Completion Documentation for STEPNEY GREEN TE
Transcription
Completion Documentation for STEPNEY GREEN TE
Completion Documentation for STEPNEY GREEN TE LLUC80001181 Issue Issue Date Work/Amendment Description Author 1 2 3 4 5 19/09/2013 New Installation - Completion Documents G. JARRETT SITE NAME: SITE ADDRESS: MDFID: PSID No: NIMS No: APO No: INSTALLATION DATE: INSTALLER: STEPNEY GREEN TE COMMERCIAL ROAD NOT SUPPLIED LLUC80001181 NOT SUPPLIED APO00060653 18/09/2013 GROESTAR LIMITED Document No.: 2132449 [Revision: 5] - Dated: 14th February 2013 - Document Status: Approved PIRM Data FCP - PIRM ID ADAM - PIRM ID 2851549M INA System Type FCP7663 Site Manufacturer Eltek Power UK Supplier Eltek Power UK Inverter Connected to Alarm System NO Rectifier Connected to Alarm System YES Unit Version Power Supply LLUC No LLU Customer STEPNEY GREEN TE Serial No 46530 1 Essential LLUC80001181 VODAFONE Item Qty 1 CONTROLLER INVERTER RECTIFIER 5 Type CONTROLLER Manufacturer Eltek Power UK Supplier Eltek Power UK Date 18/09/13 Serial No 122471116704 INVERTERS Manufacturer Supplier Date Serial No RECTIFIERS 241115.105 241115.105 241115.105 241115.105 241115.105 Manufacturer Eltek Power UK Eltek Power UK Eltek Power UK Eltek Power UK Eltek Power UK Supplier Eltek Power UK Eltek Power UK Eltek Power UK Eltek Power UK Eltek Power UK Date 18/09/13 18/09/13 18/09/13 18/09/13 18/09/13 Serial No 130171131548 130171131617 131872102806 131872102782 131872101880 SCHEDULE OF CIRCUIT DETAILS & INSPECTION & TEST RESULTS– STR 17 Issue 5 June 2011 SCHEDULE OF CIRCUIT DETAILS SITE NAME: STEPNEY GREEN TE Site Address : COMMERCIAL ROAD, LONDON, E1 0HA JOB NUMBER(NIMs): DB/SW description: Isolator DB/SW Ref: ES1A/1C/1/1C/1/3 DB/SW Rating: 32 A Location: MUA 2ND FLOOR Nominal Voltage: 240 V Circuit Description: Circuit design current: kA DB/SW ZS: 0.15 18.8 Amps Essential: 1 3 N/A Supplied from DB/SW ref: ES1A/1C/1/1C/1 DB/SW Location: MUA 2ND FLOOR Ω YES Non-Essential: No FCP7663 in Suite 215 / 216 - 217 / 218 For VODAFONE MUA 2ND FLOOR **Type C.S.A. (mm2) Ambient Temp. ( C) Grouping factor Diversity factor RCD Operate Current (mA) Max. Zs Allowed ( ) Other (State) Design Load (A) Fault Protection Method Max. Discon. Time (Secs) Installation method# Protective Device Type Rating Circuit length (M) C.P.C. Cable C.S.A. (mm2) Circuit Location: DB/SW PFC: 1.60 Number of ways: Way No: NOT SUPPLIED CHANGE CONTROL REFERENCE: 3 L1 A-PVC 10 10 B Cu 10 N/A 1 1 88 gG 32 80 N/A 0.83 0.4 N/A 18.8 3 L2 A-PVC 10 10 B Cu 10 N/A 1 1 88 gG 32 80 N/A 0.83 0.4 N/A 16.8 Line Way Type of Cable BS / BS EN S/C Cap. (kA) 3 L3 A-PVC 10 10 B Cu 10 N/A 1 1 88 gG 32 80 N/A 0.83 0.4 N/A 8.4 "#As per BS7671:2012 ** Table 4A2 Schedule of Installation Methods of Cables C.P.C. Type: T for Trunking, C for Conduit, SWA for Steel Wire Armour, AWA for Aluminium Wire Armour, Cu for Copper Conductor, Al for Aluminium Conductor" Number of Rectifiers/phase: L1 2 L2 2 L3 1 Rectifier Type: 241115.105 Design: I/We being the person(s) responsible for the design of the electrical installation (as indicated by my/our signatures below), particulars of which are described above, have exercised reasonable skill and care when carrying out the design hereby CERTIFY that the said work for which I/we have been responsible is to the best of my/our knowledge and belief in accordance with BS7671:2008: Details of departures from BS7671:2008 as amended (Regs 120.3, NONE 120.4): The extent of liability of the signatory or signatories is limited to the work described above as the subject of this certificate. Designer Name: NOT SUPPLIED Designer Signature: NOT SUPPLIED Date: 19/07/2013 Company Name : BT PLC Address: 81 NEWGATE STREET, LONDON, EC1A 7AJ Construction: I/We being the person(s) responsible for the construction of the electrical installation (as indicated by my/our signatures below), particulars of which are described above, have exercised reasonable skill and care when carrying out the construction hereby CERTIFY that the construction work for which I/we have been responsible is to the best of my/our knowledge and belief in accordance with BS7671:2008 Details of departures from BS7671:2008 as amended (Regs 120.3, NONE 120.4): Constructor Name: ALAN MOWBERRY Constructor Signature: ALAN MOWBERRY Date: 18/09/2013 Company Name : GROESTAR LIMITED Address: UNIT ONE MORLEY BUSINESS CENTRE, MORLEY ROAD, TONBRIDGE, KENT, TN9 1RA This form is based on model forms shown in Appendix 6 BS 7671:2008 © Copyright British Telecommunications plc. Registeredoffice: 81 Newgate Street, London, EC1AJ 7AJ. Registered in England No. 1800000 Page 1 of 3 SCHEDULE OF CIRCUIT DETAILS & INSPECTION & TEST RESULTS– STR 17 Issue 5 June 2011 SCHEDULE OF INSPECTIONS Site Name: STEPNEY GREEN TE JOB NUMBER(NIMs): NOT SUPPLIED CHANGE CONTROL REFERENCE: DB/SW Ref: ES1A/1C/1/1C/1/3 Way No: Y/N/NA/LIM METHODS OF PROTECTION AGAINST ELECTRIC SHOCK Y/N/NA/LIM Y Y Y NA NA Y Y Y Y NA NA Fault Protection Automatic disconnection of supply: · Presence of earthing conductor · Presence of circuit protective conductors · Presence of protective bonding conductors · Presence of earthing arrangements for combined protective and functional purposes · Presence of adequate arrangements for alternative source(s) where applicable Y Y Y Y Y NA Y Y Y Y Y NA Y Both basic and fault protection SELV Limitation of discharge of energy Double insulation Reinforced insulation Basic protection Insulation of live parts Barriers or enclosures Obstacles Placing out of reach · · FELV Choice and setting of protective & monitoring devices (for fault and or overcurrent protection) Non conducting location: Absence of protective conductors Earth-free local equipotential bonding: Presence of earth-free local equipotential bonding conductors Electrical separation: Provided for one item of current-using equipment Provided for more than one item of current-using equipment Additional Protection: Presence of residual current device(s) Presence of supplementary bonding conductors Y Y Y Y Y Y Y Y NA Y Y Y Y NA Y Y NA Y Y N/A 3 Prevention of mutual detrimental influence Proximity of non-electrical services & influences Segregation of Band I & II cables or the use of Band II insulation Segregation of safety circuits Identification Presence of diagrams, instructions, circuit charts and similar information Presence of danger notices & other warning notices Labelling of protective devices, switches and terminals Identifications of conductors Cables & Conductors Selection of conductors for current capacity and volt drop