2-0011193-phase iv remedy implementation plan-2000-06

Transcription

2-0011193-phase iv remedy implementation plan-2000-06
SCANNED
Phase IV- Remedy Implementation Plan
Release Tracking Number 2-11193
Department of Public Works Facility
11 Fletcher Street
Northbridge, Massachusetts
Preparedfor:
Town of Northbridge
Town Hall, Memorial Square
Whitinsville, Massachusetts 02148
D
3)
P
Preparedby:
Earth Tech, Inc.
196 Baker Avenue
Concord, Massachusetts 01742
June 2000
TABLE OF CONTENTS
PAGE
1.
2.
1-1
1-1
1-1
1-2
1-4
1
INTRODUCTION
1.1
Objective
1.2
Site Background
Summary of the Phase I Initial Site Investigation
1.3
Summary of Phase II CSA Findings
1.4
Phase III Report Recommendations
1.5
List of Relevant Contacts
1.4
Remedy Implementation Plan Organizati
1.5
-6
p
REMEDIAL DESIGN
Goals of the Remedial Action
2.1
2.2
Status of the Disposal Site
2.3
2.4
Disposal Site Maps
Materials to be Managed under the RIP
2.4.1 Characteristics of Material to be Treated or Managed
2.4.2 Quantity of Materials to be Treated or Managed
2.4.3 Location of Materials to be Treated or Managed
Conceptual Plan
Relevant Design and Operation Parameters
2.6.1 Design Criteria
2.6.2 Expected Effectiveness of the Remedial Actions
2.6.3 Demonstration of the Remedial Actions Ability of Achieve
Remedial Goals
Spill or Accidental Release Controls
Methods for Management or Disposal of OHM Generated
as a Result of the Remedial Action
Identification of Site-Specific Characteristics that may Affect the
Remedial Action
2.9.1 Impacts to Existing Disposal Site Activities or Operations
2.9.2 Drainage Features
2.9.3 Natural Resource Areas, Local Planning and
Development Issues
2.9.4 Site-Specific Soil and Groundwater Characteristics
Mitigative Measures
Inspections and Monitoring During the Implementation of
the Remedial Action
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2
2-1
'TLREq:ON
2-1
2-1
2-1
2-1
2-2
2-2
2-2
2-3
2-3
2-4
2-4
2-4
2-4
2-4
2-4
2-5
2-5
2-5
2-6
2-6
3.
PLANS & SPECIFICATIONS & PROJECT SCHEDULE
Plans & Specifications
3.1
Project Schedule
3.2
3-1
3-1
3-1
4.
OPERATION, MAINTENANCE & MONITORING PLAN
Person(s) Conducting OMM
4.1
4-1
4-1
Table of Contents
Page i
N:work\40196\proj~haseivrip.doc
4.2
4.3
5.
General Operating Procedures
Type, Frequency & Duration of Monitoring & Testing to
Ensure Remedial Action Design
MISCELLANEOUS IMPLEMENTATION ISSUES
5.1
Site Specific Health & Safety Plan
5.2
Permits, Licenses & Approvals for the Remedial Action
5.3
Property Access Issues
Contents
of Contents
Table
Table of
Page iiil
Page
4-1
4-1
5-1
5-1
5-1
5-1
1: ~workWOJ96kprof phase Mrip.doc
N:work\40196prj~phaseMvrip.doc
LIST OF APPENDICES
U
I
U
I
U
I
Appendix A
Comprehensive Response Action Transmittal Form & Phase I Completion
Statement (BWSC-108)
Appendix B
Technical Specifications
Appendix C
Site Specific Health and Safety Plan
Table of Contents
Page iii
I.twork\40196\pro phase ivrip.doc
LIST OF FIGURES
Figure 1
Figure 2
Figure 3
Table
Table ojtontents
of Contents
Site Location Map
Site Plan
RIP Work Plan
Page iv
Page iv
1: Iwork'4OJ96projlphase Mr:p.doc
1:\ work\I40196proj~phaseivrip.doc
1.
INTRODUCTION
1.1
Objective
The objective of this Phase IV Remedy Implementation (RIP) is to address the
Massachusetts Contingency Plan (MCP) requirements under 310 CMR 40.0870 for
the implementation of the selected remedial alternative. This Phase IV RIP addresses
pertinent conditions at Northbridge Department of Public Works (DPW) Facility
("the Site"), located at 11 Fletcher Street, Northbridge, Massachusetts toward
development of a remedial design; development of operation, maintenance, and
monitoring plans; and identification of other contingencies for the implementation of
the selected remedial action. The selected remedial action for the site includes the
installation of a bituminous concrete pavement cap over the impacted areas and the
placement and activity and use limitation (AUL). The selected remedy described in
this report is designed to address the petroleum contamination detected in surface and
subsurface soil at the site.
An original Comprehensive Response Action Transmittal Form (BWSC-108)
accompanies this submittal. A copy of form BWSC-108 is included as Appendix A.
1.2
Site Background
The current owner of the property is the Town of Northbridge. According to the
Town Assessor's Office, the Town of Northbridge has owned and operated the
property since 1941, although the property may have been used as a DPW facility
before this time. The site is located in a mixed commercial and residential area. The
site is bordered to the east by an open area; to the south by private residences and
then Fletcher Street; to the west by Douglas Road; and to the north by the Mumford
River. The Cotton Mill Apartments are located in an old mill building on Linwood
Street, to the north of the site beyond the Mumford River. The downtown area of
Whitinsville is located at to the north/northwest of the site along Linwood
Street/Main Street. The Alternatives Rehabilitation Center is located to the west of
the site on the west side of Douglas Road. Numerous residences are located to the
south/southeast of the site along Fletcher Street. The Whitinsville Golf Club is
located approximately 0.2 miles southeast of the site on Fletcher Street.
Several buildings/storage sheds are located on the site. A brick and concrete block
garage houses the DPW office. A large salt storage shed is located at the eastern end
of the property. A stucco garage is located on the southwest portion of the site. A
wood building, wood garage, and lumber barn are also located on the site. The
majority of the remaining portions of the site are either paved or landscaped. The site
is fenced on three sides, the fourth of which is bordered by the Mumford River. The
topography of the site is generally flat with the northern portion lowering slightly to
Introduction
Introduction
Page 1-1
Page 1-1
1: ~workWOJ96'prof phase iv'rifi doe
1:\work\40196\proj~haseM~rip.doc
the Mumford River. A site location plan is included as Figure 1. A site plan is
presented as Figure 2.
In 1994, while trenching in the area of a 1,000-gallon diesel tank located just west of
the Stucco Garage (see Figure 2), DPW employees observed a thin film of oil at the
groundwater table. In 1995, the DPW decided to remove all the underground storage
tanks (USTs) on site for reasons as follows: it was an alternative to the upgrading
required under state/federal regulations; the age of the USTs, environmental
concerns, and they were no longer required as a result of the installation of an above
ground fuel storage tank (AST).
In December of 1995, Earth Tech provided oversight services of the removal of a
500-gallon capacity fuel oil UST located just east of the Stucco Garage, and a 1,000gallon diesel UST, reportedly installed in 1986, located immediately west of the
Stucco Garage. A long-time DPW employee reported that waste oils had been
routinely disposed of around the building in the past, and this appears to be one
source of the oil-stained soils. A 3,000-gallon waste-oil tank was also abandoned in
place in December 1995, because half of it was situated beneath the western end of
the Brick Garage (see Figure 2).
1.3
Summary of the Phase I Initial Site Investigation
The Phase I Initial Site Investigation Report contained the results of past assessment
and remedial activities as well as more recent Preliminary Response Actions
conducted at the DPW facility. The recent work was conducted pursuant to the
requirements of the 1993 MCP and associated revisions, specifically 310 CMR
§40.0481. The report was intended to provide sufficient information to facilitate the
evaluation and Tier Classification of the DPW site.
The information presented below was gathered during the Preliminary Response
Actions completed at the site in December 1996. The detailed results of the
Preliminary Response Actions are presented in the Phase I Initial Site Investigation
Report, dated April 1997.
Soil and groundwater samples were collected from the seventeen soil borings and six
groundwater monitoring wells located on the property (see Figure 2). Of the analytes
detected, the concentrations of total petroleum hydrocarbons (TPH) in samples 82-
SI, B8-SI, B9-Sl, Bll-SI, BIl-S2, and B15-S1 exceeded the corresponding
reportable concentration (RC) of 500 parts per million (ppm), and the applicable
Method I S-l/GW-2 risk-based standard of 500 ppm. The toluene concentration
detected in B3A-Sl exceeded the applicable RC of 90 ppm, and the ethylbenzene
concentration detected in B3A-S I and 89-SI exceeded the RC of 80 ppm; neither of
these analytes was detected in concentrations exceeding Method I risk-based
Introduction
Page 1-2
1:\work\40196\projlphase ivlrip.doc
standards. The total xylenes in B3A-S1 and 89-SI exceeded the applicable RC of
500 ppm, and the applicable Method I risk-based standard of 500 ppm.
Detectable concentrations of petroleum were identified in samples collected from
groundwater monitoring wells MW-3, MW-7, and MW-8. None of the analytes
detected in groundwater were above the applicable RCGW-2 threshold, and none
were above the applicable GW-2/GW-3 Method 1 risk-based standards.
Based on the results of the Phase I investigation, Earth Tech concluded that:
o
Releases of petroleum products (including weathered fuel oil, lubricating oils
and gasoline) to soil and groundwater have occurred at the facility. These
releases probably originated from a leaking UST, overfilling of USTs, and
general waste-oil disposal practices over the course of the years.
o
Groundwater flow at the facility is oriented toward the north-northeast
(toward the Mumford River).
o
The highest concentration of TPH in soil at the site was detected in sample S5 (17,000 ppm) which was collected from the tank grave of the 500-gallon
capacity fuel oil UST.
o
The highest concentration of petroleum in groundwater at the site (38,000
ppb) was detected in sample GW-2, which was also collected from the tank
grave of the 500-gallon capacity fuel oil UST.
Benzene, toluene,
ethylbenzene, and xylenes were detected in groundwater monitoring well
MW-3; ethylbenzene and xylenes were detected in MW-7; and toluene and
xylenes were detected in MW-8. None of the detected concentrations of
TPH or volatile organic compounds (VOCs) exceeded the applicable RCs.
o
Method 1 risk-based standards were exceeded in a soil sample collected from
the former location of the 1,000 gallon capacity diesel oil UST (S2-1000D),
two soil samples collected from the tank grave of the 500-gallon capacity
fuel oil UST (S-4 and S-5), and one or more soil samples from soil borings
B2, B3A, B-8, B9, B-Il, and B-15. Based on these results, three areas of
soil contamination were defined as shown on Figure 2 of the ISA. No riskbased standards were exceeded by analyte concentrations in groundwater.
There are no Natural Resource Areas such as vernal pools, ponds, lakes, streams,
rivers, public drinking water supplies consisting of Zone II areas, Interim Wellhead
Protection Areas, Zone A areas, or Potentially Productive Aquifers within 500 feet of
the site. There are also no known private wells in the vicinity of the site.
Introduction
Introduction
Page 1-3
Page 1-3
1: hvork~4OJ96~proj1phwe Mrip.doc
1:\1work\ 40196projlphaseivrip.doc
1.4
Summary of Phase 11 CSA Findings
Earth Tech completed a Phase iI - Comprehensive Site Assessment (CSA) of the
DPW facility in January, February, and March 1999. The objectives of the Phase II
investigation were to characterize contamination at the site, identify contaminated
media, determine the concentrations and vertical and lateral extent of subsurface
contamination, identify contaminant migration mechanisms, and estimate the rate of
contaminant migration. The scope of this investigation consisted of subsurface
investigations, soil and groundwater sampling, and laboratory analyses, and report
preparation.
The Phase II field investigation involved collecting surface and subsurface soil
samples from eleven soil borings, replacing one monitoring well that had been
installed during the Phase I investigation and subsequently damaged, and collecting
and analyzing groundwater samples from existing and newly installed monitoring
wells to evaluate groundwater quality on-site.
During the Phase II investigation, 11 soil borings were advanced on January 29,
1999, February 1, 1999, and March 2, 1999. In general, Earth Tech collected soil
samples at the 2 to 4-foot, 5 to 7-foot, and 10 to 12-foot intervals as borings were
advanced and field-screened the samples for VOCs using an HNu photoionization
detector (PID). One sample from each boring, which had the highest PID reading,
was submitted for laboratory analysis for extractable petroleum hydrocarbons (EPH)
and volatile petroleum hydrocarbons (VPH). Groundwater samples were collected
from each of the existing wells on February 2, 1999 for EPH and VPH analyses.
During this investigation, Earth Tech conducted groundwater measurements in the
newly installed and existing monitoring wells. The general groundwater flow
direction at the site is towards the north-northeast towards the Mumford River.
Based on the historical and current sampling results, none of the groundwater
exceeds Method 1 Standards for GW-2 or GW-3, and groundwater was therefore not
identified as a medium of concern at the site.
The three areas of soil contamination were further identified and delineated in the
Phase 1I report. Two of the areas are associated with the underground storage tanks
that were removed in December 1995: one 500-gallon fuel oil tank to the east of the
stucco garage and one 1,000-gallon diesel tank to the west of the garage. The third
area of concern identified in the Phase I report is along the DPW driveway in the
center portion of the site. The source of the contamination in this third area was not
been identified, although it is suspected to be related to general waste oil disposal
practices in the vicinity of the driveway area. The results of the soil sampling
conducted at the facility indicate that the three areas of soil contamination are still of
concern at the facility. Levels of EPH compounds, including diesel polynuclear
Introduction
Introduction
Page 1-4
Page 1-4
1: Iwork~4OJ96\prof phase Mrip. doc
I: lwork\401%\proj~phaseMrip.doc
aromatics (PAHs) and other target PAH analytes were detected above MCP Method
I Standards at several soil boring locations.
1.5
Phase III Report Recommendations
In April 1999, Earth Tech prepared and submitted the Phase III Remedial Action
Plan that presented three remedial action alternatives (RAAs) that are reasonably
likely to achieve a Level of No Significant Risk to health, safety, public welfare or
the environment at the site. The goal of the RAAs was to reach a Permanent Solution
for the site. A Permanent Solution, as defined by the MCP, is a measure or
combination of measures which will, when implemented, ensure attainment of a level of
control of each identified substance of concern at a disposal site or in the surrounding
environment such that no substance of concern will present a significant risk of damage
to health, safety, public welfare, or the environment during any foreseeable period of
time.
The selected Phase III RAA includes the following measures:
o
Grading and paving the facility to create an asphalt cap in the areas of concern
that are currently unpaved to eliminate any exposure pathway to the
contaminated soils; and
o
The placement of an Activity and Use Limitation (AUL) to restrict the property
to non-residential use and reduce potential exposures to OHM for excavation
workers.
This alternative also includes site inspections and maintenance of the pavement on an
annual basis. The selected remedy eliminates the risks of exposure and is the most
economically feasible, while providing the site with a Permanent Solution as defined
by the MCP.
1.4
List of Relevant Contacts
The names addresses and telephone numbers are provided for the Responsible Party
(also the persons who will own/operate and maintain the remedial systems during and
following construction) and the Licensed Site Professional.
Responsible Party:
RP's Address:
Contact:
Contacts Address:
Telephone:
Introduction
Introduction
Town of Northbridge
Town Hall, Memorial Square, Whitinsville, MA 01588
Mr. Richard R. Sasseville, Director DPW
P.O. Box 88, Whitinsville, MA 01588
508-234-3581
Page i-S
Page 1-5
1: lworkWOi96iprojlphase Mrip.doc
N:work\40196\projlphaseivrip.doc
LSP:
Address:
Telephone:
License No.:
Company:
1.5
Joseph P. Vitale
196 Baker Avenue, Concord, MA 01742
978-371-4124
6746
Earth Tech, Inc.
Remedy Implementation Plan Organization
This RIP contains five sections. Section 1 is the introduction to the RIP. Section 2
presents the remedial design for the project and includes twelve subsections, Sections
2.1 through 2.11. Section 3 presents the plans, specifications, and project schedule.
Section 4 includes the operation, maintenance and monitoring plans. Section 5
presents miscellaneous implementation issues including a health and safety plan,
permits, and property access issues.
Introduction
Page 1-6
1:work\4096\projphase ivrip.doc
2.
REMEDIAL DESIGN
2.1
Goals of the Remedial Action
The goals of this remedial action are to achieve a Permanent Solution as defined by
the MCP for the site. Achieving a Permanent Solution for this site requires
implementation of a measure, or combination of measures, that will attain a level of
control of each identified substance of concern at the site such that no substance of
concern will present a significant risk to health, safety, public welfare, or the
environment during any foreseeable period of time.
As presented in the Phase III Remedial Action Plan, a Permanent Solution will be
attained by a combination of a bituminous concrete pavement (asphalt) cap and
placement of a AUL as presented in RAA No. 1 in the Phase III report.
2.2
Status of the Disposal Site
The status of the Site has been presented in the Phase II and Phase III Reports. No
new, significant information concerning the status of the Site has been identified,
relative to the development of an engineering design for the proposed remedial
action.
2.3
Disposal Site Maps
The Disposal Site Maps are attached in the Figures section of this report. Figure 2
presents the Site Plan and Figure 3 provides the proposed extents of asphalt caps.
The asphalt cap and AUL will be conservatively placed beyond the known limits of
soil contamination as shown on the figures.
2.4
Materials to be Managed under the RIP
2.4.1
Characteristics of Material to be Treated or Managed
The types of material to be managed at the site are soil and bituminous concrete
pavement. As reported in the Phase 11 Report, site soil is primarily four to seven feet
of granular fill overlying sandy soil. The soil contains low concentrations of
petroleum related contaminants including total petroleum hydrocarbons, EPH, VPH
aliphatic and aromatic hydrocarbons, PAHs, and VOCs including BTEX, MTBE, and
naphthalene. The concentrations of these contaminants are expected to be within the
acceptance criteria for soil recycling for asphalt batching. Soil will be managed and
transported in accordance with local, state, and federal regulations.
A small volume of bituminous concrete will be generated as a result of the remedial
action. Currently, portions of the three areas of concern are covered with asphalt.
Remedial Design
Page 2-1
1:work40196\projlphase irip.doc
The pavement covering these areas will need to be removed prior to the installing the
new pavement cap.
2.4.2
Quantity ofMaterials to be Treated or Managed
The estimated quantity of contaminated soil to be managed at the site is less than 125
cubic yards. It is assumed the top 6 to 7 inches of soil will need to be excavated from
the areas of concern in order to prepare the subgrade and place the dense-graded
crushed stone and bituminous concrete layers.
The estimated quantity of existing bituminous concrete pavement to be removed and
managed at the site is 40 cubic yards.
2.4.3
Location of Materials to be Treated or Managed
The locations of the soil to be managed at the subject site are within the limits of
impacted soil as delineated on Figure 2. The location of the existing bituminous
concrete pavement to be managed at the site is within the proposed limits of
pavement shown on Figure 3.
2.5
Conceptual Plan
The conceptual plan for this remedial action includes the components/activities listed
below:
o Install temporary erosion and sediment controls as required by the Order of
Conditions by the Northbridge Conservation Committee that will result from the
Notice of Intent to be filed shortly.
Remedial Design
o
Excavate the existing bituminous concrete pavement and site soil to within the
limits of work as needed prepare the area for the new pavement caps. It is
assumed the thickness of existing pavement in the limits of work range from 2 to
3 inches.
a
Grade and prepare the areas for placement of the sub-base material (dense graded
crushed stone). The areas will be graded so the final surface closely matches the
existing site elevations. Modifications to grades may be necessary for
stormwater drainage improvements. The required improvements will be decided
and finalized based upon the needs of the DPW and conditions of the Order of
Conditions.
o
Stockpile the excavated asphalt and any petroleum contaminated soil generated
from site preparation. In order to minimize the quantity of petroleum-impacted
soil to be excavated and stockpiled, this soil will be reused as grading material
within the areas of concern to the greatest extent possible. All stockpiles will be
Page 2-2
R D\work\40196\projfphaseivrip.doc
located on the DPW facility property in an area(s) that minimize disruption to the
DPW operations. All stockpiles of contaminated soil will be covered with
polyethylene sheeting to minimize contact with precipitation.
Place the sub-base layer and bituminous concrete layers within the areas on Figure 3.
The cap from top to bottom consists of 1.5-inches of bituminous concrete wearing
course, 2.5-inches of bituminous concrete binder coarse, and 2-inches of densegraded crushed stone. Note the DPW may resurface addition areas of the DPW yard
that are beyond the requirements of this remedial action. At a minimum, the three
areas of soil contamination will be capped with new bituminous concrete pavement.
Dispose and/or recycle the stockpiled bituminous concrete pavement and petroleumimpacted soil in accordance with local, state, and federal regulation.
2.6
Relevant Design and Operation Parameters
2.6.1
Design Criteria
The design criteria for the remedial action presented in this RIP are as follows:
Design
Remedial Design
o
Cap the contaminated soil with a durable surface that will eliminate the exposure
pathway to the soil;
o
Grade the areas of concern and install stormwater management controls to
improve the site drainage and address local and state water quality standards;
o
Match existing grades where possible;
o
Protect on-site workers and minimize the disruption to DPW operations;
o
Place the bituminous concrete pavement in accordance with local and state
standards;
o
Manage contaminated soil and spent bituminous concrete pavement in
accordance with all applicable regulations and to minimize disruptions to the
DPW operations;
o
Perform a site survey by a State of Massachusetts Registered Land Surveyor to
document the asphalt cap covers the three areas of concern; and,
o
Place an AUL to restrict current and future site uses to protect on-site workers
and future owners of the property from the OHM on the site.
Page 22-33
Page
lIwork~4OJ96~proj~phase ivlrip.doc
N:work\40l96\proj~phaseMvrip.doc
2.6.2
Expected Effectiveness of the RemedialActions
The expected effectiveness of the remedial actions for this site is considered high.
The placement of bituminous concrete pavement caps over the areas of concern will
eliminate the exposure pathway to the impacted soil. The effectiveness of the AUL
should is considered high because additional remedial actions would be necessary
before the property could be used for certain future uses (e.g., residential use). If the
property were to be developed for anything other than its current use that would
require disturbing the paved area, further cleanup of the contaminated soils may be
necessary.
2.6.3
Demonstration of the Remedial Actions Ability ofAchieve Remedial Goals
Capping areas with bituminous concrete to eliminate an exposure pathway to soil
contamination is a commonly accepted and used technology. Similarly, the
placement of an AUL at the site is also a commonly used property restriction to
achieve remedial goals.
2.7
Spill or Accidental Release Controls
The MCP considers these controls as design features for control of oil and hazardous
materials spills and accidental discharge or system malfunction, including without
limitation: containment structures, leak detection devices, run-off controls, pressure
valves, by pass systems, or safety cutoffs. The measures listed above with the
exception of run-off controls are not applicable to the pavement cap and AUL for the
subject site. Run-off controls during construction will most likely include the use of
hay bales and silt fence and temporary covers (polyethylene sheeting). Additional
stormwater runoff controls may be required for this project as determined in the
wetlands permitting process.
2.8
Methods for Management or Disposal of OHM Generated as a Result of the Remedial
Action
Soil and asphalt materials generated, as a result of the remedial action, will be
managed in accordance with all local, state and federal regulations. It is anticipated
that both the soil and asphalt generated will meet the acceptance criteria for recycling
-at asphalt batching plants. Materials shipped off site will be tracked under the
appropriate manifests or bills of lading under direction of the LSP.
2.9
Identification of Site-Specific Characteristics that may affect the Remedial Action
2.9.1
Impacts to Existing Disposal Site Activities or Operations
The remedial action will temporarily disrupt the DPW operations at the site. The
areas to be covered with pavement are currently used for either storage of equipment
or vehicles or within the travel ways of the DPW yard. Equipment and vehicles will
Remedial Design
Page 2-4
1:\workW0196\proj~phaseivrip.doc
need to be moved and temporarily stored off the subject areas until the placement of
the bituminous concrete pavement caps are complete.
Long term maintenance of the pavement surfaces will not impose any impacts on the
site activities or operations. Maintenance of pavement in roadways is a routine task
for the DPW; therefore, supplying the equipment, labor and materials to perform the
necessary maintenance of the pavement will be performed with minimal effort and
difficulties.
2.9.2
Drainage Features
The proximity of the site to the Mumford River and the discharge of run-off to the
river are being considered for this project. Although the work proposed in this
remedial action would improve the water quality of run-off from the site, additional
measures may be required to meet local and state water quality standards. Any
additional stormwater controls, if necessary, will be decided in the wetlands
permitting process.
The existing catch basin located to the east of the Stucco Garage will be protected
during construction. Haybales will be placed around the catch basin as shown on
Detail 2 of Figure 3.
2.9.3
Natural Resource Areas, Local Planning and Development Issues
As reported in the Phase II report, there are no Natural Resource Areas such as vernal
pools, lakes, rivers, public drinking supplies consisting of Zone II areas, Interim
Wellhead Protection Areas, Zone A areas, or Potentially Productive Aquifers within
500 feet of the Site.
As stated above in this report, approval by the Northbridge Conservation Committee
will be required for this project. A Notice of Intent will be filed for the project.
Work will not begin until the Northbridge Conservation Committee issues an Order
of Conditions. Stormwater drainage improvements may be required to meet
stormwater management standards set forth in the stormwater management policy
issued by the State of Massachusetts in May 1997.
2.9.4
Site-Specific Soil and Groundwater Characteristics
The Phase I and Phase II investigations identified 01HM in the soil and groundwater.
The presence of OHM in the soil and groundwater was considered in the selection of
the remedial action. The design, construction, or operation of the selected remedial
action alternative will not adversely affect soil and groundwater characteristics.
Remedial Design
Page 2-5
:\work\40196\projiphaseMrip.doc
2.10
Mitigative Measures
Measures to be incorporated into the design, construction, and operation of the
remedial action alternative to avoid or minimize impacts on environmental receptors
and natural resource areas (including any surface water or wetland) are as follows:
o
Haybales and silt fence shall be placed around catch basin(s) and in drain ways to
minimize soil and silt migration from the work area;
o
Placement of the bituminous concrete pavement will occur shortly after site
preparation is completed to minimize exposure time after the disruption of the
current site conditions;
o
Stockpiles of contaminated soil and old pavement will be located such that
stormwater runoff does not run through the piles. Temporary measures including
soil berms and ditches may be used to divert water around and away from the
stockpiles.
o
Stockpiles of soil will be covered with polyethylene sheeting to minimize contact
with precipitation, and,
o Stormwater drainage improvements may be required to meet stormwater
management standards set forth in the stormwater management policy issued by
the State of Massachusetts in May 1997. Potential measures include, but not
limited to, water quality swales, infiltration trenches, deep sump and hooded
catch basins, and street sweeping of paved areas. The additional measures, if
any, will be decided in the wetlands permitting process.
2.11
Inspections and Monitoring during the Implementation of the Remedial Action
Earth Tech anticipates providing oversight during various stages of the project.
Assistance will be provided with the initial layout of the areas to be worked on an asneeded basis. Full-time oversight is anticipated during excavation and regrading of
existing site pavement and soil. Part-time oversight is anticipated during the
placement of the new bituminous concrete pavement surfaces. Inspections by the
LSP will occur on an as-needed basis.
Remedial Design
6
Page2-6
l:work\4O196\proj\phase
ivMrip.doc
3.
PLANS & SPECIFICATIONS & PROJECT SCHEDULE
3.1
Plans & Specifications
The plans and technical specifications for the work are included in Figures section
and Appendix B, respectively. Figure 3 supports the work to be performed as part of
the remedial action. Technical specifications for the project that include site
preparation, temporary erosion control, earthwork, paving, and hazardous materials
management are included in Appendix B.
3.2
Project Schedule
Work will not commence until the Northbridge Conservation Committee issues an
Order of Conditions. Submittal of a NOI is expected by mid-July. An Order of
Conditions is anticipated by mid-August and work will begin shortly after. The
construction work should be completed by September 30, 2000. The AUL will be filed
upon the completion of the work. The final inspection report will be submitted no later
than December 1, 2000.
Plans,Spec fications & ProjectSchedule
Page 3-1
N: work\40196\proj~phase Mvrip-doc
4.
OPERATION, MAINTENANCE & MONITORING PLAN
4.1
Person(s) Conducting OMM
The names and telephone number of the persons conducting operation, maintenance and
monitoring activities under the proposed remedial implementation plan are presented in
Section 1.4. The Town will retain the services of an LSP to conduct inspection services
of the bituminous concrete pavement caps.
4.2
General Operating Procedures
The selected remedy does not have any generating operating procedures.
4.3
Type, Frequency & Duration of Monitoring & Testing to Ensure Remedial Action Design
Site inspections will be performed by both the DPW and a LSP to ensure the integrity
of the bituminous concrete pavement caps over the areas of concern. The DPW will
perform inspections on a routine basis to determine if any cracks or breaches in the
pavement occurs. In addition, a LSP will perform site inspections on a semi-annual
basis to inspect the integrity of the pavement caps. One inspection will be performed
in the spring after the winter thaw. The other inspection will occur approximately 6
months after the spring inspection.
Documentation of each inspection will be submitted to the DPW in the form a letter
report. At a minimum, the report will include the items listed below as structured in
accordance with 310 CMR 40.0892 (Inspection and Monitoring Reports).
o
A description of the type and frequency of inspection activities conducted.
o
A description of any significant modifications of inspections made since the
submission of the preceding Inspection and Monitoring Report.
o
A description of any conditions or problems noted during the inspection period,
which are or may be affecting the performance of the remedial action.
o
A description of measures taken to correct conditions which are affecting the
performance of the remedial action;
o
The name, license number, signature and seal of the LSP.
o
The date and time of the inspection.
The Owner of the property will perform maintenance of the caps, including
replacement of pavement and sealing of cracks on an as-needed basis.
The Town will submit the results of the inspections to the DEP every 6 months in
accordance with 3 10 CMR 40.0874 (3)(d).
Plan
OM& M
OM&
MPlan
Page 4-1
Page 4-1
liworki4Ol96~proj1phasetAri~.doc
/:\ work\40196\projlphaseMrip.doc
5.
MISCELLANEOUS IMPLEMENTATION ISSUES
5.1
Site Specific Health & Safety Plan
Earth Tech prepared a site-specific health and safety plan (HASP) in accordance with 29
CFR 1910.120. The HASP identified known and suspected chemical and physical
hazards at the work site, personal protection monitoring requirements, OSHA levels of
personal protection, protection upgrade levels, locations of emergency medical
assistance, and emergency phone numbers. The hazardous materials health and safety
plan prepared to address construction activities is presented in Appendix C.
Workers trained with the 40-hour OSHA Hazardous Waste Operations and Emergency
Response Training will perform some of the work activities associated with this project.
Workers possessing this training will perform the activities as follows: excavation of
existing pavement and soil within the three areas of concern; on site stockpiling of the
pavement and soil; and regrading of soil within the areas of concern. Upon the
acceptance of the subgrade and completion of site preparation activities for the
pavement caps, the installation of sub-base material and bituminous concrete pavement
layers can be performed by construction workers who do not have 40-hour OSHA
training.
5.2
Permits, Licenses & Approvals for the Remedial Action
The Town plans to obtain the Northbridge Conservation Committee's approval for the
proposed remedial action activities. Because the work is within the buffer zone of the
Mumford River, the Town will file a Notice of Intent (NOI) for the project. The Town
will consider the requirements of the March 1997 Stormwater Management Policy
prepared by the MA DEP and MA Office of Coastal Zone Management. The final plans
for the project will include measures to address the stormwater management standards
included in the March 1997 Stormwater Management Policy. Work will not commence
until the Northbridge Conservation Committee issues an Order of Conditions. Submittal
of a NOI is expected by mid-July. An Order of Conditions is anticipated by mid-August
and work will begin shortly after.
5.3
Property Access Issues
The site is located upon property owned by the Town of Northbridge. It is the
current location of the Northbridge DPW operations. The DPW uses portions of the
site for storage of equipment and vehicles that will be temporarily moved for the
implementation of the remedial action. There are no property access issues that are
relevant to the implementation of the RIP.
Implementation Issues
Miscellaneous Implementation
Miscellaneous
Issues
S-i
Page 5-1
Page
I: ~work~4Ol96~proj~phaseiv~rifr doe
1:\twork\40196 proj~haseiv~rip.doc
P
=
P,
-gI
Figures
.
r
-
L
4.
1.
I
II
I
a.
d.
.
E A R
T
H
T
E
C
H
Source: USGS Topographic Map, Uxbridge, MA quad
Figure 1
Site Location Map
K:USW\33582\Figure
.doc
j
-/
cit
z
0
/
/
z
0
0
z
w
zz2
C,
0
0
ob
W0.2
IL-
o
1o
-Q
I
I-
2
cJz
fl
Li
4
0+
it
C
.1
m
LU0
Ld
0,
in
U.'
IaL
w
50
0
z
WwI
C4
fti
:2,
CD
II
/
<I'
CL~*
dc 0
4
L
~7O
f
C
C
'1~
$
I
w
W5~
m
0
m
$
040
T
m
Di,
rD
4
T(c
-...
