Link Ledger - Volume VIII
Transcription
Link Ledger - Volume VIII
Winter 2012 A NEWSLETTER FOR EMPLOYEES, CLIENTS, AND LINK ASSOCIATES IN THIS ISSUE July 2012 September 2012 When Link Construction Group got news late 2011 that the Miami Herald Media Company would be building a new home for its business and production facilities, their eyes lit up with anticipation at the thought of being involved in the signature project. The 2-phased project entails the construction of a new, 3-story, 119,000 sq. ft. industrial plant that will house the printing presses, along with the renovation of a 2-story, 160,000 sq. ft. facility that will house the company’s news and business division. The two properties will sit adjacent to each other on a 15acre site in Doral. Today, after just 9 months of construction the production building shell is erect with printing presses in place for installation and the TI project fully underway. Link is scheduled to achieve substantial completion on both projects by late May of 2013. BIM — Building Information Modeling: The Miami Herald Production Building was the first project that Link implemented Building Information August 2012 Miami Herald & BIM Completed Projects Completed LEED Projects Current Projects Project Update New Hires/Promotions Company Events Awards & Corporate Events November 2012 Modeling (BIM). BIM has allowed Link’s project team to visualize the design intent and to interpret 2 -dimensional drawings of the elaborate systems and equipment that will be housing the Printing Facility. Analyzing the project in a 3-dimensional environment has brought increased productivity to the coordination process. “Through online meetings, we have been able to work hand in hand with our local subcontractors, International owner /vendors and out of state designers by virtual walk-through of the facility, identifying and making immediate decisions on conflicts that would have affected our schedule to rework and/or lead time of fabrication,” stated Tiara Rubio, Link Construction Group, BIM Specialist. The Miami Herald project team includes: Senior Project Manager, JC Nieves; Project Managers, Andy Vinals and Chad Brown; Superintendents, Rand Eachus, James Nelson and Ernie Perez; BIM Specialist, Tiara Rubio and Cost Accountant, Maria Mejia. A Special Note! We would like to take this opportunity to thank all of our clients, subcontractors, friends and especially our employees for making 2012 our most successful year yet. The past 11 months have been fulfilling with the completion of 4 LEED projects and the commencement of many new contracts, including two of our largest projects to date, The Miami Herald Production Building & The Hialeah Park Casino. We are grateful for our company's continued growth and expansion. This year Link's family has exponential grown from 40 employees to 69. We are proud of everyone's hard work and hope to continue celebrating many more accomplishments in the coming years. Willy & Mickey Link Ledger Winter 2012 COMPLETED PROJECTS North Shore Fire Sprinkler Washington Park Development This recently completed project was designed by Naya Architects and entailed the furnishing and installation of a new fire sprinkler system throughout the entire hospital to be in compliance with current AHCA/JCAHO regulations. City of Hollywood Washington Park housing project was completed in June of 2012. The job entailed construction of 33 residential units and a community center. The City partnered with Liberia Economic and Social Development, a community housing and development organization, in the development of the project. The residential units, designed by Frank Costoya Architects, were comprised of singlefamily homes, duplexes, 2-story town homes and flat layout apartments. The new housing development takes up approximately 1.5 square blocks and is located on Wiley Street between 56 th and 57th Ave, in Hollywood. Assigned to the job were Senior Project Manager, Amany Solan and Superintendent, Ernie Perez. Broward Health Administrative Offices The grand opening was held on October 4th, 2012. Assigned to the job were Senior Project Manager, Nick Fuoco, Assistant Project Manager, Johnathan Taylor and Superintendent, Rick Perrin. We are excited to have completed our first administrative offices of the Carefusion Department at Broward Health Medical Center. The project entailed the renovation of an existing 2,377square-foot administrative office space on the second floor of the Fort Lauderdale hospital. Assigned to the job were Senior Project Manager, Amany Solan and Superintendent, Greg