Sep 16, 2015
Transcription
Sep 16, 2015
CITY OF LOCKPORT CITY COUNCIL MEETING AGENDA WEDNESDAY, SEPTEMBER 16, 2015 a. PLEDGE OF ALLEGIANCE: b. ROLL CALL: c. INTRODUCTION: 7:30 P.M. d. AGENDA PARTICIPATION: (Any person who wishes to speak on a topic that is on the Agenda of the Meeting shall fill out a Speaker Card before the start of the Meeting, either at the City Clerk’s Office, or may give to the City Clerk before the start of the Meeting itself, stating name, and topic on the Agenda to be discussed. Speaker Cards are required for each of the items the Speaker wishes to address. The purpose of the Cards is to obtain the spelling of name of the Speaker, contact information, and provide for efficient meeting administration. All Speakers shall comply with these rules, which shall be posted at the Speaker Sign-In desk and rulings of the City Clerk. Speakers shall be called by name to approach the podium by the City Clerk. A time limit of five (5) minutes shall be imposed on each Speaker.) e. f. CONSENT AGENDA: 1. Regular City Council Meeting Minutes of September 2, 2015: Motion to approve the September 2, 2015 Regular City Council Meeting Minutes as presented. 2. Committee of the Whole Meeting Minutes of September 2, 2015: Motion to approve the September 2, 2015 Committee of the Whole Meeting Minutes as presented. 3. Payroll Period ending August 30, 2015: Motion to approve the Payroll Period ending August 30, 2015 as presented, 4. Approval of Various Bills: Motion to approve the Various Bills as presented. 5. Radio Communications – PD/Resolution NO. 15-072: Motion to pass Resolution No. 15-072/A Resolution authorizing the purchase of new radio equipment for the Police Department. APPROVAL OF MEETING MINUTES: (If not approved as a Consent Agenda Item) g. APPROVAL OF PAYROLL: (If not approved as a Consent Agenda item) ____________________________________________________________________ h. MAYOR’S REPORT: i. CITY CLERK’S REPORT: 1 j. STAFF REPORT: 1. CITY ADMINISTRATOR: 1. B. Benson Memo 8/27/15 and the City’s Letter of Support CA-1 Ducere LLC, Letter of support for its Oil Storage and Loading Facility in unincorporated Will County. (INFO. ONLY) ED-1 STBP-IL 7 Frontage Road Bridge Project Recommendation for Selection of Consultant/Resolution No. 15-074 Action: Motion to pass Resolution No. 15-074/A Resolution authorizing the City Administrator to enter into an Agreement with Baxter & Woodman for a cost of $185,906.47 ($37,181.30 Local Match) for the STP-Bridge IL 7 Frontage Road Bridge Project 2. ADMINISTRATIVE ASSISTANT: 3. FINANCE DIRECTOR: 4. POLICE CHIEF: 5. CITY ATTORNEY: 6. DIRECTOR OF COMMUNITY & ECONOMIC DEVELOPMENT: 7. DIRECTOR OF ENGINEERING: 1. A. Wagner Memo 9/9/15 8. DIRECTOR OF PUBLIC WORKS: 1. J. Findlay & J. Cronin Memo 9/10/15 k. PW-1 PERMANENT COMMITTEES; 1. PLAN & ZONING COMMISSION: 2. HERITAGE AND ARCHITECTURE: l. NEW BUSINESS – MISCELLANEOUS 2 CAB Chassis – Capital Outlay/Resolution No. 15-078 Action: Motion to pass Resolution No. 15-078/A Resolution authorizing the Administrator and Staff to purchase a 2016 International Cab and Chassis from Rush Truck Center of Northern Illinois for a total cost of $85,042.00. m. OPEN FLOOR FOR COMMENTS (Comments will be heard on items that do not appear on the Agenda. The Public Comment portion of the Agenda shall be subject to a twenty (20) minutes limitation. A time limit of five (5) minutes shall be imposed on each Speaker. The purpose of having Public Comments as an Agenda Item is to allow any person to make his/her views known to the City Council upon any subject of general or public interest. The Council recognizes that Public Comments are for the purpose of legitimate inquiries and discussion by the Public, and not for the purpose of advancing arguments or repetitious questions concerning matters which the Council believes to be closed or not of general public concern. The Council shall have the right during this period to decline to hear any person or subject matter upon proper motion and majority vote by the Council. Each person wishing to speak during the Public Comment portion of the Agenda must fill out a Public Comment Speaker Card stating name, and the topic about which he/she wishes to speak as well as a sign-in sheet, and give to the City Clerk at the Meeting itself. The purpose of the Cards is to obtain the spelling of the name of the Speaker, contact information, and provide for efficient meeting administration. The order of speaking shall be based upon the order of sign-in with first person signing-in speaking first and so forth. If the twenty (20) minutes has elapsed before all Speakers who have signed up are allowed to speak, the City Council may elect to continue the time period. However, if the City Council elects not to extend the time period those Speakers who signed up but did not speak may if they so choose to be placed on the next Agenda under the Public Comments Section and shall be placed at the top of the Sign-In Sheet in the same order they were in from the previous Sign-In Sheet. All Speakers shall comply with these rules which shall be posted at the Speaker Sign-In desk and rulings of the City Clerk. ) n. ADJOURNMENT 3 OPEN MEETINGS EXEMPTIONS 2(c)(1) 2(c)(2)2(c)(3)2(c)(5)2(c)(6)2(c)(11)- 2(c)(21)- Appointments, Employment, Compensation, Discipline, Performance, or Dismissal of specific Employees. Collective Bargaining Matters. Selection of a person to fill a Public Office, including a vacancy in a Public Office. Purchase or Lease of real property, including meetings held for the purpose of discussing whether a particular parcel should be acquired. The setting of a price for Sale or Lease of property owned by the public body. Litigation, when an action against, affecting or on behalf of the particular public body has been filed and is pending before a court or administrative tribunal, or when the public body finds that an action is probable or imminent, in which case the basis for the finding shall be recorded and entered into the minutes of the closed meeting. Discussion of minutes of meetings lawfully closed under this Act, whether for purposes of approval by the body of the minutes or semiannual review of the minutes as mandated by Section 2.06. 4 e.1 CC – September 2, 2015 The City Council Meeting was held on Wednesday, September 2, 2015 in the Board Room, 3rd Floor, of the Central Square Building. Mayor Streit called the Meeting to order at 9:13 p.m. COUNCIL MEMBERS PRESENT: PETRAKOS, CAPADONA, GILLOGLY SMITH, DESKIN, VANDERMEER, BARTELSEN COUNCIL MEMBERS ABSENT: PERRETTA ALSO PRESENT: S. STREIT, MAYOR A. MATTEUCCI, CITY CLERK B. BENSON, CITY ADMINISTRATOR T. THANAS, CITY ATTORNEY T. LEMMING, CHIEF OF POLICE P. HIRTH, DIRECTOR OF COMMUNITY AND ECONOMIC DEVELOPMENT L. HEGLUND, FINANCE DIRECTOR A. WAGNER, DIRECTOR OF ENGINEERING PRESS PRESENT Frank Vaisvilas, Free Lance Reporter for Southtown Star, David Lipowski, Reporter for Lockport Legend, and Cathy Wilker, Volunteer for LCTV were present to cover the Meeting. CONSENT AGENDA MOTION BYCAPADONA, SECOND BY DESKIN TO HAVE A CONSENT AGENDA. ALL VOTED AYE – MOTION CARRIED APPROVAL OF CONSENT AGENDA MOTION BY SMITH, SECOND BY GILLOGLY TO APPROVE THE CONSENT AGENDA AS PRESENTED. 1 CC – September 2, 2015 1. 2. 3. 4. 5. 6. 7. 8. Regular City Council Meeting Minutes of August 19, 2015: Motion to approve the August 19, 2015 Regular City Council Meeting Minutes as presented. Committee of the Whole Meeting Minutes of August 19, 2015: Motion to approve the August 19, 2015 Committee of the Whole Meeting Minutes as presented. Payroll Period ending August 16, 2015: Motion to approve the Payroll Period ending August 16, 2015 as presented, Approval of Various Bills: Motion to approve the Various Bills as presented. 2ND Amendment to American Tower Lease at 425 W. Division Street Cell Tower Motion to approve the proposed Second Amendment to the American Tower Lease at 425 W. Division Street. 2015 Amended Budget: Motion to approve the Amended 2015 Budget as presented. 1040 S. State Street Façade Grant Application (Lockport Vacuum): Motion to approve the Façade Grant in the amount of $3,000. The building is eligible and the work is within the scope of the program. 933 S. State Street Façade Grant Application (Embers Tap House): Motion to approve the Façade Grant in the amount of $10,000. The building is eligible and the work is within the scope of the program. 6 ALDERMEN VOTED AYE - MOTION CARRIED 1 ABSENT – PERRETTA 1 ABSTAIN - PETRAKOS DECEMBER 31, 2015 STUB AUDIT PRESENTATION BY SIKICH, LLP Jim Savio, Partner with Sikich, LLP presented and highlighted the report. MOTION BY VANDERMEER, SECOND BY CAPADONA TO APPROVE THE DECEMBER 31, 2015 STUB AUDIT AS PRESENTED. ALL VOTED AYE – MOTION CARRIED A PROPOSAL ESTABLISHING A “DORMANT” SPECIAL SERVICE AREA FOR THE SAGEBROOK SUBDIVISION/ORDINANCE NO. 15-020 Interim City Attorney, Tom Thanas presented Administrator Benson, Director of Community and Economic Development, Pam Hirth, and his Memo dated August 19, 2015. 2 CC – September 2, 2015 The recently approved Amended Annexation Agreement for the Sagebrook Subdivision being developed by M/I Homes authorizes the City of Lockport to establish a “dormant” Special Service Area (SSA) that covers all or part of the development. The SSA serves as a backup funding mechanism if the Developer of the subdivision and the Homeowner Associations (HOAs) created to serve the future Residents of the subdivision fail to perform their duties with respect to maintaining the common areas. The Special Services that may be provided will be at the City of Lockport’s discretion and shall include by way of example and not as a limitation the maintenance of common areas, landscaping, repair and replacement of entry monuments and signs, maintenance, repair and replacement of private roads, and stormwater area maintenance including aerators and any other surface or subsurface improvements needed to provide stormwater service to the Residents of the subdivision. The SSA tax is “dormant” because the tax is not imposed through the Real Estate Tax Bill process unless the City is pressed into service by the failure of the Developer or the HOAs to perform their required duties. The tax applies only to properties within the subdivision, and Lockport Residents and businesses outside of the SSA have no obligation to pay for any of the Special Services. Since 2003, the City of Lockport has established 16 dormant SSAs for Residential subdivisions. The proposed Sagebrook SSA will be SSA #17 in the City of Lockport. The use of the dormant SSA process is now common in Municipalities that have experienced a substantial increase in Residential Development. M/I Homes is the only Owner of the property at this point. Individual lots have not been sold yet. M/I Homes agreed to the establishment of the dormant SSA in the Amended Annexation Agreement and will not file a formal objection to the SSA. Subsequent purchasers of the lots and houses in Sagebrook will be buying subject to the existence of a dormant SSA, and the SSA will appear as an encumbrance on the land in the buyers’ title reports. The existence of a dormant does not diminish the value of Residential real estate. It usually enhances value so buyers know that there will be a funding mechanism in place if the Developer or an HOA fails to adequately perform its maintenance obligations. The establishment of an SSA is a two-step process. The City Council is required to pass an Ordinance that proposes the establishment of the SSA, schedule a P ublic H earing on the proposed SSA, and publish and send notice of the Public Hearing. After the Public Hearing, the City Council will be requested to pass a second Ordinance that actually establishes the SSA. If approved, the SSA Ordinance will be recorded against all of the properties that comprise the Sagebrook Subdivision. 3 CC – September 2, 2015 But, the Will County Clerk and Will County Treasurer will not be asked to impose an SSA tax until there is a need for the tax to reimburse the City for maintenance expenses it incurs in case of default by the Developer or the HOAs. The State Law that authorizes SSAs has an objection process that would allow at least 51% of the Owners of property within the SSA and at least 51% of the registered voters (“electors”) to defeat the establishment of an SSA by filing a written objection to the SSA within 60 days of the close of the Public Hearing. Because M/I Homes has agreed by the Amended Annexation Agreement to the establishment of the SSA, M/I Homes has already waived its right to object to the dormant SSA. Subsequent purchasers of the lots and houses in the subdivision are bound by the waiver in the Amended Annexation Agreement. The advantage of establishing a dormant SSA for Sagebrook is that a funding mechanism is put in place in case the developer and the HOAs fail to perform their maintenance obligations. The SSA will allow the City to step in to cure the default and not have to rely on general taxing funds to cover the expense of performing necessary maintenance of the common areas. The City staff hopes that there will never be a need for the dormant SSA to be activated because the implementation of the SSA will require staff time that is not usually allocated for this type of work. But, the property values are maintained and eyesores are avoided when a dormant SSA is activated. The City Staff recommends that the City Council approve the attached Ordinance proposing the establishment of a dormant SSA for Sagebrook and set Wednesday, October 7, 2015, at 7:00 p.m., as the date and time for the Public Hearing on the proposed SSA. The Public H earing would be conducted as an agenda item during the regular City Council Meeting on October 7th. If the City Council concludes the Hearing at that meeting and is prepared to move forward, the City Staff will be requesting the City Council to pass a second Ordinance that will actually establish the Sagebrook SSA. MOTION BY CAPADONA, SECOND BY BARTELSEN TO PASS ORDINANCE NO. 15-020/AN ORDINANCE PROPOSING THE ESTABLISHMENT OF A SPECIAL SERVICE AREA FOR THE SAGEBROOK SUBDIVISION AND SCHEDULING A PUBLIC HEARING ON THE PROPOSED SPECIAL SERVICE AREA. ALL VOTED AYE – MOTION CARRIED 4 CC – September 2, 2015 2015 BRIDGE MAINTENANCE PROJECT BID LETTING/RESOLUTION NO. 15-070 & RESOLUTION NO. 15-071 Director of Engineering, Amy Wagner presented her Memo dated August 27, 2015. On August 19th, 2015, the City Council approved the base bid in the amount of $265,133 for the 2015 Bridge Maintenance project. The Council requested additional information about the additional alternate bid amount of $374,669, for a total project cost of $639,802. The alternate bid included the repairs recommended by Willett Hoffman & Associates (the City’s NBIS program manager) to the High Road Bridge over the Mink Creek. Work to the superstructure at High Road includes concrete slab scarification, removal of existing drains and concrete around the drains, installation of new drains and a micro-silica overlay. Additionally the wing-walls are tipping inward so repair work to the substructure includes excavation behind both abutments and installation of steel support system in front of the wing-walls and steel tie rods to hold the wing-walls back in their original positions. Roadway work includes HMA surfacing to repair roadway where excavation is necessary for substructure work. We need to decide whether or not we want to award the alternate Contract to be constructed in 2016, or wait and rebid the work in the Spring. MOTION BY DESKIN, SECOND BY PETRAKOS TO PASS RESOLUTION NO. 15-071/A RESOLUTION AUTHORIZING THE EXECUTION OF A CONTRACT WITH D CONSTRUCTION IN THE BASE BID AMOUNT OF $265,133 AND ALTERNATE FOR 2016, IN THE ADDITIONAL AMOUNT OF $374,669, CONTINGENT UPON PASSAGE OF THE 2016 BUDGETED AMOUNT, WITH THE REQUEST THAT D CONSTRUCTION DELAY WORKING ON THE ALTERNATE BID LOCATION UNTIL SPRING SO THAT IT WILL BE PAID FOR IN THE 2016 BUDGET. ROLL CALL VOTE ON THE MOTION: PETRAKOS, CAPADONA, GILLOGLY, SMITH, DESKIN, VANDERMEER, BARTELSEN – AYES 0 NAY 1 ABSENT – PERRETTA 7 AYES 0 NAY 1 ABSENT – MOTION CARRIED 5 CC – September 2, 2015 READ STREET RECONSTRUCITON RECOMMENDATION FOR APPROVAL OF CHANGE ORDER/RESOLUTION NO. 15-073 Director of Engineering, Amy Wagner presented her Memo dated August 27, 2015. The Read Street Reconstruction Project is currently being constructed by the City of Lockport, with the help of Federal Surface Transportation Program (STP) funds. The underground utility work is currently underway, including the construction of new storm sewer infrastructure throughout the Corridor. As part of the original Contract, there were anticipated water main conflicts. The Contract included 140 feet of 8” water main adjustment at a unit price of $150.00 for a total cost of $21,000. During the construction of the storm sewer, the Contractor has come across several locations where the existing water main is much shallower than anticipated. IEPA design guidelines require water main to be a minimum of 5.5’ deep in order to be below the frost line for this area. The Contractor has uncovered locations where the existing water main is less than 4’ deep, and after roadway profile adjustments required by the reconstruction of the street, would be even shallower. MOTION BY DESKIN, SECOND BY CAPADONA TO PASS RESOLUTION NO. 15073/A RESOLUITON AUTHORIZING THE CHANGE ORDER IN THE AMOUNT OF $95,300, TO RESOLVE CONFLICT/DEPTH ISSUES WITH THE WATER MAIN WITHIN THE READ STREET RIGHT-OF-WAY. Mark, from Strand is present to explain the situation to the Council. The Gentleman was not standing at the podium with a microphone, therefore due to audio difficulty, his explanation could not be recorded on the record. ROLL CALL VOTE ON THE MOTION: PETRAKOS, CAPADONA, GILLOGLY, SMITH, DESKIN, VANDERMEER, BARTELSEN – AYES 0 NAY 1 ABSENT – PERRETTA 7 AYES 0 NAY 1 ABSENT – MOTION CARRIED 6 CC – September 2, 2015 RECESS MOTION BY SMITH, SECOND BY DESKIN TO RECESS THE REGULAR CITY COUNCIL MEETING AT 9:40 P.M. TO GO INTO EXECUTIVE SESSION FOR THE PURPOSE OF PERSONNEL 2(C)1, PENDING LITIGATION 2(C)11, AND ACQUISITION OF PROPERTY 2(C)5. ROLL CALL VOTE ON THE MOTION: PETRAKOS, CAPADONA, GILLOGLY, SMITH, DESKIN, VANDERMEER, BARTELSEN – AYES 0 NAY 1 ABSENT – PERRETTA 7 AYES 0 NAY 1 ABSENT – MOTION CARRIED BACK ON THE RECORD MOTION BY DESKIN, SECOND BY GILLOGLY TO GO BACK ON RECORD AT 10:28 P.M. ALL VOTED AYE – MOTION CARRIED DISCUSSION OUT OF EXECUTIVE SESSION Mayor Streit and Administrator Benson discussed three (3) additional alternative plans to improve the Hamilton Street Parking Lot. V-3 was contacted and asked to provide the City with additional options to improve the Hamilton Street Parking Lot. The City wants to assist business on State Street by providing additional parking spaces, in preparation for the 2017 IDOT State Street reconstruction project. Sketches were provided and a discussion ensued on the three (3) options presented. The discussion also included the importance of providing appropriate signage for business during the reconstruction project. Following the discussions the Council was in Agreement with further discussing and pursuing Option 1. 