Projects of CDG Développement
Transcription
Projects of CDG Développement
Projects of CDG Développement Summary Mazagan .............................. 3 Oued Chbika .............................. 4 Zenata .............................. 5 Anfa .............................. 6 Aïn Cheggag .............................. 7 Aïn Chkef .............................. 8 Agropolis .............................. 9 Haliopolis .............................. 10 Jorf Lasfar .............................. 11 Selouane .............................. 12 Technopole d’Oujda .............................. 13 Technopolis .............................. 14 Casanearshore .............................. 15 Fes Shore .............................. 16 Cala Iris .............................. 17 Oued Fès .............................. 18 Casa Green Town .............................. 19 Casablanca Marina .............................. 20 Chrifia .............................. 21 Al Massira .............................. 22 P2i Kenitra .............................. 23 Urba Pole .............................. 24 Souani .............................. 25 Ecoparc Smir .............................. 26 Rif Hotel .............................. 27 Mazagan Contractor Resort Co Developer Kerzner International Development Shareholders Kerzner International Limited : 50% CDG Développement : 21,3% Somed : 21,3% MAMDA – MCMA : 7,4% Location El Jadida (Atlantic Coast) Land area 504 ha (Phase 1 : 246 ha) Project Description Development of the new Mazagan beach resort Project Components Capacity : 7,576 beds, of which 3,700 hotel beds 4 hotels 2 golf courses (each 18 holes) 1 conference center Recreational facilities Residential units (villas and apartments) Phase 1 : 5 star hotel (500 rooms), restaurants, Casino, Night club, Health & Beauty Center, Golf and club house, 150 villas Investment 3.1 billion MAD (Phase 1 – excluding housing component) 3 Oued Chbika Contractor Shareholders 4 Oued Chbika Development CDG Développement : 35% Chbika Holding Company : 65% Location Oued Chbika (Tan Tan) Land area 1,500 ha (phase 1 : 500 ha) Project Description Development of an integrated city Project Components Phase 1 (500 ha) : Real estate : 1,851 housing units (villas and apartments) Hotels : 5,000 beds (three 4 star hotels and five 5 star hotels) Recreational and sports facilities : Golf course, Spa, etc. Social and specialized facilities Investment 6.8 billion MAD (Phase 1 : 500 Ha) Zenata Contractor Partners Zenata Development Company Casablanca Urban Agency (City Planning Authority) State Property Authority Dyar Al Mansour Location Municipality of Ain Harrouda (Prefecture of Mohammedia) Land area 1,830 ha State properties Private properties Project Description New town of Zenata Project Components Industry, logistics, services and tourism activities Residential : social, medium and higher income housing Equipments : cultural (technological university) and health-care facilities 5 Anfa Contractor Partners The Anfa Urban Planning and Development Agency (AUDA) Casablanca Urban Agency Casablanca Urban Commune The Greater Casablanca Wilaya CDG Développement Location South-West of Casablanca (inner urban perimeter, location of the former Casa-Anfa airport) SLand area 358 Ha Project Description Large urban development equipped with metropolitan facilities Project Components 4,300,000 m² distributed as follows : • Housing : 2,300,000 m² • Office space : 1,300,000 m² net floor area • Facilities : 700,000 m² net floor area (Large department stores and local convenience stores, hotels, cultural, sports and recreational facilities,…) • Green and public areas : Roughly one hundred hectares • Intermodal, Public transportation Plan : 2 intermodal hubs Regional Rapid Transit/Tramway • Regional Rapid Transit/Tramway/High speed trains and Train/Bus Investment 6 9.3 billion MAD Aïn Cheggag Contractor Jnane Saïss Développement Location South of the city of Fes (Province of Sefrou) Land area 1 772 Ha Project Description Regional project including tourist, residential and industrial zones. Project Components Investment Tourist section (tourist zone, resort, etc.) Medicinal and aromatic plant agro-pole Residential zone Industrial zone 5.5 billion MAD 7 Aïn Chkef Contractor Jnane Saïss Développement Location South West of the city of Fes (Province of Moulay Yacoub) Land area 2,042 ha Project Description Regional project including residential and industrial zones. Project Components Investment 8 Theme-based residential zones Equipment parkway (Museum of Civilizations, university campus, Sports Park, etc.) Activity zone (inland port, techno-park, business center) Botanical Park (recreational area, zoo, etc.) 7.4 billion MAD Agropolis Contracto MEDZ Location Commune of Sidi Slimane Moul Kifane (South of Meknes) Land area 130 ha (phase 1 of the agro-food industrial park), with possible extension Project Description Creation of the Agropolis complex with a view to enhance agro-food industry competitiveness in Meknes Complex intended for all players operating in the agro-food industry sector. Project Components Agro-industrial and logistics activity zone Integrated “intelligent” city featuring support services to industrial activities (Training, R&D, innovation, tertiary activities, etc.) Meeting facility (consultation and synergies between players) The 1st phase of the agro-food industrial park will include two components: An industrial park A logistic platform Investment 482 million MAD 9 Haliopolis Contractor Partners Igrane Fund Crédit Agricole of Morocco The Souss Massa Drâa Region Location The Souss Massa Drâa Region Land area 150 ha (Phase 1 : 100 ha) Project Description Industrial and logistic park dedicated to seafood products Project Components Investment 10 MEDZ Transformation industries : 46 ha Support Industries : 26 ha Logistics : 27 ha Services : 10 ha 600 Million MAD Jorf Lasfar Developer Partners MEDZ Ministry of Economy and Finance Ministry of Interior Ministry of Industry, Trade and New Technologies Location Commune of Moulay Abdellah, 17 km south of El Jadida Land area 500 ha, to be developed in two phases Project Description Industrial Park (Large plots, SME-SMI zone, High-Tech, logistics and other) Equipped plots: more than 200,000 m² Ready for use units Office space Logistics areas and warehouses Business incubator High tech zone Services for businesses and individuals Dedicated areas for Training, Research and Development The industrial area development plan includes 221 plots, of which 74 for big industries, 62 plots for SME/SMI and 85 plots for equipment. Investment 955 million MAD 11 Selouane Contractor Partners Province of Nador Nador Chamber of Commerce, Industry and Services Location Selouane Rural Commune, in the Province of Nador, in the Oriental (Eastern Morocco) Region Land area 142 ha Project Description Creation of an industrial zone in the Selouane Commune Project Components Investment 12 MEDZ Economic and industrial zone Logistics zone Road system & green areas 285 million MAD Oujda Technopole Contractor Partner MEDZ Ministry of Economy and Finance Ministry of Industry, Trade and New Technologies The Oriental Wilaya The Oriental Agency The Oriental Region The National Airport Authority The Ahl Ngad Rural Commune Location Oujda, next to the Angad airport Land area Long-term land reserves: 600 ha (of which 200 ha currently available) Project Description Multi-sector technopole Project Components Investment Industrial and Logistic park Tertiary activities Commercial activities Training, research & development. 600 million MAD 13 Technopolis Contractor MEDZ Location Salé (Commune of Hsaine) Land area Eventually 300 ha (Phase 1 : 107 ha) Project Description Rabat Sale Technology Park Consistance 14 Off-shoring hub Academic hub Research Promotion Hub Research and Development Hub Microelectronics Hub Media Hub Floor area 312 000 m2 (Phase 1) Investment 6 billion MAD (Phase 1 : 3.3 billion MAD) Casanearshore Contractor MEDZ Location Casablanca (Mohammed V Airport road) Land area 53 ha Project Description The first business park dedicated to data and information processing, information technology and business process activities. Project Components Investment Offices and services areas: 300,000 m² in the long-term Phase 1: 57,000 m² Phase 2: 80,000 m² Phase 3: approximately 130,000 m² 3.4 billion MAD 15 Fes Shore Contractor Fes Shore, MEDZ subsidiary Location Fes (Sidi Harazem road) Land area 22 Ha Project Description Integrated park dedicated to information technology, data processing and business process activities Project Components 16 Offices and services areas Catering areas Commercial activities Sports center One-stop public administration services Floor area 131,000 m² of offices and services areas Investment 1 billion MAD Cala Iris Contractor MEDZ Location Cala Iris site (80 km out of Al Hoceima) Land area 340 Ha Project Description A new luxury beach resort geared towards sustainable development. The Cala Iris Fort taps into the cultural and social heritage of the Al Hoceima region by integrating existing traditional craftsmanship and fishery activities and promoting the region’s hinterland. Project Components 11,184 beds 4,060 beds in private villas and vacation homes 3,074 beds in private and tourist accommodation 4,050 beds for tourists in 9 hotels Investment 2 billion MAD 17 Oued Fes Contractor MEDZ Location Fes Urban Commune Land area 171 Ha Project Description Tourism Development Zone Project Components 18 5 Hotel plots 19 Luxury communal housing and villas plots 5 Recreational and commercial plots Floor area 366 000 m² Investment 600 million MAD Casa Green Town Contractor CGI Location Bouskoura Rural Commune, Casablanca. Land area 357 ha Project Description Casa Green Town is an urban development designed to comply with the highest environmental and sustainable development requirements. It consists of residential developments surrounding a 18-hole golf course, a mixed-use urban center and a business and services zone. Project Components Residential development Golf course Hotel Business zone (off-shoring, show-rooms, etc.) Floor area 950 000 m² Investment 9 billion MAD 19 Casablanca Marina Contractor Al Manar Development Company, subsidiary of CGI Developer CGI Partners Location Between the Hassan II Mosque and the Port of Casablanca Land area 26 Ha (of which 10 ha recovered from the sea) Project Description A new multi-purpose hub designed to spark economic activity by meeting a substantial demand for housing, office space and commercial, tourist and recreational activities Project Components 20 Sama Dubaï Casablanca Wilaya Royal Marine Forces National Ports Authority City of Casablanca « Marina » : Tourism, recreational and leisure activities « Ramblas » : Business, leisure and shopping « Portes Océanes » : Business Center, office and residential space. « Jardins de la mosquée » : Green areas, aquarium and culture Floor area 476 600 m² Investment 5 billion MAD Chrifia Contractor Partners CGI Pierre & Vacances Madaëf Fund Location Tassoultant Rural Commune, Marrakech Land area 268 ha Project Description A holiday resort including a residential development and a hotel component, surrounding an 18-hole golf course and other leisure activities (entertainment, parks and squares). Project Components An integrated resort designed and developed along three main pillars : the village of Isli, the Tisslit oasis and Orchards. Mixed-use real estate development (tourism and residential): 1,800 housing units (villas/apartments) 480 residential tourist accommodation units (4 and 5 star) 3 four and five star hotel units (300 keys) An 18-hole golf course Entertainment, leisure and services facilities Investment 4.6 billion MAD 21 Al Massira Contractor CGI Location Oued Fnideq (Fnideq River) Land area 40 ha Project Description A new Fnideq urban center, accessible from the Ceuta coastal road, divided into three components: A main promenade lined with urban buildings and connected to the city through a main administrative street Holiday homes with a 1 hectare park and a mosque Communal housing with sports facilities Urban facilities Project components Residential developments : 290,000 m² Commercial area : 10,000 m² Facilities : 20,000 m² (mosque, park, sports facilities) Public leisure park : 58 000 m² Floor area 318,000 m² (Phase 1 : 79,340 m²) Investment 2 billion MAD 22 P2i Kenitra Contractor The grouping of companies MEDZ and Edonia will load planning, management and maintenance of all the P2I of Kenitra, either directly or through another structure it will appoint. Partners Partnership between : The Group MEDZ and Edonia World who will arrange, develop, and manage the project. State (industrial, Interior and finance ministries) which will facilitate the mobilization of land, contribute financially to the project, will establish a framework sectoral incentive (fiscal, administrative and training). Location 12 km east of the city of Kenitra in the municipality of Amer Saflia. Land area 345 ha with 198 ha on free area, 147 ha in free zone. Project Description This area is to allow industrial activities (2nd and 3rd industry category, exhibition of industrial products, etc.), hi-tech, tertiary, logistics and training. Project components Investment Lots of lands equipped Ready-made units Trays offices A city of electronics & high tech zone A logistic area An administrative area, facilities and nearby businesses and services Planned induced investment : 10 billion MAD 23 Urba Pole Contractor Convention on signature (undisclosed) Partners ONCF Location Railway station of Oujda Land area 30 ha Project Description In the center of the city of Oujda, site railway station offers the opportunity to give the city a large urban project integrated witch would mark the beginning of a new urban dynamic quality. Based on structural reorganisation of the rail activity in this area, the program is creating a multifunctional pole incorporates the residential, office spaces, a hotel and commercial galleries. Project Components Investment (out of taxes and land) 24 Residential: Tertiary: Commercial area: Hotel: Equipments: 2.5 billion MAD 210 000 m² 48 000 m² 48 000 m² 28 000 m² 19 000 m² Souani Contractor CGI Location Ajdir Circle, Ait Youssef Ou Ali Rural Commune - Province of Al Hoceima Land area 80 ha Project Description Integrated tourist and residential resort Project Components Overall project bed capacity : 4,400 beds Tourism component : 1,602 beds (36%) Hotels Holiday Village : 850 beds Coeur de vie : 100 beds Residential tourist accommodation Varied tourist accommodations : 652 beds Residential component : 2,798 beds (64%) 35 stand-alone villas ranging of 240 - 300 m2 60 semi-detached villas of 200 m2 105 terraced houses of 160 m2 550 1 Bdr, 2 Bdr, 3Bdr, and 4 Bdr apartments ranging from 60 to120 m2 Floor area 160 000 m² Investment 1.8 billion MAD 25 Eco Parc Smir Partners The M’diq – Fnideq Prefecture CGI Location M’diq – Fnideq Prefecture (M’diq Urban Commune) Private state property in rental concession Land area 118 ha Project Description Landscape architecture design of the Smir marshes Project objectives Investment 26 Regional enhancement project Ecological project : Ensure botanical sustainability and safeguard the flora and fauna of the region Education project in support of scientific research : observatory, museum Leisure project : circulation infrastructure, pedestrian pathways 80 million MAD Rif Hotel Developer Société Hôtelière de Nador Location Mar Chica Laguna – Nador Contractor CGI Project Description 4 star Hotel, Guest apartments, Spa Project Components 4 star hotel with 110 rooms (10 suites) 76 guest apartments Spa Reception and conference hall Night club Shops Games room Floor area 30 000 m² Investment 356 million MAD 27 Design and Implementation : Communication and Institutional Relations Department CDG Développement Headquarters : Espace Oudayas, Angle Avenues Annakhil et Mehdi Benbarka, Hay Ryad, Rabat – Maroc Phone number : (+212) 537 57 60 00 Fax : (+212) 537 71 46 78 www.cdgdev.ma