S
/
U
U
3
fl
m -
-
a
a
-
-
a
-
-
a
a
S
a
-
Appendix A
Comprehensive Response Action Transmittal Form & Phase I Completion
Statement (BWSC-108)
Massachusetts Department of Environmental Protection
Bureau of Waste Site Cleanup
BWSC-108
Release Tracking Number
COMPREHENSIVE RESPONSE ACTION TRANSMITTAL
FORM & PHASE I COMPLETION STATEMENT
Pursuant to 310 CMR 40.0484 (Subpart D)and &40.0800 (Subpart H)
D
2
-
11193
A. SITE LOCATION:
Site Name: (optional)
Street:
Northbridge Department of Public Works
Fletcher Street
City/Town
Location Aid:
Whitinsville
ZIP Code:
Memorial Square
01588
Related Release Tracking Numbers that this Form Addresses:
Tier Classification: (check one of the following)
[]Tier IA
]Tier IB
DTier IC
MTier |1
ENot Tier Classified
If a Tier I Permit has been issued, state the Permit Number
B. THIS FORM IS BEING USED TO:
[]
(check all that apply)
Submit a Phase I Completion Statement, pursuant to 310 CMR 40.0484 (complete Sections A, B, C, G, H, I and J).
Submit a Phase Il Scope of Work, pursant to 310 CMR 40.0834 (complete Sections A, B,C, G, H, I and J).
F
U
Submit a final Phase It Comprehensive Site Report and Completion Statement, pursuant to 310 CMR 40.0836
(complete Sections A, B, C, D,G, H, I,and J).
Submit a Phase liI Remedial Action Plan and Completion Statement, pursuant to 310 CMR 40.0882 (complete Sections A, B, C. G, H, I and J).
Z
Submit a Phase IV Remedy Implementation Plan, pursuant to 310 CMR 40.0874 (complete Sections A, B, C, G, H, I and J).
FI
Submit an As-Built Construction Report, pursuant to 310 CMR 40.0875 (complete Sections A, B, C, G, H, I and J).
U
Submit a Phase IV Final Inspection Report and Completion Statement, pursuant to 310 CMR 40.0878 and 40.0879
(complete Sections A, B, C, E, G, H, I and J).
Submit a periodic Phase V Inspection & Monitoring Report, pursuant to 310 CMR 40.0892 (complete Sections A, B, C, G, H. I and J).
Submit a final Phase V Inspection & Monitoring Report and Completion Statement, pursuant to 310 CMR 40.0893
(complete Sections A, B, C, F, G, H, I and J).
You must attach all supporting documentation required for each use of form Indicated, Including copies of
any Legal Notices and Notices to Public Officials required by 310 CMR 40.1400.
C. RESPONSE ACTIONS:
Check here if any response action(s) that serves as the basis for the Phase submittal(s) involves the use of innovative Technologies. (DEP is
interested in using this information to create an Innovative Technologies Clearinghouse.)
Describe Technologies:
D. PHASE || COMPLETION STATEMENT:
Specify the outcome of the Phase Il Comprehensive Site Assessment:
D
Additional Comprehensive Response Actions are necessary at this Site, based on the results of the Phase l1Comprehensive Site Assessment
The requirements of a Class A Response Action Outcome have been met and a completed Response Action Outcome Statement (BWSC-104)
will be submitted to DEP.
The requirements of a Class B Response Action Outcome have been met and a completed Response Action Outcome Statement (BWSC-104)
will be submitted to DEP.
Rescoring of this Site using the Numerical Ranking System is necessary, based on the results of the final Phase
Il Report.
E. PHASE IV COMPLETION STATEMENT:
Specify the outcome of Phase IV Comprehensive Site Assessment:
Phase V operation, maintenance or monitoring of the Comprehensive Response Action is necessary to achieve a Response Action Outcome.
(This site will be subject to Phase V Operation, Maintenance and Monitoring Annual Compliance Fee.)
U
of a Class A Response Action Outcome have been met. No additional operation, maintenance or monitoring is necessary to
requirements
The
ensure
the integrity of the Response Action Outcome. A completed Response Action Outcome Statement (BWSC-1 04) will be submitted to DEP.
The requirements of a Class C Response Action Outcome have been met. No additional operation, maintenance or monitoring is necessary to
ensure the integrity of the Response Action.Outcome. A completed Response Action Outcome Statement (BWSC-1 04) will be submitted to DEP.
SECTION E IS CONTINUED ON THE NEXT PAGE
Revised 3/30/95
,,
Supersedes Forms BWSC-010 (in part) and 013
Do Not Alter This Form
Page 1 of 3
Massachusetts Department of Environmental Protection
Bureau of Waste Site Cleanup
COMPREHENSIVE RESPONSE ACTION TRANSMITTAL
FORM & PHASE I COMPLETION STATEMENT
Pursuant to 310 CMR 40.0484 (Subpart D) and & 40.0800 (Subpart H)
BWSC-108
Release Tracking Number
EI~Z1193
-
E. PHASE IV COMPLETION STATEMENT:
(continued)
The requirements of a Class C Response Action Outcome have been met. Further operation, maintenance or monitoring of the remedial action
is necessary to ensure that conditions are maintained and that further progress is made toward a Permanent Solution. A completed Response
Action Outcome Statement (BWSC-1 04) will be submitted to DEP.
Indicate whether the operation and maintenance will be Active or Passive. (Active Operation and Maintenance is defined at 310 CMR 40.0006.):
0 Active Operation and Maintenance
0
Passive Operation and Maintenance
(Active Operation and Maintenance makes the Site subject to a Post-RAO-Class C Active Operation and Maintenance Annual Compliance Fee.)
F. PHASE V COMPLETION STATEMENT:
Specify the outcome of Phase V activities:
The requirements of a Class A Response Action Outcome have been met and a completed Response Action Outcome Statement (BWSC-104)
will be submitted to DEP.
U
The requirements of a Class C Response Action Outcome have been met. No additional operation, maintenance of monitoring is necessary to
ensure the integrity of the Response Action Outcome. A completed Response Action Outcome Statement (BWSC-1 04) will be submitted to DEP.
The requirements of a Class C Response Action Outcome have been met. Further operation, maintenance or monitoring of the remedial action
is necessary to ensure that conditions are maintained and that further progress is made toward a Permanent Solution. A completed Response
Action Outcome Statement (BWSC-104) will be submitted to DEP.
Indicate whether the operation and maintenance will be Active or Passive. (Active Operation and Maintenance is defined at 310 CMR 40.0006.):
0 Active Operation and Maintenance
0
Passive Operation and Maintenance
(Active Operation and Maintenance makes the Site subject to a Post-RAO Class C Active Operation and Maintenance Annual Compliance Fee.)
G. LSP OPINION:
I attest under the pains and penalties of perjury that I have personally examined and am familiar with the information contained in this transmittal form,
including any and all documents accompanying this submittal. In my professional opinion and judgment based upon application of (i) the standard of
care in 309 CMR 4.02(1), (ii) the applicable provisions of 309 CMR 4.02(2) and (3), and (iii) the provisions of 309 CMR 4.03(5), to the best of my
knowledge, information and belief,
> if Section B indicates that a Phase I, Phase 11,Phase III, Phase IV or Phase V Completion Statement is being submitted, the response action(s)
that is (are) the subject of this submittal (i) has (have) been developed and implemented in accordance with the applicable provisions of M.G.L. c. 21E
and 310 CMR 40.0000, (ii) is (are) appropriate and reasonable to accomplish the purposes of such response action(s) as set forth in the applicable
provisions of M.G.L. c. 21 E and 310 CMR 40,0000, and (iii) complies(y) with the identified provisions of all orders, permits, and approvals identified in
this submittal;
> if Section B indicates that a Phase If Scope of Work or a Phase IV Remedy Implementation Plan is being submitted, the response action(2) that
is (are) the subject of this submittal (i) has (have) been developed in accordance with the applicable provisions of M.G.L c. 21E and 310 CMR
40.0000, (ii) is (are) appropriate and reasonable to accomplish the purposes of such response action(s) as set forth in the applicable provisions of
M.G.L. c. 21E and 310 CMR 40.0000, and (iii) complies(y) with the identified provisions of all orders, permits, and approvals identified in this
submittal.
> if Section B indicates that an As-Built Construction Report or a Phase V Inspecton and Monitoring Report is being submitted, the response
action(2) that is (are) the subject of this submittal (i) is (are) being implemented in accordance with the applicable provisions of M.G.L c. 21 E and 310
CMR 40.0000, (ii) is (are) appropriate and reasonable to accomplish the purposes of such response action(s) as set forth in the applicable provisions
of M.G.L. c. 21E and 310 CMR 40.0000, and (iii) complies(y) with the identified provisions of all orders, permits, and approvals identified in this
submittal.
I am aware that significant penalties may result, including, but not limited to, possible fines and imprisonment, if I submit information which I know to be
false, inaccurate or materially incomplete.
Check here if the Response Action(s)on which this opinion is based, if any, are (were) subject to any order(s), permit(s) and/or approval(s)
issued by DEP or EPA. If the box is checked, you MUST attach a statement identifying the applicable pr '
LSP Name:
Joseph Vitale
LSP #:
6746
Telephone:
(978) 371-4000
Ext.:
4124
FAX: (optiornal)
(978) 371-2468
Stamp:
Signature:
Date:
Revised 3/30/95
/ 1o0o
Supersedes Forms SWSC-010 (in part) and 013
Do Not Alter This Form
Page 2 of 3
I
BWSC-108
Massachusetts Department of Environmental Protection
Bureau of Waste Site Cleanup
U
Release Tracking Number
COMPREHENSIVE RESPONSE ACTION TRANSMITTAL
FORM & PHASE I COMPLETION STATEMENT
u
Pursuant to ,310 M fR 40.0 484 (ubpa
2
rtD) and &40.0800 (u pa rI H)
-
1193
H. PERSON UNDERTAKING RESPONSE ACTION(S):
Town of Northbridge
Name of Organization:
Name of Contact:
Mr. Richard Sasseville, P.E.
Title:
Director of Public Works
State:
MA
P.O. Box 88
Street:
City/Town:
Telephone:
Whitinsville
Ext.:
(508) 234-3581
FAX: (optional)
ZIP Code:
01588'
(508) 234-0807
Check here if there has been a change in the person undertaking the Response Action.
I
I.RELATIONSHIP TO SITE OR PERSON UNDERTAKING RESPONSE ACTION(S):
RP or PRP
r]
Specify:
0 Owner
0 Operator
0 Generator
(check one)
0 Transporter
Other RP or PRP:
Fiduciary, Secured Lender or Municipality with Exempt Status (as defined by M.G.L. c. 21E, s. 2)
Agency or Public Utility on a Right of Way (as defined by M.G.L. c. 21 E, s. 5())
Specify Relationship:
Any Other Person Undertaking Response Action
J. CERTIFICATION OF PERSON UNDERTAKING RESPONSE ACTION(S):
, attest under the pains and penalties of perjury (1)that I have personally examined and am
Richard Sasseville
familiar with the information contained in this submittal, including any and all documents accompanying this transmittal form, (ii) that, based on my inquiry
of those individuals immediately responsible for obtaining the information, the material information contained inthis submittal is, to the best of my
knowledge and belief, true, accurate and complete, and (iii) that I am fully authorized to make this attestation on behalf of the entity legally responsible for
this submittal. I/the person or entity o whose behalf this submittal is made am/is aware that there are significant penalties, including, but not limited to,
possible fines and imprisonment, for illfully submitting false, inaccurate, or incomplete information.
1,
Title:
By:
Director of Public Works
(signature)
For
Town of Northbridge
(print name of person or entity recorded in Section H)
Date:
Q
tV
Enter address of the person providing certification, if different from address recorded in Section H.
Street:
State:
City/Town:
Telephone:
Ext.:
ZIP Code:
FAX: (optional)
YOU MUST COMPLETE ALL RELEVANT SECTIONS OF THIS FORM OR DEP MAY RETURN THE DOCUMENT AS
INCOMPLETE. IF YOU SUBMIT AN INCOMPLETE FORM, YOU MAY BE PENALIZED FOR MISSING
A REQUIRED DEADLINE.
Revised 3130/95
Supersedes Forms BWSC-010 (in part) and 013
Do Not Alter This Form
Page 3 of 3
I
I
I
I
U'
U
U
U
I,
I
I
I
I
I
I
I
I
U
I
a
Appendix B
P
4
Technical Specifications
TABLE OF CONTENTS
TECHNICAL SPECIFICATIONS
01025
02100
02210
02220
02230
02503
Measurement and Payment (not included in this submittal)
Site Preparation
Temporary Erosion Control
Earthwork
Excavation and Management of Hazardous Materials
Paving
END OF SECTION
SECTION 02100
SITE PREPARATION
PART I
GENERAL
1.01
SCOPE
A.
The work of this section includes all labor, equipment, tools, and materials necessary for
the performance of all operations in connection with clearing and grubbing, and the
removal of pavement, curbing and all incidental and appurtenant work pertaining
thereto, as specified herein, and as shown on the drawings.
MEASUREMENT AND PAYMENT
1.02
A.
Measurement and payment for the work described in this section will be made in
accordance with the provisions of SECTION 01025, MEASUREMENT
PAYMENT.
1.03
SUBMITTALS (NOT USED)
1.04
PRODUCT HANDLING (NOT USED)
1.05
SPECIAL REQUIREMENTS
40196
AND
A.
Prior to the performance of any work of this section or any related work required by
other sections of the specifications, the Limit of Work Line shall be laid out and staked
in the field by the Contractor, according to the drawings. The Contractor shall be
responsible for maintaining the Limit of Work Line during the construction operation.
B.
At all times throughout the duration of this contract, the Contractor shall be responsible
for the appearance and condition of the area within and surrounding the project site. The
Contractor shall repair or replace, at no additional expense to the Owner, any structures,
either natural or man-made such, as but not limited to, utilities, trees, plants, water
bodies, and pavements that are damaged or destroyed by any actions or sequences of
events related to the Contractor's operations.
C.
Any existing plant materials designated to be saved, protected and/or undisturbed, that
are cut or damaged without prior approval of the Engineer, shall be replaced in kind and
size by the Contractor, at no expense to the Owner. If the Engineer agrees that tree
replacement is impossible or impractical, the Contractor shall pay the Owner monies at a
rate of $400.00 per inch of the tree trunk diameter, This diameter measurement will be
taken at a height of two feet six inches up from the average natural grade around the base
of the tree.
D.
Disposal of waste/surplus materials may involve securing permits, licenses, or approvals,
which may vary according to the type of material to be disposed of prior to the start of
construction. The Contractor shall apply for these, as they may be required by the
various governing agencies and pay all required fees. The Contractor shall have sole
responsibility for the legal disposal of all waste surplus material of this project excluding
02100-1
OHM. The Owner will coordinate disposal of OHM materials. The Contractor shall be
responsible for any and all fines due to any illegal activity with regards to the disposal of
waste/surplus materials.
PART 2
PRODUCTS (NOT USED)
PART 3
EXECUTION
3.01
GENERAL REQUIREMENTS
A.
All graded areas, and all areas within the Limit of Work Line on which proposed work is
to be completed, shall be cleared and grubbed as may be needed and as indicated on the
drawings.
B.
The Contractor shall be careful to note any areas that may be designated on the drawings
to receive only selective clearing and thinning.
3.02
CLEARING, GRUBBING, TREE AND STUMP REMOVAL
A.
Trees
1.
Preparation of the site shall include the complete removal of all trees within the
Limit of Work Line, except in those areas where selective clearing and thinning
is required.
2.
Any trees within the Limit of Work Line not to be removed shall be protected
from damage during clearing and construction operations by barriers or by such
other methods as conditions may require. No construction materials or debris
shall be stored or stockpiled, or vehicles parked or operated within the limits of
the branch spread of the trees to be saved.
3.
Clearing operations shall be performed in a manner which will prevent damage
by falling trees to trees left standing or to structures under construction, and by
methods which will provide for the safety of employees and other persons.
4.
Limited clearing and thinning shall be performed in areas identified on the
drawings, as required or as directed by the Engineer. This work will involve the
removal of brush, small trees, dead, damaged and/or diseased trees. The
Engineer will tag or otherwise mark and designate trees and brush to be saved,
5.
Where branches of trees which are to be saved interfere with the work, limbs and
branches shall be trimmed off neatly and cleanly close to the bole of the tree or
to main branches. Cut surfaces shall be painted with a tree wound paint.
Pruning shall be done only by persons experienced with this work, with the work
conforming to the latest revisions of the National Arborist Association "Pruning
Standards for Shade Trees".
6.
40196
All trees which are designated to be removed shall become the property of the
Contractor to be disposed of by sale or otherwise, provided that such material
shall be removed from the property of the Owner before the completion of the
02100-2
site clearance work. The Owner assumes no responsibility for the protection and
safekeeping of such materials. The Contractor shall be responsible for all taxes,
if any, incurred in the sale of materials.
B.
3.02
Grubbing shall consist of the grubbing up, removal and disposal of all stumps, roots
larger than 6 inches in diameter, and matted root formations from the designated areas.
All rocks or boulders near the existing surface grade, which may interfere with planned
construction operations, shall be removed and disposed of as surplus/waste material, (or
used as fill, where specifically permitted by the Engineer.)
DISPOSAL OF WASTE MATERIALS
A.
Disposal of Cleared and Grubbed Materials
1.
B.
3.03
No burning of combustible material will be permitted. Remove all cleared
material from the work site and dispose of it in accordance with local laws,
codes, and ordinances.
All waste materials shall be satisfactorily and legally disposed of off site by the
Contractor.
SEDIMENT AND EROSION CONTROL
A.
The Contractor shall take such actions as may be required to ensure that his construction
activities do not interfere with or adversely impact the hydraulic characteristics or
aesthetic qualities of any natural or manmade watercourse or drain.
B.
The Contractor shall provide acceptable siltation control devices such as haybale
sediment control devices or permanent or portable control basins for the settling or
filtering of fine sands, silts and clay resulting from rainfall runoff or dewatering
operations. Any natural areas or manmade structures which have been affected by
siltation or erosion due to construction activities shall be restored to their preconstruction condition by the Contractor at no additional cost to the Owner.
C.
For more specific requirements for control of erosion and siltation, refer to SECTION
02210, TEMPORARY EROSION CONTROL.
3.04
40196
PROTECTION
A.
Before site preparation begins, protect trees and areas to remain uncleared with snow
fencing to the approximate diameter of foliage to prevent damage to the trunk, foliage
and root system by construction equipment and procedures. Fencing shall be maintained
by the Contractor.
B.
The Contractor shall mark the limit of the work area as shown on the drawings by
accurate field survey and shall meet with the Engineer prior to beginning site
preparation. Prepare only areas affected within the contract limits, except trees and
structures designated to remain. Adjust limits as directed by the Engineer.
02100-3
C.
Conduct operations with a minimum of interference to public or private accesses and
facilities. Maintain access and egress at all times and clean or sweep any roadways daily
or as required by the governing authority. At such times as deemed necessary by the
Engineer, dust control shall be provided with sprinkling systems or equipment provided
by the Contractor.
D.
During the work, protect bench marks, property corners and all other survey monuments
from damage or displacement. If a marker needs to be removed, it shall be referenced by
a licensed land surveyor and replaced, as necessary, by the same.
E.
During the work, the Contractor shall protect existing groundwater monitoring wells,
trees, shrubbery, and other vegetation and structures not designated for removal from
damage resulting from the work. Cut and remove tree branches only where, in the
opinion of the Engineer, such cutting is necessary to effect construction operation.
Remove branches other than those required to effect the work to provide a balanced
appearance of any tree, as approved prior to removal. Scars resulting from the removal
of branches shall be treated with an approved tree sealant.
F.
The Contractor shall be responsible, at his cost, to repair or replace immediately any
damage to existing trees or root systems that are to remain. The Contractor shall hire a
licensed arborist to determine the repair and replacement needs and methods.
G.
Replace damaged trees and shrubs designated to remain with the same size and species.
H.
Keep roads and walks free of dirt and debris at all times.
I.
Protect existing utility lines and structures to remain. Notify the Engineer immediately
of damage to or an encounter with an unknown existing utility line or structure to
remain. The Contractor shall be responsible for the repair of damage to existing utility
lines or structures to remain that are indicated or made known to the Contractor prior to
the start of clearing operations.
END OF SECTION
40196
02100-4
SECTION 02210
TEMPORARY EROSION CONTROL
PART I
GENERAL
1.01
SCOPE
A.
1.02
Section Includes:
1.
The work of this section includes the furnishing of all labor, materials, tools,
equipment, accessories and appurtenances necessary to satisfactorily complete
the installation of temporary erosion control measures, primarily silt fence and
haybales, not specified elsewhere, and all incidental work pertaining thereto
within the limits c f the work indicated or required as specified herein and as
directed by the Eng ineer.
2.
Temporary erosion control measures designed to control erosion and sediment
transport during and immediately after the Work associated with these Contract
Documents.
MEASUREMENT AND PAYMENT
A.
1.03
Measurement and paymer.t for the work described in this section will be made in
accordance with the provisions of Section 01025, MEASUREMENT AND PAYMENT.
SUBMITTALS
A.
Prior to the start of the construction, the Contractor shall submit to the Engineer for
acceptance his written schedules for accomplishment of the temporary and permanent
erosion and sediment contr->l work, as are applicable, for clearing and grubbing, grading,
structures at water courses, and construction. No work shall be started until control
schedules and methods of operations have been accepted by the Engineer.
B.
Submittals required under 1his section includes, but are not limited to, the following:
I.
1.04
40196
Silt Fence.
RELATED SECTIONS
A.
Section 02100 - SITE PREARATION
B.
Section 02220 - EARTH WORK
02210-1
1.05
REFERENCES
A.
ASTM: American Society for Testing and Materials:
I.
ASTM D3786: Test Method for Hydraulic Bursting Strength of Knitted Goods
and Nonwoven Fabrics: Diaphragm Bursting Strength Tester Method.
PART 2
PRODUCTS
2.01
HAY BALES
A.
2.02
Baled hay shall be at approximately 14 by 18 by 30 inches, or equivalent, securely tied
to form a firm bale. Stakes for hay bales shall be standard 1/2 inch reinforcing steel
rods, steel pickets, least 2-inch by 2-inch wood stakes, or approved equal.
SILT FENCE
A.
Mirafi Envirofense, Amaco 1380 Silt Stop, Linq GTF- 180 or approved equal.
B.
Posts:
C.
I.
Either hardwood posts or steel posts may be used.
2.
Hardwood posts shall be straight, at least 54 inches long and at least 1-% inch by
1-MA inch.
3.
Staples shall be of No. 9 wire.
4.
Steel posts shall be at least 5 feet long and have projections for fastening wire to
the fence.
Reinforcing Cord (required):
I.
The top 32 inches of the fence shall be supported reinforcing mesh or shall have
at least 6 horizontal wires. If wires are used, vertical wires shall be spaced no
more than 6 inches apart. The top and bottom wires shall be at least 10 gage; all
other wires at least 12 gage.
D.
Silt Fence Fabric:
1.
40196
The geotextile fabric and components shall be made from polypropylene,
polyester, polymide or other chemically stable material and be resistant to
ultraviolet radiation degradation. Apparent opening size (U.S. sieve number
equivalent) of 20 based on ASTM D4751. Silt retention capacity shall be no less
than 75 percent. The fabric shall have a Mullen bursting strength of no less than
200 pounds per square inch (ASTM D3786). Roll width of the fabric shall be no
less than 36 inches.
02210-2
PART 3
EXECUTION
3.01
GENERAL
A.
3.02
Sediment and erosion control measures shall be installed, maintained, and constructed in
accordance with these Contract Documents and as directed by the Engineer.
HAYBALES
A.
B.
Haybales shall be installed at the following locations, as directed by the Engineer and as
shown on the Contract Documents.
1.
Toe of slope of embankment construction. Baled hay barricade is to filter all
off-site discharges.
2.
Toe of temporary earthwork stockpiles as directed by the Engineer.
3.
Across construction ditches prior to entry into drainage system or waterway.
4.
Each side of completed drainage inlets and catch basins.
5.
Other locations shown on the Contract Drawings or designated by the Engineer.
Tightly abut hay bales to form a continuous barrier. Secure bales in place with two
stakes per bale. The bales shall be trenched 4 inches into the ground, and shall be staked
with 1-4 inch by 1-% inch wood stakes. Work shall be conducted only on the upslope
sides of the bales. Deteriorated, destroyed, or rotted bales shall not be used and shall be
replaced immediately. Sediment shall be removed and disposed of periodically from
behind the hay bales; in no case shall the accumulated sediment be allowed to rise above
the mid-height of the bale. All sediment shall be removed and disposed of in an
approved manner at the completion of the Contract. Hay bales and appurtenances shall
be removed and disposed of at the completion of the Contract unless directed otherwise
by the Engineer.
3.03
40196
SILT FENCE
A.
Silt fence shall be installed before any excavation, filling, grading, clearing, or Work
specified in Section 02220 begins.
B.
Silt fence shall be installed as shown on the Contract Documents.
C.
Supporting posts shall be placed with a maximum spacing of 4 feet on center, and driven
at least two feet into the ground.
D.
Fabric shall be anchored in a 4-inch-deep trench dug on the upslope side of the posts.
The trench should be at least 6 inches wide. The fabric is to be laid in the trench, and the
trench backfilled and compacted over the fabric.
E.
Fabric rolls shall be spliced only at fence posts. At splice locations, fabric shall be
overlapped 6 inches, folded over, and securely fastened to the fence posts.
02210-3
F.
3.04
Silt fences are to be inspected immediately after construction, after each run-off event,
and at least daily during prolonged rainfall.
DUST CONTROL
A.
3.05
The exposed soil surface should be moistened periodically, or as directed by the
Engineer, with adequate water to control dust. The use of calcium chloride will not be
allowed.
MAINTENANCE AND EVALUATION OF MEASURES
A.
3.06
The erosion control devices and measures shall be inspected at least weekly, after each
storm event, and more often if necessary, to assure continuous effectiveness. All
deficiencies shall be corrected immediately by the Contractor. Maintain devices and
measures during periods of suspension or until otherwise directed by the Engineer.
REMOVAL OF DEVICES
A.
When no longer needed, material and devices for temporary erosion control shall be
removed or may be left in place and dispersed over the adjacent area, as directed by the
'
Engineer.
B.
When dispersed over adjacent areas, the material shall be scattered to the extent that it
causes no unsightly conditions nor creates future maintenance problems. Dumped stone
shall be dispersed or covered in such a manner that it will not interfere with future
mowing operations.
C.
When removed, such devices may be reused in other locations provided they are in good
condition and suitable to perform the erosion control for which they are intended.
END OF SECTION
40196
02210-4
SECTION 02220
EARTHWORK
PART ]
1.01
A.
1.02
A.
1.03
GENERAL
SCOPE
The work of this section includes the furnishing of all labor, materials, tools, equipment,
accessories and appurtenances necessary to satisfactorily complete all stripping of topsoil,
excavation of earth and rock, stockpiling, removal of unsatisfactory materials, backfilling,
filling, compaction, and grading not specified elsewhere, and all incidental work pertaining
thereto within the limits of the work indicated or required as specified herein.
MEASUREMENT AND PAYMENT
Measurement and payment for the work described in this section will be made in accordance
with the provisions of SECTION 01025, MEASUREMENT AND PAYMENT.
SUBMITTALS
A.
Shop drawings and brochures shall be submitted for all items to be furnished in accordance with
the provisions of the DOCUMENT 00700, GENERAL CONDITIONS.
B.
Submittals required under this section includes, but are not limited to, the following:
1.
Materials Testing Results
2.
Materials Brochures
1.04
PRODUCT HANDLING - NOT USED
1.05
PROTECTION OF WORK
A.
The Contractor shall prosecute the work so that no damage occurs to adjacent utilities, structures,
property, or any other installation located in or adjacent to work areas. Damaged utilities shall
be repaired with similar or better materials of the same size and to the requirements of the utility
owner. The Contractor shall have on site the necessary manpower, materials and equipment such
as pumps, piping, and the like as required to protect and maintain uninterrupted flows in existing
utilities during construction.
B.
Excavations shall be kept free from water, snow and ice during construction. Bedding and
backfill material shall not be placed in water. Water shall not be allowed to rise upon or flow
over bedding and backfill material.
C.
The Contractor shall maintain all benchmarks, monuments and other reference points and, if
disturbed, shall replace them at no additional cost to the Owner.
D.
Excavating equipment shall be of such size and type, and used in a manner, that will not damage
existing items such as but not limited to paved surfaces, utilities, structures, trees.
E.
The finished subgrade shall not be disturbed by traffic or other operations and shall be
maintained by the Contractor in a satisfactory condition until the finished surfaces are placed.
Until the subgrade has been observed by the Engineer, no pavement materials shall be installed
thereon.
F.
The Contractor shall take whatever steps necessary to prevent catch basins and drain lines from
receiving silt and sediment washed from project work areas. The Contractor shall clean out
catch basins and drain lines that have not been successfully protected.
40196
02220-1
PART 2
2.01
A.
PRODUCTS
MATERIALS
Fill materials, meeting the following requirements, shall be used in the areas shown on the
drawings or where specified herein. Fill materials may be obtained from either on-site
excavations or from off-site sources as appropriate.
2.02
A.
COMMON FILL
Common fill shall be granular material, consisting of hard, sand and gravel with less than 35
percent passing the No. 200 sieve, when tested in accordance with ASTM C136 and ASTM C1 17
and shall be free of organic matter, trash, roots or other deleterious material.
B.
2,03
Common fill material shall contain no stone measuring greater in any dimension than two-thirds
of the loose lift thickness or 12 inches whichever is smaller. Common fill material shall be
capable of forming a firm, stable base when spread and compacted. In addition, the common fill
shall be non-plastic (plasticity index zero, defined as liquid limit minus plastic limit). Any
materials, excavated from the site, not conforming to this common fill specification, shall be
legally disposed of by the Contractor and replaced with approved material, as required, at no
additional cost to the Owner.
GRAVEL FILL (Not required)
A.
Gravel fill shall consist of hard, durable gravel and sand, free from trash, organic matter and
clay, surface coatings, and other deleterious materials.
B.
Gravel fill shall have a maximum stone size of two thirds of the loose lift thickness or 8 inches
whichever is smaller. Gravel fill used for pipe bedding shall have a maximum stone size of 2
inches. That portion passing the 4 inch sieve shall meet the following gradation requirements, as
determined by ASTM C136 and ASTM Cl 17:
2.04
U.S. Sieve Size
Percent Passing
4 inch
1/2 inch
No. 40
No. 50
No. 200
100
50-85
34-75
8-28
0-10
SELECT FILL (Not required)
A.
Select fill shall consist of hard durable sand or sand and gravel, free from trash, organic matter,
clay, surface coatings and other deleterious materials.
B.
Select fill placed between the mid-height of a pipe and 12 inches above a pipe shall have a
maximum stone size of 4 inches. Select fill used for other purposes shall have a maximum stone
size of two thirds of the loose lift thickness and that portion passing the 4 inch sieve shall meet
the following gradation requirements, as determined by ASTM C136 and ASTM C 117:
40196
U.S. Sieve Size
Percent Passing
4 inch
No. 10
No. 40
No. 200
100
30-100
0-70
0-15
02220-2
2.05
CRUSHED STONE
A.
Crushed stone shall consist of clean, crushed, non-porous rock, or crushed gravel, uniformly
blended.
B.
Crushed stone shall meet the following gradation requirement as determined by ASTM C136
and ASTM C117.
PART 3
3.01
A.
B.
3.02
A.
40196
U.S. Sieve Size
Percent Passing
1 inch
3/4 inch
1/2 inch
3/8 inch
No. 4
No. 10
100
90-100
20-55
0-15
0-5
0-2
EXECUTION
PREPARATION
Stripping
1.
Prior to any excavation, filling, or grading operations, all topsoil and subsoil or similar
organic soils found within the Limit of Work line shall be stripped to their full depth in the
area of all structures and in all areas required to be filled, excavated or graded.
2.
Stripped materials suitable for re-use as loam shall be stockpiled. Stockpiles shall be kept
separate and not mixed with other materials. Excess stripped materials and unacceptable
materials shall be legally disposed of off-site by the Contractor unless otherwise specified.
Pavement Cutting
1.
Where excavations are to be made in paved or surface treated areas, the pavement shall be
cut with a pavement saw or wheel cutter prior to excavation unless otherwise noted.
2.
In areas where the trench width is greater than the original cut, the pavement shall be re-cut
prior to paving.
EXCAVATION
General
1.
Excavation shall consist of the removal of soil, rock, and other materials to the limits shown
on the drawings, specified herein, and as required to provide firm bearing. No structures,
pavements, utilities or fill materials of any kind shall be placed in, or upon excavated areas
until such areas have been observed by the Engineer.
2.
Rippable rock shall be considered earth excavation. Rippable rock is defined as rock which
can be excavated using a single tooth hydraulic ripper pulled by a D8 Dozer or equivalent
equipment.
3.
Excavated materials meeting the requirements for the various fill materials specified herein
shall be stockpiled for reuse. Unsuitable or Excess suitable materials shall be legally
disposed of off-site by the Contractor unless otherwise specified.
4.
Excavation shall be to the limits as necessary to install foundations, utilities, pavement or
other facilities unless otherwise specified. Excavation of unsuitable material beyond the
limits necessary shall only be performed as authorized by the Engineer.
02220-3
B.
C.
5.
The proposed contour lines and spot grades shown on the drawings are finish elevations.
Excavation to subgrade shall be the distance below these elevations as may be required by
the size and thickness of pavements, structures, utilities and surface treatments as shown on
the drawings, details and sections, or as specified herein.