High. Parkview Gardens The new housing development is located at 1475 NW 61st Street in Liberty City and entailed construction of 6, three-story multi-family buildings (60 units total), a community center, and 2-story parking garage. Siskind Carlton and Partner designed the project with oversized, arched sunshades, porches, and courtyards. The project was developed by Parkview Gardens LTD, a subsidiary of Carrfour Supportive Housing, a non -profit housing organization, whose mission is to end homelessness in Miami-Dade. City of Doral, 50th Street Trails and Tails Park Saturday, July 21, 2012, Link celebrated the grand opening of the City of Doral Trails and Tails Park. Assigned to the job were Senior Project Manag- The 8.12 acre park was built with a bike path, small and large dog parks, a playground, and restroom structure. Link was thrilled to deliver this new city park to the residents of Doral. er, Nick Fuoco and Superintendents, Angel Arguelles, Nicholson Pierre Assigned to the job were Project Manager, Albert Santelices and Superintendent, Eddy and Mark Cummings. Ramos. Link Ledger Winter 2012 COMPLETED PROJECTS TD Bank Link completed its first project for TD Bank in November of 2012. The new 2,960 sq. ft., freestanding bank branch is located at 1190 NE 163rd Street in North Miami. Robert Reid Wedding Architects designed the project with a LEED Silver goal in mind. TD Bank is the largest bank branch to receive carbon neutrality, by reducing waste, using alternative energy and building environmentally friendly buildings. The building is currently in the process of seeking certification through the USGBC. Assigned to the project were Senior Project Manager, Fernando Yepes; Assistant Project Manager, Claudia Limerick, and Superintendent, Rick Perrin. Miami Green Lab Coral Gate Community Center Link Construction Group completed the City of Miami Green Lab project in June of 2012. The new “green” building, located at 151 NW 27th Ave, will house the City’s Office of Sustainable Initiatives and will be used as a resource center to educate and promote green building practices in residences and businesses within our region. Link completed the City of Miami Coral Gate Community Center in July of 2012. The new 4,600square-foot community center was designed by Astorino to LEED standards. This is Link’s 3rd LEED project with the City of Miami. The project is currently in the process of seeking LEED Silver certification through the USGBC. The unique structure, which was originally a City of Miami fire station (designed in 1951), was deconstructed down to its shell and remodeled with sustainable features, including a rainwater collection system, solar hot water heater, native landscaping, and monitoring systems. The new center, designed by Astorino, offers functional rooms that support the resource building’s initiatives, such as a gallery for seminars and products, a computer lab, a kitchen, offices, and a lobby/sitting area. Vizcaya Park Assigned to the project were Senior Project Manager, Fernando Yepes; Assistant Project Manager, Claudia Limerick, and Superintendent, Alex Quesada. Assigned to the project were Senior Project Manager, Fernando Yepes and Superintendent Robert Quiles. Link Construction Group completed the City of Miramar Vizcaya Park in June of 2012. The park is the City’s first facility to seek Leadership in Energy & Environmental Design (LEED) certification through the United States Green Building Council (USGBC) and received LEED Gold certification. The 23-acre park features large sprawling baseball fields, a football/soccer field, a basketball court, a covered playground, fitness trails, picnic pavilions, and a 7,660-square-foot community center. The park was set-up to encourage sustainable practices and is equipped with a bicycle storage space, changing rooms, and 8 low emitting/fuel vehicle parking spaces. M.C. Harry Associates designed the new park to meet LEED criteria and incorporated the following sustainable features into the design of the community center: low-emitting materials, a skylight, light diming sensors, high performance ventilation equipment, low flow plumbing fixtures, high reflective roofing system, environmentally responsible wood, water efficient and native landscaping, and open vegetated space. Assigned to the project were Senior Project Manager, Fernando Yepes; Assistant Project Manager, Claudia Limerick, and Superintendent, Rand Eachus. Link Ledger Winter 2012 CURRENT PROJECTS Flagler Station, Building 30 Costa Farms The new, 42,000-square-foot, tilt wall headquarters will