Design and Construction Presentation
Transcription
Design and Construction Presentation
San Francisco International Airport Design & Construction 5-year Capital Improvement Program SFAACC Board Meeting April 7, 2016 Capital Program Drivers 2 Over 7% annual passenger growth Over 10% increase international flights Revolutionizing our guest experience NetZero aspirations for Airport campus Organization Chart Design & Construction Terminals * Terminal 1 *Boarding Area B * Terminal 3 * T2-T3 Connector * International Terminal * Gate Capacity 3 Non-Terminal Facilities * Hotel * Consolidated Admin Campus *ATCT Demo * Cargo Redevelopment Airport Wide Initiatives * Wayfinding * REACH Ground Transportation * Long Term Parking Garage #2 * AirTrain Extension Infrastructure * Industrial Waste Treatment Plant * Security Infrastructure SFO map 4 Terminal 1 Center Project • 8-12 domestic/international carriers • International Swing Gates with sterile connection to ITB Customs & Border Patrol • Shared-Use facility (TBD) • Individual Carrier System (ICS) Baggage (TBD) • $757M budget • Schedule Design Dec15 – Nov16 Construction Aug16 - Sept20 For Construction Subcontractor Opportunities Kristin Allen, Airport Project Manager (650) 821-5372, [email protected] 5 • 24 replacement gates. (3) A380 capable Boarding Area B Project gates. (4) 2 for 1 International Swing Gate • Concession Program • Striving for NetZero • $692M budget • Schedule Design Dec15 - Nov16 Construction Aug16 - Sept20 For Construction Subcontractor Opportunities Kristin Allen, Airport Project Manager (650) 821-5372, [email protected] 6 • Renovation and expansion of Terminal 3 West Terminal 3 West • 7 for 5 gates at BAF with 7 new PBBs • International Swing Gates with sterile connection ITB CBP facility • Enhanced Concession offerings • Strive for Net Zero Ready, LEED Gold • $792M budget • Schedule Programming Jun16 - Dec16 Design Jan17 - Aug17 Construction Apr17 - Dec21 For Construction Subcontractor Opportunities Claudia Luquin, Airport Program Manager (650) 821-7721 [email protected] 7 T2 to T3 Secure Connector • Additional Lease Space for revenue generating operations • Commission Office space for SFO operations • Office space for temporary relocation during construction • NetZero Ready • Schedule • Programming (TDB) • Design (TDB) • Construction (TDB) For Project Information Claudia Luquin, Airport Program Manager (650) 821-7721 [email protected] 8 ITB Arrivals Level Improvements Potential Optimized Plan • Connect A & G baggage claim areas for greater flexibility • REACH enhancements for passengers • Connection from T1 and T3 to CBP facilities • Schedule Programming (TBD) Design (TDB) Construction (TBD) Current Plan 9 Gate Capacity Improvements • Increase availability of gates • Increase number of International Swing Gates • Allows Phasing during Construction Projects • Projects Include: BAA Upgrades & Bus Gates A2 & G91 RON Gates near BAA T2 15th Gate T3 frontal & BAF Improvements For Project Opportunities Chris McManus, Airport Project Manager (650) 821-7724, [email protected] 10 • 4 star 350 room Hotel Airport Hotel Project • SFO-Owned Grand Hyatt-Operated • Situated at SFO front entry from Highway 101 • NetZero Ready • Connected by AirTrain to terminals • $225M budget • Schedule Programming May16 - Sept16 Design Sept16 - May17 Construction Jan16 – Jul19 For Construction Subcontractor Opportunities Sarah Garcia, Airport Project Manager (650) 821-9410 [email protected] 11 Consolidated Administrative Campus – Phase 1 • Office Complex for Planning, Design & Construction, Museum and ITT Staff • NetZero Ready • $72M budget for Phase 1 • Schedule Programming Sep15 - Dec15 Design Jan16 - Dec16 Construction Aug16 - Nov17 For Construction Subcontractor Opportunities Existing AirTrain Station 12 Rick Thall, Airport Program Manager (650) 821-7878 [email protected] ACTC Demolition and Tower Improvements • Demolition of old Control Tower and 2 floors • Addition of 15th Gate • Potential outdoor observation deck bringing back the romance of travel • $49M budget • Schedule Programming Mar16 - May16 Design Jun16 - Sept16 Construction Sept16 - Sept17 For Construction Subcontractor Opportunities Mark Costanzo, Airport Project Manager (650) 821-7809 [email protected] 13 Cargo Redevelopment (BLDG 900 & 944) • 19% Growth in Cargo Traffic • Flexibility of Cargo Operations • Supporting multiple tenant operation • ADA improvements • $13M budget • Schedule Programming Sept16 - Nov16 Design Dec16 - May17 Construction Jun17 - Jan18 For Design and Construction Opportunities Burl Toler, Airport Contract Manager (650) 821-7828 [email protected] 14 • Airport-Wide Planning Wayfinding Enhancement Program & Phase 1 Implementation • Creating a consistent campus-wide wayfinding strategy • $26M budget Phase 1 • Schedule Programming Oct15 - Jun16 Guidelines Oct15 - Jun16 Implementation Oct16 for 3-5 years Current Project Management RFP info: Tokyo Narita Airport Jacob Ehrenberg, Airport Project Manager (650) 821-7866 [email protected] 15 ITB REACH Phase 1 • Upgrades to Recompose & Concession Seating, Exterior Patio, Lounge access • Increased Holdrooms for passenger comfort and support for revenue generation • $29M • Schedule Programming Apr16-Jul16 Design Jul16-Mar17 Construction Feb17-Apr18 For Construction Subcontractor Opportunities Kris Opbroek, Airport Project Manager (650) 821-5316, [email protected] 16 Long Term Parking Garage #2 • 3,600 parking stalls • Net Zero with Net Positive Capability • LEED Gold Equivalent Green Garage Certification first in the country • Innovative parking, guidance and online reservation technology • $70M budget • Schedule Design Feb16 - Oct16 Construction Oct16 - Nov18 For Construction Subcontractor Opportunities Tasso Mavroudis , Airport Project Manager (650) 821-7758, [email protected] 17 AirTrain Extension to Hotel & Lot DD • Extends AirTrain to Lot DD • New Long Term Parking and Hotel Stations • LEED Gold • Improved Long Term Parking Experience • System-wide Controls Upgrade • $207M budget Lot DD • Schedule Programming May16 - Sept16 Design Sept16 - Feb17 Construction Feb17 - Nov19 Hotel For Design and Construction Opportunities Tony Breslin, Airport Project Manager (650) 821-6522 [email protected] 18 Industrial Waste Treatment & Recycled Water System • New membrane filtration & UV disinfection • 1 MGD recycled water capacity • Recycled Water service for airport campus • $75M budget - Plant • $20M budget – Recycled Water • Schedule Programming Jun16 - Oct16 Design Oct16 - Jan17 Construction Jan17 –Jul18 For Construction Subcontractor Opportunities Mark Costanzo, Airport Project Manager (650) 821-7809, [email protected] 19 Security Infrastructure Project • Perimeter intrusion detection System (PIDS) • Closed Circuit Television (CCTV) • Access Control improvements • $150M budget • Schedule Programming July16 - Nov16 Design Nov16 – Feb17 Construction Mar17 - July19 For Construction Subcontractor Opportunities Ryan Kuss, Airport Project Manager 20 (650) 821-7812, [email protected]