6.
Over-excavation beyond the specified or detailed limits shall be backfilled and properly
compacted by the Contractor and at no additional cost to the Owner.
7.
No spread foundations shall be founded partially on rock and partially on soil. In this event
the rock shall be excavated to a minimum depth of 12 inches below the bottom of
foundation and compacted gravel fill placed to the bottom of foundation unless otherwise
shown on the drawings.
8.
Excavating equipment shall be of such size and type, and operated in a manner, that will not
damage items such as, but not limited to, existing paved surfaces, utilities, structures and
trees.
9.
The Contractor shall, at his own expense, be responsible to make excavations under guy
wires, along side of poles, buildings, and other objects as necessary to complete the work.
This may require the Contractor to perform hand excavation. The Contractor has the full
responsibility for this work for which there shall be no special compensation unless
otherwise noted herein. The relocation of utility poles, and the like, shall be done at the
Contractor's expense,
Trench Excavation
1.
Trench excavation shall consist of the removal of all materials encountered. Excavations
shall be made to accommodate the elevation, depth of cover, or detail shown on the
drawings or specified. Trench widths shall be kept to the minimum practicable but shall be
at least three feet wide or two feet plus the diameter of the pipe, whichever is greater. The
bottom of the trenches shall be firm and free of water and shall be accurately graded and
shaped to allow placement of required bedding beneath the bottom of all barrels, bells or
couplings of all pipes installed.
2.
Design criteria require that pipe be laid in trench conditions, therefore trenches for utilities
in fil areas shall be excavated after all fill materials have been placed, spread and
compacted to an elevation at least one foot above the top of the proposed utility. This
requirement is necessary to fulfill design criteria and should not be construed as a dictation
of the Contractor's means and methods of construction.
3.
If, through the Contractor's error, the excavations are carried beyond the specified limits, or
if inadequate dewatering causes softening of the subgrade which necessitates removal,
backfill shall be with gravel fill, placed and compacted as specified hereinafter under
Trench Backfilling. Backfill shall be performed at no additional cost to the Owner.
4.
When trenching occurs around trees to remain, the tree roots shall not be cut but rather, the
trench shall be tunneled under or around the roots by careful hand digging and without
injury to the roots.
Excavation in Graded Areas
I.
D.
Excavation of Unsuitable Foundation Materials Below Trench Grade and/or Subgrade
1.
40196
Excavation in graded areas shall be performed as necessary to bring such areas to proper
subgrade or finish grade..
Existing soils, which are considered unsuitable foundation materials by the Engineer, shall
be removed to the limits directed by the Engineer. The lateral limit for the excavation of
unsuitable material beneath structures shall be defined as the intersection point, with
suitable subgrade material, of an imaginary line drawn downward at a 45 degree angle from
the outside edge of the foundation.
02220-4
2.
G.
H.
3.03
A.
40196
The exposed subgrade shall be compacted and the area backfilled with gravel fill. The
Engineer shall be present during the excavation of all unsuitable soils in order to permit
verification of the limits of and volume of material removed.
Experimental Excavation
I.
The Contractor shall make excavations at locations authorized by the Engineer, for the
purpose of confirming the location and depth of existing utilities or structures.
2.
Additional experimental excavations shall be requested by the Contractor to precisely locate
utilities and underground structures which may be affected by his work. The Contractor
shall backfill the experimental excavations with materials meeting the specification for
common fill, unless directed otherwise by the Engineer. Backfill of experimental
excavation shall be compacted in accordance with the requirements for Trench Backfilling.
Temporary Stockpiles
1. Soil shall be stockpiled in a location approved by the Owner that does not prohibit any
construction and/or operations on the site.
Stockpiled soil shall be covered with
polyethylene sheeting with a thickness no less than 20 mils.
2.
Removed bituminous concrete shall be stockpiled in a location approved by the Owner that
does not prohibit any construction and/or operations on the site. Stockpiled bituminous
concrete shall be covered with polyethylene sheeting with a thickness no less than 20 mils.
3.
Slopes of stockpiles shall be maintained in a stable condition and shall, so far as practicable,
be graded reasonably smooth. The stockpile area shall be graded to allow free drainage, to
minimize erosion and to minimize to the extent practical, the infiltration of water into the
stockpile. Adequate drainage pathways shall be provided around the areas. During wet
weather and immediately prior to periods when work will cease for more than 24 hours, the
Contractor shall roll the surface to reduce the infiltration of water.
4.
The Contractor maintains the responsibility of ensuring the stockpile is covered by
polyethylene sheeting until proper disposal to a licensed recycling or disposal facility.
5.
At the completion of the stockpiling the area shall be graded, as required, to provide a safe
and neat appearance.
GRADING
General
1.
The areas to be graded shall be raked or machine-graded to remove stones and other
unsatisfactory material and then shall be compacted as specified. Any depressions which
occur during the compaction operation shall be filled with additional suitable material and
the surface then regraded and compacted until true to line and grade as required.
2.
The work includes all grading required including shaping, trimming, compacting and
finishing of the surfaces. The grading of shoulders and sloped areas may be done by
machine methods. Up to 2 inches in 10 foot tolerance will be permitted on slopes over 2
percent, and 1 inch in 10 foot on slopes under 2 percent provided the slopes are uniform in
appearance and without abrupt changes. All ruts shall be eliminated. The maximum
deviation from finished grade shall be plus or minus one inch.
3.
Grading of subgrades for paved areas shall be finished at the required depth below and
parallel to the proposed surface with 1/2 inch in ten foot tolerance.
4.
Stones larger than four inches in largest dimension shall not be present in the upper six
inches of fill. Grading operations shall be completed after the buildings have been finished,
the utilities installed, the site improvements constructed, and all materials, rubbish and
debris removed from the site.
02220-5
B.
Finish Grades
1.
Finish grades shall be as indicated, and unless otherwise specified, excavations and fills
shall be carried to proper subgrade levels below finish grades and contours shown, to allow
for finish work.
2.
The subgrade for areas on which pavement is to be placed shall be finished to the required
depth below and parallel to the proposed pavement surface, after any pipes in the paved area
are in place and tested.
I.
The grading of the slopes and other areas to be loamed may be done by machine methods
and a tolerance will be permitted in slopes as specified above, provided the slopes are
uniform in appearance and without abrupt changes.
Grading Around Trees
C.
1.
3.04
Where excavating, filling or grading is required within the branch spread of trees that are to
remain, the work shall be performed as noted below:
a.
When the existing grade at the tree is below the new finished grade, and fill not
exceeding sixteen inches is required, crushed stone shall be placed directly around the
tree trunk. The stone shall extend out from the trunk on all sides a minimum of 18
inches and finish approximately two inches above the finished grade at tree. New earth
shall not be left in contact with the trunks of any trees requiring fill.
b.
Existing trees in areas where the new finished grade is to be lowered, shall have
regrading work done by hand to elevation as indicated. Roots as required shall be cut
cleanly three inches below finished grade and scars covered with tree paint.
CLEAN-UP
A.
Where hardened surfaces or roadways, driveways, or walls are dug up or interfered with, special
attention shall be given to the refill and the consolidation before its resurfacing and it shall be
done and redone as may be required to make the premises safe at all times and to give the
required result.
B.
The Contractor shall continually provide street sweeping on roadways used by his vehicles in
order to reduce dust, siltation and nuisance problems.
END OF TEXT
40196
02220-6
SECTION 02230
EXCAVATION AND MANAGEMENT OF
HAZARDOUS MATERIALS
PART I
1.01
GENERAL
WORK INCLUDED
A.
The work covered by this section consists of furnishing all labor, equipment, and materials; and
performing all operations in connection with excavation of hazardous materials, transportation and
storage. The work also includes monitoring air quality, determining and providing worker health
and safety protection for all contractor personnel during the construction of the work and
particularly upon exposure or excavation of contaminated soil or water that may be present onsite.
B.
Work covered by this section includes earthwork.
1.02
A.
1.03
RELATED SECTIONS
Section 02220 - Earthwork
REQUIREMENTS
A.
The Contractor's attention is directed to the fact that the work site is located in area where soil
contaminated with hazardous material may be encountered during excavation and earthwork for
this project.
B.
The Contractor is required to (monitor, observe) working conditions at all times during
construction and, if it is found to be necessary, to provide appropriate protective clothing,
equipment and facilities for personnel, and to establish workplace procedures to ensure their
safety, and to enforce the use of these procedures, equipment and facilities in accordance with the
requirements listed in the Referenced Standards.
1.04
REFERENCE STANDARDS
A.
NIOSH/OSHAJUSCG/EPA: "Occupational Safety and Health Guidance Manual for Hazardous
Waste Site A'ctivities," October 1985, DHHS (NIOSH), Publication 85-115.
B.
Occupational Health and Safety Administration (OSHA) Standards and Regulations Title 29 CFR
1910 and 1926.
C.
Mass. DEP: Policy WSC - 400-89 "Management procedures for Excavated Soils Contaminated
with Virgin Petroleum Oils." A copy of this policy is included in the Appendix of this Project
Manual.
D.
Mass. General Laws:
1.
2.
40196
C.21C, Mass. Hazardous Waste Management Act
C.2 I E, Oil and Hazardous Material Release Prevention and Response Act
02230-1
E.
Code of Mass. Regulations (CMR):
1.
2.
1.05
310 CMR 40.000, (MCP) Mass. Contingency Plan
310 CMR 30.00, Hazardous Waste Regulations
TRANSPORTATION OF EXCAVATED MATERIAL
A.
The transportation of excavated material from this project for temporary storage does require a bill
of lading and an approval from the regional DEP Office or the use of licensed hazardous waste
transporters.
B.
The transportation of excavated material from this project site or temporary storage area to its final
destination does require a bill of lading and an approval from the Regional DEP Office.
1.06
A.
PART 2
2.01
PART 3
3.01
A.
TEMPORARY STORAGE OF EXCAVATED MATERIAL
Temporary storage of excavated material from this project shall be in conformance with the
industry standards and as directed by the Owner and Engineer.
PRODUCTS
Refer to Section 02220 Earthwork
PRODUCTS
EXCAVATION OF CONTAMINATED SOILS
In accordance with the Department of Environmental Protection's "Management Procedures for
Excavated Soils Contaminated with Virgin Petroleum Oils, Policy #WSC-400-89," the Contractor
shall be required to provide for the transportation, storage, treatment and disposal, or reuse of
excavated soils contaminated with virgin petroleum oils.
Sampling of excavated soils will be done by the Engineer (2 portable Photoionization detector,
PID, readings per pipe length in accordance with DEP Jar Headspace Analytical Screening
Procedure) to determine the disposition of excavated soils.
B.
When the excavated soils concentrations are greater than 10 ppm, but less than 100 ppm total
headspace volatiles, the Contractor shall be required to excavate the top half of the trench depth
and segregate. The Contractor shall then remove the bottom half of the trench depth and
segregate.
C.
When the excavated soils concentrations are greater than 100 ppm total headspace volatiles, the
Contractor shall be required to have the excavated soils transported to an approved petroleum soil
treatment/disposal facility or landfill.
3.02 BACKFILL WITH CONTAMINATED SOILS
A.
In accordance with the Department of Environmental Protection's "Management Procedures for
Excavated Soils Contaminated with Virgin Petroleum Oils, Policy #WSC-400-89," the Contractor
shall be required to provide for the storage, treatment and disposal, or reuse of excavated soils
contaminated with virgin petroleum oils.
Sampling of excavated soils will be done by the Engineer (2 portable Photoionization detector,
PID, readings per pipe length in accordance with DEP Jar Headspace Analytical Screening
Procedure) to determine the disposition of excavated soils.
B.
When the excavated soil concentrations are less than 10 ppm total headspace volatiles, the
excavated soil may be reused as backfill in accordance with the above specifications.
C.
When the excavated soils to be used in backfilling have PID concentrations greater than 10 ppm,
but less than 100 ppm total headspace volatiles, the Contractor shall backfill the trench using the
40196
02230-2
top half of the excavated soil as the bottom half of the trench depth backfill and the bottom half of
excavated soil as the top half of the trench depth backfill. All backfilling shall be in accordance
with the above specifications.
D.
At a location to be designated by the Engineer, the Contractor shall backfill using soil located in
designated storage area if accordance with Section 3.03, E, 3.
END OF SECTION
40196
02230-3
SECTION 02503
PAVING
PART I
1.01
A.
1.02
A.
GENERAL
SCOPE
The work covered by this section of the specifications includes furnishing all labor,
equipment, tools, and materials, and in performing all operations in connection with roadway
pavement overlay, and the replacement of existing paved surfaces, tack coat installation of
[granite curbing] [precast concrete curbing], [bituminous concrete curb], [bituminous
concrete berm], cement concrete sidewalks, bituminous concrete sidewalks, guard rails,
pavement markings, and all incidental work pertaining thereto as indicated on the drawings
and as specified herein.
MEASUREMENT AND PAYMENT
Measurement and payment for work described in this section will be made in accordance with
the provisions of SECTION 01025, MEASUREMENT AND PAYMENT.
1.03
SUBMITTALS
A.
Shop drawings and material reports shall be submitted for all items to be furnished in
accordance with the provisions of DOCUMENT 00700, GENERAL CONDITIONS.
B.
Submittals required under this section include, but are not limited to the following:
1.
Material reports for bituminous concrete pavement job mix formula and tack coat.
2.
Material report (job mix formula) for cement concrete.
1.04
PRODUCT HANDLING - NOT USED
1.05
ENVIRONMENTAL CONDITIONS
A.
Permanent paving shall be placed only when the underlying surface is dry, when the
atmospheric temperature in the shade is above 40 degrees F, and when the weather is not
foggy or rainy, provided, however, that the Engineer may permit, in case of sudden rain, the
placing of mixture then in transit from the plant, if laid at proper temperature and if the
roadbed is free from pools of water. Such permission shall in no way relax the requirements
for quality of the pavement and smoothness of surface.
B.
No material shall be laid upon a frozen base course or when wind conditions are such that
rapid cooling will prevent satisfactory compaction. No load shall be sent out so late in the
day that spreading and compaction cannot be completed during daylight.
PART2
2.01
A.
2.02
40196
PRODUCTS
GENERAL
All materials shall conform to the requirements of "The Commonwealth of Massachusetts
Highway Department (MHD), Standard Specifications for Highways and Bridges", latest
edition (hereinafter referred to as the "State Specifications") and as specified herein.
CALCIUM CHLORIDE
02503-1
A.
2.03
Calcium Chloride shall conform to the requirements of Section M9.01.0 of the State
Specifications.
BASE COURSE
A.
Gravel base course shall conform to the requirements for gravel fill in SECTION 02220,
EARTHWORK, except that the maximum size of stone in the gravel shall be 3 inches.
B.
The base course shall consist of approximately 2-inches of dense graded crushed stone. The
dense graded crushed stone base course shall conform to the requirements of Section M2.01.7
of the State Specifications.
2.04
BITUMINOUS CONCRETE PAVEMENT
A.
The placement of bituminous concrete shall consist of two layers; a binder coarse measuring
approximately 2.5-inches in thickness, and a top coarse measuring approximately 1.5-inches
in thickness.
The binder and top courses for Class I, Type 1-1, bituminous concrete
pavement shall conform to the requirements of Section M3.1 1.00 of the State Specifications.
B.
The general composition limits of materials, which makes up the Job Mix Formula, shall
conform to columns entitled "Binder Course" and ["Top Course"] ["Modified Top Course"]
as listed in Section M3.11.03 of the State Specifications. No bituminous concrete pavement
shall be placed until the Engineer approves the job mix formula.
PART 3
3.01
EXECUTION
DUST CONTROL
A.
Calcium chloride shall be applied to control dust. No calcium chloride will be allowed where
runoff will enter water bodies or wetlands.
B.
Calcium chloride shall be uniformly applied at the rate of 1-1/2 pounds per square yard.
3.02
A.
40196
PREPARATIONS FOR BITUMINOUS CONCRETE PAVING
Subgrade Preparation
1.
All trenches shall be backfilled and compacted as required under the SECTION 02220,
EARTHWORK. The edges of all pavements along the line of the trench shall be cut
back from exposed edges thereof, a sufficient distance to form a clean, sharp straight
edge essentially parallel to the centerline of the trench. The minimum lateral cut back to
be allowed will be 12 inches. Cut back pavement shall be carefully removed to
minimize any disturbance to foundation materials. The exposed surface of the
foundation material shall then be rolled, wetting the surface as necessary to obtain a
firm, even surface. Any depressions or uneven areas shall be regraded and re-rolled until
the surface is smooth and satisfactorily compacted.
2.
All surfaces to receive pavements shall be examined by the paving subcontractor to see
that they are in proper condition to receive paving. Starting work in any area shall
constitute acceptance of that surface. Sub-grade shall be maintained in satisfactory
condition and properly drained until surface improvement is placed. All defects
resulting from use of unaccepted surfaces shall be corrected by the Contractor at no
additional expense to the Owner.
02503-2
B.
The Contractor shall raise all Owner drain and sewer manhole frames and covers, catch basin
frames and grates and gate boxes to the established grades [as shown on the attached plates or
drawings] before paving is applied.
C.
Prior to submitting his bid, the Contractor shall contact the other utilities so as to gain their
requirements concerning any possible adjustment of gate boxes and other such structures. If
the utility wishes the Contractor to raise these boxes it shall be in accordance with the utilities
requirements. If the utility wishes to adjust their own gate boxes the Contractor shall give the
utility adequate notice ofhis paving schedule.
D.
If the gravel base course is disturbed by the adjustment of utilities, the disturbed base material
shall be carefully removed and replaced with Portland cement concrete.
3.03
A.
3.04
A.
3.05
DRIVEWAYS
Where trenches are dug through existing bituminous concrete paved driveways, the trench
shall be resurfaced with a 1-1/2 inch binder course of bituminous concrete followed by a I112 inch top course over the full width of the existing paved driveway. The limits of the
overlay course shall be as defined by the Engineer.
LEVELING COURSE
Where specified or directed by the Engineer, the Contractor shall install a leveling course of
bituminous concrete to the depths as required and as approved by the Engineer. The leveling
course shall be installed utilizing bituminous material as specified above for a top course.
TEMPORARY SURFACING
A.
Temporary surfacing shall be placed over trenches in hard surfaced streets and roads, and
other areas where directed and shall be of bituminous concrete base course as specified herein
before, laid in one course, 1-1/2 inches thick. Backfill at top of trench shall be removed to
allow for placing temporary surfacing.
B.
Contractor shall maintain temporary surfacing in good condition. Trenches shall be inspected
at least once a week and also immediately after each storm. Holes and settlements shall be
promptly refilled with bituminous mixture.
40196
02503-3
Appendix C
Site-Specific Health & Safety Plan
SITE-SPECIFIC
HEALTH AND SAFETY PLAN
Northbridge DPW Facility
11 Fletcher Street
Northbridge, Massachusetts
Prepared by:
Earth Tech, Inc.
196 Baker Avenue
Concord, MA 01742
June 7, 2000
TABLE OF CONTENTS
Page
Section
..............
... --......
..........
..... 1-1
...................................
1.0
G EN ERA L ....................
2.0
ASSIGNMENT OF HMH&SP RESPONSIBILITY........................................2-1
2.1
2.2
2.3
2.4
- 1
Health & Safety Specialist (HSS).................................2
-1
Site Safety & Health Officer (SSHO).--............................2
-2
2
........................
.....
...
...-.....
Licensed Site Professional (LSP)
......... 2 - 2
Field Personnel......................................
3.0
SITE HISTORY AND BACKGROUND..........................................................
Location, Site History, and Background -..........................
3.1
4.0
HAZARD ASSESSMENT
4.1
4.2
5.0
6.0
.... -..............
........
.......
Basic Training Required .....................................
.................
.
Site-Specific Training ..............
.....-
Safety Briefings .....................
5.4
5.5
..............
Safety Audits.........
First Aid and CPR.........................
Emergency Medical Treatment . .....
SITE CONTROL MEASURES ...
.......
.....
-........
.......
-
1
1
5- 2
5-2
6-1
.....
......
5
5
...... 5-2
.....................
.............
...
..-........
4- 1
4-2
4-3
4 -4
..... 5-1
..........
.....
....-..
MEDICAL SURVEILLANCE PROGRAM .............................
7.1
7.2
7.3
7.4
7.5
7.6
7.7
8.0
...............
...
- ...............
W aste Description/Characterization ....
Degree of Hazard --..........................................
......... ........
.......
4.2.1 Confined Space Entry ......- .. - ...... .........
.............
.....
.....
- -........
4.2.2 Spill Containment ......
5.3
6.1
7.0
4- 1
.............................................
TRAINING REQUIREMENTS ...... ......
5.1
5.2
3-1
3- 1
......
....... 6 - 1
...... 7-1
7-1
.......... ........... 7 - 2
.............-...-...........
Exclusion Zone
..........
....
.......
Contamination Reduction Zone .....
Support Zone......................-.........7.-.2.......7-2
............ 7 - 3
........
- -... ........
Modification to Site Control..
- 3
Personnel and Small Equipment Decontamination.......--..............7
7-3
Heavy Equipment Decontamination Area ..........................
7 -3
Site Visitors..................................-..........
1
PERSONAL PROTECTIVE EQUIPMENT.............................88-1
General................................................
8.1
............. 8 - 1
Anticipated Levels of Protection for Site Operations.......
8.2
Table of Contents
Page -i
L:\WORK\40196\PROJpas
dhsoc
TABLE OF CONTENTS (Cont.)
Page
Section
9.0
AIR MONITORING......................................................................................
... .. ....
General....................................................................................
9.1
9.2
9.3
9.4
10.0
DECONTAMINATION PROCEDURES...............................................................
10.1
10.2
10.3
10.4
11.0
Personnel and Small Equipment ....................................................................
H eavy Equipm ent........................................................................................
10.2.1 Decon Pad Design.............................................................................
10.2.2 D econ W ater ........................................................................................
10.2.3 Decon Water Disposal .....................................................................
10.2.4 Decon Pad Disposal ......................................................................
Contamination Prevention .............................................................................
D isposal Procedures......................................................................................
1
9- 1
9 -2
-
10-1
10 - 1
10 - 1
10 - 2
10 -2
10 - 2
10 - 3
10 - 3
10 - 5
GENERAL SAFE WORK PRACTICES AND COMMUNICATIONS....... 11 - 1
. .......
Safety Equipm ent .............................................................................
Communications ..............................................................................................
Safe Work Practices....................................................................................
Excavation/Trench Hazards ..........................................................................
Machinery and Mechanized Equipment .......................................................
Hazardous M aterials .....................................................................................
Miscellaneous Hazards ........................................
11 -1
11 - 1
11 -1
11 - 2
11 - 3
11 - 4
11 - 5
EMERGENCY PREPAREDNESS ..........................................................................
Emergency Coordinator ....................................
12.1
12.2 Emergency Services Contacts..................................................................
..........................................
Im plementation ................ .. ............................
12.3
... ...... .........................................
12.4 Fire or E xplosion...................................
..........................................
Injury
12.5 Personal
12.6 Overt Chemical Exposure ...................................
12.7 Adverse Weather Conditions ..................................................................
12.7.1 Heat Stress ........................................
. ..........
........... ..........................
12.7.2 C old Exposure.........................
..............................................
12 .8 Poison Ivy ....................... .............................
...... .........................................
Snakes and Ticks.......................................
12.9
12.9.1 Snake Bite Prevention and First Aid.................................................
12.9.2 Tick Bite Prevention and First Aid ...................................................
12.10 Spill Containment and Countermeasures Plan ........................................
Emergency Response Contractors ...................
12.10.1
12-1
12 - 1
12 - 1
12 -2
12 - 2
12 -2
12 - 3
12 - 3
12 -3
12 - 4
12 - 6
12 - 6
12 - 6
12 - 6
12 - 7
12 - 7
11.1
11.2
11.3
11.4
11.5
11.6
11.7
12.0
Exclusion Zone and Exclusion Zone Perimeter............................................9
Fence Line Monitoring ......................................
Action Levels..................................................................................................
9-1
9- 1
Table of Contents
Page -ii-
L:\WORK\40O96PROJphaseivlhasp.doc
TABLE OF CONTENTS (Cont.)
Page
Section
AUTHORIZATIONS AND FIELD TEAM REVIEW ..........................................
13.0
13.1
13.2
Authorized Personnel....................................................................................
13
-
1
Field Team Review......................................................................................
13
-
2
RECORDKEEPING...................................................................................
14.0
13-1
......... 14-1
LIST OF FIGURES
Figure
3-1
Site Location Map
12-1
Hospital Route Map
LIST OF TABLES
Table
4-1
4-2
9-1
9-2
10-1
Exposure Limits Based on Human Health Criteria - Contaminants of Concern
Physical Hazards
Air Monitoring Plan for Worker Protection in Exclusion Zone and Perimeter:
Summary of Action Levels and Respiratory Protection Requirements
Air Monitoring Plan for General Public and Other Off-Site Receptors:
Summary of Action Levels at the Fence Line
Minimum Decontamination Layout For Level C Protection and Equipment
APPENDICES
Appendix
A
B
C
D
Material Safety Data Sheets
Respirator Program
Health and Safety Field Forms
Backup Calculations for Action Levels
Contents
Table of Contents
Page -iiiPage-iii-
WORK~4OJ 96 "ROJ\phase Mhasp. doe
L:\WORK\40196PROJAphase ivhasp-doc
1.0
GENERAL
This site-specific Health And Safety Plan (HASP) has been prepared by Earth Tech, Inc. (Earth
Tech) for the environmental work to be conducted at 11 Fletcher Street in Northbridge,
Massachusetts (the Site). This HASP was prepared in accordance with the regulatory requirements
of 29 CFR 1910.120, "Hazardous Waste Operations and Emergency Response". This HASP is for
use by Earth Tech personnel and their subcontractors.
In accordance with 29 CFR 1910.120, this plan establishes the procedures and protocols necessary
for protecting workers and the general public from potential chemical and physical hazards
associated with the following activities related to the Fletcher Street activities:
o
Removal of small amount of bituminous concrete;
o
Excavation of contaminated soil and pavement;
o
General environmental evaluations.
This HASP summarizes the project organization and responsibilities; establishes Standard Operating
Procedures for preventing accidents, injuries, and illnesses; identifies hazards; discusses the personal
protective equipment that may be used at the site; identifies personnel health and safety training
requirements; summarizes the monitoring techniques to be used; establishes emergency procedures;
describes the medical surveillance program; identifies the appropriate first aid equipment that is
available; provides for accident recordkeeping; and establishes a schedule for safety inspections.
This HASP does address construction-related safety and health issues/activities/tasks. Constructionrelated safety issues during work tasks are the responsibility of the subcontractor(s) performing these
activities.
The HASP will be implemented by the Health & Safety Specialist (HSS), the Site Safety & Health
Officer (SSHO), and the Licensed Site Professional (LSP) during site work in the area(s) of concern.
All issues associated with any excavation and management of contaminated soils encountered during
construction shall be the responsibility of the LSP. Compliance with this HASP is required of all
personnel who enter this site.
Using the Modification Form presented in Appendix C, the content of this plan may change or
undergo revision based upon additional information made available to health and safety personnel,
monitoring results, or changes in the technical scope of work. Any changes proposed must be
approved by the SSHO, the HSS and/or the LSP.
General
Page 1-1
Page 1-1
WORK4OJ961PROJJphaSe MA hasp. doe
L:\tWORK401961PROJ~phase iv thasp.doc
2.0
ASSIGNMENT OF HASP RESPONSIBILITY
The following describes the health and safety designations and general responsibilities, which will
be implemented for the activities to be conducted at the site.
2.1
Health & Safety Specialist (HSS)
The Health & Safety Specialist (HSS) has overall responsibility for preparation, review and approval
of this HASP. The HSS is responsible for the implementation and oversight of this HASP. The HSS
or designee shall approve any changes to this plan due to modification of procedures or newly
proposed site activities.
Health and safety-related duties and responsibilities will be assigned only to qualified individuals
designated by the HSS. Before personnel may work on site, a current medical examination and
acceptable health and safety training must be approved by the HSS and/or SSHO (refer to Section
2.2).
Rick Denham will serve as the HSS for the 11 Fletcher Street project.
2.2
Site Safety & Health Officer (SSHO)
The HSS shall direct the site health and safety efforts through a SSHO. The SSHO will be
responsible for implementing the HASP on-site, evaluating risks, safety oversight, determining
levels of personnel protection required and performing any required monitoring at the Site. The
SSHO may direct or participate in on-site activities as appropriate when this does not interfere with
primary SSHO responsibilities. The SSHO has stop-work authorization, which he/she will execute
upon determination of an imminent safety hazard, emergency situation, or other potentially
dangerous situations, such as detrimental weather conditions. Authorization to proceed with work
will be issued by the SSHO and HSS in conjunction with the LSP after such action.
The SSHO will select the proper levels of protection based on the details of this plan. The SSHO
will be trained and certified in First Aid, CPR, and bloodborne pathogens, and have been provided
the opportunity to receive the Hepatitis B vaccination series. The SSHO shall be responsible for
preparing, maintaining and signing daily Health & Safety site logs (Appendix C). At a minimum
this log shall include a description of weather conditions, levels of personnel protection being
employed, monitoring data and any other information relevant to on-site safety conditions.
Patrick McNabb will serve as the SSHO for the 11 Fletcher Street project.
Assignment of HASP Responsibility
Page2-1
L:\WORK\40196PROJiphaseivhasp.doc
2.3
Licensed Site Professional (LSP)
The LSP will be responsible for issues associated with the completion of soil borings and installation
of groundwater monitoring wells as well soil sampling during the soil boring and monitoring well
drilling/installationactivities .The LSP shall be a hazardous waste consultant, as defined in M.G.L.
C 21A paragraph 19, holding a valid license assured by the Board of the Registration of Hazardous
Waste Site Cleanup Professionals pursuant to M.G.L. C 21A, paragraph 19-19J.
Joseph P. Vitale, LSP will serve as the LSP for the Fletcher Street project.
2.4
Field Personnel
This HASP was prepared for all of Earth Tech's representatives and subcontractors. Field personnel
will take direction regarding safety and health issues from the SSHO and/or HSS. All field
personnel who will work with or adjacent to hazardous materials will provide to the SSHO proof of
having at a minimum a 40-hour OSHA certification, 24-hour "on the job" training, up-to-date 8-hour
refresher course, and annual medical monitoring by an occupational physician. All subcontractors
shall comply with the requirements outlined in this HASP and in accordance with OSHA 29 CFR
1910 and 29 CFR 1926; but, in all cases, subcontractors shall be responsible for site safety related
to or affected by their own field operations (e.g. heavy equipment operations).
Responsibility
HASP
of H
Assignment of
Assignment
ASP Responsibility
Page 2-2
Page 2-2
L. ~WORKl4OJ96~PROJ~phaseMhasp.doc
L:\ORK\40196PROJAphase ivhasp.doc
3.0
SITE HISTORY AND BACKGROUND
3.1
Location, Site History, and Background
The Site is located at 11 Fletcher Street in Northbridge, Massachusetts. Work included at the North
Street project includes the:
o
Removal of small amount of bituminous concrete;
o
Excavation of contaminated soil; and
o
Site survey
Past releases at the Site have likely occurred as a result of petroleum operations formerly conducted
at the Site. Based on Earth Tech's current knowledge of the Site and surrounding area, and past uses
of the Site, the following materials may be expected to be encountered during the site investigation
activities:
Petroleum Hydrocarbons
Fuel oil
Gasoline
Background
and Background
Histoiy
Site
Site H
istory and
3-I
3-1
LA WORK14OI96~PROJ~phaseiv~hasp.doc
L: IWORK140196\PROJAphase iv hasp.doc
FIGURE 3-1: SITE LOCATION MAP
Source: USGS Topographic Map, Uxbridge, MA quad
Site History and Background
3-2
A::WorthbridgeDPW.doc
4.0
HAZARD ASSESSMENT
4.1
Waste Description/Characterization
The following chemical information is presented in order to identify the types of materials that may
be encountered at the facility. The detailed information on these materials was obtained from:
o
o
o
ACGIH, 1997 Threshold Limit Values and Biological Exposure Indices.
Material Safety Data Sheets.
NIOSH Pocket Guide to Chemical Hazards - 1997.
The following is a list of chemicals and compounds that may be potentially found on-site based on
previous investigations. Material Safety Data Sheets (MSDS) and/or toxicity summaries for each
compound listed below, providing information such as the chemical's characteristics, health hazards,
protection and exposure limits, are presented in Appendix A. These chemicals include:
o
Heavy metals
Waste Types:
Characteristics:
Liquid
Sludge
Solid
Semi-Solid
Corrosive
Explosive
Radioactive
Flammable
Volatile
Inert
Other
X
X
Gas
Other
X
X
Toxic
Earth Tech personnel should not enter the immediate work area around the drill rig during
operations. Exposures to environmental media will be minimized by the use of personal protective
equipment and good housekeeping practices.