7 CC – September 2, 2015 ADJOURNMENT MOTION B Y PETRAKOS, SECOND BY CAPADONA TO ADJOURN THE REGULAR CITY COUNCIL MEETING AT 10:58 P.M. ALL VOTED AYE - MOTION CARRIED Respectfully submitted by recording the minutes off the DVD, Donna Tadey, Administrative/Deputy Clerk 8 e.2 COTW – September 2, 2015 The Committee of the Whole Meeting was held on Wednesday, September 2, 2015 in the Board Room, 3rd Floor, of the Central Square Building. Mayor Streit called the Meeting to order at 7:00 p.m. and led the Council in the Pledge of Allegiance. COUNCIL MEMBERS PRESENT: PETRAKOS, CAPADONA, GILLOGLY SMITH, DESKIN, VANDERMEER, BARTELSEN COUNCIL MEMBERS ABSENT: PERRETTA ALSO PRESENT: S. STREIT, MAYOR A. MATTEUCCI, CITY CLERK B. BENSON, CITY ADMINISTRATOR T. THANAS, CITY ATTORNEY T. LEMMING, CHIEF OF POLICE D. DRAKSLER, DEPUTY CHIEF P. HIRTH, DIRECTOR OF COMMUNITY AND ECONOMIC DEVELOPMENT L. HEGLUND, FINANCE DIRECTOR A. WAGNER, DIRECTOR OF ENGINEERING J. FINDLAY, DIRECTOR OF PUBLIC WORKS PRESS PRESENT Frank Vaisvilas, Free Lance Reporter for Southtown Star, David Lipowski, Reporter for Lockport Legend, Sawat Ahmad, Report for Joliet Herald News, and Cathy Wilker, Volunteer for LCTV were present to cover the Meeting. Mayor Streit provided an update on many Developments, Residential/Commercial Developments that are currently taking place in Lockport. 1 COTW – September 2, 2015 Mayor Streit recognized the Volunteers who helped out during the Summer Art Series. Mayor Streit recognized the Blanchard Family up to the podium. He acknowledged the help that Mitzi, Katie, and Wayne have given for the Summer Art Series and for Canal Days. Mayor Streit recognized his wife Wendy, his daughters Zoe and Penelope. He thanked his wife for her countless hours thinking about things, researching things, looking up things. She has made everything happen. Mayor thanked not only Wendy, but thanked his daughters as well for all that they have done during the Summer Art Series. Mayor Streit recognized Susan and George Padgen. Susan is the kind of person that gets things done. She has an eye for quality, she wants to make sure things are done right, and she’s on it. Her husband George is right there with her helping out in any way that he can. Susan has her hand in everything and Mayor thanked both of them. Scouts from Troop 50 were present in the audience. Jacob and Colin was recognized and the Mayor thanked them for all of their help with the Summer Art Series, and some of the other fundraising events that take place in the City of Lockport. Mayor Streit said they are always out there. They are helping, whether it’s bringing water out to people, or running errands, you guys are always there, and you always pick up the slack. Mayor Streit recognized the Lockport Genealogical Society, Ron and Robin Lif were present in the audience. Mayor Streit named Candy Hrpcha, Gary Ward who couldn’t be present tonight. Mayor thanked Ron and Robin for all their work in researching the biographies of some of the historical characters, and for the pictures that were taken to be put on the Collector Cards. That outreach was really fun. It lasted throughout the summer. Businesses had visitors come out to pick up these cards. It did exactly what we wanted it to do and that was to get people to go visit businesses that they don’t always know are there. Ron and Robin were a huge part of that. Mayor Streit recognized Mainstreet Members, Tom and Lynn Sperling, Mr. Keller, Rosemary and Tina. Mayor Streit said “They’ve helped with paying vendors, helping to go through them, their accounting, they are the ones that watched after this stuff for us. The Sperling’s are tireless and they are everywhere in the downtown. Rosemary and Tina are tremendous and their financial support is always there, their spirits are there. 2 COTW – September 2, 2015 Mr. Keller is another great asset to what we’ve had.” Mayor thanked Mainstreet for all that they have done. Mayor Streit thanked the Lockport Woman’s Club for helping and putting on the “High Tea”. Mayor also verbally named and thanked the other Volunteers, Sponsors, and Businesses who couldn’t be present at tonight’s meeting. Mayor Streit said “All of these folks were a part of this. Our downtown, the City of Lockport will not turn around unless everyone is involved. I can’t thank these folks enough. I can’t thank the people in this room enough.” MIDWEST SOARING FOUNDATION Joseph Standing Bear Schranz, Founder and President of the Midwest Soaring Foundation addressed the Council. The organization lost their lease two days ago and is looking to relocate, possibly into Lockport. He feels Lockport has the spirit, and that is very important to him. So, he’s hoping to relocate to Lockport. They perform cultural events. There is an event coming up on September 26 & 27, 2015 at the Naper Settlement, Naperville, IL. Janet Sevilla, Vice President of Operations, provided a presentation about their organization. A gentleman by the name of Dave also talked about the organization and the native/American culture. Mayor Streit said he would like to propose that Midwest Soaring Foundation use the space at the Metra Station. No rent, but upkeep of the building inside and out, and pay all utilities is all he recommends. He feels this will be a great addition to our historical background and education. He would like to put this on the Council Meeting for approval. Mayor Streit explained to the new Council members about the incubator program. City Administrator Benson said a legal agreement will be drawn up and brought to a future Committee of the Whole Meeting for Council’s approval. 3 COTW – September 2, 2015 LIAISONS REPORT Alderwoman Bartelsen reported there is a Meeting scheduled tomorrow with Jody Mariano to discuss landscaping at the main corridors in Lockport. They will be tossing around ideas to see how they can dress up the main corridors. Alderman Deskin stated he received an email from Scott Wolf who is the MCP of the City of Peoria. Mr. Wolf read about the City’s Code Compliance Grant program and wanted a little bit more information. Alderman Deskin responded. Alderman Deskin said this is the second town that has contacted him. Alderman Deskin updated the Council on the Well #9 that went down by Oak Prairie and they are looking at Well 14. We need to look for future Well sites. The problem is the Hines Dragonfly. Do we have a place to drill for a Well in the future? The Meeting was broken down into three phases. We have an emergency thing we need to discuss with U.S. Fish and Wildlife and that was to get the permit for Well #9. We have an immediate Well supply need to go ahead and bring us back to levels that we once had back in 2010 which we will be discussing in the future. We also have future Well sites where we are going to be able to go ahead and drill these Wells. We are trying to move this along especially for Well #14 and hopefully we can get that drilled within the next couple of months. Mayor Streit said we had an Open House for the State Street reconstruction that is going to be slated for 2017. It was an informational Meeting. IDOT was present to answer any questions. They will keep our on-street parking, but adds turn lanes, fills the vaults, etc… DUCERE LLC/LETTER OF SUPPORT FOR ITS OIL STORAGE AND LOADING FACILITY IN UNINCORPORATED WILL COUNTY City Administrator Ben Benson presented his Memo dated August 27, 2015. Ducere LLC, a Broker for oil distribution services, has proposed the development of new oil storage and barge loading facility that will be located in unincorporated Will County on the MWRD Island in the west half of the Chicago Sanitary and Ship Canal. 4 COTW – September 2, 2015 The source of the oil will be from the Enbridge Pipeline currently terminating at the Lockport Shell Tank Farm. The oil would be transported from the Shell Tank Farm to the new facility on MWRD Island through a 30-inch diameter underground pipeline. A substantial portion of the pipeline would be located within public right-of-way, some of which is under the jurisdiction and control of the City of Lockport. The pipeline would be about 1.75 mile long. The City Staff has done a preliminary review of the engineering aspects of the proposed facility on MWRD Island and the underground pipeline that would be constructed to transport the oil from the Shell Tank Farm to the new Ducere storage and loading facility. The Staff has also reviewed the proposed route of the underground pipeline part of which will include City right-of-way. The City Staff’s preliminary opinion of the proposal is that it will not have a negative impact on the City’s right-of-way. The City Staff has informed Ducere’s Representatives that an Easement Agreement will need to be approved by the Lockport City Council, and the Agreement will need to include compensation or other value to be received by the City in exchange for granting the easement for the underground pipeline. Ducere has already expressed its willingness to negotiate a substantial benefit to the City in exchange for Grant of Easement. Ducere has already entered into Easement Agreements with the Property Owners in the path of the proposed pipeline including the Lockport Township Park District and several individual homeowners. Ducere’s storage and barge loading facility has already been approved by the Will County Land Use Committee and then the Will County Board. So, Ducere has local development approval to proceed with the project. Ducere still needs to obtain a permit to operate its new facility form the U.S. Army Corps of Engineers. The City has been asked for comment on the proposed Corps Permit. The City received a Public Notice announcement from the U.S. Army Corps of Engineers on August 27, 2015, and the deadline for the City’s response is September 17, 2015. Ducere has asked the City of Lockport to express its support for the project and its willingness to work with Ducere in having the underground pipeline constructed in a manner that will promote public safety but will also generate a benefit for nearby Residents and Businesses. 5 COTW – September 2, 2015 Federal and State pipeline regulations will control public safety aspects, and the City will ensure that the City’s Easement Agreement with Ducere will include Ducere’s mandatory compliance with those regulations, including strict compliance with regulations designed to protect the City’s water and sewer systems and the public drinking water supply. Ducere will be required to utilize directional drilling to burrow under the Sanitary Ship Canal and they will trench through the I&M Canal while burying the rest of the route to protect the environment and surrounding amenities. The proposed terminal and distribution point is isolated away from Lockport Residents and Businesses, and all barge loading occurs outside the main channel of the Chicago Sanitary and Ship Canal. The plan also includes the removal of an old sunken barge in the Ship Canal which could pose a hazard to barges and the removal of the old grain silos on the MWRD property. Ducere facility is expected to create new tax revenues for the region, increased employment with construction jobs, permanent jobs with the terminal operation, tankermen, and tug boats. The City Staff is recommending that a letter of support be sent as requested by Ducere. The actual storage and loading facility will be located in unincorporated Will County, and the proposed operation will have no direct impact on the City. In the near future, the City and Ducere will resume negotiations for the Grant of Easement within the public right-of-way. The Easement Agreement will include standard provisions that are found in Underground Pipeline Easement Agreements the City has with other underground utilities. The City of Lockport is not relinquishing its negotiation position by sending a letter of support to the Corps of Engineers. The project cannot move forward without an Easement Agreement being approved by the Lockport City Council. So, the City Staff is recommending that the letter of support be authorized by the City Council, and the City Staff be directed to continue negotiating an Easement Agreement that will provide valuable benefits for Lockport Residents and Businesses. ACTION: MOTION TO AUTHORIZE ISSUANCE OF THE LETTER OF SUPPORT BEFORE SEPTEMBER 17TH DEADLINE, AND AUTHORIZE THE CITY STAFF TO CONTINUE WITH ITS NEGOTIATIONS WITH DUCERE AND BRING TO THE COUNCIL A FUTURE PROPOSAL. 6 COTW – September 2, 2015 Alderman Smith said “It looks like that it appears to me that all the activity per barge is on the west side of the Canal, is that correct?” Mayor Streit answered “Yes, it’s basically that knitch right where the corn tower is and then on the other corn tower. All of the facility loading they want to do on the north side of the bridge by that corn tower where it currently is. There will be barges out there like you see now….” PUBLIC COMMENT Sandy Burcenski, C.A.R.E. Member addressed the Council. Mrs. Burcenski stated she has lived on the west side of Lockport for 41 years. She has been a Lockport Resident all her life. “I’ve heard everybody talking, I’ve got prepared statements and notes, but when you say you are sending a letter, what is it called, it states in here, it is in your recommendation – Staff is recommending the letter, you are saying well it’s not really supporting, but you are supporting. You are giving the impression of support to the Army Corps of Engineers that you are in favor of this. And, to say that there is pipelines everywhere, there are no pipelines on the west side. I would ask every one of you do you want this going through your neighborhood? I mean, I am at a loss as to why you would even consider something like this? The Mayor says a quiet zone. I would like nothing more than a quiet zone including everybody on that west side but that is a totally separate issue and that should not be a dangling carrot to try to get a pipeline on the west side. The one question I want to ask is Ducere, LLC , this Company is a Broker, who are they a Broker for? Are they a Broker for Enbridge?” Mayor Streit answered “No. They take oil from Canada. Just wherever the oil comes from.” Sandy Burcenski said “They are going to be a part of the Enbridge with the Enbridge pipeline.” Mayor Streit explained “What they will do is, the goal is, Enbridge Pipeline basically terminates up by the tank farm. They are going to extend it 1.7 miles ……” Sandy Burcenski said “So now it’s going to come through our neighborhood. Is everybody on the Council aware of the pipeline breaks? 