house the company’s indoor houseplant, bedding plant, and perennial plant division. The building was designed by RLC Architects and will include administrative office spaces, a purchasing department, plant show rooms, humidity control plant test areas, a marketing and photo studio room, an employee fitness area, and an employee cafeteria. The project is scheduled for comWe are looking forward to completing our first pletion in February 2013. project with Flagler Development. Assigned to the job are Project Manager, Albert Assigned to the job are Senior Project Manager, Santelices and Superintendent, Angel Arguelles. Neil Jurado and Superintendent, Manny Alvarez. In June 2012, Link commenced construction on the 172,000-square-foot industrial spec warehouse located within the Flagler Station Industrial Park at 10315 NW 112th Avenue in Miami. Boca Raton-based RLC Architects designed the warehouse with 30’ clear height ceilings and office component availability. The project is slated for completion in late January 2013. VF 101 Warehouse In July 2012, Link commenced construction on the 52,524-square-foot VF 101 Spec Warehouse, located at 11800 NW 101st Road in Medley. Miami-based Rodriguez Pereira Architects designed the project and completion is slated for December 2012. Gama Global Link has been awarded the construction of Gama Global at Pan American West Business Park, located at 13250 NW 25th Street in Miami. The project, designed by Rodriguez Pereira Architects, consists of a new 68,980-square-foot tilt up and precast twin tee warehouse/office building of which 10,000 square feet will be finished offices Assigned to the job are Senior Project Manager, (1st floor and mezzanine level). Neil Jurado and Superintendent, Toyo Fernandez. Assigned to the job are Senior Project Manager, Neil Jurado and Superintendent, Eddy Ramos. Miramar Streetscape The Link team has recently began working with the City of Miramar on their streetscape project. This contract entails new landscaping, irrigation, street lighting, water main extension, force main alterations, water services, drainage, milling & resurfacing, sidewalks and valley gutters. Assigned to the job are Senior Project Manager, Nick Fuoco and Superintendent, Joe Klein. Jesus Ministries Worship Center Phase I, consists of the construction of the complete water, sewer, drainage, fire sprinklers, landscaping & irrigation systems and the parking lot for the whole project including phase I & phase II for the exterior area and to build the shell, MEP and finishes corresponding to phase I, located at 8700 Miramar Parkway in City of Miramar. Assigned to the job are Senior Project Manager, Fernando Yepes and Superintendent, Alex Quesada. Link Ledger Winter 2012 CURRENT PROJECTS Snake Creek Trail Hialeah Water & Sewer South Florida Logistics Center Miami-Dade County Parks & Recreation Department has awarded Link Construction Group Phase 1 of the Snake Creek Trail project. The new 3.4 mile trail route will start at Miami Gardens Drive and extend down to the Turnpike along the Snake Creek Canal. The landscaped asphalt path will be approximately 10 feet wide with signage for trail users and include benches, bike racks, rain shelters and fitness stations. The project commenced July 2012 and is slated for completion a year from then in July 2013. Link has been contracted by the City of Hialeah for the renovation and addition to its Water and Sewer Administration Building, located at 3700 W 4th Avenue in Hialeah. The building structure provides customer support to the residents of Hialeah. Construction entails renovating a 12,788 -square-foot, 1-story building plus a 1,100 sq. ft. building addition. The project was designed by Harvard Jolly Architecture and is slated for completion in February 2013. Link has been awarded the construction of the South Florida Logistics Center, located at 3200 NW 67th Avenue in Miami. The project, designed by RLC Architects, consists of the construction of a single story warehouse building of approximately 171,000 square feet and supporting infrastructure. Construction will begin in November of 2012 and is slated for completion in December of 2013. Assigned to the job are Senior Project Manager, Fernando Yepes and Superintendent, Ernesto Silva. Assigned to the job are Senior Project Manager, Neil Jurado and Superintendent, Robert Quiles. Assigned to the job are Senior Project Manager, Nick Fuoco and Superintendent, Jose Roque. Downtown Doral DCT Commerce Center - Schenker Logistics Link was awarded Infrastructure Phase 1B of the Downtown Doral project, which