super4-5-6 frames

Transcription

super4-5-6 frames
SUPER4-5-6
EDITION 02
12 July 1999
REVISION 01
06 August 1999
viale dell' industria 2 - 38068 rovereto (trento) - telefono: + +39 0464 303030 - fax: ++39 0464 303031
e-mail: [email protected] - internet: www.metalsistem.com
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
INDEX
CALCULATION ASSUMPTIONS ........................................................................ 4
SUPER4-5-6 FRAMES........................................................................................ 7
SUPER 4-5-6 FRAME ......................................................................................................7
ROW SPACER TIES FOR TS STRUCTURES....................................................................11
TS WALL TIE .................................................................................................................11
FRAME AND UPRIGHT PROTECTION ............................................................................12
ASSEMBLY OF SUPER4-5-6 FRAME .............................................................................13
HORIZONTAL, SHORT DIAGONAL AND LONG DIAGONAL
SPACER BARS FOR SUPER 4-5-6 FRAMES .................................................................14
ASSEMBLY OF SUPER4-5-6 INTERLOCKING FRAMES..................................................15
SUPER4-5-6 INTERLOCKING FRAMES ..........................................................................16
SUPER 4-5-6 UPRIGHTS.................................................................................. 17
SUPER4-5-6 BEAMS ....................................................................................... 19
LOAD BEARING CAPACITY OF SUPER4-5-6 BEAM COUPLES........................ 20
CODES FOR SUPER4-5-6 BEAMS WITH MOULDED CONNECTORS
- SERIES 70 ..................................................................................................................21
CODES FOR SUPER4-5-6 BEAMS WITH RIVETED CONNECTORS
- SERIES 140 ................................................................................................................22
CODES FOR SUPER4-5-6 BEAMS WITH WELDED CONNECTORS
- SERIES 106 AND 172.................................................................................................23
NOTE ON THE PAINTING PROCEDURE.........................................................................23
TS BEAM SECURITY CLIPS ...........................................................................................24
BRACING......................................................................................................... 25
VERTICAL BRACING FOR SINGLE ENTRY RACKING......................................................25
VERTICAL BRACING FOR DOUBLE ENTRY RACKING ....................................................26
HORIZONTAL BRACING .................................................................................. 27
HORIZONTAL BRACING ................................................................................................27
DRIVE-IN ......................................................................................................... 28
DRIVE-IN STUB ARMS.................................................................................... 29
numero edizione
02
data edizione
12.07.1999
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 2
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
DRIVE-IN GUIDE RAIL ..................................................................................... 29
LOAD BEARING CAPACITY OF DRIVE-IN GUIDE RAIL.................................... 31
numero edizione
02
data edizione
12.07.1999
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 3
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
SAFETY STANDARDS AND
CALCULATION ASSUMPTIONS
The correct use of a product, distinguishes both the Customer and the
manufacturer. METALSISTEM recommends that Customers make use of their
product in strict conformity with the design characteristics given and standards of
best practice.
The design and assembly of the racking systems must be carried out by qualified
personnel. METALSISTEM is not responsible for any improper or inappropriate use
of its product.
a) Floor slab loading
Prior to installation of the product, check that the floor slab is of adequate load
bearing capacity.
b) Site installation
The site installation of racking systems must be carried out by expert
personnel following the assembly criteria and specifications tabled in the
technical catalogues. Site personnel must ensure that all frame bolts have
been tightened and all safety elements have been installed.
Fig. 1
Rack alignment
c) Rack alignment
While assembling the rack installation, the verticality of the frames must be
checked for both the ‘X’ and ‘Z’ directions. Unless more restrictive tolerances
have been specified, the deviation off both the X and Z planes must not
exceed ±10mm or 1/350 of the height (ie Max Deviation = H/350), whichever
is greater.(figure 1).
For more detailed information on verticality tolerances refer to Operating
Instructions “Assembly of Super 4-5-6 Racks Code:ISQ01_04/C_011.
d) Load bearing capacity plate
Load bearing capacity plates must be fastened in a clearly visible position
nominating the model type, year of assembly, load bearing capacity of the
frames, load bearing capacity per pair of beams or per shelf (expressed as a
uniformly distributed load), the load unit applied, the height of the first level
from ground and the number of levels. (figure 2).
Fig. 2
Load bearing capacity plates 400 x 300 code 67011
Load bearing capacity plates 300 x 240
code 67012
e) Rack safety standard
Rack frames must be fastened to the floor slab with at least two anchor bolts
for every upright. In cases where the height of the frame is:
- more than 5 times its depth, for single entry racking;
- or, more than 10 times its depth, for double entry racking;
that structure must be fastened via the installation of top ties.
The racking structure must also be supplied complete with column and/or
frame protectors.
f) Reference Standards
The theoretical calculation is based on the following reference standards
- C.N.R. 10011/88
- C.N.R. 10022/84
Reference standards for the materials are:
- EN 10142
numero edizione
02
data edizione
12.07.1999
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 4
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
- EN 10147
- EN 10204
g) Software references
The theoretical calculations of finished elements were elaborated with the
SICS program. Guide lines followed as the basis for the calculations are those
of the organisation CISI (Costruttori Italiani Scaffalature Industriali).
Plastic Lable with cardboard insert
and P.V.C. cover
(Code 67018)
Fig. 3
h) Frame load bearing capacity
The Super4-5-6 load bearing capacity graph (Graph 1) shows the load bearing
capacity of frames used for pallet racking installations. These are expressed
as a function of the height, from ground, of the first pair of beams. The
following underlying assumptions apply when interpreting the graph. The
racking has:
a minimum of 4 consecutive bays of equal length;
a minimum of 3 beam levels;
a constant height between levels;
an equal and uniformly distributed load has been applied to all levels.
frames must be fastened to the floor slab with at least two
anchor bolts for every upright.
Given that the load bearing capacity of the rack may depend on other elements
such as, the number of levels, the proportion between height and depth,
installation in seismic areas etc., contact the METALSISTEM Technical
Department for consultation should there be doubts about any aspects of the
installation.
i) Load bearing capacities of beam pairs
The load bearing capacities of the beam pairs were calculated with the
following assumptions:
- loads are uniformly distributed;
- admissible tensile stress of the material;
- deflection 1/200.
It is mandatory to place beam retaining security clips on either side of all
beams.
l) Bracing
The bracing system is composed of cross brace elements placed on both
vertical and horizontal planes and from the beams present in the bracing bay.
