8-hr TWA of 100 pp=, with a 15minute ceiling of 200 ppm, and an action level of 50 ppm. Current OSA TLV is 200 ppm. 8-hr IMA 100 (ski L)* or 375 mg/u Human, Inhalation 200 Mm ITCao (ceaitfl nervous at ) Rat inhalation IXo 4000 jpml4 hr Rat oral LD5 0 5000 .g/1 SECTION 111.-PHYSICAL DATA Boiling point, 1 atm, deg F (C) vapor pressure 0 25|C, =m Hg apor density (Air-l) Solubility in water, 1 - 231 (110.6) 28 3.2 0.05 Specific gravity (ater-1) Volatiles, X Evaporation rate (BuAc-1) Molecular weight -. 0.866 100 1.9 92.15 pearance & Odor: Water white liquid with a characteristic aromatic odor, whose recogniOdor detection is uantion threshold (unfatigued) is 2-5 ppa (100Z of test panel). satisfactory for safety because of fatigue. LOiER UPPER SECTION IV. FIRE AND EXPLOSION DATA I Flash Point and Method 40 F (4.4 C) Closedlcuv ' Flammability Limits In Air Autoignition Temp. (56 C) 997 fL Ib volume 1 1.2 _7 Extinguishing Media; Carbon dioxide, dry chemical, foa. and water fog. Water may be in.effective for putting out fire, but use spray to cool fire-exposed containers. At room temperature; toluene emits vapors that can form flammable mixtures with air. It is a dangerous fire hazard and a moderate explosion kazard when exposed to heat and flame. Vapors can flow along surfaces to distant ignition ources, then flash back. Firefighters should wear self-contained breathing apparatus. and eye protection when fighting toluene fires. SECTION' V. REACTIVITY DATA Toluene is a stablelmaterial under normal storage and handling. It does not undergo hazardous polymerization. Since toluene is a flaaable liquid, avoid contact with heat, sparks or open fI eme. Avoid contact with strong oxidizing agents. combination with explosive. Nitric acid and toluene, especially in ulfuric acid, will produce nitrated compounds which are dangerously - Oxidation in air can form oxides of carbon and nitrogen. GENERAL 0EL.ECTRIC GEERLQELCTIC cc egn-w SecS- C.,a No. SECTION VI. HEALTH HAZARD INFORMATION TV 317 100 ppm (skin) (See Sect.Il) fa gut, nausea Vapor inhalation can produce headache and a Hrht drowsiness at 10 pp, a~nd itching skin at 100-200 ppm, anesthetic effects and respiratory tract and eye Irritation above 200 ppm. Absorption can occur through the skin, and liquid contact with possible dermatitis from repeated or prolongewill cause 'defatting of the a Ee contact is irritatIng and can be damaging (corneal burns)'. Ingestion clontact. digestiLve tract and results In systemic 'effects from absorption. Irritates te FIRS AIED: Get medical help. Imediately irrigate with water for .15 minutes. EyeFContact: Wash area with soap & water; remove contaminated clothing promptly. SkinCtat: Get medical help if irritation persists or if large areas of skin were exposed. Inhalation: Remove to fresh air; restore breathing and give oxygen if needed. Cet medical helpt Ingestion: Get medical help as soon as possible! When victin is conscious, give USF mineral oil to drink. (Aspiration is a potential hazard if vomiting occurs!) AND DISPOSAL PROCEDURES SPILL, LEAK, SECTION VII. Report large spills to safety personnel. Remove ignition sources; provide expJsionThose involved in clean-up must use protection again liquid conproof ventilation. Pick as liquid vben feasible, or absorb -on vermiculite tact and vapor inhalation. or sand and-scoop .up with nonsparking tools into a metal container with cover. Liqui. Do not flush can be flushed with a water spray to an open holding area for handling. to sever, to a confined space, or to a watercourseI DISPOSAL: Consider reclaiming by distillation or disposal via a licensed Waste disposa Follow Scrap may be incinerated under properly controlled conditions. company. Federal, State and local regulations. SECTION VIII. SPECIAL PROTECTION INFORMATION Provide general and exhaust ventilation to meet TLV requirements. Ventilation ans & Exhaust hoods other electrical service must be nonsparking and explosion proof. Exposure should have >100 lfm face velocity and be designed to capture heavy vapors. above the TLV for nonroutine and emergency situations requires use of an organic chemical cartridge respirator up to 200 ppm; above 200 ppm a full face piece is required with an apprbved canister-type gas mask or self-contained breathing equipment. Safety goggles or glasses should be worn in areas of use. Impermeable (neoprene has been recommended) gloves and apron, face shield, and other protective clothing may be needed to prevent skin contact during use, especially vbere splashing may occur. An eyewash station should be available if splashing is possible. A safety shower and washing facilities- should be available. SECTION IX. SPECIAL PRECAUTIONS AND COMMENTS Store in cool, clean, well-ventilated area away from sources of heat and ignition and away from oxidizing agents. Area must meet requirements .f OSHA Class IB liquid. No smoking in areas of storage or use. Nonsparking tools should be used near toluene. Ground and 'bond metal containers for Use safety cans for handling small amounts. Protect containers from physical amage. liquid transfers to prevent static sparks. hasizing the liver, kidneys nervous systeM, Preplacement and periodic medical exams At least an annual exam Is recommended lungs, heart and blood should be provided. Use of alcohol can aggravate for workers exposed above .the action level (50 ppm)the narcotic effect and blood effects of toluene. DATA SOURCE(S) CODE: 1-9,12,20,21,24,26 ai., . ..... Z -f-Iy . JoI~an~ O- W-.* a .tb ry .1.........~&.-...n..---...-. c~r-~Wev*-l 6. h fl..d..n.o4 I p APPROVALS: * Industrial Hygiene ad e--"'""" 'oWot ..... da Safety MEDICAL REVIEW: .1 / J GENERAL ELECTRIC - No.318 Material Safety Data Sheet Froin Genium's Reference Collection XYLENE (Mixed Isomers) Genium Pubishing Corpora'on 1145 C 33-36 Schenectdy. 8 6 USA U (518) 377-8855 (Revision D)~ Issued: November 1980 GetMMI PeIus*NG CORP. Revised: August 1988 SECTION 1. MATERIAL IDENTIFICATION. I 26 Material Name: XYLENE (Mixed Isomers) Description (OrIgin/Uses): Used as a raw material for the oroduction ofbenzoic acid, phihalic anhydride, isophthalic and trephthalic acids and Iheir dimethyl esters in the manufacture of polyester fiber; in sniliing cacgur; with Canadian balsam as oil-immersion in mioscopy; and as a cdaning agent in microscopic sechniqucs. Other Designations: Dimethylbensne;Xylol; CH - CAS No. 1330-20-7 Manufacturer: Contact your sappier or distributor. &it the latest edition of the Chaemicweek HMIS BayeriGidc (Genium ref. 73) for a list of suppliersH1 2 Comnents: Although thee a three differt ises of xylee (ortho. mea and pit), the health and physical -F 3 R 0 dee isomers, of all mixture wrinen for a xylene This MSDS is ar very similar. all tire. isomers bazards of PPGO which is *sualy c mercial xylne. NFrA R I 1I *Seesect SECTION 2. INGREDIENTS AND HAZARDS I Xykne (Mixed % Isomers) CAS No. 1330-20-7* S 2 K 3 8 EXPOSURE LIMITS " IDLU~ *-Xylen, CAS No.0095-47-6 u-Xylene, CAS No. 0108-38-3 Levet 1000 ppm OSHA PEL $p1 TWA: 100 p. 435 m&' ACCI TLVs, 198748 TLV.TW& 100 ppm. 435 mglm '-S hL 1 ppm. 655 n~we p-Xylene,CAS No.0106-42-3 Check with yonr supplier to deermine if there arm additions, contaminants, or Simpuries (such as benzene) that arm present in reorable quantitics per *29 CFR 19 10.ToityD Immediately dangerous to life and health. **""See NIOSK RTECS (No. 2E2100000), for additional data with references to IproducU4 illitatiii and IlUtRa-ra. -a Human Man. I Toicity Dnta LC ; 10000 ppm16 fin WA: 0 pm,43 mg/ SECT1iON 3. PHYSICAL DATABoiling Point:- 2757 to 293$ (135C to 145Q* Water Solubility (%): Insoluble Melting Point: -13' (-2C) Evaporation ERate: 0.6 Relative to BuMA 1 Molecular Weight: 106 GramsMo g/ 1%Volatile by Volume: Ca ZOO