7 COTW – September 2, 2015 As most of you know I’ve been involved with C.A.R.E. for the last twenty plus years and we’ve investigated many of the pipelines. The issue is the biggest pipeline break from the ones in our area is Romeoville. We’ve had numerous ones on New Avenue, we’ve had numerous ones on High Road. These are major, major issues. There is one on High Road that is still being monitored at their homes. Now this is going to come through the west side. I’m asking you not, no comment, do not send any type of letter of any type of support to this Company. Based on the Staff Report I believe it is obvious you haven’t not only done your homework, you haven’t even considered your Residents not only on the west side but in your entire town. To actually consider bringing in my opinion a dangerous, toxic and potentially underground time bomb into my neighborhood is not only incredibly reckless, but totally irresponsible. This is 2015. Not 1915. Is this seriously the direction that you want for the City of Lockport? In my opinion if you allow this you will be setting a precedent that could majorly backfire with your development. Not only in the downtown area but the development in the whole town. I’ve been coming to these Meetings for over twenty years and I thought I had seen everything until tonight. You have a situation where you are bringing this into the west side. It identifies, ok you are going to be filling in wetlands, as far as flooding issues we’ve had problems in the past on the west side flooding issues, breaks, are you aware of what they are going to be putting into these pipelines? Potential contamination of property, water, property values, safety issues and you say, well there is going to be Federal and State Agencies. What’s Federal and State Agencies going to do? What do you think is going to happen if there is a spill down there? If you have tar sand or something to that effect that spills on that west side. What do you think the Federal Agencies are going to do? There will be a lawsuit. You know what is going to be sitting down there? We are going to be sitting down there. The people of the west side. To say well this one already signed the Agreement, that one signed the Agreement….you know what I would tell them, hopefully they took that to a good Lawyer and checked that Easement Agreement because these Companies have a ton of Lawyers that know how to get through all of this. This is a situation, I mean, I am at a loss as to why even entertain this? Don’t entertain this. A lot of people probably on the west side will come down my throat as far as – well we could get a quiet zone. Do not trade a quiet zone to allow something like this to come through that neighborhood. Like I say, you are going backwards. This City is a City that wants to move forward. You are almost at 25,000 people we are at a high density. It’s not like it was years ago. Do you really want something like this in your town? I can go on and on and on. It’s going to go under the I&M Canal. 8 COTW – September 2, 2015 Depending on your agreement, I had read, where this pipeline is and the way they work this Agreement if you have trucks or you have cars parked by that park down there and it goes over it and that pipeline breaks they may not have to clean that up. It may be up to the property owners to take care of that. There is certain things that you have to look at. That’s the other thing, it’s going right next to a park where children are playing. This is a 30 inch pipe bringing in all likely hood, tar sands with different chemicals in there to get the oil through and the chemicals that go to get this oil through are not good. You are talking about benzene, thallium, and these are all carcinogenics. We were flooded in 1996 and the pumps stopped at Chevron/Texaco so a lot of that liquid, we had that goo on the west side. What is also interesting, what is really interesting is Chevron/ Texaco will not allow this through their property. I don’t know how many of you, if you even realize that.” Mayor Streit said “That’s actually not accurate.” Sandy Burcenski answered “That’s true.” Mayor Streit said “It’s not true.” Sandy Burcenski said “That is what they told me!” Mayor Streit said “They didn’t want it to be a part of their property, but they were willing to let it go along the Canal wall. It’s just that Ducere didn’t want to deal with Chevron.” Sandy Burcenski said “Chevron told me they would not allow it.” Mayor Streit said “They told me too. They said they were open to talking with Ducere about running it through the west side of the property, but Ducere didn’t want to deal with Chevron because they saw that it took forever to do it with Cogent.” Sandy Burcenski said “Chevron is not going to allow that go through them. Chevron may be telling you, but Chevron would not allow that because of liability issues. One of the biggest things is liability.” Mayor Streit said “Their biggest concern that they told me was they don’t want it to go through some of the sections that they had that they had remitted. 9 COTW – September 2, 2015 It’s not that their anti-oil, it’s just that they want to make sure that anything that was oil today that’s not theirs didn’t go through those spots. They said that they were open to talking to Ducere about it along the west end of the property because there wasn’t any past oil from Chevron or Texaco at the time, so anything would be solely Ducere. So, it’s not entirely accurate. But that’s fine.” Sandy Burcenski said “Maybe I shouldn’t have even brought that up. The bottom line is I do not want this in my neighborhood. I don’t think any of you would want this in your neighborhood. I don’t think selling out for a quiet zone, we should have had a quiet zone twenty years ago. I’ve approached every Mayor up here at the City. When I moved down to the west side so many of the Residents told me, the old timers told me, you know what you move down to the west side, the wild, wild west down here because nobody in the City of Lockport really even looks at us or considers us a part of the City. They don’t do anything for us. Obviously to even entertain something like this shows exactly where you stand as far as the west side. C.A.R.E. has worked with these pipeline issues, with this whole situation with the information we have. I’m telling you this is something we do not, I do not want, I shouldn’t say we, I do not want this in my neighborhood. I would ask all of you, do not send any letter, any type of letter of any type of support if the only thing you’re thinking about in my opinion is the quiet zone. It’s not good enough. It’s not good enough. It’s not good enough for this town, it’s not good enough for the Residents, and it sure is not good enough for the people on the west side. It’s wrong.” Josh, who lives in Lockport stated he has lived here for twelve years. “I was just wondering, you said it was just a distribution company like transporting oil, but you also stated that they would be drilling….” Mayor Streit answered “No, they are drilling to put the pipeline through. That’s the drilling.” Administrator Benson said “Directional drilling to get the pipe 50 feet under the Illinois Shipping Canal.” Mayor Streit does care about the west side and about the downtown. He wants better development downtown and feels the blaring of a train horn that starts at 2nd Street and works its way through the downtown, is not a good thing for customers to hear if they are sitting outside eating at the Public Landing, or Embers Tap House. 10 COTW – September 2, 2015 Mayor Streit also said it was up to Ducere to convince us that this pipeline is safe, to convince us that they have the proper ability to clean this up, to convince us that if this breaks somewhere that it’s not up to the property owners to clean it up that Ducere is going to be on it, it is up to them to convince us and they have not yet done that. They still have to come before us and make those arguments to not just us, but to the Residents. Mayor is happy to send a support letter that says fine, I want to see what you guys can propose to us and by no means, mean’s we are agreeing to it. “ RECIPIENT OF THE GFOA BUDGET AWARD Finance Director Heglund said “For years the Financial Statements of the City have been given an award from the GFOA. Prior to me getting here Eric Brown, Maggie, and Jack have all worked on trying to put together a Budget but they never submitted it for award. So, we decided last January with the 2015 Budget that we would go ahead and apply to the GFOA for the Budget Award and we just got recognition that we did get that award.” Matter of Information. No Action Required. RADIO COMMUNICATIONS – PD/RESOLUTION NO. 15-072 Deputy Chief, Dave Draksler presented his Memo dated August 26, 2015. The Police Department currently transmits on an analog system for day-to-day operations. It is licensed and regulated by the FCC. This platform requires numerous transmitters and receivers to provide satisfactory communication. Throughout the Department’s history, we have struggled with poor radio communication. As of January 1, 2013, all public safety and industrial/business land mobile radio systems operating in the 150-174 MHz and 421-470 MHz bands were required to cease using 25 kHz efficiency technology and begin using at least 12.5 kHz efficiency technology. This became known as FCC’s narrow banding mandate. This mandate has negatively impacted our communication capabilities. 11 COTW – September 2, 2015 Several steps have been taken in past years to address this deficiency only resulting in failed improvements. These limitations increase when transmissions are performed from inside a structure such as our PD, retail establishments, and local schools. Our current infrastructure has crippled our operations and has made this a priority task seeking all necessary authorizations from the Council in an expeditious manner. As of August 10th, Lockport and Crest Hill had to temporarily abandon this system due to Officer safety concerns. Poor radio communications has directly affected Department operations. Several times, Officers have missed dispatch calls only because their portable never received the transmission. Even more so, Officer’s transmissions to the Dispatcher via their portable often times are unreadable and must be repeated. These poor signals are escalated when an Officer speaks to another Officer portable to portable. Continuous communication between an Officer and a Dispatcher is the Officer’s lifeline. When the Officer is unable to communicate with his Dispatcher through his portable radio, he has to find other means to communicate. It may be a cell phone or a mobile (car) radio. In the past five (5) years, the Police Department has had its share of critical incidents that involved armed barricaded subjects. These incidents, which usually last several hours, involve the relaying of critical information back and forth between the Officers, Command Post, and Dispatch. Specifically during two critical incidents in the past three (3) years, Officers on the back perimeter were unable to communicate with Officers on the front perimeter. As a result, these Officers missed critical information that could have been catastrophic. This is not only an Officer safety concern, but a Public safety concern as well. This is unacceptable to our standards and I feel would be unacceptable by the Public who reply on the Police Department to provide efficient and quality service. On Monday, August 24th, Chief Lemming and I, along with WESCOM Executive Director Steve Rauter, joined Crest Hill Police Chief Dwayne Wilkerson as he presented this same issue before his governing Council. We each provided testimony in support for the migration to a digital system. A straw poll taken of the Aldermen at the Meeting showed a unanimous support toward the migration to the River System and commitment for purchase of radio equipment for their Agency. In order for this migration to occur, each Agency will have to purchase new P25 Compliant Portable Radios. As a result, we reached out to five (5) Vendors (A-Beep, Chicago Communication, Digital Sky, Miner Electric, and United Radio). 12 COTW – September 2, 2015 Each Vendor was given a detailed list of a specific and defined number of model and brand radios, accessories, and chargers. Three Vendors responded with written quotes. Of the three Vendors, A-Beep was the lowest bid. It should be noted that the model radio we are seeking to purchase, has a manufacture sales promotion good for orders placed by September 30th. Because there is a substantial cost savings, we are requesting final authorization for this purchase in order to reap the benefits of this promotion. The funds to purchase this equipment will come from our Federal Seizure Account. During the preparation of this year’s fiscal Budget, we earmarked funds in case this purchase came to fruition. Because our quantity of radios and accessories may vary, we are seeking approval to purchase the necessary equipment not to exceed $99,900.00. CONSENT AGENDA: MOTION TO PASS RESOLUTION NO. 15-072/A RESOLUTION AUTHORIZING THE PURCHASE OF NEW RADIO EQUIPMENT FOR THE POLICE DEPARTMENT. DISCUSSION REGARDING CONTINUATION OF THE TEMPORARY REDUCTION IN CERTAIN PERMIT FEES AND CONTINUATION OF DELAY OF PAYMENT OF CERTAIN IMPACT FEES In November 2013, the Council passed Resolution No.: 13-090 which allowed for a 50% reduction in certain (building) permit fees to incent Residential Development for a period of 24 months. The following fees are included in the reduction: water tap-on fees, sewer tap fees, building permit fees, and municipal facilities fees. This Resolution is due to expire on November 5th. The reduction in fees was a result of a perceived imbalance in the permit fees charged by the City relative to the construction of homes and similar fees charged by surrounding Communities as well as the decline in the number of permits being issued by the City. The number of housing permits issued each year is one of the key pieces of demographic information for enticing new retail development. In 2013, the City issued 29 residential permits (29 new units) and in 2014, the City issued 50 residential permits (55 new units). To-date, the City has issued 22 residential permits (for 26 new units). It is Staff's opinion that the decline in permits this year is a result of active subdivisions reaching build-out. No new Residential subdivisions were platted nor did any existing entitled Residential become active in 2014. 13 COTW – September 2, 2015 In addition, it should be noted that existing Annexation Agreements for entitled Residential property already include a negotiated reduction in impact fees and in some cases, the reduced fees approved in the Annexation Agreements (for the previously active subdivisions) were allowed a further (50% ) reduction (as provided for in Resolution 13-090). Should the Council direct Staff to extend the fee reduction incentive, it will only be applicable to new residential development and will not be applicable to existing residential development governed by an approved Annexation Agreement. If any reduced fee structure established in an approved Annexation Agreement is equal to or less than the fee structure that would result from the extension of this program, no further reduction will be allowed. In June 2014, the Council passed Resolution No.: 14-046 which allowed for the continuation of a delay in payment of School, Park and Library District fees until final inspection (prior to occupancy). The initial program was approved in 2012. Under the current Resolution, the program is due to expire on December 31st. At the time the program was implemented and then subsequently extended, it was done to assist homebuilders with cash-flow issues during the housing downturn. Though the housing market is rebounding, it is Staff’s opinion that extending this program or making it a permanent program has no negative impacts on the Districts as the true impact really occurs once the home is occupied and the Residents actually begin using the District's respective facilities. The delay in payment program would however, continue to help/benefit the City's Residential Homebuilders and Developers. Staff is seeking input and direction from the Council on how to proceed with these Residential Incentive Programs due to expire at the end of this year. Alderman Capadona would like a break down on the fees; Building Permit fees, Tap-On fees, Water Tap-On fees, Sewer Tap-On fees, Municipal Facility fees, School fees. He would like the values. He would like to see the whole picture. Discussion ensued about a possible extension for six months or one year. A timeline would be good to have. How much property is out there that isn’t developed? How much Residential could go in? How much more can the City absorb? Pam will identify on a map how many acres of additional Residential that there would be for opportunities that aren’t entitled to get entitled and developed. She will bring that information back for Council review in October. Administrator Benson said we will package this up into another Committee of the Whole in October. Administrator Benson asked if there were any deliberation on the continuation on the fee payment delay. He would actually like to make that a permanent Ordinance change. 