In the condition when there are less than 3 loading levels per bay or less than 4
consecutive bays, bracing is applied to rack installations in order to stabilise
the structure. At least 1 braced bay must be placed for every 8 consecutive
bays. Bracing may also be used to limit errors in verticality on both the X and
Y planes.
m) Custom built applications
The METALSISTEM Technical department is at the disposal of its customers
for any specific calculations or custom built applications.
METALSISTEM reserves the right to modify the technical characteristics of its
products at any time as it sees fit. Technical data, dimensions and
characteristics given in this document are indicative only.
numero edizione
02
data edizione
12.07.1999
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 5
data edizione
12.07.1999
Refer to point (h) of “Safety
Standards and Calculation
Assumptions”.
numero edizione
02
NOTE:
In those cases where the frame
uprights are not equally loaded, the
Load Bearing Capacity shall be given
by the upright with the highest applied
load multiplied by two.
The Super 456 Load Bearing
Capacities represented in graph 1 have
been calculated assuming both frame
uprights are loaded equally.
The Super4,5,6 load bearing capacity
graph shows the maximum bearing
capacity per frame expressed as a
function of the height of the first
loading level from ground.
Graph 1
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
11000
12000
13000
14000
15000
0
numero revisione
01
Maximum Load Bearing Capacty per frame (Kg)
data revisione
06.08.1999
500
SUPER 4
SUPER 5
SUPER 6
1500
2000
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Ground to first level distance (mm)
1000
2500
Page 6
Graph 1
3000
SUPER4-5-6 FRAME
LOAD BEARING CAPACITY GRAPH
SUPER4-5-6
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
SUPER4-5-6 FRAMES
SUPER 4-5-6 FRAME
Table 1
SUPER4-5-6 FRAME
HEIGHT
S4-5-6 FRAME
Refer to Figure 20 and
accompanying Table 6
‘Assembly 4-5-6 frames
table of components ’ for
correct frame assembly
indications.
Fig. 4
ATTENTION
For detailed information
regarding the assembly of
the Super 4-5-6 bolted
frames refer to the
Operating Instructions
‘Assembly of Super 456
Frames’ contained in
METALSISTEM INFORMA
Newsletter 239.
numero edizione
02
data edizione
12.07.1999
SUPER 4
Code
SUPER 5
Code
SUPER 6
Code
(mm)
NOMINAL
DEPTH
(mm)
1979
2475
2970
3499
3995
4491
4986
5482
5978
6473
6969
7498
7994
8489
8985
9481
9976
600
600
600
600
600
600
600
600
600
600
600
600
600
600
600
600
600
MP106X20
MP106X25
MP106X30
MP106X35
MP106X40
MP106X45
MP106X50
MP106X55
MP106X60
MP106X65
MP106X70
-
MP206X20
MP206X25
MP206X30
MP206X35
MP206X40
MP206X45
MP206X50
MP206X55
MP206X60
MP206X65
MP206X70
MP206X75
MP206X80
MP206X85
MP206X90
MP206X95
MP206XA0
MP306X20
MP306X25
MP306X30
MP306X35
MP306X40
MP306X45
MP306X50
MP306X55
MP306X60
MP306X65
MP306X70
MP306X75
MP306X80
MP306X85
MP306X90
MP306X95
MP306XA0
1979
2475
2970
3499
3995
4491
4986
5482
5978
6473
6969
7498
7994
8489
8985
9481
9976
700
700
700
700
700
700
700
700
700
700
700
700
700
700
700
700
700
MP107X20
MP107X25
MP107X30
MP107X35
MP107X40
MP107X45
MP107X50
MP107X55
MP107X60
MP107X65
MP107X70
-
MP207X20
MP207X25
MP207X30
MP207X35
MP207X40
MP207X45
MP207X50
MP207X55
MP207X60
MP207X65
MP207X70
MP207X75
MP207X80
MP207X85
MP207X90
MP207X95
MP207XA0
MP307X20
MP307X25
MP307X30
MP307X35
MP307X40
MP307X45
MP307X50
MP307X55
MP307X60
MP307X65
MP307X70
MP307X75
MP307X80
MP307X85
MP307X90
MP307X95
MP307XA0
1979
2475
2970
3499
800
800
800
800
MP108X20
MP108X25
MP108X30
MP108X35
MP208X20
MP208X25
MP208X30
MP208X35
MP308X20
MP308X25
MP308X30
MP308X35
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 7
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
NOTES ABOUT THE
UPRIGHT
SUPER4-5-6 FRAME
HEIGHT
SEAMING
Fig. 5
SEAMING
The union between the
uprights and the frame bracing
components is created via the
frame bracket coupling
Frame Bracket coupling
Code
08004
M8 x 70 Bolt with nut
Code
08011
Fig. 6
ATTENTION
•
•
The upright face with the
seaming must always be
oriented towards the
centre of the frame.