Exposure limits for the materials of concern are presented in Table 4-1. The American Conference
of Governmental Industrial Hygienists (ACGIH) Threshold Limit Values (TLVs) for the work
environment are given for airborne exposures. Three TLV standards are presented, if available, for
each chemical. The Time Weighted Average (TWA) is the time-weighted average concentration for
a normal 8-hour day and a 40-hour work week, to which nearly all workers may be repeatedly
exposed, day after day, without adverse effect. The Short-term Exposure Limit (STEL) is a 15minute time-weighted average exposure that should not be exceeded at any time during a work day
even if the 8-hour TWA is within the TLV. Exposures above the TLV-TWA up to the STEL should
not be longer than 15 minutes and should not occur more than four times per day. There should be
at least 60 minutes between successive exposures in this range. The ceiling limit (CEIL) values refer
to the maximum exposure concentration for any duration. Also presented are the OSHA Permissible
Exposure Limits (PELs). The PEL values are presented either as an 8-hour TWA, 15-minute STEL,
Hazard Assessment
Page 4-1
L: WORK40196PROJlphase ivhasp.doc
or CEIL. The CEIL indicates the upper limit acceptable excursions above the TWA. The
immediately dangerous to life and health (IDLH) value represents a maximum concentration from
which one could escape within 30 minutes without any escape-impairing symptoms or any
irreversible health effects. Other relevant health-based information that applies to this health and
safety plan or to the employee's right to know is discussed in the Material Safety Data Sheets for the
chemicals of concern in Appendix A.
4.2
Degree of Hazard
On-site hazards include physical and chemical hazards. No radiological, biological, or laboratory
wastes are suspected on-site. Potential contaminants of concern at the site (e.g., heavy metals) can
affect the body if they are inhaled, come in contact with the eyes or skin, or are ingested. These
materials may be released during soil intrusive activities and contact with contaminated groundwater.
The primary concern is for skin exposure and inhalation exposure to contaminated soils (and
groundwater if encountered). Exposure to these substances by inhalation of suspended particulates
(in the breathing zone) is not anticipated based on the activities being conducted during this project.
Atmospheric monitoring for vapors, however, will be conducted in the Breathing Zone to define the
level of respiratory protection needed.
Soil excavation activities may provide the potential for encountering buried hazards. All utilities
will be "cleared" before intrusive activities begin. This includes location of overhead utilities. This
will be the responsibility of the subcontractor(s) performing these activities. If encountered, field
activities will be stopped, and the SSHO and the HSS must be notified.
Physical hazards that may be encountered at the site during field activities include overhead and
tripping hazards associated with heavy construction equipment operations.
Excessive noise may be generated from air compressors, heavy construction equipment, etc. As a
precaution, hearing protection will be available to be worn when working around constructionrelated equipment or deemed necessary. In areas where sound levels prohibit normal speech and
where personnel will spend extended time (>1 hour) hearing protection will be required.
Depending on seasonal weather conditions, there is some potential for workers on-site to be affected
by heat stress if site activities are scheduled for the summer months or cold exposure if activities are
conducted during winter months. The SSHO will monitor for heat stress or cold exposure in
accordance with Section 12.7 of this HASP.
A summary of physical hazards is presented in Table 4-2. Air monitoring and Action Levels are
presented in Section 9.0 of this HASP.
Assessment
HazardAssessment
Page 4-2
Page 4-2
L: ~WORId4OJ96PROJ\phaseivlhasp.doc
TROJAphase iv 1hasp.doc
L:\ WORK\40196P
4.2.1
Confined Space Entry
A confined space is defined as a space which has any one of the following characteristics: limited
opening for entry and exit; is large enough to be bodily entered; and is not designed for continuous
worker occupancy. A permit-required confined space is a confined space that contains or has the
potential to possess a recognized hazard to personnel (e.g., a hazardous atmosphere, engulfment
potential, etc.). This may include excavations as part of this project. Where a location is determined
to be a permit-required confined space, all Standard Operating Procedures for permit-required
confined space entry will be performed in accordance with the applicable OSHA Standard 29 CFR
1910.146 (Permit Required Confined Space Entry).
For all permit-required confined space entries performed during the project, a written permit system
which evaluates conditions and assures safe entry procedures are followed shall be implemented by
the SSHO. A copy of the Confined Space Entry Permit is located in Appendix C. The entry permit
will remain in the area until the work has been completed. The permit will be retained and reviewed
by the SSHO to assure the appropriate procedures have been implemented. Training in confined
space entry procedures must be obtained by all personnel prior to working on a project task requiring
entry into permit-required confined space. Prior to entry, the atmosphere throughout the space shall
be monitored for oxygen deficiency, combustible gases, hydrogen sulfide, carbon monoxide, and any
other toxic substances expected. Safe air quality is air quality that meets each of the following
requirements.
o
Oxygen content of 19.5% to 23.5%
o
Hydrogen sulfide content of <10 ppm
o
Combustible gas content of <10% of the lower explosive limit (LEL); and
o
Carbon monoxide content <25 ppm
o
Exposure level for any toxic substance determined or suspected to be present
which is below the PEL-TWA or TLV-TWA for any substance specified by
the OSHA or ACGIH.
Based on monitoring, if the concentration levels are within safe air quality limits specified above,
entry may proceed. If air quality falls outside any of the limits specified above, personnel will not
enter the space without consulting the SSHO, or if air quality falls outside these limits while in a
space, they will exit the space immediately and contact the SSHO. All air quality readings will be
recorded on the Confined Space Entry Permit.
An employee entering vertically into a permit-required confined space shall wear a full body harness
secured to a lifeline. The lifeline shall be secured in such a manner that if a rescue must be made,
the above ground end of the lifeline can be attached to a winch. Entry without this equipment will
only be allowed where it can be demonstrated that the presence of the equipment would not assist
Assessment
HazardAssessment
Hazard
Page 4-3
Page4-3
WOPJC4OI 96PROJ\phase iv~hasp. doe
L: IWORK\4096PROJ~phaseiv ihasp.doc
in the rescue of personnel or would increase the hazard of the entry. PPE will be used as specified
in Section 8.0 and will typically be Level D unless air monitoring detects elevated vapor
concentrations or dangerous oxygen levels.
When entering a confined space or other areas where safe air quality does not exist, a trained
attendant must be present at all times to assist and observe worker(s) in the confined space. The
attendant will handle the safety line, observe traffic, and react to any emergency situations. The
observer will at all times keep in contact with the employee(s) in the confined space and will order
them out when ill effects (e.g., unsteadiness, unusual behavior, drowsiness, spasms, etc) are
observed or hazardous conditions exist. Throughout the confined space entry, a trained rescue
service will be available and a means of communication with them will be established. All confined
entries will be conducted in accordance with the contractors SOP.
4.2.2
Spill Containment
Prevention of spills and vapor releases is a primary concern during all planning and work activities.
Spill control and countermeasures are discussed in Section 12.10 of this HASP.
Assessment
HazardAssessment
Hazard
Page 4-4
Page 4-4
L: W'ORKWOJ96~PRO.Aphase iv~hasp.doc
L:\tWOR K\40196\PROJAphaseiv~hasp.doc
-I
A
e a
a
.
.4.
-1 '3.0
.0
a
-o-
Ca
*-
Co
o
en
Ca
0
o
U
0)
C
C.)
u
U
0
0
.0
Cu
2
0
U
4..
a
Cu
0
0~
a-o
C)
-s
.
C
C
C
44
=
I>4
Ed
L)
N
C
Cu
C)-
I-
C
en
eN
4o)
0
C
C)
-v
a
TABLE 4-2
Physical Hazards
TASK(S)
HAZARD
DESCRIPTION
PREVENTION/MONITORING
TECHNIQUES
All tasks
Sampling
Slip, trip, falls
From various debris on
Ensure buddy system awareness and
ground, cluttered conditions,
equipment, slippery footing
good housekeeping practices.
Pinch points,
From "tight" spaces and
Ensure clear work area, good
sharp corners,
clearances; objects and
housekeeping, move unnecessary
restricted
components
equipment, utilize buddy system, place
guards on machinery, wear gloves where
movement
t
appropria e.
Drilling,
Heat
Associated with protective
Ensure adequate work/rest schedule;
excavation,
Stress/Cold
garment use, respiratory
buddy system; dress appropriately for
sampling,
Stress
protection and exposure
weather.
Drilling,
Struck by
From heavy equipment
Drill rigs, backhoes, dump trucks, and
excavation,
Equipment
during construction activities
other equipment equipped with backup
decon
alarms. Employees remain clear of swing
backfilling
radius and rotating parts of equipment.
Excavation,
Collapse of
From improperly shored or
backfilling,
excavation
sloped excavations
confirmation
walls
No employees allowed in excavated area
unless protection methods in place and
authorized by competent person. Samples
sampling
from the bottom of excavation will be
collected from the backhoe bucket.
All tasks
Assessment
HazardAssessment
Inclement
High winds, lightning, hail,
Restrict work in exposed areas, seek
weather
etc.
shelter, terminate work activities.
Page 4-6
Page4-6
LA WORKl4OI96PRO.Aphase iv~hasp.doc
L:\IWORK\40196\PROJAphase Mhasp.doc
5.0
TRAINING REQUIREMENTS
5.1
Basic Training Required
Personnel who are required to work in areas where the potential for toxic exposure exists shall
complete training or have site experience conforming to the requirements of 29 CFR 1910.120(e).
The required 40-hour course (and 24-hours of "on the job" training) provides training on procedures
for working at hazardous waste sites. Personnel are also required to have received 8 hours of
refresher training annually thereafter. In addition, all supervisory personnel (e.g., the SSHO, project
superintendent) are required to have 8 hours of additional specialized training for managing
hazardous waste operations.
Subcontractors shall provide written documentation that these training/experience requirements have
been met. All personnel shall also be trained in the contents of Appendix B, "Respiratory Protection
Program."
5.2
Site-Specific Training
Site-specific training to employees to minimize on-site hazards will be provided that will address
the activities, procedures, monitoring and equipment for the field operations. This training will
include identifying the names of personnel and alternate personnel responsible for site safety, and
facility layout.
In addition, this training, at a minimum, will include the following:
I.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
Site description and history.
Project activities, including coordination with other contractors.
Hazard evaluation.
On-site safety responsibilities.
Site control and work zones (WZ).
Personnel training.
Medical monitoring.
Atmospheric monitoring.
Personal protection, clothing, and equipment.
Decontamination procedures.
Emergency procedures.
Review of site-specific material safety data sheets (MSDSs).
Safe work practices.
Other elements covered in this site-specific HASP.
This training will also allow field workers to clarify anything they do not understand and to reinforce
their responsibilities regarding safe operations. Training must include emergency preparedness,
location of assembly areas, proper entry and exit procedures for Exclusion Zone (EZ), warning
systems, location of emergency equipment, and route to hospital. Site safety meetings shall be
documented using the Site Safety Meeting Form presented in Appendix C.
TrainingRequirements
5-1
L: WORK\40196\PROJ\phase ivihasp.doc
Evidence of this training and training performed under the requirements of 29 CFR 1910.120(e) will
be presented to the HSS and/or SSHO, if requested.
5.3
Safety Briefings
Project personnel will be given briefings by the SSHO on a daily or as-needed basis to further assist
site personnel in conducting their activities safely. Briefings will be provided when new operations
are to be conducted, changes in work practices must be implemented due to new information made
available, or if site or environmental conditions change. Briefings will also be given to facilitate
conformance with prescribed safety practices when performance deficiencies are identified during
routine daily activities or as a result of safety audits.
5.4
Safety Audits
The HSS, as deemed necessary, will conduct regular safety audits of field operations and
subcontractor performance to review for compliance with health and safety policies and procedures.
Daily operations will adhere to the protocols outlined in this HASP and will be enforced by the
SSHO.
5.5
First Aid and CPR
At least one individual shall be trained and qualified to administer first aid and CPR. The HSS will
identify the individual requiring this training in order to ensure that emergency treatment is available
during every workshift from a person qualified in first aid and CPR. These courses will be
consistent with requirements of the American Red Cross and/or American Heart Association.
Individuals who may administer First Aid and CPR are also required to have completed training in
Bloodborne Pathogens and have had the opportunity to receive the Hepatitis B vaccination series.
Training Requirements
5-2
L: WORK\4OJ96\PROJlphaseivhasp.doc
6.0
MEDICAL SURVEILLANCE PROGRAM
All personnel performing field work in areas where the potential for toxic exposure exists will be
required to have passed a pre-assignment and/or periodic medical examination that is consistent with
29 CFR 1910.120(f). A release for work will be confirmed by the HSS and/or the SSHO before an
employee can begin hazardous site activities.
Additional medical testing may be required in consultation with the company physician if an overt
exposure or accident occurs, or if other site conditions warrant further medical surveillance.
Subcontractors will maintain the medical records for their own employees but shall also provide
written documentation certifying that each employee at the site has met the requirements of the
Medical Surveillance Program. This documentation will be provided before the first day of work
for each employee assigned to the site. The pre-assignment and annual examinations are essentially
the same in content and will include:
o
o
o
o
o
o
o
o
An updated medical and occupational history
A screening physical examination
Blood and urine laboratory tests
Chest x-ray
Electrocardiogram
Pulmonary function tests
Audiometry
Visual acuity test
The physician has the authority to include other tests.
6.1
Emergency Medical Treatment
Provisions for emergency medical treatment shall be integrated with the overall Site Emergency Plan
(see Section 12) and shall include:
o
o
o
o
At least one individual per shift qualified to render first aid and CPR.
First aid kits in compliance with OSHA requirements and emergency first aid stations
in the immediate work vicinity. Universal precautions shall be used for all first aid
operations.
Conspicuously posted phone numbers and procedures for contacting ambulance
services, fire department, police and medical facilities.
Maps and directions to medical facilities.
Surveillance Program
Medical Surveillance
Medical
Program
6-1
6-1
WORKI4OIP6L'-'RO.Aphase iiAhasp. doc
L:\WORK\40196\PROJAphase iv~hasp.doc
7.0
SITE CONTROL MEASURES
The purposes of the site control measures discussed in this section are to maintain order at the site
and to minimize chemical and physical hazards to on-site personnel, visitors, and the public. Site
organization and control will be established and maintained according to the recommendations set
forth in EPA's "Standard Operating Safety Guide," October 1985 and the
NIOSH/OSHA/USCG/EPA publication "Occupational Safety and Health Guidance Manual for
Hazardous Waste Site Activities," October 1985. Three general areas of operation shall be
established as necessary to reduce the risk of personnel exposure to hazardous substances. The three
areas are:
o
Exclusion Zone (Zone A)
o
Contamination Reduction Zone (Zone B)
o
Support Zone (Zone C).
The decision to establish these control zones, as well as the dimensions of each area and the safe
working distances between each area, shall be established by the SSHO and balanced against
practical work considerations and existing field conditions. The extent and relative positions of the
control zones will change during progressive stages of the project. The limits of these control zones
will be adjusted as site-specific conditions relative to contaminant conditions are better defined.
These changes from the original defined field parameters will be documented.
7.1
Exclusion Zone
The Exclusion Zone (Zone A) is the area containing or suspected of containing contaminated
materials. The Exclusion Zone is generally defined as the area immediately surrounding the tank
area, soil boring, well hole, or the area that is contaminated or will be unavoidably contaminated by
site operations. Since this area shall be considered contaminated, all personnel within the area must
use the prescribed levels of personal protection. The Exclusion Zone may be marked with caution
tape or other similar temporary barricade system (e.g., barricade fences) to allow for adjustments to
the size and location due to changing site conditions. Access and egress from the Exclusion Zone
will be through the Contaminant Reduction Zone following the procedures described in Section 10.0
of this HASP. The Exclusion Zone boundary (hotline) is based on observations and/or
measurements of air contaminant concentrations. Any change in the protection level specified by
the HASP shall be approved by the SSHO and the HSS before being initiated.
As defined in the HASP, there may be some areas where the use of respiratory protection is not
required during normal work activities. Respirators will be immediately available for use, however,
should a potential hazard become evident. Areas where respirators are not required are identified
by the following characteristics:
Site Control Measures
Page 7-1
L:\WORK\40O96\PROfphase ivhasp.doc
no known airborne hazards are present; and
-
there is little or no potential for being impacted by the release of hazardous airborne
contaminants.
Because of the nature of field operations, Tyvek suits, disposable gloves, and shoe coverings should
be available for use in the Exclusion Zone and Contamination Reduction Zone as a general rule.
Hard hats, steel toe/shank boots, safety glasses and work clothes are required in all cases. Any item
taken into the Exclusion Zone shall be considered to be contaminated until carefully inspected and/or
decontaminated. All vehicles, equipment, instruments, and materials taken into the Exclusion Zone
shall remain in the zone until no longer needed or until they need repair.
Work Zone (Exclusion Zone) Entry and Exit Logs are to be completed on a daily basis. An example
of this log is presented in Appendix C.
7.2
Contamination Reduction Zone
The Contamination Reduction Zone (Zone B) shall be placed at the Exclusion Zone perimeter and
will provide a physical separation of the Exclusion Zone and the Support Zone. The Contamination
Reduction Zone is intended to prevent the spread of contaminants from work areas. All
decontamination procedures shall be conducted within this area. A portable eye wash, first aid kit,
towels, plastic bags, fire extinguisher and decontamination supplies are required in this area. The
Contamination Reduction Zone will provide an entry for personnel and equipment into the Exclusion
Zone and an exit area for decontamination personnel, materials and equipment from the Exclusion
Zone. Personnel entering this area will wear the PPE prescribed by the Action Levels. The
Contamination Reduction Zone may be surrounded with a suitable temporary barricade system (e.g.,
caution tape, barricade fence, etc.) to allow for adjustments to the size and location due to changing
site conditions.
Decontamination details are provided in Section 10 of this HASP.
7.3
Support Zone
The Support Zone (Zone C) is considered the uncontaminated area and will be identified by the
SSHO when field activities begin. The support zone shall be upwind of the Exclusion Zone, and
within the limits of the construction boundaries, but away from areas containing hazardous materials.
It will contain the Command Post, which will provide for team communications and emergency
response. A mobile telephone is generally located in this area. Appropriate sanitary facilities,
safety, medical, and support equipment will also be provided in this area. Any personnel not fully
trained for work with hazardous materials will be required to remain in the Support Zone.
Boundaries for the Support Zone may be separated from public access through the use a suitable
temporary barricade system (e.g., caution tape, barricade fence, etc.).
Site Control Measures
Page 7-2
L:\WORK\40196\PROJphase ivhasp.doc
7.4
Modification to Site Control
Less stringent site control and decontamination procedures may be utilized based upon field
activities and results of monitoring data. However, any modifications must be authorized by the
HSS and the SSHO.
7.5
Personnel and Small Equipment Decontamination
Personnel and small equipment decontamination areas will be established on-site. Personnel will
decontaminate and/or dispose of soiled protective clothing (i.e. disposable boots and gloves, etc.)
in the Contamination Reduction Zone established next to the Exclusion Zone. Refer to Section 10.1
for ftrther decontamination procedures.
7.6
Heavy Equipment Decontamination Area
To prevent off-site transport of contamination, construction equipment and vehicles will, as
necessary, be decontaminated at a fixed temporary decontamination area before exiting the
Contamination Reduction Zone immediately after exiting the Exclusion Zone. This location will
be selected by the SSHO prior to startup of field activities. Heavy equipment (drill rig, backhoes,
etc.) and other construction equipment will be steam-cleaned and/or decontaminated via dry brushing
at the fixed decontamination area, as necessary. Decontamination liquids will be collected and
disposed of in accordance with all applicable Federal, State and local regulations. Refer to Section
10.2 for further decontamination procedures.
7.7
Site Visitors
Visitors are requiredto report to the SSHO prior to accessing the site, although none are anticipated.
The SSHO will determine the purpose of individual visits, and will document decisions regarding
their access to the site. If granted limited access, visitors must sign in and out under the SSHO's
direction daily for the duration of their approved visit. Under no circumstances will visitors be
allowed to interfere with or participate in operations within the scope of the field investigation.
As needed, the SSHO will establish a designated Level D area as an observation point for visitors
during intrusive activities. This designated area will be located to offer proximate viewing of site
operations, and positioned such that visitors in no way may inhibit site access, logistics, or general
operations. Further, the SSHO will locate the viewing areas such that visitors present are at minimal
risk of exposure to site hazards.
Prior to gaining access to designated viewing areas described above, visitors must provide the SSHO
with documented compliance with Section 5 of the HASP, comply with other applicable sections,
and satisfy additional conditions placed on them as deemed appropriate by the SSHO to assure
visitor safety. Site visitors will be escorted throughout the site by the SSHO.
Measures
Control Measures
Site Control
Site
Page 7-3
Page 7-3
L: \WORKl4OJ96PRO.Aphase ivlhasp.doc
L:\WORK40196\PROJAphase ivhasp.doc
8.0
PERSONAL PROTECTIVE EQUIPMENT
8.1
General
Personal protective equipment (PPE) for general operations will be consistent with the requirements
of 29 CFR 1910 Subpart I, "Personal Protective Equipment." Basic levels of protection for
hazardous waste operations will be selected in accordance with the provisions of 29 CFR
1910.120(g)(3), "Personal Protective Equipment Selection," and 1910.120 Appendix D, "General
Description and Discussion of the Levels of Protection and Protective Gear." Modification to basic
PPE ensembles may be necessary for specific operations. In these cases, further definition will be
provided by review of specific hazards, conditions, and proposed operational requirements and by
conducting monitoring at the particular operation. Protection may be upgraded or downgraded, as
deemed appropriate by the SSHO and verified by the HSS.
8.2
Anticipated Levels of Protection for Site Operations
o
o
Soil excavation, boring, screening and sampling operations
General environmental evaluations
D/C
D/C
Level D personal protective clothing and equipment includes:
o
Work clothes.
o
Tyvek disposable coveralls - required when splashing by contaminated liquids is a
possibility and/or significant contact with contaminated soils is expected.
o
Polycoatededisposable tyvek coveralls - required when splashing by contaminated
liquids is expected to be heavy and/or significant contact with contaminated soils is
expected to be heavy.
o
Hardhat.
o
Safety glasses or goggles.
o
Steel toe, steel shank boots.
Protective Equi~men:
PersonalProtective
Equipment
Page 8-1
Page 8-1
WORKWOI961PROJ\phase ivlhasp. doc
L:\tWORK\40196)PROJAphase ivithasp.doc
o
Disposable latex gloves - required when collecting soil samples and when splashing
by contaminated groundwater is a possibility.
o
Outer nitrile gloves - required when splashing by contaminated liquids is expected
to be heavy and/or when significant contact with contaminated soils is likely.
o
Disposable outer boots - required when splashing by contaminated groundwater is
possible and/or when significant contact with contaminated soils is expected to be
heavy.
o
Noise protection - as warranted.
Level C protective clothing and equipment includes:
o
Full-face air-purifying respirator (NIOSH/Mine Safety Health Administration
(MSHA) approved) fitted with acid gas/organic vapor/High Efficiency Particulate Air
filter (HEPA) cartridges.
o
Hard hat.
o
Disposable tyvek coveralls.
o
Polycoated disposable tyvek coveralls - required when splashing by contaminated
liquids is expected to be heavy and/or significant contact with contaminated soils is
expected to be heavy.
o
Disposable latex inner gloves.
o
Nitrile outer gloves.
o
Steel toe, steel shank boots.
o
Disposable outer boots.
Level B PPE, although not anticipated, includes the above Level C clothing with the addition of a
self-contained breathing apparatus (SCBA) or supplied air-line respirator in place of an air-purifying
respirator. If action levels are exceeded, and based on evaluation of the conditions, if Levels C or
B respiratory protection is deemed necessary, work activities will be halted and the HSS contacted
immediately before upgrading the levels of protection other than allowed by the Action Levels
established in this HASP.
The use and care of respiratory protection will be in accordance with the protocols described in
Appendix B. Action levels used to determine the need to upgrade or downgrade the levels of
protection are described in Section 9.4 of this HASP.
PersonalProtective
ProtectiveEqz4vmera
Equipment
Page 8-2
Page 8-2
L. ~WORK~4OJ96~PROAphase iv~hasg doe
L:\WORK\40J96\PROJAphaseivihasp.doc
9.0
AIR MONITORING
9.1
General
Atmospheric conditions will be monitored during soil sampling activities providing potential
exposures to contaminated soils, and to determine the possible need to upgrade the personal
protection of on-site workers and to identify potential emergency conditions. In areas contaminated
with hazardous materials, the atmosphere in the worker breathing zone, at the Exclusion Zone
perimeter, and at the fence line of the Site shall be monitored. When atmospheric monitoring is
occurring, instrument readings shall be documented using the Atmospheric Monitoring Log
presented in Appendix C. All air monitoring equipment shall be maintained and calibrated
according to the manufacturer recommendations. Maintenance and calibration data will be recorded
and included in the Atmospheric Monitoring Log presented in Appendix C.
9.2
Exclusion Zone and Exclusion Zone Perimeter
Activities in the Exclusion Zone shall be initiated in Level D protection with the contingency to
upgrade the level of protection based on the action levels.
Monitoring for VOCs shall be performed continuously in the Exclusion Zone during soil sampling,
test boring activities. A photoionization detector (PID) shall be used to monitor the Breathing Zone
and all geological samples upon their retrieval for the presence of VOCs. All soils and soil piles,
if any, from an excavation shall also be monitored using a PID to detect any volatiles. The Exclusion
Zone perimeter will be continuously monitored (i.e., every 30 minutes) for VOCs and particulates
(visible dust) at an upwind and downwind location. Vapor suppression activities (i.e., minimize or
stop soil disturbance and application of vapor suppression materials) will be utilized when necessary
to minimize the presence of gases and vapors. Dust suppression activities (i.e., water trucks, water
mist over excavation) will be utilized when necessary to minimize the generation of particulate
aerosols (i.e., visible dust). Refer to Table 9-1 for a summary of Action Levels and respiratory
protection requirements for particular activities and contaminants detected.
9.3
Fence Line Monitoring
Level D protection will be utilized by personnel conducting fence line monitoring with the
contingency to upgrade the level of protection based on the action levels presented in Table 9-2. In
most cases, the fence line will also serve as the Exclusion Zone perimeter. The PID shall be used
to monitor fence line for VOCs during all soils sampling, test boring/monitoring well installation
and sampling, and soil stockpiling/disposal activities. Vapor suppression (i.e., minimize or stop
contaminated soil disturbance and/or application of vapor suppression materials) and dust
suppression activities (i.e., water trucks, water mist over excavation) will be utilized when necessary
to minimize the generation of vapors and/or particulate aerosols (i.e., visible dust).
Monitoring
Air
A
ir Monitoring
Page 9-1
Page 9-1
WORK~4OJ96lPRO.Aphase iiA hasp. doe
L:\WORK\40196\PROJAphase
ivlhasp.doc
9.4
Action Levels
Instrumentation may include the PID for total volatile organic compounds. The Action Levels in
this HASP will apply to all site work during the duration of activities conducted at 328 North Street
in the areas of concern (refer to Section 3). Action Levels for direct-reading instruments are
provided in Table 9.1 (worker protection in the Exclusion Zone and at Exclusion Zone perimeter)
and Table 9.2 (general public/off-site receptors at the fence line). The backup calculations and
justifications for these Action Levels are provided in Appendix D.
A ir Monitoring
Page 9-2
L: t WORK40196\PROfiphase iv hasp.doc
cu
j
9-
-
'S
44* -o
x
oZ
..-.
-
e,
1.
o
-
C.g.
"Pco
t,
gzL.
C
SC
C6
5
0
m
6m
*"0
10%
'-4
c~4
4'g
..
2
2
2
V
I~.
-eo
4-
*0
o6.
A
=
C
6
c
aX0
0
'n
u
40
C-)-
I
oo
o
PC
-
oc
A
V
-o
a
,u.A
--
e
-
~H
0.
o
1==
.
A
?'8Co
U,
C
g 4o5*
4-
4 )
en
o-6C
o
-o
V7
4?
&E 53
$i
u.2
U
8-E3)-0
u.2&i
-5
-j
E
u 8
a
C.
ii
x
a
4?
OS
p
C
<
*C
e2
0 .-
t4
0
D
E
y
u .~g
.3
'
>
0
0
3g
L4C>
.0
a0
S
Ei
x
=
0
O
-
---
-0
22
32 . o
oDo
0
0
t;2
Eu0
C
E.
U
a
C
C
--
0
8.--
o
cona,
0
rn
0,
~0
'4OD
v
U
0
rL
a
-'
y
E.
CO
0
CI)
- -
oH
os
-0
-a
aS
N
-
nm
a .
-
.-
o.
0
E
-
's:C
>
EWE
CU
e a
'4-
ON
0
cc
U
C-
0:
e
A-a
0
..
=5
Ctw
eU C.-
oa
-c
2B
C
C
*
6
r
= g 2
C
o
.C
g
m
ao
o
C
.0
.
E*_-
-
8
- -
C
ab
-O
+-
o=ce&
a'uEta
g
~e-
U
:
U-,
U)
C
--'
Co
C
11
C
0
10.0
DECONTAMINATION PROCEDURES
The SSHO shall determine the level of decontamination necessary based on the evaluation of
specific work activities and the potential degree of contamination encountered. Temporary
Contamination Reduction Zones shall be established as necessary.
10.1
Personnel and Small Equipment
Personnel will perform decontamination in the personal decontamination area upon entering the
Contamination Reduction Zone. Decontamination of personnel in Level D will consist of closure
and disposal of coveralls (when worn), disposable boots (when worn), and gloves. A minimum
decontamination layout for Level C protection and equipment is presented in Table 10-1.
Decontamination of personnel using Level C protective equipment will consist of:
o
Removal and disposal of boot covers.
o
Removal and disposal of coveralls.
o
Removal and disposal of outer gloves.
o
Removal, cleaning, and storage of respiratory equipment.
o
Washing boots or other non-disposable protective equipment (i.e., hard hat, safety
glasses/goggles, etc.) suspected of being contaminated using soap solution followed
by potable or distilled water rinse.
o
Removal and disposal of inner gloves.
Contaminated wash solutions and PPE will be disposed of at an appropriate and licensed disposal
facility. Hand tools and other small equipment will be decontaminated as needed by washing in
decontamination basins, or if possible, by dry decontamination.
10.2
Heavy Equipment
Prior to exiting contaminated areas that are being excavated, equipment and transport vehicles may
be decontaminated by washing if the equipment potentially came in contact with contaminated
materials. Heavy equipment may be dry decontaminated, if possible. It should be noted that, if
possible, clean areas/corridors that either eliminate or minimize any decontamination washing will
be utilized. Efforts will be made to unload, use and load transport equipment in a manner that
prevents contact of the vehicles with impacted materials and, therefore, decontamination will not be
necessary.
DecontaminationProcedures
Page 10-1
L:\WORK\40196\PROJphase ivlhasp.doc
10.2.1 Decon Pad Design
The decon pad will be portable and readily assembled/disassembled to insure that it does not
interfere with traffic control provisions. A typical decon pad design is as follows:
-
Typical decon pad dimensions will be 50 feet (length) by 15 feet (width);
a
The decon pad will slope toward a center low point sump to allow for collection of
decontamination water;
o
The pad will be constructed of 60 mil high density polyethylene (HDPE) liner
material overlain by a geotextile, and a minimum of 12 inches of clean sub-angular
stone will be back filled over the HDPE liner and geotextile;
o
A 12-inch high containment berm constructed of clean sub-angular stone will be
placed around the perimeter of the decon pad; and
0
The decon pad will be equipped with 3-feet high splash guards dropped inside the
bermed pad to prevent over spray.
10.2.2 Decon Water
Equipment and vehicles exiting established Exclusion Zones will be washed down, as required,
using a high pressure water and steam system.
Decon water will drain toward the center of the decon pad. A 6-inch diameter perforated HDPE pipe
(SDR 17 or equal) will be located at the low point of the pad which will collect and drain decon
water into a 55-gallon sump or equivalent.
Water collected in the sump will be pumped into a 5,000-gallon storage (poly) tank or equivalent.
Flexible hose and/or piping will serve as the connection between the decon pad sump and the poly
tank.
10.2.3 Decon Water Disposal
Poly tanks that are at or near capacity will be transported to a fully operational, licensed facility that
is in compliance with all Federal, State, and local regulations, which is capable of decon water
recycling or disposal.
Earth Tech will prepare all hazardous waste manifests, bills of lading, and all other documentation
in order to transport and dispose of decon water. The Client will be designated as generator and will
sign all manifests.
motion Procedures
L~econtam
Procedures
Decontamination
Page 10-2
Page 1 0-2
L:IWORK~40J96PRO.Yphase ivlhasp.doc
L:\IWORK\40196\PROJAphase iv hasp.doc
Documentation certifying that all decon water was transported to, accepted, and disposed of, will
be submitted to the Client. The documentation will include, but is not limited to the following:
-
A record of each load from the site to the disposal/recycling facility, including all
manifests, bills of lading, and all other documentation as applicable.
-
All documentation for each load shall be tracked by the original manifest document
number that was assigned at the site.
It should also be noted that decon water will not be transported off-site until all disposal/recycling
facility documentation has been reviewed and approved by the Client or their representative.
Transportation of the decon water from the site to the disposal/recycling facility will be in
accordance with all U.S. Department of Transportation, U.S. EPA and MADEP regulations. Decon
water hauler(s) will be licensed in all states affected by the transport.
Chemical analyses shall be performed on behalf of the Client, as necessary, to fulfill any
disposal/recycling testing requirements of the approved facility. The decontamination water will be
sampled at the frequency specified by the disposal facility and for the parameters required for waste
acceptance at the facility. A copy of all chemical analyses results will be submitted to the Client
after receipt of the laboratory report.
10.2.4 Decon Pad Disposal
Once contaminated soils excavation activities within the Exclusion Zones have been completed, the
decon pad(s) will be disassembled and each component handled properly.