14 COTW – September 2, 2015 Mayor Streit has no problem with that and would like to move that forward on the Consent Agenda. Administrator Benson said that will be brought back on September 16th. NEW BUSINESS Administrator Benson provided an update on the Caton Farm/Bruce Road Bridge project. The eastern portion of the project seems not to be potentially necessary. Staff will return to the Council regarding possible funding. Memo’s and Recommendations will follow. State Senator Pat McGuire provided an update on the Senate Bill 317 regarding the Lockport Museum. Tom, from the American Legion thanked everyone for the wonderful support that was shown while the moving wall was in Lockport. Bob Lowe, addressed the Council. He wanted to emphasize that the new Caton Farm/Bruce Road Bridge is going to impact Fairmont. He feels Fairmont is a forgotten Community. Fairmont Representatives should have a substantial part in this because their Community is going to be affected by it. ADJOURNMENT MOTION BY VANDERMEER, SECOND BY PETRAKOS TO ADJOURN THE COMMITTEE O F THE WHOLE MEETING AT 9:06 P.M. Respectfully submitted by recording the minutes off the DVD, Donna Tadey, Administrative/Deputy Clerk 15 e.4 To: From: RE: Date: City Council Lisa Heglund Various Bills September 9, 2015 Below is a list of some of the invoices that are in your packet. I have included some additional information to further explain the expense. The amounts listed below are based on the invoice amount. 1. IL Dept. Natural Resources $1,400 (Commuter Lot) – Annual lease payment for State owned portion of Commuter Lot parking 2. REO Funding Solutions $93,592 (Development) – Reduction in letter of credit for Hawthorn Preserve development 3. Gaskill & Walton $18,652.50 (Capital Outlay Sewer) – Pay request #2 for Bonnie Brae phosphorus removal project 4. West Side Specialized Service $1,118.36 (Sewer) – New cutting edge and bolts for John Deere endloader 5. AC Pavement Striping $85,360 (Street) – Payment for chip and seal on Canal St to be reimbursed through Haunted House admission fee 6. All Data $1,500 (Administration) – Annual renewal fee for vehicle repair software 7. Aries Industries $1,218.78 (Street) – 1 chain drive repair kit 8. Austin Tyler $468,565.60 (Capital Outlay various) – a. Boehme St water main project #4 b. Summit & Runyon #5 c. Canal Street Grading 1st and final pay request 9. Baxter & Woodman $6,524 (Capital Outlay Street) – Engineering on following: a. Storm sewer survey for 17th & Mary Ann Lane b. Storm sewer outfall sewer survey 10. Camz Communication $1,175 (Capital Outlay Water) – Installation of lighting, console and radio for new Ford pickup truck 11. CDW Government $3,243.05 (Police) – Purchase of 3 UPS units, 3 UPS remote monitors, and back up tower 12. Clarke Environmental Mosquito $5,712.18 (Special Projects) – mosquito control 13. EJ USA $1,630.50 (Water) – Purchase of various parts for use in water system maintenance (Tee, Bolts, Sleeve, Valve) 14. Hampton, Lenzini & Renwick $3,664.36 (Capital Outlay Street) – Phase III engineering for Division St Bridge 15. Hospinvest, LLC $5,774 (Administration) – Final payment on hotel study 16. Meade Electric $1,702.69 (Street) – Reset street light after EMA car accident 9th & Hamilton St 17. PT Ferro $6,000 (Capital Outlay Street) – Storm sewer adjustments to curbs and catch basins for The Fields 18. Ray O’Herron $6,427.06 (Police) – Purchase of 8 bullet proof vests 19. RJ’s Landscaping $5,680 (Capital Outlay Street) – Landscaping at Milne Grove School due to 2015 sidewalk program. To be reimbursed by School 20. Robinson Engineering $3,401 (Engineering) – Data collection for railroad Quiet Zone 21. Seeco Construction Service $5,498.50 (Capital Outlay various) – material testing at BBSD & Summit Dr 22. Standard Equipment Company $1,047.38 (Sewer) – Purchase of root cutter 23. State Treasurer $1,219.80 (Street) – Quarterly payment for traffic signal at 159th & Adelman 24. Strand & Assoc $79,789.20 (Capital Outlay various) – Engineering for following projects a. BBSD Phosphorus Removal project b. Garfield Ave phase III c. Summit Dr water modeling d. Future water supply e. Miscellaneous sanitary and water related f. State & 9th St water main g. Well 14 redrilling h. Read St phase III i. 2015 Construction Engineering projects 25. V3 Companies $2,725 (TIF) – Engineering work for vaults due to State St project e.5 -.m&IFTIEWllU Agenda Memorandum To: Mayor & City Coundl From: Deputy Chief Dave Draksler Subject: Radio Communications - PD Date: Ausust 26, 201S PCH-1 Item# BACgGBQUNOi The police department currently transmits on an analog system for day-to-day operations. It is licensed & regulated by the FCC. This platform requires numerous transmitters and receivers to provide satisfactory communication. CUR8ENT/ PAS! P808LEM$; Throughout the department's history, we have struggled with poor radio communication. As of January 1, 2013, all public safety and lndustrlaVbuslness land mobile radio systems operating In the 1~174 MHz and 421-470 MHz bands were required to cease using 25 kHz effldency technology and begin using at least 12.s kHz efficiency technology. This became known as FCCs narrow banding mandate. This mandate has negatively Impacted our communication capab411ties. Several steps have been taken In past years to address this deficiency only resulting In fllied Improvements. These limitations Increase when transmissions are performed from Inside a structure such as our PD, retail establishments and local schools. Our current Infrastructure has crippled our operations and has made this a priority task seeking all necessary authorizations from the Council In an expeditious manner. As of August 10"', Lockport & Crest HiH had to temporarily abandon this system due to officer safety concerns. PAST INODENlS: Poor radio communications has directly affected department operations. Several times, offlcen have missed dispatch calls only because their portable never received the transmission. Even more so, officer's transmissions to the dispatcher via their portable often times are unreadable and must be repeated. These poor signals are escalated when an officer speaks to another offscer portable to CA-1 COMMITTEE OF THE WHOLE Item # Agenda Memorandum To: Mayor & City Council From: Ben Benson, City Administrator Subject: Request from Ducere LLC, for a Letter of Support for its Oil Storage and Loading Facility in Unincorporated Will County Date: August 27, 2015 BACKGROUND/HISTORY Ducere LLC, a broker for oil distribution services, has proposed the development of new oil storage and barge loading facility that will be located in unincorporated Will County on the MWRD Island in the west half of the Chicago Sanitary and Ship Canal. The source of the oil will be from the Enbridge Pipeline currently terminating at the Lockport Shell Tank Farm. The oil would be transported from the Shell Tank Farm to the new facility on MWRD Island through a 30-inch diameter underground pipeline. A substantial portion of the pipeline would be located within public right-of-way, some of which is under the jurisdiction and control of the City of Lockport. The pipeline would be about 1.75 mile long. (See Map) The City staff has done a preliminary review of the engineering aspects of the proposed facility on MWRD Island and the underground pipeline that would be constructed to transport the oil from the Shell Tank Farm to the new Ducere storage and loading facility. The staff has also reviewed the proposed route of the underground pipeline part of which will include City right-ofway. The City staff’s preliminary opinion of the proposal is that it will not have a negative impact on the City’s right-of-way. The City staff has informed Ducere’s representatives that an easement agreement will need to be approved by the Lockport City Council, and the agreement will need to include compensation or other value to be received by the City in exchange for granting the easement for the underground pipeline. Ducere has already expressed its willingness to negotiate a substantial benefit to the City in exchange for grant of easement. Ducere has already entered into easement agreements with the property owners in the path of the proposed pipeline including the Lockport Township Park District and several individual homeowners. Ducere’s storage and barge loading facility has already been approved by the Will County Land Use Committee and then the Will County Board. So, Ducere has local development approval to proceed with the project. Ducere still needs to obtain a permit to operate its new facility from the U.S. Army Corps of Engineers. The City has been asked for comment on the proposed Corps permit. The City 1 received a Public Notice Announcement from the U.S. Army Corps of Engineers on August 27, 2015, and the deadline for the City’s response is September 17, 2015. Ducere has asked the City of Lockport to express its support for the project and its willingness to work with Ducere in having the underground pipeline constructed in a manner that will promote public safety but will also generate a benefit for nearby residents and businesses. Federal and state pipeline regulations will control public safety aspects, and the City will ensure that the City’s easement agreement with Ducere will include Ducere’s mandatory compliance with those regulations, including strict compliance with regulations designed to protect the City’s water and sewer systems and the public drinking water supply. Ducere will be required to utilize directional drilling to burrow under the Sanitary Ship Canal and they will trench through the I&M Canal while burying the rest of the route to protect the environment and surrounding amenities. The proposed terminal and distribution point is isolated away from Lockport residents and businesses, and all barge loading occurs outside the main channel of the Chicago Sanitary and Ship Canal. The plan also includes the removal of an old sunken barge in the ship canal which could pose a hazard to barges and the removal of the old grain silos on the MWRD property. Ducere facility is expected to create new tax revenues for the region, increased employment with construction jobs, permanent jobs with the terminal operation, tankermen, and tug boats. RECOMMENDATION The City staff is recommending that a letter support be sent as requested by Ducere. The actual storage and loading facility will be located in unincorporated Will County, and the proposed operation will have no direct impact on the City. In the near future, the City and Ducere will resume negotiations for the grant of easement within the public right-of-way. The easement agreement will need formal approval by the City Council before it becomes effective. The easement agreement will include standard provisions that are found in underground pipeline easement agreements the City has with other underground utilities. The City of Lockport is not relinquishing its negotiation position by sending a letter of support to the Corps of Engineers. The project cannot move forward without an easement agreement being approved by the Lockport City Council. So, the City staff is recommending that the letter of support be authorized by the City Council, and the City staff be directed to continue negotiating an easement agreement that will provide valuable benefits for Lockport residents and businesses. ATTACHMENTS PDF of Public Notice Application for Ducere LLC with US ARMY CORPS OF ENGINEERS (Which includes a Map of the proposed pipeline and detailed description of project) SPECIFIC CITY COUNCIL ACTION REQUIRED A. Authorize issuance of the letter of support before September 17th deadline, and authorize the City staff to continue with its negotiations with Ducere. 2 ED-1 City Council Agenda Memorandum To: Mayor & City Council From: Amy Wagner, P.E. Subject: STBP- IL-7 Frontage Road Bridge Project Recommendation for Selection of Consultant Date: September 9, 2015 Item # BACKGROUND/HISTORY In February 2015, the City’s Engineering Department requested Surface Transportation Bridge Program (STBP) funding for the repair or replacement of the IL-7 Frontage Road Bridge over the Des Plaines River (Structure No. 099-0135). The latest inspection resulted in a sufficiency rating of 35.0 making it eligible for rehabilitation through federal STBP funding. This bridge provides the most direct access to the Metropolitan Water Reclamation Districts Lockport Powerhouse and is the only access to this area between the Illinois & Michigan Canal and the Des Plaines River. The US Army Corp of Engineers utilizes this access for maintenance of the Sanitary & Shipping Canal walls. In April 2015, we were notified that we are to receive the requested funding for Phase 1 engineering (see attached funding letter). The funding for Phase 2 design and phase 3 construction will be awarded, contingent upon the availability of funding in the fiscal year requested. We did not have any issues with funding for the Division Street Bridge, and expect none for the full funding of this project. In April 2015, we solicited proposals for the services of a professional engineering firm to develop a phase I study. We sent the RFQ to those firms who responded to the last RFQ for the Second Street Bridge, and we also posted the RFQ information to the City’s website. We received 6 proposals of which were all extremely competitive in qualifications. Therefore, we chose to interview all 6 candidates. In July 2015, we interviewed the following firms: Baxter & Woodman, Mokena, IL Strand Associates, Joliet, IL HR Green, New Lenox, IL TranSystems, Schaumburg, IL Hampton, Lenzini & Renwick, Elgin, IL Willett Hofmann & Associates, Dixon, IL Of these, which we found to be equally qualified, we chose Baxter & Woodman to complete the Phase 1 based on the interview, and their innovative ideas for cost savings. Baxter & Woodman is the consulting Engineer that is also working on the 2nd Street Bridge project. . PROS/CONS/ALTERNATIVES (IF APPLICABLE) The City would need to enter into an engineering services agreement with the State, pay for the engineering services after invoiced by the consultant, and request reimbursement by the state for the 80% Federal share. The funding letter states that we are awarded 80% of the estimated Phase 1 Engineering cost of $200,000. The proposal from Baxter & Woodman was for $185,906.47. The City’s portion is 20% or $37,181.30. The State has already reviewed and approved both the Engineering Services Agreement and the Local Agency Agreement for Federal Participation. RECOMMENDATION We recommend that the City enter into an agreement with Baxter & Woodman for a cost of $185,906.47 ($37,181.30 Local Match). ATTACHMENTS (IF APPLICABLE) A. Resolution authorizing the Mayor to enter into an agreement with Baxter & Woodman for the STBP- IL-7 Frontage Road Bridge Project, and also to enter into an agreement with the State of Illinois for Federal Cost participation of 80% of the cost of Phase 1 Engineering, with the City to agree to fund the remaining 20% local share from the City’s General revenue fund. B. Copy of the Preliminary Engineering Services Agreement for Federal Participation. C. Copy of the Local Agency Agreement for Federal Participation. SPECIFIC CITY COUNCIL ACTION REQUIRED A. Motion to approve the resolution as presented 074 RESOLUTION # 15-________ A RESOLUTION AUTHORIZING THE CITY ADMINISTRATOR TO ENTER INTO AN AGREEMENT WITH BAXTER & WOODMAN FOR A COST OF $185,906.47 ($37,181.30 LOCAL MATCH) FOR THE STP-BRIDGE IL-7 FRONTAGE ROAD BRIDGE PROJECT WHEREAS, the City of Lockport endeavors to improve the IL-7 Frontage Road Bridge (Structure number 099-0135) over the Des Plaines River, that is approximately 0.19 miles in length and known to the Illinois Department of Transportation as MFT Section Number 15-00083-00-BR and State Job Number P-91-068-16. WHEREAS, the cost of said improvement has necessitated the use of federal funds. WHEREAS, the federal fund source requires a match of local funds. WHEREAS, the use of federal funds requires a joint funding agreement (AGREEMENT) with the Department of Transportation. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF LOCKPORT AS FOLLOWS: Section 1: The Mayor is authorized to enter into an Agreement with Baxter & Woodman for completing the Phase 1 Engineering for the STP-Bridge 2nd Street Bridge Project for a cost of $179,901.65 ($35,980.33 Local Match). Section 2: that the City of Lockport authorizes thirty-five thousand, nine hundred eighty and 333/100 dollars, ($35,980.33) or as much of such sum as may be needed to match federal funds in the completion of the aforementioned project known as MFT Section Number 15-00083-00BR. BE IT FURTHER RESOLVED, that the Mayor is hereby authorized and directed to execute the above-mentioned AGREEMENT and any other such documents related to advancement and completion of said project. Section 3: Effective Date: This Resolution shall become effective upon passage, approval and publication in book and pamphlet form as provided by law. 074 RESOLUTION # 15-________ PASSED this ________ day of __________, 2015. _____ ALDERMEN VOTING AYE ______ ALDERMEN VOTING NAY _____ ALDERMEN ABSTAINING ______ ALDERMEN ABSENT the MAYOR voting aye _____ voting nay _____ not voting _____ _____ PETRAKOS _____ CAPADONA _____ GILLOGLY _____ SMITH _____ DESKIN _____ VANDERMEER _____ PERRETTA _____ BARTELSEN _____ MAYOR ATTEST: ________________________ Steve Streit, Mayor _____________________________Alice Matteucci, City Clerk Local Agency City of Lockport County Will Section 15-00083-00-BR Project No. BROS-4003(590) Job No. P-91-068-16 Contact Name/Phone/E-mail Address Amy Wagner, P.E. 815-838-0549, x2315 [email protected] Consultant Baxter & Woodman, Inc. L O C A L A G E N C Y Preliminary Engineering Services Agreement For Federal Participation C O N S U L T A N T Address 8840 W. 192nd Street City Mokena State IL Zip Code 60448 Contact Name/Phone/E-mail Address Adam James 815-459-1260 [email protected] THIS AGREEMENT is made and entered into this day of , between the above Local Agency (LA) and Consultant (ENGINEER) and covers certain professional engineering services in connection with the PROJECT. Federal-aid funds allotted to the LA by the state of Illinois under the general supervision of the Illinois Department of Transportation (STATE) will be used entirely or in part to finance engineering services as described under AGREEMENT PROVISIONS. Project Description Name IL 7 Frontage Road Termini Route FAP 351 Length 0.19 mi Structure No. 099-0135 over Des Plaines River Description Phase I Preliminary Engineering for the rehabilitation of existing Structure Number 099-0135. ENGINEER Project No. 150440.40. Agreement Provisions I. THE ENGINEER AGREES, 1. To perform or be responsible for the performance, in accordance with STATE approved design standards and policies, of engineering services for the LA for the proposed improvement herein described. 