Millstone 345-kV DCT Split and SLOD SPS Removal
Transcription
Millstone 345-kV DCT Split and SLOD SPS Removal
EVERSOURCE LOCAL SYSTEM PLAN 2015 October 22, 2015 Update to Eversource LSP for 2014 The Eversource Local System Plan (LSP) has been revised to incorporate the latest proposed changes to the Eversource Local transmission system for Connecticut, Massachusetts, and New Hampshire. The LSP Project List is a cumulative listing of proposed transmission solutions intended to meet local needs. This LSP-2015 supersedes Eversource’s LSP-2014. 1 Purpose of the Local System Plan Per Attachment K – Local, the LSP: Describes projected improvements to non-PTF (non-Pool Transmission Facilities) that are needed to maintain system reliability Reflects: – Local Needs Assessments – Corresponding transmission system plans and future studies – Maps indicating project locations Identifies: – Local Planning Process – Criteria, Data, and Assumptions used in the Local System Planning Process 2 LSP Communication ISO-NE posts the materials on the PAC web page prior to the meeting. PAC, Transmission Customers, and other Stakeholders have 30 days after the meeting to provide any written comments for consideration by Eversource. – Comments to be directed to: Robert P. Clarke Director, Transmission Business Operations Eversource One NSTAR Way, SE320 Westwood, MA 02090-9230 Phone: 781-441-8057 email: [email protected] 3 LSP Communication (cont.) Each PTO (Participating Transmission Owner) is individually responsible for publicly posting and updating the status of its respective LSP and transmission project list on their website in a format similar to the ISO-NE Regional System Plan (RSP) Project List . Eversource’s project lists are located at: – https://www.eversource.com/Content/ct-c/about/majorprojects-infrastructure/transmission-rates-tariffsinterconnections/ferc-order-890-posting-and-676-erequirements 4 Local System Planning Process Local studies can result from: – Load growth – Area reliability assessments – Point of Delivery Requests from customers – Other efforts that may impact local facilities (e.g., elective transmission upgrades, reliability transmission upgrades, generator interconnections, short circuit or temporary overvoltage studies) The Local System Plan: – Summarizes the needs – Summarizes the selection of preferred solution – Includes Local Projects that are related to projects listed in the RSP 5 Criteria and Assumptions All Eversource local transmission facilities (69 kV and above) are part of the interconnected Eversource system and shall be designed in accordance with criteria described in the Eversource Transmission Reliability Guidelines. Eversource complies with NERC, NPCC, and ISO-NE planning criteria. The annual ISO-NE CELT Report forecasts for the New England area (90/10) load, with appropriate municipal customer forecasts and/or sub-area forecasts, are used. Studies use the ISO-NE provided base cases and the ISO-NE short circuit database. 6 This Local System Plan includes the following types of Transmission System connections (illustrative examples) PTF Non-PTF 115 kV bus Distribution Connection to PTF Distribution 115 kV Non-PTF Substation Radial Connection to PTF Eversource has distribution connections and radial transmission connections. 7 NH, MA, and CT Projects in Regional System Plan Large-scale reliability assessments may ultimately have Local ramifications. Assessment studies are described in the ISO-NE RSP. Several longer-term assessments have been completed, and others are being conducted. Information about studies being conducted that may affect the local system can be found in the ISO-NE 2015 RSP*: – New Hampshire, RSP section 6.3.2.2 and 6.3.2.4 – Connecticut, RSP section 6.4.2 and 6.4.2.3 – Eastern Massachusetts, RSP section 6.4.2.1 and 6.4.2.2 – Western Massachusetts, RSP section 6.4.2.1 * Public Meeting Draft 2015 Regional System Plan posted on August 28, 2015. 