The stone base will be tested to determine the most appropriate end use or disposal method. The
HDPE liner will be pressure washed. It is anticipated that both materials will be reused and/or
disposed in a lined landfill. The geotextile will be properly disposed at a lined landfill.
10.3
Contamination Prevention
One of the most important aspects of decontamination is the prevention of contamination. Good
contamination prevention should minimize worker exposure and help ensure valid sample results
by precluding cross-contamination. Procedures for contamination avoidance include:
Personnel
o
Know the limitations of all PPE being used.
o
Do not walk through areas of obvious or known contamination.
o
Do not handle or touch contaminated materials directly. Do not sit or lean on
potentially contaminated surfaces.
DecontaminationPrnredures
Page 10-3
L: IWORKl40196\PROJ~phaseMvhasp.doc
0
Make sure all PPE does not have any cuts or tears prior to donning.
o
Fasten all closures on suits, covering with tape, if necessary.
o
Take particular care to protect any skin injuries.
o
Stay upwind of airborne contaminants.
o
Do not carry cigarettes, gum, food, or candy into contaminated areas.
o
Do not smoke, eat, or drink in contaminated areas.
o
Shower at the hotel or home, immediately upon arrival, at the end of the work day.
SamplingfMonitoring
o
Cover instruments with clear plastic, leaving openings for sampling ports, sensor
points.
o
Bag sample containers prior to placement of sample material into containers.
Heavy Equipment
o
Limit the surface area of equipment that comes into contact with contamination.
General
10.4
o
If contaminated tools are to be placed on non-contaminated equipment for transport
to the decontamination pad, use plastic to keep the non-contaminated equipment
clean.
o
Place spoils from subsurface work so as not to be in the expected paths of individuals.
o
Keep any excavated soils out of the way of workers.
Disposal Procedures
Discarded materials, waste materials, field equipment and supplies will be handled to preclude the
potential for spreading contamination, creating a sanitary hazard, or causing litter to be left on site.
Potentially contaminated materials, e.g., clothing, gloves, etc., will be bagged or drummed with
appropriate labeling affixed as regulated, and disposed of and shipped with other hazardous
materials. Non-contaminated materials shall be collected, bagged, and disposed of as simple nonhazardous solid waste.
t'econtarrnnaton
Procedures
DecontaminationFroceaures
10-4
rage
Page 10-4
L:1WUKAI4UJYOkrWJJ~pflOSe ivinasp.aoc
L:\WORK40196(PUPhs inapdoc
Table 10-1
Minimum Decontamination Layout
For Level C Protection and Equipment
Station 1
Station 2
Station 3
Station
Station 5
4
Decon
Procedures
Equipment
Drop
PPE and
Other
Equipment
Wash
PPE and
Other
Equipment
Rinse
PPE
Disposal
Hand and
Face Wash
Equipment needed to perform decontamination
Station 1: Plastic Sheet
Station 4: 20-30 Gallon Trash Can,
Disposal Bag
Station 2: Wash tub, Decon Solution,
Long-handled soft-bristled
scrub brush
Station 5: Field table, wash tub, 5 gal.
water cooler or carboy, soap,
towels
Station 3: Wash tub, rinse water, longhandled soft-bristled scrub
brush
Procedures
Decontamination
DecontaminationProcedures
Page 10-5
Page 10-5
L:IWORIC40J96~PRO.Aphase ivlhasp.doc
L:\IWORK\40196PROJAphase iv Ihasp.doc
11.0
GENERAL SAFE WORK PRACTICES AND COMMUNICATIONS
11.1
Safety Equipment
Basic emergency and first aid equipment will be available at the Support Zone and/or the
Contamination Reduction Zone. as appropriate. This shall include communications equipment, first
aid kit, emergency eye wash, fire extinguishers, and other safety-related equipment.
11.2
Communications
Walkie-Talkies:
Hand-held units shall be used as much as possible by field teams for
communication between downrange operations and the Command Post basestation.
Telephones:
A mobile telephone will be located in the Command Post area in the SZ for
communication with emergency support services/facilities.
Hand Signals:
Hand signals will be used by downrange field teams in conjunction with the
buddy system. These signals are very important when working with heavy
equipment. They shall be known by the entire field team before operations
commence and reviewed during site-specific training.
11.3
Signal
Meaning
o
Hand gripping throat
Out of air; can't breathe
o
Grip partner's wrist
Leave area immediately; no debate
o
Hands on top of head
Need assistance
o
Thumbs up
OK; I'm all right; I understand
o
Thumbs down
No; negative
Safe Work Practices
The following safe work practices will be implemented during site operations:
o
Prior to the start of work, this HASP will be reviewed and placed in a conspicuous
location. Emergency phone numbers will be posted next to the on-site telephone.
Emergency phone numbers will include hospital, ambulance, fire, and police.
o
Only properly trained and equipped personnel will be allowed to work in potentially
contaminated areas.
General Safe Work Practicesand Communications
Page 11-
L:WORK\40196\PROJ.phaseivhasp.doc
o
The number of personnel and equipment in the sampling areas will be kept to a
minimum, consistent with safe site operations.
o
Workers shall adhere to the "buddy system" while working downrange and in
designated exclusion areas. Radio contact shall be maintained between pairs on-site
in order to assist each other in case of emergencies.
o
Workers shall not exit exclusion areas until soiled equipment and clothing have been
removed and decontaminated or properly disposed of.
o
Eating, drinking, chewing gum or tobacco, smoking, or any practice that increases
the probability of hand-to-mouth transfer, ingestion, and inhalation of potentially
contaminated materials is prohibited.
11.4
o
As necessary, personnel will thoroughly wash their hands and faces upon leaving the
investigation areas.
o
Contact with potentially contaminated materials and surfaces shall be avoided.
Personnel shall comply withtcontamination control measures.
o
Personnel with facial hair or other facepiece seal obstructions will not be permitted
to work where respirators are required.
o
Work shall only be conducted if adequate illumination is provided, i.e., visual
observation is not impaired due to loss of daylight conditions.
o
Sampling personnel shall not work near heavy equipment.
Excavation/Trench Hazards
Sloughing of trench sidewalls may occur during excavation and trenching activities. Safety related
to any excavation or test pitting activities shall be the responsibility of the contractor/subcontractor
performing such work. Actions to be taken to minimize the potential for hazards related to these
activities are the responsibility of the contractor and include:
o
Locate all underground utilities (call Dig Safe) prior to excavation
o
All trenching activities will be in accordance with OSHA 29 CFR 1926 Subpart P.
o
Lay back slope to a stable pitch. Sloping must be inspected by a competent person
(generally the contractors on-site supervisor).
o
Utilize shoring if necessary. All shoring systems must be approved by a registered
Professional Engineer.
and Communications
Practicesand
Work Practices
General Safe Work
Communications
Page 11 2
Page 1 1-2
L:\WORK~4OJ96~PRO.Aphase t'Ahasp.doc
L:\WORK\40196\PROJAphase Mvhasp.doc
11.5
o
Equipment and excavated material shall be placed no closer than 5 feet from the edge
of the excavation.
o
Heavy equipment not required for work activity will be kept away from the
excavation.
o
Personnel will not be permitted to enter the excavation unless it is approved by a
competent person, as defined by OSHA.
o
A means of egress from the trench excavations that are 4 feet or more in depth will
be provided. This can be accomplished by the use of ladders, ramps or stairway, and
must be placed so as to require no more than 25 feet of lateral travel for employees.
o
Entry of personnel shall be carefully monitored by a competent person. Daily
inspections of any excavations, adjacent areas, and protective systems will be made
by a competent person for evidence of a situation that could result in possible caveins, hazardous atmospheres, or other hazardous conditions. Any excavation will be
monitored for oxygen, potential explosive conditions, and toxic vapors prior to and
during entry. An inspection will be conducted by the competent person prior to the
start of work and as needed throughout the shift. Inspections will also be made after
every rain storm or other hazard increasing occurrence. These inspections are only
required when employee exposure can be reasonably anticipated.
o
Appropriate Personal Protective Equipment will be worn by personnel entering the
excavation trench.
Machinery and Mechanized Equipment
Actions to be taken to minimize the potential for hazards related to the operation of machinery and
other mechanized equipment include:
o
Operation of machinery will be only performed by experienced operators.
o
Machinery will be inspected daily before use.
o
Safety features such as belts, harnesses and warning lights/alarms will be used
throughout these activities.
o
Guide ropes will be used when lifting items.
o
All electrical equipment will be locked out and tagged out prior to conducting repairs
or maintenance. Lock/tag will only be removed by the person who placed it.
o
Equipment capable of stopping, lowering and holding at least the full test load shall
be provided.
o
Riding on load, hoods, hammers, buckets, material hoists, etc. not meant for
GeneralSafe Work Practicesand Communications
Page 11-3
L:WORK\401961PROJlphase ivhasp.doc
personnel is prohibited.
o
The operator of hoisting equipment will not perform any other work or leave his/her
position at the controls until the load has been safely landed or returned to ground
level.
o
Adequate clearance shall be maintained between moving or rotating parts of the
equipment and fixed objects to allow for passage of personnel.
11.6
Hazardous Materials
Actions to be taken to minimize the potential for hazards (refer to Section 4.0) related to personnel
who may come in contact with hazardous materials include:
11.7
o
Hazardous materials expected to be on-site will be discussed at the morning safety
meeting. The HASP, including MSDS copies or toxicity summaries, will be kept onsite.
o
Appropriate Personal Protective Equipment will be used by workers for each phase
of work, as described in Section 9.0.
o
Monitoring of worker exposure will be performed to ensure an adequate level of
protection.
o
Standard Operating Procedures will be followed for loading and sealing containers
and trucks that may contain hazardous materials.
o
Control zones will be established as described in Section 7.0.
o
The directives of the SSHO shall be followed for emergency supplies, response and
spill cleanup procedures, as described in the Site Emergency Plan (see Section 12).
o
If spills occur, the area will be sampled and tested to assure complete cleanup.
Miscellaneous Hazards
Actions to be taken to minimize the potential for hazards associated with on-site activities not
previously addressed (e.g., operation of power tools, vehicular traffic control, etc.) include:
o
Only trained personnel are to use power tools. Operation of power tools will be as
specified by the manufacturer. Safety glasses and protective guards will be
employed. Ground fault circuit interrupters will be used on all electrical equipment
used outdoors.
o
D.O.T. approved containers will be used to store all fuels.
o
Shut down of engines will be performed prior to any fueling/refueling or servicing
GeneralSafe Work Practicesand Communications
Page 11-4
L: WORK\40196PROJ phase ivlhasp.doc
activities. Electrical equipment will be disconnected when not in use.
o
An appropriately rated fire extinguisher will be on hand in each work area.
o
Open flames will only be allowed in designated work areas.
o
Equipment will be inspected, removed from service and tagged to indicate it is not
in good working condition.
o
The SSHO will warn employees of all potential traffic hazards before starting
activities involving exposure to traffic.
Communications
and Communications
Practicesand
Work Practices
Safe Work
General
GeneralSafe
Page 11-5
Page 11-5
L. ~WORK~4Ol96~PROJ\phase iv~hasp.doc
L:\IWORK\40196\PROJ~phaseMvhasp.doc
12.0
EMERGENCY PREPAREDNESS
12.1
Emergency Coordinator
The SSHO shall be the Site Emergency Coordinator and implement the emergency action plan as
outlined (29 CFR 1910.38). Although the following five items are typically more applicable to
operating facilities, they will be implemented to the extent possible when applicable. (These shall
be determined prior to site work by the SSHO and presented during the site initiation meeting.)
o
Emergency escape procedures and routes.
o
Procedures to account for employees after evacuation.
o
Rescue and medical duties.
o
Preferred means of reporting fires and emergencies.
o
Names, job titles, or departments to contact for additional information of duties.
These items will be discussed during each site orientation meeting conducted on-site by the SSHO.
12.2
Emergency Services Contacts
The SSHO or a designee will act as the Site Emergency Coordinator and shall verify appropriate
emergency contacts and make contact with them before beginning work on-site. The Emergency
Coordinator will inform the emergency contacts about the nature and duration of work expected on
the site and the type of contaminants and possible health or safety effects of emergencies involving
these contaminants. Also at this time, the Emergency Coordinator and the emergency response
contacts shall make arrangements to handle any emergencies that might be anticipated.
EMERGENCY PHONE NUMBERS:
Police Department
Fire Department
911
911
Hospital Emergency Room
Hospital Address
National Response Center
Poison Control Center
LSP (Joseph Vitale)
Health & Safety Specialist (Rick Denham)
SSHO (Patrick McNabb)
Earth Tech Medical Director (Dr. David Barnes)
.Emergency Preparedness
Page 12-1
508-234-8792
Whitinsville Medical Center
18 Granite Street
Whitinsville, MA
800-424-8802
800-542-4225
978-371-4124
978-371-4326
978-371-4227
800-229-3674
L: WORK40196\PROJ\phaseivlhaspdoc
A Hospital Route Map is presented in Figure 12-1.
Once the Support Zone is established, and before field activity start-up, the Site Emergency
Coordinator shall drive the route to the hospital, post directions and/or a map to the hospital, post
emergency phone numbers, and set up the first aid station, 10-pound Type A/B/C fire extinguisher,
and other emergency equipment.
12.3
Implementation
The Site Emergency Coordinator shall implement the emergency action procedures whenever
conditions at the site warrant such action. The Site Emergency Coordinator will be responsible for
coordinating the evacuation, emergency treatment, and emergency transport of site personnel as
necessary, and for notification of emergency response units and the appropriate management staff
The following conditions may require implementation of emergency action procedures:
o
Fire or explosion on-site.
o
Serious personal injury.
o
Release of hazardous materials, including gases or vapors at levels greater than the
maximum use concentrations of respirators.
o
Unsafe working conditions, such as inclement weather.
The following alarm system(s) will be used to alert employees to evacuate the danger area:
( )Air hom
( ) Radio/Telephone
(X) Direct Verbal Communications (10 Employees or less)
( ) Other
12.4
Fire or Explosion
If an actual fire or explosion has taken place, emergency steps will include 1) evacuation of work
area and venting, and 2) notification of the fire department and other appropriate emergency
response groups if necessary.
12.5
Personal Injury
Emergency first aid will be administered on-site as appropriate. Then, the individual will be
decontaminated if possible, depending on the severity of the injury, and transported to the nearest
medical facility, if needed.
Preparedness
Emergency
Emergency Preparedness
Page 12-2
Page 12-2
LA WORKI4OI96PROJ~phaseivlhasp. doe
L: IWORK\ 40196PROJAphase ivhasp.doc
12.6
Overt Chemical Exposure
Typical response procedures include:
SKIN CONTACT:
Use copious amounts of soap and water. Wash/rinse affected area
thoroughly, then provide appropriate medical attention. An eye wash
will be provided on-site at the CRZ and/or support zone as
appropriate. Eyes should be rinsed for at least 15 minutes upon
chemical contamination.
INHALATION:
Move to fresh air and/or, if necessary, decontaminate/transport to
hospital.
INGESTION:
Decontaminate and transport to emergency medical facility.
PUNCTURE
WOUND OR
LACERATION:
Decontaminate and transport to emergency medical facility. The
SSHO will provide medical data sheets to medical personnel as
requested.
12.7
Adverse Weather Conditions
In the event of adverse weather conditions, the SSHO will determine if work can continue without
endangering the health and safety of field workers. Some items to be considered before determining
if work should continue are:
o
Potential for heat stress and heat-related injuries.
o
Potential for cold stress and cold-related injuries.
o
Treacherous weather-related working conditions.
o
Limited visibility.
o
Potential for electrical storms.
12.7.1 Heat Stress
The SSHO shall continuously visually monitor personnel to note for signs of heat stress. In addition,
field personnel will be instructed to observe for symptoms of heat stress and methods on how to
control it. One or more of the following control measures can be used to help control heat stress:
Emergency
Preparedness
Emergency Preparedness
Page 12-3
Page 12-3
L. ~WORKI4OJ96~PROJ\phaseiv~hasp.doc
L:\WORK\40196PROJ~phaseivhasp.doc
o
Provision of adequate liquids to replace lost body fluids. Employees must replace
water and salt lost from sweating. Employees must be encouraged to drink more
than the amount required to satisfy thirst. Thirst satisfaction is not an accurate
indicator of adequate salt and fluid replacement.
o
Replacement fluids can be commercial mixes such as Gatorade.
o
Establishment of a work regime that will provide adequate rest periods for cooling
down. This may require additional shifts of workers.
o
Cooling devices such as vortex tubes or cooling vests can be worn beneath protective
garments.
o
All breaks are to be taken in a cool rest area (77* F is best).
o
Employees shall remove impermeable protective garments during rest periods.
o
Employees shall not be assigned other tasks during rest periods.
o
Employees shall be informed of the importance of adequate rest, acclimation, and
proper diet in the prevention of heat stress.
The heat stress of employees on-site may be monitored by the Wet Bulb Globe Temperature Index
(WBGT) technique when workers are not wearing protective coveralls (i.e. Tyvek). This method
will require the use of a heat stress monitoring device. Monitoring of personnel wearing impervious
clothing shall commence when the ambient temperature is 70 *F or above. This will be performed
by a person with a current first aid certification and who is trained to recognize symptoms of heat
stress.
12.7.2 Cold Exposure
If the field activities occur during a period when temperatures average below freezing, the following
guidelines will be followed.
Persons working outdoors in temperatures at or below freezing may be subject to frostbite. Extreme
cold for a short time may cause severe injury to the surface of the body, or result in profound
generalized cooling of the body core, resulting in coma and death. Areas of the body which have
high surface area-to-volume ratio such as fingers, toes, ears, are the most susceptible.
Two factors influence the development of a cold injury; ambient temperature and the velocity of the
wind. Wind chill is used to describe the chilling effect of moving air in combination with low
temperature. For instance, 10*F with a wind of 15 miles per hour (mph) is equivalent in chilling
effect to still air at - 8*F.
Emergency
Preparedness
Emergency Preparedness
Page J2-4
Page 12-4
L: ~WORK~4OJ961PROJlphase hA hasp. doe
L:\WORK\401961PROJ~phaseivlhasp.doc
As a general rule, the greatest incremental increase in wind chill occurs when a wind of 5 mph
increases to 10 mph. Additionally, water conducts heat 240 times faster than air. Thus, the body
cools suddenly when chemical-protective equipment is removed if the clothing underneath is
perspiration-soaked.
Local injury resulting from cold is included in the generic term frostbite. There are several degrees
of damage. Frostbite of the extremities can be categorized into:
o
Frost nip or incipient frostbite: Characterized by suddenly blanching or whitening
of skin.-
o
Superficial frostbite: Skin has a waxy or white appearance and is firm to the touch,
but tissue beneath is resilient.
o
Deep frostbite: Tissues are cold, pale, and solid; extremely serious injury.
Prevention of frostbite is vital. Keep the extremities warm. Wear insulated clothing as part of one's
protective gear during extremely cold conditions. Check for symptoms of frostbite at every break.
The onset is painless and gradual--you may never know you have been injured until it is too late.
To administer first aid for frostbite, bring the victim indoors and rewarm the areas quickly in water
between 39C and 41*C (102"F to 105*F). Give a warm drink-not coffee, tea, or alcohol. The victim
should not smoke. Keep the frozen parts in warm water or covered with warm clothes for 30
minutes, even though the tissue will be very painful as it thaws. Then elevate the injured area and
protect it from injury. Do not allow blisters to be broken. Use sterile, soft, dry material to cover the
injured areas. Keep victim warm and get immediate medical care.
After thawing, the victim should try to move the injured areas a little, but no more than can be done
alone (without help).
o
Do not rub the frostbitten part (this may cause gangrene).
o
Do not use ice, snow, gasoline, or anything cold on frostbite.
o
Do not use heat lamps or hot water bottles to rewarm the part.
o
Do not place the body part near a hot stove.
Systemic hypothermia is caused by exposure to freezing or rapidly dropping temperature. Its
symptoms are usually exhibited in five stages: 1) shivering; 2) apathy, listlessness, sleepiness, and
(sometimes) rapid cooling of the body to less than 95*F; 3) unconsciousness, glassy stare, slow
pulse, and slow respiratory rate; 4) freezing of the extremities; and, finally, 5) death.
Preparedness
Emergency Preparedness
Emergency
Page 12-S
Page 12-5
L. ~WORIO4OI96\PRO.Aphcne iv~ha.~p.dou
L:\WORK\40196PROJAphase ivhasp.doc
Effects arising from cold exposure will be minimized by providing workers with insulated clothing
when the equivalent chill temperature is less than 30*F. At minimum, workers exposed to
temperatures below -10* F with wind speeds of more than 5 miles per hour shall be medically
certified by the Physician as suitable for such exposure. The ultimate responsibility for delaying or
curtailing work at a site due to inclement weather rests with the SSHO.
12.8
Poison Ivy
If someone should come in contact with poison ivy, the individual should immediately wash the
affected area with the Ivy Cleaner provided in the first aid kit. If a rash develops, it should be treated
at a medical facility as soon as possible.
12.9
Snakes and Ticks
12.9.1 Snake Bite Prevention and First Aid
On project sites, precautions against the possible presence of snakes should be taken when walking
through overgrown vegetation and when moving debris (i.e. lumber, scrap metals, etc.). If someone
is bitten by a snake, and the snake bite occurs in a location that is within a I-hour drive of a medical
facility, a conservative approach is safest. Keeping the victim quiet, lying or sitting and reassuring
him/her is all that is required. He/she should be transported safely (no speeding) to the nearest
medical facility. In North America, death from snakebite to healthy adults is very rare. Many bites,
even from known poisonous snakes, do not result in a significant amount of venom being injected.
Even when significant envenomation occurs, symptoms develop slowly over many hours and can
be controlled with appropriate treatment. Field treatments advised against include ice, cutting, and
suction around the wound, and tourniquets. Studies indicate that ice leads to increased tissue
destruction. Cutting and sucking out the wound can be shown to offer some help if it is done with
the correct technique and equipment and if the victim has received a large dose of venom. In light
of the damage that can be done, the risk of such a procedure is too high. It is best to transport the
person immediately to a medical facility.
12.9.2 Tick Bite Prevention and First Aid
Routinely check for ticks after being outdoors. Remove ticks as soon as possible before they embed.
To minimize exposure, wear light-colored clothing so ticks can be detected. Tuck pants into boots
or socks and wear longsleeved shirts. Apply tick/insect repellent to clothing.
When a tick is found embedded, remove it by grasping it with a tweezers as close to the skin as
possible and gently pull it straight out. Do not twist or jerk the tick because the head may remain
embedded. Once the tick is removed, wash the bite area and your hands with soap and water and
apply an antiseptic to the bite. Save the tick in a jar labeled with the date and the place where the
tick was acquired. A physicianmay find this information and the tick specimen helpful in diagnosis
if an infection results.
Emergency
Preparedness
Emergency Preparedness
Page 12-6
Page 12-6
L: WORK~4O1961PRO.Aphase iv~hasp. dcc
L:\WORK\40196\PROJAphase ivhasp.doc
12.10 Spill Containment and Countermeasures Plan
As indicated in this HASP, all work on potentially hazardous materials will occur in controlled work
zones. Further, there will be no significant quantities of hazardous substances, such as solvents,
involved in site activities. All vehicles and equipment will be properly maintained to minimize the
potential releases of oil, gasoline and other materials
The SSHO should be familiar with the notification requirements outlined in this HASP. In addition,
all subcontractor personnel can recognize spills, and know the links of communication for
notification.
Once a spill has been recognized and appropriate notifications have been made, the SSHO will
institute appropriate spill control and countermeasure measures. The following response principals
apply:
1.
Follow contingency and evacuation procedures in this plan.
2.
For spills less than 10 gallons, contain the spill to the smallest area possible, through the use
of adsorbents and site equipment to build berms. Prevent to the extent possible, the
migration of spills to nearby sewers, drainage structures, open waters, and other sensitive
human and environmental receptors.
3.
Conduct and complete the response in accordance with all applicable local, state and federal
regulations. Seek assistance in determining the extent and completeness of the spill
response from the Client and appropriate authorities.
4.
For spills 10 gallons or greater, contain the spill to the smallest area possible, as noted above.
Notify the appropriate emergency response contractor. Coordinate with the Client the
methods to be employed in collection, storage, and the ultimate disposal of all contaminated
materials. All applicable hazardous waste regulations will be adhered to.
12.10.1
Emergency Response Contractors
Listed below are three Emergency Response Contractors. These contractors are experienced in the
removal and disposal of oils, contaminated soils, hazardous chemicals, and asbestos pipelines and
appurtenances. The telephone numbers for these contractors are also provided.
1.
Enpro Services, Inc. (508) 465-1595.
2.
CYN Environmental Services (800) 242-5818.
3.
Clean Harbors, Inc. (800) 645-8265; (800) OIL-TANK.
Emergency
Preparedness
Emergency Preparedness
Page 12-7
Page 12-7
Li WORKi4OI96~PRO.Aphase iv~hasp.doc
L:\WORKi40196\PROJ~phaseivhasp.doc
FIGURE 12-1 - HOSPITAL ROUTE MAP
Directions
1.
2.
Start out going South on MA-122 by turning right.
Turn RIGHT onto CHURCH ST.
o199
WpQuestco,
Miles
1.9
0.7
Inc.: o1999 GDT. Inc.
Full Route
Preparedness
Emergency
Emergency Preparedness
Page 12-8
Page 12-8
A: WorthbridgeflPW doe
A:WorthbridgeDPW.doc
13.0
AUTHORIZATIONS AND FIELD TEAM REVIEW
13.1
Authorized Personnel
Personnel authorized to enter the areas of concern while field activities are being conducted must
be authorized by the HSS or a designee. Authorization will involve completion of appropriate
training courses and medical examination requirements as required by OSHA 29 CFR 1910.120,
current fit-testing, and review and signing of this HASP. All personnel must be escorted by
appropriately trained personnel, and check in with the Field Team Leader at the Command Post.
PERSONNEL AUTHORIZED TO PERFORM WORK ON-SITE:
1.
Earth Tech Personnel
2.
Earth Tech Subcontractors
3.
4.
OTHER PERSONNEL AUTHORIZED TO ENTER SITE:
1.
2.
3.
4.
5.
Team Review
Field Team
and Field
Authorizations and
Review
Page 13-1
Page 13-1
L. ~WORK~4OJ96~PROJ\phaseivlhasp.doc
L:\ WORK\40196PROJAphase ivithasp.doc
13.2
Field Team Review
Each field team member shall sign this section after site-specific training is completed and before
being permitted to work on site.
Ihave read and understand this Site Inspection Health and Safety Plan. I will comply with
the provisions contained therein.
Site/Project: Northbridge DPW
11 Fletcher Street
Northbridge, MA
Name Printed
Ii
_____
and Field
Authorizations and
Field Team
Team Review
Review
Signature
[
Date
I
_____
Page 13-2
Page 13-2
Ii
WORK~4OJ96~PROPphaseiv~hasp. doc
L:\tWORK40196\PROJ~phase Mvhasp. doc
14.0
RECORDKEEPING
The following records and reports will be established and kept as appropriate for the 11 Fletcher
Street project:
o
o
Accident/Incident Reports
Daily Sign In/Sign Out Log
o
o
Air Monitoring Records
Sample Manifest/Transmittal (Chain of Custody Form)
o
Employee Training Certificates
Employee Exposure Record
Site-Safety Orientation Log
Health and Safety Audit Reports
Instrumentation Calibration Logs
Material Safety Data Sheets/Chem Data Sheets or Hazardlines
Medical Data Sheets (to be sent with injured personnel to hospital)
Medical Examination Reports (Physician's Written Opinion)
Respirator Fit Test Records
Respirator Inspection Records
o
o
o
o
o
o
o
o
o
A blank Medical Data Sheet is included in Appendix C of this HASP. A Medical Data Sheet will
be completed for each person working at the site.
Recordkeeping
Page 14-1
LtWORK\40I96\PROAphase hvhasp.doc
APPENDIX A
MATERIAL SAFETY DATA SHEETS
MaterialSafety DataSeeft Coilection:
3
-
Genlum Publishing Corporation
-iP
1145 Catalyn Street
Schenectady. NY 12303-1836 USA
(518)377-8854
Sheet No- 316
Benie: 1
Issued: I Ing
Revision: E, 8/90
Section L Material Identircation
'Bemnn (C,) Despi
gasoline. catalytic e
a solvent
Derived by fretiocal distianion of coal tar,
o peoleum, andtrnneai-ylaiouoetoaeby
a large number of macnas scha
i
reacin Used as
inks, oils, and fas; in
teroe aagr dodeylbenxne iort
m
OW10
- PdhdaFChen,
psubber,
of boinene or Pyrolysis of
R I
1
4
S
2*
-32
32
NFPA
K 4
n
iaoua.oil cloth, varnshe, and-lacquer for printing and
gphy in denigin
s
extraction and r-ie
uyand in
factones. Benene has been baned as an
use and is no longer usedn edes"ingaudiet i products intended for
Other Designation CAS No. 0071-43-2, bear, cabon oil, coal napbh, eyclohexabiene, mn!a napda, nitation
beirnae hn.
h
L.
Cide, hrobenerl
ashte ditclatest CaSICCIwCC BMCn'GfWS' 1 forea suppliers list.
Mamufacturos~~~~~~~
oriupicdslbm
Ar0ro
[OIWS
H 3
F 3
ppPt0
#el *
A
Cations: Ben
s a conimed hasna cacinotaby the IARC. Cronic L-lkevd epores m ar c nr(etmia)amdbowe
Ansrow darzge,with noy to bood-fr=ingdat- it is also a dangerous fire hazrd when exposed to heat or flame
:
Section 2. Ingredients and Occupational Exposure Linits
enDeae, ca 100%e
1989 OSHA PELA
(29 CFR 1910.1000, Table -1-A)
8-brTWA:1 ppm.3 mg/ms
15-min STEL 5 FIm. 15 mym'
1989-90 ACGIH
TLV-TWA: 10 ppm, 32 ngn'
(29 CFR 1910.4000, Table Z-2)
8-Ir TWA 10 ppm
Acceptable Ceiling Concentration: 25 ppm
Acceptable Maximum Pea 50 ppm (10 min)t
TWA:0.1 ppm, 0.3 mrng/m
Ceiling ppm 3 mnm
1988 NIOSH REa
-
1985-g6 Toxicity Datit
Manoral, Il:
50 mg/kg no toxic effect noted
Man. inhain, T,.: 150ppm inhaled intermiuently over
I yr in a number disrete, separate doses ffc the
blood (other changes) and nuitifonal and gross metaboEzra (bodymaFcasI)
,ipah
Rabbis, eye 2mg administerd ov 24 rpmduc sever
irritaion
1910.4000, Scbpu2.Sates dardie arun
bene andadin29 C 1910.1023appraesto alon a~a
inday stem exposre are cacady under die acion level 0,., dsibutic and ale of fuel, ted
oil sad gs ddling and provdca emna gas Pe-"ig and the prenate
adn for liquid mixture): for die ~
* OSHA29 Ct
sinhegmos
Table -2 appy.
t A
abl -e air
peak abov&e eacceptable celing o-~enwtion foran i-hr shift
t Seet OSH, RIC3 CYl40W00), for additonal iuntive, nuatiive, reproductive, tomodgenic, and touicity dam.
topo
bnene exept in soe
and piplies cote proMac
utaubnsegments, the bez
mits innsir
Section3. PhysicalData
-5
BiigPoint176'
'T
Molecular Weight 78.11
MetagPoint42'F (D
Sine Grvt (15
'C/4
C:0g787
YQwDPruL
100mtHIat7 9 '(26.1
WaterSoll0g1gofpat
25'C)
C)
%Volatle by~ounO
EVaportio(At =):.7 I
Ey~aradon
(Ether=-1):2.Vhosity O.6468 mPa at 20C
Appearance and Odor: Acoledess liquid with acharactedstic sweer, aa
odor.be odor recognition threshold (100% ofpanel)isaroximnsey 5 ppm (unfatigued) inair. Odor is no an adquate warning of aard,
Section 4. Fire and Explosion Data
-
Flash Point 12'F (-11.1 'C), CC
Autoignito. Temperature:928' (498'C) ILELC 1.3%Yv
UELU7.1% l
Eztlnguishing Medi Use dry emnical, foam, orcabon dioxide to extinguish benzene fir.Water may be ineffective as an exingmising
agent since it can sear and spread the fire. Use water
tmcool fireexposed continers, flush spills away frm exposures, dispose benzne
-
UalFmna
o?
Hazards:
hsa
lB flammabe likquid. A eoucconation cweding3250 ppms is cnsiered a poential
fiae explosion
Bennsvapor is heavier than air and can colleet in low lyn reas or trave to an igtion"source and flash
losivew
and famable bearsne vapor-air mixtures caa easily form at toom tempatre. Emtne .a ignition soncee where beaens is used,
or
stored.
entry.Since firs nay produce toxic futmeswa a self-contained breathing
Special
e4gting Procedares:solate bzard area and
(r A) wi h afuU facepiece o
in
tprts$raei
e ldor p
.mad r
and
d e
g
Snturl
mc
n D otelese0
f
te
stay aut of low areas. Beaware o rcannCtW
ghess protctive elod&ing provides rr '
sewrsc waways.. Runoff to sewer can create polution, fire, and explosion bazard.
Section 5. Reactivity Data
Stab~ity/PolymerzatLou: Benrene is stable at room temperature in closed containers under normal stooge and handling conditions. Hazardous
plymerzzation cannot occur.