2. To attend any and all meetings and visit the site of the proposed improvement at any reasonable time when requested by representatives of the LA or STATE. 3. To complete the services herein described within 365 calendar days from the date of the Notice to Proceed from the LA, excluding from consideration periods of delay caused by circumstances beyond the control of the ENGINEER. 4. The classifications of the employees used in the work should be consistent with the employee classifications and estimated manhours shown in EXHIBIT A. If higher-salaried personnel of the firm, including the Principal Engineer, perform services that are indicated in Exhibit A to be performed by lesser-salaried personnel, the wage rate billed for such services shall be commensurate with the payroll rate for the work performed. 5. That the ENGINEER is qualified technically and is entirely conversant with the design standards and policies applicable for the PROJECT; and that the ENGINEER has sufficient properly trained, organized and experienced personnel to perform the services enumerated herein. 6. That the ENGINEER shall be responsible for the accuracy of the work and shall promptly make necessary revisions or corrections resulting from the ENGINEER’s errors, omissions or negligent acts without additional compensation. Acceptance of work by the STATE will not relieve the ENGINEER of the responsibility to make subsequent correction of any such errors or omissions or for clarification of any ambiguities. 7. That all plans and other documents furnished by the ENGINEER pursuant to this AGREEMENT will be endorsed by the ENGINEER and will affix the ENGINEER’s professional seal when such seal is required by law. Plans for structures to be built as a part of the improvement will be prepared under the supervision of a registered structural engineer and will affix structural engineer seal when such seal is required by law. It will be the ENGINEER’s responsibility to affix the proper seal as required by the Bureau of Local Roads and Streets manual published by the STATE. 8. That the ENGINEER will comply with applicable federal statutes, state of Illinois statutes, and local laws or ordinances of the LA. Page 1 of 6 Printed on 9/1/2015 8:58:37 AM BLR 05610 (Rev. 11/21/13) 9. The undersigned certifies neither the ENGINEER nor I have: a. b. c. d. e. f. g. employed or retained for commission, percentage, brokerage, contingent fee or other considerations, any firm or person (other than a bona fide employee working solely for me or the above ENGINEER) to solicit or secure this AGREEMENT, agreed, as an express or implied condition for obtaining this AGREEMENT, to employ or retain the services of any firm or person in connection with carrying out the AGREEMENT or paid, or agreed to pay any firm, organization or person (other than a bona fide employee working solely for me or the above ENGINEER) any fee, contribution, donation or consideration of any kind for, or in connection with, procuring or carrying out the AGREEMENT. are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from covered transactions by any Federal department or agency, have not within a three-year period preceding the AGREEMENT been convicted of or had a civil judgment rendered against them for commission of fraud or criminal offense in connection with obtaining, attempting to obtain or performing a public (Federal, State or local) transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements or receiving stolen property, are not presently indicted for or otherwise criminally or civilly charged by a government entity (Federal, State or local) with commission of any of the offenses enumerated in paragraph (e) and have not within a three-year period preceding this AGREEMENT had one or more public transactions (Federal, State or local) terminated for cause or default. 10. To pay its subconsultants for satisfactory performance no later than 30 days from receipt of each payment from the LA. 11. To submit all invoices to the LA within one year of the completion of the work called for in this AGREEMENT or any subsequent Amendment or Supplement. 12. To submit BLR 05613, Engineering Payment Report, to the STATE upon completion of the project (Exhibit B). 13. Scope of Services to be provided by the ENGINEER: Make such detailed surveys as are necessary for the planning and design of the PROJECT. Make stream and flood plain hydraulic surveys and gather both existing bridge upstream and downstream high water data and flood flow histories. Prepare applications for U.S. Army Corps of Engineers Permit, Illinois Department of Natural Resources Office of Water Resources Permit and Illinois Environmental Protection Agency Section 404 Water Quality Certification. Design and/or approve cofferdams and superstructure shop drawings. Prepare Bridge Condition Report and Preliminary Bridge Design and Hydraulic Report, (including economic analysis of bridge or culvert types and high water effects on roadway overflows and bridge approaches). Prepare the necessary environmental and planning documents including the Project Development Report, Environmental Class of Action Determination or Environmental Assessment, State Clearinghouse, Substate Clearinghouse and all necessary environmental clearances. Make such soil surveys or subsurface investigations including borings and soil profiles as may be required to furnish sufficient data for the design of the proposed improvement. Such investigations to be made in accordance with the current Standard Specifications for Road and Bridge Construction, Bureau of Local Roads and Streets Administrative Policies, Federal-Aid Procedures for Local Highway Improvements or any other applicable requirements of the STATE. Analyze and evaluate the soil surveys and structure borings to determine the roadway structural design and bridge foundation. Prepare preliminary roadway and drainage structure plans and meet with representatives of the LA and STATE at the site of the improvement for review of plans prior to the establishment of final vertical and horizontal alignment, location and size of drainage structures, and compliance with applicable design requirements and policies. Make or cause to be made such traffic studies and counts and special intersection studies as may be required to furnish sufficient data for the design of the proposed improvement. Complete the general and detailed plans, special provisions and estimate of cost. Contract plans shall be prepared in accordance with the guidelines contained in the Bureau of Local Roads and Streets manual. The special provisions and detailed estimate of cost shall be furnished in quadruplicate. Furnish the LA with survey and drafts in quadruplicate all necessary right-of-way dedications, construction easements and borrow pit and channel change agreements including prints of the corresponding plats and staking as required. Page 2 of 6 Printed on 8/19/2015 10:47:41 AM BLR 05610 (Rev. 11/21/13) II. THE LA AGREES, 1. 2. To furnish the ENGINEER all presently available survey data and information To pay the ENGINEER as compensation for all services rendered in accordance with this AGREEMENT, on the basis of the following compensation formulas: Cost Plus Fixed Fee CPFF = 14.5%[DL + R(DL) + OH(DL) + IHDC], or CPFF = 14.5%[DL + R(DL) + 1.4(DL) + IHDC], or CPFF = 14.5%[(2.3 + R)DL + IHDC] Where: Specific Rate DL = Direct Labor IHDC = In House Direct Costs OH = Consultant Firm’s Actual Overhead Factor R = Complexity Factor (Pay per element) Lump Sum 3. To pay the ENGINEER using one of the following methods as required by 49 CFR part 26 and 605 ILCS 5/5-409: With Retainage a) b) c) For the first 50% of completed work, and upon receipt of monthly invoices from the ENGINEER and the approval thereof by the LA, monthly payments for the work performed shall be due and payable to the ENGINEER, such payments to be equal to 90% of the value of the partially completed work minus all previous partial payments made to the ENGINEER. After 50% of the work is completed, and upon receipt of monthly invoices from the ENGINEER and the approval thereof by the LA, monthly payments covering work performed shall be due and payable to the ENGINEER, such payments to be equal to 95% of the value of the partially completed work minus all previous partial payments made to the ENGINEER. Final Payment – Upon approval of the work by the LA but not later than 60 days after the work is completed and reports have been made and accepted by the LA and the STATE, a sum of money equal to the basic fee as determined in this AGREEMENT less the total of the amounts of partial payments previously paid to the ENGINEER shall be due and payable to the ENGINEER. Without Retainage a) b) 4. For progressive payments – Upon receipt of monthly invoices from the ENGINEER and the approval thereof by the LA, monthly payments for the work performed shall be due and payable to the ENGINEER, such payments to be equal to the value of the partially completed work minus all previous partial payments made to the ENGINEER. Final Payment – Upon approval of the work by the LA but not later than 60 days after the work is completed and reports have been made and accepted by the LA and STATE, a sum o money equal to the basic fee as determined in this AGREEMENT less the total of the amounts of partial payments previously paid to the ENGINEER shall be due and payable to the ENGINEER. The recipient shall not discriminate on the basis of race, color, national origin or sex in the award and performance of any DOTassisted contract or in the administration of its DBE program or the requirements of 49 CFR part 26. The recipient shall take all necessary and reasonable steps under 49 CFR part 26 to ensure nondiscrimination in the award and administration of DOT-assisted contracts. The recipient’s DBE program, as required by 49 CFR part 26 and as approved by DOT, is incorporated by reference in this agreement. Implementation of this program is a legal obligation and failure to carry out its terms shall be treated as violation of this agreement. Upon notification to the recipient of its failure to carry out its approved program, the Department may impose sanctions as provided for under part 26 and may, in appropriate cases, refer the matter for enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986 (31U.S.C. 3801 et seq.). III. IT IS MUTALLY AGREED, 1. That no work shall be commenced by the ENGINEER prior to issuance by the LA of a written Notice to Proceed. 2. That tracings, plans, specifications, estimates, maps and other documents prepared by the ENGINEER in accordance with this AGREEMENT shall be delivered to and become the property of the LA and that basic survey notes, sketches, charts and other data prepared or obtained in accordance with this AGREEMENT shall be made available, upon request, to the LA or to the STATE, without restriction or limitation as to their use. Page 3 of 6 Printed on 8/19/2015 10:47:41 AM BLR 05610 (Rev. 11/21/13) 3. That all reports, plans, estimates and special provisions furnished by the ENGINEER shall be in accordance with the current Standard Specifications for Road and Bridge Construction, Bureau of Local Roads and Streets Administrative Policies, Federal-Aid Procedures for Local Highway Improvements or any other applicable requirements of the STATE, it being understood that all such furnished documents shall be approved by the LA and the STATE before final acceptance. During the performance of the engineering services herein provided for, the ENGINEER shall be responsible for any loss or damage to the documents herein enumerated while they are in the ENGINEER’s possession and any such loss or damage shall be restored at the ENGINEER’s expense. 4. That none of the services to be furnished by the ENGINEER shall be sublet, assigned or transferred to any other party or parties without written consent of the LA. The consent to sublet, assign or otherwise transfer any portion of the services to be furnished by the ENGINEER shall not be construed to relieve the ENGINEER of any responsibility for the fulfillment of this agreement. 5. To maintain, for a minimum of 3 years after the completion of the contract, adequate books, records and supporting documents to verify the amounts, recipients and uses of all disbursements of funds passing in conjunction with the contract; the contract and all books, records and supporting documents related to the contract shall be available for review and audit by the Auditor General and the STATE; and to provide full access to all relevant materials. Failure to maintain the books, records and supporting documents required by this section shall establish a presumption in favor of the STATE for the recovery of any funds paid by the STATE under the contract for which adequate books, records and supporting documentation are not available to support their purported disbursement. 6. The payment by the LA in accordance with numbered paragraph 3 of Section II will be considered payment in full for all services rendered in accordance with this AGREEMENT whether or not they be actually enumerated in this AGREEMENT. 7. That the ENGINEER shall be responsible for any and all damages to property or persons arising out of an error, omission and/or negligent act in the prosecution of the ENGINEER’s work and shall indemnify and save harmless the LA, the STATE, and their officers, agents and employees from all suits, claims, actions or damages of any nature whatsoever resulting there from. These indemnities shall not be limited by the listing of any insurance policy. 8. This AGREEMENT may be terminated by the LA upon giving notice in writing to the ENGINEER at the ENGINEER’s last known post office address. Upon such termination, the ENGINEER shall cause to be delivered to the LA all drawings, plats, surveys, reports, permits, agreements, soils and foundation analysis, provisions, specifications, partial and completed estimates and data, if any from soil survey and subsurface investigation with the understanding that all such material becomes the property of the LA. The LA will be responsible for reimbursement of all eligible expenses to date of the written notice of termination. 9. This certification is required by the Drug Free Workplace Act (30ILCS 580). The Drug Free Workplace Act requires that no grantee or contractor shall receive a grant or be considered for the purpose of being awarded a contract for the procurement of any property or service from the State unless that grantee or contractor will provide a drug free workplace. False certification or violation of the certification may result in sanctions including, but not limited to, suspension of contract or grant payments, termination of a contract or grant and debarment of the contracting or grant opportunities with the State for at least one (1) year but no more than five (5) years. For the purpose of this certification, “grantee” or “contractor” means a corporation, partnership or other entity with twenty-five (25) or more employees at the time of issuing the grant, or a department, division or other unit thereof, directly responsible for the specific performance under a contract or grant of $5,000 or more from the State, as defined in the Act. The contractor/grantee certifies and agrees that it will provide a drug free workplace by: a. Publishing a statement: (1) Notifying employees that the unlawful manufacture, distribution, dispensing, possession or use of a controlled substance, including cannabis, is prohibited in the grantee’s or contractor’s workplace. (2) Specifying the actions that will be taken against employees for violations of such prohibition. (3) Notifying the employee that, as a condition of employment on such contract or grant, the employee will: (a) abide by the terms of the statement; and (b) notify the employer of any criminal drug statute conviction for a violation occurring in the workplace no later than five (5) days after such conviction. b. Establishing a drug free awareness program to inform employees about: (1) The dangers of drug abuse in the workplace; (2) The grantee’s or contractor’s policy of maintaining a drug free workplace; (3) Any available drug counseling, rehabilitation and employee assistance program; and (4) The penalties that may be imposed upon an employee for drug violations. c. Providing a copy of the statement required by subparagraph (a) to each employee engaged in the performance of the contract or grant and to post the statement in a prominent place in the workplace. d. Notifying the contracting or granting agency within ten (10) days after receiving notice under part (B) of paragraph (3) of subsection (a) above from an employee or otherwise receiving actual notice of such conviction. e. Imposing a sanction on, or requiring the satisfactory participation in a drug abuse assistance or rehabilitation program by, f. Assisting employees in selecting a course of action in the event drug counseling, treatment and rehabilitation is required and indicating that a trained referral team is in place. g. Making a good faith effort to continue to maintain a drug free workplace through implementation of the Drug Free Workplace Act. Page 4 of 6 Printed on 8/19/2015 10:47:41 AM BLR 05610 (Rev. 11/21/13) Exhibit A PAYROLL ESCALATION TABLE FIXED RAISES FIRM NAME PRIME/SUPPLEMENT Baxter & Woodman, Inc. PRIME DATE PTB NO. 0.00 CONTRACT TERM START DATE RAISE DATE 12 MONTHS 1/1/2016 1/1/2017 08/13/15 N/A OVERHEAD RATE COMPLEXITY FACTOR % OF RAISE 153.00% 2.00% ESCALATION PER YEAR 1/1/2016 - 1/1/2017 12 12 = = 100.00% 1.0000 The total escalation for this project would be: Bureau of Design and Environment I:\Crystal Lake\LCKPT\150440-Des Plaines Bridge\Contract\CECS - Exhbit A 0.00% Printed 8/19/2015 10:50 AM Exhibit A Subconsultants FIRM NAME Baxter & Woodman, Inc. PRIME/SUPPLEMENT PRIME PSB NO. N/A NAME Direct Labor Total Seeco Consultants, Inc. Total DATE Contribution to Prime Consultant 12,328.