STIP WP1 Ardleigh Green Bridge

Transcription

STIP WP1 Ardleigh Green Bridge
Upper Holloway Bridge replacement
Upper Holloway Bridge replacement - update
Junction Ward Partnership meeting
29 July 2015
Upper Holloway Bridge replacement
Daniel Hall – TfL Project Manager
Laura Leporati – TfL Project Manager
Alison Scammell – TfL Consultation Specialist
Nick Atkinson – Hochtief (UK) Public Liaison Officer
Upper Holloway Bridge replacement
Scope:
Replace the bridge's deck, which sits beneath the
road, and strengthen the abutments that support the
bridge from below.
An additional bridge will carry utilities.
Work has begun and the project will be completed by
2017.
The A1 Holloway Road bridge
replacement is part of the Road
Modernisation Plan
Benefits:
• A new parapet wall along the edge
of the road bridge will improve
safety for road and rail users.
• Fewer maintenance closures will
be required as the life span of the
road bridge will have been
increased.
• Utilities moved to a separate new
bridge will significantly reduce
disruption to pedestrians and
traffic when utility works are
needed.
Upper Holloway diversion routes
Upper Holloway
Northbound Diversion routes
Southbound diversion routes
Upper Holloway Bridge replacement
Communications
•
•
•
•
•
•
•
Stakeholder engagement strategy
Regular liaison with London Borough of Islington and local
stakeholders (residents’ associations, elected members, TfL
attendance at ward meetings and area committees)
Customer Relationship Management (Oyster)
Website, social media
Press releases, local press advertising
Information letters to local residents
On site drop-in information sessions
Upper Holloway Bridge replacement
Contact details:
Any queries relating to the Upper Holloway bridge replacement
please contact our contractor’s Public Liaison Officer:
Nick Atkinson (Hochtief UK) :
Tel: 07468 701805 and [email protected]
Project web page: www.tfl.gov.uk/upper-holloway-bridge
For other TfL enquiries and contact details please visit:
https://tfl.gov.uk/help-and-contact/