(Fig. 5 - 6)
The upright has a vertical
orientation which must be
adhered to. In other
words, the wider portion
of the joint buttons are
positioned towards the
base of the upright (Fig. 7)
numero edizione
02
data edizione
12.07.1999
SUPER 4
Code
SUPER 5
Code
SUPER 6
Code
(mm)
3995
4491
4986
5482
5978
6473
6969
7498
7994
8489
8985
9481
9976
NOMINAL
DEPTH
(mm)
800
800
800
800
800
800
800
800
800
800
800
800
800
MP108X40
MP108X45
MP108X50
MP108X55
MP108X60
MP108X65
MP108X70
-
MP208X40
MP208X45
MP208X50
MP208X55
MP208X60
MP208X65
MP208X70
MP208X75
MP208X80
MP208X85
MP208X90
MP208X95
MP208XA0
MP308X40
MP308X45
MP308X50
MP308X55
MP308X60
MP308X65
MP308X70
MP308X75
MP308X80
MP308X85
MP308X90
MP308X95
MP308XA0
1979
2475
2970
3499
3995
4491
4986
5482
5978
6473
6969
7498
7994
8489
8985
9481
9976
900
900
900
900
900
900
900
900
900
900
900
900
900
900
900
900
900
MP109X20
MP109X25
MP109X30
MP109X35
MP109X40
MP109X45
MP109X50
MP109X55
MP109X60
MP109X65
MP109X70
-
MP209X20
MP209X25
MP209X30
MP209X35
MP209X40
MP209X45
MP209X50
MP209X55
MP209X60
MP209X65
MP209X70
MP209X75
MP209X80
MP209X85
MP209X90
MP209X95
MP209XA0
MP309X20
MP309X25
MP309X30
MP309X35
MP309X40
MP309X45
MP309X50
MP309X55
MP309X60
MP309X65
MP309X70
MP309X75
MP309X80
MP309X85
MP309X90
MP309X95
MP309XA0
1979
2475
2970
3499
3995
4491
4986
5482
5978
6473
6969
7498
7994
8489
8985
9481
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
MP110X20
MP110X25
MP110X30
MP110X35
MP110X40
MP110X45
MP110X50
MP110X55
MP110X60
MP110X65
MP110X70
-
MP210X20
MP210X25
MP210X30
MP210X35
MP210X40
MP210X45
MP210X50
MP210X55
MP210X60
MP210X65
MP210X70
MP210X75
MP210X80
MP210X85
MP210X90
MP210X95
MP310X20
MP310X25
MP310X30
MP310X35
MP310X40
MP310X45
MP310X50
MP310X55
MP310X60
MP310X65
MP310X70
MP310X75
MP310X80
MP310X85
MP310X90
MP310X95
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 8
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
SUPER4-5-6 FRAME
HEIGHT
Towards
base plate
Fig. 7
PVC top cap for
Super4-5-6 upright
Cod. 08021
Fig. 8
10X80 Anchor bolt
Cod. 08006
Fig. 9
TS metal base plate complete
Cod. 08000
TS metal base plate shims
12/10
20/10
Cod. 08057
Cod. 08022
SUPER 4
Code
SUPER 5
Code
SUPER 6
Code
(mm)
9976
NOMINAL
DEPTH
(mm)
1000
-
MP210XA0
MP310XA0
1979
2475
2970
3499
3995
4491
4986
5482
5978
6473
6969
7498
7994
8489
8985
9481
9976
1100
1100
1100
1100
1100
1100
1100
1100
1100
1100
1100
1100
1100
1100
1100
1100
1100
MP111X20
MP111X25
MP111X30
MP111X35
MP111X40
MP111X45
MP111X50
MP111X55
MP111X60
MP111X65
MP111X70
-
MP211X20
MP211X25
MP211X30
MP211X35
MP211X40
MP211X45
MP211X50
MP211X55
MP211X60
MP211X65
MP211X70
MP211X75
MP211X80
MP211X85
MP211X90
MP211X95
MP211XA0
MP31X20
MP311X25
MP311X30
MP311X35
MP311X40
MP311X45
MP311X50
MP311X55
MP311X60
MP311X65
MP311X70
MP311X75
MP311X80
MP311X85
MP311X90
MP311X95
MP311XA0
1979
2475
2970
3499
3995
4491
4986
5482
5978
6473
6969
7498
7994
8489
8985
9481
9976
1200
1200
1200
1200
1200
1200
1200
1200
1200
1200
1200
1200
1200
1200
1200
1200
1200
MP112X20
MP112X25
MP112X30
MP112X35
MP112X40
MP112X45
MP112X50
MP112X55
MP112X60
MP112X65
MP112X70
-
MP212X20
MP212X25
MP212X30
MP212X35
MP212X40
MP212X45
MP212X50
MP212X55
MP212X60
MP212X65
MP212X70
MP212X75
MP212X80
MP212X85
MP212X90
MP212X95
MP212XA0
MP312X20
MP312X25
MP312X30
MP312X35
MP312X40
MP312X45
MP312X50
MP312X55
MP312X60
MP312X65
MP312X70
MP312X75
MP312X80
MP312X85
MP312X90
MP312X95
MP312XA0
1979
2475
2970
3499
3995
4491
4986
5482
5978
1300
1300
1300
1300
1300
1300
1300
1300
1300
MP113X20
MP113X25
MP113X30
MP113X35
MP113X40
MP113X45
MP113X50
MP113X55
MP113X60
MP213X20
MP213X25
MP213X30
MP213X35
MP213X40
MP213X45
MP213X50
MP213X55
MP213X60
MP313X20
MP313X25
MP313X30
MP313X35
MP313X40
MP313X45
MP313X50
MP313X55
MP313X60
Fig. 10
numero edizione
02
data edizione
12.07.1999
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 9
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
SUPER4-5-6 FRAME
HEIGHT
SUPER 4
Code
SUPER 5
Code
SUPER 6
Code
(mm)
6473
6969
7498
7994
8489
8985
9481
9976
NOMINAL
DEPTH
(mm)
1300
1300
1300
1300
1300
1300
1300
1300
MP113X65
MP113X70
-
MP213X65
MP213X70
MP213X75
MP213X80
MP213X85
MP213X90
MP213X95
MP213XA0
MP313X65
MP313X70
MP313X75
MP313X80
MP313X85
MP313X90
MP313X95
MP313XA0
1979
2475
2970
3499
3995
4491
4986
5482
5978
6473
6969
7498
7994
8489
8985
9481
9976
1400
1400
1400
1400
1400
1400
1400
1400
1400
1400
1400
1400
1400
1400
1400
1400
1400
MP114X20
MP114X25
MP114X30
MP114X35
MP114X40
MP114X45
MP114X50
MP114X55
MP114X60
MP114X65
MP114X70
-
MP214X20
MP214X25
MP214X30
MP214X35
MP214X40
MP214X45
MP214X50
MP214X55
MP214X60
MP214X65
MP214X70
MP214X75
MP214X80
MP214X85
MP214X90
MP214X95
MP214XA0
MP314X20
MP314X25
MP314X30
MP314X35
MP314X40
MP314X45
MP314X50
MP314X55
MP314X60
MP314X65
MP314X70
MP314X75
MP314X80
MP314X85
MP314X90
MP314X95
MP314XA0
1979
2475
2970
3499
3995
4491
4986
5482
5978
6473
6969
7498
7994
8489
8985
9481
9976
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
MP115X20
MP115X25
MP115X30
MP115X35
MP115X40
MP115X45
MP115X50
MP115X55
MP115X60
MP115X65
MP115X70
-
MP215X20
MP215X25
MP215X30
MP215X35
MP215X40
MP215X45
MP215X50
MP215X55
MP215X60
MP215X65
MP215X70
MP215X75
MP215X80
MP215X85
MP215X90
MP215X95
MP215XA0
MP315X20
MP315X25
MP315X30
MP315X35
MP315X40
MP315X45
MP315X50
MP315X55
MP315X60
MP315X65
MP315X70
MP315X75
MP315X80
MP315X85
MP315X90
MP315X95
MP315XA0
Fig. 11
ORIENTATION OF THE TS
METAL BASE PLATE
In order to improve
structural stability and to
simplify its assembly, the
TS base plate must be fixed
to the upright so that its
longer face is parallel to
the direction of the beams.