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12,328.00 I:\Crystal Lake\LCKPT\150440-Des Plaines Bridge\Contract\CECS - Exhbit A 08/13/15 IL 7 Frontage Road Bridge over Des Plaines River Exhibit A Route: IL 7 Frontage Road Local Agency: City of Lockport *Firm's approved rates on file with Bureau of Accounting and Auditing: (Municipality) Section: Project: Job No.: Overhead Rate Complexity Factor Calendar 15-00083-00-BR Method of Compensation: Cost Plus Fixed Fee 1 Cost Plus Fixed Fee 2 Cost Plus Fixed Fee 3 Specific Rate Lump Sum 153% 0.00 365 days 14.5%[DL + R(DL) + OH(DL) + IHDC] 14.5%[DL + R(DL) + 1.4(DL) + IHDC] 14.5%[(2.3 + R)DL + IHDC] Cost Estimate of Consultant’s Services in Dollars ELEMENT OF WORK EMPLOYEE MANHOURS CLASS. 1. Project Initiation 2. Topographic Survey Processing 3. Bridge Condition Report 4. Preliminary Structure Design 5. Plans, Cost Estimate & ROW Evaluation 6. Hydraulic Analysis 7. Environmental Coordination 8. PESA 9. Meetings & Public Involvement 10. Project Development Report 11. Geotechnical Investigation 12. QA/QC 13. Manage Project See Payroll Rates TOTALS I:\Crystal Lake\LCKPT\150440-Des Plaines Bridge\Contract\CECS - Exhbit A 44 38 143 200 144 114 160 64 116 172 10 22 68 1,295 PAYROLL PAYROLL RATE COSTS (DL) See Payroll Rates OVERHEAD 1,600.46 1,557.14 8,253.09 11,245.20 5,389.64 4,536.40 6,582.90 2,707.22 5,991.00 6,784.86 547.98 1,245.54 2,890.32 2,448.70 2,382.42 12,627.23 17,205.16 8,246.15 6,940.69 10,071.84 4,142.05 9,166.23 10,380.84 838.41 1,905.68 4,422.19 59,331.75 90,777.58 SERVICES IN-HOUSE BY DIRECT OTHERS COSTS 40.00 470.00 69.00 203.00 598.00 40.00 12,328.00 13,808.00 TOTAL 587.13 599.51 3,027.65 4,125.30 1,977.19 1,664.18 2,414.94 993.14 2,197.80 2,489.03 201.03 456.93 1,060.31 4,676.29 4,734.07 23,927.97 32,615.66 15,612.98 13,611.27 19,138.68 8,045.41 17,953.03 19,694.73 13,915.42 3,608.15 8,372.82 195.00 21,794.14 185,906.47 195.00 20.00 40.00 PROFIT Printed 8/19/2015 10:50 AM Exhibit A - Preliminary Engineering AVERAGE HOURLY PROJECT RATES FIRM PSB Baxter & Woodman, Inc. N/A DATE 08/13/15 PRIME/SUPPLEMENT PRIME SHEET AVG TOTAL PROJECT RATES HOURLY Hours CLASSIFICATION RATES Principal 70.00 0 Sr. Engineer IV 60.51 327 Sr. Engineer III 50.66 0 Sr. Engineer II 46.23 394 Sr. Engineer I 40.17 0 Engineer III 37.05 200 Engineer II 28.88 128 Engineer I 24.90 0 Sr Geologist I 45.00 46 Engineer Tech V 49.83 30 Engineer Tech IV 42.40 8 Engineer Tech III 37.01 0 Engineer Tech II 29.65 0 Engineer Tech I 15.56 0 Cadd Tech IV 41.89 130 Cadd Tech III 36.80 6 Cadd Tech II 31.46 0 Cadd Tech I 25.49 0 Clerical I 25.12 26 0 0 0 0 0 0 0 0 1. Project Initiation PAYROLL TOTALS 1295 Hours % Wgtd Part. Avg 25.25% 15.28 30.42% 14.07 8 18.18% 8.41 4 10.53% 4.87 15.44% 9.88% 5.72 2.85 8 16 18.18% 36.36% 6.74 10.50 4 10.53% 3.55% 2.32% 0.62% 1.60 1.15 0.26 10.04% 0.46% 4.21 0.17 6 6 13.64% 13.64% 5.71 5.02 2.01% 0.50 100% $45.82 44 100.00% $36.37 I:\Crystal Lake\LCKPT\150440-Des Plaines Bridge\Contract\CECS - Exhbit A % Wgtd Part. Avg 2. Topographic Survey Processing Hours % Wgtd Part. Avg 3. Bridge Condition Report Hours % Wgtd Part. Avg 1 4. Preliminary Structure Design Hours % Wgtd Part. Avg OF 3 5. Plans, Cost Estimate & ROW Evaluation % Wgtd Part. Avg 24 16.67% 7.71 3.04 36 44 25.00% 30.56% 9.26 8.82 30 78.95% 33.07 40 27.78% 11.64 38 100% $40.98 144 100% $37.43 115 80.42% 48.66 140 70.00% 42.36 28 19.58% 60 30.00% 13.87 143 100% 9.05 $57.71 200 100% $56.23 Hours Printed 8/19/2015 10:50 AM ' Exhibit A - Preliminary Engineering AVERAGE HOURLY PROJECT RATES FIRM PSB Baxter & Woodman, Inc. N/A DATE 08/13/15 PRIME/SUPPLEMENT PRIME SHEET PAYROLL TOTALS 7. Environmental Coordination 6. Hydraulic Analysis AVG HOURLY Hours % CLASSIFICATION RATES Part. Principal 70.00 Sr. Engineer IV 60.51 Sr. Engineer III 50.66 Sr. Engineer II 46.23 32 28.07% Sr. Engineer I 40.17 Engineer III 37.05 72 63.16% Engineer II 28.88 Engineer I 24.90 Sr Geologist I 45.00 Engineer Tech V 49.83 Engineer Tech IV 42.40 8 7.02% Engineer Tech III 37.01 Engineer Tech II 29.65 Engineer Tech I 15.56 Cadd Tech IV 41.89 Cadd Tech III 36.80 Cadd Tech II 31.46 Cadd Tech I 25.49 Clerical I 25.12 2 1.75% 114 100% Wgtd Hours Avg % Part. Wgtd Hours Avg 12.98 48 30.00% 13.87 23.40 24 32 15.00% 20.00% 5.56 5.78 30 18.75% 9.34 24 15.00% 0.44 2 $39.79 160 9. Meetings & Public Involvement 8. PESA 4 % Part. 6.25% Wgtd Hours Avg 2.89 % Part. 2 10. Project Development Report Wgtd Hours Avg % Part. OF 3 11. Geotechnical Investigation Wgtd Hours Avg % Part. Wgtd Avg 44 37.93% 22.95 6 3.49% 2.11 6 60.00% 36.31 72 62.07% 28.69 48 27.91% 12.90 4 40.00% 18.49 60 32 34.88% 18.60% 12.92 5.37 10 100% $54.80 46 71.88% 32.34 6.28 6 9.38% 3.93 24 13.95% 5.85 1.25% 0.31 8 12.50% 3.14 2 1.16% 0.29 100% $41.14 64 100% $42.30 172 100% $39.45 2.98 I:\Crystal Lake\LCKPT\150440-Des Plaines Bridge\Contract\CECS - Exhbit A 116 100% $51.65 Printed 8/19/2015 10:50 AM ' Exhibit A - Preliminary Engineering AVERAGE HOURLY PROJECT RATES FIRM PSB Baxter & Woodman, Inc. N/A DATE 08/13/15 PRIME/SUPPLEMENT PRIME SHEET 12. QA/QC PAYROLL AVG HOURLY Hours % CLASSIFICATION RATES Part. Principal 70.00 Sr. Engineer IV 60.51 16 72.73% Sr. Engineer III 50.66 Sr. Engineer II 46.23 6 27.27% Sr. Engineer I 40.17 Engineer III 37.05 Engineer II 28.88 Engineer I 24.90 Sr Geologist I 45.00 Engineer Tech V 49.83 Engineer Tech IV 42.40 Engineer Tech III 37.01 Engineer Tech II 29.65 Engineer Tech I 15.56 Cadd Tech IV 41.89 Cadd Tech III 36.80 Cadd Tech II 31.46 Cadd Tech I 25.49 Clerical I 25.12 TOTALS 22 100% 3 OF 3 13. Manage Project Wgtd Hours Avg % Part. Wgtd Hours Avg % Part. Wgtd Hours Avg % Part. Wgtd Hours Avg % Part. Wgtd Hours Avg % Part. Wgtd Avg 0% $0.00 44.01 12.61 $56.62 56 82.35% 38.07 12 17.65% 4.43 68 100% $42.50 I:\Crystal Lake\LCKPT\150440-Des Plaines Bridge\Contract\CECS - Exhbit A 0 0% $0.00 0 0% $0.00 0 0% $0.00 0 Printed 8/19/2015 10:50 AM Exhibit A - Preliminary Engineering PAYROLL RATES FIRM NAME PRIME/SUPPLEMENT PSB NO. Baxter & Woodman, Inc. DATE PRIME N/A ESCALATION FACTOR CLASSIFICATION Principal Sr. Engineer IV Sr. Engineer III Sr. Engineer II Sr. Engineer I Engineer III Engineer II Engineer I Sr Geologist I Engineer Tech V Engineer Tech IV Engineer Tech III Engineer Tech II Engineer Tech I Cadd Tech IV Cadd Tech III Cadd Tech II Cadd Tech I Clerical I CURRENT RATE $69.84 $60.51 $50.66 $46.23 $40.17 $37.05 $28.88 $24.90 $45.00 $49.83 $42.40 $37.01 $29.65 $15.56 $41.89 $36.80 $31.46 $25.49 $25.12 08/13/15 0.00% CALCULATED RATE $70.00 $60.51 $50.66 $46.23 $40.17 $37.05 $28.88 $24.90 $45.00 $49.83 $42.40 $37.01 $29.65 $15.56 $41.89 $36.80 $31.46 $25.49 $25.12 $0.00 $0.00 $0.00 $0.00 $0.00 I:\Crystal Lake\LCKPT\150440-Des Plaines Bridge\Contract\CECS - Exhbit A Printed 8/19/2015 10:50 AM IL 7 FRONTAGE ROAD BRIDGE OVER DES PLAINES RIVER PHASE I ENGINEERING SERVICES CITY OF LOCKPORT EXHIBIT C SCOPE OF SERVICES LOCATION: This project is located on the IL 7 Frontage Road Bridge over the Des Plaines River (S.N. 099-0135), within the City of Lockport. PROJECT UNDERSTANDING: The IL 7 Frontage Road structure is an eight-span steel beam bridge. A 2014 special feature inspection resulted in a sufficiency rating of 35 and lowering the weight limit to 8 tons. The bridge is in critical condition due to severe deterioration of the beams at piers 2 & 6. The bridge provides the most direct access to the Metropolitan Water Reclamation District’s Lockport Powerhouse and is the only access to this area between the Chicago Sanitary and Ship Canal and the Des Plaines River. The US Army Corps of Engineers utilizes this bridge to access the Sanitary and Ship Canal walls for maintenance. The IL 7 Frontage Road carries one lane of traffic in each direction and is a local street under the jurisdiction of the City of Lockport with an ADT of 450. This project involves Phase I Engineering and Environmental Studies for the rehabilitation of the structure. Baxter and Woodman will perform structural calculations necessary to provide a recommended scope of work, with the purpose of removing the load posting and extending the service life of the structure. Likely scope items include a bridge deck repair and overlay, structural steel repairs, steel re-painting, expansion joint and bearing replacement, and installation of new bridge railings. Reconstruction of the abutment back walls and approach slabs will also be included if deemed costeffective. This project will follow federal project development procedures to ensure eligibility for federal funding after completion of the Phase I Study. The project will be coordinated with IDOT's Bureau of Local Roads and Streets and the Federal Highway Administration for reviews and Phase I Design Approval. It is anticipated that this project will be processed as a Categorical Exclusion, Group II. SCOPE OF SERVICES: 1. PROJECT INITIATION Data Collection: Obtain, review and evaluate the following information provided by the City for use in design: o Utility Atlases o Existing Roadway and Structure Plans with Inspection Reports o GIS Shape files surrounding the project limits -1- IL 7 FRONTAGE ROAD BRIDGE OVER DES PLAINES RIVER CITY OF LOCKPORT o o o Aerial Photography Maintenance and flooding records Crash Data (5 years) Utilities: Contact J.U.L.I.E. for potentially impacted utility companies. Initiate utility coordination by contacting utility companies that have facilities along the project limits and requesting utility atlas maps. Plot locations and sizes of existing utilities in electronic drawings. 2. TOPOGRAPHIC SURVEY PROCESSING Topographic Survey Processing: Process topographic survey data collected under separate contract. Terrain Model: Download and develop digital terrain model for use in design and plan preparation. Right of Way: Utilize available tax parcel information to establish an approximate right-of-way. Conduct research at the County Recorder to obtain recorded documents for determining the limits of existing right of way and easements. 3. BRIDGE CONDITION REPORT Bridge Condition Report: Prepare a Bridge Condition Report in accordance with IDOT guidelines. Describe the physical condition of the existing bridge, construction/repair history, and field inspection and evaluation results. Address all known significant structural, geometric, and hydraulic deficiencies associated with the structure. Develop and document a proposed scope of work for the structure. Evaluate potential scope of work alternatives. Determine the most costeffective alternative for restoring the bridge to a structurally adequate and functionally serviceable condition. Present recommendations to the City and IDOT for review and approval. 4. PRELIMINARY STRUCTURE DESIGN Preliminary Structure Design: Prepare TS&L drawings according to IDOT Bridge Manual Section 2.3, AASHTO LRFD Bridge Design Specifications, and BLRS Chapter 4 for the proposed structure. Determine the extent of structural repairs needed to support the deck overlay and remove the load posting from the bridge. Prepare structural calculations to demonstrate that proposed repairs will restore the original load-carrying capacity of the structure. Submit structural calculations with exhibits showing typical repair details to IDOT Bridge Office for review and concurrence. 5. PLANS, COST ESTIMATE, AND RIGHT OF WAY EVALUATION ROW Analysis: Determine the preferred improvement right-of-way requirements and need for acquisition. Recommend and identify necessary temporary construction easements, permanent easements, or right-of-way acquisition to complete the proposed improvements. Plan and Profile: Identify design constraints including clear zone, obstructions, drainage limitations, and potential design exceptions. Plan and profile sheets will include improvement -2- IL 7 FRONTAGE ROAD BRIDGE OVER DES PLAINES RIVER CITY OF LOCKPORT limits, stations and offset callouts, define paving limits, label construction limit locations and right of way breaks, utility adjustments, guardrail locations, and wetland locations and impacts. Typical Sections: Prepare typical sections for the existing and proposed improvements, showing dimensions for roadway surfaces, bases, subbases, subgrade treatments, curb and gutter, guardrail, ditches, backslopes, and right of way. Cross Section Design: Design roadway cross sections at 50-foot intervals. Compute earthwork calculations. Conceptual Barrier Warrant Investigation: Analyze the need for a roadside barrier based on environmental conditions, calculated clear zone, horizontal geometry, cross section slopes, design ADT volumes, and design speed limit. Conceptually lay out the limits of required guardrail, and other roadside barrier. The limits will be used to assist with impacts to adjacent properties, floodplain fill, structure types, and cost estimating. Final barrier warrant analysis will be completed during Phase II. Estimate of Cost and Schedule: Develop preliminary cost estimates for the improvement and anticipated schedule for construction. 6. HYDRAULIC ANALYSIS Preliminary Bridge Design and Hydraulic Report (PBDHR): Hydraulic Data section of PBDHR form will not be completed because it is not required by IDOT for this project. All proposed work is anticipated to be above the 100-yr flood elevation. Hydraulic Analysis: Compile hydraulic survey information in the immediate vicinity of the structure per IDOT Drainage Manual Sec. 2-602. Obtain existing FEMA regulatory model. Analyze upstream and downstream impacts from temporary causeways with respect to IDNR Part 3704 and 3708 Rules. o A Scour Critical Evaluation Form will not be required as the existing substructure is to remain and is founded on rock. o Complete hydraulic modeling of crossed waterway. o Prepare a recommended conceptual design for temporary causeways to be used during construction. o A Waterway Information Table will not be required as all proposed work is anticipated to be above the 100-yr flood elevation. 7. ENVIRONMENTAL COORDINATION Environmental Survey: Prepare the Environmental Survey Request Form and related exhibits. Submit to IDOT to determine potential environmental impacts. Biological, Archeological, and Historical surveys will be performed by the State. Wetland delineation and special waste assessment will be performed by Baxter & Woodman as described below. Permit Agency Early Coordination: As a part of bridge rehabilitation, temporary in-stream work features for construction of the project will be considered (e.g., causeways). During Phase II Design, this information will be described in submittals to the Illinois Department of Natural Resources – Office of Water Resources and the US Army Corps of Engineers for work in a Public Water and work involving fill material into Waters of the United States. To the extent that any -3- IL 7 FRONTAGE ROAD BRIDGE OVER DES PLAINES RIVER CITY OF LOCKPORT needed temporary work features can be anticipated and addressed in the permit submittals, it will reduce the effort needed by the Contractor for permit coverage. This approach can reduce the associated potential for delaying construction operations while awaiting receipt of permit authorization for the temporary work features. During Phase I, we will initiate coordination with the following regulatory agencies to obtain preliminary design comments: o Illinois Department of Natural Resources – Office of Water Resources (IDNR-OWR) o US Army Corps of Engineers (ACOE) Wetlands: Perform wetland delineation in the project corridor during the growing season; including documentation of baseline vegetation, hydrology, and soils information. Prepare a Wetland Delineation Report and Exhibits that summarize the methodology used, site description, and results of survey. Wetland Impact Evaluation: Prepare a wetland report detailing the work within a regulatory wetland, including a description of the wetlands being impacted, avoidance, minimization, and mitigation efforts. Submit to IDOT for review and approval. 