city of fort worth - Trinity River Vision Authority
Transcription
city of fort worth - Trinity River Vision Authority
TRINITY RIVER VISION AUTHORITY PARTIAL RESPONSE ACTION PLAN IMPLEMENTATION MCKINLEY IRONWORKS/AIRCO (VCP #2474) UNION PACIFIC RAIL ROAD SPUR (VCP #2301) MMM/APAC (VCP #2472) COMPETITIVE SEALED PROPOSAL NO. 15-097 ADDENDUM NO. 1 September 2, 2015 Offerors are hereby informed of the following changes to the Proposal Package dated August 11, 2015 for the project referenced above. SPECIFICATION REVISIONS 1. Section 01501, CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS Replace Paragraph 1.12 B.1. with the following: 1. Chain link fence shall be at least six (6) feet in height. Chain link fabric shall be attached to the top rail, bottom rail, and line posts at 18-inch centers with a minimum of two turns per tie. Panels and screening fence shall be sufficiently sturdy to withstand typical construction damages and weather elements. 2. Section 02222, BACKFILL AND COMPACTION Replace Paragraphs 1.01 B. and C. with the following: B. Work includes placement of select fill and compaction to at least 95 percent of maximum density by standard proctor in Future Levee areas which are defined as all excavation areas, except Area 4, as shown in the Plans. C. Work includes placement of common fill in designated portions of excavation Area 4 and compaction of placed fill materials as specified in this section. Add Paragraph 1.01 D: D. Work includes seeding of backfilled areas in accordance with Section 02270 – SEEDING FOR EROSION CONTROL. ADDENDUM NO. 1 CSP 15-097 McKinley/Airco, UPRR and MMM/APAC RAP Implementation ADD 1 - 1 September 2, 2015 Replace Paragraph 3.01 A. with the following: A. Material conforming to the requirements of select and common fill shall be placed in no more than 9-inch loose lifts measured before compaction. PLAN REVISIONS 1. Sheet G-2, Excavation Plan 1) Removed four monitoring wells labeled as 43-MW1, 2, 3, and 4 on the MMM/APAC site; 2) Added coordinates for four monitoring wells labeled as 42-MW4, 5 and-6 and CC06-020 on McKinley/Airco site; 3) Revised coordinate reference language to match the USACE language used as project reference; and 4) Added control points to sheet. 2. Sheet G-3, Typical Details Revised to include sketch clarifying payment items for excavation work. RESPONSES TO QUESTIONS RECEIVED BY 5:00 PM FRIDAY, AUGUST 28, 2015 Q1. Is it anticipated, based on previous remediation/assessment, that materials such as concrete pilings/foundations might be encountered in the excavations? A1. Because no as-built drawings were available for the properties, it is possible that concrete piling/foundations may be encountered in the excavations. During excavation of the northern portion of the MMM/APAC pit, concrete pilings/foundations were encountered. Q2. What overlap is expected with the ongoing project at the Texas Refinery site? A2. The Texas Refinery RAP Implementation project is ongoing and the McKinley/Airco & MMM/APAC RAP Implementation project is anticipated to be awarded at the October TRVA Board meeting. Q3. Will compaction testing be required for the general grading in Area 4? (understanding the deep excavation will require testing) Who will be responsible for the testing? A3. See revisions to Specification 02222, BACKFILL AND COMPACTION noted on previous page for clarification of compaction requirements. As noted in Paragraph 1.01 A., Contractor is responsible for compaction testing. ADDENDUM NO. 1 CSP 15-097 McKinley/Airco, UPRR and MMM/APAC RAP Implementation ADD 1 - 2 September 2, 2015 Q4. How should the additional manhole that was observed on the site be handled? A4. The manhole observed at the approximate southwest corner of the McKinley/Airco property is located within the Bypass Channel footprint and is not required to be removed by this contract. Because the sanitary sewer line will be abandoned by the City, the manhole does not need to be protected during the execution of the work. ADDITIONAL ATTACHMENTS: 1. CSP 15-097 Plan holders List as of September 2, 2015 2. CSP 15-097 Pre-Proposal Conference Sign-In Sheet BIDDER SHALL ACKNOWLEDGE RECEIPT OF ADDENDUM: By:____________________________ Title: __________________________ ADDENDUM NO. 1 CSP 15-097 McKinley/Airco, UPRR and MMM/APAC RAP Implementation ADD 1 - 3 September 2, 2015 CONTROL POINT DATA CONTROL POINT NUMBER 3001 3002 3003 3004 NORTHING EASTING ELEV DESCRIPTION 6965298.04 6965260.04 6965161.84 6965389.15 2324342.89 2324217.79 2324749.98 2324616.75 533.503 535.259 531.136 530.894 5/8"IRS RED ARS CAP 5/8"IRS RED ARS CAP X SET TRAV PT X SET TRAV PT Trinity River Vision Authority McKinley Ironworks/Airco (VCP #2474) Union Pacific Rail Road Spur (VCP #2301) MMM/APAC Pit (VCP #2472) CSP No. 15-097 139140-100801 Advertisment Dates: August 