Erection methods Routing of cables in prescribed zones Cables incorporating earthed armour or sheath, or run within an earthed wiring system, or otherwise adequately protected against nails, screws etc. Additional protection provided by 30mA RCD for cables in concealed walls (where required in premises not under the supervision of a skilled or instructed person) Connection of conductors Presence of fire barriers and protection against thermal effects General Presence & correct location of appropriate devices for isolating & switching Adequacy of access to switchgear and other equipment Particular protective measures for special installations and locations Connection of single-pole devices for protection/ switching in line conductors only Correct connection of accessories and equipment Presence of undervoltage protective devices Selection of equipment and protective measures appropriate to external influences Selection of appropriate functional switching devices Y – Indicates an inspection has been carried out and is satisfactory. N – Indicates an inspection has been carried out and is unsatisfactory (periodic inspections only). NA – Indicates the inspection is not applicable to a particular item. LIM – Indicates a limitation prevented the inspection being carried out (periodic inspections only) This form is based on model forms shown in Appendix 6 BS 7671:2008 © Copyright British Telecommunications plc. Registeredoffice: 81 Newgate Street, London, EC1AJ 7AJ. Registered in England No. 1800000 Page 2 of 3 SCHEDULE OF CIRCUIT DETAILS & INSPECTION & TEST RESULTS– STR 17 Issue 5 June 2011 Bonding Line Way 3 L1 PASS 3 L2 PASS 3 L3 PASS * Record r1+r2 r1 rn r2 r1+r2 r2 N/A N/A N/A N/A N/A N/A N/A N/A N/A 0.03 0.03 0.03 N/A N/A N/A Line/ Line Line/ Neutral Line/ Earth Neutral / Earth RCD Rated Current (mA) All other Circuits* Ring circuits Insulation Resistance (Record lowest value) (MΩ) Max. Measured EFLI Zs (W) Continuity (Ω) >999 >999 >999 >999 >999 >999 >999 >999 >999 >999 >999 >999 PASS PASS PASS 0.13 0.13 0.15 N/A N/A N/A CHANGE CONTROL REFERENCE: 3 NOT SUPPLIED Way No: RDC Operating times IDn (mS) (All) 5IDn mS (30mA only) N/A N/A N/A N/A N/A N/A Part of Sample test – Yes / No JOB NUMBER(NIMs): ES1A/1C/1/1C/1/3 Functional test of RCD (Pass/Fail) STEPNEY GREEN TE Polarity (Pass/Fail) SITE NAME: DB/SW Ref: N/A N/A N/A N/A N/A N/A N/A Comments NONE NONE NONE Comments on existing installation (in the case of an alteration or addition. See section 633): NONE TEST INSTRUMENTS All test instruments must have an associated valid calibration certificate at the time of test Type Insulation Tester Continuity E.L.I. Tester R.C.D Tester Manufacturer/Model Other KEWTECH KT62 KEWTECH KT62 KEWTECH KT63 N/A N/A 222986 222986 222986 N/A N/A Serial Number Other Other Other Obtain permission from the Manager responsible for the electrical installation before working on this equipment Inspector Name: Inspector Signature: ALAN MOWBERRY ALAN MOWBERRY Date: 18/09/2013 Company: UNIT ONE MORLEY BUSINESS CENTRE, MORLEY ROAD, TONBRIDGE, KENT, TN9 1RA This form is based on model forms shown in Appendix 6 BS 7671:2008 © Copyright British Telecommunications plc. Registeredoffice: 81 Newgate Street, London, EC1AJ 7AJ. Registered in England No. 1800000 Page 3 of 3 UNIT ONE MORLEY BUSINESS CENTRE, MORLEY ROAD, TONBRIDGE, KENT, TN9 1RA GROESTAR LIMITED Site Specific Risk Assessment Task Identification: FCP7663 Suite 215 / 216 - 217 / 218 for VODAFONE Site Location: Building: STEPNEY GREEN TE Postal Address: COMMERCIAL ROAD LONDON E1 0HA Specific Access Arrangements: OBASS Rack/Cabinet ID System Type: Rack Designation: Manufacturer: Rack Location: Delivery Date: FCP7663 LLUC80001181 Eltek Power UK SECOND Floor 18/09/2013 APO Number: APO00060653 Date: Engineers Name: ALAN MOWBERRY Engineers Signature: PIRM ID: Unit: Suite No: Serial No: In-Service Date: 2851549M MUA 215 / 216 - 217 / 218 46530 18/09/2013 Risk Assessment 18/09/2013 ALAN MOWBERRY This Document is to be issued and used in conjunction with GROESTAR LIMITED 'Generic Risk Assessment' Document. It shall be used to evaluate the suitability of the generic risk assessment in relation to the potential risks and hazards found on site by engineers prior to the commencement of any work. The particular hazards faced when dealing with DC power are highlighted in the 'DC Risk' document list and the risks and control measures to be adopted for work associated with power system upgrades and battery removal/installation are detailed therein. Please review that document and those associated with other aspects of the work (i.e. Manual Handling, Working at Height, Safe Use of Work Equipment etc.) and sign this document above to confirm that ALL perceived hazards have been addressed and that suitable control measures are in place to reduce the risks faced to an acceptable level. If you find that there are significant hazards which have not been identified or addressed then they must be noted on this form along with suggested control measures. Such control measures will be relayed to your Line Manager for approval. The control measures and procedures highlighted in the Generic Risk Assessment Documents must be adhered to at all times. Employees found to have deviated from the Safe System of Work provided for the task may face disciplinary action or prosecution. The Generic Risk Assessment covers (and is suitable for) the task on this site Agree / Disagree Agree *Where additional control measures may be necessary, they shall be noted here and relayed to the relevant Line Manager for approval before continuing with the work. Hazard: Persons Affected: Proposed Control Measures: Additional Risk/Controls agreed and approved by: Appendix A. Commissioning Record SITE BUILDING/CUSTOMER’S NAME: STEPNEY GREEN TE ADDRESS: COMMERCIAL ROAD, LONDON, E1 0HA ACCESS ARRANGEMENTS: OBASS RACK/CABINET SYSTEM TYPE: FCP7663 RACK DESIGNATION: LLUC80001181 MANUFACTURER: Eltek Power UK DELIVERY DATE: INA RECTIFIERS Rect Type PIRM ID: FLOOR: 2851549M SECOND UNIT: SERIAL NO: IN SERVICE DATE: SUITE: 215 / 216 - 217 / 218 46530 18/09/2013 Rating Serial No Mod/Rev level Phase 1 241115.105 Eltek Power UK 2kW 130171131548 3.2 1 18/09/2013 2 241115.105 Eltek Power UK 2kW 130171131617 3.2 2 18/09/2013 3 241115.105 Eltek Power UK 2kW 131872102806 3.2 3 18/09/2013 4 241115.105 Eltek Power UK 2kW 131872102782 3.2 1 18/09/2013 5 241115.105 Eltek Power UK 2kW 131872101880 3.2 2 18/09/2013 6 7 8 9 10 11 12 13 14 15 16 Manufacturer MUA Date IN COMMERCIAL CONFIDENCE Site Acceptance