May 3, 2011 VIA EMAIL Mr. Bob Verisario Director of Building and
Transcription
May 3, 2011 VIA EMAIL Mr. Bob Verisario Director of Building and
May 3, 2011 VIA EMAIL Mr. Bob Verisario Director of Building and Grounds Glenbard Township High School District 87 671 Crescent Boulevard Glen Ellyn, Illinois 60137 Re: 2011 Facilities Master Plan Architect’s Project Number: 211018.00 Meeting Minutes Summary of a Focus Group Meeting held at 12:30PM, Tuesday, May 3, at the Facilities Office. These notes record our understanding of items discussed and decisions made at this meeting. Please notify us within seven (7) calendar days of any necessary additions or corrections. PERSONS IN ATTENDENCE Jason Lembke, Legat Architects Robert Wroble, Legat Architects Paul Pessetti. Legat Architects See attached for Staff Attendees ITEMS DISCUSSED 1. 2. 3. 4. 5. Jason welcomed the group and reviewed the Agenda for today’s meeting. Jason asked if anyone had prepared their homework from the April 19th Meeting “What does learning look like to you?” Staff shared homework related to Fine Arts (attached). Jason reminded staff that they still had until the end of the school year to submit their homework. Information should be submitted to [email protected] Jason reviewed presentation to staff about trends in education today, multiple pathways to 21st Century Education, what other countries are doing, concepts related to S.T.E.M., and images of 21st Century Education environments. Group talked about what they felt they were preparing students to be: • Computer Programmers/ Technicians • Artist • Healthcare/ Sports Med • Musician • Conductor • Actor Group broke into Core Curriculum focus areas for discussion. Summary is as follows: GROUP 5 DRIVERS ED Glenbard Township High School District 87 2011 Facilities Master Plan Meeting Minutes May 3, 2011 Page 2 of 7 SOUTH • Common office spaces to promote collaboration • Update to simulators/ depends on state direction EAST • • • Goof physical classroom space Need meetings space for staff/ student conference Newer simulators/ old technology WEST • Classroom/ simulators located at district office! NORTH • Large room/ better suited for health • Simulator space adequate P.E. • • • • Capacity 47-48 students (vary between 40-48) Need classroom space/ could double as team room +/- 40 students o CPS technology o Power point o Video review o Smart boards o Marker board o Used for testing o Used for Assessments Note: (currently held in gymnasium space) Limited storage space o Indoor track o Wrestling o Gymnastics o Cheerleading o All sports Locker space (boy’s & girl’s) o PE and athletic o Girls lacking more so o PE full with small next to it LOCKER ROOMS Glenbard Township High School District 87 2011 Facilities Master Plan Meeting Minutes May 3, 2011 Page 3 of 7 • • • Students need access during the day (card access?) Separation of athletic/ P.E. locker rooms Need more multi-use space o Gym, basketball, batting cages, volley ball o Practices run until 9:00 PM (winter/spring) EAST/SOUTH • Outdoor multi-use surface (Turf at stadium) o P.E. classes can’t go outside – too wet East – 1960/70 weight/ room too small • Equipment is crammed in • Access only through fitness center • Shared with special needs North dedicated athletic entry/separates from general student entry NON-TRADITIONAL SPACES EAST • • • Cafeteria tables in hallway/floor Cannot fit student body in gym Overall appearance of school (dated 50+ years) o Assemblies • All space for team teaching/ presentations/ guest speakers • Multipurpose space for: o P.E.; Drwers Ed; Health; Athletics • At main entry (door) congested at passing periods o Need alternative routes OUTDOOR SPACE • • • Storage/ storage/storage o All sports Field drainage/ leveling Location for A.E.D. GENERAL • • South/ East/ A.C./ Ventilation overall but: o Gym ventilation is poor Office space located in locker rooms Glenbard Township High School District 87 2011 Facilities Master Plan Meeting Minutes May 3, 2011 Page 4 of 7 o o o Not good for student access Culturally restrictive Office needs to be located outside of locker rooms TURF • • • • At all schools; especially ones that don’t have it yet (East/South) Future team building activities: (currently at East and West) South/North/East Tennis courts in bad shape o ½@East redone Weight room at East! WEIGHT ROOMS • • • • South equipmlent in poor condition Less is more! o Need open spaces for fitness training/group exercise More/ adequately spaced equipment Need to accommodate special needs students TURFAT EAST/SOUTH GENERAL OFFICE FIELDHOUS LIGHTINGS AT EAST ATHLETIC TRAINING ROOMS • • • • • Located near gyms Outside access Appropriate size Better layouts Better observation from office Diagram: A/C conditions: o Gyms, outside, office, storage Power access Water access o (training/fitness/gyms) & outdoor spaces Glenbard Township High School District 87 2011 Facilities Master Plan Meeting Minutes May 3, 2011 Page 5 of 7 THEATER • • (2) Spaces Large group space outside Avd/Em for curriculum as Aud/TH. Is used (3 classes) 93-100 • • • 1 per day/ 7 pds. Diverse ability levels In assigned class but meet in library Diagram: o What if diff levels of quiet o Research, tech, writing, (small group) • • • • • • • • Ext. door/ larger 50-60/pd 120 at time Acoustics/ volume of space (move live) some flexibility/ curtains Large group practice (30 pp) 200 & instruments being stored Flat floor Travel path to and for piano (damaged) SPEECH BAND PERFORMANCES SPACES • • Fly (Full) Diagram: o Orchestra pits o Deeper o Can’t see1st and 2nd rows o Pot lift A/v o o Performers can’s be heard over pit Mics/ speakers upgraded, rented now (lesser priority) ACOUSTICS • LIGHTS Rear wall echo Glenbard Township High School District 87 2011 Facilities Master Plan Meeting Minutes May 3, 2011 Page 6 of 7 • • LED? (Future) Stage lights (now)/dimming • • OK Astragals instead of keyed mullion POWER VESTIBULES • If feasible DRESSING / STORAGE • • • • Storage – loft in scene shop? Need separate rooms Located near house 20 each sex max. SCENE SHOP • • • Location adjacent to stage (not under) Duplicates as storage so can’t use as scene (South) North is ok • Update public facilities TOILETS ORCHESTRA • • Follow East as example No complaint • • • • • Flat hoods/ port. seated risers Uniform space Go 65 singers Acoustic/ replace existing Directional now (change) CHOIR LOBBY SPACE Glenbard Township High School District 87 2011 Facilities Master Plan Meeting Minutes May 3, 2011 Page 7 of 7 • • with athletics Doesn’t allow for simultaneous activities BROADCAST • Studios in each building • Portable (inside band/orch.) vs. built (examine existing construction for acoustics) o Not fewer than exist More storage needed PRACTICE • MIDI • • Lab for 25-30 Smart board Meeting adjourned, 2:30PM Sincerely, Legat Architects, Inc. Paul J. Pessetti, AIA LEED AP PJP/GH ATTACHMENTS Sign In Sheet Roster CC Chris McClain File: 211018MMN:B3 FILENAME 210018MMN_G1G2.doc