dsrcs - Northeast Ohio Regional Sewer District
Transcription
dsrcs - Northeast Ohio Regional Sewer District
The attached copy of the Dugway South Relief and Consolidation Sewer Pre-bid Meeting Presentation is provided for viewing by interested parties and is not considered an addendum to the bid documents. In the case of conflict between the contents of the presentation and the contents of the bid documents, the bid documents take precedence. Dugway South Relief and Consolidation Sewers Project PRE-BID CONFERENCE 4500 Euclid Avenue, Cleveland, OH 44115 January 21, 2016 Pre-Bid Conference Purpose The purpose of this pre-bid conference is to afford the bidders an opportunity to raise questions pertaining to the plans and specifications and for the Owner to clarify those points. In addition, certain important specific features of the project will be brought to the attention of the bidders. The plans and specifications stand as issued and nothing discussed during this meeting will be construed to have changed the intent of these documents. Any potential modifications which may be discussed will not become official until issued in an Addendum to the plans and specifications. 1360 DSRCS PRE-BID CONFERENCE JANUARY 21, 2016 Project Information NEORSD Engineering Project Manager - Alison Schreiber Program Manager - Doug Lopata NEORSD Construction Supervisor – Karrie Buxton NEORSD Contract Compliance Manager Tiffany Jordan Outreach Coordinator Ben Holbert Certification Officer Diana Jones Prevailing Wage Officer Galen Adams Design Consultant – AECOM Consultant Project Manager – David Mast BID OPENING – 3900 Euclid Ave, Cleveland, Ohio Tuesday, February 23, 2016 @ 1 p.m. (Local) Engineer’s Estimate: $36,800,000 NEORSD Business Opportunity Program Goals: NEORSD MBE/WBE ≥ 12% NEORSD SBE ≥ 6% 1360 DSRCS PRE-BID CONFERENCE JANUARY 21, 2016 For Bid Documents and Addenda: www.neorsd.org 1360 DSRCS PRE-BID CONFERENCE JANUARY 21, 2016 Page 4 Questions? Contact Tiffany Jordan at (216) 881-6600, Ext. 6640 1360 DSRCS PRE-BID CONFERENCE JANUARY 21, 2016 For Business Opportunity Program and certified vendor directory: www.neorsd.org Page 5 What is the Dugway South Relief and Consolidation Sewer Project? Dugway Storage Tunnel Dugway West - The Dugway South Relief and Consolidation Sewer (DSRCS) project is a component of Dugway South RCS - DSRCS will convey flow from the future Doan Valley Tunnel and Doan Valley Relief and Consolidation Sewer. 1360 DSRCS PRE-BID CONFERENCE JANUARY 21, 2016 Doan Valley Tunnel - Flow from DSRCS will discharge to the Dugway Storage Tunnel and the Dugway West Interceptor Relief Sewer. CLEVELAND EAST CLEVELAND E. 111TH ST. 1360 DSRCS PRE-BID CONFERENCE E. 125TH ST. Project Location SUPERIOR AVE. JANUARY 21, 2016 Three Major Project Components Mainline Sewer Linn Primrose Rozelle Ave. Existing Dugway Culvert East 114th St. Primrose Ave. Consolidation Sewer Phillips Avenue Relief Sewer Dugway Storage Tunnel (By Others) LEGEND East 113th St. East 112th St. East 111th St. Trenchless Method Installation Open Cut Method Installation Superior Ave Hand Mined Trenchless Component Flow Structure (not all shown) Access Manhole or Work Shaft (not all shown) NOT TO SCALE 1360 DSRCS PRE-BID CONFERENCE JANUARY 21, 2016 Ada Ave. DSRCS Mainline – 90” ID Finished Sewer (in Soft Ground Tunnel) – 90” ID Finished Sewer (in Rock Tunnel) – New Structure, DSRCS – 1/2 – Tunnel Shaft, DSRCS – 3 – Crossing Below Dugway Culvert NOT TO SCALE JANUARY 21, 2016 East 113th