Certificate TERM CONTRACT REF 8001354 Installation of a FCP7663 for VODAFONE Job Description: GROESTAR LIMITED Company: NIMS No: Estimate No: NOT SUPPLIED N/A Site: MTC Cost £ Measured Term Contract STEPNEY GREEN TE, E1 0HA N/A Checks And Documentation Description Supplies complete as ordered System commissioned satisfactorily IMC Log On 163268 Inverter Alarms Tested Prompt N/A and Witnessed Deferred N/A Rectifier Alarms Tested Prompt 10756375 and Witnessed Deferred 10756387 Measured quantities sheet (Excl. rates) satisfactory and PIRM form completed CC17 completed STR17 completed Short-form manual Log Book Commissioning test records System Contents List (delivery note) This Site Acceptance Certificate Complete Seen by CoW Original left with Copy left with Yes Yes Yes No No No Site Site Installer Installer N/A N/A N/A N/A N/A N/A N/A Yes N/A No N/A N/A N/A N/A Yes N/A Yes N/A Yes N/A N/A Yes Yes Yes No N/A No N/A No N/A N/A No No No N/A N/A N/A N/A N/A N/A Installer Site Installer N/A N/A N/A N/A Site Site Site Installer Installer Installer Full Completion On behalf of BT Plc, I hereby certify that those items described as complete above have above has been delivered, installed, commissioned and demonstrated satisfactorily without any outstanding deficiencies. The Acceptance Date is: 18/09/2013 Any variations to the original order have been agreed under Helpdesk Log No. ALAN MOWBERRY Signature: Name: ALAN MOWBERRY Date For BT Personnel ON THE DAY OF COMPLETION, Please e-mail or fax this form and the associated measured quantities sheet to your designated accounts administrator. Comments 18/09/2013 N/A LLU FCP Quality Audit Check List SITE / EXCHANGE NAME STEPNEY GREEN TE FLOOR SECOND SUITE 215 / 216 - 217 / 218 P.S.I.D NUMBER (LLUC) LLUC80001181 STRUCTURE FCP7663 OPERATOR VODAFONE CABINET SERIAL NUMBER 46530 METER SERIAL NUMBER 10105360 MPAN NUMBER 8000010083130 Item Overview No. 1 Installation is ready for audit a b c d Is all work at site finished. Is the work area clean and tidy and free from scrap wire, cable and construction materials. Has all Packing material, rubbish, and scrap cables been disposed of properly and not left to accumulate on site. Has Loose optional hardware e.g. Molex leads, spare fuses been left in a plastic box in the Powerbase cabinet. Yes Yes Yes Yes e If there are any Non service affecting minor defects that can be corrected without interruption to service the remedial work should be carried out. The defect should still be recorded and include a statement that the item has been cleared by the auditor. (photograph before and after may be required). No 2 Rack/Cabinets/Shelves Positioning and aligned with adjacent racks a Are cabinets installed facing the correct way and in the correct position. Has adequate space (cabinet width + nominal 10mm) been left for each RSUs for customer supplied cabinets. Note: Fail if a 600mmW x 2200mmH or 800mmW x 2200mmH cabinet would not fit in the RSU provided. (Refer to Guidance document in FCP A planners guide) Pass where single RSU width +5mm or more and for multi-RSUs total width +10mm or more. Fail where 4mm or less and 9mm or less respectively. Pass c Position must line up with floor markings. Measurements taken to the main datum line must be within 0 to +10mm and vertical alignment must be plumb Pass d Are all cabinets positioned as specified in the site plan, drawings, specifications and job pack, and with reference to at least two datum points for the vertical, horizontal or angled alignment. Pass b e f g h i j k l m n o p q Yes/No Pass/Fail Do all cabinet installations have supplementary support (eg upright / external floor brackets) to aid stability. 1)600 x 600mm Power Base cabinet stability - standalone single cabinet PoPs - Where installed with bolted-up superstructure and cable basket link onto fixed arterial runway this is deemed to be adequate additional support. 2)600 x 600mm Power Base cabinet stability - standalone single cabinet PoPs under TEP-1 E - Must be bolted to the OHI using either at least one Pass standard figure of 8 brackets or bolted to a fixed upright adjacent to the cabinet. 3)600 x 800 and 800 x 800 Power Base cabinets under TEP-1 E - Bolting up to the figure of 8 brackets is recommended but is not a failure reason as long as the OHI is adequately supported by adjacent fixed upright metalwork. Earth bonding is deemed to be adequate where the TEP-1 E is bonded to the room CEP and the FCP Power Base cabinet likewise. Are all floor fixings for FCP cabinets and uprights used either dome headed fixings (transition to Torx) or hex bolts (Hex bolts in recessed fixings only) not Pass greater than 40mm long. (Screw length is an installation guide and not a requirement to remove and check. Packing with multiple washers is not acceptable.) Has the cable management system been fixed correctly to the Power Base/HDF/Customer. Use Cabinets/Upright pillar as dictated by layout and Not Applicable indicated in job pack drawings. Dummy uprights are necessary where PoP is installed under TEP1 E, these shall be positioned to allow customer cabinet installation without being removed. Have they been labelled ‘Do Not Remove’. Refer to EIPB briefing. Have all Openreach supplied cabinets been fixed to the OH ironwork or CMS using appropriate (non-adjustable) brackets. Has Earth bonding been provided where 600x800 and 800x800 cabinets are used under legacy ironwork without top fixings. Has the correct cabinet tops been fitted (the lattice top is acceptable for ac only). Are all fixings for the cabinet in the position as specified in the relevant assembly drawings. Are cabinet side panels fitted only at each end of a contiguous block of customer use cabinets. Are access slots in cable ears fitted to 800mm wide cabinets having security doors fitted with cover plates secured with screws. Are Cabinets and ironwork undamaged. No scratches visible at arm’s length, scratches down to bare metal are unacceptable. Does the cabinet have any dents that may affect functionality? These are not acceptable. For all dent defects a photo with ruler alongside is required. Are doors fitted as required (standard on AC+DC Power base, Expanded Battery Capacity Cabinets & CuC). Are all door locks and catches fitted, undamaged and functioning. Ensure user codes are correct relative to customer order. (2244 if not specified) Door lock guidance in FCP – A Planner’s Guide in CD Portal Not Applicable Not Applicable N/A Pass Pass Pass Not Applicable Pass Pass Pass Pass r Pass s Check that nothing interferes