RENOUVELLEMENT URBAIN
Transcription
RENOUVELLEMENT URBAIN
URBAN REGENERATION International Experience : France Workshop NASHO – February 2016 Groupe Logement Français 33m housing units in France, including 4,5m social housing units French Housing Group = 80 000 social housing units, o/w 30% located in « city policy areas » = 205 000 people housed 2 La CABS xxxx xxx 3 Content 1. FROM PRECINCT CONSTRUCTION TO PRECINCT RENEWAL EXAMPLE OF THE NORTHERN PRECINCT OF AULNAY SOUS BOIS 2. A NEW WAY TO CONDUCT URBAN RENEWAL EXAMPLE OF THE CITE DES INDES IN SARTROUVILLE 4 1. FROM PRECINCT CONSTRUCTION TO PRECINCT RENEWAL EXAMPLE OF THE NORTHERN PRECINCT OF AULNAY SOUS BOIS 5 Existing assets at inception 4 400 housing units built between 1969 and1971 3 malls, 1 tennis field, 1 outdoor theatre, 1 japanese garden 1971, inauguration of the « 3000 » 6 Existing assets before renewal 7 Existing assets before renewal 8 Existing assets before renewal 9 1980/90s: first challenges Urban: No structuring road/street network Lack of readability and hierarchy between public and private spaces Physical break with the rest of the city Economic and social: High youth percentage Important number of sizeable households Low employment rate for « economically active population » High unemployment 2004 NORTHERN PART CITY PARIS REGION Total Population 23 671 80 30 10 951 136 Less than 20 year old 41% 31% 25% Unemployment rate 27,6% 12% 11,5% Employed « economically active population » 28,8% 42% 44,3% Household size 3,9 2,5 2,4 10 Steps for urban renewal 1996-1999 : Grand Projet Urbain (« large urban project ») – upgrading of 750 housing units 2000-2004 : Grand Projet Ville (« large urban project ») upgrading of 730 housing units 2004-2018 : Projet de rénovation urbaine – upgrading of 1500 housing units and 1 000 units demolished 11 Achievements of the UR project Between 2004 and 2020, Northern precinct represents : in euros 329 m of capital investments 176 m of investments sur le patrimoine LFn 93 m financed by LFn 81 m grant 382 housing units for ownership Social housing rate goes down from 88% to 80% 12 Partnership project management Project coordinated by the city, together with: Housing operators Financiers: State and « département »* Project partners: schools, operator/contractor, inhabitants… Two project management levels : Operational : meeting once to twice a month Strategic : meeting three times a year * intermediary level between province and municipality in France 13 Main objectives of the Project 1. Linking the precinct to the city former RN2* becomes an urban boulevard** * National road/semimotorway ** Integrated into the city 14 Main objectives of the Project 1. Linking the precinct to the city former RN2* becomes an urban boulevard** 15 Main objectives of the Project 2. Building a service road/street network for residential area 124 housing units demolished to create 9 new streets 1997 2010 16 Main objectives of the Project 3. Transforming urban forms 12 « towers » demolished 2006-2009 : Les Etangs, 4 « towers » demolished 2011 : Les Etangs, delivery of « Clos des Sorbiers » and « Clos des Tulipiers », 17 Main objectives of the Project 3. Transforming urban forms Small residential developments Zéphyr, tranche 2, Christophe Colomb street « Residentialisation »Tower 41 « Residentialisation » Zéphyr tranche 2 18 Main objectives of the Project 4. Replacing with new housing units 289 new social housing units on-site 168 new social housing units off-site Clos des Sorbiers, delivered in 2011 Allées de la Renaissance, delivered in 2010 19 Main objectives of the Project 5. Upgrading existing housing units Outside and inside refurbishment of buidings 2013 2010 20 Main objectives of the Project 5. Upgrading existing housing units Outside and inside refurbishment of buidings 2010 2010 2013 2013 21 Main objectives of the Project 6. Functional mix Create a new central hub (public facilities and shops/stores) - 1 hyper market - 2 super markets - 12 retail stores 22 Main axes of the Project 7. Diversifying the residential supply 357 private units 90 social units for ownership 58 intermediary units 137 units for ownership, Bouygues immobilier 90 social units for ownership, SCCV Aquilon 103 units for ownership, Bouygues immobilier 23 Main axes of the Project 8. Enabling smooth territory management Reorganise utilisation options Public consultation