8. PRELIMINARY ENVIRONMENTAL SITE ASSESSMENT (PESA) Historical Records Review: Review and document historical data sources for the project area, including aerial photographs, topographic maps, fire insurance maps, County resources, and other readily available development data. Environmental Regulatory Records Review: A computer search of Federal, State, Tribal, and local government agency records will be performed to determine if the Site or adjacent properties are included within the selected regulatory databases. Based on the results of this query, the Site and its surrounding properties shall be evaluated for recognized environmental concerns (REC). Queries shall be performed, but not be limited to, the following regulatory databases: o National Priority List (NPL) of Hazardous Waste Sites; o Hazardous Waste Treatment, Storage, Disposal Facilities (TSDF); o Underground Storage Tank or Leaking Underground Storage Tank Locations (UST/LUST); o Sanitary Landfill and Solid Waste Sites (SL/SWS); o State Hazardous Waste Sites (SHWS); o CERCLIS sites o Small and Large Quantity Hazardous Waste Generators (RCRIS-SQG/LGG) o RCRA Report Preparation: Based on Environmental Screening results and site visit, prepare a PESA using the processes described in A Manual for Conducting Preliminary Environmental Site Assessments for Illinois Department of Transportation Infrastructure Projects, Second edition, January 2012. o Prepare a letter report summarizing the activities and results of the assessment. The report will include pertinent documentation to support the screening results of the assessment. It will also provide a summary of conclusions from the limited information collected. -4- IL 7 FRONTAGE ROAD BRIDGE OVER DES PLAINES RIVER CITY OF LOCKPORT 9. 10. MEETINGS AND PUBLIC INVOLVEMENT Meetings: The following meetings are anticipated for this project: o City (4 total) (Kickoff, Concept, Preliminary, Prefinal) o IDOT Kickoff Meeting: (1) o IDOT/FHWA Coordination Meeting: (1) o Utility Coordination /Field Meeting (1): AT&T o Key Stakeholders (3 total): (MWRDGC (1), ACOE (1), Material Service Corp (1) o Public Meeting (1) Public Meetings: Prepare advertisement, exhibits, handouts, and attend one Public Meetings. Prepare meeting minutes to document public comments. Prepare mailings to property owners identified with land acquisition. PROJECT DEVELOPMENT REPORT Phase I Documentation: Prepare a Local Project Development Report for Group II Categorical Exclusion and submit the report to IDOT-BLRS and the Federal Highway Administration for review and approval. Pre-final and Final submittals are anticipated. Maintain an updated PPI form and funding application with CMAP and Council of Mayors if necessary. Traffic Forecasting: Coordinate with the City and Chicago Metropolitan Agency for Planning (CMAP) for concurrence on 2040 traffic projections. Accident Analysis: Obtain accident data from the City and compile for review. Complete an accident diagram for the study area in the last 5 years and summarize findings. Complete an accident analysis to evaluate the frequency, severity, and recommended countermeasures. 11. GEOTECHNICAL INVESTIGATION Structural Borings: Utilize Seeco Consultants, Inc. to take one 20-foot structural boring at each abutment (2 borings estimated). Pavement Cores: Existing pavement materials will be cored at the structure boring locations as well as at 2 additional locations, approximately 50 feet from each abutment to determine pavement material types and thicknesses. Chloride Content: 6 samples of the bridge deck will be tested for chloride content. Asbestos: 2 partial depth bridge deck cores will be performed and analyzed for asbestos. Lead Paint Determination: Obtain up to 5 samples of paint from existing steel beams and perform laboratory tests to determine if lead paint is present. 12. QA/QC Perform in-house peer and milestone reviews by senior staff during project initiation, conceptual review, preliminary and final submittals. Provide ongoing reviews of permitting and utility coordination efforts. Conduct milestone reviews of subconsultants and provide feedback throughout the progress of work. -5- IL 7 FRONTAGE ROAD BRIDGE OVER DES PLAINES RIVER CITY OF LOCKPORT 13. MANAGE PROJECT Plan, schedule, and control the activities that must be performed to complete the project including budget, schedule, and scope. Coordinate with City and project team to ensure the goals of the project are achieved. Prepare and submit monthly invoices, coordinate invoices from subconsultants, and provide regular updates to the City. Deliverables: The following is a list of anticipated final deliverables to the City for this project: o Electronic DGN, Geopak, Digital Photos, and GIS files used in project development including Plan, Profiles, Cross Sections, Survey, and Exhibits. o Electronic Record of Design files including Project Development Report content, Drainage Reports and Models, Environmental Reports, Estimates, Exhibits, and related electronic submittals (pdf or as appropriate). Baxter & Woodman utilizes an electronic filing system in lieu of paper copies. I:\Crystal Lake\LCKPT\150440-Des Plaines Bridge\Contract\Scope of Work - Exhibit C.doc -6- CITY OF LOCKPORT IL ROUTE 7 FRONTAGE ROAD BRIDGE OVER DES PLAINES RIVER EXHIBIT D PROJECT SCHEDULE* ROUTE: SECTION: COUNTY: STRUCTURE NO.. IL 7 Frontage Road 15-00083-00-BR Will 099-0135 2016 TASK Kick-off Meeting with City & IDOT Project Initiation and Data Collection Complete Geotechnical Analysis and Report Bridge Condition Report Preliminary Structure and Roadway and Design Prepare Preliminary Bridge Design and Hydraulic Report (includes TSL) Hydraulic Analysis Wetland Assessment and Submit WIE Environmental Coordination Attend FHWA Coordination Meeting with City Submit Draft Phase I Report IDOT Review of Draft Report Incorporate IDOT Review Comments Submit Final Project Development Report and Obtain Design Approval Manage Project, Meetings and Agency Coordination *Schedule contingent upon agency review January February March April May June July August September October November December IL 7 FRONTAGE ROAD BRIDGE OVER DES PLAINES RIVER PHASE I ENGINEERING SERVICES CITY OF LOCKPORT EXHIBIT E BAXTER & WOODMAN, INC. 2015 SCHEDULE OF HOURLY WAGE RATES AND OVERHEAD COSTS FOR PROFESSIONAL SERVICES ILLINOIS DEPARTMENT OF TRANSPORTATION EMPLOYEE CLASSIFICATION HOURLY WAGE RATES Principal $68 to $70 Sr. Engineer IV $55 to $68 Sr. Engineer III $48 to $53 Sr. Engineer II $44 to $48 Sr. Engineer I $38 to $43 Engineer III $34 to $38 Engineer II $27 to $29 Engineer I $23 to $26 Engineer Tech V $48 to $54 Engineer Tech IV $39 to $45 Engineer Tech III $35 to $38 Engineer Tech II $28 to $34 Engineer Tech I $17 Sr. Geologist I $45 CAD / GIS / Survey IV $38 to $52 CAD / GIS / Survey III $35 to $39 CAD / GIS / Survey II $27 to $33 CAD / GIS / Survey I $25 to $26 Clerical $24 to $26 General and employee overhead is 153% of employee compensation. Personal-owned vehicle Mileage Charges will be reimbursed at the rate set by the U.S. Internal Revenue Service. Company-owned/leased vehicle usage will be reimbursed at a rate of $65.00 per diem or $32.50 per half diem. Traffic Counters $50/day. Miovision Traffic System usage will be reimbursed at a rate of $600.00 per diem and $24.00 per hour processing. Postage - At cost. Revised 2013-12-09, 162DRM I:\Crystal Lake\LCKPT\150440-Des Plaines Bridge\Contract\Rate Sheets, IDOT 2015 IL 7 FRONTAGE ROAD BRIDGE OVER DES PLAINES RIVER PHASE I ENGINEERING SERVICES CITY OF LOCKPORT EXHIBIT F BAXTER & WOODMAN, INC. OVERHEAD* RATE AS PERCENTAGE RATE OF EMPLOYEE COMPENSATION Total Percent Salaries with Retirement Plan 119.00% Repairs 3.00% Rents 4.00% Taxes 1.00% Depreciation 3.00% Dues & Subscriptions 1.00% Utilities (Electric, etc.) 1.00% Insurance 3.00% Professional Services 3.00% Office Supplies & Services 3.00% Computer Service 5.00% Recruitment & Training 2.00% Telephone 3.00% Reproduction 1.00% Automotive Expense 1.00% Misc. Services & Expenses 0.00% IDOT Approved Rate *Payroll Burden and Indirect Cost Revised 2013-11-14, 162DRM I:\Crystal Lake\LCKPT\150440-Des Plaines Bridge\Contract\Rate Sheets, 153% 153.00% EXHIBIT G Direct Costs Check Sheet COMPANY NAME: Baxter & Woodman, Inc. PTB NUMBER: TODAY'S DATE: ITEM ALLOWABLE Per Diem (per GOVERNOR’S TRAVEL CONTROL BOARD) Lodging (per GOVERNOR’S TRAVEL CONTROL BOARD) Air Fare Vehicle Mileage (per GOVERNOR’S TRAVEL CONTROL BOARD) Vehicle Owned or Leased UTILIZE QUANTITY W.O. ONLY J.S. ONLY CONTRACT RATE TOTAL Up to state rate maximum $0.00 $0.00 Actual cost (Up to state rate maximum) $0.00 $0.00 Coach rate, actual cost, requires minimum two weeks' notice, with prior IDOT approval $0.00 $0.00 1,200 $0.575 $690.00 3 $65.00 $195.00 Up to state rate maximum $32.50/half day (4 hours or less) or $65/full day Vehicle Rental Actual cost (Up to $55/day) $0.00 $0.00 Tolls Actual cost $0.00 $0.00 Parking Actual cost $0.00 $0.00 Overtime Premium portion (Submit supporting documentation) $0.00 $0.00 Shift Differential Actual cost (Based on firm's policy) $0.00 $0.00 Overnight Delivery/Postage/Courier Service Actual cost $10.00 $160.00 Copies of Deliverables/Mylars (In-house) Actual cost (Submit supporting documentation) $0.00 $0.00 Copies of Deliverables/Mylars (Outside) Actual cost (Submit supporting documentation) $0.00 $0.00 Project Specific Insurance Actual cost $0.00 $0.00 Monuments (Permanent) Actual cost $0.00 $0.00 Photo Processing Actual cost $0.00 $0.00 2-Way Radio (Survey or Phase III Only) Actual cost $0.00 $0.00 Telephone Usage (Traffic System Monitoring Only) Actual cost $0.00 $0.00 CADD Actual cost (Max $15/hour) $0.00 $0.00 Web Site Actual cost (Submit supporting documentation) $0.00 $0.00 Advertisements Actual cost (Submit supporting documentation) $0.00 $0.00 Public Meeting Facility Rental Actual cost (Submit supporting documentation) $0.00 $0.00 Public Meeting Exhibits/Renderings & Equipment Actual cost (Submit supporting documentation) $0.00 $0.00 Recording Fees Actual cost $0.00 $0.00 Transcriptions (specific to project) Actual cost $0.00 $0.00 Courthouse Fees Actual cost $0.00 $0.00 Storm Sewer Cleaning and Televising Actual cost (Requires 2-3 quotes with IDOT approval) $0.00 $0.00 Traffic Control and Protection Actual cost (Requires 2-3 quotes with IDOT approval) $0.00 $0.00 Aerial Photography and Mapping Actual cost (Requires 2-3 quotes with IDOT approval) $0.00 $0.00 Utility Exploratory Trenching Actual cost (Requires 2-3 quotes with IDOT approval) $0.00 $0.00 Testing of Soil Samples* Actual cost $0.00 $0.00 Lab Services* Actual cost (Provide breakdown of each cost) $0.00 $0.00 Equipment and/or Specialized Equipment Rental* Actual cost (Requires 2-3 quotes with IDOT approval) $0.00 $0.00 16 FEMA Regulatory Floodplain Model 1 $450.00 $450.00 EDR Report 1 $180.00 $180.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTAL DIRECT COST $0.00 $1,675.00 *If other allowable costs are needed and not listed, please add in the above spaces provided. LEGEND W.O. = Work Order J.S. = Job Specific PRINTED 8/17/2015 BDE 436 (Rev. 09/30/13) State Contract Local Public Agency Day Labor Job Number Section Fund Type 15-00083-00-BR STP-Br Construction Project Number Job Number RR Force Account X City of Lockport Local Public Agency Agreement for Federal Participation Local Contract ITEP, SRTS, or HSIP Number(s) Engineering Project Number P-91-068-16 Right-of-Way Job Number Project Number BROS-4003(590) This Agreement is made and entered into between the above local public agency, hereinafter referred to as the “LPA”, and the State of Illinois, acting by and through its Department of Transportation, hereinafter referred to as “STATE”. The STATE and LPA jointly propose to improve the designated location as described below. The improvement shall be constructed in accordance with plans prepared by, or on behalf of the LPA, approved by the STATE and the STATE’s policies and procedures approved and/or required by the Federal Highway Administration, hereinafter referred to as “FHWA”. Location Local Name Termini IL 7 Frontage Road FAP 351 Route Length 0.19 Mi over Des Plaines River Current Jurisdiction LPA TIP Number 12-15-0023 Existing Structure No 099-0135 Project Description Phase I Preliminary Engineering for the rehabilitation of bridge, S.N. 099-0135. Division of Cost STP-Br Type of Work Participating Construction Non-Participating Construction Preliminary Engineering Construction Engineering Right of Way Railroads Utilities Materials TOTAL % 148,726 $ ( ( ( ( ( ( ( * 148,726 LPA % ) ) ) ) ) ) ) ( ( ( ( ( ( ( $ ) ) ) ) ) ) ) 37,181 $ % ( ( ( ( ( ( ( BAL 37,181 Total ) ) ) ) ) ) ) $ 185,907 185,907 * Maximum FHWA (STP-Br) participation 80% not to exceed $148,726. NOTE: The costs shown in the Division of Cost table are approximate and subject to change. The final LPA share is dependent on the final Federal and State participation. The actual costs will be used in the final division of cost for billing and reimbursment. If funding is not a percentage of the total, place an asterisk in the space provided for the percentage and explain above. Local Public Agency Appropriation By execution of this Agreement, the LPA attests that sufficient moneys have been appropriated or reserved by resolution or ordinance to fund the LPA share of project costs. A copy of the authorizing resolution or ordinance is attached as an addendum (required for State-let contracts only) Method of Financing (State Contract Work Only) METHOD A---Lump Sum (80% of LPA Obligation) METHOD B--Monthly Payments of METHOD C---LPA’s Share due by the of each successive month. divided by estimated total cost multiplied by actual progress payment. (See page two for details of the above methods and the financing of Day Labor and Local Contracts) Printed 9/1/2015 Page 1 of 5 BLR 05310 (Rev. 06/12/15) Agreement Provisions THE LPA AGREES: (1) To acquire in its name, or in the name of the STATE if on the STATE highway system, all right-of-way necessary for this project in accordance with the requirements of Titles II and III of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, and established State policies and procedures. Prior to advertising for bids, the LPA shall certify to the STATE that all requirements of Titles II and III of said Uniform Act have been satisfied. The disposition of encroachments, if any, will be cooperatively determined by representatives of the LPA, and the STATE and the FHWA, if required. (2) To provide for all utility adjustments, and to regulate the use of the right-of-way of this improvement by utilities, public and private, in accordance with the current Utility Accommodation Policy for Local Agency Highway and Street Systems. (3) To provide for surveys and the preparation of plans for the proposed improvement and engineering supervision during construction of the proposed improvement. (4) To retain jurisdiction of the completed improvement unless specified otherwise by addendum (addendum should be accompanied by a location map). If the improvement location is currently under road district jurisdiction, an addendum is required. (5) To maintain or cause to be maintained, in a manner satisfactory to the STATE and the FHWA, the completed improvement, or that portion of the completed improvement within its jurisdiction as established by addendum referred to in item 4 above. (6) To comply with all applicable Executive Orders and Federal Highway Acts pursuant to the Equal Employment Opportunity and Nondiscrimination Regulations required by the U.S. Department of Transportation. (7) To maintain, for a minimum of 3 years after final project close-out by the STATE, adequate books, records and supporting documents to verify the amounts, recipients and uses of all disbursements of funds passing in conjunction with the contract; the contract and all books, records and supporting documents related to the contract shall be available for review and audit by the Auditor General and the department; and the LPA agrees to cooperate fully with any audit conducted by the Auditor General and the STATE; and to provide full access to all relevant materials. Failure to maintain the books, records and supporting documents required by this section shall establish a presumption in favor of the STATE for the recovery of any funds paid by the STATE under the contract for which adequate books, records and supporting documentation are not available to support their purported disbursement. (8) To provide if required, for the improvement of any railroad-highway grade crossing and rail crossing protection within the limits of the proposed improvement. (9) To comply with Federal requirements or possibly lose (partial or total) Federal participation as determined by the FHWA. (10) (State Contracts