with equipment inside the cabinet or prevents future growth e.g. Poorly run in cables causing bowed sides to the cabinet. Pass t Are correct number of HDF sub frames fitted and installed in the correct position. HDF sub-racks must be positioned as per the relevant FCP template code matrix. Where not correctly positioned the HDF subrack(s) must be moved into the correct position. Not Applicable Pass Pass x y z aa ab Are Correct number of CuC installed. Note that optional Molex FDU and AC PDUs in CuC are mounted at top of cabinet front and rear. Are CUC options fitted: Has Cabinet Labelling & Detailing been completed correctly – The top horizontal cross-rail of each cabinet has a label mounting strip front and rear. A typical label is: ● Power Base Cabinet 1 of 1 - Front – LLUC70003660 (FCP7195) ● Power Base Cabinet 1 of 1 - Rear– LLUC70003660 (FCP7195) ● CUC1 of 2 Front – LLUC70003660 (FCP7195) ● CUC1 of 2-Rear – LLUC70003660 (FCP7195) ● CUC2 of 2 Front – LLUC70003660 (FCP7195)CUC2 of 2- Rear– LLUC70003660 (FCP7195) 3 Cable runways a Is all runway and ironwork installed as instructed in the relevant documentation/job pack. Not Applicable b Has the Link basket been fixed to the HDF where this is provided, if there is no HDF has the link basket been connected to the Power Base Cabinet. Not Applicable c d e f g h i j Are all fixings in the position as specified in the relevant plans, drawings and specifications. Have all fixings been sufficiently tightened to prevent them working loose. Has the link basket ramp been mechanically clamped to the overhead cable runway. Cable ties are not acceptable. Is the cable duct access and primary DC distribution access on the roof of the Powerbase cabinet clear of obstruction. Has Fibre cabling been run to where required by the customer. Has the link runway(s) been used for both Tie and Fibre cables. Are all cables installed as specified in the relevant plans, drawings, specifications and documentation. Have Tie Cables installed been built to SED and all records updated as appropriate. Service Establishment Document is accessed via LLUMS. Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable w If Fail Rectified Pass Equipment door where fitted does not foul on the cabinet framework. u v If No Rectified Not Applicable N/A Pass Pass Pass Pass Not Applicable Pass/Fail If Fail Rectified N/A N/A k l m n o p q r 3a a b 3b Is the cable tray within a 600mm wide Power Base cabinet fitted to the left hand side of the cabinet? Concession to leave on right applies where standalone cabinet already cabled and/or landlocked. Access for customer cabling has not been compromised by un-necessary cable risers (only fitted to 600mm wide Power Base, left hand side when viewed from the front), containment systems, cable tray or cabling etc. The 1 50x50mm cable riser channel is not required in 800mm wide x 600mm deep Power Base cabinets as it obstructs tie cables and customer MSAN cabling. Where supplied it shall be removed in order to meet requirements. HDF sub-racks have been provided to match the number of ‘expected future maximum ties’ as stated by the customer in their order. Up to 6 tie cables may be provided in a 600mm wide FCP Power Base cabinet. Up to 30 / 24 / 18 tie cables in an 800mm wide Power Base (based on 1/2/3 battery strings). An HDF rack is provided when expected future maximum ties required exceeds the capacity of the Power Base cabinet. Where 54 – 108 tie cables are required a second HDF rack is supplied. Each HDF rack has its own cable runway link. Openreach LLU Tie cables ordered for installation with a ‘new build’ FCP installation are part of the OR QA. Optical fibre cabling provided for ethernet services is NOT treated as part of the PoP handover. Fibre defects found are to be raised with the ethernet teams. Central number TBA but at this moment in time use 08006783078 option 2 All checks above complied with Health & Safety requirements e.g. Cable holes fire stopped permanently and no sharp ties. Earthing a Has the FCP CEP been installed to source connection as specified in the relevant plans, drawings, specifications and drawings. Cable lug to be fitted at source end. The FCP Power Base cabinet shall have a CEP block mounted under the yellow superstructure frame or, where under TEP-1 E, affixed to the cabinet top as per ISIS. f g h i Not Applicable N/A Not Applicable N/A Not Applicable N/A If Fail Rectified Pass/Fail Pass/Fail 25mm single core green/yellow cabling installed between the MUA CEP and the DIN rail mounted CEP block on the PoP structure. This should be labelled both ends to indicate source or destination as required. (Compliance with BS6701). Refer to ISIS NWK/LLU/A022. New installs from the 07/01/2013 25mm is the standard, anything installed prior to this date A 1 0mm earth is currently acceptable but is subject to a remadial works programme. Is the cable neatly dressed & adequately supported (tied to iron work) within the PoP and on overhead ironwork to the main MUA CEP. The CEP earth cable is not be run in the Kopex. It may however be run in the associated trunking. A DIN rail mounted Cabinet CEP has been provided in each Power Base, Customer Use Cabinet and the HDF. These must be connected to the PoP CEP mounted on the overhead cable management system using 16mm² single core green/yellow cabling and suitably labelled. A bond between the Cabinet CEP and the cabinet earth terminal shall be made using 16mm² single core green/yellow cabling. New installs from the 07/01/2013 16mm² is the standard, anything installed prior to this date A 10mm² earth is currently acceptable but is subject to a remadial works programme. Has the CEP cable connection been identified with LLUC Number at source end, and CEP source at the cabinet end e.g. ‘To CEP AdjSE2/1/1’. Has the HDF Cabinet ESP bonding point been connected to suitable earth. Do all AC PDU's and Molex FDU have a CEP connection where used in CuC (earth point at rear). Has an Earth strap been fitted across hinges of the adjustable basket link. A separate earth from the PoP CEP to the ramp grid mesh is acceptable. (Grid mesh or hinge bonding are both acceptable solutions) Pass Pass Pass Pass Pass Not Applicable Pass Not Applicable j Pass k Labels on each Cabinet CEP outgoing cable stating its connection e.g. cable from Power Base CEP to +Ve of DC system – ‘+Ve of DC system’ or from Cabinet CEP to Cabinet earth terminal – ‘ Cabinet earth terminal’ Pass 5 Electrical a c d Has the Correct cable been used as specified in Works Instructions. Are cable