St. 1360 DSRCS PRE-BID CONFERENCE East 112th St. – Upstream Shaft, Left Unfinished, DSRCS-6 East 111th St. – Drop Shafts, DSRCS-5 and 5A Ada Ave. DSRCS Mainline Mainline (Soil) from DSRCS-1/2 to DSRCS-3 Hand Mined (2-Pass)or Alternate Method Mainline (Rock) from DSRCS-3 to DSRCS-6 TBM (2-pass) w/ Rock Bolts or Rib & Lagging NOT TO SCALE JANUARY 21, 2016 East 113th St. East 112th St. East 111th St. 1360 DSRCS PRE-BID CONFERENCE Ada Ave. DSRCS Mainline, cont’d – Requires Type 2 support (ribs and lagging) from DSRCS-3 to STA 7+00. – Crossing Below Dugway West Culvert requires Type 2 tunnel support detail 300 feet each side of Dugway Culvert crossing NOT TO SCALE East 113th St. NOT TO SCALE East 112th St. JANUARY 21, 2016 Page 11 East 113th St. 1360 DSRCS PRE-BID CONFERENCE East 112th St. East 111th St. DWC Blind Connection from Shaft DSRCS-4 toDSRCS DSRCS Mainline Sewer in Tunnel Mainline Tunnel Shaft DSRS-4 JANUARY 21, 2016 1360 DSRCS PRE-BID CONFERENCE Phillips Avenue Relief Sewer – 2 Baffle Drop Structures (DSRCS-4 and PL-6) – 42” ID Adit Tunnel (Rock Tunnel) – 42” ID Finished Sewer MTBM (1-pass) or TBM (2-pass) PL-4 PL-3 (Access) – 24” ID to 30” ID Sewers (Open Cut Construction) PL-5 JANUARY 21, 2016 Rozelle Ave. East 114th St. PL- 6 (Baffle Drop) PL-2 (External Drop) 1360 DSRCS PRE-BID CONFERENCE – Optional Shafts Primrose Avenue Consolidation Sewer – Regulator D-38 Replacement 1360 DSRCS PRE-BID CONFERENCE JANUARY 21, 2016 D-38 Ada Ave. Primrose Ave Primrose Ave. E 112th – 18” ID to 30” ID Sewer (Open Cut Construction) E 111th St. – Crosses Through DWC in DSRCS-1/2 TERS and Permanent Structure; Picks Up DWI “D” and “E” Interceptors Linn Dr. – Regulator D-36 Pickup Overview of Acceptable Methods Abandonment of Dugway West Interceptor (DWI) and New Local Sewer Services NEW Local Sanitary Line Confirm and Connect House Services DWI “D” DWI “E” DWC NOT TO SCALE 1360 DSRCS PRE-BID CONFERENCE JANUARY 21, 2016 Page 16 - Partially on District-owned Property, partially within right-of-way - Maintain access to residential driveways LINN DR. Structure DSRCS-1/2 Site ADA AVE. 1360 DSRCS PRE-BID CONFERENCE JANUARY 21, 2016 Structure DSRCS-1/2 – Downstream End of Mainline System – Dry Weather Outlet to DWIRS – Overflow to Existing Dugway Culvert – Baffle / Weir / Flap Gates on SWO – Primrose Consol. Sewer and D-36 Flows Collected 1360 DSRCS PRE-BID CONFERENCE JANUARY 21, 2016 Structure DSRCS-1/2, continued. – Drilled Secant Piles for TERS – Pre-grouting around Existing Dugway Culvert Pipe 1360 DSRCS PRE-BID CONFERENCE JANUARY 21, 2016 Excavation and Connection at Existing PM-16 Shaft 1360 DSRCS PRE-BID CONFERENCE JANUARY 21, 2016 - - - Site is on Districtowned property Site is shared with Dugway Storage Tunnel (DST) Contract. DSRCS contractor may use this site only between July 26, 2016 and January 16, 2018. Liquidated damages for site demobilization milestone = $1,000 per day plus cost of delay to other contractor. 1360 DSRCS PRE-BID CONFERENCE DSRCS-3 Site DSRCS-3 JANUARY 21, 2016 DST Structure DSRCS-3 – Mining Shaft for DSRCS mainline – Contractor Responsible for TERS Selection – Optional expanded and Squared-Off Excavation Limit Shown – Outlet “Stub” Pipe Lower Elevation than Mainline Tunnel 1360 DSRCS PRE-BID CONFERENCE JANUARY 21, 2016 Structure DSRCS-5A – North Side of Dugway Culvert – Intercepting Flow in Local Sewer – Drill Drop Shaft into Mainline DSRCS Sewer – Contractor Responsible for Selecting TERS 1360 DSRCS PRE-BID CONFERENCE JANUARY 21, 