Emkllz37 ncomptbties: Beazene explodes on cntect with diberate, permangaic acid, bromine pentafluoride. pcroxodisfic acid, and
pcroxomoaosulfuric acid. Is *nites on contact with dioxn difluoride. dioxygenytetrafluoobre iodine bep'luonde, and sodium perxide
1.ni
mtne
+ water. Benzene foam sensative, explosive mixtr wi iodine petafluoride, omne, liquid oxygen. silver padranitry pacd
acid, and arsenic pentaluoride
+ potassium meuthxide (explodes above 30 *). A viorous or incandescent racion occurs wi bromine
trifluorde, uranium hexafluoride, and hydrogen + Raney nckel (above 410 *(210 C)J. Beazene is icomnpatibk with oxidizing matcrials.
Conditions to AvoidS Avoid heat and ignition sources.
Hnzrdous Products of Decomposition: Thermal oxidative decomposition of benzene can produce toxic gases and vapors such as carbon
monoxide.
Oa-re-
-a-l3-9 -
NU--
a
r
o.316
Car
juf
*Benzene
&/90
tion . Health Hazard Data
oedty: The ACGIH. OSHA, and JARC list he=ne as.
-pvely.a
supeced human Carcnogen. a caer- huzaud, and, bad o
a human and ammal evidence, a human careoge. (Group
I)..
-
of Rsks: Prolonged skin aenae or ccessive inhina of ear e vapor my cause headache, wealess.
a
'e o and fatigue,
mst "oau health hazards are cancer (leukemia) and bone marrow damage with injury to Wood-foaming tissue
chro lw-le
Hi
vel exposures may irrtate the respirtory trc and cause cen-'al nervous system (CNS) depression.
Medical Conditions Aggravated by Long-Term Exposur: Exposure may won
ailmenm of he ear, bangs. Ever. kidneys. Wood. and CNS.
U
Brav
central nens system, bone marrow. eyes. upperrespiratry tract, and *in.
try Routes: Inhalation, skin cota
ectecdw Symptoms of acute overexposum include irritation of the eyes, nose, and respiratngy tract, bmatalesness, cuphowianause,
s.
headachec dizziness. and intoxncatno. Severe cposure may lead to convulsions and -ncosciosness.
Skin contact may cause a
J
rash (dermatiis).
c Effects: Lang-term chronic exposure may resaut in many blood disorders ranging from aplastic anemia (an inability to faon blood cells)
1 ary
AMD
-CGently lift the eyelids and flush imo~tyand ontinuously wit flooding =aonts atwater until transported toloneeecy mdical
c onsl a physician inumediately.
remove contamineated clohing Immedi=ey rinse with flooding amountsof water for atleas 15 min. Forseddened or bisteed
tconsut a physician. Wash affecMe"aea wit soap and water
titm: Remove exposed pe
to fresh air. Emergency personel should
against inhalation exposur. Provide CPR to support
or cialation as necessary.
awake and !ns
to a medical i
IngesoNever ve anything
mou to an uneoascioue a convulsing peon. in
do arinduce vouairngsince aspiration may be
firtapp
a rprite platparameicor commune tedlaIlupr
h *idn'
Not: Evaluate chronie exposure swth aCC~ pheloage maydbe udfor igns f yr
*c.Poexws1n
±alindicators of leukemia with a bone marrow biosyno'l=
conugtsOay
sdfo0iloiaCmntrigasettexoue
Atemenagement is primarily supportive for CNS dersin
on 7. Spill, Leak, and Disposal Procedures
:
-..
p wnwlad0e nmrareplan (SCCP). Notify safty personnel, evacuate all unecearmy
'"O"t e!"nmn all beat ad ignition soures, and provide adequate ventilation.
against vapor Ihaadon eye
and skin absorption. Absorb as mach benzene as pobe with a inert, naoerias.
For l
spils, d
ar abiad of spill
tpUU " Designandprcca be a
cootain liquid. Use nonsparking tools to place wastt liquid or absorbent into cloable cornais for disposaLee wate outf confned
ces such as sewers, waersheds, and waterways bec=us of
d
-losion
Foger
iallow applicable OSHA regulations (29 CFR 1910.20
Disposak Contact your supplier or a licensed contractor for
recondations. Folow applicable FeraL state, ad localreguladon.
~ADesignations
pdas a RCRA Hazardous Waste (40CFR 26133), Hazardous WasteNo.U019
as a CERCLA Hazardous Subsanc (40 CFR 3024), Reportable Quantity (RQ): 1000 lb (454 kg) ( per Clean Water Ad.Sec.307(o),311
1I2 and per RCRA, Sec. 3001)
SARA
HazardousSubstance(40C=R3S5):Notlsted
as SARA Toxic Chemical (40 CFR 37265)
-HADesgations
as an Air Con'minant(29 CFR 1910.1000. Tables Z-l-A aod Z-2)
r
Section & Special Protection Data
-.-
Wear protective eyeglasses or chemical safetygoggl per OSHA eye-- ad faco-protection regulat (29 CFR 191043)3
rator Seek professional advice r to scspkair
~n
ctio ad us. Follow OSHA respirator regulations (29 CR191034) and,if meeswear a NIOS-approved respira.For nergency orwwoutie operations (cleaning spils, ractot vessels, or strage tanks) wan
CB W
3wainqgIAbr-p uinrespirardo
not prtectwarkerisagas-d4Jcieabnaphra
Mpe Wear impervious gloves, boots apcons, and gaunets to prevent skin contact.
Pfotdde*general and local cxploslon-cofwudran systems to maintain airborne oncutio atleast below wOSHA PEIa
Lcalhast ventlation is pcetumed sic itptei ent,, ar.minntdispersion Into the wo ar bycotrolg it at its source.cu
t
EMs Make available in the work an emergency eyewash stations, safetyfluk- ch shower:, an washing faeiies.
abntamited Equipment: Never wear
s lasts in the work ar. softhases may absorb,
all nses concnrae, rnitan. Remove this
froan
shoes and equipmenr
andcoaminned dothing before weaing.
,
ea, drink, or smoke in work arasPcie good personal hygiene after using is maetea=, especially before caing, drnig
anonthe tid, or applying coscs-
iection 9. Special Precautions and Conmnents
2
:
-
-
Rn Stre itightly closed containm in acooL dq. well-ventilated aa away from all heat and ignitin souces mad
E
mIinateriais.Cazstio BOMe tpWr aaayflrat
m
os
inurerin air.To prevent static sparks, eleercly ground and bond all
d equipment used ' shipping,receiving. a fnin g operations in praducion and storage reas. Whenopening arelosing
czene containers, use
tools.Keep fire extinguiers readiy available.
. Controls: Because
sp eicinly regulatesbenme (29 CR 19104028), educate wodrs about its potential hazards and
Minmize all possible exposures to acinogens. If possile, substinute less toxi solvents fhr beene- use dhis masat with e
and only if absolutely essentiaL Avoid vapor inhalatin ad sin and eye contat Use only with adequate venile and appote
snal protc
g .Institute a rs
ry poto
prow tht incudes regular trining,
ane ,inspect,' and cvinadan
ksignate regulated aas of benzecne use (sce legend in the box below) and label ben-ne cesiner with "DAN . CNTANS BENZEN,
Prtions:Provide preplacement and periodic medical xaminrations with emphasis on a history of blood diseaseor previous exposure.
Transportation Data (49 CFR 172.101,.02)
IOT Shipping Naue Benzcc (boaolo
)OT Hazard Clas Flammable liquid
No.: U11114
Labe: Fammabk liquid
IMO Shipping Name: Beaene
IMO Hazard Class:3.2
ID No.: UNI1l4
IMO Label: Flammable liquid
T Packaging Exceptions 173-118
lOT Packaging Requirements: 173.119
IMDG Packaging Group: U
DANGR
CANCER HAZARD
SMOGGO
FLAMMAIEF
AUrHORIZED PERSONNELONY
RESPIRA-OR REQURE
CIFD cI-. Refer"ees:.12. 12.26 73.U4-94.100101.103, 109, 124,124 127. 132,134,134 13. 139. 143
by: M1 Alison. 8S: Industri. Hylcene Rcvlew: DI Wlmn. CMH Medkal Revkw: M3 Upfal. MD. MPH; Edfted by: JR Sun. MS
r
my" so e .car
ibircm o.,b udmaw to
9,,
c~mte rwbvm~
rp
awcv
w~
dfim
MaterialSafety Data Shees Collection:
Genium. Publishing
Corporation
1145 Catayn Stree'
Scbenectady, NY 12303-1836 USA
(518)377-854
Sheet No. 757Coal Tar Creosote
Issued: 7/91
Section 1. Material Idendfcadon
Coal Tar Creosoe noecular tonania "im with pudty) DesedAdMe:Thee main dedvadoet by
dislluion of coal
p caatrc Cfbonidion of bitminous coat by mxin strained naph
e oil. wash oil. and
strained or light anthracene oiL as a by-ptoduct of conventional coal cokIng It typically contains up to 160 chsmicals,
mainy aromatic compounds such as pheol
andpyridine.Used mainly as a wood preservative for railroad ties,
*fe ceposs manne pings. and oedr
for outdoor use aa wer-proofing agent iOil o05erment
mecagent for mir
se araio.a hp derian and lubdeant for die molds in mfacdng oheicals: and in
as an ntsepic disinfectaan,
,apyre tac. ger, *H'and
Other Designations CAS No. 001-584-. Awp. bdck oil.
N
coal tar oil, &SO, coste OI
ceosonmn, cresylic creosoteheavy oiL l
onil
en-oiPreserv.o sore, salkesotcomr oil, wash oil
Manufacturer Cnactyour supplier
. Consuk latest CIe1wal WeekBuyr'GuiddU fli a supplies list.
Cano=
lammable, liquid coal tar creosote is toxic by Inualadon Iniesion and skin contact. The ARC and NTP
tar todifld by hiH4
classify it as
a rena
n
rSkia absorpmion
with phenol, a MajorcponeqoM
34
R
I
3
K
1
N-A
4
4V
2
\
"skin
absotic
12
P
2
F 2
Mat
t Sc. a
Sec.ge8
of coal tar crese=
Section 2. Ingredients and OccupatIonal Exposure Lmits
Coal tar ceoso,
ca 100%
1990 OSRA PEL
8-hr TWA: 0.2 mg/mt
1990-91 ACGIR TLV
TWA: 0.2 mg *
198546 Tohicl Datat
R. oral, LD 7
r toxic efects not yet reviewed
Dog oral.
600 k toxic effects not yet reviewed
R04 a'gadai
d dnuig 91 dys pior to matng
exractable
prodcason
falopiantubes and ovaries
M Os ski, : 99 Ugkg produces wnnors in dn and appendages
1M9 ILH Level
19 NOS
REL
70ormin- 0.1 mg/u (cyhme
portio
-
pnred vod.oeo
RECS(GFS0).
eAs coaitr
t See NS.
Section 3. Physieal
Boiling
foradcdson ami
rpcodnetn.
riio.
nd otastit
dt
-
Data
e dia: 381 to? 52 f (194 to 400'c
Molecular Weg t. vares
fih purity
Dat
on Rang e: 6 to 554 fT (230 to 290T'C)
Denslay/Spefic Gravityl1.07 to 1.08 at 6 s (20 'C)
Buat of Co E osiona2.5t
Blab
-Water Solubility: Sightly soluble
Keos Vaporizati:,
looBtu ab
Appearance and
Odor: Pure coal tr cresoto is colodess. but the industrial
product is a yeulw to black oiy liquid with an aromatic smoky
smer and a buing c ade so.
Section 4. Fire and ExLosion Data
PShb Point:u165.2'F(74C), CC
c
Anteiton
t1peare 67'F( C )e c I LELe Normspore sa d U lE gondtponed
er regular tom For Imai
w,efog or regula rfoam. Since
ExdneIshing Media:Forsmal fires.use dry chial.e carbon dioxide(W
wat is least effective, use Itas an extingisin agent only when the pref=6 measures are unavailable. Howeve. use wate spry to cool aire-
Uanausol
ymrExplosion Hazards:V
my
avel to an
'Gon scur and nash bac. Cnnaies
may explode in bog of JIM Cod sr
do
tur
Since fit amy podue toxic fumes wear a sel-cotait nedwppeasr)ihfoflca
Oaado inpreuo-desand or posdoe-prmal '
od. Also, ear pUl pmotdicve caohro. Stay an r
ends of tanks. rnd tiV fie i
Wag area use mionitor d=1i or u nnnd= h Ose hodr;If impossile withdraw from area and let firnbum Imnwdimy leave aem If youaro
a riang sound from venting safety device or nodice any firc-caused tank discoloration. Isolat aroa for V/2 mil in all dircops if rec In vocs
tawk, mail car or tan uck. Be aware of runoff from fire control methds. Do no Pelease to sewers or watewaysL My dieroamninate or properly
d3sposa of personal
protective clothing. oindorsndwehooso
Cecalot
In nasiiltexpCoso
a idin ls edcn.nrcue
niceseI
eprtr
n rsue
Section
S. Reactivity
Data
Coal tar creosote is stable at room tiemaure in closed containers under normal storae and handlin conditions.
=Stability/Polymerisation:
Hzruly
miztocantcur
Chemieal nciaties:ti Creosote oil mixed with clorosulonic acid in a closed contane causes an increas in temperature and pressre
Condition to Aod: Avoid excessive het wA contat with chlorosulfonic acid.Hazardous Products of Decomposition: Thermal oxidadve decomposicion of coal car creosoto can produce oxides of cabon and thick, black,
acrid smoke.
cofyddait 0 199
W Nb
Oenin
An co~mrerraJ us or rcducon
.
keTf
Irepe
c OsAq
Witoub e pubicher rminion
K pretMed.
aection 6. HeaIth
Hazard Dat
Carcinogeictr
In 1990 reports. the MRC. NIP. and OSHA
lisr coal tar creMosoe as a
'
Swmaiy of Rtkc Coa tot aaoso
by a
inge~stion and skin contact. It contans avariety of boebos such as sha Wn
potycyclc anrmti hydiocarboos suchIsastoic
benzo(a
n wAdrvtvs h
Vo~xct efu dM
~sr
COnctatiauc. amont. ad duraton Effects may 1f,"rn
b40
Medica Condib-ons Aggravated by Leag-Term Exposure: chronic repi atrskin diseases.
ganm Eyes. s.bladder, kidneys, and respiratoy systm
Fnmnsry
inke*
and akin contact
I
-
Acute
Skin conct may case i
bundig. t
ne , pigment changes. da
is (a rash of remdes and sma bun
bums. Phorosenasitizadon (w o
fnm
rash With es r eccr
r
may beh
contact may cause cojuinenhvicis
of the eye'a
(corneal inmmaion), Or
bumWs
i
rsul m omsc, vonunag am
discss. and shock. Systemic absorption by any rute (Tc
a
cston
Epsue
doses (parcucflajy by inge tion)ay beW
dinine, headac nous
e
vomiting salivatio and
Chronk Efec: Dermatis, skin encer, and b cadre
nag
-
I
3
or
may
y: endylift the elids and flush immedately and condnuoudy wit fooin amounts of water ul transported to an mergenay medial
facihty Dor wet victim tubes or k
1idm Qstc
y remove contamiated
Wa
consul a physician.
--
em fihl
osed anntl a py
.W
eced ama with soap
= rfim
tnly.
flooding amounts of water for at least 15 min. For reddened or
Remo exposed peson to fresh al and supp breahing as needed.
Nev give,
mouth to anunconscumor convulsing p
Ifon.
Ifingested. have that consciow person drink I to 2 glasses of
After fir
d, get a
a isn.
or comunity mediel support
Note to flqsuda- &eSo
b
Inurne.
Section 7. Spil, Leak, and Disposal Procedures
Siilu
Notify
personel. Isoa hazard are,
f~~~mesm
inhzr ra
S
S
p esne
hud protect
en
try, and Sy upwin Of sIs. Shut off all Ignitiotn
soursm ffizes
vj~aporih
be used to reduce vapor but it may not prevent I
ad
nneZnom
ta
ter and
i ab=e1comnas for laer
plicable OSHA
Enviromuental Degradaton: Coal
cre
6o)
nue
Of creosote an coal ar D
W:
your supplier or a
*
(29 CFR 1910.120).
oln. or
on and skin or eye contact If possible with no risk, stop=ek.
ate
For small spills. take up with eart. sand, vermicuite. or other
Plor large spills. dike far ahead of liquid spil forlater
I: godsh (Camsurrsau s), 3.51'ppn24 hr
wir nlns). 1.260 ppm/S Sys (604) mixture of creosote and coal tar.
reco ndauions.Follow applicabe Federal, state, and local regulations.
i foulng to
Mrshoreline. Ecotoxiciky values are
bob whir qu (ComH
isted sa RCRA Hazardous Waste (40 CFR 261.33). Hazardous Material No.U051
I SARA
Jstedas a CERCLA Hazardous Substanc* (40CFR302.4 ,rt
Quantity (RO): 1 lb (0A54 kg)
Extremy Hazardous Substance (40 CFR 355): Not
[O
per RCRA. See. 3001]*
Listed as aSARX Toxic Chemical (40 CFR 372.65)
OSHA Designations
Listed (as coa tr pitch voletiles) as an Air Contahinant (29 CFR 1910.1000, Table Z-1-A)
Section& Special Protection Data
Goggle Wear protective creglasscs or chemical safety goggles. perOSHA eye- and face-protecdon regulations (29 CFR 1910.133). Since
*
conta~t lens use in industry is controversial, estblish you own polc.
Respirator: Seck poessional advice prior to spr or selection duse. Follow OSHA respirator regulations (29 CFR 1910.134) and, if
S
, wpt NIQSH-agd pinsor For eineigency or o
ue
ions (ciesung spills. eaco vessels, or stomge tanks), wea an
3mA
anMtI Air-punhnn rapnar do notpf0Arwr=
i n.yameffw ans~rs
Other
Wear i
%o
the
oves.boots, po and ganaes to prevent skin contact. A
a layer of petroleum jelly or lanolin castor oil
ceduces vapor contact ard penetration through akin. Frequent chango o protective garment is an addidonal protective
Vendiiom Provide gents and local exhaust veniladoay mnns
aqqnp wie hNgh-efllcieay particulate an toaintain aimne con.enstations below t.e OSHA PE (Sec. 2). Ioeal exhas ndton is perre since it prvevcns conaminant dispeion into de work are by
oonholng i ait sourco~l
Safety Si-tie- Make available she
In work area emergency eycwashsai.safeWnquick-drechhowrns. and washing haczies.
Contamnnated Equipment: Take particular cae to avoid any conamination of drains or vcntlation duct Remove this material foM your shoes
and eqwipment. I aner contaminated clohng before wearing.
I
Conints: Never eat, drink, or smoke in wort areas. Pradicegood personal hygiene after using this material especially before eag
Smokng, usin the oilet, or applyin
c
smetics
drekinkilg,
Section 9. Special Precautions and Comments
Storage Rulrementt Avoid physical damage to container. Store in a cool, dry, well-ventilated area. Store coal tar crcosote as close to area of
use as ,
to ninimize transporing distance.
Engineering Controlsa Use engineenng controls to keep airbome concetrations below the OSHA PEL Institte a respiratory protection
program that nles
regular training. maintenance. insp'ction, and evaluaton. Always perforni synthesis and purificadon procedures under a
verWca ventilation hood and make regular operational safety chccks. Label doors to rooms where coal tar crcosoweis produced, used. or stored as
c ocate
ency equipment at nil-marked and clearly identified stations in casc emergen escape is necessary.
Other Prcud
:and
Periodic medical examinations of exposed workers e
'wjadzng
respiatory, skin, liver. and kidney
disordersincluding comprbcnsive work and medical history, physical eainiation. CXR.
s. urinalysis L.
and spunmm cytology as the
atrending physician considers appropriate. Educate workers about coal tar creasore's carcinogenicity and proper handling procedures to avoid
I
-
Commens- Caution is In order when handling or sawing old creosoce-zrested lumber since it crtains a considerable portion of creosote for
up to 25 to 30 ycars.
Transportation Data (49 CFR 172.101)
DOT Shipping Name: Creosote
DOT Hazad Class: Flammable liquid
ID No.: UN 1136
DOT Label: Flammable liquid
MSDSCfSC-o~ud Refercnccs; 26. 73. 100, 101. 103,124.126. 127, 132, 133. 136, 138, 139. 140, 142, 143. 146. 148. 153. 159
PrePared by: M Oannon. BA; Industrial Hygie Revtiew: Di Wilson, Ct; Medical Rrencw: Mark Upfal. MD. MPH; Edited by: JRiSuan. MS
-wu1
ICI.±CS mos,.AIhgfn.bktfl
0hc
hn
bk";s
Wc. .
prn.0..
.Lne
biawnk'. Ocaa ru .bcw
5
Co~pcto. remc -- a~m.a .
36
"0poffpnt
15*
sfiaaIsp-
IG
-
---
%X444%666-
-
-s
-
-
Sheet No.470
Diesel Fuel Oil No. 2-D
1145 CatalynStreet
Schenectady. NY 12303-1g36 USA
(518)377-854
Issued: 10/8
Revision: A. 1I/90
-1331A
Section 1. Material Identification
Diesel Fad On No.2-D Descrpti Diesel fuel is obtained from the middle distila in petroleum separation; a distillate R
oi of low sulfur content. It is composed chiefly of unbraced paflins. Diesel face is available in various grades. one of- I
which is synonymous with fuel oil No. 2-D. This diesel fuel oil requires a mini-- Cetae No. (efficiency rating for
diesel fulomoparable to octane number ratings for gasoing) of 40 (ASM D613) Used as a fue for trucks. ships
other automotive engines; as mosquito control (coating on breeding waters); and for driling muds.,.
Other Designations: CAS No. 68334-30-5, diesel fuel.
Manufacturer Contact your supplier or distributor. Consult the latest CAanicatamWkBuyer/Guidd# for a suppliers list,
I
NFPA
-
9d
2
HMIS
H
R 0
PPG'
Caudons Diesel fuel oil No.2-1 is a skin irritant and central nervous deprssant wish high mist coocentrations. It is neviimecW
hazard andmoderate fire ris.Sc.
Section 2. Ingredients and Occupational Exposure Limits
U
Diesel fuel oil No. 2-D*
1990-91 ACGIH TLV -1U NIOSH REL
989 OSHA PEL
Nose established
1985-86 ToxIcity Data*
Rat, oral, LD,: 9 g/kg produces gasoinfstia (hypermoility. diarrhe)
effects
None established
Mineral Oil Mist
TWA:5 mglm't
10 mg/m 3
-*-
SmE.
I
Diead fad No.2-D Seads to be law
i amontaics and high in parainfica:Iis thet ili comnx i
of: 1) >95% paraffinic.olcem-ud, mlarb
and
(<100ppu* (A low benelevelsd cscasenogeie Rist. roel oils ca beex-anp undertbe
hydrocbos, 2) sulfur (.%). aind 3) ba
bene smtndard 09 CR 1910.IO28). Alhough low in the fuel itsel beaene c-oncMatin HWy to be much hiber in procesng area.
Assaplek by avnaper-conectg metbod.
* Mouitor~OCSH. RfT30QZ130000), forrure taticity data.
acsic
I
Section3. Physical Data A
!
-
Rolnng Polnt7Range 340 to 675 T (171 to 358 ')
Vscostr 1.9 to4.1 centistoke at 104 ' (40 T)
Speci-Cc Grvlty:<tJ6
Water SolubltyIJnsoluble
i
'Utff:y
.-
Appearance and Odor Brown, slightly viscous liquid.
Section 4; Fire and:Explosibn DataY
ij
UEL 7.5% V&
dxe, orfoamto fight f.Use a r spray to cool fie exposed entainers Do not use a
Ry
Extiguising Medic Use d chemicarboc
fcedwat wqay decdyon burig oi since this wills-anrthf fire.Use asmotdg technique forextinguising fir
Unasuaflmeor Exlosonasraeds Dieselfuel oRNo.3-D i aOSEHA Clas cmassibequid.Rtvs tMy is nneto that ofgas 0i1.
Flas
Nt:125*F(S2'C)i
. .
Astolgniton Temperature: 500 T(932 ')
LEL: 0.6% v
Vaposmay travel to a source of Ignitinn and flash back.
Special Fre-flghdng Procedures: Moat 1hard aea and deny cny. Since fe may produce toxic fmes, wear a selfkoantin
breathing
dn crposiie-psure mode and full protective odthg. If faibe,
apparatus(SCA) wit a ful facepiece operated in theptesure
remove containers from fire. Be aware of runoff from fire control nedods Do not release to sewers or waterways due to pollution and fire or
explosionazard.
Section5;. Reciiy<ta
+
s
M
i
j
g
MM
:-li
Stablity/Polymerization: Diesel fael oi No. 2-D3 is stabe sroom temperature in closed cnntains undernormal sorage and handlgcoaditions. Hzardous polymerization cannot occur.
Chemical Incompatlbiltest t is incompatible with strng oxidizing agents; heain greatly increates the fire hazard. Conditions to Avoid: Avoid heat and ignitioc sources.
Hazardous Products of Decomposition: Thermal oxidative deconiposition of diesel fuel oil No 2-D can produce various hydrocarbons and
hydrocarbon derivatives, and other partial oxidation products such as caton dioxide. carbon monoxide, and sulfur dioxide-
0o
moc=..mi.xMn
caes
-
arcnogenlcy Altho
fa an
e
ILARC has not assigned an ovral evaluation to diesel fuc as a roupk has evaluated occupationaln
probable human ercimogen (Group 2A). It has evaute-d isa (lght) diesel ala not clasabe
rS h inra
amary Risks:
Q Although diesel fuers toxicologic cffects should resemble keosine's, t
arc somewhat more prouanced due Io additives
cha sulfuuned esers. Excesve inhalation of aerosol or tist ean cause respirtory nract rntation. headache dinnc nasea, vomitingand
m ofcooreinaioa,.depending oa covcemtration and exposure te. When removd from
area, affected prsoans nsally recover
"T'ayIf vomiting occurs after ingestion and if oil ,s aspirated into the lungs.
and pulmonary edema. progressin to renal inIeCment and chermcal pneumonitis, may result. A comparative ratio of oral to aspirated lehal doses
may be I pt vs.5. . ration may also
suit in bansuat CNS depression or excitement. Secodmany effects may include bypoxia (nsufficient oxygen in body cells),' ection puesmao1C (ormatino, and chronc lung dysfunction. Inhalt
may result
pr
cardiac d
mias, respirary arss and CNS oict
Soonged or repeated skin contact may irritate hair folicls and block
glands.
' a ra of acne pimples and spots, usually an
UI a Coeditions A rvated by Ln-Term Exposure: None reported.krget O sa: C
n erVous system,
. and mucous memubranes.
knary Etry Routes: efnfasfn ingestion hi
Systeeffcs
from gesUo
inud gastronestinan irritation, vomiting. dianbeA, ad in severe cases central nervoussem
progressmg to coca rdeath. Inhalan of aerosols or mists may result in icreased rate of respirato, tachycardia (excessiv
id
beatand cyanosis (dark purplish discoloration of die skin and amcous membranes caused by defieient blood oxygenation).
nloe eets: Repeaed contact with the sin causes dermatitis.
ltthe eylids and flus immediately and continuously with flooding amoant of water untifil trnsported to an emergency medic
Vemove cona a
*. Rinse with
mounts of water rat least 15 min. If large areas of the body have been
persists,
r
get medicahe
ash affected area wit soap and water.
aation: Remove exposed pesn to fresh azr and support
hinasneeded.
s
rmmothtan
by
on-anas or convul'ig perso. If ingested, do ow induce vomiring due to aspiration hazard.
terurt
get proa n-lant,parashedlcor communItymedicalspport.
4e to
ne
lavage is contraindicated due to aspiration hazard. Prefcared antidotes are charcoal and mil In cases of sevee
3rnn
"""e"v"l consid.nnioring aneial blood gases to ensure adequate ventlation. Observe the patient for 6 br. If vital signs become
Wor symptom%develop, obtain a chiest x-ray.
9? a physician immediately.
f
ction7. Spill, Leak and Disposal Procedures
-7 .
m otif safety personnel, evacat area fore spills remove all heat and ignition sources, and pmvide maxinu ep
m uier
Mso esold
a vrtcta
portinhalation and liquid contact 4Cea up spills promptly to reduce fire orvapor
.
aanl
'upsmaabsorbealnp
spills orresidues For lgels,
dike far ahead to coutn. Pick up liquid foredamadrsposal. Do not release to sewers or waterways due to health and fire and/or
o
bawd. Folow applicable
reguarins (29
~R 1910.120). Diesel fuel oil No. 2-D spils may be environmental hazards. Report
tact your supplier or a licensed contractor for de-iled reeommcnc s 01l6W applcablc Federal, state, and local regulations.
Wate (40 CFR 261.21): Igntable waste
HSazardousSbstance (40 CFR 3024): Not listed
.RA Extremely Hazardous Substance (40
355): Not listed
Toxie Chemica (40 CFR 372.65): Not listed
A Desinaons
Cootaananan (29 CFR 1910.1000 Subpart Z): Not listed
ction & Special Protection Data
K or chemical nfety goggles, per OSHA= and face-protection regulato (29 CFR 1910.133).
ad=Weepoor to respirao setion and use.F
OSHA respiatoir regnlarin (29 CER 1910.134) Ad if neces
r steetivae
ln
o
wih a s fibrer and orgaV= vapor enaridge. Foremergency or omotin
en
(clea g spil
ctorves or s to
ks weranSCA.Wrng Air-pu fyfag reqhando noprcrworkmrin yxwm-dfcieaonospher.
S Wearlnpervious goeboa
~Si
f
r.
Rowad gaun-det bprven skin contact
kide
labl
a
invenda
I~nal
snt edmn"is
aioni
e
n
drtinsthaworker safety ad
sinc it prvnssystemi maintain
iprsa -dm~n
nothe bodeMar
at fts son~or=
areag g
e
sh san, safetyfliclk-drecch showers,
washing
ides
an u d Egaipment: Never wear contact
n
the w areasofflenses
er
may absor. and all Senses concen
, frandtn.Ramve ts
dfiom
ourdi and equipment. Landerennremiboe clothing before ang
ca,
nk, or smoke in work reas. Practice gdod personal bygiLne after using this mteda, especialy before cadng drinng
Pa
Ma Equipme
la: In
we
usigbe tolecrapplying conieis.-
ction 9$ Special Ptctutionsiand Cdmments
r.,.tg. t
nr s<a
geRinewnts: We and stoag conditions should be suitable forna OSHA Class U Combustible li'quid. Store in closed container inna
ZFS
arewa from hea and Ignition sources amd strong ozidii apeoMs proect containers from physical damage. To prevent static
I~~ntt
and bond all conainen and equipment used in shipping. teceiving, or transferring operations. Use nonsparkng tools
equipment No smoig in s
e or use areas.
trols: Avoid vap or mist inhalation and p
skin ntt Wear protective rubber gloves and chemical safety glasses
rwthii gh stconcentration
may occur.
sab
etional otecve clotg may be required dependin on working
"*stte a resp
protectiont
that includes regular *i
maintenanee
t
and evaluation Practice good
hgeeand housekeeping w uesk ) not wear oil contanated loin.Al least wekylaundering oftwork clothes
is reom-
elecuicalWy
Cdon
IPackaging
Lred
Mid. Ionot put oily rags m porckes When working with this material, wear gloe or use barir creant-
Data (49 CFR 172.101)-
ShppngNme: Fuel oilHandClass: Combustible liquid
4.:
NA 1993
Label: None
viedr.
;ICj rcye sigusr
qWhenof
e
ain nIO
resa wad
as meoc:
saa~k' =we,
Exceptions:
17318i2
tk Doppw
(49
1d2-101
cthis m
Wo
a or oi.
a ed
aeriw=.in a red=
qykingwit
Packaging Regninments: None
nwe
l u d
er
Z ren
vesog.Ar a~e
we rt aff cmnanan.laan
coFq..
ri goe.k
l t e i e o
)S Ceffedafefeneesz1.47 12.73. ,101. 103, 126. 127 132 133, 136.143, 146
by: MI Allisco. BS; Industd~al Hygiene Review: Dl Wilson. CiH; MedkcAl Revdew: AC Dadtington. MD: Edrced by: JR Stuarn MS
..
r....r.C......r..r..---.-'
...-------.'..........-..-.-----
,............--........n.mM
..
pta.
No. 385
Materia- Safety Data Sheet
from Gcnium's Reference Colection
ETHYL BENZENE
Genium Publishing Corporation
1345CatalStreetU
-183USA
S
ady, N
(518)377-8855
SECTION
(Revision A)
Issued: August 1978
Revised: November 1988
u"'"e cona
"""
1. MATERIAL IDENTIFICATION
27
Material Name: ETHYL BENZENE
Description (Origi/Uses): Used s a solvent nd as an intermediate in the production of stywne monomer.
Other Designations: Pbenyledan; Ethylbenzol; CACH,; CAS No.0100-41-4
Manfacturer Contact your supplier or distibutor. Consult the
Buyers' Guide (Genium ref. 73) for a list of suppliers.
