Gentry Classic Gable1

Transcription

Gentry Classic Gable1
16778
STOP!
Call Us First!
DO NOT RETURN TO STORE.
For immediate help with assembly or product information
call our toll free number:
1-800-577-9663
or email:
[email protected]
Our staff is ready to provide assistance
April through October M-F 8:00 AM to 6:00 PM EST
Saturday 8:30 AM to 4:30 PM EST
November through March M - F 8:00 AM to 5:00 PM EST
(This page intentionally left blank.)
16778
A Backyard Products Company
01/18/12
ASSEMBLY MANUAL
CLASSIC GENTRY GABLE 12' x 12' (365,8 x 365,8 cm)
BUILDING SIZE
ACTUAL FLOOR SIZE
12' x 12' (365,8 x 365,8 cm)
12' x 12' (365,8 x 365,8 cm)
KEEP THIS MANUAL FOR FUTURE REFERENCE
IMPORTANT!
READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY.
BEFORE YOU BEGIN
• BUILDING RESTRICTIONS AND APPROVALS
Be sure to check with local building department and homeowners association for specic restrictions and/ or requirements before building.
• ENGINEERED DRAWINGS
Contact our Customer Service Team if engineered drawings are needed to pull local permits.
• SURFACE PREPARATION
To ensure proper assembly you must build your shed on a level surface. Recommended methods and materials to level your shed are
listed on page 8.
• CHECK ALL PARTS
Inventory all parts listed on pages 4 - 6. Contact our Customer Service Team if any parts are missing or damaged.
• ADDITIONAL MATERIALS
You will need additional materials to complete your shed. See page 3 for required and optional materials and quantities.
- CUSTOMER SERVICE Call: 1-800-577-9663 email: [email protected]
1
TOOLS
Required
❑ Phillips
Screwdriver
Optional
❑ Tool Belt/
Nail Pouch
❑ Utility Knife
❑ Shingle Blades
❑ Drill / Driver
❑ 3/8" Drill Bit
❑ #2 Philips Drive Bit
❑ Tin Snips
(for drip edge)
❑ Caulk Gun
❑ Hammer
❑ Chalk Line
❑ Paint Tools
❑ Level
❑ Nail Gun
❑ Pencil
❑ Safety Glasses
❑ Tape Measure
❑ Ladder
❑ Square
• gun nails
❑ WoodGlue
❑ Gloves
❑ Sawsall
or
Safety! Always use approved safety glasses during assembly.
HELPFUL REMINDER SYMBOLS
Look for these symbols for helpful reminders throughout this manual.
= Assistance Required; two or more people.
= Mark part with pencil.
= Ensure squareness.
BEGIN
= Important required step or operation.
FINISH = You have nished the assembly or installation.
= Helpful assembly hint.
= Beginning of steps for assembly or installation.
= Level
ORIENT LUMBER AND TRIM FOR BEST APPEARANCE
Framing lumber is graded for structural strength and not appearance. Exterior trim is graded for one good side.
Always install the material leaving the best edge and best surface visible. Please remember that these blemishes in no way
negatively affect the strength or integrity of our product. (See Fig. A, B, C.)
A
B
2
C
ADDITIONAL MATERIALS
COMPLETING YOUR SHED
You will need these additional materials:
3-TAB SHINGLES (Bundles)................... 7
PAINT FOR TRIM ......................1 Quart
PAINT FOR SIDING (Gallons)................. 2
WOOD GLUE ................. Exterior Rated
Use 100% acrylic latex exterior paint.
Use 100% acrylic latex exterior paint.
(2) coats recommended.
1" GALVANIZED ROOFING NAILS(lbs)... 2
3
CAULK ............................................ 3
Tubes
Use acrylic latex exterior caulk that is paintable.
For shingles.
OPTIONAL MATERIALS
DRIP EDGE (Feet)................................. 60
#15 ROOFING FELT (Sq ft. to cover)..... 180
1" GALVANIZED ROOFING NAILS(lbs)... 1/2 lb.
For roong felt.
REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS
FOR INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.
FLOOR PANELS (Not Included)
You will need oor panels and nails to complete your oor.
Floor panel sizes and quantities are shown below.
NOTE: Use a minimum of 5/8" (1,6 cm) Oriented Strand Board (OSB)
x3
5/8" x 48" x96"
(1,6 x 121,9 x 243,8 cm)
x3
5/8" x 48" x48"
(1,6 x 121,9 x121,9 cm)
x1
2" (5,1 cm)
1 lb. of 2" (5,1 cm) Hot Dipped
Galvanized Box-Type Nails.
3
PARTS IDENTIFICATION AND SIZES
Double letter part identication
is stamped on some parts.
WOOD SIZE CONVERSION CHART
RS
2" x 4"..............1-1/2" x 3-1/2" (3,8 x 8,9 cm)
RS
Nominal Board Size
Actual Size
1" x 4".................3/4" x 3-1/2" (1,9 x 8,9 cm)
RS
2" x 3"..............1-1/2" x 2-1/2" (3,8 x 6,3 cm)
1" x 3".................3/4" x 2-1/2" (3,8 x 6,3 cm)
• Check these locations for part
stamp.
CLASSIC GENTRY GABLE 12' X 12' PARTS LIST
RAFTERS
WALLS
INVENTORY YOUR PARTS before you begin.
We suggest sorting parts by the category they are listed in.
x7
TP
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
x5
2 x 4 x 92-1/2" (5,1 x 10,2 x 235 cm)
x24
TJ
AI
x2
UM
x2
AM
2 x 4 x 67" (5,1 x 10,2 x 170,2 cm)
x1
x1
x6
x5
x1
F
3/8 x 3 x 66" (1 x 7,6 x 167,6 cm)
2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm)
2 x 4 x 68" (5,1 x 10,2 x 172,7 cm)
AV
SP
2 x 4 x 60-1/2" (5,1 x 10,2 x 153,7 cm)
2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
STL
2 x 4 x 44-1/2" (5,1 x 10,2 x 113 cm)
SG
x1
AJ
x5
AL
x14
x4
ADA
AF
TRIM
DOOR
x1 GAA
2 x 4 x 12-1/2" (5,1 x 10,2 x 31,8 cm)
2 x 4 x 7" (5,1 x 10,2 x 17,8 cm)
x12
2 x 4 x 77-15/16" (5,1 x 10,2 x 198 cm)
2 x 4 x 18-1/8" (5,1 x 10,2 x 46 cm)
6 x 24" OSB (15,2 x 61 cm)
3/8 x 1-3/4 x 83-1/2" (4,4 x 212.1 x 1 cm)
x4
x2
WYR
19/32 x 4 x 85-3/16" (1,5 x 10,2 x 216,4 cm)
x2
WYL
19/32 x 4 x 85-3/16" (1,5 x 10,2 x 216,4 cm)
x2
x1
x1
OO
ZJ
AHR
19/32 x 3 x 62" (1,5 x 7,6 x 157,5 cm)
x1
x2
AHL
19/32 x 3 x 62" (1,5 x 7,6 x 157,5 cm)
x2
x2
1" x 3" x 5" (2,5 x 7,6 x 12,7 cm)
2 x 4 x 34" (5,1 x 10,2 x 86,4 cm)
x4
OVERHANG
GAUGE BLOCK FOR 3/4" (1,9 cm)
MEASUREMENT.
3/4" (1,9 cm)
3/8 x 1-3/4 x 81-1/2" x 3/8" (4,4 x 207 x 1 cm)
AH
2 x 3 x 69" (5,1 x 7,6 x 175,3 cm)
19/32 x 2-1/2 x 72" (1,5 x 6,4 x 182,9 cm)
VX
AS
7/16 x 48 x 96" (1,1 x 121,9 x 243,8 cm)
19/32 x 2-1/2 x 26 5/8" (1,5 x 6,4 x 67,6 cm)
2 x 6 x 96" (5,1 x 15,2 7/16
x 243,8
cm) x 96" (1,1 x 58,7 x 243,8 cm)
x 23-1/8
2 x 6 x 49-1/2" (5,1 x 15,2 x 125,7 cm)
4
WINDOW
LOFT/ BENCH/ SHELF
PARTS IDENTIFICATION AND SIZES
x4
x2
TP
KP
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
x2
x1
BE
1 x 3 x 96" (2,5 x 7,6 x 243,8 cm)
PT
2 x 3 x 96" (5,1 x 7,6 x 243,8 cm)
x4
x1
x2
SP
2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
WJ
1 x 4 x 48" (2,5 x 10,2 x 121,9 cm)
FO
1 x 3 x 48" (2,5 x 7,6 x 121,9 cm)
x1
NK
2 x 3 x 48" (5,1 x 7,6 x 121,9 cm)
x1
HYA
x4
AO
1 x 4 x 96" (2,5 x 10,2 x 243,8 cm)
1 x 4 x 44-1/2" (2,5 x 10,2 x 113 cm)
2 x 4 x 22-1/2" (5,1 x 10,2 x 57,2 cm)
x6
3/8" x 14-1/4 x 22-1/2" (1 x 36,2 x 57,2 cm)
x1
x7
PYA
x1
BG
x7
AC
x6
AZ
19/32 x 3 x 30-1/8" ( 1,5 x 7,6 x 76,5 cm)
x2
DT
19/32 x 3 x 28-1/8" (1,5 x 7,6 x 71,4 cm)
x1
x1
x4
BWR
19/32 x 3 x 21" (1,5 x 7,6 x 53,3 cm)
BWL
19/32 x 3 x 21" (1,5 x 7,6 x 53,3 cm)
2 x 4 x 19-3/4" (5,1 x 10,2 x 50,2 cm)
LR
DF
2 x 3 x 19" (5,1 x 7,6 x 48,3 cm)
2 x 4 x 11-5/8" (5,1 x 10,2 x 29,5 cm)
2 x 3 x10" (5,1 x 7,6 x 25,4 cm)
19/32 x 3 x 8-1/2" (1,5 x 7,6 x 21,6 cm)
LOFT/ BENCH/ SHELF
PANEL PARTS LIST
NOTE: Panel parts are not stamped with part identication.