sheath and wires undamaged. No evidence of abrasions, burns, cuts, or nicks along the length of the cable. both ends. No requirement to remove trunking lids for length of run. Power feeds should be installed as specified in the relevant plans, drawings specifications and documentation. Are all equipment connections as specified in the relevant schematic drawings. e Has Insulation been checked to ensure it is not trapped in a connector. f Are all crimped connectors correctly and securely fitted. g Are all strands of conductor within the terminal (screw, crimp and clamp terminations). Visual. h Have correct size protection devices been installed as specified in the relevant plans, drawings specification and documentation. NWK/LLU/A022 See ISIS i Is the colour coding of conductors correct and connected to the correct polarity. For single phase Brown shall be used and marked L1, L2 or L3. For three line circuits (>3kW) all line conductors may be Brown but must be labelled L1, L2 & L3 respectively or be Brown, Black, Grey. Pass j Has the Correct size of AC cable been used (note: Brown insulation to be used for single line circuits i.e. not black or grey). Cables should be minimum 10 mm2 singles, or if armoured specified, 3 or 5 core 1 0mm2 cable (mounted on cable tray) unless otherwise specified in the relevant plan, drawing, specification or documentation. Installer is responsible forcircuit design see ISIS NWK/LLU/A022 Pass k If Armoured cable has been used have conductors been identified with heat shrink. Fire stop where cable passes through wall or ceiling (see G0019). l m If Fail Rectified Pass Labels on each PoP CEP outgoing cable stating its connection, e.g. cable to Power Base or CUC CEP indicating cabinet number – ‘Power Base No1’ or ‘CUC No1’ b If Fail Rectified Not Applicable Not Applicable Pass Pass Pass 4 e Not Applicable Pass Pass Cable ties are not over-tight and damaging cable. Have all ties been cut leaving no sharp edges. Cables are adequately supported. Have all new cable holes been permanently fire-stopped. Have all threads / sharp edges been cut and protected with end caps Have all studs been checked to ensure they do not protrude by more than 3 threads. Would be applicable to all overhead I/W. Have all hazards been removed before leaving site. Have all sharp edges and burrs been removed from all metalwork to minimise the risk of injuries, damage to clothing and cabling. c d Not Applicable Not Applicable Not Applicable Pass/Fail Plastic tie fixings installed at correct distances, locations and correctly tensioned a b c d e b Pass Pass/Fail If Fail Rectified Pass Visual of Pass Pass Pass Visual Pass Pass Have power feeds been correctly identified at the fuse board e.g. 4L1, 4L2, 4L3 4N, 4E for 3 line circuits, 6L1, 6N/L1, 6E/L1 for single line circuits. Circuit designation to be completed at Fuse Distribution Board. Have Sleeve type identifiers been used. Pass Pass Not Applicable Pass Pass n Has all power trunking, Kopex and armoured cable been installed and supported correctly. Ideally, T’ off existing BT perimeter trunking down suite line in 50x50mm galvanized trunking onto Power Base Cabinet. Otherwise routing to be in 75x75mm galvanized trunking. Final take off to AC box may be in Kopex but < 2m and adequately supported. Creating new suite line power trunking from another is not permitted. (Resolve issues with BT Planner). Not Applicable o Have Flush T’ connections only been made to perimeter power trunking. No bushing permitted, except from suite line trunking to Cabinet, or where flanging is an H&S issue (resolve with Clerk of Works). Not Applicable p q r s Has all trunking lid been replaced. Have Trunking, Kopex or armoured cable runs been installed so they do not interfere with tie or fibre cable runs. Has the AC Circuit designation been completed on schedule at Fuse Distribution Board. Is the Elster meter PSTN line installed and does the Modem respond by dialling the meter number and listening for modem response. Not Applicable Pass Pass Not Applicable N/A t If the PoP is a single line, 230V install, check for correct connection to the Elster meter. An L2 supply must be connected to L2 on meter, there should be no looped connections to L1 or L3. For an A1 140 meter L1 & L3 should be showing on the meter display. For an A1 700 meter L1 and L2 would show as phase failures on the meter display. u v For AC only products has a Commando plug been provided with the socket. Are there no exposed conductors. w Check there is no open access to exposed conductive parts. Ensure that the protective cover is fitted to the rear of the inverter magazine for example. If single cores are showing then use of spiral-wrap as cable containment over the exposed but insulated cores is an acceptable solution x y z Not Required Not Applicable Pass Pass Pass Pass Are all cables neatly dressed, undamaged and adequately supported. Are all terminations marked. Are all cables dressed neatly and not impinging on tie cabling and customer use areas. battery cables do not bow out. Check Pass 6 Lighting a Is the lighting securely fixed, undamaged, correctly aligned secured in the swan neck position, works and does not interfere with equipment cabinet doors. Loose light fittings - Affected early builds pre-November. Eltek manufacturing practice is to torque to 1 00Nm and use thread locking compound. Where Not Applicable existing light fittings are found tro be loose the corrective action is to fit a serrated locking washer and retighten. b c Pass/Fail Standard FCP lighting is controlled by two hour on’ push button timer. Two hour timer can be over-ridden by pressing the button and holding until the red LED flashes, the lights will then go off after a further short delay.Does this opperate correctly. When installed under TEP-1 E, is the suite lighting at the front and rear of the cabinets in full working order. 