Only) That the method of payment designated on page one will be as follows: Method A - Lump Sum Payment. Upon award of the contract for this improvement, the LPA will pay to the STATE within thirty (30) calendar days of billing, in lump sum, an amount equal to 80% of the LPA’s estimated obligation incurred under this Agreement. The LPA will pay to the STATE the remainder of the LPA’s obligation (including any nonparticipating costs) within thirty (30) calendar days of billing in a lump sum, upon completion of the project based on final costs. Method B - Monthly Payments. Upon award of the contract for this improvement, the LPA will pay to the STATE, a specified amount each month for an estimated period of months, or until 80% of the LPA’s estimated obligation under the provisions of the Agreement has been paid, and will pay to the STATE the remainder of the LPA’s obligation (including any nonparticipating costs) in a lump sum, upon completion of the project based upon final costs. Method C - Progress Payments. Upon receipt of the contractor’s first and subsequent progressive bills for this improvement, the LPA will pay to the STATE within thirty (30) calendar days of receipt, an amount equal to the LPA’s share of the construction cost divided by the estimated total cost, multiplied by the actual payment (appropriately adjusted for nonparticipating costs) made to the contractor until the entire obligation incurred under this Agreement has been paid. Failure to remit the payment(s) in a timely manner as required under Methods A, B, or C, shall allow the STATE to internally offset, reduce, or deduct the arrearage from any payment or reimbursement due or about to become due and payable from the STATE to LPA on this or any other contract. The STATE, at its sole option, upon notice to the LPA, may place the debt into the Illinois Comptroller’s Offset System (15 ILCS 405/10.05) or take such other and further action as my be required to recover the debt. (11) (Local Contracts or Day Labor) To provide or cause to be provided all of the initial funding, equipment, labor, material and services necessary to construct the complete project. (12) (Preliminary Engineering) In the event that right-of-way acquisition for, or actual construction of, the project for which this preliminary engineering is undertaken with Federal participation is not started by the close of the tenth fiscal year following the fiscal year in which the project is federally authorized, the LPA will repay the STATE any Federal funds received under the terms of this Agreement. (13) (Right-of-Way Acquisition) In the event that the actual construction of the project on this right-of-way is not undertaken by the close of the twentieth fiscal year following the fiscal year in which the project is federally authorized, the LPA will repay the STATE any Federal Funds received under the terms of this Agreement. Printed 9/1/2015 Page 2 of 5 BLR 05310 (Rev. 06/12/15) (14) (Railroad Related Work Only) The estimates and general layout plans for at-grade crossing improvements should be forwarded to the Rail Safety and Project Engineer, Room 204, Illinois Department of Transportation, 2300 South Dirksen Parkway, Springfield, Illinois, 62764. Approval of the estimates and general layout plans should be obtained prior to the commencement of railroad related work. All railroad related work is also subject to approval be the Illinois Commerce Commission (ICC). Final inspection for railroad related work should be coordinated through appropriate IDOT District Bureau of Local Roads and Streets office. Plans and preemption times for signal related work that will be interconnected with traffic signals shall be submitted to the ICC for review and approval prior to the commencement of work. Signal related work involving interconnects with state maintained traffic signals should also be coordinated with the IDOT’s District Bureau of Operations. The LPA is responsible for the payment of the railroad related expenses in accordance with the LPA/railroad agreement prior to requesting reimbursement from IDOT. Requests for reimbursement should be sent to the appropriate IDOT District Bureau of Local Roads and Streets office. Engineer’s Payment Estimates shall be in accordance with the Division of Cost on page one. (15) And certifies to the best of its knowledge and belief its officials: (a) are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from covered transactions by any Federal department or agency; (b) have not within a three-year period preceding this Agreement been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements receiving stolen property; (c) are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State, local) with commission of any of the offenses enumerated in item (b) of this certification; and (d) have not within a three-year period preceding the Agreement had one or more public transactions (Federal, State, local) terminated for cause or default. (16) To include the certifications, listed in item 15 above, and all other certifications required by State statutes, in every contract, including procurement of materials and leases of equipment. (17) (State Contracts) That execution of this agreement constitutes the LPA’s concurrence in the award of the construction contract to the responsible low bidder as determined by the STATE. (18) That for agreements exceeding $100,000 in federal funds, execution of this Agreement constitutes the LPA’s certification that: (a) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress or any employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any cooperative agreement, and the extension, continuation, renewal, amendment or modification of any Federal contract, grant, loan or cooperative agreement; (b) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress or an employee of a Member of Congress, in connection with this Federal contract, grant, loan or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying”, in accordance with its instructions; (c) The LPA shall require that the language of this certification be included in the award documents for all subawards at all ties (including subcontracts, subgrants and contracts under grants, loans and cooperative agreements) and that all subrecipients shall certify and disclose accordingly. (19) To regulate parking and traffic in accordance with the approved project report. (20) To regulate encroachments on public right-of-way in accordance with current Illinois Compiled Statutes. (21) To regulate the discharge of sanitary sewage into any storm water drainage system constructed with this improvement in accordance with current Illinois Compiled Statutes. (22) To complete this phase of the project within three (3) years from the date this agreement is approved by the STATE if this portion of the project described in the Project Description does not exceed $1,000,000 (five years if the project costs exceed $1,000,000). (23) To comply with the federal Financial Integrity Review and Evaluation (FIRE) program, which requires States and subrecipients to justify continued federal funding on inactive projects. 23 CFR 630.106(a)(5) defines an inactive project as a project which no expenditures have been charged against Federal funds for the past twelve (12) months. To keep projects active, invoicing must occur a minimum of one time within any given twelve (12) month period. However, to ensure adequate processing time, the first invoice shall be submitted to the STATE within six (6) months of the federal authorization date. Subsequent invoices will be submitted in intervals not to exceed six (6) months. (24) The LPA will submit supporting documentation with each request for reimbursement from the STATE. Supporting documentation is defined as verification of payment, certified time sheets or summaries, vendor invoices, vendor receipts, cost plus fix fee invoice, progress report, and personnel and direct cost summaries.and other documentation supporting the requested reimbursement amount (Form BLRS 05621 should be used for consultant invoicing purposes). LPA invoice requests to the STATE will be submitted with sequential invoice numbers by project. Printed 9/1/2015 Page 3 of 5 BLR 05310 (Rev. 06/12/15) The LPA will submit to the STATE a complete and detailed final invoice with applicable supporting documentation of all incurred costs, less previous payments, no later than twelve (12) months from the date of completion of this phase of the improvement or from the date of the previous invoice, which ever occurs first. If a final invoice is not received within this time frame, the most recent invoice may be considered the final invoice and the obligation of the funds closed. (25) The LPA shall provide the final report to the appropriate STATE district within twelve months of the physical completion date of the project so that the report may be audited and approved for payment. If the deadline cannot be met, a written explanation must be provided to the district prior to the end of the twelve months documenting the reason and the new anticipated date of completion. If the extended deadline is not met, this process must be repeated until the project is closed. Failure to follow this process may result in the immediate close-out of the project and loss of further funding. (26) (Single Audit Requirements) That if the LPA expends $750,000 or more a year in federal financial assistance they shall have an audit made in accordance with 2 CFR 200. LPAs expending less than $750,000 a year shall be exempt from compliance. A copy of the audit report must be submitted to the STATE (Office of Finance and Administration, Audit Coordination Section, 2300 South Dirksen Parkway, Springfield, Illinois, 62764), within 30 days after the completion of the audit, but no later than one year after the end of the LPA’s fiscal year. The CFDA number for all highway planning and construction activities is 20.205. Federal funds utilized for constructon activities on projects let and awarded by the STATE (denoted by an “X” in the State Contract field at the top of page 1) are not included in a LPA’s calculation of federal funds expended by the LPA for Single Audit purposes. (27) That the LPA is required to register with the System for Award Management or SAM (formerly Central Contractor Registration (CCR)), which is a web-enabled government-wide application that collects, validates, stores, and disseminates business information about the federal government’s trading partners in support of the contract award and the electronic payment processes. To register or renew, please use the following website: https://www.sam.gov/portal/public/SAM/#1. The LPA is also required to obtain a Dun & Bradstreet (D&B) D-U-N-S Number. This is a unique nine digit number required to identify subrecipients of federal funding. A D-U-N-S number can be obtained at the following website: http://fedgov.dnb.com/webform. THE STATE AGREES: (1) To provide such guidance, assistance and supervision and to monitor and perform audits to the extent necessary to assure validity of the LPA’s certification of compliance with Titles II and III requirements. (2) (State Contracts) To receive bids for the construction of the proposed improvement when the plans have been approved by the STATE (and FHWA, if required) and to award a contract for construction of the proposed improvement, after receipt of a satisfactory bid. (3) (Day Labor) To authorize the LPA to proceed with the construction of the improvement when Agreed Unit Prices are approved, and to reimburse the LPA for that portion of the cost payable from Federal and/or State funds based on the Agreed Unit Prices and Engineer’s Payment Estimates in accordance with the Division of Cost on page one. (4) (Local Contracts) For agreements with Federal and/or State funds in engineering, right-of-way, utility work and/or construction work: (a) To reimburse the LPA for the Federal and/or State share on the basis of periodic billings, provided said billings contain sufficient cost information and show evidence of payment by the LPA; (b) To provide independent assurance sampling, to furnish off-site material inspection and testing at sources normally visited by STATE inspectors of steel, cement, aggregate, structural steel and other materials customarily tested by the STATE. IT IS MUTUALLY AGREED: (1) Construction of the project will utilize domestic steel as required by Section 106.01 of the current edition of the Standard Specifications for Road and Bridge Construction and federal Buy America provisions. (2) That this Agreement and the covenants contained herein shall become null and void in the event that the FHWA does not approve the proposed improvement for Federal-aid participation within one (1) year of the date of execution of this Agreement. (3) This Agreement shall be binding upon the parties, their successors and assigns. (4) For contracts awarded by the LPA, the LPA shall not discriminate on the basis of race, color, national origin or sex in the award and performance of any USDOT – assisted contract or in the administration of its DBE program or the requirements of 49 CFR part 26. The LPA shall take all necessary and reasonable steps under 49 CFR part 26 to ensure nondiscrimination in the award and administration of USDOT – assisted contracts. The LPA’s DBE program, as required by 49 CFR part 26 and as approved by USDOT, is incorporated by reference in this Agreement. Upon notification to the recipient of its failure to carry out its approved program, the STATE may impose sanctions as provided for under part 26 and may, in appropriate cases, refer the matter for Printed 9/1/2015 Page 4 of 5 BLR 05310 (Rev. 06/12/15) enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986 (31U.S.C. 3801 et seq.). In the absence of a USDOT – approved LPA DBE Program or on State awarded contracts, this Agreement shall be administered under the provisions of the STATE’s USDOT approved Disadvantaged Business Enterprise Program. (5) In cases where the STATE is reimbursing the LPA, obligations of the STATE shall cease immediately without penalty or further payment being required if, in any fiscal year, the Illinois General Assembly or applicable Federal Funding source fails to appropriate or otherwise make available funds for the work contemplated herein. (6) All projects for the construction of fixed works which are financed in whole or in part with funds provided by this Agreement and/or amendment shall be subject to the Prevailing Wage Act (820 ILCS 130/0.01 et seq.) unless the provisions of that Act exempt its application. ADDENDA Additional information and/or stipulations are hereby attached and identified below as being a part of this Agreement. Number 1- Location Map, (Insert Addendum numbers and titles as applicable) The LPA further agrees, as a condition of payment, that it accepts and will comply with the applicable provisions set forth in this Agreement and all Addenda indicated above. APPROVED APPROVED Local Public Agency State of Illinois Department of Transportation Steven Strait Name of Official (Print or Type Name) Randall S. Blankenhorn, Secretary Mayor By: Aaron A. Weatherholt, Deputy Director of Highways Title (County Board Chairperson/Mayor/Village President/etc.) (Signature) Date Omer Osman, Director of Highways/Chief Engineer Date William M. Barnes, Chief Counsel Date Jim Ofcarcik, Acting Chief Fiscal Officer (CFO) Date Date The above signature certifies the agency’s TIN number is 36-6005974 conducting business as a Governmental Entity. DUNS Number Date 070694617 NOTE: If the LPA signature is by an APPOINTED official, a resolution authorizing said appointed official to execute this agreement is required. Printed 9/1/2015 Page 5 of 5 BLR 05310 (Rev. 06/12/15) Addendum #1 LOCATION MAP PROJECT LOCATION IL 7 FRONTAGE ROAD BRIDGE OVER DES PLAINES RIVER SECTION NO: 15-00083-00-BR CITY OF LOCKPORT PW-1 15-078 RESOLUTION # ____ RESOLUTION AUTHORIZING THE ADMINISTRATOR AND STAFF TO PURCHASE A 2016 INTERNATIONAL CAB AND CHASSIS FROM RUSH TRUCK CENTER OF NORTHERN ILLINOIS FOR A TOTAL COST OF $85,042.00 WHEREAS, the City has determined the need to add a plow truck to our fleet for salting, snow removal and winter operations; WHEREAS, the City has obtained the State purchase price for a 2016 International Cab and Chassis; WHEREAS, the City obtained a quote through the Illinois Joint Purchasing Program; NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF LOCKPORT AS FOLLOWS: Section 1: Resolution authorizing the administrator and staff to purchase a 2016 International Cab and Chassis from Rush Truck Center of Northern Illinois in the amount of $85,042.00. Section 2: Effective Date: This Resolution shall become effective upon passage, approval and publication in book and pamphlet form as provided by law. PASSED this ________ day of __________, 2015. _____ ALDERMEN VOTING AYE ______ ALDERMEN VOTING NAY _____ ALDERMEN ABSTAINING ______ ALDERMEN ABSENT the MAYOR voting aye _____ voting nay _____ not voting _____ _____ PETRAKOS _____ CAPADONA _____ SMITH _____ GILLOGLY _____ DESKIN _____ VANDERMEER _____ PERRETTA _____ BARTELSEN _____ MAYOR ________________________ Steve Streit, Mayor Alice Matteucci, City Clerk ATTEST: