4812 heavy bag stand owner`s manual

Transcription

4812 heavy bag stand owner`s manual
4812 HEAVY BAG
STAND OWNER’S MANUAL
Note:Warning Labels
FRONT VIEW
Everlast Worldwide, 1900 Hwy DD, Moberly, MO 65270
Customer Service 800.821.7930
020414
C4
4812 HEAVY BAG STAND OWNER’S MANUAL
CONGRATULATIONS! YOU HAVE JUST PURCHASED THE EVERLAST HEAVY BAG/SPEED BAG STAND.
PLEASE READ OVER THE INSTRUCTIONS CAREFULLY PRIOR TO ASSEMBLY.
Prior to Assembly:
These instructions cover all 4812 models, for example 4812B, 4812W, etc.
It is important that you follow the instructions carefully. Construction should take around 1 -2 hours to complete.
Place the EVERLAST Heavy Bag Stand at your desired location.
Remove all components from the box, and make sure all the parts are present.
Two people are recommended for assembly, all tools required for assembly included, Allen Wrench M10 and Plate
wrench with M8, M10 openings. (You may also need a rubber mallet at times to push bolts through.)
Find a spacious area for assembly and use. We recommend an area at least 4ft. x 6ft., with a ceiling at least 7 ft. 3 in. high.
It is strongly recommended that well-padded bag gloves are worn when using the heavy bag function of the stand.
Tighten the assembly bolts by hand (unless stated otherwise) until all are in place, and then tighten the bolts with a wrench when
assembly is completed.
Be sure that all bolts and nuts are aligned properly before tightening them. When installation is complete, make sure all parts are
snug and that the platform is properly erected and ready for use.
If at any time you find any part is worn or defective, cease use of the platform and contact EVERLAST to provide you with any
necessary replacement parts for a nominal fee.
NOTE: The maximum weight of the heavy bag on this unit must not exceed 100 lbs.
WARNING: Failure to follow instructions herein may cause serious injury. Boxing is an invigorating yet
strenuous activity. Before starting any workout routine, consult your physician.
Before each use, please inspect to make sure that the stand is in good working order and that all bolts are tightened, and verify
that both the heavy bag and the speed bag are hanging from the stand
correctly.
As with any sport, the participant is subject to a certain amount of risk. Boxing, by its very nature, contains an element of risk of
injury for which the EVERLAST user must be responsible.
The EVERLAST Heavy Bag/Speed Bag Stand is not a toy. Please do not allow children to use it without adult supervision. Similarly,
before allowing people unfamiliar with the heavy bag to use it, instruct them on the basics. The user must accept full responsibility for the safe and proper assembly and use of all equipment.
How to Stabilize the Stand:
We are recommend (3) 25 lb Standard weight plates, on each peg, for all bags up to and including 100lbs.
4812 HEAVY BAG STAND EXPLODED DRAWING/PARTS LIST
No.
4812-01
4812-02
4812-03
4812-04
4812-05
4812-06
4812-07
4812-08
4812-09
4812-10
4812-11
4812-12
4812-13
4812-14
4812-15
4812-16
4812-17
4812-18
4812-19
4812-20
Description
Center Base Tube
Right Base Tube
Left Base Tube
Heavy Bag Tube
Right Support Tube
Left Support Tube
Upright Tube
Foam Pad
Weight Peg
Allen Bolt M10*100mm
Allen Bolt M10*95mm
Allen Bolt M10*20mm
Nylon Nut M10
Normal Nut M10
Washer M10
Eye Bolt M10*150mm
Stabilizer End Cap
Stabilizer End Insert
Round End Insert
Round Plastic Tube Cap
Qty.
1
1
1
1
1
1
1
3
3
8
2
3
11
1
21
1
3
1
3
1
Pre.- Assembled
No
No
No
No
No
No
No
Yes
No
No
No
No
No
No
No
No
Yes
Yes
Yes
Yes
13
15
20
14
16
04
13
15
13
15
06
15
07
11
15
05
19
11
10
10
08
15
13
19
15
13
15
08
15
15
13
15
13
15
03
13
17
09
15
15
15
13
10
09
10
12
15
10
01
17
18
15
10
12
19
FRONT VIEW
13
02
08
15
13
15
15
10
15
09
17
12
10
Assembly For EVERLAST Heavy Bag Stand
Model #4812
Items needed for step 1:
STEP 1: BASE CONSTRUCTION
Sub Step 1.