7 Power equipment correctly installed as per customer order (e.g. rectifiers, inverters and batteries) to Eltek O&M documentation. a Are batteries located securely on shelf and linked correctly. Shelf is flat and undamaged. b Does battery cabling intrude into customer cable riser or into customer equipment area (must be within the width of the 1 9” nutting strips). c Is the battery shelf clean and clear of any obstructions. Bowed battery shelves (with batteries in place) - New installs since November have revised Eltek shelf. Where earlier installation with 2 or more battery strings manage as post-handover remedial action as the work is non-service affecting. Bowed battery shelves (top cover, no batteries) - Treat and fix as post-install damage due to being used wrongly as a step by persons unknown. d e f g h i Refer Is the battery box lid correctly fitted on the top of the battery box structure. Check battery terminations are not touching the metal work and that a sufficient gap (min. 5mm approx.)has been left between the terminals & cabinet side panels. Have battery terminals got shroud covers fitted. Check all cable terminations. Is the battery temperature sensor in place and secured in bottom battery compartment and working without encroaching into the customer cable management area. Top battery shelf between batteries 2-3 Are the correct number of rectifiers, inverter modules, battery strings and optional items such as AC & DC PDUs/Molex distribution, metering, are fitted as per the customer order. Blanking Blanking l m Are all required Inverters correctly located in the inverter shelf and secured. plates must be fitted where inverters are not installed (Fail) With the system powered up, are all rectifiers and inverter modules on-line with healthy’ status indication. Is the DC Controller configured correctly for the declared initial loading: eg rectifier & battery count is correct. n Does the Rectifier load current alarm settings match those indicated in the customer order BOM and reflect initial maximum power load current. o Does the DC Distribution MCB ratings match customer order, noting 40A MCBs are required for Molex distribution. Ways 8 & 16 for Power base Molex, Ways 7 & 15 for 1st Customer cabinet Molex, ways 6 & 14 for 2nd customer cabinet Molex. DC MCBs in FCP7791 and FCP7648 - Pass with default MCB config or with 14 x 63A + 2 x 40A feeding Molex FDU. BSkyB requirement is the latter as standard. Note that BSkyB first ordered with default only but later requested the minor change henceforth. Eltek were asked to swap to 14 x 63A as part of Molex FDU retro-fit. k p q Have DC primary MCB ways 8 & 16 been used to feed the 16-way Molex sub-distribution strip fitted in the Power Base Cabinet? Are the MCBs 40A rated. Exposed DC system combs - Not an issue or failure reason. Eltek practice is to use heatshrink sleeving on the unused tongues. Tool access is required to gain access to DC system. Has the 1st customer use cabinet fitted with Molex distribution been fed from Primary DC distribution ways 7 & 15, the 2nd customer use cabinet Molex fed from ways 6 & 14 and so on. r Has a connection kit been supplied for each cabinet with a 16-way Molex FDU a connection kit comprising a set of 2.5mm2, 3 metre long, plug ended tails (live, neutral, earth) and fuses (ten each of 1A, 2A, 3A, 6A & 1 0A). This kit should be neatly boxed and placed in the unused area in the cabinet. s AC PDU – top (first topmost rear, second topmost front) t Molex DC distribution – topmost front, second topmost rear). Note: if more than one of each per CuC then AC PDU top, Molex FDU under. u Has the circuit designation been completed on the Power Base Primary and Molex DC Distribution legends. v Are Mains leads tied neatly routed from source to load. w x Are Plugs all mechanically secure and cannot be accidently unplugged. Inverter plugs have a push button release mechanism, the plugs should be pushed fully in so the button engages. Are the IEC plugs fitted to the mains leads used for inverter supply and output undamaged and sheaths are gripped within the plug. No insulation or bare conductors showing. 8 Alarms a Have the Alarms been provided as requested in relevant documentation, specifications or job pack. Power alarm connection on early orders that were given GWS codes (replication of MCU and B-Buss orders that Eaton declined to deliver) - EIPB to allocate alarm ports and connect to PEMP as any other new build order with the DC / Inverter options. No expectation to daisy chain where MCU-Max Aux. EIPB to seek advice from BTO Power Policy team where questions over PEMP arise. Alan Heath is the lead manager. b c d e f g h Not Applicable Pass/Fail If Fail Rectified Pass Pass Are all required rectifiers correctly located in the rectifier shelf and secured. plates must be fitted where rectifiers are not installed (Fail) j If Fail Rectified Are the alarm cables used CAT5. Have Bootlace Ferrules been installed at Adam Unit connection terminals. Where shielded cables are used then heat-shrink or rubber sleeve is required where outer sheath is cut back. Insulation tape is acceptable for nonshielded cables. Is the alarm cable labelled with PIRM ID at Adam/Gateway/ACU location end. Have the Alarms been tested. Generate a prompt alarm (switch off incoming AC Isolator) Generate a deferred alarm (switch off inverter DC supply or remove a rectifier module). Confirm with Network Alarms support team: 0800 9172363 options 3-2–3 -2. Record reference number in hand over documentation. Are Major & Minor capacity alarms set as per the dimensioning tool. (See ISIS NWK LLU A022 Section 4.2.3 contoller configuration file link) Pass Pass Pass Pass Pass Pass Pass Pass Not Applicable Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass/Fail Pass Pass Pass Pass Pass Pass Pass Pass If Fail Rectified 9 a b 10 Records Pass/Fail Has correct documentation been supplied, including electrical completion certification, as specified in the relevant plans, drawings, specifications and documentation. Is the documentation at the current issue. Has one copy been left in the Power Base document holder. Labelling d e f g h i j k l m n ● Max permitted total AC load o ● Expected future maximum AC load p ● Meter MPAN Number (Must be 13 numbers) q ● Meter serial number r ● PSTN Number c Quality Checks Sign off & Verification Print name ALAN MOWBERRY Position INSTALLATION ENGINEER Company GROESTAR LIMITED Date 18/09/2013 Type of Audit Post Installation Contractor Lead Engineer GROESTAR LIMITED Others GROESTAR LIMITED Others GROESTAR LIMITED Pass Pass Pass/Fail Is all label information correct, printed and fixed correctly Equipment labelling should conform to relevant documentation, Works Instructions and Job Pack information. Any labelling should be legible, made of fade resistant materials and not be damaged, peeling or defaced. (other than warnings) will be black legend on white background. Fuse supplies to cabinet equipment should be marked with their designation and fuse rating. The following information must be included on the labels fitted to the PoP: ● AC distribution Fuse board details ● Fuse rating ● Single or three line (single-line or