(Figure 11)
The orientation of the TS
base plate may run along
the axis of the frame only
when the UPN 140 Load
Distribution
Profile
is
applied or when a column
protector is utilised.
UPN 140 Load Distribution
Profile for TS Structures
Cod. 08046
Fig. 12
numero edizione
02
data edizione
12.07.1999
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 10
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
ROW SPACER TIES FOR TS STRUCTURES
Row spacer ties for TS structures are used as connectors between the frames of double entry
racking. Row spacer ties must always be used in pairs, they are placed on either side of the
upright and locked into position via the security clips which are an integral part of the component.
The security clip, located under the upper button inserts of the row spacer, is positioned by
pressing it flat against the upright.
CODES FOR ROW SPACER TIES FOR TS STRUCTURES
Row spacer tie for TS structures
(for dimensions over 250mm)
NET SPAN
CODE
250
300
350
400
450
500
550
600
SPECIAL
08336
08338
08340
08342
08344
08346
08348
08350
09322
Fig. 13
Table 2
NOTE : When ordering with the ‘Special’ code, both for row spacers and wall ties,
nominate the net span between the uprights (Figure 14)
Row spacer ties are not available for net spans under 250mm. In these cases steel plates with five
connectors holes must be used in the standard dimensions listed in table 3.
Fig. 14
Steel Plates with five connection
holes on each side (for
dimensions less than 250mm)
Fig. 15
CODE
DESCRIPTION
NET SPAN BETWEEN
UPRIGHTS
(mm)
08918
08919
08920
08917
08921
08922
64mm centre distance between connection buttons
80mm centre distance between connection buttons
110mm centre distance between connection buttons
150mm centre distance between connection buttons
190mm centre distance between connection buttons
264mm centre distance between connection buttons
14
30
60
100
140
214
Table 3
TS WALL TIE
The TS structure may be fixed to a wall using the “Universal Fasteners” (code 08380 and 08382).
The details of this product can be found in the Technical Catalogue “Pallet Racking Accessories”
The TS upright can be fastened hard up against the wall via the application of the TS Wall Fastening
Plate. (Table 4).
DESCRIPTION
TS WALL FASTENING PLATE
TS WALL FASTENING PLATE CODE
CODE
08924
Table 4
TS Wall Fastening Plate
Fig. 16
numero edizione
02
data edizione
12.07.1999
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 11
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
FRAME AND UPRIGHT PROTECTION
Protection for frames and uprights are available for TS structures. Upright protection is shown in
Figure 16
TS COLUMN PROTECTOR
CODE 08014
Fig. 18
Figures 17, 18 e 19 show the three types of frame protection available for TS structures.
TS upright wooden impact damper
Code 08018
Fig. 17
The wooden impact damper
must always be coupled with
the application of the TS
column protector. Thus
providing an effective
protection for the structure
against accidental impact by
manoeuvring lift trucks.
It is suggested to insert the
wooden impact damper (with
column protector) only on the
corridor facing upright.
DOUBLE FRAME PROTECTOR
WITHOUT SUPPORT
code 08016
SINGLE FRAME PROTECTOR
code 08015
Fig. 19
DOUBLE FRAME PROTECTOR
WITH SUPPORT
code 08017
Fig. 20
Fig. 21
Both double frame protectors (figures 20 and 21) are used for double entry racking. These are
classified into two categories, with and without central support.
The double frame protectors with central support are used in cases where the frame depth is
greater than 1000mm and the clear span between the frames of a double entry rack is greater than
300mm.
The bolts that are used to assemble and to fix the protection to the ground are listed in table 5.
BOLTS FOR FRAME AND UPRIGHT PROTECTION
CODE
08008
08090
08094
08096
DESCRIPTION
BX 12/100 Dia. 18 ANCHOR BOLT
M12 x 35 Bolt
M12 Self locking nut
M12 washer
TS COLUMN
PROTECTOR
SINGLE FRAME
PROTECTOR
(No.)
(No.)
4
8
4
4
4
DOUBLE FRAME
PROTECTOR
WITHOUT SUPPORT
DOUBLE FRAME
PROTECTOR
WITH SUPPORT
(No.)
8
4
4
4
(No.)
10
6
6
6
Table 5
numero edizione
02
data edizione
12.07.1999
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 12
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
ASSEMBLY OF SUPER4-5-6 FRAME
ASSEMBLY OF SUPER4-5-6 FRAMES
TABLE OF COMPONENTS
HEIGHT
(mm)
600-1500 mm DEPTH
HORIZONTAL
SPACER BAR
SHORT DIAGONAL
SPACER BAR
LONG DIAGONAL
SPACER BAR
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
1
1
2
3
3
4
5
5
6
7
7
8
9
9
10
11
2000
2500
3000
3500
4000
4500
5000
5500
6000
6500
7000
7500
8000
8500
9000
9500
10000
Table 6
Figure 20 shows the location of the TS frame bracing components. The frame
must ALWAYS be closed at the top and bottom with a horizontal spacer bar. The
dimensions refer to the centre line of the TS bracket coupling locations. The
bracing elements are sandwiched between the TS bracket couplings (code 08004)
which come as right and left elements. These are assembled in pairs and lock into
position via the tightening of a centrally located bolt. (code 08011).
Table 6, lists the number of each component that will form a frame.
Table 7 gives the overall depth of the frame (measured from the buttons) as well as
giving the dimensions of the components that form the frame.