Vapor Pressure: 7o w9 Torn at 687 (201C) Specific Gravity (HO =I): 026 Vapor Density (Air = 1): 3.7 Appearauce and Odor; A ew liquid; afmatic htrscarbon 'Materials with wider.and uannwer bologMranges SECTION 4 FIRE D Flis Pon and Metod 'F Evaorti9on(2RtC0.3 R ) i oB c:mmercialy available. ATA g5'oFanaility 7(46C) U- T nm Lrnits in Air %by Volom C 1% - Extinguish lang Media: Use foam, dry chemical, or carbon dioxide- Use wae sprays to ztduce the rate of burning and to cool coaminers UnusuI Fire or Explosion Hazards: Xyne vapor is heavier th). air and may igniton and flash bact Prave a consuidrtle s distaace to a ow*ying sc e of Special Fire-flghting Procedures: Wear a self-contained breathing apparatus (SCBA) with a full faceicce operated in the pressut- =)o depnod or posi(ive-pr(ssuAm SECTION 5. REACTIVITY DATA FXyle is sble in closed m Zinen dwrig routine operion Chemical Incompatbilties This It does not undio hazardous polymeriza way racarblonactdaigcrously with stroag oxidizecrs. Conditions to Avoid: Avoid anyxposure to sources ofignitionand to sirovgoxidizas aardous Products or Decomposition: Carbon tanoxide (CO) may be volvd durin xyle fires 'o.318 XYLENE (Mixed Isomers) 8/88 JCTION 6. HEALTH -HAZARDINFORMATION 4a4A W - DM yleuis not listed as a carcinogen by the !ARC. NTP, or OSHA. Uumma ry of Risks: Liquid xylene is a skin irritant and causes crythema, dryness. and defaning;proloagcd contact may causc liscring. Inhaling xylenc can depress the central nervous system (CNS), and ingesting itcan result in gasrOintestiaal disturbance; and 'ossibly hematcmesis (vorniting blood). Effects on he eyes, kidneys. liver, lungs. and the CHSare also reportd. Medical Conditions Zravated by Long-Term Exposure: Probkms with eyes, skin, central ncrvous system, kidneys. and liver may be worsened by pasre to xylene. -Target Organs: CNS, cyes. gasnontr sin trac, blood, iver.kidneys. skin. Primary Entry: Inhalation, Acute Effects: Dizziness; excitement; drowsiness;-incoordination; staggering gat irritation ofeyes, nose, in cootacftabsorption and throat;corneal vacuolizaticm; anorexia; nausea; vomiting; abdominal pain; and dermatitis. La2ge- headachc; loss of appetite. narvousness. pale skin, and skin rash. Chronic Effects: Rcversible eye RST A ID: Eyes. Immediately flush eyes, including under the eyelids, gently but thoroughly with plenty of running water for at 15 minutes Skin. Immediately wash the affected area with soap and water. Inhalation. Remove the exposed person to frsh air restore andlor support his or her breathing as needed. Have a trained person administer oxygen. Ingestion. Never give anything mouth to somnone who is unconscious or convulsing. Vomiting may occur spontancously but do not induce it:f vomiting should , keep cxposed pcrson7s head below his or her hips to prevent aspiration (breathing the liquid xylene into the lungs). Severe morrhagic ponumonitis with grave, possibly fatal, pulnonary injury can occur from aspiring very small quantities of xylene. GET MEDICAL HELP (IN PLANT, PARAMEDIC, COMMUNITY) FOR ALL EXPOSURES. Seek prompt edical assistance for further treatment, observation, and-support after first aid. If exposure Is severe, spltilzastion foi- at least 72 hours with careful monitoring for delayed onset of pulmonary edema Is commended. ECTION .PIL-;LEAKNDEDISPOSAUfRROCEDURES M-@MO9ND id-iM:a &il/Lak:Notify safety personneL provide ventilation, and eliminate all sources of ignition immediately. Cleanup personnel need Kacetion against conact with and inhalation of xylene vapor(see sect. g). Contain large spills and collect waste or absorb it with an inert naterial such as sand, earth, or vermiculite. Use nonsparking tools so place waste liquid or absorbent into closable containers (or disposal. waste out of sewers, watersheds, and waterways. aste Disposal: Contact your supplier or a licensed contractor for detailed recommeations. Follow Federal, state, and local lations. 