consists of the construction of the roadways. Downtown Doral, located at 8410 SW 53rd Terrace in Doral, is a 120-acre master-planned community destined to be the heart of the City of Doral and home to the new Doral City Hall and Downtown Doral Park. Designed by Coral Gables-based civil engineer David Plummer & Associates, the project commenced November 2012 and is slated for completion in February 2014. DCT Commerce Center involves the new construction of two warehouse office buildings for Worldwide logistics company DB Schenker. This tight scheduled project currently sits on a 15 acre parcel of which the 2 building equal 335,196 square feet. The project entails a 30,000 square foot interior office build out for DCT's tenant DB Schenker. All 4 projects currently share forces from the Link team to its subcontractors. Construction is slated for completion in May 2013. This industrial office park is a major force of the current industrial sector construction wave. This is our 3rd project for DCT Industrial Group. Assigned to the job are Senior Project Manager, Nick Fuoco and Superintendent, Toyo Fernandez. Assigned to the job are Senior Project Manager, Nick Fuoco; Project Manager, Alberto Santelices; Assistant Project Manager, Christian Hernandez and Superintendent, Rick Perrin Sr. Link Ledger Winter 2012 PROJECT UPDATE Hialeah Park Update: Casino Addition Commenced As of September 2012 the Hialeah Park Casino Addition has commenced. Ewing Cole designed the 300,000 plus square-foot, 3-story building addition & renovation of the existing North Grand Stand, in an Old Spanish style. The building features include a two-story lobby with artwork by Greek artist/sculpture Alexandra Tsoukala, over 800 slot machines and 22 poker tables. Additionally, renowned Miami-based landscape designer, Raymond Jungles, has been contracted to landscape the grounds. The project is currently 2 months underway and is slated for completion in June of 2013. Link construction team includes: Executive Project Manager, Jazer Challenger; General Superintendent, Joe Llanes; Senior Project Manager Hector Meruelo; Project Manager, Armando Varona; Assistant Project Manager, Guido Del Valle; Assistant Project Manager, Claudia Castillo; Project Accountant, Omar Siddiqkara; Project Engineer, Javier Cabrera & Superintendents: Mark Werntz, Antonio Roque & George Parrack. Rendering of the new Hialeah Park Casino November Aerial of Hialeah Park Casino Link’s Partnership with Kristi House Link Construction Group has partnered with Kristi House in the renovation of its Project Gold headquarters, an emergency drop-in shelter for child-victims of sex trafficking. The Drop-in Center will be the location for the offices of program staff, the first stop for intake and assessment, and a safe space for girls ages 11-17 who are survivors of commercial sexual exploitation and sex trafficking. The Drop-In Center will provide short-term emergency refuge, crisis intervention, and ongoing support and services. About Kristi House: Kristi House, Inc. is a private, non-profit organization in Miami, Florida, dedicated to healing and eradicating child sexual abuse. Kristi House operates the Orlowitz-Lee Children’s Advocacy Center responsible for sexual abuse cases in all of Miami-Dade County. For more information on Kristi House visit www.kristihouse.org Link Ledger Winter 2012 PERSONNEL NEW HIRES (June-November) The Link Family is growing! Link is thrilled to present to you the new members of the pack. Link greatly values each of their employees hard work, passion, and commitment to the company. Link welcomes all of you and are honored to have you as part of the team! ARLENE TORRES Accounting Assistant June TOYO FERNANDEZ EDGAR GUERRA JAZER CHALLENGER JOSE ROQUE Executive Project Manager September Superintendent October Office Assistant November GUIDO OMAR SIDDIQKARA HEIDI PABON Assistant Project Manager September Assistant Project Manager October Marketing November JOE KLEIN CHAD BROWN MARK WERNTZ DANNY VERCETTI Superintendent July Project Manager October Superintendent October Estimator November DANIEL GIRADO CHRISTIAN HERNANDEZ CLAUDIA CASTILLO ARMANDO VERONA Assistant Project Manager August Assistant Project Manager October Assistant Project Manager November LISETTE GONZALEZ ANTONIO ROQUE Receptionist August Assistant Superintendent October Superintendent June DEL VALLE Project Manager November PROMOTIONS! FELIX MARTINEZ was NEIL JURADO was promoted to Chief Estimator promoted to Senior Project Manager November 2012 September 2012 November 2012 NICK FUOCO was AMANY SOLAN