2016 Structure DSRCS-5 – South Side of Dugway Culvert – Intercepting Flow from Local Sewer – External Drop Manhole into Mainline DSRCS – Contractor Responsible for Selecting TERS 1360 DSRCS PRE-BID CONFERENCE JANUARY 21, 2016 Structure DSRCS-6 – Upstream End of DSRCS Mainline Rock Tunnel – Liner Plate / Fiberglass Rock Bolts & Mesh Required – Shaft To Be Left Unfinished for Future DVT & DVRCS Tunnel Contractors 1360 DSRCS PRE-BID CONFERENCE JANUARY 21, 2016 Page 25 DSRCS-6 Site - - - District is acquiring the properties for this site. Site will be shared with Doan Valley Tunnel Contract and Doan Valley Relief and Consolidation Sewer Contract. DSRCS contractor must demobilize from this site by January 16, 2018. Liquidated damages for site demobilization milestone = $1,000 per day plus cost of delay to other contractor. 1360 DSRCS PRE-BID CONFERENCE JANUARY 21, 2016 Structure DSRCS-4 – SE Corner of Lakeview and Castlewood – Potential MTBM or TBM Launching Shaft – Baffle Drop Structure with Several Incoming Pipes – Contractor Responsible for Selecting TERS 1360 DSRCS PRE-BID CONFERENCE JANUARY 21, 2016 DSRCS-4 Site - Partially on property being acquired by the District, partially within right-of-way 1360 DSRCS PRE-BID CONFERENCE JANUARY 21, 2016 DSRCS-4 DSRCS Manhole PL-6 – Baffle drop manhole at upstream end of Phillips Ave trenchless segment – Multiple flow entry points at various elevations 1360 DSRCS PRE-BID CONFERENCE JANUARY 21, 2016 Manhole PL-6 Site Configuration 1360 DSRCS PRE-BID CONFERENCE JANUARY 21, 2016 Temporary Earth Support System Selection and Design by Contractor Phillips Avenue Relief Sewer Mainline Sewer Ada Ave. Linn Primros e Primrose Ave. Consolidation Sewer Rozelle Ave. East 114th St. Existing Dugway Culvert East 113th St. East 112th St. East 111th St. Superior Ave NOT TO SCALE 1360 DSRCS PRE-BID CONFERENCE JANUARY 21, 2016 Important Considerations 1360 DSRCS PRE-BID CONFERENCE JANUARY 21, 2016 - Project is in a predominantly residential neighborhood. Contractor shall be minimize disturbances such as noise, dust, traffic, access, etc. - Begin coordination with 3rd party utilities early to allow for long lead times. - Work hours are 7:00 AM to 7:00 PM Monday through Saturday, excluding legal holidays. Permission is required from the City of Cleveland, City of East Cleveland, and the District to work outside those hours. The Contractor shall bear the cost of any lighting, safety, sound barriers, etc. necessary for night work. Generators shall not be used during nonworking hours, or during the hours of 7:00 PM to 7:00 AM if the contractor receives permission for night work. - Refer to the bid documents for constraints, maintenance of traffic, and other requirements. Documents from this Meeting – The pre-bid meeting sign-in sheets will be loaded on the project ShareFile site for viewing. – The pre-bid conference presentation will be loaded on the project ShareFile site for viewing. Addenda – The first addendum will address pre-bid meeting questions and answers (if available) as well as revisions and/or clarifications to bid documents as needed. The addendum will be posted to the project ShareFile site. – Future addenda will be posted to the ShareFile site as necessary. 1360 DSRCS PRE-BID CONFERENCE JANUARY 21, 2016 Page 33 QUESTIONS? After this conference, all questions must be emailed to: [email protected] The deadline for questions is Monday, February 15, 2016 at 5 p.m. (Local) Complex questions should be submitted sooner.