11 & 18, 2015 Mandatory Prebid Meeting: August 25 @ 2:00pm (TRVA) Bid Date: September 15, 2:00pm, Trinity River Vision Authority (TRVA) 307 West Seventh Street, Suite 100, Fort Worth, TX 76102 PLAN HOLDERS LIST NAME/ADDRESS McGraw-Hill Construction 3315 Central Avenue Hot Springs, Arkansas 71913 Contact Leslie Huntley Phone 501-321-2956 Fax TEXO/AGC Plan Room/Lawton Reprographic Centers 14305 Inwood Road Dallas, TX 75244 Contact Megan Berling Phone 800-364-2059 Fax Fort Worth Hispanic Chamber of Commerce 1327 N. Main Street Fort Worth, TX 76164 Contact Jennifer Garcia Phone 817-625-5411 Fax 817-625-1405 Fort Worth Metropolitan Black Chamber of Commerce 1150 South Freeway, #211 Fort Worth, TX 76104 Contact Trelaine Mapp Phone 817-871-6538 Fax 817-332-6438 NTCR Planroom 2828 Trinity Mills Rd., Suite 330 Carrollton, TX. 75006 Contact Linda Gant Phone 972-820-9020 Fax 972-820-8910 Vendor or Contractor Supplier Plan Room Set # Date 1 8/11/2015 X 2 8/11/2015 X 3 8/11/2015 X 4 8/11/2015 X 5 8/11/2015 X PLAN HOLDERS LIST Contact Phone Contact Phone Contact Phone Contact Phone Contact Phone Contact Phone Contact Phone NAME/ADDRESS Hulcher Services 611 Kimberly Drive Denton, Texas 76202 Carmelita Hart 940-387-0099 Fax Lone Wolf Resources 3420 Executive Center Drive, #210 Austin, TX 78731 John Adams/Randy Shoemaker 432-258-1339 Fax Envirocon, Inc. 101 International Drive Missoula, Montana 59808 Lori Mathews 406-523-1171 Fax Effective Environmental 9950 Chemical Road Pasadena, TX 77507 Hiren Shah/E.J. Orsak 817-829-0050 Fax 281-474-2580 iSqFt Plan Room 4500 Lake Forest Drive, Suite 502 Cincinatti, OH 45242 Sara Hutchison 1-800-364-2059 X7069 Fax Progressive Waste 1124 Cotton Exchange Drive Savannah, TX 76227 Dave Davis 817-526-0578 Fax Magnus Pacific Corporation 100 W. Oak Street, Suite 301 Denton, TX 76201 Jeff Sallas/Rodney Louviere 940-381-6600 Fax Set # Date 6 8/11/2015 7 8/11/2015 8 8/11/2015 9 8/12/2015 10 8/12/2015 11 8/12/2015 12 8/12/2015 Vendor or Contractor Supplier Plan Room PLAN HOLDERS LIST Contact Phone Contact Phone Contact Phone Contact Phone Contact Phone Contact Phone Contact Phone NAME/ADDRESS SWS c/o Capstone 715 Discovery Blvd., Suite 101 Cedar Park, TX 78613 Eric Clegg/Howard Maynard 512-539-0023 Fax Remedial Construction Services 9977 W. Sam Houston Pkwy N., Suite 100 Houston, TX 77064 Sheri May 281-664-1166 Fax USA Environment, L.P. 10234 Lucore Street Houston, TX 77017 Lisa Lopez 972-664-9833 Fax 972-664-9615 Sunbelt Industrial Services 2415 Cullen Street Fort Worth, TX 76107 Lance McClure 817-877-0428 Fax Entact 3129 Bass Pro Drive Grapevine, TX 76051 Mark Risk 972-580-1323 Fax Clean Harbors 400 Arbor Lake Drive, Suite B900 Columbia, SC 29223 Peter Mondeel 803-691-3478 Fax Effective Environmental Inc. 9950 Chemical Road Pasadena, TX 77507 Hiren Shah/E.J. Orsak 817-829-0050 Fax 281-474-2580 Set # Date 13 8/12/2015 14 8/13/2015 15 8/15/2015 16 8/18/2015 17 8/18/2015 18 8/25/2015 19 8/25/2015 Vendor or Contractor Supplier Plan Room PLAN HOLDERS LIST Contact Phone Contact Phone Contact Phone Contact Phone NAME/ADDRESS Weston Solutions 3900 Dallas Parkway, Suite 175 Plano, TX 75093 Robert Appelt 469-666-5526 Fax IEA, Inc. 18333 Preston Road, Suite 205 Dallas, Texas 75252 Mike Moore 214-884-4253 Fax 214-884-4258 TAS Environmental 3929 East California Fort Worth, TX 76119 Kayla Agan 817-253-1855 Fax Reyes Group 1520 Parker Road Grand Prairie, TX 75050 Kory Peterson 214-260-3535 Fax 214-260-3536 Set # Date 20 8/25/2015 21 8/25/2015 22 8/25/2015 23 8/26/2015 Vendor or Contractor Supplier Plan Room Trinity River Vision Authority McKinley Ironworks/Airco (VCP #2474) Union Pacific Rail Road Spur (VCP #2301) MMM/APAC Pit (VCP #2472) CSP No. 15-097 Mandatory Pre-Bid Meeting August 25, 2015 Name Company Email Brian Turner SWS Environmental [email protected] Howard Maynard SWS Environmental [email protected] John Landwehr Hulcher Services Inc. [email protected] Eddie Green Hulcher Services Inc. [email protected] Wayne Aldridge Magnus Pacific [email protected] Dave Lamar Envirocon [email protected] Robert Castilaw Envirocon [email protected] Josh Buchheit Envirocon [email protected] Craig Duston Recon [email protected] Robert Appelt Weston Solutions, Inc. [email protected] Jason Kettler USA Environment [email protected] Randy Shoemaker Lone Wolf Resources [email protected] Mike Moore IEA, Inc. [email protected] David Owen TRWD [email protected] Kayla Agan TAS Environmental [email protected] Charles Gaddy CB&I [email protected] Sara Goyer CB&I [email protected] E.J. Orsak Effective Environmental [email protected] Lance McClure Sunbelt [email protected] Nick Ramirez Eagle Remediation & Demolition [email protected] Jay Donoho Hulcher Services Inc. [email protected] James Geiger Clean Harbors [email protected] Kory Peterson Reyes Group [email protected]