was JONATHAN TAYLOR was promoted to Senior Project Manager promoted to Senior Project Manager September 2012 November 2012 FERNANDO YEPES was promoted to Senior Project Manager promoted to Project Manager November 2012 Link Ledger Winter 2012 COMPANY EVENTS Link 7th Annual Fishing Challenge American Heart Walk 2012 Mercedes Benz Corporate Run Early Saturday, October 6, 2012, Link employees gathered at FIU for the American Heart Associations 5K Heart Walk. This was Link’s first year supporting the organizations fight against heart disease. With the help of its employees, clients, friends, and business associates Link was able to surpass it’s $10,000.00 fundraising goal and raised $11,085.00 in just two months. Link would like to thank everyone for their support and generosity! It was greatly appreciated. Link Extreme Racing On August 30, 2012, Link hosted it’s first team building company event at Xtreme Indoor Karting in Ft. Lauderdale. Employees were broken up into 3 teams of racers, which each competed in a 15 lap race around a 1/2 mile asphalt track. The top 4 fastest racers in each team were selected to compete in a final race for 1st, 2nd and third place ranks. Congratulations to first place winner Mickey Cerra, second place winner Rick Perrin, and third place winner James Nelson! Link Ledger Winter 2012 EVENTS AND AWARDS 2012 Accolades & Awards AHCA Trade Show Jobsite123 The Florida Agency for Health Care Administration held their annual seminar this past month in Orlando, Florida to discuss the improvement and maintenance of patient and resident safety. Their seminar covered the latest code updates, improvements in health care delivery and design, as well as other aspects of patient and resident safety as they relate to the design, construction and maintenance of health care facilities. Key note speakers included: THE NEW MARKETING TOOL FOR COMMERCIAL CONSTRUCTION BUYERS! Jobsite123 is an instant prequalification tool which our top commercial construction buyers are currently requesting to be used by all contractors. This business development tool is powerful in that you can build your own profile and showcase Link’s qualification and industry relationship in a search engine providing answers to the most common prequalification Hugh Greene, President and CEO of Baptist questions in the click of a button. Health Systems A. Pat Geraghty, President of Blue Cross and Blue Shield of Florida TOP 100 BEST PLACES TO WORK - RANKED #14 TOP 25 GENERAL CONTRACTORS RANKED #15 TOP 100 PRIVATE COMPANIES - RANKED # 67 TOP 25 HISPANICOWNED BUSINESSES RANKED # 21 F.I.U. TOP 100 MINORITY BUSINESS AWARDS - FINALIST Link Construction recently established the ‘Link Construction Group Senior Design Project and Competition Scholarship Fund’ within the College of Engineering and Computing at the Florida International University. This donation is in support of undergraduate students in the OHL School of Construction, funds will provide support for senior design projects and scholarships for students to attend national and international competitions in the construction field. Link also participated in hosting a suite at all F.I.U Panther Football games with the former President of the University, Dr. Modesto Alex "Mitch" Maidique. Currently 23 employees either graduated or are enrolled in the university. ABC-FEC GC Showcase Several team members from Link Construction attended the Associated Builders and Contractors GC Showcase which was held at The Seminole Hard Rock Hotel and Casino. Link was able to have face-to-face with some of South Florida's top subcontractors and was also able to showcase their current work and projects down the pipe line. SOUTHEAST’S TOP CONTRACTOR RANKED # 73 The ABC-FEC (Florida East Coast) Chapter is a partnership of the eighty (80) national chapters of Associated Builders and Contractors, representing the interests of over 23,000 commercial, industrial and institutional merit shop contractors, suppliers and industry professionals. Founded in 1968, ABC-FEC is also a partner with ABC of Florida, representing the mutual interests of Florida's five (5) ABC chapters within state government. COMMERCIAL CONTRACTOR OF THE YEAR Link Ledger Winter 2012 Happy Holidays! LINK CONSTRUCTION GROUP 7003 N. Waterway Drive • Suite #218 • Miami, FL 33155 • 305-665-9826
Similar documents
Link Ledger - Volume IX
Orlando Ceballos - Owner/City of Hialeah Liaison Armando Varona, Project Manager Guido del Valle, Project Manager Miami Herald Production Facility and Headquarters Miami, FL New Construction/Interi...
More information