2SHA Designations ~Cotaminant (29 CFR 1910.l0 Subpan Z) A Designations (40 CFR 302.4) EZRA Hazardous Waste, No. U239 ERC.A Hazardous Substance, Reportable Quanitr 1000 lbs (454 kg), per the Clean Water Act (CWA), section 311 (b) (9) jCTIONSEISPETAfRPROTETJGNHNFORMATIONalMit NMM gles: Always wear protective eyeglasses or chemical safety goggles. Where splashing is possible, wear a full face shield as a ppicnaEary protective mesue. Follow OSHA cye- and face-protection regulations (29 CFR 1910.133). Respirator: Use a NIOSHtpptoved respirator per the NIOSH PockerGuide so ChanicalHarardsfor the maximumr-use concentrations andtAr the exposure limits inda section 2. Follow OSHA respirator regulations (29 CFR 1910.134). For emergency or nonroutine use (leaks or cleaning reactor Is and stqrage tanks), wear an SCB A with a full facepiece operated in the pressure-demand or positive-pressure mode. Warning: Airwl nairators or protect workers in oxygen-delicieat ar-spheres. Other: Wear impervious gloves, boots, aprons, gauntets, :t., as required by the specifies of the work operation to prevent prolonged or repeated skin contact with xylene. Ventladoen: Install tnd operate general and local maximum, explosion-proof ventlatio systems powerful enough to maintain airborne levels of xylene SIM; the OSHA PEL standard cited in section 2- Local exhaust ventilation is prefrred because it prevents dispersion of xylene into 'niamrefcnce103 for detailed econmendations. work areas by eliminating it at its source. Consult the latest edition of fety Stations: Make eyewash stations, safetylquick-drench showers, and washing facilities availeabl in areas of use and handling. :ontaminated Equipment: Contact enses pose a special bazard; soft lenses may absorb irritants and all lenses concentate them. Do war contact lenses in any work area. Remove enntanzinatrd clothing and launder it before waring it again; clean xy1ene from shoes deuiprnent. Comments: Practice good personal hygiene; always wash thoroughly after using this materiaL Keep it off of your Obnand equipment. Avoid transfenring it from y'our bands to your mouth while eating, drinking, or smoking. Do not eat, drink, or anote at any work area. Do not inhale xylene vapor. torage/Segregation: Store xylene in acooL dry, well-ventilated area away from sources of ignition and strong oxidizers. Protect containers from physical damage. Ipecal Handling/Storage: Make sure all engineering systems (production. transportation) are of maximum explosion-proof design. Ground and bond all containers, pipelines. etc, used in shipping transferring, reacting. producing, and sampling operations. ransportatlon Data (49 CFR 172-101-2) OT Shipping Name: Xylene DOT ID No. UN1307 References: 1.2.12,73.4-94,100. 103. *U*n " of *ormcaiay wIonnio bas fr DOT Label: Flamimable Liquid IMO Label: Flammable Liquid DOT Hazard Class: Flammable Liquid' IMG Class: 3.2 or3.3 purcses 1.pu Prepared by PJ Igoe, BS n: besanty purhases rspoosibaty Therefor:, alnug tacuoate crr tm frm "keimarPt'"ni ct infonnaec, cinm Pubbiting Cnp- E alenDsno Wsrmta, makcs so rrpn-Cfl ccand . st n M acncy Or UiaaLiaty Of gUeh in(ontn ar mo purpos orfor comusqumc of its pimms Industrial Hygiene Review: DJ Wilson, CIH zpoTahAty appticnioc %o eusmno so Medical Review: MJ Hardies, MD APPENDIX B RESPIRATOR PROGRAM APPENDIX B RESPIRATOR PROGRAM The following respirator program is in accordance with OSHA 29 CFR 1910.134 Respiratory Protection Program requirements. This program governs the selection and use of respirators on-site. Respirators for the Earth Tech field sampling team will be provided by Earth Tech. The respirator protection program will be administered by, and is the responsibility of the HSS and/or SSHO for the site. Contractors and their subcontractors will furnish their own