TABLE OF DIMENSIONS
SUPER 4-5-6 FRAME, OVERALL FRAME DEPTH
AND DIMENSIONS OF FRAME COMPONENTS
NOMINAL
FRAME
DEPTH
(mm)
OVERALL
FRAME
DEPTH (Ls)
(mm)
HORIZONTAL
SPACER
BAR
(mm)
SHORT
DIAGONAL
SPACER BAR
(mm)
LONG
DIAGONAL
SPACER BAR
(mm)
CENTER
DISTANCE TO
BEAM LIPS
(Ic) (mm)
600
700
800
900
1000
1100
1200
1300
1400
1500
590
689
788
887
986
1085
1184
1283
1382
1481
423
522
621
720
819
918
1017
1116
1215
1314
565
641
724
810
898
989
1082
1175
1269
1364
855
907
966
1032
1102
1177
1255
1336
1420
1505
544
643
742
841
940
1039
1138
1237
1336
1435
Table 7
numero edizione
02
data edizione
12.07.1999
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Fig. 22
Page 13
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
HORIZONTAL, SHORT DIAGONAL AND LONG DIAGONAL SPACER BARS
FOR SUPER 4-5-6 FRAMES
SUPER4-5-6
HORIZONTAL SPACER
BAR FOR SUPER 4-5-6
FRAME
NOMINAL FRAME
DEPTH
(mm)
HORIZONTAL SPACER
BAR
Code
SHORT DIAGONAL
SPACER BAR
Code
LONG DIAGONAL
SPACER BAR
Code
600
700
800
900
100
1100
1200
1300
1400
1500
SPECIAL
04206
04208
04210
04212
04214
04216
04218
04220
04222
04224
04200
04506
04508
04510
04512
04514
04516
04518
04520
04522
04524
04500
04606
04608
04610
04612
04614
04616
04618
04620
04622
04624
04600
LONG AND SHORT
DIAGONAL SPACER
BAR FOR SUPER 4-5-6
FRAME
Table 8
Fig. 23
NOTE: The SPECIAL code is ordered as the actual length of the member.
numero edizione
02
data edizione
12.07.1999
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 14
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
ASSEMBLY OF SUPER4-5-6 INTERLOCKING FRAMES
ATTENTION
The diagonal spacer bars
function ONLY IF their safety
clips have been positioned.
Therefore the fastening of all
safety clips is MANDATORY.
Super 4-5-6 interlocking
frames are only available in
400mm, 500mm, and 600mm
nominal depths.
NOTE:
At the base:
Double horizontal spacer bars
(one internal and one external)
At the Top:
The frame is closed with one
horizontal spacer bar.
Fig. 24
ASSEMBLY OF INTERLOCKING FRAME
TABELLA COMPONENTI
HEIGHT
[mm]
NOMINAL DEPTH
[mm]
400
500
600
H.S.B.
D.S.B.
H.S.B
D.S.B.
H.S.B
2000
3
4
3
3
3
D.S.B.
3
2500
3
5
3
4
3
3
3000
3
7
3
5
3
4
3500
3
8
3
6
3
5
4000
3
9
3
7
3
6
4500
3
11
3
8
3
7
5000
3
12
3
9
3
8
5500
3
13
3
10
3
9
6000
3
14
3
11
3
9
6500
3
16
3
12
3
10
7000
3
17
3
14
3
11
SEE ALSO: METALSISTEM NEWS LETTERS NUMBER 245, ANNEXURE B
Tabella 9
H.S.B. = HORIZONTAL SPACER BAR
D.S.B. = DIAGONAL SPACER BAR
numero edizione
02
data edizione
12.07.1999
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 15
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
SUPER4-5-6 INTERLOCKING FRAMES
CODES FOR SUPER 4-5-6 INTERLOCKING FRAMES
HEIGHT
(mm)
NOMINAL DEPTH
SUPER 4
Code
SUPER 5
Code
SUPER 6
Code
1979
2475
2970
3499
3995
4491
4986
5482
5978
6473
6969
600
600
600
600
600
600
600
600
600
600
600
06100
06102
06104
06106
06108
06110
06112
06114
06116
06118
06120
06600
06602
06604
06606
06608
06610
06612
06614
06616
06618
06620
07000
07002
07004
07006
07008
07010
07012
07014
07016
07018
07020
Table 10
NOTE : The overall depths that correspond to the nominal depths listed in tables 10 ans 11 have
been listed in table 7.
S4-5-6 INTERLOCKING
FRAME
For indications on the
correct assembly of
interlocking frames see
figure 22 and Table 9
Fig. 25
CODES FOR SUPER 4-5-6 HORIZONTAL AND
DIAGONAL SPACER BARS FOR INTERLOCKING FRAMES
SUPER4-5-6
HORIZONTAL SPACER
BAR FOR INTERLOCKING
FRAMES
NOMINAL DEPTH
HORIZONTAL SPACER BAR
Code
DIAGONAL SPACER BAR
Code
400
500
600
04080
04090
04100
04380
04390
04400
SUPER4-5-6
DIAGONAL SPACER BAR
FOR INTERLOCKING
FRAMES
Table 11
Fig. 26
numero edizione
02
data edizione
12.07.1999
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 16
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
SUPER 4-5-6 UPRIGHTS
Table 12 shows the cut lengths that are available for TS 4-5-6 uprights up to 9’976mm.
The shaded cells indicate the standard cut lengths.
These measurements may also be used to determine the upper face of a beam junction.