NFPA
RI
HMIS
H 2
est edition of de ChcAscuwek
-
F
3
R
0
13
PPG*
*See sect.8
SECTION 2. INGREDIENTS AND HAZARDS
%
-EXPOSURE LIMITS
Ca 100
Ethyl Benzane, CAS No. 0100-41-4
K 4
OSHA PEs
-HrTWA: 100 ppm, 435 tng/mn
15- Min SIT: 125 ppm, 545 mg/n
ACGIH TLVs, 198g-9
TLV-TWA: 100 ppm. 435 mgh'
TLV-STEL 125 ppm, 545 mghn'
Toxicity DataHuman, Inhalation, TC,, 100 ppm (8 Hrs)
Rat Oral, LD; 3500 mgtkg
*Se NIOSH. RTECS (DA0700000), for additional data with references to
reproductive, irritative, and mutagenic effects.
SECTION 3.. PHYSICAL :DATA.2
-
Boing Point: 277"F(13C)
Melting Point -139F (-95)
Vapor Pressure: 7.1 Tou at 687 (20'C)
Vapor Density (Air = 1) 3.7
% Volatile by Volume: Ca 100
Molecular Weight: 106 GramsvMole
Solubity in Water (%): Slight
Specife Gravity (,0 = 1): 086258 at77'F (25'C)
Appearance nad Odor A clear, colorless, flammable liquid; chacteristic momaic hydrocarbon odor.
SECTION 4. FIRE AND EXPJLOSION -DATA
Flash Point and Method 647 (IC) CC AUtoigniion Tempemnr
8107 (432.22'C)
ILEl 1%vtv
UEL 6.7%v/v
Eztinguishing Media: Use foam, dry-chencal, orcarbon dioxde to puteethyl benfire A water spray may be ieffectve inextinguishing de ft, because itcan scaier and spread the buring liquid. Use water spray to cool fiu-caposed containes ofethyl benze4 to
it 'is
dispere ethyl benzene vpor and to protect personnelhanempting to stop an edhy benn let Unusual Fle or Explosion E
liquid can Cadily form explosive vapor-ar sham es, especialy when hestd. Etyl benzen vapor Is heavier than air and may nave aeonsiderable an
to a low-tying soarce offnitin and flash beek to its oigin. Sped.! Fre4gbdng Procedures: Wear a self-coataned
b:athing apparams (SCRA) with a fNl facepiece operated in the pessureeman- orpositiw-presse mode.
SECTION -5. REACTIVITY§DATA
T.-
:-T7'
-
StabliltyiPolymerizaton: Ethyl beanme is stable in eloed containets during routine operations. Hatardous polymerizaioo cannot occur.
'
Chemical Incompatibtlldes: Hazardous chemical reactions can occur between ethyl benzene and stong oxidizing agents, acids, nn
and bases. Conditions to Avoid Avoid any exposure to sources of ignition such as heat, spaks, open fame, and lighted tobacco products,
etc., and to inconpatible chemicals. Use caution when enteing confined spaces, particulady low-lying ares where explosive concentrations
of ethyl benzene vapor may be pesent. Provide good ventlation to such =as so prevent the conceuration of tis vapor. Hazardous Prodncts of Decomposition: Thermal-oxidative degradation can include toxic gases such as carbon nmooxide md/r aromatic hydrocarbon gases.
SECTION 6. HEALTH HAZARD INFORMATION
:-
Carcinogenlity: Ethyl benzene is not listed as a carcinogen by the NTP. IARC. or OSHA
Summary of Risks Ethyl benzene vapor is severely iritating to the eyes and to the mucous membranes of the respiratory system. Sus tained inhalation of excessive levels can cause depression of the central nacrus system (CNS) characTized by dizziness, headache.
narcosis and com& Skin contact with liquid ethyl becne causes irritation dermatitis and defatting can also develop. The acute Ma! toxicity
of ethyl bezene is low; however, ingestion of it presents a serious aspiration hazard. Aspirating even a small amount into the lungs can
resultin extensive edema (ungs filled with fluid) and hemorrhaging of the lung tissue. No systemic effects are expected at the levels that
produce pronounced, unignorable, disagrecable skin and eye irriaton. The TLVs cited in section 2 ar set to prevent this intolerable
iritation. Medical Conditions Aggravated by Long-Term Exposure: None reported Target Organs: Skin, eyes, respiratory system. and
CNS. Primary Entry: Inhalation, skin contact Acute Effects:
Irritation of the skin, eyes,
and respiratory system. Also, cardiac-rhythm dis-
tnrbance due to sensitization; acute bronchitis, broochospasm, pulmonary and laryngeal edema; cuphoia; headache; giddiness; dizziness;
and incoordination, as well as possible depression; confusion; and coma. Chronic Effects: None reported. First Aid: Eyes. Immediately
No. 385
ETHYL BENZENE
11/88
SECTION 6. HEALTH HAZARD INFORMATION, con.
E
flmsh cyes. including under the eydids. gently but thoroughly with flooding amounts of running water for at least 15 riinates Skin. Rinse
the affected wra with plenty of watcr, then wash it with soap and waor. Inhalation. Remove the exposed person to fresh ai; restore andler
support his or her breathing as needed. Have qurredmedical personnel administer oxygen as required. Ingesdon U.cltly. Should
this type of exposure occur :he aspiratioc h:srd sst be consdered. Do mot induce vomiting unless directed to do so by a physician. To
prevent aspiration by spontaneous vomiting, keep the victim's bead low (between his or her knees). Get medical help (to plant, parmedc, community) for al exposures. Sock prompt medical assistance for uIner reiman, observation. and support after rust aid. Note
to Physician Professional judgafet is reqeired as so whether or not to indce vomiting because of the possibility of aspiration. A gastric
lavage may be administerri, followed by saline caharsis, if this procedure is appropriate to the specific incident. Moniutor cazdic and
puhnouary unctions.
SECTION 7. SPILL, LEAK, AND DISPOSAL PROCEDURES
SpN/Lenlc Notify safety personnel, evacuate nnccesuy personnel, elimina2e all sources of ignition immediately,and provide afequate
aplosi-proof ventilation. Clienup personnel need ponection against skin or eye contact with this liquid as well as inhalation of its vapor
it with an inert material-such as sandparth, or vermiculite. Use nonsparking
isorb
(se sect. g). Contain Lage spills and collect waste or
tools to p-ae waste iquid or absorbent into closable containers for disposal Keep waste out of sewers, watersheds, and waterways. Waste
Disposal: Cnaet your supplier or a licensed conractor for detailed recommendations. Follow Federal, stat, and local regulations.
05S1A Designadens
kIed man AirCnobtinne (29 CFR 1910.1000 Subpat Z).
EPA Deguthais (40 CFR 302.4)
CElC.A lanado Subsme, Repotable
Quaytity: 1000 lbs (454 kg). per tO Cea Water Act (CWA), i 311 (b)(4) and 307 (a).
SECTION & SPECIAL -PROTECTION INFORMATION
Goggles: Always wear protective eyeglasses or chemnil safety goggles. Where splashing is possible, wear a full fa shield. Follow
OSHA eye- and face-protaioo regulations (29 CFR 1910133). Rspirator Wear a NIOSH-approved respirator per Genine reference 88
forlhe matism-se concentraticns adlor the exposurelimits cited in section 2. Folow OSHA respirator regulations (29 CFR 1910134).
For enesgency or nouroutine operations (spils or ceaning reactor vessels and storage tanks), wear an SCBA. Warnin Ar-purifying
espia s Wl or protect workers in oxygen-deficient asnospheres. Other: Wear impervious gloves, boots, aprons, and gauntlets, etc., to
prevent prolonged or repeated skin contact with this materiaL Ventdlatiom Install and operate general and local maximun explosion-proof
Verlann system powerful enough to mitain airbome levels of this material below the OSHA PEL standard citwd in section 2. Local
e"aust ventilation is preferred became it prevents dispersion of the contaminant into the general work ar by eliminating it at its source.
Cosult the Intest edition of Cenium reference 103 for detailed recommendations. Safety Stations: Make emergency eyewash statons,
safety/quick-drench showers, and washing facilities available in work aeas. Contaminated Equipment: Contact lenses pose a special
hazard; soft lenses may absorb irritants, and all lenses concentrate them. Do nor wear contact leases in any work area. Remove contnminaedcohnand ander it before tearng it again;clean this material from shoes and equipment. Comments: Practice good personal
hyie; always wash thoroughly after using this marial and before eating, drinking smoking using the toilet, or applying cosmetics
Keep it off your clothing and equipment. Avoid transfening it from your bands to your mouth while eating, drinking, or smoking. Do nor
c2r drink, or smoke in any work area. Do not inhale ethyl benzene vapor.
SECTION 9. -SPECIAL: PRECAUTIONS AND COMMENTS
SETIONeregatio:
C
yl benz
in closed containers in a coo dy weD-ventilated are away from sourc of ignition and
fif lage quantities ofethyl benenIe.ste bult storage areas from acute fire hards. Engineering Catls: Make sure
all engineering systems (producion, nransportation) ae of maim explosion-proof design. To prevent static sparks, electricaly ad bood al containers, pipelines, etc. used in shipping. tnsft ring, reacting. production. and sampling operations. Other: Use safety
c for rasfeing small amounts of ethyl benzene.
D=aptionDat (49 CFR 172.101-2)
DOT Sipping Name Ethyl Benzene
DOT Hazard Cas Flammable liquid
IDso.UmN7
DOT Labe Flammtable Liquid
DOT Packaging Exceptionst 49 CFR 173.118
DOT Packaging Requirements: 49 CFR 173.119
LMO Shipping Noac Ethylbeazene
IMO Hazard Class 3.2
IMO Labek Flammable Liquid
IMDG Packaging Group: II
References: 1. 26,3.84-94,. 100, 1.-117.120, M22.
A"1n a tothenntatay ofnnf.a.
bar fr
~oC~~2ily pwdunmea ncpm'ry.Theadro:Mut aa
P..Me§p
*"o'
Monp.
''f
'cP
kroP1.i
h
-~a
'"
a-cam
sanCa2.
Wends
m*. no CpC%--t- -dM=Ma
nosrupocnibaky
=ccury ormsniwty er'such nruramc raicatia to
.
of is
p.,da'es- a~ pupom orror C-~r-~er
as to ac
7E2
-
-- -
.-
4,mt
....
Prepared by PJ Igoe, BS
Industrial Hygiene Review- DJ Wilson, CIH.
Medical Review: W Silverman, MD
-
Genium Publishing Corporation
1145 CalWyU Saeet
-
-
Sheet No.467
Automotive Gasoline, Lead-free
Schenecdy. NY 12303-1836 USA
(51g)377:s54
.
Material Safety Data Sheet Collection:
10/8i
ksnte&. 10/81
kW
'&cttoniA~N~atera&al
d
Automotive Gasoline,
A
9/91
Revision: A 0101
Revidnn-
ad-ftee, Descripdam: A mixtue of volatile hydrocaboos coiposed mainly of branched-chain
PsfrIns, cyclopsafmis, olefats, nsphthens, and smouba In general. gasole is produced from petrlcum, shale OIL
Athabaa tar sands, and coal. Motor gasolines are made chiefly by cracingp0o--sses, which couver heavier petrolCUm
fractos mio mote volatile fractious by themal or catalytic decompositioo. Widely used as fuel in internalnncombesdon
engines of the speat-gnited, reciprocating type.-Aumwave gasoline has anuo
nenumberoF approximary 90 A higb
eonat of armatde hydroeabons and a consequent high toxicity we also anociatd wit a high Octane raing.Some
gno e sold in the US contain a minor pmportion of eseracahytlead, which is added in cownenuanw not ceding 3 of
per gation to preven engine "knoc However, methyI-en-btyI eher (MMBE) has alma canpietely seplaced
R
t
S
K
I
2
Rirti
NFPA
2*
4.
absoti
HMIS
H 2
F 3
R I
pPGt
Other Desigadons CAS No.8006-61-9, benzin, gasohne. gasolene, notor spirits, nanaagaso&e, pctpl.
Manufacurer o'an
aryour supplierardisutbuwor.mConellatest ChanicdWeek Rayrs'Gedet" fora suppirs.
tsc.S
Cautions Inhalation of attomotive gasolne vaprs can came intense burning tout and lugs central cervons system
(CNS)
depeessioc. and possible (9at pulMO"-y edema. Gasoine is a dangerous fire and explosion haMad when exposed to heat and Darne.
1990 OSHA PELS
8-br TWA 300 ppm. 900 rggr
1985-6 Toxicity Data0
1990-91 ACGIH TLVs
TWA 300 ppm, $90 mghrn
srEL50ppm, 1480 mgrW
15-sciSISEO:500ppm, 1500
Mwgm
Man, inhalation, TCj: 900 ppmf 1;
1990 NIOSH REL
None established
*Atypicalmodem aone~co"pDriis W% paaffins,14% amade, and 6%oeGas."
infmr pboqorus. and MBE
t 5ccNIosMfJrasDC300
for-ajroariitdna.
..
Boling Point Initialy, 1027 (39 'C; after 10%died, 140 $
(60 Cx after 5 distilled, 230'F(110 *C) after 90%distlled,
338F (170';C
finalboiing poin399 *(204'q
Vapor Density (alr=I):3Ato 4.
(-43*q
Astoi
Tem
he men ben actenis
appriely II.Odxcraddisiminclide
DeAsityISpeflc Graavty:0.72 to 0.76 *60'
Water Soblbity: Insonble
Appearance and Odor A clear (gasoHne may be coloted with dye), mobile
lash Ponut:-45'
toxic effects include sense
ergans and special senses (oxjunctiva iritation). behaviora
hafu-idnadane, distoted perceptions), bags. thorax, or
reepinua (-00gh)
Human, eye: 140 ppm/8 lr; toxic effects include mild rritation
Rat inhalation, LC; 300 g1/3 ain
(156C)
liqid with a characteristic cdorrecogizable at about 10 ppm in air.
536 sL537(80 s456'C) LEL, Lc3% w
I UU6.0S v/t
Extinguking Medt Use dry chemicaL carbon dioxlde, cral hl foam as extinguishing media. Use of water may be ineffective t extinguish
re, but use war spray to knock down vapors and to cool fie-cxposed drus and tanks to prevent pcssuic ruptre. Do not use a Solid steam of
water sc itmay spread theL
e.
Unusual Mre or Explosion Hazards Automobile gmsoline san CSA Class IB M
liquid and adangeos fir and elosion hazard
wen exposed to hea and
neeriring
Vapomcan fow toan ignition soee and
Vi
Bashe. Aumnnobile gasoline can ai teactviOnty wi
at.
Special Fire-fighting Procedures: isolate ard ar and deny city.Since fi e may produce toxic fumes wear a self-confh
breating
apparnahs (SCA) with a fu facepiece operated in por
pirive-pressre mnode, and fM protective coddn. When he fire is
exting"uihed use nonsparking tools for cleanup. Be awat of rnoff from fire cannt mehods. Do not dlease to sewers orwaways.
Sbhlty/Polymerizatiow Automotive gasoline is stable stroom teratersne in closed cnninee undr normal storage nd hnazxing conditions.
Hazardous polymertiniou cannot occur.
Chemical Incompatibilties Automotive gasoline can rea with oidizing materials such as peroxides uitric acid, and pechlorates.
Conditions to Avoid: Avoid heat and ignition source.
I
Hazardous Prod ucts of Decompostdon Thermal oxidative decomposidoa of autmotive gasoline can produce oxides ofcarbon and partially
oxidizcd hydrocarbons.
Copyriht
01992
on
hing
Crpra
A.cmni..e a rgqncu .fle.ram p
9 wref1
r-c-
W&a.
9/91
Automotive Gasoline. Lad-free
o.467
'on 6. Health Hanrd Data
'arcnogencldr
In990
reports, the IARC list gasoline asaposible human eacinogec (Group 2B)A tho
the LAC has-assigued a overall
withs group ia
u
im evidence).
umary of Rlsks: Gasoline vapors ame considered moderately
Vapor inhalation
cause
nervous system(CNS) depression
End mucos m
rcane and respirtory tract iritation. BEn =
of high concaios can cause a fatal
moa
dema.Reported
to
ppm causes eyenose,
3ftto gasolin vapOr eeetons are160 to 270 ppm causes eye and tUat ititaion in several hornS0
tnhesa inaioandosicin
rn2000cppmx cmild
n
e i 30 min.
coucentrations ar suaca
g in 42.10
'ol
Iffla areas of stia are exposd to 2SlgcOmamount
be absorbd.
sici
oarecue
dermatits.
valuatio
to gasoline it has not assigned an ovaRievaluaion to specific subsranre
ind '
lsmaydevlopcaM cause
deresin
aistion can tasesVer
o
sIn aduls maygesto
by
50 gpodu
c seerest
tedical Conditions Aggravted by
oneot
centaInervoussyereme
: S Orans: Skin, eye, respi
krlma 7 Entry Routes Inhalation.
e
skinenact
ects: Acute inhalation produces intense nose, throat, and bung irritban
heese bluned V'3,o' conjunctivitis; nof the fc
ene
inebriatio(
and
somned nes wit cnvulsins.
tl confusion;
'
wgait; sarnd
cased bylack
membrane
eeos
and
of
coloration
purplish
to
dark
and cyanosis (a blue
diznes er.
>f
as-!-e eobn4ug cMSCc
o'
ughkhrns
of brieah, increased te 46f repiaton
Vrebvl rpid heartbeat, fewer, khen ,hr ad
symptom fo~wig acute exposwt inidcut
cChroni auladoc resuls in p
-treities followed by -otor weaksstinexposu
:as b
ii drying. and lesons.
'loss,nasea,
hemorrbagei of te pacs
weight loss.insonia
fatty 4eeration of t
ier and kidnes,
and unesual sensitivityh)
the distal
lift the elidsand flush Imdiatcly and continuously with Gooding amunts of water until tasponed to an emergency.nniea
remove contaminted
- Rinse with flooding amounat of water for at lent 15 min. Forreddened or blistered skin, consukt a
War.
affected rea with soa
Reno" exposed p
to fres air and
as needed.
'r o Never give inythg by mouth to an
ifnc'ous or donor induce wvoinkbg due to aspiration bazd.
conscious victim a iue
of(2 tablespoons of acdvated charcoal
In g e
ate to dtink Consulta physcian immedistity.
After flst aid, get appropriate la-piant, paramedl. or connalty medile support
0
p iLeslk:Notify safety pesnwneLca alc all unnecessay
r should protect against vapor
othernen
I
adsorbent. Dike storage areasto oleats
qutie Toxkdty: Blueill, feshwater.
supplieror
Contact
tion sonute, and provide maximum ezplodoa-proof
remove heat and
and liquid contact Use f
tools. Take up small V wit sand or
and spills. Folow app
regulations (29 CFR 19 0.120).
pp96r
contractor for detailed
mdatonFoflow applicable Federal, state, and locaregulations.
azardious Waste (40 CFR 261.21): Characteistic of Ignhabuity
CERCLA Hazardous Substane (40 CFR
Not listed
,AAExtremely Hazardous Substance (0
355):Nottlistcd
ARA
oxirheden (4 C~t37.65):Not listed
as
eminant(29 CFR 1910.4000, Table ZL-A)
Wear rotective eyeglasses or chemical st
goes,
OSHA eye- and face-pro~-tion regulations (29 CFR 1910.133). Since
lens use m idusy u controversial, establishy
ownp
VSect
a
advice prior 1o rese.m s
tFollow
OSHA respirator rguais (29 CFR1910.134)
dif
necessry, t
a
aSH- Vs T re a no specific MOSH
m am
However, forvaporoncenions not m dangeous to life orb
a use
c artridgerespiratoreqipped with organic vapor ctid
rsM
a upped-aireslat
oroperations(cleaning spills,
e
ar Wee" rww
polyiylucmeewllugod
t
c*
bot cMwd
Povide general and local
Ic cL exhaustveuation is prere
nate
acorvessels,orsaxrage ta),wrw an SCB
m
Ar-parug
For
reprsonranor
ttt prcupw
iged ornupeated sin cono=c Materials soch as nwpten or
c ?rmcetv dtn. oe Resistance of specific material can vayhfom produtto
p
exhast ventiltWin systems to==intain airborne
nnatio
since itpevents eumiLA nrdAirpmon into the work xica by coou
Make avalable in ework ea emergency
Equipment: Remve this material from your
below t OSHA
it at Its somsco
Stat,
and
Nee catdrink, or smoke in work areas. Practice good
-using the toier, orapplyingenosmtics.-
*nnlrespneed
clohn
iea ing
hygiene aftyrsing hi materaspecialybeforc a in
PE3s
dinking.
ng
nehlizbg
Orage RequIrements Store in closed containers in a cool, dry, wdl-ventilated rea away from beat and nitnn satns and
a or
Protect containers from physcal dmage. Avoid dueetsunlight Storage must meet Requiremenat of OSHA Class IB iquid.
errin progran taincludesregalertranin
inhaationnod skior eye co te Considerurespiratory
rsAvoid
vapors. Only use
to rave
evenlanon
ati ndoor use of this material requires exploss-proof
'nspctio and
line as a fwsore due to its volatility and fammhblerexplosive nate. Practice good personal hygiene and housekeeping procedures. Wear
Wrk cldoting daily.
Transportation Data (49 CFR 172101,.102)
er.e
Nasn:
IMO Shp
casing-hadaminaraia)
N eGasoline (incug
DOTShlppi
Enneen
OT Hazard
ID No- UN1203
n-Flammabe liquid
IMO Hz
3.2
ID No.: UN1203
IMO LabeL Flammable liquid
DOT Labeh Flammable liquid
DOT Packaging Exceptocs 173.18
IMDG PackngLng Group: H
DOT Packaging RequIrerents 173.119
SDS ceCtau on Rcreaces: 26.73.39.00.10I,103.124.126. 17. 132.133. M 133.14. 143.146. 153.159
Edited by JR Susu.MS
Prepred by: M Allison. BS; Industril Hygise Review Di Wilsca. CIM: Medicl Revkw: W Silvarman. MD;
yif
-r-a-.r
e .wdt-e rpred- a.fp
MIanbCa99or lot. .raum cy bd..dn
cor
p
Geniun Publishing Corporaton
Sbeet No.735
1145 Caalynsoeot
Methyl Terary Buty! Ether
Schncctad.NY 12303-1836 USA
(515)3774-685
I
L
ds nw
especially in I
boosmiavy
gsihW o
a ls of sp ta % y cat2meat dkiaesacworngradpi alment
bM, JOB I a ldeakin
oxyge
combsdiacy4by
n99a8n MIBE
d chYs
I
C; ad medC
fcta
'S-
Sn.
4h di
i
peMib
and MT E oneftd p50coahpoduce
yused ineAM
ione ndispi
cemntly aned inSbom 10% of ft nsdons ga=00n- As eaded gasoine is phased ot this percentag =sePole to
$ thtehe, 2,.
=py
OtherDesigations:CAS W,164-44MX medy13.1-A=fmkayle ytemr (2,-Mneig-2p
AK
Manfetuer Cstesyo rqplie ar distbutrConsu dhostt hmn caneek Bayerw*Gado for Asupplier list
eCan-Ema~srflansoaurMBis a wd mad
akdaritat mmaycssdhwnedszcffvifeadoeirnh1
Hnrae
"a',
e sa. a
Mehi etAry betylther Ca100%
7
U
7990H
sa NIos,RTZ
(KNS25000.
1985-8Tokty Date
Rat ora%LDx;:4g/kg
Ra, imadIn,.,2 23,576 ppml4 br
198MOSEREL
None tmaded
D9W0 9ACGI TLY
EL
NoneehmMNowe WMAS'
forsdtioaa nicty data
sonin ramem
v~s
-c)MiENta
weOiight-
l
meltg Pobnt:-166F(-110 Y.)
Specini Gravity (20 'C4 C):.0.7405
Vapor Pressurc 245 mmHg at 77 7(25 'C)
Water SolubihtyI4.8 g/100g
Appearance mid Oder. A clea, colodess liquid with asliht hydrocarbon odor with. mild mint or izpen-lik odor.
Flashm on:-I2A *P(28*C)
Anoandn
epesm:85P(3*C
~ 6%v/v
| UEL:8A% vir
ExtingI idgMedie Use dry ceimles cuboc diwxde, bale., war pay, or lcohol foams saextshingWedia.
cHasis:tBE
is xtly n ammblet Is vapors muy explode if Ignited In a wciod arca or travel to a mu
UnmasnalFre or Explodon
of ignitom ad flash back. At tenesm
shor Aow
Bashpoint, MIBE ca ekass vapor matifmflamme mixtum.
Special Plre-Ofghtn Procedurm Since fEn may prodc* vxi feomes, worn
a self-cotainoed breamg apparats (SCB) with a fun faceplce
opecded a tbeIaa o essu---n orpoidvo usue aode and sppopriate, rcqwd chemical promeive cloddg (mobading oggcs, rubber
ovweom
gloes, and boots). If eAsibk rem
- containe om fiedAisaes. Merwise use waterspray o cool fi-exposed-mo
ewar of runoff from me contr! mtdodL Do not release toencwla se
et, ws or warways due to the potntial explosion and healt
IhasalJMTBEpresents.
USmE MIs stahe at room tmpmte
In Closed enniue
mnde normal stanga and hOIAFng ennUOZI MI-B Is
"men i acd a-MaEkHzados polymeriztioncannotoccur
VaMg,
,*m
nngaM
am MUBB does not mfwith watror oma madwral. Itis inompauible and unstab with stoogxcddg
snoog acids cmsties, -mi,aldhds =z-nn a=d chlorinatd compovfd
Cndtom to Avokt Avoid n heat d ignition rces.
'Hazardos Products of Dccoapostoon: Tbnal ouidative dccomposidon oflMIBE en produce carbon dioxide (CO) a4 war Tar.
and metbyl tadicL If prenc in suffcient
-butyl kormn , acetone, foracid,
Incompletb combesdon can produco carbon monxi,
concentrations. these product of partial oxdaion can pose serious heath hazards.
3
I wet mOpmw~w m-C
H 2
P. I
W 1-1Oct- j-1 $r5"806--53POU ?JST CU'(STD ENGR)Prariopgekictr The IY and IARC do not list M as a
o
Ofld- Data on MTEigeao
nand kehaledan
amkiy snibased ot niMutditIkS.Haman expowes aeSepodpmwldtry wiM
gall bladder us by directitnsioa Thexcports reval MTBW
StgasEno-MTBE minl ci and wit use of MTBE n
aynesthcde effect on th centraleroas sysem (CS). A
ofuansa, vomirrng. and sedabo followed bygeneralanedai is
dodwb inceasig
. A wam or bummig seuInoa is
whaD
al aiustinatim. Elevaod livert feion iedies, duodenal
Uamnnuiou, ideo y I
blood cell hemolsi, and foal
odor ae Aso noted with his pcedm.
Animal sdies DOM imty iritation
to mn'ous nkanmes of the nose.
An , and con Aspiration of gasolino-MThE vilrftsma
case haag pmenMnmis
lCacdonAgrvated byo
Ezpoem-nrc
rpotd
Eetes
tna
resin.-
ccCae with
the eyesa ork akin
cause
cae may
na and
Effecs:
Cronieinh
ei' (cnra erosjyt
q adcgenrl
muirtmne).
in at high concentatiocs. Inhaaion may resultin mesa momiting,
krr atnn
infam
or burning
n depresoa).Inagesdioc of M~TBB masy rsak in aspiration pneumonlits
es Geday lift the eyelids and flusb immdIatey and ccadanousty with flooding aounts of water until uranspoted to an emergency
.ra~wphysician isiaitly,
rm ovlan
affected area wid
coing
ee wi flooding mounts of wate for at has 15 min. Porreddenod or blistered skin, consult a
ap
W .
by wndth to an
p nu
Never give
pdaeontheaiskof
'
ear
n
.o
medicstp-
?
.n- f MCTh
sigus.If
exp
as needed
or
' person. If igested, conslt a physician Lmmdistely. Do o indcer
if individualis coughing or chokinge apertn may have sheady occured; trnsportto an
a wial facty.
rirs Ald, Set pprrainparamedico
6ee
-Atoae c-------reomene fo-neto
nydeopetf
medica
ne
Rmam exposed pamon to hes *W and
ashli
-
occured,on
xmr
cmchs
exwfad
x-ray:, and supportive cueby be nee ay
fMTiRa- poor
-ee
Syu o1
Carbg
Is
reirmayb
rnspiraion expoucrs.
~e
wyWobsene
tom
in an alert
folowing
'Leak:
pen~ane acu iE uoneocasy personnet rmove allheat and ignition aouroes, and provide mnwm*pleooV~efldan paanneshould protect against vapor haaladno and skin or eye contact. Take up spilled meterial with aoncombudible
xbcn mateuial and
losed areas
in eppropiate containcrs for disposal.r
lage spI s, dilm far ahead of spill to contain. Do not allow &M
to eater
(posa)or waterways. iBiE is moto watr soluble than othergasoline components, so ther may be a higher MBTR conce-
ea a spil ofgasolinc iBB mixures. It also has a modera to '
O nbllity In soiL MBB Is poody biod.in acivated sludge. Cleanup of gundwatr eoutamhani IsdifficL.
high air-o-water radon a used, air
can reamoe MTBE. Products of ar"opmiei degradadon include t-butyl formate., aone, and e"thyl radicals. Follow appirgUt1Cinn (29 CPR 1910.120).
t d wdhenc
Wy
M
IC
contact
j Z
supplier or a licesd coutractorfr detaled
reemomendadons. Folow applicable PederaL sate, and loeairegulations.
et Waste (40 CFR 26133: Not listed
EafzdarO* Substance (40 CPR 02.: Not listed
A ExmxHazardous Substce (40 CR 355) Not listed
as a U
Toxic Chemic(40 CPR 372.5)
(29 CPR 1910.1000, SnbpartZ):Notlisted
-andfj, ~
M~w
P1~v~yOR~rM91=PerUS&WH
novreopor -
ad PS
reactor vessels, or storage a&e), wear .
Oerarscpirator.Forergcyrnaroetinopeadn(1-anoa
fWWbnfprv So
IStlowUPv&
U regulaios 1VCF 113).
-re
( C 190134) and, if nece-
boots; qapos, and Ctanfica to provcprlogeor repeatedd nontact.
general and local
"poanpof ventilation syse a
ani a-rneconcentrations atlevels thatpromote woaker
yATWA ofup to ppinin
oddo
madvetueffeci
deu at ARCO's MTBE
ties.
cd
atn is prefered since itpvenw coainiser
into the wodk area by coUtzulling it at its sot=P
j
M
ake available in Me wodc rea cme
=ewas staions, afay/quik-4rench shower, and washing facices.
wodtrecsofteaca may tbsob, and all lensesconcnrte, rritan.Rems this
Equpmnt:Neverweawmharlenses in
Mimy oes wand eqipm
a-une conta
ted ting before warn.
ii
cat, din. or smC in work areas. Praede good personalhygine aer osing thin mreial especly before eating, drinking
ng.ausing t toilet, or applying coamis
Rcquiemmat Strin Ughv closed onuane in a coolweZ-veonwatd ara away frm aR boat and *
so re Outsid or
bed sag may be p
Vefed, c cnraines agamst
damae To prevent sbt spa,
ground and bod all
ndq Anmente' s receivingr
roi
' and torage areas
Avodvapors
and coa wi
eyes.
respiratory protredon program that ine
nu
"" inption, and alua
Avoid heat and ignition aowues. Practice g personal bygiene and houeckepng
utesansportation Data (49 CFR 17±102)
Nane: Mehlcr-butylether
M:UN298
Zbeh Fi2umule liqui
;Pacaing Group: ?
VPcmReferences73, 103,124, M36 150, 151
Bygne RevIew DI Wson. CIH Medcal Xei'ew: W
Sitcanan, 1M.
by Als. BS: lndusl
f
*mflflflr~w~
ft&
kfmM
ZcoFwh.siw to be
rFa astpqc
arccmeqnam of~w
RAied
by: JR Stua, MS
oan
317
MATERIAL SAFETY DATA SHEET
TOLUENE
CORPORATE RESEARCH & DEVELOPMENT
Revision C
SCH ENECTADY, N.Y. 12305
Phone:
(518) 385-4085
DIAL CO.
8*235-4085
I
Date
August 1979
SECTION I. MATERIAL IDENTIFICATION
TOLUENE
OTHER DESIGNATIONS: Toluol 3 Methylbeazene, Phenyluethane, CH3 C6 E5 , GE Material D5Ifl,
ASTM D 62 and D841, CASU 000 108 883
MANUFACTURER: Available from many suppliers, including Shell Chemical Co. and
Sun Oil Co.
mATERIAL NAME:
SECTION
II. INGREDIENTS AND HAZARDS
roluene
ACGIT
ca 100
(1978);
HAZARD DATA
I
(skiiL) notation indicates a potential cOn-
tribution to overall exposure via skin absorption.
OSHA/
NIOSH (1976) proposed an 8-hr TWA of 100 pp=, with a 15minute ceiling of 200 ppm, and an action level of 50 ppm.
Current OSA TLV is 200 ppm.
8-hr IMA 100
(ski L)*
or 375 mg/u
Human, Inhalation
200 Mm
ITCao
(ceaitfl nervous at )
Rat inhalation
IXo 4000 jpml4 hr
Rat oral
LD5 0 5000 .g/1
SECTION 111.-PHYSICAL DATA
Boiling point, 1 atm, deg F (C)
vapor pressure 0 25|C, =m Hg
apor density (Air-l)
Solubility in water, 1
-
231 (110.6)
28
3.2
0.05
Specific gravity (ater-1)
Volatiles, X
Evaporation rate (BuAc-1)
Molecular weight
-.