respirators and medical surveillance for their employees. The HSS and/or SSHO will be responsible for ensuring that they are in compliance with this respirator program. The respirators will be selected according to the hazard and level of protection determined by monitoring action levels and the decision of the HSS and/or the SSHO. The respirators and levels are: Level Respirator B Positive Pressure-Pressure Demand SCBA or Supplied Air Respirator with 5minute escape bottle. C Full-face air purifying respirator with combination dust (HEPA) and organic vapor/acid gas cartridge. The full facepiece respirator with combination dust and organic vapor/acid gas cartridge will be appropriate for the dust conditions and organics that may be encountered. D No respirator required. The respirator users will be fit tested with the size, style, and make of the respirator they will be using on-site. The fit test will be recorded and these Fit Test Records win be maintained in the Command Post. Employee respirator training is provided on an annual basis and at site-specific training sessions. This training includes: o o A discussion of the nature of the respiratory hazards and the dangers if the respirator is not used properly. The reasons that respirators are required for protection, along with any engineering o o o o o o o controls that may be used. Instructions in the selection, use, sanitary care, maintenance, proper storage, and limitation of the full facepiece respirator with combination cartridge, and the SCBA. Practice in proper fitting, wearing, adjusting, and checking face seal of the respirator. An opportunity to handle the respirator. Instruction on how to recognize and cope with emergency situations requiring respiratory protection. Explanation of the requirements for a self-contained breathing device for work in unknown concentrations and Immediately Dangerous to Life or Health (IDLH) atmosphere and for fire fighting. Explanation of the medical surveillance program and how it relates to respirator use. Explanation of the requirements for maintaining a tight seal, why beard and facial hair is prohibited, and why use of contact lenses while wearing respirators is prohibited. Respirators will be assigned to individual workers. Each individual shall be responsible for cleaning and maintaining their assigned respirator and documenting this using the Respirator Service Log presented in Appendix C. They will be cleaned and disinfected before being reassigned. Respirators will be cleaned after each day of work according to manufacturer's instructions. The cleaning will be done at the Command Post. Used cartridges will be disposed of and replaced with new ones. After cleaning, the respirators will be inspected and checked for defects such as excessive dirt, cracks or other distortions, scratches, incorrectly mounted lens, broken or worn cartridge holders on the facepiece, breaks, loss of elasticity, broken buckles, and excessively worn serrations on head harness that may cause slippage on the headstraps or head harness. Further checks include: o o o o A check of the tightness of the connections. A check of the facepiece, valves, connecting tube, and canisters. A check of the regulator and warning devices on SCBA for proper functioning. For air purifying: Check the exhalation valve after removing its cover for: o o o " Foreign material, such as detergent residue, dust particles, or human hair under the valve seat. Cracks, tears, or distortion in the valve material. Improper insertion of the valve body in the facepiece. Cracks, breaks, or chips in the valve body, particularly in the sealing surface. o Missing or defective valve cover. o Improper installation of the valve in the valve body. Check the air purifying elements for: o Incorrect cartridges, canister, or filter for the hazard. o Incorrect installation, loose connections, missing or worn gaskets, or cross threading in holder. o Expired shelf life of cartridge or canister. o Cracks, dents, or breaks in the cartridge or canisters case. o Evidence of prior use of cartridge or canister, such as broken seal tape foil or other sealing material. 