SUPER4-5-6 TABLE OF CUT LENGTHS
[mm]
-
1.153
1.186
1.219
1.252
2.276
2.309
2.342
2.375
-
1.285
1.318
1.351
2.408
2.442
293
326
360
3.499
4.524
4.557
4.590
4.623
5.647
5.680
5.713
5.746
6.771
6.804
6.837
6.870
4.656
4.689
4.722
5.779
5.812
5.845
6.903
6.936
2.475
3.532
3.565
3.598
1.384
1.417
1.450
1.483
2.508
2.541
2.574
2.607
3.631
3.664
3.697
3.730
4.755
4.788
4.821
4.854
5.879
5.912
5.945
393
426
459
492
1.516
1.549
1.582
1.615
2.640
2.673
2.706
2.739
3.763
3.797
3.830
3.863
4.887
4.920
4.953
525
558
591
624
1.648
1.681
1.714
1.748
2.772
2.805
2.838
2.871
3.896
3.929
3.962
657
690
723
1.781
1.814
1.847
2.904
2.937
756
1.880
789
822
855
1.913
1.946
888
921
954
987
1.020
1.054
1.087
1.120
numero edizione
02
7.994
9.018
9.051
9.084
9.117
6.969
8.027
8.060
8.093
9.150
9.183
9.216
5.978
7.002
7.035
7.068
7.101
8.126
8.159
8.192
8.225
9.249
9.282
9.316
9.349
7.134
7.167
7.200
7.234
8.258
8.291
8.324
8.357
9.382
9.415
9.448
4.986
6.011
6.044
6.077
6.110
6.143
6.176
6.209
6.242
7.267
7.300
7.333
7.366
8.390
8.423
8.456
3.995
5.019
5.052
5.085
5.118
8.489
9.514
9.547
9.580
9.613
2.970
4.028
4.061
4.094
5.151
5.185
5.218
6.275
6.308
6.341
7.399
7.432
7.465
8.522
8.555
8.588
9.646
9.679
9.712
3.003
4.127
5.251
6.374
7.498
8.622
9.745
4.160
4.193
4.226
5.284
5.317
5.350
6.407
6.440
1.979
3.036
3.069
3.103
6.473
7.531
7.564
7.597
8.655
8.688
8.721
9.778
9.811
9.844
2.012
2.045
2.078
2.111
3.136
3.169
3.202
3.235
4.259
4.292
4.325
4.358
5.383
5.416
5.449
7.630
7.663
7.696
7.729
8.754
8.787
8.820
8.853
9.877
9.910
9.943
5.482
6.506
6.539
6.573
6.606
2.144
2.177
2.210
2.243
3.268
3.301
3.334
3.367
4.391
4.424
4.457
5.515
5.548
5.581
5.614
6.639
6.672
6.705
6.738
7.762
7.795
7.828
7.861
8.886
8.919
8.952
data edizione
12.07.1999
3.400
3.433
3.466
4.491
numero revisione
01
data revisione
06.08.1999
7.894
7.928
7.961
9.481
9.976
8.985
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Table 12
Page 17
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
CODES FOR SUPER 4-5-6 UPRIGHTS
SUPER4-5-6
UPRIGHT
HEIGHT
mm
SUPER 4
Code
SUPER 5
Code
SUPER 6
Code
1979
2475
2970
3499
3995
4491
4986
5482
5978
6473
6969
7498
7994
8489
8985
9481
9976
SPECIAL
01000
01002
01004
01006
01008
01010
01012
01014
01016
01018
01020
09010
01500
01502
01504
01506
01508
01510
01512
01514
01516
01518
01520
01522
01524
01526
01528
01530
01532
09012
01600
01602
01604
01606
01608
01610
01612
01614
01616
01618
01620
01622
01624
01626
01628
01630
01632
09014
NOTE: The SPECIAL code is ordered in the cut lengths of table 12
Super4-5-6
UPRIGHT FRAME SECTION
Fig. 27
Table 13
numero edizione
02
data edizione
12.07.1999
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 18
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
SUPER4-5-6 BEAMS
The beams are closed sections of varying thickness with moulded, riveted or welded connectors
present at either extremity. A channel, present in the upper face of the beam provides a lip within
which a variety of components such as shelf units, secondary beams, and other applications.
The load bearing capacities shown on the tables refer to the loading produced by Europallets in a
good and sufficiently ridged state of repair. The loads applied must be stable and suited to the
intended application of the racking system. Disposable pallets or pallets of a low quality (not
Europallets) can only be used in conjunction with secondary beams and/or shelves.
Series /3 beams may only be used for the storage of pallets producing loads no greater than
1000 kg, series /4 beams may only be used for the storage of pallets producing loads no greater
than 1200 kg, series /5 beams may only be used for pallets producing loads no greater than
1500 kg and series /6 beams may only be used for pallets producing loads no greater that 2000 kg.
Table 14 lists all beams available in the TS series, their minimum and maximum lengths.
1.
2.
3.
SUMMARY OF MINIMUM AND MAXIMUM AVAILABLE LENGTHS OF TS
BEAMS
Beam with welded
connector
Beam with riveted
connector
Beam with moulded
connector
BEAMS
Fig. 28
MINIMUM
MAXIMUM
MOULDED CONNECTOR
920 mm
4020 mm
WELDED CONNECTOR
1120 mm
4020 mm
RIVETED CONNECTOR
920 mm
4520 mm
WELDED CONNECTOR
920 mm
4520 mm
70 / 3 / 4
CORRECT POSITIONING
OF THE SUPER4-5-6
BEAMS
106 / 3 / 4 / 5 / 6
140 / 3 / 4 / 5 / 6
172 / 6
Table 14
Fig. 29
The Super 4-5-6 beam MUST
ALWAYS be fixed to the
upright with its upper shelf
insert lip facing the centre of
the frame.
numero edizione
02
data edizione
12.07.1999
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 19
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
LOAD BEARING CAPACITY OF
SUPER4-5-6 BEAM COUPLES
NOTE:
Check, (using table 15), that the beam series is compatible with the maximum pallet load (or, maximum
load unit), prior to consulting table 16 for the sizing of the beam.
MAXIMUM LOAD PER PALLET
Series
Series
Series
Series
/3
/4
/5
/6
1 000 kg
1 200 kg
1 500 kg
2 000 kg
Table 15
LOAD BEARING CAPACITY PER BEAM COUPLE
(Uniformly distributed load - Deflection 1/200)
Lc
(mm)
70/3
(kg)
70/4
(kg)
106/3
(kg)
106/4
(kg)
106/5
(kg)
106/6
(kg)
140/3
(kg)
140/4
(kg)
140/5
(kg)
140/6
(kg)
172/6
(kg)
900
1000
1200
1500
1800
2000
2100
2200
2400
2500
2700
3000
3300
3500
3600
3900
4000
1600
1600
1600
1600
1435
1158
1047
952
794
729
620
495
-
2000
2000
2000
2000
1799
1452
1314
1195
999
918
781
625
-
3000
3000
3000
3000
3000
2716
2586
2466
2256
2187
1970
1588
1304
1154
1088
918
870
4000
4000
4000
4000
3359
3019
2873
2741
2508
2406
2147
1730
1421
1257
1185
1001
949
6000
6000
6000
4993
4154
3733
3553
3389
3102
2976
2641
2129
1749
1548
1460
1233
1169
6000
6000
6000
5995
4989
4485
4269
4073
3728
3578
3176
2563
2108
1866
1760
1490
1412
3000
3000
3000
3000
3000
3000
3000
3000
3000
3000
2896
2600
2358
2214
2090
1772
1680
4000
4000
4000
4000
4000
4000
4000
3963
3628
3481
3219
2890
2621
2413
2278
1931
1832
6000
6000
6000
6000
6000
5416
5156
4919
4503
4321
3995
3588
3254
2983
2815
2387
2265
6000
6000
6000
6000
6000
6000
6000
5809
5315
5103
4719
4238
3843
3578
3378
2865
2718
6000
6000
6000
6000
6000
6000
6000
6000
6000
6000
6000
5712
5183
4880
4741
4366
4254
Lc = Beam length
numero edizione
02
data edizione
12.07.1999
numero revisione
01
Table 16
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 20
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
CODES FOR SUPER4-5-6 BEAMS WITH
MOULDED CONNECTORS - SERIES 70
HEIGHT OF PROFILE
Hp - (mm)
HEIGHT OF CONNECTOR
Hs - (mm)
70
144
Table 17
The galvanised, moulded connector beams are made from hot dipped galvanised steel using the
SENDZIMIR process.