8 LSP Project List The LSP Project List is a cumulative listing of proposed transmission solutions intended to meet LSP needs. The LSP Project List includes the status of each Non-Pool Transmission Facility (Non-PTF project). Non-PTF costs are provided for Proposed, Planned, Under Construction, and In Service categories of projects, using the same guidelines as the various stages of RSP projects. Some projects may have Non-PTF costs yet to be determined. – – – – – Concept - Project is under consideration as a possible solution but the needs assessment is not yet completed. Costs not known. Proposed – Needs assessment completed and project proposed as the solution, but Proposed Plan Application (PPA) not yet filed. Planned - PPA has been filed and approved by ISO-NE. Under Construction - Final engineering and internal approvals completed and project being implemented. In Service - Project completed. 9 Eversource Service Territories Eversource operates in three states: Connecticut Massachusetts New Hampshire 10 Connecticut Projects Bloomfield Transformer Canal Transformer & Breaker Manchester Transformer Tracy Transformer & Breaker Bulls Bridge Transformer Newtown Substation Greenwich 115/13.2 Substation 11 Local System Plan – Connecticut Status of project descriptors in blue have changed from previous LSP or are newly listed Eversource CT Local Area Transmission Facilities Projects - Connecticut Need Projected ISD Month/Year; Non-PTF Est. Cost Project Area Reliability 2014 * Northwest Load Growth May-15 * Southwest Reliability Dec-15 * Greater Hartford Load Growth Load Growth May-16 $2.4M May-17 $2.0M Load Growth and Reliability May-18 $107M Load Growth Dec-18 * Southwest Eastern Norwalk/ Stamford Status Solutions Bloomfield 3B - Replace Failed 3X Transformer (Bloomfield) In Service Replace the 3X transformer which failed on 8/20/14 with a new 115/23 kV, 60 MVA transformer (system spare) Bulls Bridge substation – Add 27.6 kV Capacity (New Milford) In Service Replace the existing 115/27.6 kV transformer with a new dual-voltage transformer Planned Proactive replacement of aging 3A-2X with a new 115/23 kV, 60 MVA transformer Project Manchester 3A - replace aging 3A-2X transformer (Manchester) Canal substation - add 115/23 kV transformer and add a 115 kV breaker (Southington) Tracy substation - add 115/23 kV transformer and add a 115 kV breaker (Putnam) Greenwich 115/13.2 kV Substation Project (Greenwich) Southwest Newtown Substation (Newtown) Planned Planned Planned Planned Add a second transformer of 47 MVA and a 115 kV breaker Add a third transformer of 47 MVA and two 115 kV circuit breakers. Add a new 115/13.2 kV bulk power substation in the Greenwich area with three 60 MVA transformers and a sixbreaker ring bus. Also, two new 115 kV cable circuits from Cos Cob to Greenwich. Replace two existing transformers (28 & 30 MVA) with 60 MVA transformers. * There are no Non-PTF costs for this project 12 Local System Plan – Connecticut (continued) Status of project descriptors in blue have changed from previous LSP or are newly listed Eversource CT Local Area Transmission Facilities Projects - Connecticut Need Projected ISD Month/Year; Non-PTF Est. Cost Reliability Dec-16 Greater Hartford Reliability Dec-16 Southwest Reliability 2017 Reliability Project Area Project Status Solutions Manchester 3A - replace aging 3A-3X transformer (Manchester) Concept Proactive replacement of aging 3A-3X with a new 115/23 kV, 60 MVA transformer Sasco Creek 51R - Metro North to replace existing 51R-1X and 51R-2X transformers Concept Proactive replacement of aging 51R-1X and 51R-2X with new 115/27.6 kV transformers. Greater Hartford Bloomfield 3B - replace aging 3B-2X transformer (Bloomfield) Concept Proactive replacement of aging 3B-3X with a new 115/23 kV, 60 MVA transformer 2018 Greater Hartford Westside 7A - replace aging 7A-3X transformer (Middletown) Concept Proactive replacement of aging 7A-3X with a new 115/13.2 kV, 60 MVA transformer Reliability 2018 Greater Hartford Newington 4A - replace aging 4A-1X and 4A-3X transformers (Newington) Concept Proactive replacement of aging 4A-1X and 4A-3X with new 115/23 kV, 60 MVA transformers Load Growth 2019 Greater Hartford Scitico Substation (Enfield) Concept Add a third transformer (60 MVA) to the substation. Reliability 2019 Northwest Franklin Dr 1B - replace aging 1B-4X and 1B-5X transformers (Torrington) Concept Proactive replacement of aging 1B-4X and 1B-5X with new 115/13.2 kV, 60 MVA transformers Reliability 2019 Northwest Canton 5R - replace aging 5R-2X transformer (Canton) Concept Proactive replacement of aging 5R-2X new 115/23 kV, 60 MVA transformers 13 Eastern Massachusetts Projects Somerville Transformer Newton Highlands Substation and Reliability Improvement Sudbury Reactors Hopkinton Transformer Valley Substation BOSTON SUB AREA K-St to Dewar/ Andrew Sq Barnstable – Harwich Tap Harwich Tap – Harwich Bulk Acushnet – Pine Street Mashpee Substation Hyannis Jct Wing Lane Substation 14 Local System Plan – Eastern Massachusetts Status of project descriptors in blue have changed from previous LSP or are newly listed Eversource Local Area Transmission Facilities Project Listing - Eastern Massachusetts Need Projected ISD Month/Year; Non-PTF Est. Cost Load Growth/ Reliability Dec-14 $2.7M SEMA Reliability Dec -14 $5.1M Load Growth Project Area Project Status Solutions Upgrade the capacity of the 119 line from Harwich Tap to Harwich Bulk Substations In Service Upgrade ~4.5 miles of line to increase capacity. NEMA /Boston Sudbury Reactors In Service Add 2 (20 Mvar) 115 kV reactors at Sudbury for light load voltage control Jun-15 $301K NEMA /Boston Somerville Transformer 110A upgrade In Service Upgrade transformer 110A to a 65.4 MVA unit Load Growth Oct-15 $16.2M SEMA Hyannis Junction Substation Upgrade Under Triple-End Hyannis Junction with 3rd 115/23 kV 30/40/50 Construction MVA transformer bank and reconductor 115 kV line 123 Load Growth/ Reliability Jun-16 $7M SEMA Wing Lane Substation Double Ending Double-End Wing Lane Substation with 2nd 24/32/40 Under MVA 115/13.2 kV bank. Reconfigure lateral #112 line to Construction Arsene Street with a ABB Pass MO 2-breaker auto throw over scheme. Reliability Dec-15 $15.9M SEMA Acushnet - Pine St Upgrades Under Add 115 kV breakers and reconfigure both Acushnet and Construction Pine Street Substations. Reliability Jun-16 $3.6M SEMA Pine St. upgrade Under Add 2 (10 Mvar) Reactors at Pine St. Construction 15 Local System Plan – Eastern Massachusetts (continued) Status of project descriptors in blue have changed from previous LSP or are newly listed Eversource Local Area Transmission Facilities Project Listing - Eastern Massachusetts Need Projected ISD Month/Year; Non-PTF Est. Cost Project Area Reliability Dec-15 $19M SEMA Load Growth/ Reliability Jun-16 $20.2M NEMA /Boston Load Growth/Reliability/ Generation Interconnection Dec-15 *June-17 Reliability Project Solutions Status New 115 kV Line from Barnstable to Harwich Tap Under Build a new 7.8 mile 115 kV #139 line from Barnstable to Construction Harwich Tap. K-St to Dewar/ Andrew Sq Cable Project Under Install two 1-mile HPFF UG cables from K St to manhole Construction on Day Blvd and split wye splices. Reconfigure K St bus. SEMA Valley Substation Upgrade (2 year project) Upgrade Valley Substation to two (2) 115/23 kV 30/40/50 Under MVA transformer banks. Replace #108 bank in 2015. Construction Upgrade #113 side of station and replace #113 bank in 2017 Dec-15 $1.4M NEMA/ Boston Add a 115 kV capacitor bank at Newton Highlands Substation Proposed Add 54 Mvar 115 kV capacitor bank at Newton Highlands Substation Reliability May-16 $16M NEMA/ Boston Carver St. Station upgrade, Phase I Proposed Upgrade Carver St. Station. Install six 115 kV cirucit breakers, upgrade protection and control, replace transformers 110Aand 110B. Load Growth Jun-17 $1.73M SEMA Install 3rd Transformer at Hopkinton Station 126 Proposed Add 115 kV breaker and 3rd Transformer Load Growth Reliability Jun-19 $30M NEMA/ Boston New Substation proposed to improve Newton Highlands Capacity Proposed Construct a new substation with two new 37/50/65.4 MVA transformers, to be supplied by new transmission line Reliability Dec-20 $12.1M NEMA/ Boston Carver St. Station upgrade, Phase II Proposed Further develop Carver St. Station. Migrate to a 115 kV breaker and a half arrangement. * There are no Non-PTF costs for this project 16 Local System Plan – Eastern Massachusetts (continued) Status of project descriptors in blue have changed from previous LSP or are newly listed Eversource Local Area Transmission Facilities Project Listing - Eastern Massachusetts Need Projected ISD Month/Year; Non-PTF Est. Cost Project Area Load Growth 2016 SEMA Tremont Substation - Transformer upgrade Concept Replace #114 12/16/20 MVA transformer with 15/20/25 [28] transformer using the spare removed from Valley Substation Reliability 2016 SEMA 230/115 kV Autotransformer at Medway Substation Concept Add a 230/115 kV Autotransformer at Medway Substation for use under extreme operating conditions Load Growth Reliability 2016 SEMA 2nd 115 kV Line from Duxbury to Marshfield Concept Install 2nd 115 kV transmission line from Duxbury substation to Marshfield Substation Load Growth 2016-2017 NEMA /Boston Sherborn - Transformer and Switchgear upgrades Concept Upgrade both 40 MVA transformers to 65.4 MVA transformers Load Growth 2017 SEMA Wellfleet - Transformer upgrades Concept Replace 16/21/26 MVA transformers with 30/40/50 MVA transformers Concept Upgrade Falmouth Tap Switching Station from a 1-breaker series bus arrangement to a 115 kV breaker and a half scheme. Install a 115/23 kV bulk distribution station with one 30/40/50 MVA transformer to address area load growth Concept 1) Install a 2nd 115 kV transmission line. 2) Construct additional distribution circuit backup. 3) Construct 2nd 115 kV line and new substation at Bracket Road Load Growth/ Reliability Load Growth/ Reliability 2017 2019 SEMA SEMA Project Falmouth Tap Switching Station Upgrade 115 kV line from Orleans to Wellfleet Status Solutions 17 Local System Plan – Eastern Massachusetts (continued) Status of project descriptors in blue have changed from previous LSP or are newly listed Eversource Local Area Transmission Facilities Project Listing - Eastern Massachusetts Projected ISD Month/Year; Non-PTF Est. Cost Project Area Load Growth/ Reliability 2017 SEMA Fisher Road Supply Upgrade, 115 kV 4.4 miles line from Cross Road to Fisher Road. Concept 1) Install a 2nd 115 kV transmission line. 2) Construct additional distribution circuit backup. Load Growth 2018 SEMA Rochester Substation - Transformer upgrade Concept Replace #114 10/12.5 MVA transformer with 12/16/20 MVA transformer using spare transformer Load Growth 2018-2019 SEMA Industrial Park Substation - Upgrade Transformers and Triple End Station Concept Upgrade both transformers to 62.5 MVA, triple end station with 3rd 37/50/65.4 MVA bank Load Growth 2019 NEMA New Substation proposed to improve Amtrak capacity Concept New GIS 4 breaker ring bus substation with two new 37/50/65.4 MVA transformers, to be supplied by new transmission line Concept Install a 2 bay, 6 breaker arrangement, with a new control house. Need Project Status Solutions Reliability 2019 SEMA Proposed solution to mitigate the loss of Marshfield, Duxbury, and Kingston Substations following a failure of the 19152 breaker at Kingstion Station Load Growth 2019-2020 SEMA Double Ending Oak Street Substation Concept Double Ending Oak Street Substation with 2nd 30/40/50 MVA bank and 23 kV bus section Load Growth 2020 NEMA /Boston Maynard - Concord Supply Upgrade Concept 1) Install a third cable from Sudbury to Maynard. 2) Install oil return piping and cooling equipment for increased capacity from the existing cables. Load Growth TBD NEMA Framingham - Install 3rd Transformer Concept Install a 3rd 65.4 MVA transformer Load Growth TBD NEMA Maynard - Transformer upgrades Concept Upgrade both transformers to 65.4 MVA 18 Western Massachusetts Projects UMass/Amherst Orchard Transformer Southwick Transformer West Springfield GIS 19 Local System Plan – Western Massachusetts Status of project descriptors in blue have changed from previous LSP or are newly listed Eversource Local Area Transmission Facilities Project Listing - Western Massachusetts Need Projected ISD Month/Year; Non-PTF Est. Cost Load Growth and Reliability May-15 * Project Area Project Springfield Southwick Substation transformer (Southwick) Status In service UMASS-Amherst new substation (Tillson Farm) Load Growth and Reliability Dec-15 $14.7M Under Construction Hadley Dec-17 $57.2M Springfield West Springfield 8C Substation transmission asset replacement (West Springfield) Load Growth and Reliability Apr-16 * Springfield Orchard Substation 3rd transformer (Springfield) Load Growth and Reliability 2017 Hadley Load Growth and Reliability 2017 Greenfield Load Growth and Reliability 2017 Hadley Replace the second transformer as part of the Southwick 23 kV conversion project. UMASS-Amherst will be constructing/owning/operating a new 115/13.8 kV substation with two 50 MVA transformer transformers. Install a circuit switcher and relaying at Amherst 17K to accommodate Tillson Farm Substation Amherst Substation (Amherst) Reliability Solutions Under Replace existing 115 kV substation with GIS Construction Planned Install 3rd 115/13.8 kV 30 MVA transformer in existing bay Gunn Substation transformer upgrade (Easthampton) Concept Replace existing 15A-2X 15/20/25 MVA transformer with a 28/37/47 MVA transformer Montague Substation transformer upgrade (Montague) Concept Replace existing 21C-4X 15/23 MVA transformer with a 28/37/47 MVA transformer Gunn Substation transformer upgrade (Easthampton) Concept Replace existing 15A-1X 15/20/25 MVA transformer with a 28/37/47 MVA transformer * There are no Non-PTF costs for this project 20 Local System Plan – Western Massachusetts (continued) Status of project descriptors in blue have changed from previous LSP or are newly listed Eversource Local Area Transmission Facilities Project Listing - Western Massachusetts Need Projected ISD Month/Year; Non-PTF Est. Cost Project Area Load Growth and Reliability 2018 Greenfield Load Growth and Reliability 2018 Pittsfield Obsolescence and Reliability 2018 Obsolescence and Reliability Project Status Solutions Cumberland Substation transformer upgrade (Greenfield) Concept Replace existing 22B-2X 18/24/30 MVA transformer with a 28/37/47 MVA transformer Doreen Substation transformer upgrade (Pittsfield) Concept Replace exisitng 19A-1X 15/20/25 MVA transformer with a 28/37/47 MVA transformer Springfield Breckwood Substation transformer upgrade (Springfield) Concept Replace existing 20A-2X 18/24/30 MVA transformer with a 28/37/47 MVA transformer 2019 Springfield Clinton Substation transformer upgrade (Springfield) Concept Replace existing 21S-2X 18/24/30 MVA transformer with a 28/37/47 MVA transformer Obsolescence and Reliability 2019 Springfield Clinton Substation transformerupgrade (Springfield) Concept Replace existing 21S-1X 18/24/30 MVA transformer with a 28/37/47 MVA transformer Obsolescence and Reliability 2019 Springfield Clinton Substation transformer upgrade (Springfield) Concept Replace existing 21S-3X 18/24/30 MVA transformer with a 28/37/47 MVA transformer Obsolescence and Reliability 2020 Springfield Breckwood Substation transformer upgrade (Springfield) Concept Replace existing 20A-1X 18/24/30 MVA transformer with a 28/37/47 MVA transformer Obsolescence and Reliability 2020 Greenfield Montague Substation transformer upgrade (Montague) Concept Replace existing 21C-3X 18/24/30 MVA transformer with a 28/37/47 MVA transformer Obsolescence and Reliability 2020 Springfield Breckwood Substation transformer upgrade (Springfield) Concept Replace existing 20A-3X 18/24/30 MVA transformer with a 28/37/47 MVA transformer 21 New Hampshire Projects Rimmon Substation Mill Pond Substation North Keene Substation Peaslee Substation 22 Local System Plan – New Hampshire Status of project descriptors in blue have changed from previous LSP or are newly listed Eversource Local Area Transmission Facilities Project Listing - New Hamsphire Need Load Growth / Obsolete Equipment Projected ISD Month/Year; Non-PTF Est. Cost 2017 Project Area division Northern Project Webster Substation - replace all transformers with two 115/34.5 kV, 44.8 MVA transformers (Franklin) Current Status Solutions Concept Replace the existing three 115/34.5 kV, 20 MVA transformers at Webster substation with two 115/34.5 kV, 44.8 MVA transformers. Concept The new Unitil distribution substation (Broken Ground) will be supplied by existing 115 kV Transmission lines (P145 and V182), Curtisville. The project will offload PSNH's Garvins and Oak Hill substations. Load Growth 2017 Central Build a new Broken Ground/Curtisville Substation (Concord) Obsolete Equipment 2017 Central Retire existing 115/34.5 kV Greggs Substation (Goffstown) Concept Remove the 115/34.5 kV transformer and associated 34.5 kV equipment at the existing Greggs substation. The 115 kV substation will remain. Obsolete Equipment 2018 Western Keene Substation - Rebuild 115/12.47 kV substation with 30 MVA transformer and associated switchgear. Concept Rebuild Keene Substation equipment with one new 30 MVA transformer and associated switchgear. The existing TB3 transformer (22.4 MVA) at Keene will remain. Load Growth 2019 Northern White Lake Substation - Replace one of the existing 28 MVA transformer with a 44.8 MVA transformer (Tamworth) Concept Replace one of the existing 115/34.5 kV, 28 MVA transformer at White Lake substation with a new 115/34.5 kV, 44.8 MVA transformer. 23 Local Projects Included in the Regional System Plan The projects listed below are associated with PTF projects listed in the ISO-NE RSP project list. The RSP Project ID is shown in parentheses. Eversource Local Area Transmission Facilities Project Listing - Projects in Regional System Plan Need Load Growth Load Growth Reliability Projected ISD Month/Year Jun-15 $3.6M Jun-16 $28.2M Jun-16 $15.5M Project Area Eastern (NH) Eastern (NH) Southern (NH) Project Construct a new 115/12.5 kV distribution substation (Mill Pond Substation) in the Portsmouth area. New 115 kV Switching Station, to be called Peaslee. From Peaslee construct new 115 kV lines. New substation to replace the existing distribution Rimmon substation Status Needs Assessment Solutions Potential overloads in the Portsmouth area of New Hampshire and provide operational flexibility to the distribution system The new Distribution substation transformer will be supplied by tapping existing Transmission lines. Distribution infrastructure upgrades will serve local load growth and provide reliability of service.This project is associated with a PTF project listed in the ISO-NE RSP project list. (1557) Under Construction Needed for Unitil 34.5 kV system load growth and PSNH design criteria. Construct a new 115 kV Switching Station. Construct a new 5.5-mile 115 kV line from existing Kingston Tap to the new switching station. Construct two lines to Unitil 115/34.5 kV Substation (two 60 MVA transformers). This project is associated with a PTF project listed in the ISO-NE RSP project list. (1183). Under Construction 115/34.5 kV transformation is needed in the Manchester, New Hampshire area to address thermal loading violations on the existing Rimmon Substation 115/34.5 kV transformer . Rebuild Rimmon substation and add three 115 kV breakers, install a 2nd 115/34.5 kV transformer and two 115 kV 13.3 Mvar capacitors, connect the Rimmon substation to the J114 line. This project is now a PTF project listed in the ISO-NE RSP project list. (1661) In Service Reliability Jun-16 $10M Western (NH) New 115 kV Substation, to be called North Keene. Planned Load Growth Reliability Jun-16 $7.9M SEMA Mashpee Substation Double Ending Planned Construct a new substation, loop in the L163 line with two 115 kV breakers, install one 115/12.47 kV 30 MVA transformer. This project is now a PTF project listed in the ISO-NE RSP project list. (1660) Double-End Mashpee Substation with 2nd Contingency outage of the #115 Falmouth to 30/40/50 MVA 115/23 kV transformer bank. Install Barnstable line interrupts 133.9 MW of two 115 kV sectionalizing breakers. This project forecasted peak load and 35 Mvar of reactive is associated with a PTF project listed in the ISOsupport NE RSP project list. (1393). Needed to relieve potential distribution overloads and short circuit issues in the Keene area of New Hampshire. 24 Future Studies: Connecticut Load growth may require a third transformer (60 MVA) at the North Bloomfield Substation Load growth may require a second transformer at the Carmel Hill Substation Load growth may require increased transformer capacity at the West Brookfield Substation Load growth may require replacing two 25 MVA 115/13.2 kV transformers with 47 MVA transformers at Uncasville substation Load growth may require a new 115/23 kV bulk power substation in the Torrington area (Burrville Substation) 25 Future Studies: Massachusetts Load growth and reliability needs may require voltage conversion of Midway 19B from 13.8 kV delta to 13.8 kV grounded wye, or 23 kV grounded wye Load growth and reliability needs may require Transmission to be extended into Hannon (a new substation) in the City of Springfield Load growth and reliability needs may require adding a 13.8 kV transformer for distribution at South Agawam 42E Carver St. Station upgrade, Phase II (third transformer) 26 Future Studies: New Hampshire Load growth may require a second transformer at Portsmouth Substation Load growth may require replacing the Pemigewasset transformer with a larger transformer Load growth may require a new substation in the Dover/Madbury area Customer reliability need may require a new substation in the Littleton area 27 Please provide any written comments for consideration by November 23, 2015 (as defined in the ISO-NE Open Access Transmission Tariff Section II – Attachment K Appendix 1 [Attachment K – Local], section 1.4). Robert P. Clarke Director, Transmission Business Operations Eversource One NSTAR Way, SE320 Westwood, MA 02090-9230 Phone: 781-441-8057 email: [email protected] 28 Thank you for participating in the Eversource LSP Presentation. Questions? 29