0 For air supplied respirators, check the air supply system for: o o o Integrity and condition of air supply lines and hoses, including attachments and end fitting. Correct operation and condition of all regulators, valves, or other air-flow regulators. If SCBA, that the cylinder is sufficiently charged for the intended use, preferably fully charged (mandatory on an emergency device). The emergency SCBA will have a tag for logging in the monthly inspections. Monitoring of the work area will be performed and the results will be used to select the appropriate level of protection. Refer to air monitoring section of the HASP (Section 9.0). This Respirator Program will be re-evaluated and revisions and updates added regularly. Persons will not be assigned to tasks requiring the use of respirators unless it has been determined that they are physically able to perform the work and use the equipment. The Earth Tech-contracted physician will determine what health and physical conditions are pertinent. Only those respirators jointly approved by NIOSH/MSHA shall be used. All component parts (i.e., canister, replacement straps, etc.) will be of the same make. All Earth Tech employees shall document their respirator use time on the Record of Respiratory Wear Log presented in Appendix C. This record shall be submitted to the HSS on a weekly basis. APPENDIX C HEALTH AND SAFETY FIELD FORMS MEDICAL DATA SHEET Project Name/Location: Employee Name: Address: Home Telephone: Birthdate: Height: Drug and Other Allergies: Weight: Notable Medical Conditions/Medical Restrictions: Do you wear contact lenses? Yes Are you using any medications? No Yes Emergency Contact: No If yes, please list: Relationship: Address: Phone: Personal Physician: Phone: Address: E A R T H T E C H Health andSafety Plan Fe MoNficaon Form A tWOf WYEWdAnadAL LMf COMAmNY I I I page NO. -o Project - Pndecati -he Safety Offioa I I I I Field Modification to HASP: I Prepared By: site Safty officer - - Date Acxcepted ByDate Accepted By' Contractor Representative (if Applicable) Date Approved Br Date I1/94 rnoon--- tie E A R T H T E C H- rvisor'sIncidentRepon Sup FaxSent by: Telephone / I Datofthisrepot No.: (Print Name) Accident TYPE OF INCIDENT: Insediin_ _ Injry-_ Spilt_ Other- Firc: Type nsection: Phn nspectds Name Agencr AenyAd&ss: I Employee Office Location Namw Region: R66. Group: EMPLOYEE INFORMATION: EmployesNam: Soci Security No.: AA*= ewa Date fBirth . Daeof ire:Wage Employe Jm=uronDate of icident Numberof)vinor Marital Single -Dem_ Status: Matied Rat-$ Employee's Occution Annuntly: Days/k.: Employe Hrs on Proect Years ofEvxeience in H__ oury: _ When Incident Occurred?: E Widowed _ Divred Job No.: HrsjDay: This Occupation?: INCIDENT INFORMATION: Time: Date of Incident Date Reported to SupervisZ. Witness(s): Was Incident Believed to be Result of Employment?: Yes If on Job Site, Location on Job Site Name of Job: Where Incident Occurred: No Address Where IncideA Occurre f First Aid Applied, by Whoa: Type of injmy and Part of Body AffectedName/Address MedicalProvider: Brief Description of Incident 3mployee Activity at Tirc of Incident Description of Property Damagcd- 3OSHA 200 LOG INFORMAflON: Is incident OSHA recordable?: Yes No Does incident involve medical treatment?: Yes No D 0 0 O Does incident involve fatality?: Yes No Does incident involve first aid only?: Yes No Does Incident involved lost timerestricted activity?: 0 0 Project Employees Supervisor: Manager (Print Name) (Print Name) 'Telephone Nro.: Current Status: si Telephone No.: See reverse side for instructions. Yes No 300 C g. E A A R T H ECO T E C N WTEMNA47WL LTD COMPANY ecr AirAirMoitoin MonitoringDaa Data Record I Pmject Project No.: Dae: Page No. LOCATION SKETCH METEOROLOGICAL DATA - Estimated Wind Speed (MPH): Wind Direction (Tme): (Max.) Temp. (Min.): General Weader Conditions: Flow Pump No. Rate L/Min. Pump Location End Start .3 - Total Min. Total Volume Taken By 01U4 Comments: . 