The painted, moulded connector beams are made from pickled high yield strength steels which are
subsequently powder coated. The standard colour is yellow (RAL 1004)
CODES FOR THE 70 SERIES BEAMS
Lc
(mm)
920
1220
1520
1820
2020
2120
2220
2420
2720
3020
SPECIAL
70/3
(Galvanised
code)
05000
05002
05004
05006
05008
05009
05010
05012
05014
05016
09200
70/3
(Painted
code)
05020
05022
05024
05026
05028
05029
05030
05032
05034
05036
09220
70/4
(Galvanised
code)
05050
05052
05054
05056
05058
05059
05060
05062
05064
05066
09250
Lc = Beam length
70/4
(Painted
code)
05070
05072
05074
05076
05078
05079
05080
05082
05084
05086
09270
Table 18
NOTE: The SPECIAL code is ordered as the Lc length
numero edizione
02
data edizione
12.07.1999
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 21
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
CODES FOR SUPER4-5-6 BEAMS WITH
RIVETED CONNECTORS - SERIES 140
HEIGHT OF PROFILE
Hp - (mm)
HEIGHT OF CONNECTOR
Hs - (mm)
140
270
Table 19
The galvanised, riveted connector beams are made from hot dipped galvanised steel using the
SENDZIMIR process.
The painted, riveted connector beams are made from pickled high yield strength steels which are
subsequently powder coated. The standard colour is yellow (RAL 1004)
CODES FOR THE 140 SERIES BEAMS
Lc
(mm)
140/3
(galvanised
140/3
(Painted
code)
1220
05672
1520
05673
1820
05674
2020
05675
2120
05676
2220
05677
2420
05678
2720
05679
3020
05680
3520
05681
4020
05682
SPECIAL 05670
Lc = Beam length
140/4
(galvanised
140/4
(Painted
140/5
(galvanised
140/5
(Painted
140/6
(galvanised
140/6
(Painted
code)
code)
code)
code)
code)
code)
code)
05872
05873
05874
05875
05876
05877
05878
05879
05880
05881
05882
05870
05692
05693
05694
05695
05696
05697
05698
05699
05700
05701
05702
05690
05892
05893
05894
05895
05896
05897
05898
05899
05900
05901
05902
05890
05712
05713
05714
05715
05716
05717
05718
05719
05720
05721
05722
05710
05912
05913
05914
05915
05916
05917
05918
05919
05920
05921
05922
05910
05742
05743
05744
05745
05746
05747
05748
05749
05750
05751
05752
05740
05942
05943
05944
05945
05946
05947
05948
05949
05950
05951
05952
05940
Tabella 20
NOTE: The SPECIAL code is ordered as the Lc length
numero edizione
02
data edizione
12.07.1999
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 22
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
CODES FOR SUPER4-5-6 BEAMS WITH
WELDED CONNECTORS - SERIES 106 AND 172
HEIGHT OF PROFILE
Hp - (mm)
HEIGHT OF CONNECTOR
Hs - (mm)
106
237
172
303
Table 21
The welded connector beams are made from pickled high yield strength steels which are
subsequently powder coated. The standard colour is yellow (RAL 1004)
CODES FOR THE 106 and 172 SERIES BEAMS
Lc
(mm)
106/3
code
106/4
code
106/5
code
106/6
code
172/6
code
1220
1520
1820
2020
2120
2220
2420
2720
3020
3520
4020
SPECIALE
00183
00184
00185
00186
00187
00188
00189
00190
00191
00192
00180
00206
00208
00210
00212
00214
00216
00218
00220
00222
00224
00200
00236
00238
00240
00242
00244
00246
00248
00250
00252
00254
00230
00266
00268
00270
00272
00274
00276
00278
00280
00282
00284
00260
00864
00866
00868
00870
00872
00874
00876
00878
00880
00882
00884
00860
Lc = Beam length
Table 22
NOTE: The SPECIAL code is ordered as the Lc length
NOTE ON THE PAINTING PROCEDURE
The painted beams are powder coated in standard Yellow RAL 1004, applied via the following
procedure:
• Hot wash degreasing and iron phosphate pre-treatment;
• application of thermosetting powder paint;
• curing at a temperature of approximately 240°C with a force ventilated air circulation oven.
The powder coating of beams in colours other than yellow (in the RAL scale of colours) is possible
with quantities greater than 100 pieces with payment of an additional lump sum to cover line
stoppages for the colour change. A longer lead time is required in these cases.
numero edizione
02
data edizione
12.07.1999
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 23
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
TS BEAM SECURITY CLIPS
CODE
DESCRIPTION
08082
TS Beam retaining clips
NOTE: The TS Beam Retaining clips are applied to the 70 series beams
Table 23
CODE
DESCRIPTION
08028
Right side TS security clips
08029
Left side TS security clips
Table 24
ATTENTION:
THE USE OF SECURITY CLIPS IS MANDATORY.
THE SECURITY CLIPS HAVE A STRUCTURAL FUNCTION.
numero edizione
02
data edizione
12.07.1999
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 24
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
BRACING
VERTICAL BRACING FOR SINGLE ENTRY RACKING
POS.
1
2
3
4
5
6
7
8
COMPONENTS
Vertical bracing moulded section anchor plate for
single entry TS racks
Vertical bracing straight section anchor plate for
single entry TS racks
M8 x 20 bolt with nut
48 x 2 flat brace section
M8 x 20 bolt with nut and washer
M8 tensioner
TS frame coupling
M8x70 bolt with nut
NOTE:
See Operating Instructions:
“VERTICAL BRACING APPLIED TO
PALLET RACKING”
CODE
08361
08362
08002
08911
08002+08095
08912
08004
08011
Table 25
Fig. 30
The ordering of bracing accessories has been simplified by the introduction of a macro code which group together the elements of
pos. 1-2-3-5-6-7-8 Each macro code contains the accessories (including the bolts for the connection of the flat brace sections) to
assemble one fastening level.