Bornes enterrées Tenants consultation Family gardens, résidence Zéphyr T1 24 Bottom line Existing assets fully upgraded after the PNRU* Upgrade from rank D to C or B in terms of thermal insulation Hierarchy of road/street network and improved raffic conditions Outdoor spaces well defined * National Programme for Urban Renewal 25 Bottom line But….. The precinct remains isolated from the rest of the city because of a social and economic gap Limited social mix -> Integrate private developers in the project implementation 26 Bottom line Evolution of the % social housing in the area at the ZUS* scale Before PRU** : 6 200 housing units, o/w 5 466 social housing units, that is 88% * Sensitive Urban Zone ** Urban Renewal Project 27 Residential mix on-site Evolution of the % social housing in the area at the ZUS scale At the end of PRU : 6 050 units, o/w 4 795 social units, that is 79% 28 2. A NEW WAY TO CONDCT URBAN RENEWAL EXAMPLE OF THE CITE DES INDES IN SARTROUVILLE 29 Precinct at inception 30 30 1st project 2006-2020 Objectives and programme : Stop the enclave condition and open up the precinct to the rest of the city Improve living conditions for inhabitants 281 housing units demolished reduce density at precinct core Creation, refurbishement of roads Development of public spaces, 1088 housing units residentialised Renovate and diversify housing supply Refurbishement of 468 housing units, construction of 185 new social housing off-site Diversify functional mix inside the neighborhood Creation of a business park 31 1st project 2006-2020 Financing Total investment : 220 M€ Total investment for Logement Francilien (French SHI) : 67,6 M€ o/w grants : 26,2 M€ (38%) o/w own Logement Francilien resources : 41,3 M€ (62%) 32 First assessment of the actions conducted on-site Transformed precinct core : creation of quality public spaces Improved living conditions, to be continued (residentialisation, refurbishments) First step towards diversified functional mix (business park) Precinct getting « calmer » Strong shift in the precinct image But: no social mix in the precinct (100% social housing after 1st programme) Inhabitants involvement in the precinct to be improved 33 A 2nd programme under preparation Creation of a new model for urban renewal A necessity: identify new partnerships and new economic models to transform precincts, with less public funds An opportunity: a site with high « potential » and a developer ready to commit on the long term Guiding principle: create value by developing the land as the programme moves forward -> Private developer involved in project management to define the programme with all relevant stakeholders 34 Issues at stake for the 2nd programme Quartier des Indes to become an attractive, mixed and sustainable precinct : Deeply transform the cité des Indes Create diverse and attractive housing supply for current and future inhabitants Image shift Attractiveness for new inhabitants Social mix Develop a quality urban supply (facilities, shops…) Ensure quality lifestyle for inhabitants whithin a precinct in evolution : Keep service delivery quality Support to households 35 35 New project 300 housing units demolished under 5 big phased over 20-30 years New projet construction capacity of 2600 units: In the Quartier des Indes : 1 800 units, o/w 35% social rental units (630 social rental + 1170 ownership) Nearby: 800 units, o/w 35% social rental units (280 social rental + 520 ownersihp) Diversified supply: social housing, social ownership, retirement villages, young professional residences, ownership Diverse architecture : stand-alone houses, split-level apartments, maisons, duplex, intermediary housing (between social and commercial), medium-to-high rise buildings, etc. First thoughts about a future project « capacity » study to check the feasibility of a mixed project on the Cité des Indes site 36 36 2016-2018 Phase 1 Building4 02/03/2016 37 37 2018-2020 Phase 2a Tower 18 Tower 17 02/03/2016 38 38 2017-2023 Phase 2b Building 1 02/03/2016 Building 2 39 39 2020-2026 Phase 3 Building 12 Tower 13 Tower 19 02/03/2016 40 40 2023-2029 Phase 4 Building 10 Building 11 Building 9 02/03/2016 41 41 2026-2031 Building 3 Phase 5 Building 7 Building 6 Building 5 02/03/2016 42 42 Phase 4 Phase 3 Phase 2b Phase 2a Phase 5 02/03/2016 Pied de page du document Phase 1 43 43 New Project 44 44 Thanks for your attention 45