Supply Chain Planning with SAP APO
Transcription
Supply Chain Planning with SAP APO
Supply Chain Planning with SAP APO Functional Solution Management SCM Apri 2010 Pain Points in your Global Supply Chain Do you have problems with … Forecast quality? Excess inventory? Lack of visibility in your supply chain? Capacity shortages? Creating an optimized finite production plan? … and therefore face Lost sales due to missing capacity / components or unnecessary production and high inventory Excessive work-in-capital; high scrap/expiry costs for products with shelf life or short life cycle No systematic consideration of inventory in your supply chain, which results in lost sales and/or excess inventory Lack of information for right planning decisions High set-up costs/times and low resource utilization © SAP 2008 / Supply Chain Planning with SAP APO / 2 Do you therefore need a tool to … … improve forecast quality? … support you in creating optimized production plans in all your factories? © SAP 2008 / Supply Chain Planning with SAP APO / 3 … systematically consider your inventory and calculate safety stock figures? … improve your sales order entry confirmation and provide reliable sales order confirmation dates? … increase the visibility in your global supply chain? … optimize your short term distribution and transportation planning? How SAP APO is structured Advanced Planning & Optimization Demand Planning APO DP: Improves the forecast quality and planning accuracy Supply Network Planning Global Available-to-Promise Transportation Planning & Vehicle Scheduling © SAP 2008 / Supply Chain Planning with SAP APO / 4 Alert Monitor Production Planning & Detailed Scheduling Synchronize supply with demand in your global supply chain by balancing push and pull network-planning processes and by handling replenishment and production based on actual demand. APO SNP: Improves visibility across your global supply chain and lowers inventory APO PP/DS: Supports you in creating optimized production plans APO gATP: Allows state-of-the-art sales order confirmation planning processes APO TP/VS: Optimizes transportation loads and minimizes transportation costs APO Alert Monitor: Powerful exception message system integrated in all APO planning modules Customers and releases SAP APO by the Numbers First release: SAP APO 1.1 (1998) Current release: SAP APO 7.0 (9th APO release) - part of SAP SCM 7.0 Outlook: Planned next APO shipment: Q4/2009 Enhancement package 1 for SAP SCM 7.0 (APO 7.01) Active customers: 2000+ Top Industries Adoption: © SAP 2008 / Supply Chain Planning with SAP APO / 5 CP, HighTech, Mill, IM&C, Chemicals, Automotive, Life Sciences APO DP (Demand Planning) Calculate and determine future demand to improve demand quality and accuracy Features Key Benefits Comprehensive forecasting tool-set Improved forecast quality Statistical forecasting with causal and time-series methods One tool for power and business user Selection of best-fit model Automatic outlier detection available Highly configurable planning books with macro functionality Supporting aggregation / disaggregation logic Lifecycle planning Plan promotions separately from the rest of your forecast Track & monitor forecast accuracy Seasonal planning Collaborative demand planning © SAP 2008 / Supply Chain Planning with SAP APO / 6 Consolidated demand plan (different regions, countries, departments, …) Statistical Forecasting Methods Causal Analysis Constant A U T O M A T E D Exponential smoothing Moving average Weighted moving average Trend Exponential smoothing Linear Regression Multiple Linear Regression (MLR) Influence Variables Climate (e.g. Temperature) Price Advertising Distribution ... Season (without trend) Exponential smoothing P I C K Trend - Season Exponential smoothing Manual Forecasting Seasonal linear regression B E S T Others © SAP 2008 / Page 7 Croston (sporadic demand) History No Forecast External Forecast Composite Forecast Own defined model selection based on error measure Combine different forecasts Weight each forecast (time independent or dynamic) Demand Planning Master Data: Characteristic Value Combinations Characteristics Characteristic values Product Prod01 Prod02 Prod03 Location DC01 DC02 DC03 Customer Cust01 Cust02 Cust03 © SAP 2008 / Page 8 Characteristic value combinations (CVCs) Prod01, DC01, Cust01 Prod01, DC01, Cust02 Prod01, DC01, Cust03 Prod01, DC02, Cust01 Prod01, DC03, Cust02 Prod01, DC03, Cust03 ……. Planning Object Structure Duet Demand Planning (not part of APO) Duet Demand Planning enables managers, sales executives, and planners to utilize the full Microsoft Excel capabilities as an intuitive planning front end for SAP SCM Faster and accurate plans aligned to customer demand requirements Leverages the full capabilities of Microsoft Excel (formulae, functions, graphics, etc.) Presents an intuitive interface that requires minimum training Delivers improved user acceptance and productivity through simple and timely access to relevant business information Designed as a composite application based on Enterprise SOA © SAP 2008 / Supply Chain Planning with SAP APO / 9 APO SNP (Supply Network Planning) Calculates quantities to be produced and delivered to the locations to match customer demand and maintain desired service levels. Features Key Benefits Integrate purchasing, manufacturing, distribution, and transportation Increased visibility over the overall