Oyster Point - San Mateo County Harbor District
Oyster Point
Informational Presentation to
San Mateo County Harbor District
June 29, 2016
1
Agenda
• Summary of the Oyster Point Precise Plan Improvements (Approved 2011)
• Overview of Landfill Cap Deficiencies and Regulatory Permitting Process
• Summary of Sea Level Rise Considerations
• Conceptual Construction Phasing
2
Agenda
• Summary of the Oyster Point Precise Plan Improvements (Approved 2011)
• Overview of Landfill Cap Deficiencies and Regulatory Permitting Process
• Summary of Sea Level Rise Considerations
• Conceptual Construction Phasing
3
Oyster Point
Informational Presentation to
San Mateo County Harbor District
June 29, 2016
Oyster Point Phase I Precise Plan – Existing Conditions
4
Oyster Point
Informational Presentation to
San Mateo County Harbor District
June 29, 2016
Oyster Point Phase I Precise Plan – Approved Design
5
Dwarf Pink, Red and White Oleander
(Median planting on Oyster Pt. Blvd. adjacent to Crescent Park)
Sloped Lawn and Beach (At Crescent Park)
Canary Island Date Palm (At Upper Trail adjacent to Marina Blvd. and Crescent Park and in the gateway median of Oyster Pt. Blvd.)
PRECEDENTS FOR THE PUBLIC REALM:
Planting Palette for the Public Realm
Ceanothus ‘Yankee Point’
(Understory planting on both sides of the Upper Trail)
DRAFT February 23, 2011
Bougainvillea ‘San Diego Red’
(Understory planting in Oyster Pt. Blvd. gateway median)
Prepared for the City of South San
Francisco
Concept Design for the Public Realm
Bioswale Storm Water Treatment
(Mix of sedges and rushes adjacent to marina parking area)
ROMA Design Group
PLANTING
Oyster Point Redevelopment Master Plan
Preparedfor theCity of South SanFrancisco byROMADesignGroup
F E B R U A RY 2 2 , 2 0 1 1
18
Integral Color Asphalt Ped/Bike Pathway
(At palm-lined Upper Trail)
Stepped Beach Edge (At Crescent Park Beach)
PRECEDENTS FOR THE PUBLIC REALM:
Street Lighting,‘Pechina’by Holophane
(At public streets and parking areas)
Site Furniture for the Public Realm
Ornamental Metal Picket Fence (At interim boat storage)
DRAFT February 23, 2011
Trash Receptacle (At
public open spaces)
Prepared for the City of South San
Francisco
Concept Design for the Public Realm
Bench, ‘Knight’by Forms+Surfaces
(On Bay Trail and Upper Trail,where appropriate)
ROMA Design Group
S I T E F U R N I S H I N G S A N D P AV I N G
Oyster Point Redevelopment Master Plan
Preparedfor theCity of SouthSanFranciscoby ROMADesign Group
F E B R U A RY 2 2 , 2 0 1 1
19
Agenda
• Summary of the Oyster Point Precise Plan Improvements (Approved 2011)
• Overview of Landfill Cap Deficiencies and Regulatory Permitting Process
• Summary of Sea Level Rise Considerations
• Conceptual Construction Phasing
8
OYSTER POINT ~RIN'"
r
a
1_
EXISllNG FERRY
TERMINAl.
----
.~
EAST BASIN
.-.
CITY PARCE L
--,
EXPLANA TION
MS.'. '-"'___ "'_'-""""'Ilb'!
Trea.:tM!I & FIoIo, Inc., December 200e
,.
.
"
"c.,.
op., <il Al>Proxi?lal.lOcaIIonol"""",,,,,,,oortng,,,.
,
".
_
_
_
=
=E"maIed lMdiII c.:-
Tho"""... ContooJ ...
"' ....... to' "'*l
._~
I --
1 ~ 1 Boring<...,1.1<0100 Soil ~"", Inc
Irom '"""" ,,10<1 '0.2 ""'.
"""""""',...."""
Sooott¥;o"""
190jl Boring<""'~ Soil ~"II,
"Comme<daI6- St <>"Y ~
_ ... .
-"
ow_ .
Inc.
~"TI<~bomg'lnrfllX'll t _
... .
T ",""",,"&FIoIo, Ir<:,, ~2OOe
.... (100. _
-:
""""''''''Il ..... ""'_ In ....... _
_ • .,.,.
~"'-"'<
~~"""'_'~"" """ ' 1"'"
_
_
• _
_
•
po<~01""
hya"aUIc CC<"dJcIMIy \aye<
"'0'_
®
~
11'..,."'...",
or. _
~ " " - " " . 9 ~ Zone I,
1-/1. 8uidO>;l 1-B, """ Bt-.g K
a..-v
'f" .
'.-
,OOOl ~by_
'997 Boringoby _
_ + 1989 Boringobyf<o<d>lIi
... """"'.,.
"""" + 19!19""""'",,",,, _""'~~
~
-t>e ... ny ..., .
1984 EIonrJg> bj<W_d-o,oo COOSUO .....
'",,"I~SI
Morotomg ..... ~
"Boa"""
l mC P T""'"'V'".,.~S
, ... .
'9" Boringo",. _ ~
.... .