Sub Step 2.
Sub Step 3.
Sub Step 4.
Place center base tube (01) on floor. Place left and right base tubes (02, 03) on floor in position, loops facing upward.
Insert 1 Weight Peg (19, 08, 09) into each of the three Base tubes (01, 02, 03) and secure with 3 M10*20mm Allen Bolts (12).
Align left and right base tubes with front hole set on center base tube as shown in Diagram 1.
Insert 2 M10*100mm Allen Bolts (10), secure with 4 M10 Washers (15) and 2 M10 Nylon Nuts (13) as shown in Diagram 1,
tighten loosely by hand.
Diagram 1
19
08
13
03
15
01
19
17
09
13
08
15
12
09
18
No.
4812-01
4812-02
4812-03
4812-08
4812-09
4812-10
4812-12
4812-13
4812-15
4812-17
4812-18
4812-19
Description
Qty.
Center Base Tube
1
Right Base Tube
1
Left Base Tube
1
Foam Pad
3
Weight Peg
3
Allen Bolt M10*100mm 2
Allen Bolt M10*20mm
3
Nylon Nut M10
2
Washer M10
4
Stabilizer End Cap
3
Stabilizer End Insert
1
Round End Insert
3
15
10
17
15
12
10
FRONT VIEW
19
02
08
09
17
12
STEP 2: HEAVY BAG TUBE CONSTRUCTION
Items needed step 2:
No.
Sub Step 1. Attach M10 Eye Bolt (16) with 1 Normal Nut (14), 1 M10 Washer (15), and 1 M10 Nylon Nut (13)
Sub Step 2. Align Upright Tube (07) to rear holes on Center Base Tube (01) attach by inserting 2 M10*100mm Allen Bolts (10), secure with 4812-04
4812-05
4 M10 Washers (15) and 2 M10 Nylon Nuts (13) as shown in Diagram 3, tighten loosely by hand.
4812-06
Sub Step 3. Insert completed Heavy Bag Tube (04) into Upright Tube (07) as shown in Diagram 4.
4812-07
Sub Step 4. Attach Left Support Tube (06) to Left Base Tube (03) by inserting 2 M10*100mm Allen Bolts (10),
4812-11
secure with 4 M10 Washers (15) and 2 M10 Nylon Nuts (13) as shown in Diagram 5, tighten loosely by hand.
4812-13
Sub Step 5. Attach Right Support Tube (05) to both Main Tube (04, 07) and Right Base Tube (02) by inserting 2 M10*100mm Allen Bolts (10), 4812-14
4812-15
and 2 M10*95mm Allen Bolts (11) secure with 8 M10 Washers (15) and 4 M10 Nylon Nuts (13) as shown in Diagram 5,
4812-16
tighten loosely by hand.
4812-20
4812-10
13
Description
Heavy Bag Tube
Right Support Tube
Left Support Tube
Upright Tube
Allen Bolt M10*95mm
Nylon Nut M10
Normal Nut M10
Washer M10
Eye Bolt M10*150mm
Tube Cap Insert
Allen Bolt M10*100mm
Qty.
1
1
1
1
2
8
1
17
1
1
6
15
14
16
04
04
04
13
Diagram 2
15
13
15
07
15
15
Diagram 3
13
07
15
13
06
Diagram 4
15
Diagram 5
11
11
07
05
15
10
15
10
03
02
13
15
13
15
15
15
10
10
STEP 3: CUSTOMIZATION AND ACCESSORIES
With all parts complete, retighten all bolts on entire unit, and double check for stability.
For increased stability please purchase weight plates and add evenly to all three weight pegs on stand as
shown in Diagram 7
For increased bag stability, please purchase the Everlast Heavy Bag Anchor which features a laser welded water
bladder and holds 45lbs. of water. Also comes with a bungee cord to attach to the bottom of your Everlast Heavy
Bag’s double end attachment.
08
Diagram 7
08
Weight Plates
Weight Plates
08
Weight Plates
GO TO EVERLAST.COM FOR HEAVYBAG WORKOUT TIPS AND FREE RING TIMER DOWNLOAD.