Code
08100 VERTICAL BRACING MACRO CODE FOR SINGLE ENTRY TS RACKS
FASTENING LEVEL
FASTENING LEVEL
EX. 1 brace set has 2 fastening levels
EX. 2 brace sets have 3 fastening levels
EX. 3 brace sets have 4 fastening levels
Fig. 31
Example :
The bracing for the drawing above contain the following elements:
No. 2 08911
48 x 2 flat brace section L. xxx mm
No. 2 08100
Vertical bracing macro code for single entry TS racks
numero edizione
02
data edizione
12.07.1999
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 25
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
VERTICAL BRACING FOR DOUBLE ENTRY RACKING
POS.
1
2
3
4
5
COMPONENTS
CODE
Vertical bracing coupling for double entry TS racks
Vertical bracing run spacers for double entry racks
TS frame coupling
M8X70 bolt with nut
48 x 2 flat brace section (plus its accessories; ie:
tensioner (08912) and bolts (08002 + 08095))
M8 x 110 Zn. Bolt with nut
M8 x 30 bolt with nut
6
7
08360
08355
08004
08011
08911
VITB811Z
08098
ATTENTION: The length of the vertical bracing run spacers is not equal to the
length of the run spacer. Its length (L) is determined by the following:
L(run spacer) = Clear span between frames (Ln)+ 5mm
NOTE: See Operating Instructions “VERTICAL BRACING APPLIED TO PALLET RACKING”
Fig. 32
Table 26
The ordering of bracing accessories has been simplified by the introduction of a macro code which groups together the elements of
pos. 1-3-4-6-7. Each macro code contains the accessories (including the bolts for the connection of the flat brace sections) to
assemble one fastening level.
Code
08101 VERTICAL BRACING MACRO CODE FOR DOUBLE ENTRY TS RACKS
FASTENING LEVEL
FASTENING LEVEL
EX. 1 brace set has 2 fastening levels
EX. 2 brace sets have 3 fastening levels
EX. 3 brace sets have 4 fastening levels
Fig. 33
Example :
numero edizione
02
The bracing for the drawing above contain the following elements:
No. 2
08911
48 x 2 flat brace section L. xxx mm
No. 8
08355
Vertical bracing run spacers for double entry racks L. xxx mm
No. 2
08101
Vertical bracing macro code for double entry TS racks
data edizione
12.07.1999
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 26
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
HORIZONTAL BRACING
Vertical bracing is always used in conjunction with plan bracing.
Plan bracing is composed of the following elements.
HORIZONTAL BRACING
POS.
1
2
3
4
5
2
Screw
Peg
M8 Nut
6
COMPONENTS
Bracket for horizontal bracing
8 x 50 sunk hexag. Screw peg with M8 nut
m8 x 20 bolt with nut
48 x 2 flat brace section
M8x 20 bolt with nut
M8 washer
M8 tensioner
NOTE:
See Operating Instructions:
“APPLICATION OF BRACKET FOR HORIZONTAL
BRACING”
CODE
08908
08909
08002
08911
08002
08095
08912
Table 27
Fig. 34
The ordering of bracing accessories
has been simplified by the
introduction of a macro code which
groups together the elements of
pos. 1, 2, 3, 5 and 6.
Each macro code contains the
accessories to assemble one flat
brace element complete.
Code
00062
Horizontal bracing macro code
for TS/SB/UB structures
Fig. 35
Example :
The bracing for the drawing above contain the following elements:
No. 2 08911
48 x 2 flat brace section L. xxx mm
No. 2 00062
Plan bracing macro code for TS/SB/UB structures
numero edizione
02
data edizione
12.07.1999
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 27
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
DRIVE-IN
GRAPH FOR LOAD BEARING CAPACITY OF STUB ARMS
GRAPH FOR BRACING TUNNEL
Graph 2
For the design procedure of a Drive-In system consult the
OPERATING INSTRUCTIONS ISQ 01-04C-009
numero edizione
02
data edizione
12.07.1999
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 28
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
DRIVE-IN STUB ARMS
Single sided 185 TS
Left and Right side
Drive-In stub arm
CODE
DESCRIPTION
08009
Single sided 185 TS Right side
Drive-In stub arm
Single sided 185 TS Left side
Drive-In stub arm
08010
The drive-in guide rails are fixed to the drive-in stub arms via 1, 20mm
bolt, code VITB820B
Fig. 36
Table 28
DRIVE-IN GUIDE RAIL
15/10 GAUGE DRIVE-IN GUIDE RAIL PROFILE
Code
08089/D
08089/S
08088/D
08088/S
VITB820B
69828
15/10 GAUGE DRIVE-IN GUIDE RAIL JOINT
SECTION
Description
15/10 drive-in guide rail profile - right
15/10 drive-in guide rail profile - left
Drive-In guide rail joint section - right
Drive-In guide rail joint section - left
M8 x 20 Bolt with nut (No 4 for every Drive-In guide rail joint)
Bracket + M8 bolt (3 for every Drive-in guide rail joint section)
Table 29
numero edizione
02
data edizione
12.07.1999
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 29
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
REINFORCED 15/10 DRIVE IN GUIDE RAIL
PROFILE
REINFORCED 15/10 DRIVE IN GUIDE RAIL JOINT
SECTION
Code
Descrption
08089/D
08089/S
08088/D
08088/S
VITB820B
69828
08485
VITB820B
15/10 drive-in guide rail profile - Right
15/10 drive-in guide rail profile - Left
Drive-in guide rail joint section - Right
Drive-in guide rail joint section - Left
M8 x 20 Bolt with nut (No. 4 for every drive-in guide rail joint)
Bracket + M8 bolt ( 3 for every Drive-in guide rail joint section)
Drive-In guide reinforcement
M8 x 20 Bolt with nut (for every Drive-In guide reinforcement : No. 3 per span, of
which 2 are at the ends towards the stub arm and 1 in the centre)
Table 30
DRIVE-IN ENTRANCE CRESCENTS
The Metalsistem entrance crescents are cast aluminium components that are bolted to the loading
extremity of the Drive-in tunnel to guide the pallets into position.
Each entrance crescent is bolted to a stub arm with 2 M8 x 20 (circular head with allen key insert)
bolts (code VITB820Z).
Table 31
Code
numero edizione
02
data edizione
12.07.1999
Description
08019/S
Left entrance crescent
08019/D
Right entrance crescent
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc
Page 30
Metalsistem S.p.A.
38068 Rovereto (Tn) Italy
SUPER4-5-6
LOAD BEARING CAPACITY OF DRIVE-IN GUIDE RAIL
Graph 3
numero edizione
02
data edizione
12.07.1999
numero revisione
01
data revisione
06.08.1999
data di stampa
visto
06.08.1999
nome file: Super456Ingl_ed_02.doc