dsrcs - Northeast Ohio Regional Sewer District

Transcription

dsrcs - Northeast Ohio Regional Sewer District
The attached copy of the Dugway South Relief and Consolidation Sewer Pre-bid Meeting
Presentation is provided for viewing by interested parties and is not considered an addendum to
the bid documents. In the case of conflict between the contents of the presentation and the
contents of the bid documents, the bid documents take precedence.
Dugway South Relief and
Consolidation Sewers Project
PRE-BID
CONFERENCE
4500 Euclid Avenue,
Cleveland, OH 44115
January 21, 2016
Pre-Bid Conference Purpose
The purpose of this pre-bid conference is to afford the
bidders an opportunity to raise questions pertaining to the
plans and specifications and for the Owner to clarify those
points. In addition, certain important specific features of the
project will be brought to the attention of the bidders. The
plans and specifications stand as issued and nothing
discussed during this meeting will be construed to have
changed the intent of these documents. Any potential
modifications which may be discussed will not become
official until issued in an Addendum to the plans and
specifications.
1360 DSRCS PRE-BID
CONFERENCE
JANUARY 21, 2016
Project Information
NEORSD Engineering
Project Manager - Alison Schreiber
Program Manager - Doug Lopata
NEORSD Construction Supervisor – Karrie Buxton
NEORSD
Contract
Compliance
Manager
Tiffany Jordan
Outreach
Coordinator
Ben Holbert
Certification
Officer
Diana Jones
Prevailing Wage
Officer
Galen Adams
Design Consultant – AECOM
Consultant Project Manager – David Mast
BID OPENING – 3900 Euclid Ave, Cleveland, Ohio
Tuesday, February 23, 2016 @ 1 p.m. (Local)
Engineer’s Estimate: $36,800,000
NEORSD Business Opportunity Program Goals:
NEORSD MBE/WBE ≥ 12%
NEORSD SBE ≥ 6%
1360 DSRCS PRE-BID
CONFERENCE
JANUARY 21, 2016
For Bid Documents and Addenda:
www.neorsd.org
1360 DSRCS PRE-BID
CONFERENCE
JANUARY 21, 2016
Page 4
Questions?
Contact Tiffany Jordan at
(216) 881-6600, Ext. 6640
1360 DSRCS PRE-BID
CONFERENCE
JANUARY 21, 2016
For Business Opportunity Program
and certified vendor directory:
www.neorsd.org
Page 5
What is the Dugway South Relief and Consolidation Sewer Project?
Dugway Storage Tunnel
Dugway West
- The Dugway South Relief
and Consolidation Sewer
(DSRCS) project is a
component of
Dugway South RCS
- DSRCS will convey flow
from the future Doan
Valley Tunnel and Doan
Valley Relief and
Consolidation Sewer.
1360 DSRCS PRE-BID
CONFERENCE
JANUARY 21, 2016
Doan Valley Tunnel
- Flow from DSRCS will
discharge to the Dugway
Storage Tunnel and the
Dugway West Interceptor
Relief Sewer.
CLEVELAND
EAST
CLEVELAND
E. 111TH ST.
1360 DSRCS PRE-BID
CONFERENCE
E. 125TH ST.
Project Location
SUPERIOR AVE.
JANUARY 21, 2016
Three Major Project Components
Mainline Sewer
Linn
Primrose
Rozelle Ave.
Existing
Dugway
Culvert
East 114th St.
Primrose Ave.
Consolidation
Sewer
Phillips Avenue
Relief Sewer
Dugway
Storage
Tunnel
(By Others)
LEGEND
East 113th St.
East 112th St.
East 111th St.
Trenchless Method Installation
Open Cut Method Installation
Superior Ave
Hand Mined Trenchless Component
Flow Structure (not all shown)
Access Manhole or Work Shaft
(not all shown)
NOT TO SCALE
1360 DSRCS PRE-BID
CONFERENCE
JANUARY 21, 2016
Ada Ave.
DSRCS Mainline
– 90” ID Finished Sewer
(in Soft Ground Tunnel)
– 90” ID Finished Sewer
(in Rock Tunnel)
– New Structure, DSRCS – 1/2
– Tunnel Shaft, DSRCS – 3
– Crossing Below Dugway
Culvert
NOT TO SCALE
JANUARY 21, 2016
East 113th St.
1360 DSRCS PRE-BID
CONFERENCE
East 112th St.
– Upstream Shaft, Left
Unfinished, DSRCS-6
East 111th St.
– Drop Shafts,
DSRCS-5 and 5A
Ada Ave.