4n)3 FO34Aoqp.H&S to D --- -l -il C)-n- IIII I -I-- II gol 3IIIII - _I Co. - - C,- I _ li Innf I.' i I a H E A R T A tr-o T E C H WMRMnAOWtLn.COMirMNY Job ExposureReport Employe NamSocial Scurit Number: - Project Nm: - Project Numbe: - She Fncmio Level ofPotecticr Dates of Site Participation: I I I I ji I. Wer acion levels exceeded in the work area (breathing zone)? 2. Ifycs, 3. List known or suspected contaminants on-site (list from HASP): 4. Personal exposure monitoring data attached? Yes_ No No N/A list typc of monitoring and readings Yes SSO Name (Print): SSO Signature: Date: .1/94F06Cc.& F026IC-p-H&S E A R T R @ T E C H A tagac WMVA4V4AL LiTU CDANY. QualitatveRespiratorFit Test _.. Name. SSN# Division- Date:. FULL FACE PASS L 2. 4. 5. 6. 7. (ange tesa subject with esting agent Positive Pressure fit tes Negative presse fit test Normal breathing Deep breathing Tun head from side to side Nod head up and down S. 9. 10. 11. Talking Jogging in place Normal breathing Sensitivity check 3. I I j FAL HALF FACE PAS FAIL Respratr Identification HALFEACE FULLfFACE B. C D. Model Size Approval Number (T1D) Testin~g Agent* 1 Irritant Fume Saccharin Solution 2. 3. Isoamyl Acetate * Testing must be conducted with agent No. I and either agent No.2 or No. 3 E Qualitative fit testing shall be: 1. 2. 3 4. Condueted for full face and half face respirators. Performed immediately when the est subject has a weight change of 20 pounds or more, significait facial sca&ring significant dental changes, reconstructive or cosmetic surgery or any other condition that may interfere with facepiece scaling. Performed only on test subjects without hair growth or any other obstruction between the skin and facepiece. Fit-testing for asbestos to be conducted every six months. Test Conductor Signature/Date ev. m194 Employee Signature/Date F, 3 a a -~ ~ P1 ~ 0 c. Ii IA 0 ~ i0 2 e a0 - 5 o. grjue | |I 8 0 6 F N F.- 5. '6 I - S Ca I 0 C' k..e ~ 'C C I~- ~ t~)4 ~t Ii E A R T H A troC0 T aMRt4D04L E C H LTD.CWAAv Couned Sace Efn-y Parrmit A I PROJECT INFORMATION Project Name Proje Number LOCATION and DESCRIPTION of confined Space Date PURPOSE of Eaty TUe M DEPARTMENT Artentant Superviso's Authorization (Lead Persn) Expiration Entrat Entrants M A2 EQUIPMENT AND MONITORING A.2.1 Equipmnt -Calibrated CSE Sign Specify other Per AppendixB T4.023 be taken D ITest(s) conducted by:* F, T= P.E.L Test Yes % Of Oxgn 19.5%Y-23.5% % of LEL Lessthan1% Less than.10 pm_______ F~L'nge Sulfide Toxics@ No monitoring Equipentg Escape Pack Steel-Toe Shoes E A.2 Monitoring STest(s)to Yes NOIt(s) Yes Item(s) Traffic Safety Equipxmen Ntryools HardhatVerlnrBor Zg Site: Site: Site: Site: Site Site- Date: Date: Date: Date:. Date: Daft: No - ______ - other 0 A3 LEVEL 11 PROCEDURES A.3.1 A confined space with an atmosphere which is not within all of the limits (PELs) specified above may be ventilated and may be entered when sampling indicates an atmosphere within the specified PEl. Regardless if atmosphere has been rendered safe in this situation prior to entry, the local emergency response authority must be notified. **OR* A.3.2 In the event an atrosphere cannot be brought within the limits specified above for oxygen, hydrogen sulfide, toxic substances or combustible gases, DO NOT enter. Halt work activities. Re-evaluation of the work task is required. mnmediatcly contact supervisor and REHSM. Entry at a later date may be allowed provided the entry team is properly trained and equipped. A4 EMERGENCY RESPONSE Local Emergency Response (Phone) Ambulance (Phone) Fire (Phone) Police (Phone) NOTES: P. - Permissible Exposure Limit LE.L - Lower Explosive Limit a) - Monitoring shall be continuous and throughout confined space. @ - Any toxic substances suspected or known prior to entry may require specific detection equipment (i.e. HNU, detector tubes). - - Other Le.. Dust that obscures vision at distance of 5 ft or less, etc. COMMENTS: AppendixA White Copy - Project File 11/94 Yellow Copy - Region Environmental, Health and Safety Manager Pink Copy - Project Manager r~,--'o E A A R T tVCO H T E C U WTrEnonaL LTD.COMAMNY Air-PurifyingRespirators Assignment and Service Log Respiraor Type (Full-face Or Halfa): mnufacvntc. Model Namber Size Date Assigne Assigned To Wmn: Inecio And Maintenance Record (To Be Maintaind By Employee) Date Serviced By Note: After each project, submit completed form to your Division Safety Rcpresentative. E A R T H T E C H A tqC&O NTERMnvxAL LTD.COJ4FANY Hard CommunicaionPogrm Gemical/oduct Inventorg red by. F040/MCoph&S E A R T H T = A4C4CU WTnl"^T'f E C LTD.CO H Atmospheric MonitoringLog FieLd Health and Safety WY Page -of Cicle: Son Mon The Wed Thu Fri Sac site Projec No.: Site Safety Officr- Action Lcvels- D J- i >-C I:- B -(Sop work, call in for instructions) (Check boK and write in levels for upgrade) Ta+quipmenr Wnater _____ OVA HNe 02 IEL PPM % H2S PPM % PPM Additional Comments: Comena= Duration ofReadings, UpgaesLocaion. etc. .... Signature: NOTE: Place in project files. FO24CoP.H&S E T H A R A lce WRNAYOML T E C H D.VCO4MMY Site Safety Meeting Page Meeting Condurfed BR Summary Of Items Discussed: PersNnnel hesan Name Representing Signature 3. 4. 5. 6. 7. - 10. 12. 13. 14. 16 17 18. 1920. NOTE: Place in project files. t -- of APPENDIX D BACKUP CALCULATIONS FOR ACTION LEVELS APPENDIX D BACKUP CALCULATIONS FOR ACTION LEVELS Action Levels have been established for the protection of workers from potential health hazards associated with chemicals, dust and oxygen deficient atmospheres. The justification for these Action Levels is provided below. Organic Vapors, Gasoline and Other Petroleum Products An Action Level for use of respiratory protection of 0.5 ppm for will be used due to the possibility of encountering benzene. At a concentration of 5 ppm, as measured with the photoionization detector (PID), length-of-stain indicator tube sampling for benzene will begin to determine the level of benzene in the breathing zone. Level C respiratory protection (i.e., full face air-purifying respirator) will be required if benzene concentrations are above 0.5 ppm. Level B protection is required when benzene concentrations are above 5 ppm, respectively. The Protection Factor (PF) for a full face air-purifying respirator is 50. Therefore, the upper limit for use of cartridge respirators of 5 ppm benzene (above this level, Level B will be used) produces a maximum exposure level, in the face piece of 0.1 ppm benzene; which provides a 10 times margin of safety below the benzene PEL of 1 ppm. The PEL for gasoline (TPH) is 300 ppm; the PELs for fuel oil (as Stoddard solvent), xylenes and ethylbenzene are 100 ppm each; the PEL for toluene is 50 ppm, and the PEL for MTBE is 40 ppm. Level C respiratory protection (e.g., full-face air -purifying respirator) will be required if PID concentrations are above 20 ppm. Based on PF of 50 for full-face air-purifying respirators and a maximum use concentration of 100 ppm, the maximum exposure level within the face piece would be 2 ppm. This provides a 150 times margin of safety for gasoline (as TPH); a 50 times margin of safety for fuel oil (as Stoddard Solvent), xylenes, and ethylbenzene; a 25 times margin of safety for toluene; and a 20 times margin of safety for MTBE below their respective PELs. The fence line Action Levels are 1 ppm above background sustained for one minute (i.e., detectable VOCs) as measured with the PID.