x1
x1
x1
x1
7/16 x 36 x 96"
(1,1 x 91,4 x 243,8 cm)
x1
1/4 x 23-7/8 x 48"
(0,6 x 60,6 x 121,9 cm) Peg board
7/16 x 11-1/2 x 96"
(1,1 x 21,2 x 243,8 cm)
x1
7/16 x 19-1/2 x 48"
(1,1 x 49,5 x 121,9 cm)
x1
7/16 x 11-1/2 x 48"
(1,1 x 21,3 x 121,9 cm)
7/16 x 19-1/2 x 92-1/2"
(1,1 x 49,5 x 235 cm)
x2
7/16 x 47-7/8 x 48"
(1,1 x 121,6 x121,9 cm)
7/16 x 48 x 96"
(1,1 x 121,9 x 243,8 cm)
x2
7/16 x 36 x 40-7/8"
( 1,1 x 91,4 x 103,8 cm)
1/4 x 23-7/8 x 96"
(0,6 x 60,6 x 243,8 cm) Peg board
x2
ROOF
x1
7/16 x 36-1/2 x 96"
(1,1 x 92,7 x 243,8 cm)
5
x2
7/16 x 36-1/2 x 47-7/8"
(1,1 x 92,7 x 121,6 cm)
WALL PANELS
x2
x2
x2
x1
3/8 x 48 x 84"
(1 x 121,9 x 213,4 cm)
x9
3/8 x 48 x 84"
(1 x 121,9 x 213,4 cm)
x1
x1
3/8 x 48 x 84"
(1 x 121,9 x 213,4 cm)
3/8 x 48 x 84"
(1 x 121,9 x 213,4 cm)
x1
x1
LEFT DOOR RIGHT DOOR
FASTENER/HARDWARE BAG (Not Actual Size)
2” (5,1 cm)
x120
3” (7,6 cm)
x91
x19
2” (5,1 cm)
x64
1-1/4” (3,2 cm)
1” (2,5 cm)
x18
x92
3/4” (1,9 cm)
NAIL BOXES (Not Actual Size)
x4 Boxes
3” (7,6 cm)
x6 Boxes
2” (5,1 cm)
Other HARDWARE (Not Actual Size)
x4
x12
22-1/4" x 29-3/4"
(56,5 x 75,6 cm)
x1
3/4” (1,9 cm)
x1
x2
16" x 8" ( 40,6 x 20,3 cm)
x2
x12
x1
x12
1-1/2” (3,8 cm)
1/2” (1,3 cm) x12
x2
64” Metal Threshold
3/4” (19 mm) x6
x8
6
1” (2,5 cm)
CONCRETE FOUNDATION
If you choose to install your kit on a concrete slab refer to the diagram below.
Attach the sill plates on the foundatIon as shown, and continue on to page 11.
Treated Sill Plate
Caulk between
sill plate and
concrete.
D
D
C
3-1/2"
(8,9 cm)
B
A
4"
(10 cm)
Sill plates MUST be treated lumber.
Building Size
Actual Floor Size
12'x 12' (365,8 x 365,8 cm) 12'x 12' (365,8 x 365,8 cm)
A
B
C
D
144" (365,8 cm)
137" (348 cm)
144" (365,8 cm)
203-5/8" (517,2 cm)
12' x 12' Building Requires:
x2 2 x 4 x 11'-5" (5,1 x 10,2 x 348 cm)
x2 2 x 4 x 12' (5,1 x 10,2 x 365,8 cm)
x1 Caulk
Allow new concrete slabs to cure for at least seven (7) days.
• A treated 2 x 4" (5,1 x 10,2 cm) sill plate is required when installing your shed on concrete.
Purchase full length treated lumber.
• Use a high quality exterior grade caulk beneath all sill plates.
• Fasten 2 x 4" (5,1 x 10,2 cm) sill plates to slab using approved concrete anchors (fasteners not included).
• Check local code for concrete foundation requirements.
7
FLOOR LEVELING OPTIONS
There are multiple ways to level your oor frame. Our recommended leveling method is shown below.
Leveling materials are not included in this kit.
FOUNDATION OR FLOOR MATERIALS
• This shed does not include any oor or leveling materials.
• See the FLOOR LEVELING section on page 9 for recommended methods and suggested materials to properly level your
oor, as this will vary depending on your specic site.
PREFERRED METHOD - 4x4 TREATED RUNNERS
• 3" Screw angled into 4x4.
• (2) at each point frame and 4x4 touch.
4x4 Runners
(not included).
12"
(30,5 cm)
Measurements to
centers of 4x4's.
12"
(30,5 cm)
DOOR
MATERIAL REQUIRED
x3 4" x 4" x 12' (10,2 x 10,2 x 365,8 cm) Treated Lumber
x42
Fasteners for Frame to 4"x 4".
(3" Screws shown as one option.)
Minimum 3" screws / exterior grade.
3" (7,6 cm)
Use only wood treated for ground contact and fasteners approved for use with treated wood.
Always support frame seams.
Maximum between leveling
material locations.
Shingle
4x4 Runner
Level
48"
12"
12"
Shingle
Do not exceed 16".
Gravel
2" Block
LEVELING METHODS
Gravel
4" Block
2x4 Treated Lumber
8" Block
• Level under 4x4 runners only.
• Locate leveling material 12" from ends of runners and no more than 48" apart.
• Asphalt shingles should be used between 4x4 runners and blocks or treated lumber. Never use
shingles in direct contact with ground.
• For best results and aiding in water drainage use gravel under each concrete block.
LEVELING MATERIALS
Gravel
2x4 Treated Lumber
Asphalt Shingles
Solid Masonry Blocks in 1", 2", 4" or 8" thickness
Leveling higher than 16" not recommended.
8
FLOOR FRAME
LEVEL AND SQUARE FLOOR FRAME
Before attaching oor decking, it is important to level and square the oor frame.
A level and square oor frame is required to correctly construct your shed.
BEGIN
1
See page 8 for the preferred oor leveling method.
2
Use level and check the frame is level before applying oor panels.
3
Check for frame squareness by measuring diagonally across corners. If the measurements are the
same, the frame is square. The diagonal measurement will be approximately 203-5/8" (517,2 cm).
4
When the frame is level and square secure one side of frame to the 4x4 runners using one fastener
at ends of each runner. At the opposite end of the frame, secure the frame to 4x4 runners with one
fastener at ends of each runner making sure the frame remains square (Fig. A).
FINISH
5
Once the oor frame is level and square fasten the frame at each point the frame contacts the 4x4
runners.
First, secure at ends
with one fastener.
Fig. A
203-5/8"
(517,2 cm)
203-5/8"
(517,2 cm)
DOO
R
Second, secure at ends
with one fastener.
9
IMPORTANT!
IMP
O R TA N T !
Check the oor frame is level after installing oor panels. Re-level if needed.
DO
OR
• The oor should be used as a level work surface for wall construction.
HINT:
• Organize your wall sections during subassembly
to avoid over-handling of the walls.
BACKWALL
SIDEWALL
FRONTWALL
DO
SIDEWALL
OR
10
SIDE WALL FRAME
PARTS REQUIRED:
x4
x64
SP
3" (7,6 cm)
2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
x14
AI
2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm)
x4
TP
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
IMPORTANT! You will build two walls the same.
BEGIN
1
Orient parts on edge on oor as shown.
2
Nail using two 3" nails at each connection.
HINT:
DO
144"
(365,8 cm)
120"
(304,8 cm)
96"
(243,8 cm)
48"
(121,9 cm)
72"
(182,9 cm)
96"
(243,8 cm)
24"
(61 cm)
TP
3" (7,6 cm)
Nails
SP
78-1/2"
(199,4 cm)
AIx7
SP
TP
96"
(243,8 cm)
48"
(121,9 cm)
3" (7,6 cm)
Nails
3" (7,6 cm)
Nails
11
OR
SIDE WALL PANELS
PARTS REQUIRED:
x2
x100
3/8 x 48 x 84"
(1 x 121,9 x 213,4 cm)
GAA
2" (5,1 cm)
AL
3/4" GAUGE
BLOCK
1-1/2" GAUGE
BLOCK
Ensure your wall frame is square by installing one panel and squaring frame.
BEGIN
1
Place LEFT panel onto wall frame with primed side up as shown.
Locate the panel 1-1/2" above the top plate. Use AL as a gauge block
for the 1-1/2" top overhang measurement. Use GAA as a gauge block to
mark the 3/4" side measurement on the wall stud. Secure panel with two
2" nails in the corners (Fig. A).
2
3
Move to the opposite end. Using the long edge of the panel as a lever,
move the panel side-to-side until you have a 3/4" measurement on the
wall stud. Secure corner with two 2" nails (Fig. B).
Nail the panel using 2" nails 6" apart on edges and 12" apart
inside panel.
For squareness maintain 3/4" and
1-1/2" measurement along panel edge.
1-1/2"
(3,8 cm)
48"
(121,9 cm)
BEGIN HERE
2 Nails
DO
1-1/2"
(3,8 cm)
Overlap
Fig. A
3/4" Gauge
Block
12"
(30,5 cm)
Primed side
UP
Flush
Lip
Edge
Square
Edge
12
1-1/2"
(3,8 cm)
Overlap
3/4"
(1,9 cm)
AL
6" (15,2 cm)
OR
3/4"
(1,9 cm)
3/4"
(1,9 cm)
2 Nails
Fig. B
SIDE WALL PANELS
PARTS REQUIRED:
x200
3/8 x 48 x 84"
(1 x 121,9 x 213,4 cm )
x4
2" (5,1 cm)
AL
1-1/2" GAUGE
BLOCK
4
Place middle panel on frame as shown with primed side facing up
ush with rst panel. Nail using 2" nails 6" apart on edges and 12"
apart inside panel.