three- line) ● LLUC number ● Correct customer name ● 24 customer contact number (customer to input) ● PIRM - Including AC only FCP s ● Suite line a b Labels Pass Pass Not Applicable Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Position INSTALLATION ENGINEER INSTALLATION ENGINEER N/A If Fail Rectified Pass Pass Checklist based on BT Document: LLU POP EIPB Check Sheet Issue Date 13th December 2012 - Author: Chris Cole ABK344 Name ALAN MOWBERRY PAUL GRANT N/A If Fail Rectified N/A LLUC80001181 - STEPNEY If any of the above are 'Fail' and cannot be rectified on site, please note details in the box below. Include as much detail such as what side of the cabinet, part numbers etc. Fails found and corrective action taken Fails found and not corrected - Outstanding Works BT-Typical Rejection/Snagging Items Issue DC cable intrusion into customer space (cable management ears or equipment space) AC Flex sheath cut back exposing insulated cores Inverter/rectifier showing alarm Rack not fixed to floor with dome headed fasteners or coachbolts but fixed to overhead ironwork CEP earthing cable C.S.A. not correct i.e. 25/16mm² Supplementary bonding not installed Cable ramp hinge arrangement not bonded (Note Eltek connect an earth from the PoP CEP to the ramp gridmesh) Cable ramp fixed with cable ties not mechanical clamps Side Panels fitted to internal cabinet facesto contiguous suite of cabinets Internal cable tray fitted to RHS (Viewed from front) on a 600mm wide PB (Note Zen Concession for land locked installations) Internal cable tray fitted to 800mm wide PB. MCB input comb not insulated Alarm PCB not fitted correctly Sharps on cable ties Door code locks - code not set/lock not working MCB ratings correct NMC alarms ref. number not quoted on Handover documents. Inadequate RSU space (failed tolerance limit) Labelling incorrect Electricity meter & PSTN line not comissioned CEP conductor sizing to achieve BS7671 & BS6701 compliance CEP Block Provision at Power Base cabinet. Cable channel risers (~150x50mm) fitted in the inner rack core of 800W x 600D cabinets Cable channel risers (~150x50mm) fitted in 600W Power Base cabinets. Exposed single insulated ac flex into inverter chassis (outer sheath removed for ferrite core). Reject or Snag Applicable Reject Yes Reject Reject Yes Yes Reject Yes Reject A 10mm² earth is acceptable until otherwise notified Reject Yes Yes Reject Yes Reject Reject Yes Yes Reject Yes Reject Reject or fix at QA Reject Reject or fix at QA Reject or fix at QA Reject or fix at QA Snag - Resolve at QA Reject Reject or fix at QA Snag - EIBP to fix by CDD All installations started from 7/1/13 must use 25mm2 cable from MUACEP to FCP CEP. From FCP CEP block to a threaded fastener on the FCP cabinet a 16mm2 earth bondmust be used. Installations predating 7th Jan 2013 may be passed where a 16mm2 or 10mm2 conductor is used but shall be the subject of a subsequent remedial action plan to achieve full compliance. The FCP Power Base cabinet shall have a CEP block mounted under the yellow superstructure frame or, where under TEP-1E, affixed to the cabinet top as per ISIS. The ~150x50mm cable riser channel Is not required in 800mm wide x 600mm deep Power Base cabinets as it obstructs tie cables and customer MSAN cabling. Where supplied it shall be removed in order to meet requirements. Must be located on left when viewed from front. Concession to leave on right applies where standalone cabinet already cabled and/or landlocked. Eltek to ensure installs are left with riser channel on left. Use of spiral-wrap as cable containment over the exposed but insulated cores is an acceptable solution. Yes Yes Yes Yes Yes Yes Yes Yes Yes Not applicable Yes Yes Yes Yes Yes RSU dimensions width Pass where single RSU width +5mm or more and for multi-RSUs total +10mm or more. Fail where 4mm or Yes less and 9mm or less respectively. Bowed battery shelves (with batteriesin place) New installs since November have revised Eltek shelf. Where earlier installation with 2 or more battery strings manage as post-handover remedial action as the work is non-service affecting. Treat and fix as post-install damage due to being used wrongly as a step by persons unknown. DC system & battery cable dressing causing intrusion into tie and customer cables Cable dressing method and remedial action has risers. been addressed. Bowed battery shelves (top cover, no batteries) Yes Yes Yes 600 x600mm Power Base cabinet stability- standalone single cabinet PoPs. Where installed with bolted-up superstructure and cable basket link onto fixed arterial runway this is deemed to be adequate additional support. Yes 600 x 600mm Power Base cabinet stability - standalone single cabinet PoPs under TEP-1E. Must be bolted to the OHI using either at least one standard figure of 8 brackets or bolted to a fixed upright adjacent to the cabinet. Yes 600 x800 and 800 x800 Power Base cabinets under TEP-1E. Bolting up to the figure of 8 brackets is recommended but is not a failure reason as longasthe OHIis adequately supported by adjacent fixed upright metalwork. Earth bonding is deemed to Yes be adequate where the TEP1E is bonded to the room CEP and the FCP Power Base cabinet likewise. Exposed DC system combs. Not an issue or failure reason. Eltek practice is to use heatshrink sleeving on the unused tongues. Tool Yes access is required to gain access to DC system. DC system diode matrix alarm PCB. 16-Way Molex FDU provision in DC system. DC MCBs in FCP7791 andFCP7648 Eltek advised that the first 141 DC powercores supplied used their 'Mk1' PCB. Where identified, the Yes later Mk2 diode matrix PCB shall be fitted. Fitment direct from factory starts in weekcommencing 21/1/13. Eltek retrofit programme is running for all DC FCP orders deployed without the Molex FDU. Record of completions is required Yes from Eltek. All CPs other than BSkyB need the FDU for ethernet NTEs for backhaul purposes so prioritisation based on this need. Note - must be done for BSkyB though. Pass with default MCB config or with 14 x 63A* 2 x40A feeding Molex FDU. BSkyB requirementis the latter as standard. Note that BSkyB first ordered with Yes default only but later requested the minor change henceforth. Eltek were asked to swap to 14x63A as part of Molex FDU retro-fit. Loose light fittings Affected early builds pre-November. Eltek manufacturingpractice is to torque to 100Nm and use Yes thread locking compound. Where existing light fittings are found tro be loose the corrective action is to fit a serrated locking washer and retighten. Damaged