DSRCS Mainline
Mainline (Soil) from DSRCS-1/2
to DSRCS-3
Hand Mined (2-Pass)or
Alternate Method
Mainline (Rock) from DSRCS-3
to DSRCS-6
TBM (2-pass) w/ Rock Bolts or
Rib & Lagging
NOT TO SCALE
JANUARY 21, 2016
East 113th St.
East 112th St.
East 111th St.
1360 DSRCS PRE-BID
CONFERENCE
Ada Ave.
DSRCS Mainline, cont’d
– Requires Type 2 support
(ribs and lagging) from
DSRCS-3 to STA 7+00.
– Crossing Below Dugway
West Culvert requires Type
2 tunnel support detail 300
feet each side of
Dugway Culvert crossing
NOT TO SCALE
East 113th St.
NOT TO SCALE
East 112th St.
JANUARY 21, 2016
Page 11
East 113th St.
1360 DSRCS PRE-BID
CONFERENCE
East 112th St.
East 111th St.
DWC
Blind Connection from Shaft DSRCS-4
toDSRCS
DSRCS Mainline Sewer in Tunnel
Mainline
Tunnel
Shaft DSRS-4
JANUARY 21, 2016
1360 DSRCS PRE-BID CONFERENCE
Phillips Avenue Relief Sewer
– 2 Baffle Drop Structures
(DSRCS-4 and PL-6)
– 42” ID Adit Tunnel
(Rock Tunnel)
– 42” ID Finished Sewer
MTBM (1-pass) or
TBM (2-pass)
PL-4
PL-3 (Access)
– 24” ID to 30” ID Sewers
(Open Cut Construction)
PL-5
JANUARY 21, 2016
Rozelle Ave.
East 114th St.
PL- 6
(Baffle Drop)
PL-2
(External Drop)
1360 DSRCS PRE-BID
CONFERENCE
– Optional Shafts
Primrose Avenue Consolidation Sewer
– Regulator D-38
Replacement
1360 DSRCS PRE-BID
CONFERENCE
JANUARY 21, 2016
D-38
Ada Ave.
Primrose Ave
Primrose Ave.
E 112th
– 18” ID to 30” ID Sewer
(Open Cut Construction)
E 111th St.
– Crosses Through DWC
in DSRCS-1/2 TERS and
Permanent Structure;
Picks Up DWI “D” and
“E” Interceptors
Linn Dr.
– Regulator D-36 Pickup
Overview of Acceptable Methods
Abandonment of Dugway West Interceptor (DWI)
and New Local Sewer Services
NEW Local
Sanitary Line
Confirm and
Connect House
Services
DWI
“D”
DWI
“E”
DWC
NOT TO SCALE
1360 DSRCS PRE-BID
CONFERENCE
JANUARY 21, 2016
Page 16
-
Partially on
District-owned
Property, partially
within right-of-way
-
Maintain access to
residential
driveways
LINN DR.
Structure DSRCS-1/2 Site
ADA AVE.
1360 DSRCS PRE-BID
CONFERENCE
JANUARY 21, 2016
Structure DSRCS-1/2
– Downstream End
of Mainline System
– Dry Weather Outlet
to DWIRS
– Overflow to
Existing Dugway
Culvert
– Baffle / Weir / Flap
Gates on SWO
– Primrose Consol.
Sewer and D-36
Flows Collected
1360 DSRCS PRE-BID
CONFERENCE
JANUARY 21, 2016
Structure DSRCS-1/2, continued.
– Drilled Secant
Piles for TERS
– Pre-grouting
around Existing
Dugway Culvert
Pipe
1360 DSRCS PRE-BID
CONFERENCE
JANUARY 21, 2016
Excavation and Connection at Existing PM-16 Shaft
1360 DSRCS PRE-BID
CONFERENCE
JANUARY 21, 2016
-
-
-
Site is on Districtowned property
Site is shared with
Dugway Storage
Tunnel (DST)
Contract.
DSRCS contractor
may use this site
only between July
26, 2016 and
January 16, 2018.
Liquidated damages
for site
demobilization
milestone = $1,000
per day plus cost of
delay to other
contractor.