5
Repeat STEP 4 to secure right panel.
Do not nail
in groove.
DO
FINISH
6
OR
You have nished building your side wall.
3/4"
(1,9 cm)
Repeat process to make second wall.
3/4"
(1,9 cm)
To draw panels tight
at seams angle nail.
AL
Flush
1-1/2"
(3,8 cm)
48"
(121,9 cm)
48"
(121,9 cm)
12"
(30,5 cm)
Flush
6" (15,2 cm)
Flush
Primed side UP
Square
Edge
Lip
Edge
13
Lip
Edge
Square
Edge
FRONT WALL FRAME (Door Header)
PARTS REQUIRED:
x1
x18
3" (7,6 cm)
F
3/8 x 3 x 66" (1 x 7,6 x 167,6 cm)
x2
AM
2 x 4 x 67" (5,1 x 10,2 x 170,2 cm)
BEGIN
1
Apply glue to parts as shown. Align parts on a at surface as shown.
2
Assemble header with 3” (7,6 cm) nails in a staggered pattern.
3
Turn assembled header over and repeat staggered nail pattern.
DO
OR
FINISH
4
You have nished building your door header.
HINT:
AM
1/2”
(1,3 cm)
1/4”
(,6 cm)
AM
F
F
1/4”
(,6 cm)
1/2”
(1,3 cm)
AM
Glue
Flush
3" (7,6 cm)
Nails
1/2”
(1,3 cm)
3" (7,6 cm)
Nails
14
FRONT WALL FRAME
PARTS REQUIRED:
x1
x2
AJ
2 x 4 x 12-1/2" (5,1 x 10,2 x 31,8 cm)
AO
2 x 4 x 22-1/2" (5,1 x 10.2 x 57,2 cm)
STL
x1
2 x 4 x 44-1/2" (5,1 x 10,2 x 113 cm)
x1
AV
x30
2 x 4 x 60-1/2" (5,1 x 10,2 x 153,7 cm)
3" (7,6 cm)
AI
x5
2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm)
x1
TJ
2 x 4 x 92-1/2" (5,1 x 10,2 x 235 cm)
BEGIN
1
Orient parts on edge on oor as shown.
2
Nail using two 3" nails at each connection and four 3" nails at seam.
DIMENSIONS ARE TO CENTER OF STUDS.
DO
OR
137”
(348 cm)
126-3/4”
(321,9 cm)
HINT:
58-1/4”
(148 cm)
44-1/2”
(113 cm)
92-1/2”
(235 cm)
36-3/8”
(92,4 cm)
12-3/8”
(31,4 cm)
STL
TJ
(4) 3" (7,6 cm)
Nails
AO
(2) 3" (7,6 cm)
Nails
(2) 3" (7,6 cm)
Nails
AI x5
AO
MAINTAIN DIMENSION
67”
(170,2 cm)
69-1/4”
(175,9 cm)
78-1/2”
(199,4 cm)
38”
(96,5 cm)
1-1/2”
(3,8 cm)
1-1/2”
(3,8 cm)
AV
AJ
12-3/8”
(31,4 cm)
64”
(162,6 cm)
60-1/2”
(153,7 cm)
15
12-1/2”
(31,8 cm)
FRONT WALL FRAME
PARTS REQUIRED:
x32
SG
x1
3" (7,6 cm)
2 x 4 x 34" (5,1 x 10.2 x 86,4 cm)
BG
x1
2 x 4 x 11-5/8" (5,1 x 10.2 x 29,5 cm)
x5
AL
2 x 4 x 7" (5,1 x 10,2 x 17,8 cm)
Pre - Assembled Header
BEGIN
1
Orient the pre-assembled header, AL, BG and SG as shown.
2
Secure using 3" nails at each connection as shown.
HINT:
DO
OR
DIMENSIONS ARE TO CENTER OF STUDS.
68-1/2”
(174 cm)
44-1/2”
(113 cm)
20-1/2”
(52,1) cm
AL x5
7”
(17,8 cm)
Header
11-5/8”
(28,6 cm)
(2) 3" (7,6 cm)
Nails
78-1/2”
BG (199,4 cm)
Flush
MAINTAIN DIMENSION
34”
(86,4 cm)
67”
(170,2 cm)
SG
Flush
16
FRONT WALL FRAME
PARTS REQUIRED:
x14
3" (7,6 cm)
x1 UM
2 x 4 x 68" (5,1 x 10,2 x 172,7 cm)
BEGIN
1
Orient parts on edge on oor as shown.
2
Secure using 3" nails as shown.
FINISH
3
DO
You have nished your front wall frame.
OR
HINT:
UM
UM
68"
(172,7 cm)
MAINTAIN DIMENSION
64"
(162,6 cm)
(2) 3" (7,6 cm)
Nails
17
FRONT WALL PANELS
PARTS REQUIRED:
x50
2" (5,1 cm)
GAA
x1
2x4"
TEMP. SPACER
3/4" GAUGE
BLOCK
BEGIN
1
Place the left front wall panel onto wall frame as shown with primed side up.
2
Use the gauge block to mark the 3/4" measurement on the wall stud. Locate
the panel 1-1/2" from the top plate.
3
Nail panels to frame with two 2" nails 6" apart on edges.
DO
FINISH
4
Do not nail
in groove.
Proceed to attaching your other front panel.
3/4" Gauge
Block
OR
1-1/2"
(3,8 cm)
2 x 4"
3/4"
(1,9 cm)
Lip
Edge
6"
(15,2 cm)
6" (15,2 cm)
3/4"
(1,9 cm)
Primed
side UP
MAINTAIN DIMENSION
64"
(162,6 cm)
Square
Edge
Flush
3/4"
(1,9 cm)
18
FRONT WALL PANELS
PARTS REQUIRED:
x64
2" (5,1 cm)
x1
2x4"
TEMP. SPACER
BEGIN
1
Place window panel onto wall frame as shown with primed side up.
2
Use the measurement on the wall stud. Locate the panel 1-1/2" from
the top plate.
3
Nail panels to frame with two 2" nails 6" apart on edges.
DO
FINISH
4
Proceed to attaching your other panels.
2 x 4"
Flush
1-1/2"
(3,8 cm)
6"
(15,2 cm)
6"
(15,2 cm)
12"
(30,5 cm)
64"
(162,6 cm)
Primed
side UP
Square
Edge
3/4"
(1,9 cm)
Flush
Lip
Edge
Do not nail
in groove.
19
OR
FRONT WALL PANELS
PARTS REQUIRED:
x1
x2
3" (7,6 cm)
TP
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
x35
Temporary Support
2" (5,1 cm)
x1
BEGIN
1
2
Place right front wall panels onto frame with top of panels ush to previously
installed panels.
Nail panel to frame with 2" nails 6" apart on edges.
3
Attach tempoary support TP using two 3" screws as shown.
DO
FINISH
4
Square
Edge
Proceed to assembling your side wall frames.
Flush
Lip
Edge
1-1/2"
(3,8 cm)
6" (15,2 cm)
64"
(162,6 cm)
Primed
side UP
Hint: Use part “TP” (2 x 4 x 96") as a
temporary support until wall is installed.
3" Screw
20
OR
3" Screw
BACK WALL FRAME
PARTS REQUIRED:
x2
x24
3" (7,6 cm)
STL
2 x 4 x 44-1/2" (5,1 x 10,2 x 113 cm)
x2
TJ
2 x 4 x 92-1/2" (5,1 x 10,2 x 235 cm)
x5
AI
2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm)
BEGIN
1
Orient parts on edge on oor. Measure and mark from end of boards.
2
Use two 3" nails at each connection and four 3" nails at seams.
FINISH
3
DO
OR
Repeat process to make second wall. Proceed to attach wall panels.
HINT:
137”
(348 cm)
116-1/2”
(295,9 cm)
92-1/2”
(235 cm)
44-1/2”
(113 cm)
68-1/2”
(174 cm)
92-1/2”
(235 cm)
20-1/2”
(52,1 cm)
(4) 3" (7,6 cm)
Nails
(2) 3" (7,6 cm)
Nails
TJ
STL
78-1/2”
(199,4 cm)
AIx5
TJ
STL
92-1/2”
(235 cm)
(2) 3" (7,6 cm)
Nails
44-1/2”
(113 cm)
(4) 3" (7,6 cm)
Nails
21
BACK WALL PANELS
PARTS REQUIRED:
x35
GAA
3/8 x 48 x 84"
(1 x 121,9 x 213,4 cm)
x1
2" (5,1 cm)
3/4" GAUGE
BLOCK
2x4"
TEMP. SPACER
Ensure your wall frame is square by installing one panel and squaring frame.
BEGIN
1
Place a 48" x 84" panel onto wall frame with primed side up as shown.
Locate the panel 1-1/2" above the top plate. Use a 2 x 4" as a gauge
block for the 1-1/2" top overhang measurement. Use GAA as a gauge
block to mark the 3/4" side measurement on the wall stud. Secure panel
with two 2" nails in the corners (Fig. A).
2
3
Move to the opposite end. Using the long edge of the panel as a lever,
move the panel side-to-side until you have a 3/4" measurement on the
wall stud. Secure corner with two 2" nails (Fig. B).
Nail the panel using 2" nails 6" apart on edges and 12" apart
inside panel.
For squareness maintain 3/4" and
1-1/2" measurement along panel edge.
1-1/2"
(3,8 cm)
1-1/2"
(3,8 cm)
Overlap
6" (15,2 cm)
6"
(15,2 cm)
1-1/2"
(3,8 cm)
Overlap
3/4"
(1,9 cm)
BEGIN HERE
Fig. A
12"
(30,5 cm)
OR
3/4"
(1,9 cm)
48"
(121,9 cm)
2 x 4"
3/4" Gauge Block
Lip
Edge
2 Nails
DO
Primed
side UP
3/4"
(1,9 cm)
Square
Edge
22
2 Nails
Fig. B
BACK WALL PANELS
PARTS REQUIRED:
x2
x85
3/8 x 48 x 84"
(1 x 121,9 x 213,4 cm)
2" (5,1 cm)
2x4"
TEMP. SPACER
4
Place middle 48" x 84" panel on frame as shown with primed side
facing up ush with rst panel. Nail using 2" nails 6" apart on edges
and 12" apart inside panel.
5
Place right 48" x 84"panel on frame as shown with primed side facing up ush
with second panel. Nail using 2" nails 6" apart on edges and 12" apart inside
panel.
DO
OR
FINISH
6
You have nished building your back wall.
Do not nail
in groove.
To draw panels tight
at seams angle nail.
48"
(121,9 cm)
Flush
Flush
2 x 4"
48"
(121,9 cm)
1-1/2"
(3,8 cm)
6" (15,2 cm)
12"
(30,5 cm)
Primed
side UP
Flush
3/4"
(1,9 cm)
3/4"
(1,9 cm)
Flush
6"
(15,2 cm)
Square
Edge
Lip
Edge
23
Lip
Edge
Square
Edge
SIDE WALL INSTALLATION
PARTS REQUIRED:
x4
3" (7,6 cm)
x24
3" (7,6 cm)
x50
2" (5,1 cm)
BEGIN
1
Center side wall assembly on the oor.
Ensure 1-1/2" measurement is on top
2
Use OO as a temporary brace. Secure with two 3" screws.
3
First, nail lower edge of panel to oor frame using 2" nails 6" apart.
Angle nail to hit oor frame (Fig. A).
4
Nail side wall bottom plate to oor using eight 3" nails.
(Nail two 3" nails between each stud through bottom plate)
DO
Do not nail
in groove.
FINISH
5
You have nished standing your side wall.
Repeat steps 1-4 to attach second side wall.
1-1/2"
(3,8 cm)
6"
(15,2 cm)
3" (7,6 cm)
Nail
R
CENTE
Install 2"
nails rst.
Angle to nail into
oor frame.
OR
ON FLO
144”
(365,8 cm)
OO
DO
OR
2" (5,1 cm) Nail
Fig. A
24
OR
BACK WALL INSTALLATION
PARTS REQUIRED:
x12
x4
3" (7,6 cm)
3" (7,6 cm)
x55
2" (5,1 cm)
BEGIN
Stand backwall on oor.
It is important to secure the back wall in the following order.
1
Center back wall on oor
between side walls.
DO
Nail the lower back wall corner
to the side wall with one 2" nail
(Fig. A).
OR
2" (5,1 cm)
Nail
Fig. A
CENTER
2" (5,1 cm)
Nail
2
Be sure the measurement between
the panel edge and side wall is
the same along the entire length.
Then secure with one 2" nail in the
upper corner (Fig. B).
Fig. B
6"
(15 cm)
Nail along the panel edge using
2" nails spaced 6" apart into
framing.
Nail along bottom of panel using
2" nails 6" apart. Angle nail to hit
oor frame (Fig. C).
6"
(15 cm)
2" (5,1 cm)
Nail
3
Same
Measurement
Panel
Fig. C
3" (7,6 cm)
Screws
Fig. D
Secure framing using two 3" (7,6 cm) screws.
Remove temporary brace.
Repeat process to secure back wall
to other side wall.
3" (7,6 cm)
Nail
25
FRONT WALL INSTALLATION
PARTS REQUIRED:
x4
3" (7,6 cm)
x10
3" (7,6 cm)
x45
2" (5,1 cm)
BEGIN
Stand frontwall on oor.
It is important to secure the frontwall in the following order.
1
Center frontwall on oor side-to-side.
DO
OR
Nail the frontwall ush to the oor using
2" nails 6" apart. Angle nails to hit oor
frame (Fig. A).
64"
(162,6 cm)
Nail the lower sidewall corner to the
frontwall with one 2" nail (Fig. B).
TP
2" (5,1 cm)
Nail
Fig. A
2" (5,1 cm)
Nail
2
6"
6"
(15,2 cm)
(15,2 cm)
CENTER
Fig. B
2" (5,1 cm)
Nail
Be sure the measurement between the
panel edges are the same along the entire
length. Then secure with one 2" nail in the
upper corner (Fig. C).
Fig. C
6"
(15 cm)
Nail along the panel edge into the trim
using 2" nails spaced 6" apart.
2" (5,1 cm)
Nail
Remove tempoary support TP.
6"
(15 cm)
3
Same
Measurement
Panel
3" (7,6 cm)
Screws
Secure the frontwall frame to oor using two
3" nails (Fig. D).
Fig. E
Secure framing using two 3" screws (Fig. E).
Repeat process to secure the right side
of the frontwall.
3" (7,6 cm)
Nail
26
Fig. D
WALL DOUBLERS INSTALLATION
PARTS REQUIRED:
x2
x64
x2
SP
2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
3" (7,6 cm)
STL
2 x 4 x 44-1/2" (5,1 x 10,2 x 113 cm)
x16
3" (7,6 cm)
TJ
x2
2 x 4 x 92-1/2" (5,1 x 10,2 x 235 cm)
x2
TP
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
BEGIN
1
Orient parts on top of wall frames. Measure and mark from end of boards.
2
Secure from top using two 3" nails spaced every 24" (Fig. A).
3
Secure from bottom using four 3" screws at each corner (Fig. B).
DO
OR
FINISH
4
You have nished securing the wall doublers.
44-1/2”
(113 cm)
3" (7,6) cm
Nails
92-1/2”
(235 cm)
Fig. A
48”
(121,9 cm)
STL
TJ
TP
SP
96”
(238,8 cm)
Ensure all doubler seams are not-aligned
over seams of wall top plates.
96”
(243,8 cm)
TP
DOOR
SP
TJ
Nail 24” (61cm)
TYP.
3" (7,6) cm
Screws
STL
Fig. B
92-1/2”
(235 cm)
27
44-1/2”
(113 cm)
48”
(121,9 cm)
RAFTERS
PARTS REQUIRED:
x1
x144
x12
OO
6 x 24" (15,2 x 61 cm)
2 x 3 x 69" (5,1 x 7,6 x 175,3 cm)
x14
2" (5,1 cm)
ADA
2 x 4 x 53-1/4" (5,1 x 10,2 x 135,3 cm)
BEGIN
1
Place two rafter-halves (ADA) in the corner of back and side walls. Rafters
contact at peak.
Assemble (5) Rafters with gussets on both sides.
Assemble (2) Rafters with gussets on one side.
DO
OR
144”
(365,8 cm)
HINT:
Fit base of rafters in corners
of back wall.
Use oor and walls to
help assemble rafters!
Temporary support (OO)
Contact at peak
2
Apply glue to rafters where gusset will t.
3
Secure gusset to rafters using 2" (5,1 cm) Nails as shown.
4
Flip over rafter assembly and repeat STEPS 2-4 to attach second gusset to other side.
5
Repeat STEPS 2-5 to build additional assembles. Remove OO.
FINISH
6
Flush
You have nished assembling
your rafters.
1/4" gap (6 mm)
GUSSET
x2
2" (5,1 cm)
Center
Glue
Contact at peak
Glue
28
RAFTER INSTALLATION
PARTS REQUIRED:
x28
x5
3" (7,6 cm)
x2
Rafter Assemby
2 gusset plates
Rafter Assemby
1 gusset plate
BEGIN
1
Locate rafters directly over the wall studs.
Check you have the measurements shown.
2
Secure with two 3" screws angled at each end.
DO
OR
FINISH
3
You have nished installing your rafters.
DIMENSIONS ARE FROM OUTSIDE OF WALL PANELS.
DIMENSIONS ARE TO CENTER OF RAFTERS.
24-3/8”
(61,9 cm)
24”
(61 cm)
24”
(61 cm)
24”
(61 cm)
24”
(61 cm)
24-3/8”
(61,9 cm)
Align over
studs.
Flush to
panel
Flush to
panel
Maintain the measurements between rafters.
29
GABLE PANELS
PARTS REQUIRED:
x12
x4
x2
x2
1-1/2"
(3,8cm)
AF
2 x 4 x 18-1/8" (5,1 x 10,2 x 46 cm)
x2
BEGIN
1
Place center gable panel on AF primed side up as shown.
2
Mark middle gable panel at center on primed side.
3
Place left panel on AF ush to center gable panel and secure
using three 1-1/2" nails.
4
Repeat STEP 3 for right panel.
5
Repeat STEP 1-4 for front gable panels.
DO
OR
FINISH
6
You have nished assembling your gable panels.
1-1/2"
(3,8cm)
3-1/2"
(8,9 cm)
6"
(15,2 cm)
AF
1-3/4"
(4,4 cm)
2-1/2"
(6,4 cm)
Flush
Flush
6"
(15,2 cm)
2" Nails
(5,1 cm)
2-1/2"
(6,4 cm)
Flush
Mark
30
Flush 2-1/2"
(6,4 cm)
GABLE INSTALLATION
PARTS REQUIRED:
x8
3" (7,6 cm)
x114
x2
2" (5,1 cm)
Pre - Assembled
BEGIN
1
Center gable assembly on side wall and overlap side wall panels.
2
Attach using 2" (5,1cm) nails 6" (15,2 cm) apart.
3
Secure uprights using two 3" (7,6 cm) screws as shown.
DO
FINISH
4
Repeat steps 1-3 to secure the other side wall gable panels.
2" Nails
(5,1 cm)
6"
(15,2 cm)
6"
(15,2 cm)
Flush
Center
Mark
3" Nails
(7,6 cm)
31
Flush
OR
ROOF PANELS
PARTS REQUIRED:
x8
2" (5,1 cm)
x2
7/16 x 48 x 96"
(1,1 x 121,9 x 243,8 cm)
Roof panels may cause serious injury
until securely fastened.
You must square the roof by attaching one panel rst. You
must use the panel's long edge as a lever to bring your
roof into square. Commonly known as "racking".
DO
2" Nails
(5,1 cm)
OR
Flush
at peak
BEGIN
1
Attach panel to end of rafter with
rough side up (Primed grid-line side)
3/4" (1,9 cm) from outside edge of
rafter (Fig. A) and panel ush at
peak (Fig. B ).
Fig. A
Secure with two 2" nails at the
corners.
Fig. B
DO
OR
3/4"
(1,9 cm)
Roof Panel
Flush
at peak
Fig. D
Truss
Gabel Panel
2
Fig. C
Move to the opposite end. Using
the long edge of the panel as a
lever, move the panel side-toside until the top corner is ush
with the peak (Fig. C), and there
is 1/2" (1,3 cm) measurement to
the rafter (Fig. D).
1/2"
(1,3 cm)
DO
OR
You may need to move your
side wall to get the 1/2" (1,3 cm)
measurement. Secure panel with
two 2" Nails in the corners.
2" Nails
(5,1 cm)
32
ROOF PANELS
PARTS REQUIRED:
x176
2" (5,1 cm)
7/16 x 36-1/2 x 47-7/8"
(1,1 x 92,7 x 121,6 cm)
x2
7/16 x 36-1/2 x 96"
(1,1 x 92,7 x 243,8 cm)
x2
3
Keep spacing between the
center of each rafter at the
lower edge of the panel and
secure with one 2"nail into each
rafter (Fig. E).
7/16 x 47-7/8 x 48"
(1,1 x 121,6 x121,9 cm)
x2
NOTE: Measurements from outside of panels
24-3/4"
(62,9 cm)
24"
(60,9 cm)
Move to the top of the panel
and keep spacing between the
center of the rafters. Secure
with one 2" nail into each rafter
(Fig. E).
Nail the roof panel using 2"
nails 6" apart on edges and 12"
apart inside panel.
24"
(60,9 cm)
24"
(60,9 cm)
24"
(60,9 cm)
Fig. E
2" Nail
12" (30,5 cm)
apart
6" (15,2 cm)
apart
4
Attach the lower roof panel
ush to the upper panel, with
the 1/2" (1,3 cm) measurement
at the rafter (Fig. F).
DO
OR
Flush
at peak
Roof Panel
Truss
Gabel Panel
FINISH
Repeat process to attach roof
panels on the opposite side.
OR
DO
Nail the roof panel using 2"
nails 6" apart on edges and 12"
apart inside panel.
5
24-3/4"
(62,9 cm)
Fig. F
6" (15,2 cm)
apart
12" (30,5 cm)
apart
6" (15,2 cm)
apart
Fig. G
12" (30,5 cm)
apart
48"
(121,9 cm)
DO
OR
96"
(243,8 cm)
47-7/8"
(121,6 cm)
DO
OR
33
36-1/2"
(92,7 cm)
GABLE TRIM
PARTS REQUIRED:
x56
x2
WYL
19/32 x 4 x 85-3/16" (1,5 x 10,2 x 216,4 cm)
x2
WYR
19/32 x 4 x 85-3/16" (1,5 x 10,2 x 216,4 cm)
2" (5,1 cm)
BEGIN
1
Install left front gable trim WYL ush to top of panel and ush at
peak (Fig. A) as shown.
2
Secure to wall using 2" nish nails 7-1/4" apart.
3
Repeat steps 1-2 to attach right front gable trim.
4
DO
OR
Repeat steps 1-3 to secure the back wall gable trim.
Flush
FINISH
5
You have nished installing your gable trim.
Roof
Panel
Fig. A
Flush
2" Nails
(5,1 cm)
Flush to top
of panel
34
EAVE TRIM
PARTS REQUIRED:
x2
x60
1-1/4" (3,2 cm)
VX
2 x 6 x 96" (5,1 x 15,2 x 243,8 cm)
x2
AS
x8
2 x 6 x 49-1/2" (5,1 x 15,2 x 125,7 cm)
3" (7,6 cm)
BEGIN
1
Orient AS between gable trim ush to edge of
roof panel (Fig. A).
2
Screw through roof panel into eave side overhang using
1-1/4" screws approximately 7-1/2" apart as shown.
3
DO
OR
Orient VX between AS and gable trim, ush to edge of roof panel.
FINISH
4
Repeat process on opposite side. You have nished your eave trim.
Flush
Fig. A
AS
VX
3” (7,6 cm)
Screw
1-1/4” (3,2 cm)
Screws
AS
7-1/2" (19,1 cm)
apart approximately
49 1/2"
(125,7 cm)
96"
(243,9 cm)
DO
OR
VX
35
CORNER TRIM
PARTS REQUIRED:
x64
2" (5,1 cm)
x4
3/8 x 1-3/4 x 81-1/2" (1 x 4,4 x 207 cm)
x4
3/8 x 1-3/4 x 83-1/2" (1 x 4,4 x 212,1 cm)
BEGIN
1
Secure 83-1/2" (212,1 cm) corner trim under side eave trim.
Attach with 2" nails as shown in (Fig. A).
2
Secure 81-1/2" (207 cm) corner trim ush under gable
panel. Attach with 2" nails as shown.
3
Repeat on other side.
DO
OR
FINISH
4
Corner
trim
Proceed to installing your collar ties.
Seam is ush.
Caulk seam
before painting trim.
Fig. A
DO
OR
83-1/2"
(212,1 cm)
81-1/2"
(207 cm)
36
COLLAR TIE
PARTS REQUIRED:
x1
x6
3" (7,6 cm)
TP
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
BEGIN
1
Locate collar tie TP on the rafter over the center of the door
as shown.
Check collar tie is level and ush to roof panel.
2
Nail collar tie to the rafter with three 3" nails at each end.
DO
FINISH
3
You have nished installing your collar tie.
Flush
3" (7,6 cm)
Nails
TP
HINT: For best appearance,
install collar tie on back
side of rafter.
37
OR
LOFT JOIST ASSEMBLY
PARTS REQUIRED:
x48
3" (7,6 cm)
x4 2 xTP
4 x 96" (5,1 x 10,2 x 243,8 cm)
x4
SP
2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
BEGIN
2
Ensure parts TP and SP are aligned perfectly on a at surface. Spread
glue across SP and TP as shown.
Assemble joist with 3” (7,6 cm) nails in a staggered pattern.
3
Turn assembled joist over and repeat staggered nail pattern.
1
DO
4
Repeat steps 1-3 to assemble second loft joist.
SP
Glue
TP
TP
SP
Flush
Flush
38
Flush
OR
LOFT INSTALLATION
PARTS REQUIRED:
x18
3" (7,6 cm)
x2 LOFT JOIST ASSEMBLY
x1 PT
x12
3" (7,6 cm)
2 x 3 x 96" (5,1 x 7,6 x 243,8 cm)
x1
NK
2 x 3 x 48" (5,1 x 7,6 x 121,9 cm)
x2
AO
2 x 4 x 22-1/2" (5,1 x 10,2 x 57,2 cm)
x1
PYA
2 x 4 x 19-3/4" (5,1 x 10,2 x 50,2 cm)
BEGIN
1
Locate NK and PT directly under the side wall top plates and secure
with two 3" (7,6) nails at each backwall stud.
2
Secure AO and PYA as shown with two 3" screws on each side.
3
Secure with two 3" screws on each side.
4
Position loft joists on top of AO and PYA as shown.
Secure with 3" nails.
3-1/2”
(8,9 cm)
3" (7,6 cm)
Screws
DO
NK
3-1/2”
(8,9 cm)
PT
AO
3" (7,6 cm)
Screws
AO
Flush
3” (7,6 cm)
Flush
Nails
LEVEL
PYA
3-1/2”
(8,9 cm)
SIDE WALL
Flush at wall panel.
3" (7,6 cm)
Nails
Loft Joist
Window
OR
3" (7,6 cm)
Screws
39
AO
Flush
3" (7,6 cm)
Screws
BENCH ASSEMBLY
PARTS REQUIRED:
x2
3" (7,6 cm)
x6
x36
3/8 x 8 x 12-1/2" (1 x 20,3 x 31,8 cm)
2" (5,1 cm)
x7 LR
2 x 3 x19" (5,1 x 7,6 x 48,3 cm)
BEGIN
2
Secure six LR to shelf panels using three 2" (5,1 cm) nails. Assemble 6
shelf supports as shown.
Secure one LR to studs with two 3" (7,6 cm) nails as shown.
3
Secure shelf supports at shown heights with three 2" (5,1 cm) nails.
1
DO
OR
x6
2" (5,1 cm)
Nail
LR
11-5/8”
29,5 cm
Flush
Level
4-7/16”
(11,3 cm)
7/16”
(1,1 cm)
3" (7,6 cm)
Nail
LR
Corner stud
Refrence this height
LR
Same dimension
Flush
Level
Flush
Floor
2" (5,1 cm)
Nail
40
BENCH PANELS
PARTS REQUIRED:
x1
7/16 x 19-1/2 x 92-1/2"
(1,1 x 49,5 x 235 cm)
x1
3" (7,6 cm)
x62
2" (5,1 cm)
7/16 x 19-1/2 x 48"
(1,1 x 49,5 x 121,9 cm)
x1
x1
x1
1/4 x 23-7/8 x 96"
(0,6 x 60,6 x 243,8 cm) Peg board
KP
1 x 4 x 96" (2,5 x 10,2 x 243,8 cm)
x1
x1
HYA
1/4 x 23-7/8 x 48"
(0,6 x 60,6 x 121,9 cm) Peg board
1 x 4 x 44-1/2" (2,5 x 10,2 x 113 cm)
BEGIN
1
Install shelf panels centered over shelf supports. Secure with three 2" (5,1 cm)
nails at each support
2
Secure HYA and KP with two 2" (5,1 cm) nails at each support and
four 2" (5,1 cm) nails at seams.
Secure the end of KP with a 3" nail as shown
3
DO
Secure pegboard with three 2" (5,1 cm) nails at each support and (6)
2" (5,1 cm) nails at seams.
Ensure pegboard is in contact with top of bench.
FINISH
You have nished installing your shelves and pegboard.
5
OR
4
92-1/2"
(235 cm)
Flush
48"
(121,9 cm)
2” (5,1 cm)
Nails
2” (5,1 cm) Nails
HYA
KP
3” (7,6 cm)
Nail
Flush
Flush
41
SHELF ASSEMBLY
PARTS REQUIRED:
x72
2" (5,1 cm)
x7 AC
2 x 3 x10" (5,1 x 7,6 x 25,4 cm)
x1
FO
1 x 3 x 48" (2,5 x 7,6 x 121,9 cm)
x1
BE
1 x 3 x 96" (2,5 x 7,6 x 243,8 cm)
BEGIN
1
2
Secure AC to BE and FO using two 2" (5,1 cm) nails at each support
and four 2" (5,1 cm) nails at each seam.
Secure shelf support as shown with two 2" (5,1 cm) nails at each wall stud.
DO
OR
144"
(365,8 cm)
120"
(304,8 cm)
96"
(243,8 cm)
2” (5,1 cm) Nails
72"
(182,9 cm)
48"
(121,9 cm)
24"
(61 cm)
Flush
Flush
BE
FO
AC x7
Flush with top of pegboard
42
3” (7,6 cm)
Nails
SHELF PANELS
PARTS REQUIRED:
x30
2" (5,1 cm)
7/16 x 11-1/2 x 96"
(1,1 x 21,2 x 243,8 cm)
x1
7/16 x 11-1/2 x 48"
(1,1 x 21,3 x 121,9 cm)
x1
x1
KP
1 x 4 x 96" (2,5 x 10,2 x 243,8 cm)
x1
WJ
1 x 4 x 48" (2,5 x 10,2 x 121,9 cm)
BEGIN
3
Install shelf panels centered over shelf supports. Secure with two 2" (5,1 cm)
nails at each support
4
Secure WJ and KP with two 2" (5,1 cm) nails at each support and
three 2" (5,1 cm) nails at seams.
Secure shelf from oustide of the front wall panel using 1-1/2" Nails at
shown measurments.
5
DO
OR
FINISH
6
You have nished installing your shelf.
1-1/4” (3,2 cm)
Nails
24"
(61 cm)
1-1/2” (3,8 cm)
Nails
KP
WJ
Level
14"
(35,6 cm)
3” (7,6 cm)
Screw
3” (7,6 cm)
62"
Nails
(157,5 cm)
Flush
43
LOFT PANELS
PARTS REQUIRED:
x1
x48
2" (5,1 cm)
7/16 x 36 x 96"
(1,1 x 91,4 x 243,8 cm)
x1
7/16 x 36 x 40-7/8"
( 1,1 x 91,4 x 103,8 cm)
BEGIN
Install loft panels centered over loft joists and ledger
board. Secure with 2" (5,1 cm) nails 8" (20,3 cm) apart.
1
NOTE: There will be a gap of approximately 1/2”
on either side of installed deck panels.
FINISH
2
DO
You have nished installing your Loft.
Flush
8”
20,3 cm
2” (5,1 cm)
Nails
8”
(20,3 cm)
View of loft from above
44
OR
DOORS
PARTS REQUIRED:
x2
x2
OO
1-1/4" (3 cm)
2 x 3 x 69" (5,1 x 6,5 x 175,3 cm)
x4
2" (5,1 cm)
HINT:
Look for 3/8" SPACER
attached to doors.
GAA
3/4" GAUGE
BLOCK
x1
x1
Left Door
Right Door
BEGIN
1
Orient parts as shown on at surface.
(right) and green (left) on hinge board.
2
Attach temporary supports OO with 3" screws in middle and at ends as shown.
Tighten securely.
3
Attach tempoary supports GAA with two 1-1/4" screws. Tighten Securely.
3/8" offset is to top. Look for red
GREEN
OFFSET 3/8"
(1 cm)
DO
OR
RED
Make sure spacer
is attached.
3/8" OFFSET
(1 cm)
3/8"
(1 cm)
23-1/2"
(59,5 cm)
(4) 3" (7,6 cm)
Screws
Tighten screws
securely.
OO
(2) 1-1/4" (3,2 cm)
Screws
GAA
23-1/2"
(59,5 cm)
Bottom edges ush.
3/8"
(1 cm)
45
DOORS
x13
PARTS REQUIRED:
3" (7,6 cm)
x1
OO
2 x 3 x 69" (5,1 x 7,6 x 175,3 cm)
2
Attach tempoart support OO as a ledger board ush under wall
panels for doors to rest on, Using 3" (7,6 cm) Screws (Fig A).
DO
OR
Flush
to panel
64"
m)
(162,6 c
OO
OO
3
4
Fig. A
Measure and mark center of door opening (Fig. A). Center doors on
mark as shown (Fig. B).
Screw hinge boards into wall supports and oor using eight 3" screws as
shown.
Make sure screws go into framing and oor (Fig. C, D).
Remove temporary supports and check doors open properly.
5
FINISH
6
You have nished installing your doors.
Center 3/8" measurement
on mark.
Fig. B
3/8"
(1 cm)
Fig. C
Angle 3" (7,6 cm)
Screw
3" (7,6 cm)
Screws into the wall
support and oor frame.
Fig. D
46
DOOR WEATHERSTRIP
x10
PARTS REQUIRED:
x2
2" (5,1 cm)
OO
2 x 3 x 69" (5,1 x 7,6 x 175 cm)
BEGIN
1
With left door closed, center a weatherstrip OO vertically on the left door
in the door opening (Fig. A). OO will offset the left door 1" OUT past the
door trim 1" (Fig. B).
2
Secure OO using 2" (5,1 cm) screws through outside trim into OO (Fig. B).
3
On right door center OO vertically in door opening (Fig. A). OO will offset
the right door 1" IN from the door trim (Fig. C).
4
Secure OO using ve 2" (5,1 cm) screws through outside trim into OO (Fig. C).
DO
OR
FINISH
5
You have nished installing your door weatherstrips.
1"
OFFSET
(2,5 cm)
OO
Center OO
in door
opening.
Fig. B
Fig. A
1" (2,5 cm)
Overhang
Fig. C
Screws
2"
(5,1 cm)
Screws
2"
(5,1 cm)
x10
14" (35,5 cm)
Approximately
47
DOORS
AH
PARTS REQUIRED: x2 19/32
x 3 x 26 5/8" (1,5 x 7,6 x 67,6 cm)
x7
x2
x66
x1
AHR/AHL
19/32 x 3 x 62" @ 22.5* (1,5 x 7,6 x 157,5 cm @ 22.5*)
2" (5,1 cm)
3/4" (1,9 cm)
ZJ
19/32 x 3 x 72" (1,5 x 7,6 x 182,9 cm)
BEGIN
1
Reinforce the door trim using 3/4" (1,9 cm) screws through door panel into trim
(Fig. A). Locate screws as shown in Fig. B. Use two screws at seams.
3/4” (1,9 cm)
Screws
DO
OR
14" (35,6 cm)
Approximately
Two 3/4” (1,9 cm)
Screws
Fig. A
2
3
4
Fig. B
Center trim ZJ over doors and secure using seven 2" nish nails into framing as
shown.
Center
Remove 3/8" spacers from doors.
Install AH and AHL/AHR as shown and secure from inside with eleven
3/4" (1,9 cm) screws
ZJ
FINISH
5
2” (5,1 cm)
Screws
You have nished securing your door and trim.
3/4” (1,9 cm)
Screws
Level
AH
AH
Flush
AHL
AHR
Flush
48
DOORS
PARTS REQUIRED:
x11
x4
3/4” (1,9 cm)
Coated screws
x1
x12
3/4” (1,9 cm)
64" (162,6 cm) METAL THRESHOLD
BEGIN
1
Center metal threshold between door opening.
2
Secure Threshold using eleven 3/4" (1,9 cm) coated screws into oor as shown.
DO
OR
FINISH
3
You have nished installing your door Threshold.
3/4” (1,9 cm)
Coated Screws
BEGIN
1
Level decorative hinges in position as shown and secure with 3/4" (1,9
cm) screws.
FINISH
2
You have nished installing your decorative
door hinges.
Flush
49
3/4” (1,9 cm)
Screws
DOOR HARDWARE
PARTS REQUIRED:
x8
1” (2,5 cm)
x2
3/8" (0,9 cm) Drill Bit
BEGIN
1
2
Place bolt onto OO in open position with bolt end 1/4" (0,6 cm) down from
frame (Fig A), and 1/2" (1,3 cm) up from oor (Fig B). Bolt is open when loop is
contacting base.
Mark and pre-drill holes for screws. Install bolt with screws supplied
and drill 5/16" (0,8 cm) hole deep enough for bolt to slide into.
DO
OR
FINISH
3
You have nished installing your door bolts.
Fig. A
LOCATE AND PRE-DRILL HOLES TO AVOID SPLITTING WOOD
OVER DOOR FRAME
1/4" with bolt in open
position.
OO
2 x 3 x 69"
LEFT
DOOR
5/16" drill for bolt:
1" deep.
x4
PRE-DRILL
(4) HOLES
OPEN POSITION,
Spring is loose.
Loop contacts
base.
HINT: With door
closed extend bolt
and tap hammer to
leave a mark in wood
for drilling.
Fig. B
LOCATE AND PRE-DRILL HOLES TO AVOID SPLITTING WOOD
OO
2 x 3 x 69"
OPEN POSITION,
Spring is loose.
Loop contacts
base.
PRE-DRILL
(4) HOLES
x4
1/2" with bolt in open
position.
FLOOR FRAME
50
5/16" drill for bolt:
1" deep.
DOOR HARDWARE
PARTS REQUIRED:
x2
x1
1-1/2” (38 mm)
1/4" (0,6 cm)
1/2" (1,3 cm)
Drill Bits
1
Measure and mark position on right door as shown.
2
Pre-drill 1/4" hole at mark. Finish hole with 1/2" drill bit.
3
Position hardware in hole and secure with screws as shown.
1-1/2"
(3,8 cm)
DO
OR
TOP VIEW
1/2"
1,3 cm
1/4" Pre-drill and
1/2" Drill-through.
SIDE VIEW
1-1/2"
3,8 cm
35-3/4"
90,8 cm
Set Screw
INSTALL ON
RIGHT DOOR.
FINISH
4
You have nished mounting your door hardware.
1-1/2"
(3,8 cm) x2
51
WINDOW SHUTTERS
PARTS REQUIRED:
x6
x1
x18
AZ
19/32 x 3 x 30-1/8" ( 1,5 x 7,6 x 76,5 cm)
x4
1" (2,5 cm)
DF
19/32 x 3 x 8-1/2" (1,5 x 7,6 x 21,6 cm)
BWR
19/32 x 3 x 21" (1,5 x 7,6 x 53,3 cm)
x1
BWL
3/8" (0,9 cm) Drill Bit
19/32 x 3 x 21" (1,5 x 7,6 x 53,3 cm)
BEGIN
1
Position parts primed side-down on oor, as shown.
You will build two shutters the same.
2
Secure with 1" (2,5 cm) screws as shown.
3
Repeat steps to build your second shutter.
DO
OR
FINISH
4
You have nished building your window shutters. Proceed to install your
window.
8-1/2”
(21,6 cm)
30-1/8”
(76,5 cm)
2-1/2”
(6,4 cm)
2-1/2”
(6,3 cm)
1/2”
(1,3 cm)
AZ x 6
2-1/2”
(6,4 cm)
2-1/2”
(6,4 cm)
BWR
DF x 4
Install with primed
side facing down.
2-1/2”
(6,4 cm)
BWL
52
WINDOW
PARTS REQUIRED:
x8
x18
2" (5,1 cm)
x2
x1
3/4" (1,9 cm)
x4
DT
1-1/4" (3,2 cm)
19/32 x 3 x 28-1/8" (1,5 x 7,6 x 71,4 cm)
BEGIN
1
Postion window in front gable as shown and secure with four 1-1/4" (3,2) screws.
Seal window with high-quality paintable exterior caulk
2
Mark center of window frame as shown.
DO
OR
CENTER
2"
(5,1 cm)
CENTER
CENTER
HINT: Claulk behind
frame
CENTER
3
Tack trim (DT) and shutters in place
Flush
with 2" nish nails as shown.
From the inside of the shed, use
3/4" screws to secure the shutter
indicated at X .
4
Center
FINISH
5
DT x 2
2-1/2"
(6,4 cm)
Flush
You have nished mounting your
window
30-1/8"
(76,5 cm)
Center
Flush
Flush 2-1/2"
(6,4 cm)
Center
5-5/8"
(14,3 cm)
30-1/8"
(76,5 cm)
53
5-5/8"
(14,3 cm)
Vent
• Follow directions provided by manufacturer and these instructions.
x12
x1
1/2” (13 mm)
16 x 8" ( 40,6 x 20,3 cm)
BEGIN
1
Locate and mark for two vents in side walls as shown. (1) at
top and (1) at bottom
Cut out marked openings
DO
OR
Caulk behind vent anges
2
Secure using 1/2" (1,3 cm) screws
14"
(35,6 cm)
FINISH
3
You have nished installing your
vents.
Caulk
6"
(15,2 cm)
1/2"
(1,3 cm)
3"- 5"
(7,6 - 12,7 cm)
1/2"
(1,3 cm)
Caulk
7"- 8"
(17,8 - 20,3 cm)
5"
(12,7 cm)
6"
(15,2 cm)
14"
(35,6 cm)
54
PAINT & CAULK
- NOT INCLUDED -
• Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all
around the door trim.
• Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be
easily
overlooked that must be painted:
• Bottom edge of all siding and trim
• Inside of doors and all 4 edges
Note:
Prime all un-primed exterior wood before painting.
(Follow directions provided by manufacturer.)
ROOF FELT
- NOT INCLUDED • Install felt ush to all roof edges overlapping 3". Use minimal amount of roong nails to hold in place.
OK to overlap at ridge.
3" OVERLAP
Flush
Flush
DRIP EDGE
- NOT INCLUDED • Install drip edge over roof felt on gable side and
under roof felt on eave side (Fig. A).
• Do not use nails on side of drip edge that hangs over side of building.
• Only nail top of drip edge as shown.
Roof felt
Drip edge
Drip edge
Edge ush to
trim.
Fig. A
Snip bottom side of drip edge and
bend over to other side of roof.
(Follow directions provided by manufacturer.)
55
SHINGLES
- NOT INCLUDED • Follow directions provided by manufacturer and these instructions.
Familiarize yourself with a 3-Tab Shingle.
Notch
Notch
SHINGLE NAIL PATTERN
1"
(2,5 cm)
1/2"
(1,3 cm)
Sealing Strip
1"
(2,5 cm)
Half A Rain Slot
Full Rain Slot
NAILS
NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS.
BEGIN
1
Install rst starter row upside down and color up with a 1" overhang at back and bottom of roof panel. Use (4) nails per
shingle.
Starter row must be straight and level all the way across with lower edge of roof deck.
NOTE: If you have installed drip edge install shingles ush to drip edge.
FRONT OF
SHED
BACK OF
SHED
(4) Nails
TABS UP
1" (2,5 cm) overhang or ush
with drip edge.
Shingle overlaps roof
decking.
1" (2,5 cm) overhang
past roof deck.
56
SHINGLES
continued...
2
2
Beginning at front of shed, install rst row of shingles with notch at 1" past roof edge or ush with drip edge.
Roof Deck
FRONT OF
SHED
1"
(2,5 cm)
BACK OF
SHED
Flush with starter row.
Notch
- or Drip Edge
Flush with starter row.
Notch
3
Install second row of shingles ush at top of rst row's rain slots. Ensure 1" overhang or ush to drip edge at front,
stagger each row.
FRONT OF
SHED
BACK OF
SHED
Bend in roof
1"
(2,5 cm)
Notch
Flush with rain slots.
4
Continue installing rows of
shingles by staggering at front.
Flush with rain slots.
1"
(2,5 cm)
FRONT OF
SHED
Notch
57
SHINGLES
continued...
5
Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot,
as shown below. If shingles overlap at ridge cut to peak with a utility knife.
Cut Off.
5"
(12,7 cm) MAX.
CUT
Top of rain slot.
5"
(12,7 cm)
or less.
• If more than 5" to rain slot you must install another row of shingles.
6
Repeat steps 1 - 7 to shingle the opposite side of your roof. Trim shingles at ridge.
7
Once both sides are shingled you need to trim ends. Strike a chalk line 1" from edge.
8
Using your shingle hooked blade carefully cut shingles along chalk line.
FINISH
9
You have nished shingling your roof. Proceed to capping the ridge.
58
SHINGLES - RIDGE CAP
• You will nish off the top of the roof with a ridge cap made from shingles.
BEGIN
1
Cut shingles into THREE pieces.
Hint: Use cut-off pieces rst.
2"
(5,1 cm)
2"
(5,1 cm)
2"
(5,1 cm)
2"
(5,1 cm)
2"
(5,1 cm)
2"
(5,1 cm)
Score shingle,
then snap-off angled cut.
12x12'
Weather Seal
Top of slot.
Note: • You will need about 30 - 32 cut pieces for 12' x 12' model
2
30 to 32
Pieces
Install rst ridge cap ush to shingles at front, as shown.
(1) Nail per side through weather
seal.
Flush
3
Install second ridge cap 5" back, as shown.
(1) Nail per side through weather
seal.
5"
12,7 cm
Flush
FRONT OF
SHED
59
SHINGLES - RIDGE CAP
continued...
4
Continue installing ridge cap to back of roof.
5
Make sure there is 4" between the shingle-color and edge of shingles.
4"
(10,2 cm)
6
Trim cap off ush to shingles
When you have 4" minimum of shingle color cut one piece to cap your roof.
Cut at top of rain slot.
Cap
7
Install ush to shingles.
Flush to shingles
(2) Nails per side.
FINISH
8
You have nished your ridge cap.
60
Use as a visual aid only.
12-12-03
F L O O R K I T I N S T RU C T I O N S
FOR 10X4 BUILDING EXTENDER
ACTUAL SIZE 120” WIDE X 48” DEEP
Parts Needed:
A 2 - 2x4x24" Bond Boards
B 2 - 2x4x96" Bond Boards
C 9 - 2x4x45" Floor Joist
D 1 - 48"x96"x5/8" Floor Panels
E 1 - 23-7/8"x48"x5/8" Floor Panels
- 2" and 3" Nails
#16635
1-800-437-0784
This instruction may be different from the one specified in Building instruction.
●
●
●
Generic floor extender for Marco and Premier Series buildings
NOT for use with Solar Shed.
Assemble extended floor 16" on center as shown or 24” on center if desired.
B
A
C
C
C
A
C
C
C
C
C
Using 3” nails, nail twice
through each Bond Board A
& B into each end of each
Joist C , keeping pieces
flush at top and ends, and
maintain 16” and 12”
spacing as shown. Where
A & B join together use
4-3” nails.
48"
(12 cm)
16"
(41 cm)
16"
(41 cm)
Center of
Stud
A
16"
(41 cm)
Center of
Stud
16"
(41 cm)
Center of
Stud
16"
(41 cm)
Center of
Stud
16"
(41 cm)
Center of
Stud
12"
(30 cm)
Center of
Stud
ASSEMBLY OF 120” X
48” FLOOR FRAME
A:Position Bond Boards A
& B and Floor Joists C
as shown.
C
B
NOTE: Part letters are
not stamped on floor
kits.
12"
(30 cm)
Center of
Stud
120"
(305 cm)
C
B
A
(4) 3" (7.6 cm)
Nails
at Joint
B
Y
C
A
(2) 3" (7.6 cm)
Nails
X
B: Completed Floor Frame
should be positioned at
building site, leveled,
using shims between floor
frame and ground before
proceeding to Floor
Panel Attachment.
Y
X
10x4 Floor Instructions
Square frame by making
corner-to-corner
measurements (X to X and
Y to Y) the same.
10X4 F L O O R K I T I N S T RU C T I O N S CONTINUED
Original Floor
C
C:
3" Nails
(7.6 cm)
Attach 10x4 Extender Floor Kit to original 10x8 or 10x10 floor kit with (2) 3” nails between every joist as shown.
2" Nails
(5 cm)
D
C
48"
(122 cm)
D
B
A
120"
(305 cm)
D:
Position a 48 x 96” Floor Panel D flush to the outside edges of sides and back of Floor Frame. Secure panel with
two 2” nails at outside corners and one 2” nail at other corners.
E
Original Floor
32"
(81 cm)
16"
(41 cm)
16"
(41 cm)
D
2" Nails
(5 cm)
32"
(81 cm)
16"
(41 cm)
E
12"
(30 cm)
Nails every 12" (30 cm) through Floor Panels into all Floor Bond Boards and Floor Joists
E:
Position a 23-7/8” x 48” Floor Panel E flush against first panel and flush to edges of Floor Frame. Secure panel
with two 2” nails at outside corners and one 2” nail at the other corners.
Note: Mark a line on the Floor Panel over the center of each Floor Joist using a pencil and a piece of lumber from
the kit (or use a chalk line) to make nailing easier.
With Floor Panels flush to outside edges of Floor Frame, nail with 2” nails every 12” through Floor Panels into all
Floor Bond Boards and Floor Joists.
Your Floor is now complete. Check to be sure it is properly positioned and leveled to ground before beginning
assembly of your Wooden Storage Building.
10x4 Floor Instructions
02-24-06
FLOOR KIT INSTRUCTIONS
FOR 10x8 and 10x16 BUILDINGS
ACTUAL SIZE • 120” WIDE x 96” DEEP (10X8)
• 120” WIDE x 192” DEEP (10X16)
Parts Needed:
A 2 - 2x4x48" Bond Boards
B 2 - 2x4x72" Bond Boards
C 9 - 2x4x93" Floor Joist
D 2 - 48"x96"x5/8" Floor Panels
E 1 - 23-7/8"x96"x5/8" Floor Panels
- 2" and 3" Nails
#16630
1-800-437-0784
This instruction may be different from the one specified in Building instruction.
NOTE: Part letters are
not stamped on floor
kits.
Use for Premier Series Buildings only, cannot be used for
a Marco Series Building or Premier Solar Shed
A
A
C
C
ASSEMBLY OF 120” X 96”
FLOOR FRAME
B
C
C
C
C
C
C
A:Position Bond Boards A
& B and Floor Joists C
as shown.
C
96"
(244 cm)
B
16"
(41 cm)
16"
(41 cm)
Center of
Stud
A
16"
(41 cm)
Center of
Stud
Using 3” nails, nail twice
through each Bond Board A
& B into each end of each
Joist C , keeping pieces
flush at top and ends, and
maintain 16” and 12”
spacing in middle as
shown. Where A & B
join together use 4-3”
nails.
12"
(30 cm)
Center of
Stud
12"
(30 cm)
Center of
Stud
16"
(41 cm)
Center of
Stud
16"
(41 cm)
Center of
Stud
16"
(41 cm)
Center of
Stud
120"
(305 cm)
C
B
A
(4) 3" (7.6 cm)
Nails
at Joint
B
Y
C
A
(2) 3" (7.6 cm)
Nails
X
B: Completed Floor Frame
should be positioned at
building site, leveled,
using shims between floor
frame and ground before
proceeding to Floor
Panel Attachment.
Y
X
10x8 and 10x16 Floor Instructions
Square frame by making
corner-to-corner
measurements (X to X and
Y to Y) the same.
10x8 and 10x16 F L O O R K I T
I N S T R U C T I O N S (CONTINUED)
C
2" Nails
(5 cm)
C
96"
(244 cm)
D
B
A
120"
(244 cm)
C:
Position a 48 x 96” Floor Panel D flush to the outside edges of sides and back of Floor Frame. Secure panel with
two 2” nails at outside corners and one 2” nail at other corners.
Nails every 12" (30 cm)
through Floor Panels into all
Floor Bond Boards and Floor
Joists
D
32"
(81 cm)
16"
(41 cm)
32"
(81 cm)
D
16"
(41 cm)
E
12"
(30 cm)
D
2" Nails
(5 cm)
16"
(41 cm)
(2) 10x8
(2) 3” nails between every joist as shown
FOR 10 x 16 FLOOR BUILD TWO 10 x 8 FLOORS,
ATTACH PRIOR TO INSTALLING FLOOR DECKING
D:
Position a 23-7/8” x 96” Floor Panel E flush against first panel and flush to edges of Floor Frame. Secure panel
with one 2” nail at outside corners.
Position the other 48” x 96” Floor Panel D flush against second panel and flush to edges of Floor Frame. Secure
panel with two 2” nails at outside corners and one 2” nail at each of other corners.
Note: Mark a line on the Floor Panel over the center of each Floor Joist using a pencil and a piece of lumber from the kit
(or use a chalk line) to make nailing easier.
With Floor Panels flush to outside edges of Floor Frame, nail with 2” nails every 12” through Floor Panels into all
Floor Bond Boards and Floor Joists.
Your Floor is now complete. Check to be sure it is properly positioned and leveled to ground before beginning
assembly of your Wooden Storage Building.
10x8 and10x16 Floor Instructions
WARRANTY
Backyard Storage Solutions, LLC warrants the following:
Limited Conditional
1.
Every product is warranted from defects in workmanship and manufacturing for one year.
Warranty *
2.
All hardware and metal components are warranted for two years.
3.
Trim is warranted for 10 years.
4.
Waferboard siding and sheathing is warranted for two years.
5.
SmartSide™ siding is warranted for 10 years on all Marco series buildings and 15 years on all Premier Series buildings.
6.
Timber series buildings’ siding and trim are warranted for 10 years.
7.
Solar Shed windows are warranted for 1 year.
8.
Cedar lumber is warranted for 15 years.
9.
Cedar doors and Cedar Garden Center are warranted for 10 years.
10.
Metal roof is warranted for 25 years.
Backyard Storage Solutions, LLC will repair, replace or pay for the affected part. In no event shall Backyard Storage Solutions, LLC pay
the cost of labor or installation or any other costs related thereto. All warranties are from date of purchase. If a cash refund is paid on an
affected part, it will be prorated from the date of purchase.
CONDITIONS
The warranty is effective only when:
1.
The unit has been erected in accordance with the assembly instructions.
2.
The unit has been properly shingled and painted or stained and reasonably and regularly maintained thereafter.
3.
The failure occurs when the unit is owned by the original purchaser.
4.
Backyard Storage Solutions, LLC has received the warranty registration card within thirty (30) days of purchase and notification
of the failure in writing within the warranty period specified above.
5.
Backyard Storage Solutions, LLC has had reasonable opportunity during the sixty (60) days following receipt of notification
to inspect and verify the failure prior to commencement of any repair work.
REQUIREMENTS
Storage Buildings & Playhouses
To validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit; shingle the roof and paint or
solid-colored stain the siding using 100% acrylic latex exterior product with a minimum of two (2) coats within thirty (30) days of assembly;
caulk above all doors and all horizontal and vertical trim boards; paint and seal all exposed edges, sides and faces of SmartSide™ and
waferboard siding to include all exterior walls and all sides and all edges of doors.
Gazebos, Pergolas & Timber Buildings
To validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit. This includes treating all of the
exposed cedar and pine surfaces on your gazebo or timber building with an exterior grade wood preservative, an exterior oil-based
semi-transparent stain, an acrylic latex exterior paint or an acrylic latex solid color exterior stain within 30 days of assembly and as needed
thereafter to maintain your warranty.
Keep vegetation trimmed away from building and make sure siding panels and trim do not come in contact with masonry or cement. The
minimum ground clearance for siding must be one half inch (½ inch) from concrete slab or two and one half inches (2 ½”) from the ground
when building is erected or constructed on a treated wood floor kit. Water from sprinklers must be kept off unit. In no event will Backyard
Storage Solutions, LLC be responsible for any indirect, incidental, consequential or special damages nor for failure(s) that are caused by
events, acts or omissions beyond our control including, but not limited to, misuse or improper assembly, improper maintenance (which
eventually leads to rot or decay) and acts of God. Backyard Storage Solutions, LLC will not be held responsible for any labor costs incurred
to construct your unit. This warranty gives you certain specific rights that vary from state to state.
CLAIM PROCEDURE
To make a claim under this warranty, you can either call 1-888-827-9056 or prepare a letter. Please have ready the information below when
you call or include the information when writing:
1.
The model and size of the product.
2.
A list of the part(s) for which the claim is made.
3.
Proof of purchase of the Backyard Storage Solutions, LLC item, as shown on the original invoice.
4.
Run code, as listed on the yellow warranty card enclosed in the product package.
Mail the above information to:
Backyard Storage Solutions, LLC
Attn: Customer Service
1000 Ternes
Monroe, MI 48162
*WARRANTY TERMS MAY VARY OUTSIDE THE U.S.A.
IMPORTANT: This is your warranty certificate.
Please complete and mail your warranty card to properly validate your warranty.
61