Transco NY/ISO Workgroup Meeting Expansion Update
Transcription
Transco NY/ISO Workgroup Meeting Expansion Update
Transco NY/ISO Workgroup Meeting Expansion Update October 23, 2013 Williams Update Cindy Bottomley Director, Pipeline Control Rich Truxell Manager, Houston Pipeline Control 2 The Williams Companies > One of the leading energy > > > > > > > > > 3 infrastructure companies in North America 15,000 miles of interstate gas pipelines 1,000 miles of NGL transportation pipelines 10,000 miles of oil and gas gathering pipelines Daily gas processing capacity of 6.6 billion cubic feet of natural gas Natural gas liquids production of more than 200,000 barrels per day 4,100 employees NYSE: WMB Headquarters in Tulsa, Okla. Learn more at williams.com Transco System Overview System Facts > Peak design capacity 9.9 MMDth/d. > ~ 10,200 miles of pipe LEIDY 91 MMDth W/D 1,328 MDth/d Inj. 519 MDth/d Zone 6 STA. 240 LNG 2 MMDth W/D 399 MDth/d Inj. 10 MDth/d – 2,000 mainline miles > 40 Mainline Compressor Stations – 369 compressor units – 1.5 MM HP > Extensive Offshore Gathering System > ~ 900 Active Metering Points. > 197 MMDth Storage Capacity. Zone 5 PINE NEEDLE LNG 4 MMDth W/D 414 MDth/d Inj. 21 MDth/d Zone 4 WASHINGTON 78 MMDth W/D 817 MDth/d Inj. 431 MDth/d Zone 2 Zone 1 4 EMINENCE 10 MMDth W/D 1,240 MDth/d Inj. 150 MDth/d Zone 3 S-2 12 MMDth W/D 137 MDth/d Inj. 104 MDth/d Northeast Supply Link “Sta 520” 15 MDth/d 100 MDth/d Receipt Quantities Potter Cameron “Sta 517” 135 MDth/d “Leidy” Bradford Tioga Lycoming Sullivan Nat’l Fuel Susquehanna NY Wyoming Lackawanna Luzerne Leidy Hub Clearfield Manhattan Central Manhattan Clinton Station 520 Station 517 Union Centre Narrows 60% PA 50 MDth/d 20% Texas Eastern 50 MDth/d > Capacity: 250 MDth/d Dominion > Expansion of Transco's existing system from Marcellus production in northeastern PA to the zone 6 Market Pool (Sta 210) and existing New York City delivery points. – Half of volumes placed into service to Station 210 in August 2013 > In-service date: November 2013 5 20% Station 210 NJ Delivery Quantities 150 MDth/d Northeast Connector (FT); Rockaway Lateral (FDLS) > Two related projects that would expand Transco’s system and add a new lateral into the NYC area. > Northeast Connector – 100 MDth/d expansion from Station 195 to the Rockaway Delivery Lateral. > Rockaway Delivery Lateral – 3 mile, 647 MDth/d lateral from the Lower NY Bay Extension to National Grid on the Rockaway Peninsula. NY Compression > In-service date: 2nd half of 2014 Compression Zone 6 207 205 PA 200 195 6 DE Rockaway Lateral Rockaway Philadelphia Compression NJ Rockaway • Measurement • Regulators • Heaters 3.3 miles 26” Lateral Constitution Pipeline > A 125-mile, 30-inch pipeline connecting Williams’ Midstream System in Susquehanna County, PA to Iroquois Gas Transmission and Tennessee Gas Pipeline in Schoharie County, NY Iroquois Wright & TGP Line 200 > Capacity: 650 MDth/d Otsego Chenango > Owned (41%) and operated by WPZ; Cabot Schoharie MA Oil and Gas owns 25%, Piedmont Constitution Pipeline Company owns 24% and Capitol Energy Ventures (WGL) owns 10% > Target in-service date: March 2015 Greene Constitution Pipeline Delaware Broome NY Susquehanna Bradford Williams Springville Gathering System Albany CT Wayne Williams Midstream Planned Central Wyoming Lackawanna Station Williams Transco GPL NJ PA 7 NY
Similar documents
Welcome to Barnsley Gardens!
5,700 MDTH/d from Texas Eastern In-service: 3Q14 CapEx: $4.8 MM
More information