0.866
100
1.9
92.15
pearance & Odor: Water white liquid with a characteristic aromatic odor, whose recogniOdor detection is uantion threshold (unfatigued) is 2-5 ppa (100Z of test panel).
satisfactory for safety because of fatigue.
LOiER UPPER
SECTION IV. FIRE AND EXPLOSION DATA
I
Flash Point and Method
40 F (4.4 C) Closedlcuv
'
Flammability Limits In Air
Autoignition Temp.
(56 C) 997
fL
Ib volume
1 1.2
_7
Extinguishing Media; Carbon dioxide, dry chemical, foa. and water fog. Water may be in.effective for putting out fire, but use spray to cool fire-exposed containers.
At room temperature; toluene emits vapors that can form flammable mixtures with air. It
is a dangerous fire hazard and a moderate explosion kazard when exposed to heat and
flame. Vapors can flow along surfaces to distant ignition ources, then flash back.
Firefighters should wear self-contained breathing apparatus. and eye protection when fighting toluene fires.
SECTION' V. REACTIVITY DATA
Toluene is a stablelmaterial under normal storage and handling. It does not undergo
hazardous polymerization.
Since toluene is a flaaable liquid, avoid contact with heat, sparks or open fI eme.
Avoid contact with strong oxidizing agents.
combination with
explosive.
Nitric acid and toluene, especially in
ulfuric acid, will produce nitrated compounds which are dangerously
-
Oxidation in air can form oxides of carbon and nitrogen.
GENERAL 0EL.ECTRIC
GEERLQELCTIC
cc
egn-w
SecS-
C.,a
No.
SECTION VI.
HEALTH HAZARD INFORMATION
TV
317
100 ppm (skin) (See Sect.Il)
fa gut, nausea
Vapor inhalation can produce headache and a Hrht drowsiness at 10 pp,
a~nd itching skin at 100-200 ppm, anesthetic effects and respiratory tract and eye Irritation above 200 ppm. Absorption can occur through the skin, and liquid contact
with possible dermatitis from repeated or prolongewill cause 'defatting of the a
Ee contact is irritatIng and can be damaging (corneal burns)'. Ingestion
clontact.
digestiLve tract and results In systemic 'effects from absorption.
Irritates te
FIRS AIED:
Get medical help.
Imediately irrigate with water for .15 minutes.
EyeFContact:
Wash area with soap & water; remove contaminated clothing promptly.
SkinCtat:
Get medical help if irritation persists or if large areas of skin were exposed.
Inhalation: Remove to fresh air; restore breathing and give oxygen if needed. Cet
medical helpt
Ingestion: Get medical help as soon as possible! When victin is conscious, give USF
mineral oil to drink. (Aspiration is a potential hazard if vomiting occurs!)
AND DISPOSAL PROCEDURES
SPILL, LEAK,
SECTION VII.
Report large spills to safety personnel. Remove ignition sources; provide expJsionThose involved in clean-up must use protection again liquid conproof ventilation.
Pick as liquid vben feasible, or absorb -on vermiculite
tact and vapor inhalation.
or sand and-scoop .up with nonsparking tools into a metal container with cover. Liqui.
Do not flush
can be flushed with a water spray to an open holding area for handling.
to sever, to a confined space, or to a watercourseI
DISPOSAL: Consider reclaiming by distillation or disposal via a licensed Waste disposa
Follow
Scrap may be incinerated under properly controlled conditions.
company.
Federal, State and local regulations.
SECTION VIII.
SPECIAL PROTECTION INFORMATION
Provide general and exhaust ventilation to meet TLV requirements.
Ventilation ans &
Exhaust hoods
other electrical service must be nonsparking and explosion proof.
Exposure
should have >100 lfm face velocity and be designed to capture heavy vapors.
above the TLV for nonroutine and emergency situations requires use of an organic
chemical cartridge respirator up to 200 ppm; above 200 ppm a full face piece is required with an apprbved canister-type gas mask or self-contained breathing equipment.
Safety goggles or glasses should be worn in areas of use. Impermeable (neoprene has
been recommended) gloves and apron, face shield, and other protective clothing may
be needed to prevent skin contact during use, especially vbere splashing may occur.
An eyewash station should be available if splashing is possible. A safety shower and
washing facilities- should be available.
SECTION IX.
SPECIAL PRECAUTIONS AND COMMENTS
Store in cool, clean, well-ventilated area away from sources of heat and ignition and
away from oxidizing agents. Area must meet requirements .f OSHA Class IB liquid. No
smoking in areas of storage or use. Nonsparking tools should be used near toluene.
Ground and 'bond metal containers for
Use safety cans for handling small amounts.
Protect containers from physical amage.
liquid transfers to prevent static sparks.
hasizing the liver, kidneys nervous systeM,
Preplacement and periodic medical exams
At least an annual exam Is recommended
lungs, heart and blood should be provided.
Use of alcohol can aggravate
for workers exposed above .the action level (50 ppm)the narcotic effect and blood effects of toluene.
DATA SOURCE(S)
CODE: 1-9,12,20,21,24,26
ai.,
. .....
Z
-f-Iy
.
JoI~an~
O-
W-.*
a
.tb
ry
.1.........~&.-...n..---...-.
c~r-~Wev*-l
6.
h
fl..d..n.o4
I
p
APPROVALS:
*
Industrial Hygiene
ad
e--"'"""
'oWot
.....
da
Safety
MEDICAL REVIEW:
.1
/
J
GENERAL
ELECTRIC
-
No.318
Material Safety Data Sheet
Froin Genium's Reference Collection
XYLENE (Mixed Isomers)
Genium Pubishing Corpora'on
1145 C
33-36
Schenectdy.
8
6 USA
U
(518) 377-8855
(Revision D)~
Issued: November 1980
GetMMI PeIus*NG CORP.
Revised: August 1988
SECTION 1. MATERIAL IDENTIFICATION.
I
26
Material Name: XYLENE (Mixed Isomers)
Description (OrIgin/Uses): Used as a raw material for the oroduction ofbenzoic acid, phihalic anhydride, isophthalic
and trephthalic acids and Iheir dimethyl esters in the manufacture of polyester fiber; in sniliing cacgur; with
Canadian balsam as oil-immersion in mioscopy; and as a cdaning agent in microscopic sechniqucs.
Other Designations: Dimethylbensne;Xylol; CH - CAS No. 1330-20-7
Manufacturer: Contact your sappier or distributor. &it
the latest edition of the Chaemicweek
HMIS
BayeriGidc (Genium ref. 73) for a list of suppliersH1 2
Comnents: Although thee a three differt ises
of xylee (ortho. mea and pit), the health and physical -F 3
R 0
dee
isomers,
of
all
mixture
wrinen
for
a
xylene
This
MSDS
is
ar
very
similar.
all
tire.
isomers
bazards of
PPGO
which is *sualy c mercial xylne.
NFrA
R I
1I
*Seesect
SECTION 2. INGREDIENTS AND HAZARDS
I
Xykne (Mixed
%
Isomers) CAS No. 1330-20-7*
S 2
K 3
8
EXPOSURE LIMITS
"
IDLU~
*-Xylen, CAS No.0095-47-6
u-Xylene, CAS No. 0108-38-3
Levet 1000 ppm
OSHA PEL
$p1 TWA: 100 p. 435 m&'
ACCI TLVs, 198748
TLV.TW& 100 ppm. 435 mglm
'-S
hL 1 ppm. 655 n~we
p-Xylene,CAS No.0106-42-3
Check with yonr supplier to deermine if there arm additions, contaminants, or
Simpuries (such as benzene) that arm present in reorable quantitics per
*29 CFR 19 10.ToityD
Immediately dangerous to life and health.
**""See NIOSK RTECS (No. 2E2100000), for additional data with references
to IproducU4 illitatiii and IlUtRa-ra.
-a
Human
Man. I
Toicity Dnta
LC ; 10000 ppm16 fin
WA: 0
pm,43 mg/
SECT1iON 3. PHYSICAL DATABoiling Point:- 2757 to 293$ (135C to 145Q*
Water Solubility (%): Insoluble
Melting Point: -13' (-2C)
Evaporation ERate: 0.6 Relative to BuMA 1
Molecular Weight: 106 GramsMo
g/
1%Volatile by Volume: Ca ZOO
Vapor Pressure: 7o
w9 Torn at 687 (201C)
Specific Gravity (HO =I): 026
Vapor Density (Air = 1): 3.7
Appearauce and Odor; A ew liquid; afmatic htrscarbon
'Materials with wider.and uannwer bologMranges
SECTION 4 FIRE
D
Flis Pon and Metod 'F
Evaorti9on(2RtC0.3 R ) i
oB
c:mmercialy available.
ATA g5'oFanaility
7(46C)
U- T
nm
Lrnits in Air
%by Volom
C 1%
-
Extinguish lang Media: Use foam, dry chemical, or carbon dioxide- Use wae sprays to ztduce the rate of burning and to cool coaminers
UnusuI Fire or Explosion Hazards: Xyne vapor is heavier th). air and may
igniton and flash bact
Prave
a consuidrtle
s
distaace to a ow*ying sc
e of
Special Fire-flghting Procedures: Wear a self-contained breathing apparatus (SCBA) with a full faceicce operated in the pressut-
=)o
depnod or posi(ive-pr(ssuAm
SECTION 5. REACTIVITY DATA
FXyle
is sble in closed m
Zinen dwrig routine operion
Chemical Incompatbilties This
It does not undio hazardous polymeriza
way racarblonactdaigcrously with stroag oxidizecrs.
Conditions to Avoid: Avoid anyxposure to sources ofignitionand to sirovgoxidizas
aardous Products or Decomposition: Carbon tanoxide (CO) may be volvd durin xyle
fires
'o.318
XYLENE (Mixed Isomers)
8/88
JCTION 6. HEALTH -HAZARDINFORMATION
4a4A W
- DM
yleuis not listed as a carcinogen by the !ARC. NTP, or OSHA.
Uumma ry of Risks: Liquid xylene is a skin irritant and causes crythema, dryness. and defaning;proloagcd contact may causc
liscring. Inhaling xylenc can depress the central nervous system (CNS), and ingesting itcan result in gasrOintestiaal disturbance; and
'ossibly hematcmesis (vorniting blood). Effects on he eyes, kidneys. liver, lungs. and the CHSare also reportd. Medical Conditions
Zravated by Long-Term Exposure: Probkms with eyes, skin, central ncrvous system, kidneys. and liver may be worsened by
pasre to xylene. -Target Organs: CNS, cyes. gasnontr sin trac, blood, iver.kidneys. skin. Primary Entry: Inhalation,
Acute Effects: Dizziness; excitement; drowsiness;-incoordination; staggering gat irritation ofeyes, nose,
in cootacftabsorption
and throat;corneal vacuolizaticm; anorexia; nausea; vomiting; abdominal pain; and dermatitis.
La2ge- headachc; loss of appetite. narvousness. pale skin, and skin rash.
Chronic Effects: Rcversible eye
RST A ID: Eyes. Immediately flush eyes, including under the eyelids, gently but thoroughly with plenty of running water for at
15 minutes Skin. Immediately wash the affected area with soap and water. Inhalation. Remove the exposed person to frsh
air restore andlor support his or her breathing as needed. Have a trained person administer oxygen. Ingestion. Never give anything
mouth to somnone who is unconscious or convulsing. Vomiting may occur spontancously but do not induce it:f vomiting should
, keep cxposed pcrson7s head below his or her hips to prevent aspiration (breathing the liquid xylene into the lungs). Severe
morrhagic ponumonitis with grave, possibly fatal, pulnonary injury can occur from aspiring very small quantities of xylene.
GET MEDICAL HELP (IN PLANT, PARAMEDIC, COMMUNITY) FOR ALL EXPOSURES. Seek prompt
edical assistance for further treatment, observation, and-support after first aid. If exposure Is severe,
spltilzastion foi- at least 72 hours with careful monitoring for delayed onset of pulmonary edema Is
commended.
ECTION .PIL-;LEAKNDEDISPOSAUfRROCEDURES
M-@MO9ND id-iM:a
&il/Lak:Notify safety personneL provide ventilation, and eliminate all sources of ignition immediately. Cleanup personnel need
Kacetion against conact with and inhalation of xylene vapor(see sect. g). Contain large spills and collect waste or absorb it with an inert
naterial such as sand, earth, or vermiculite. Use nonsparking tools so place waste liquid or absorbent into closable containers (or disposal.
waste out of sewers, watersheds, and waterways.
aste Disposal: Contact your supplier or a licensed contractor for detailed recommeations. Follow Federal, state, and local
lations.
2SHA Designations
~Cotaminant (29 CFR 1910.l0 Subpan Z)
A Designations (40 CFR 302.4)
EZRA Hazardous Waste, No. U239
ERC.A Hazardous Substance, Reportable Quanitr 1000 lbs (454 kg), per the Clean Water Act (CWA), section 311 (b) (9)
jCTIONSEISPETAfRPROTETJGNHNFORMATIONalMit
NMM
gles: Always wear protective eyeglasses or chemical safety goggles. Where splashing is possible, wear a full face shield as a
ppicnaEary protective mesue. Follow OSHA cye- and face-protection regulations (29 CFR 1910.133). Respirator: Use a NIOSHtpptoved respirator per the NIOSH PockerGuide so ChanicalHarardsfor the maximumr-use concentrations andtAr the exposure limits
inda
section 2. Follow OSHA respirator regulations (29 CFR 1910.134). For emergency or nonroutine use (leaks or cleaning reactor
Is and stqrage tanks), wear an SCB A with a full facepiece operated in the pressure-demand or positive-pressure mode. Warning: Airwl nairators
or protect workers in oxygen-delicieat ar-spheres. Other: Wear impervious gloves, boots, aprons, gauntets,
:t., as required by the specifies of the work operation to prevent prolonged or repeated skin contact with xylene. Ventladoen: Install
tnd operate general and local maximum, explosion-proof ventlatio systems powerful enough to maintain airborne levels of xylene
SIM; the OSHA PEL standard cited in section 2- Local exhaust ventilation is prefrred because it prevents dispersion of xylene into
'niamrefcnce103 for detailed econmendations.
work areas by eliminating it at its source. Consult the latest edition of
fety Stations: Make eyewash stations, safetylquick-drench showers, and washing facilities availeabl in areas of use and handling.
:ontaminated Equipment: Contact enses pose a special bazard; soft lenses may absorb irritants and all lenses concentate them. Do
war contact lenses in any work area. Remove enntanzinatrd clothing and launder it before waring it again; clean xy1ene from shoes
deuiprnent. Comments: Practice good personal hygiene; always wash thoroughly after using this materiaL Keep it off of your
Obnand equipment. Avoid transfenring it from y'our bands to your mouth while eating, drinking, or smoking. Do not eat, drink, or
anote at any work area. Do not inhale xylene vapor.
torage/Segregation: Store xylene in acooL dry, well-ventilated area away from sources of ignition and strong oxidizers. Protect
containers from physical damage.
Ipecal
Handling/Storage: Make sure all engineering systems (production. transportation) are of maximum explosion-proof design.
Ground and bond all containers, pipelines. etc, used in shipping transferring, reacting. producing, and sampling operations.
ransportatlon Data (49 CFR 172-101-2)
OT Shipping Name: Xylene
DOT ID No. UN1307
References: 1.2.12,73.4-94,100. 103.
*U*n " of
*ormcaiay
wIonnio bas fr
DOT Label: Flamimable Liquid
IMO Label: Flammable Liquid
DOT Hazard Class: Flammable Liquid'
IMG Class: 3.2 or3.3
purcses
1.pu
Prepared by PJ Igoe, BS
n:
besanty purhases rspoosibaty Therefor:, alnug tacuoate crr tm
frm
"keimarPt'"ni
ct infonnaec, cinm Pubbiting Cnp-
E
alenDsno Wsrmta, makcs so rrpn-Cfl ccand
.
st
n
M acncy Or UiaaLiaty Of gUeh in(ontn ar
mo
purpos orfor comusqumc of its
pimms
Industrial Hygiene Review: DJ Wilson, CIH
zpoTahAty
appticnioc %o
eusmno
so
Medical Review: MJ Hardies, MD
APPENDIX B
RESPIRATOR PROGRAM
APPENDIX B
RESPIRATOR PROGRAM
The following respirator program is in accordance with OSHA 29 CFR 1910.134 Respiratory
Protection Program requirements. This program governs the selection and use of respirators on-site.
Respirators for the Earth Tech field sampling team will be provided by Earth Tech. The respirator
protection program will be administered by, and is the responsibility of the HSS and/or SSHO for
the site. Contractors and their subcontractors will furnish their own respirators and medical
surveillance for their employees. The HSS and/or SSHO will be responsible for ensuring that they
are in compliance with this respirator program.
The respirators will be selected according to the hazard and level of protection determined by
monitoring action levels and the decision of the HSS and/or the SSHO. The respirators and levels
are:
Level
Respirator
B
Positive Pressure-Pressure Demand SCBA or Supplied Air Respirator with 5minute escape bottle.
C
Full-face air purifying respirator with combination dust (HEPA) and organic
vapor/acid gas cartridge. The full facepiece respirator with combination dust and
organic vapor/acid gas cartridge will be appropriate for the dust conditions and
organics that may be encountered.
D
No respirator required.
The respirator users will be fit tested with the size, style, and make of the respirator they will be
using on-site. The fit test will be recorded and these Fit Test Records win be maintained in the
Command Post.
Employee respirator training is provided on an annual basis and at site-specific training sessions.
This training includes:
o
o
A discussion of the nature of the respiratory hazards and the dangers if the respirator is
not used properly.
The reasons that respirators are required for protection, along with any engineering
o
o
o
o
o
o
o
controls that may be used.
Instructions in the selection, use, sanitary care, maintenance, proper storage, and
limitation of the full facepiece respirator with combination cartridge, and the SCBA.
Practice in proper fitting, wearing, adjusting, and checking face seal of the respirator.
An opportunity to handle the respirator.
Instruction on how to recognize and cope with emergency situations requiring respiratory
protection.
Explanation of the requirements for a self-contained breathing device for work in
unknown concentrations and Immediately Dangerous to Life or Health (IDLH)
atmosphere and for fire fighting.
Explanation of the medical surveillance program and how it relates to respirator use.
Explanation of the requirements for maintaining a tight seal, why beard and facial hair
is prohibited, and why use of contact lenses while wearing respirators is prohibited.
Respirators will be assigned to individual workers. Each individual shall be responsible for cleaning
and maintaining their assigned respirator and documenting this using the Respirator Service Log
presented in Appendix C. They will be cleaned and disinfected before being reassigned. Respirators
will be cleaned after each day of work according to manufacturer's instructions. The cleaning will
be done at the Command Post. Used cartridges will be disposed of and replaced with new ones.
After cleaning, the respirators will be inspected and checked for defects such as excessive dirt, cracks
or other distortions, scratches, incorrectly mounted lens, broken or worn cartridge holders on the
facepiece, breaks, loss of elasticity, broken buckles, and excessively worn serrations on head harness
that may cause slippage on the headstraps or head harness.
Further checks include:
o
o
o
o
A check of the tightness of the connections.
A check of the facepiece, valves, connecting tube, and canisters.
A check of the regulator and warning devices on SCBA for proper functioning.
For air purifying:
Check the exhalation valve after removing its cover for:
o
o
o
"
Foreign material, such as detergent residue, dust particles, or human hair under
the valve seat.
Cracks, tears, or distortion in the valve material.
Improper insertion of the valve body in the facepiece.
Cracks, breaks, or chips in the valve body, particularly in the sealing surface.
o
Missing or defective valve cover.
o
Improper installation of the valve in the valve body.
Check the air purifying elements for:
o
Incorrect cartridges, canister, or filter for the hazard.
o
Incorrect installation, loose connections, missing or worn gaskets, or cross
threading in holder.
o
Expired shelf life of cartridge or canister.
o
Cracks, dents, or breaks in the cartridge or canisters case.
o
Evidence of prior use of cartridge or canister, such as broken seal tape foil or
other sealing material.
0
For air supplied respirators, check the air supply system for:
o
o
o
Integrity and condition of air supply lines and hoses, including attachments and
end fitting.
Correct operation and condition of all regulators, valves, or other air-flow
regulators.
If SCBA, that the cylinder is sufficiently charged for the intended use, preferably
fully charged (mandatory on an emergency device). The emergency SCBA will
have a tag for logging in the monthly inspections.
Monitoring of the work area will be performed and the results will be used to select the appropriate
level of protection. Refer to air monitoring section of the HASP (Section 9.0).
This Respirator Program will be re-evaluated and revisions and updates added regularly.
Persons will not be assigned to tasks requiring the use of respirators unless it has been determined
that they are physically able to perform the work and use the equipment. The Earth Tech-contracted
physician will determine what health and physical conditions are pertinent.
Only those respirators jointly approved by NIOSH/MSHA shall be used. All component parts (i.e.,
canister, replacement straps, etc.) will be of the same make.
All Earth Tech employees shall document their respirator use time on the Record of Respiratory
Wear Log presented in Appendix C. This record shall be submitted to the HSS on a weekly basis.
APPENDIX C
HEALTH AND SAFETY FIELD FORMS
MEDICAL DATA SHEET
Project Name/Location:
Employee Name:
Address:
Home Telephone:
Birthdate:
Height:
Drug and Other Allergies:
Weight:
Notable Medical Conditions/Medical Restrictions:
Do you wear contact lenses?
Yes
Are you using any medications?
No
Yes
Emergency Contact:
No If yes, please list:
Relationship:
Address:
Phone:
Personal Physician:
Phone:
Address:
E
A R
T
H
T
E
C
H
Health andSafety Plan
Fe
MoNficaon Form
A tWOf WYEWdAnadAL LMf COMAmNY
I
I
I
page NO.
-o
Project
-
Pndecati
-he
Safety Offioa
I
I
I
I
Field Modification to HASP:
I
Prepared By:
site Safty officer
-
-
Date
Acxcepted ByDate
Accepted By'
Contractor Representative (if Applicable)
Date
Approved Br
Date
I1/94
rnoon--- tie
E A R T H
T
E
C
H-
rvisor'sIncidentRepon
Sup
FaxSent by:
Telephone
/
I
Datofthisrepot
No.:
(Print Name)
Accident
TYPE OF INCIDENT: Insediin_
_
Injry-_
Spilt_
Other-
Firc:
Type nsection:
Phn
nspectds Name
Agencr
AenyAd&ss:
I
Employee Office Location Namw
Region:
R66.
Group:
EMPLOYEE INFORMATION:
EmployesNam:
Soci
Security No.:
AA*=
ewa
Date
fBirth
.
Daeof ire:Wage
Employe Jm=uronDate of icident
Numberof)vinor
Marital
Single
-Dem_
Status:
Matied
Rat-$
Employee's Occution
Annuntly:
Days/k.:
Employe Hrs on Proect
Years ofEvxeience in
H__
oury:
_
When Incident Occurred?:
E
Widowed
_
Divred
Job No.:
HrsjDay:
This Occupation?:
INCIDENT INFORMATION:
Time:
Date of Incident
Date Reported to SupervisZ.
Witness(s):
Was Incident Believed to be Result of Employment?: Yes
If on Job Site,
Location on Job Site
Name of Job:
Where Incident Occurred:
No
Address Where IncideA Occurre
f First Aid Applied, by Whoa:
Type of injmy and Part of Body AffectedName/Address MedicalProvider:
Brief Description of Incident
3mployee
Activity at Tirc of Incident
Description of Property Damagcd-
3OSHA
200 LOG INFORMAflON:
Is incident OSHA
recordable?:
Yes
No
Does incident involve
medical treatment?:
Yes
No
D
0
0
O
Does incident
involve fatality?:
Yes
No
Does incident
involve first aid only?:
Yes
No
Does Incident involved lost
timerestricted activity?:
0
0
Project
Employees
Supervisor:
Manager
(Print Name)
(Print Name)
'Telephone
Nro.:
Current Status:
si
Telephone No.:
See reverse side for instructions.
Yes
No
300
C
g.
E A
A
R
T H
ECO
T
E
C
N
WTEMNA47WL LTD COMPANY
ecr
AirAirMoitoin
MonitoringDaa
Data Record
I
Pmject
Project No.:
Dae:
Page No.
LOCATION SKETCH
METEOROLOGICAL DATA
-
Estimated Wind Speed (MPH):
Wind Direction (Tme):
(Max.)
Temp. (Min.):
General Weader Conditions:
Flow
Pump No.
Rate
L/Min.
Pump
Location
End
Start
.3
-
Total
Min.
Total
Volume
Taken By
01U4
Comments:
. 4n)3
FO34Aoqp.H&S
to
D
---
-l
-il
C)-n-
IIII
I
-I--
II
gol
3IIIII
-
_I
Co.
-
-
C,-
I
_
li
Innf
I.'
i
I
a
H
E A R T
A tr-o
T
E
C
H
WMRMnAOWtLn.COMirMNY
Job ExposureReport
Employe NamSocial Scurit Number:
-
Project Nm:
-
Project Numbe:
-
She Fncmio
Level
ofPotecticr
Dates of Site Participation:
I
I
I
I
ji
I.
Wer acion levels exceeded in the work area (breathing zone)?
2.
Ifycs,
3.
List known or suspected contaminants on-site (list from HASP):
4.
Personal exposure monitoring data attached?
Yes_
No
No
N/A
list typc of monitoring and readings
Yes
SSO Name (Print):
SSO Signature:
Date:
.1/94F06Cc.&
F026IC-p-H&S
E A R T
R @
T
E
C
H
A tagac WMVA4V4AL LiTU CDANY.
QualitatveRespiratorFit Test
_..
Name.
SSN#
Division-
Date:.
FULL FACE
PASS
L 2.
4.
5.
6.
7.
(ange
tesa subject with esting agent
Positive Pressure fit tes
Negative presse fit test
Normal breathing
Deep breathing
Tun head from side to side
Nod head up and down
S.
9.
10.
11.
Talking
Jogging in place
Normal breathing
Sensitivity check
3.
I
I
j
FAL
HALF FACE
PAS
FAIL
Respratr Identification
HALFEACE
FULLfFACE
B.
C
D.
Model
Size
Approval Number (T1D)
Testin~g Agent*
1
Irritant Fume
Saccharin Solution
2.
3.
Isoamyl Acetate
* Testing must be conducted with agent No. I and either agent No.2 or No. 3
E
Qualitative fit testing shall be:
1.
2.
3
4.
Condueted for full face and half face respirators.
Performed immediately when the est subject has a weight change of 20 pounds or more, significait facial
sca&ring significant dental changes, reconstructive or cosmetic surgery or any other condition that may
interfere with facepiece scaling.
Performed only on test subjects without hair growth or any other obstruction between the skin and facepiece.
Fit-testing for asbestos to be conducted every six months.
Test Conductor Signature/Date
ev.
m194
Employee Signature/Date
F,
3
a
a
-~
~
P1
~
0
c.
Ii IA
0
~
i0
2
e
a0
-
5 o.
grjue
| |I
8
0
6
F
N
F.-
5.
'6
I
-
S
Ca
I
0
C'
k..e ~
'C
C
I~- ~
t~)4 ~t
Ii
E A R T H
A
troC0
T
aMRt4D04L
E
C
H
LTD.CWAAv
Couned Sace Efn-y Parrmit
A I PROJECT INFORMATION
Project Name
Proje Number
LOCATION and DESCRIPTION
of confined Space
Date
PURPOSE of Eaty
TUe
M
DEPARTMENT
Artentant
Superviso's Authorization (Lead Persn)
Expiration
Entrat
Entrants
M
A2 EQUIPMENT AND MONITORING
A.2.1 Equipmnt
-Calibrated
CSE Sign
Specify other Per AppendixB T4.023
be taken D
ITest(s) conducted by:*
F,
T=
P.E.L
Test
Yes
% Of Oxgn
19.5%Y-23.5%
% of LEL
Lessthan1%
Less than.10 pm_______
F~L'nge Sulfide
Toxics@
No
monitoring Equipentg
Escape Pack
Steel-Toe Shoes
E
A.2 Monitoring
STest(s)to
Yes
NOIt(s)
Yes
Item(s)
Traffic Safety Equipxmen
Ntryools
HardhatVerlnrBor
Zg
Site:
Site:
Site:
Site:
Site
Site-
Date:
Date:
Date:
Date:.
Date:
Daft:
No
-
______
-
other 0
A3 LEVEL 11 PROCEDURES
A.3.1 A confined space with an atmosphere which is not within all of the limits (PELs) specified above may be
ventilated and may be entered when sampling indicates an atmosphere within the specified PEl.
Regardless if atmosphere has been rendered safe in this situation prior to entry, the local emergency response
authority must be notified.
**OR*
A.3.2 In the event an atrosphere cannot be brought within the limits specified above for oxygen, hydrogen sulfide, toxic
substances or combustible gases, DO NOT enter. Halt work activities. Re-evaluation of the work task is required.
mnmediatcly contact supervisor and REHSM. Entry at a later date may be allowed provided the entry team is
properly trained and equipped.
A4 EMERGENCY RESPONSE
Local Emergency Response (Phone)
Ambulance (Phone)
Fire (Phone)
Police (Phone)
NOTES: P.
- Permissible Exposure Limit
LE.L - Lower Explosive Limit
a) - Monitoring shall be continuous and throughout confined space.
@ - Any toxic substances suspected or known prior to entry may require specific detection equipment
(i.e. HNU, detector tubes).
- - Other Le.. Dust that obscures vision at distance of 5 ft or less, etc.
COMMENTS:
AppendixA
White Copy - Project File
11/94
Yellow Copy - Region Environmental, Health and Safety Manager
Pink Copy - Project Manager
r~,--'o
E
A
A
R
T
tVCO
H
T
E
C
U
WTrEnonaL LTD.COMAMNY
Air-PurifyingRespirators
Assignment and Service Log
Respiraor Type (Full-face Or Halfa):
mnufacvntc.
Model Namber
Size
Date Assigne
Assigned To Wmn:
Inecio And Maintenance Record (To Be Maintaind By Employee)
Date
Serviced By
Note: After each project, submit completed form to your Division Safety Rcpresentative.
E
A
R
T
H
T
E
C
H
A tqC&O NTERMnvxAL LTD.COJ4FANY
Hard
CommunicaionPogrm
Gemical/oduct Inventorg
red by.
F040/MCoph&S
E
A
R
T H
T
=
A4C4CU WTnl"^T'f
E
C
LTD.CO
H
Atmospheric MonitoringLog
FieLd Health and Safety
WY
Page -of
Cicle: Son Mon The Wed Thu Fri Sac
site
Projec No.:
Site Safety Officr-
Action Lcvels- D
J-
i
>-C
I:- B
-(Sop
work, call in for instructions)
(Check boK and write in levels for upgrade)
Ta+quipmenr
Wnater
_____
OVA
HNe
02
IEL
PPM
%
H2S
PPM
%
PPM
Additional Comments:
Comena= Duration ofReadings,
UpgaesLocaion. etc.
....
Signature:
NOTE: Place in project files.
FO24CoP.H&S
E
T
H
A
R
A
lce WRNAYOML
T
E
C
H
D.VCO4MMY
Site Safety Meeting
Page
Meeting Condurfed BR
Summary Of Items Discussed:
PersNnnel hesan
Name
Representing
Signature
3.
4.
5.
6.
7.
-
10.
12.
13.
14.
16
17
18.
1920.
NOTE: Place in project files.
t --
of
APPENDIX D
BACKUP CALCULATIONS FOR ACTION LEVELS
APPENDIX D
BACKUP CALCULATIONS FOR ACTION LEVELS
Action Levels have been established for the protection of workers from potential health hazards
associated with chemicals, dust and oxygen deficient atmospheres. The justification for these Action
Levels is provided below.
Organic Vapors, Gasoline and Other Petroleum Products
An Action Level for use of respiratory protection of 0.5 ppm for will be used due to the possibility
of encountering benzene. At a concentration of 5 ppm, as measured with the photoionization
detector (PID), length-of-stain indicator tube sampling for benzene will begin to determine the level
of benzene in the breathing zone. Level C respiratory protection (i.e., full face air-purifying
respirator) will be required if benzene concentrations are above 0.5 ppm. Level B protection is
required when benzene concentrations are above 5 ppm, respectively. The Protection Factor (PF)
for a full face air-purifying respirator is 50. Therefore, the upper limit for use of cartridge respirators
of 5 ppm benzene (above this level, Level B will be used) produces a maximum exposure level, in
the face piece of 0.1 ppm benzene; which provides a 10 times margin of safety below the benzene
PEL of 1 ppm.
The PEL for gasoline (TPH) is 300 ppm; the PELs for fuel oil (as Stoddard solvent), xylenes and
ethylbenzene are 100 ppm each; the PEL for toluene is 50 ppm, and the PEL for MTBE is 40 ppm.
Level C respiratory protection (e.g., full-face air -purifying respirator) will be required if PID
concentrations are above 20 ppm. Based on PF of 50 for full-face air-purifying respirators and a
maximum use concentration of 100 ppm, the maximum exposure level within the face piece would
be 2 ppm. This provides a 150 times margin of safety for gasoline (as TPH); a 50 times margin of
safety for fuel oil (as Stoddard Solvent), xylenes, and ethylbenzene; a 25 times margin of safety for
toluene; and a 20 times margin of safety for MTBE below their respective PELs.
The fence line Action Levels are 1 ppm above background sustained for one minute (i.e., detectable
VOCs) as measured with the PID.