1360 DSRCS PRE-BID
CONFERENCE
DSRCS-3 Site
DSRCS-3
JANUARY 21, 2016
DST
Structure DSRCS-3
– Mining Shaft for
DSRCS mainline
– Contractor
Responsible for
TERS Selection
– Optional expanded
and Squared-Off
Excavation Limit
Shown
– Outlet “Stub” Pipe
Lower Elevation than
Mainline Tunnel
1360 DSRCS PRE-BID
CONFERENCE
JANUARY 21, 2016
Structure DSRCS-5A
– North Side of
Dugway Culvert
– Intercepting Flow in
Local Sewer
– Drill Drop Shaft into
Mainline DSRCS
Sewer
– Contractor
Responsible for
Selecting TERS
1360 DSRCS PRE-BID
CONFERENCE
JANUARY 21, 2016
Structure DSRCS-5
– South Side of
Dugway Culvert
– Intercepting Flow
from Local Sewer
– External Drop
Manhole into
Mainline DSRCS
– Contractor
Responsible for
Selecting TERS
1360 DSRCS PRE-BID
CONFERENCE
JANUARY 21, 2016
Structure DSRCS-6
– Upstream End of
DSRCS Mainline
Rock Tunnel
– Liner Plate /
Fiberglass Rock
Bolts & Mesh
Required
– Shaft To Be Left
Unfinished for
Future DVT &
DVRCS Tunnel
Contractors
1360 DSRCS PRE-BID
CONFERENCE
JANUARY 21, 2016
Page 25
DSRCS-6 Site
-
-
-
District is acquiring the
properties for this site.
Site will be shared with
Doan Valley Tunnel
Contract and Doan
Valley Relief and
Consolidation Sewer
Contract.
DSRCS contractor
must demobilize from
this site by January 16,
2018.
Liquidated damages for
site demobilization
milestone = $1,000 per
day plus cost of delay
to other contractor.
1360 DSRCS PRE-BID
CONFERENCE
JANUARY 21, 2016
Structure DSRCS-4
– SE Corner of Lakeview
and Castlewood
– Potential MTBM or TBM
Launching Shaft
– Baffle Drop Structure with
Several Incoming Pipes
– Contractor Responsible
for Selecting TERS
1360 DSRCS PRE-BID
CONFERENCE
JANUARY 21, 2016
DSRCS-4 Site
-
Partially on
property being
acquired by the
District, partially
within right-of-way
1360 DSRCS PRE-BID
CONFERENCE
JANUARY 21, 2016
DSRCS-4
DSRCS Manhole PL-6
– Baffle drop manhole at
upstream end of Phillips
Ave trenchless segment
– Multiple flow entry points at
various elevations
1360 DSRCS PRE-BID
CONFERENCE
JANUARY 21, 2016
Manhole PL-6 Site Configuration
1360 DSRCS PRE-BID
CONFERENCE
JANUARY 21, 2016
Temporary Earth Support System
Selection and Design by Contractor
Phillips Avenue
Relief Sewer
Mainline Sewer
Ada
Ave.
Linn
Primros
e
Primrose Ave.
Consolidation
Sewer
Rozelle Ave.
East 114th St.
Existing
Dugway
Culvert
East 113th St.
East 112th St.
East 111th St.
Superior Ave
NOT TO SCALE
1360 DSRCS PRE-BID
CONFERENCE
JANUARY 21, 2016
Important Considerations
1360 DSRCS PRE-BID
CONFERENCE
JANUARY 21, 2016
-
Project is in a predominantly residential
neighborhood. Contractor shall be minimize
disturbances such as noise, dust, traffic, access, etc.
-
Begin coordination with 3rd party utilities early to allow
for long lead times.
-
Work hours are 7:00 AM to 7:00 PM Monday through
Saturday, excluding legal holidays. Permission is
required from the City of Cleveland, City of East
Cleveland, and the District to work outside those
hours. The Contractor shall bear the cost of any
lighting, safety, sound barriers, etc. necessary for
night work. Generators shall not be used during nonworking hours, or during the hours of 7:00 PM to 7:00
AM if the contractor receives permission for night
work.
-
Refer to the bid documents for constraints,
maintenance of traffic, and other requirements.
Documents from this Meeting
– The pre-bid meeting sign-in sheets will be loaded on the
project ShareFile site for viewing.
– The pre-bid conference presentation will be loaded on the
project ShareFile site for viewing.
Addenda
– The first addendum will address pre-bid meeting questions
and answers (if available) as well as revisions and/or
clarifications to bid documents as needed. The addendum
will be posted to the project ShareFile site.
– Future addenda will be posted to the ShareFile site as
necessary.
1360 DSRCS PRE-BID
CONFERENCE
JANUARY 21, 2016
Page 33
QUESTIONS?
After this conference, all questions must be emailed to:
[email protected]
The deadline for questions is
Monday, February 15, 2016 at 5 p.m. (Local)
Complex questions should be submitted sooner.