light fitings A small number of instances of physical damage have been encountered. It is suspected that these are due to careless cable installation (copper or fibre) Yes post Eltek install. Action is to get these repaired / replaced. FCP Power Base top covers (where DC powersystem fitted) The Eltek Mk2 lid (solid) is in use as standard. All square hole lid types should by now have been replaced where the DC poweroption is supplied. The Yes solid cover does not need to be retro-fitted for 'ac only' installations. Eltek top cover has been demonstrated and advised Yes as acceptable for use. HDF sub-racks must be positioned as perthe relevant FCP template code matrix. Where not HDF sub-rack positioning w.r.t FCP template code &customer order. Yes correctly positioned the HDF sub-rack(s) must be moved into the correct position. EIPB to allocate alarm ports and connect to PEMP as any other new build order with the DC / Inverter Power alarm connection on early orders that were given 'GWS' codes (replication options. No expectation to daisy chain where MCUYes of MCU and B-Buss orders that Eaton declined to deliver). Max Aux. EIPB to seek advice from BTO Power Policy team where questions over PEMP arise. Alan Heath is the lead manager. FCP CuC top covers. Pass Fail X Installation Equipment Records for STEPNEY GREEN TE LLUC80001181 SITE NAME: SITE ADDRESS: MDFID: PSID No: NIMS No: APO No: INSTALLATION DATE: INSTALLER: STEPNEY GREEN TE COMMERCIAL ROAD NOT SUPPLIED LLUC80001181 NOT SUPPLIED APO00060653 18/09/2013 GROESTAR LIMITED Document No.: 2132449 [Revision: 5] - Dated: 14th February 2013 - Document Status: Approved Installation Equipment Records for SITE / EXCHANGE NAME STEPNEY GREEN TE SITE ADDRESS COMMERCIAL ROAD, LONDON MDFID NOT SUPPLIED PSID No. LLUC80001181 NIMS No. NOT SUPPLIED APO No. APO00060653 INSTALLATION DATE 18/09/2013 INSTALLER DETAILS Company GROESTAR LIMITED Address UNIT ONE MORLEY BUSINESS CENTRE, MORLEY ROAD, TONBRIDGE, KENT, TN9 1RA Engineers name (1) ALAN MOWBERRY Position/Job Title (1) INSTALLATION ENGINEER Eltek Licence NO (1) N/A CSCS Licence No (1) C0119773 Other person on site (2) PAUL GRANT Eltek Licence No (2) E/GR012 CSCS Licence No (2) C0040763 Other person on site (3) N/A Eltek Licence No (3) N/A CSCS Licence No (3) N/A Continuity Insulation Tester Make KEWTECH KT62 Continuity Insulation Tester Serial No 222986 EFLI Tester Make KEWTECH KT63 EFLI Tester Serial No 222986 RCD Tester Make N/A RCD Tester Serial No N/A Other Tester Make N/A Other Tester Serial No N/A GENERAL SITE DATA Installation Date 18/09/2013 Site Name STEPNEY GREEN TE Site Address COMMERCIAL ROAD Town LONDON Postcode E1 0HA Access Arrangements OBASS Floor SECOND Location room for FCP MUA Suite 215 / 216 - 217 / 218 Operator VODAFONE PIRM ID 2851549M PSID (LLUC) Number LLUC80001181 NIMS Number NOT SUPPLIED APO Number APO00060653 System Manufacture Eltek Power UK System Type FCP7663 Cab Serial No 46530 Equipment delivery date INA In Service date 18/09/2013 System Power (KW) 3 MECHANICAL RSU 2 Space Dimensions (>1030mm) 610 AC METER AC Meter Serial No 10105360 MPAN Number 8000010083130 PSTN Line Number N/A Meter Comissioning Ref (UKDC) N/A RECTIFIER INFO (ADDED RECTIFIERS ONLY) 241115.105 Type of Rectifiers Qty of Rectifiers required to support order 5 Eltek Power UK Manufacturer of Rectifiers Rating 2 Serial Number Rectifier 1 130171131548 Serial Number Rectifier 2 130171131617 Serial Number Rectifier 3 131872102806 Serial Number Rectifier 4 131872102782 Serial Number Rectifier 5 131872101880 Serial Number Rectifier 6 0 Serial Number Rectifier 7 0 Serial Number Rectifier 8 0 BATTERY INFORMATION Make of Batteries Enersys Strings Fitted this build 3 Type of Batteries SBS C11FT 12V 91Ah Date of Manufacture 18/08/2013 INVERTER INFO (ADDED INVERTERS ONLY) Type of Inverters 0 Qty of Inverters required to support order 0 Manufacturer of Inverters 0 Rating Serial Number Inverter 1 0 Serial Number Inverter 2 0 Serial Number Inverter 3 0 Serial Number Inverter 4 0 ELECTRICAL READINGS FROM MASTER CONTROLLER Record float voltage of system displayed on Controller Record load current Record float voltage measured at distribution Record battery current. 54.05 36 53 4 Record AC supply voltage AC Ph1 232 Record AC supply voltage AC Ph2 238 Record AC supply voltage AC Ph3 AC / DC ELECTRICAL INTERFACES 242 Voltage and Polarity Check for Each Outlet (Pass / Fail) Voltage Polarity AC Distribution Panel Twin socket Outlet / 240 Powerbase Cabinet PASS AC 6 Way PDU/Powerbase Cabinet 240 PASS DC 18 Way Distribution AUX Cabinet 1 53 PASS DC 18 Way Distribution AUX Cabinet 2 N/A N/A DC 18 Way Distribution AUX Cabinet 3 N/A N/A DC 18 Way Distribution AUX Cabinet 4 N/A N/A ALARMS and CONTROLLER IMC Log On Reference No. 163268 Rectifier Prompt Alarm Reference 10756375 Rectifier Deferred Alarm Reference 10756387 Inverter Prompt Alarm Reference N/A Inverter Deferred Alarm Reference N/A Controller Type Smartpack2 Controller Serial No. 122471116704 Controller Manufacturer Eltek Power UK Firmware Version 1 Alarm System Type PEMP Config File No. 1 0 Completed Installation Photo Pack for STEPNEY GREEN TE LLUC80001181 Document No.: 2132449 [Revision: 5] - Dated: 14th February 2013 - Document Status: Approved FCP FRONT CABINET VIEW (DOORS CLOSED) FCP REAR CABINET VIEW (DOORS CLOSED) POWER CABINET (DC) FRONT VIEW (DOORS OPEN) POWER CABINET (AC) REAR VIEW (DOORS OPEN) POWER CABINET DC DISTRIBUTION POWER CABINET AC DISTRIBUTION POWER CABINET CONTROLLER POWER CABINET BATTERY STRING 1 POWER CABINET BATTERY STRING 2 POWER CABINET BATTERY STRING 3 POWER CABINET RUNWAY LINK NOT APPLICABLE OVERHEAD IRONWORK NOT APPLICABLE BUILDING AC DISTRIBUTION PANEL ES1A/1C/1/1C/1/3 BUILDING AC DISTRIBUTION PANEL FUSEWAY ES1A/1C/1/1C/1/3 Way 3 AC CONTAINMENT TO POWER CABINET EXCHANGE CEP PROTECTING LLUC80001181 POWER CABINET (DC) FRONT ID LABEL POWER CABINET (AC) REAR ID LABEL POWER CABINET (AC) REAR METER & ID LABELS FCP SOCKET POLARITY ( MAINTENANCE SOCKET ) FCP SOCKET POLARITY ( INVERTER SOCKET ) FCP SOCKET POLARITY ( CUSTOMER CABINET 1 SOCKET ) FCP SOCKET POLARITY ( CUSTOMER CABINET 2 SOCKET ) NOT APPLICABLE FCP SOCKET POLARITY ( CUSTOMER CABINET 3 SOCKET ) NOT APPLICABLE FCP SOCKET POLARITY ( CUSTOMER CABINET 4 SOCKET ) NOT APPLICABLE EBC BATTERY STRINGS 1, 2 & 3 NOT APPLICABLE www.eltek.com Eltek Power Eltek Power UK Eltek House, Cleveland Road, Gråterudv. 8, Hemel Hempstead, Pb 2340 Strømsø, Hertfordshire HP2 7EY 3003 Drammen, Norway +441442 219355 Phone: +47 32 20 32 00 Fax +441442 245894 Fax: +47 32 20 32 10