1970
~by
Go_,
J<;noo......,.,_
O>-1 . ' 96<~by"""''' 8O.mo&'->cioteo
10 .... """' .....
Ai>Pt"' ....... _
..... .
.".,
•
-- ~--
-
1 EiO';aIKlO' Me "',,,"" on NGV02S Datum.
2. 'Maste" Plan ",til F'M>ing, • .,.,. Pm... ~ WI ,
<10100 (W16115
... , .
Co-' .
Ige2Bo< <vs&,LWedSoil ~
,976Bo<n,;,.by CoopotCloo1<
OYSTER POINT DEVELOPMENT
South San Frandsco, California
SITE PLAN SHOWING POTENTIAL
DEFICIENCIES OF LANDFILL COVER
Date ot/ t5/ tt
Project No. 730480 104 Figure 2
LANliAN TREADWELL ROLLO 9
SCOPE OF WORK DOCUMENT SUBMITTALS
REGULATORY AGENCY APPROVALS
Document f Requirement
San Mateo County
LEA
Cal Recycle
RWaCB
BAAQMO
City of South San
FrancIsco
Reviewing Agency (Plann ing
PCNt-ao-.land Use Pl... I"PCLUP"] (27 CCfI .211H I
-..............
An-'Yah MId Teoh..... Report for
..... , _~ by c..r..1 W _DbGh.rg_
Envlrorm ...... MId o.otMhnl"
a..... n Qta D _
Am . . . . . a ...... ,..."A......... ........ao... .....t&i _ _ ......
("PCUP") (2 7 CCR 12 ' . . 1....:1 "-biDlw to 0c>INDIive AGtian "'-s
("CAPs" ] [27 CCR 1221121
Prine",,' Approving Agerry
Review and comment as it
docmg appropriate
Review and com"""m as it
Review and comment as it
<!oems approp<iate
Review and comment as it
docms appropriate
<!oems approp!iate
Co-Approving Agency
Co-Approving Agency
Reviewing Agency
Reviewing Agency
Principal Concurring Agency
No formal rola
Principal Concurr ing Agency
No formal role
Co-CofICurriflg Agency
No lo,mal role
Dcpa,t,oo nt)
landfil l Owner/Operator
(Publ", Works Dept)
Named Discharger wider
WD Rs.(Pwlic Works Dept.)
Named D isc harger (mder
WD Rs (Cily South SFJ .
Landli ll Owner/Operato r (City
South SF)
10
Agenda
• Summary of the Oyster Point Precise Plan Improvements (Approved 2011)
• Overview of Landfill Cap Deficiencies and Regulatory Permitting Process
• Summary of Sea Level Rise Considerations
• Conceptual Construction Phasing
11
Projected Sea Level Rise with
Existing Conditions
YR 2050 = 16”
YR 2100 = 55”
12
Projected Sea Level Rise with
Future Graded Conditions
YR 2050 = 16”
YR 2100 = 55”
13
CANA
CANARY ISLAND DATE PALM
TE PALM
CANARY ISLAND DA
PALM
‘YANKEE POINT’ CEANOTHUS UNDERSTORY
Year 2100
Year 2050
SAND BEACH
OYSTER POINT BOULEVARD
NORTHBOUND LANES
BAY TRAIL
MEDIAN
UPPER TRAIL
Prepared for the City of South San
Francisco
Concept Design for the Public Realm
‘YANK
Bay Trail at Crescent Park
DRAFT February 23, 2011
Projected Sea Level Rise with
Future Graded Conditions
ROMA Design Group
SECTION:
C R E S C E N T PA R K
Prepared for theCity of South SanFranciscoby ROMA Design Group
F E B R U A RY 2 2 , 2 0 1 1
N
17A
Agenda
• Summary of the Oyster Point Precise Plan Improvements (Approved 2011)
• Overview of Landfill Cap Deficiencies and Regulatory Permitting Process
• Summary of Sea Level Rise Considerations
• Conceptual Construction Phasing
15
Oyster Point Phase I
Conceptual Construction Phasing
Existing streets/trail
16
Oyster Point Phase I
Conceptual Construction Phasing
Existing streets/trail (to remain in service)
Demolition of existing buildings and paving
17
Oyster Point Phase I
Conceptual Construction Phasing
Existing streets/trail (to remain in service)
Landfill cap repair/replacement
18
Oyster Point Phase I
Conceptual Construction Phasing
Existing streets/trail (to remain in service)
Construction of new streets and utilities
Construction of new landscape/parking areas
19
Oyster Point Phase I
Conceptual Construction Phasing
Existing streets/trail (to remain in service)
New streets and utilities (in service)
Construction of new landscape/parking areas
Demolition of existing streets
20
Oyster Point Phase I
Conceptual Construction Phasing
Existing streets/trail (to remain in service)
New streets and utilities (in service)
New landscape/parking areas (in service)
Grading at building pad/playing fields
(with cap replacement as necessary)
21
Oyster Point Phase I
Conceptual Construction Phasing
Existing streets/trail (to remain in service)
New streets and utilities (in service)
New landscape/parking areas (in service)
Construction of Phase I buildings
22
Oyster Point Phase I at Completion
-C_~)
f
23