supply chain Consider constraints and penalties to plan the product flow along the supply chain Optimized sourcing and capacity utilization Advanced safety stock methods considering multilevel supply chain networks and demand variability Improved customer service Supports system wide inventory modeling and planning Enable planning on different levels of detail (aggregated planning) Choice of heuristic-, rule- or optimization-based algorithm © SAP 2008 / Supply Chain Planning with SAP APO / 10 Reduced inventory levels Algorithm: SNP Heuristic Planned Production Orders 70% Demands 60% 30% 40% Planned Stock Transfers Planned Purchase Requisitions 100% 100% Demands Local DC SNP Heuristic is a heuristic without considering constraints in the supply network. Supplier SNP Heuristic does the sourcing based on quota arrangements and priorities. Plant As additional planning step, Capacity Levelling can be performed in order to resolve capacity overloads. © SAP 2008 / SNP Overview, Dr. Gerald Heisig, 11 DC Algorithm: Capable-To-Match (CTM) Planned Production Orders -> Production Capacities -> Priority of PPM/PDS Prio 1 Demands -> Priority Classes Prio 1 Prio 2 Prio 2 Planned Stock Transfers -> Transportation and Handling Capacities -> Quota Arrangements and Procurement Priority Planned Purchase Requisitions -> Procurement Priorities Prio 1 Prio 1 Demands -> Priority Classes CTM planning uses a constraint-based heuristic planning Local DC approach for the cross-supply-chain checks of capacities as well as material availability. CTM considers predefined supply categories and demand priorities CTM supports characteristic-based planning (as of SCM 7.0) © SAP 2008 / SNP Overview, Dr. Gerald Heisig, 12 Supplier Plant DC Algorithm: SNP Optimization Planned Production Orders -> Production Capacities -> Production Costs $ $ $ Demands -> Cost for - non deliveries - late deliveries $ Planned Stock Transfers -> Transportation and Handling Capacities -> Transportation Cost Planned Purchase Requisitions -> Procurement Costs $ $ Local considering DC SNP Optimization is a cost-based optimization all capacity constraints and material availability in the supply network. SNP Optimization determines the optimal solution based on predefined costs for supply alternatives and demands. © SAP 2008 / SNP Overview, Dr. Gerald Heisig, 13 Supplier Plant DC Distribution Planning: Deployment and Transport Load Builder Supply Stock Supply Demand Stock Stock Deployment determines the best short-term solution to allocate available supply to meet demand and to replenish stocking locations. Deployment confirms or changes the supply network plan depending and creates a optimized plan for stock transfers The rules-based Deployment Heuristic distributes the products according to quotations and priorities. The Deployment Optimizer distributes the products according to cost while also considering specific rules. © SAP 2008 / SNP Overview, Dr. Gerald Heisig, 14 The Transport Load Builder (TLB) groups deployment results for single products (i.e. confirmed stock transport purchase requisitions) to multi product stock transport orders. The TLB considers factors like volume, weight or number of pallets to fill transport vehicles optimal. Plant DC Operational Planning – Production Planning and Detailed Scheduling (PP/DS) Purpose Create procurement proposals Optimize and plan the resource schedule and the order dates/times in detail Plan critical products and bottleneck resources Create executable production plans Benefits: Reduce lead times Increase on-time delivery performance Increase the throughput of products Reduce the stock costs, through better coordination of resources, production, and procurement Optimization integrated into PP/DS © SAP 2007 / PP/DS Overview 15 APO PP/DS (Production Planning & Detailed Scheduling) Production Planning delivers a short term plan that matches overall supply to demand, given available resources and production methodology. Features Multi-level production planning Order Pegging Use existing or own developed heuristics Key Benefits Determines how, when, and where resources and materials should be deployed to accomplish the production goals. Master planning for materials and capacity (resource loads). Detailed Production Scheduling determines optimal production sequence for execution to meet delivery commitments based on actual constraints on the shop floor. Features Capacity-Load Optimization Optimal Sequencing Flexible & Graphical Activity Scheduling What-if Analysis & Simulation Configurable Exception Alert Monitor … © SAP 2007 / PP/DS Overview 16 Key Benefits Optimal production sequence that is feasible and can be executed. Allows simulation of various planning scenarios to determine optimal schedule. Optimization based on actual constraints ensures reliable delivery due date promises. Powerful Tools : Detailed Scheduling Planning Board Resource View Save your own simulation © SAP 2007 / PP/DS Overview 17 Product View Feature: Multi-level problem solving with order pegging Sales Order 10 20 10 10 20 40 10 30 100 30 100 40 60 50 Shortage Planned Order Dependent Req. 20 30 50 50 50 30 50 (+20) Planned Order Excess coverage 50 Dependent Req. 50 50 20 80 Pur. Requisition © SAP 2007 / PP/DS Overview 18 50 30 70 Delay (-10) 50 Screenshot: Order context (table view) Demand Which orders cover the demand… © SAP 2007 / PP/DS Overview 19 Feature: Capacity Reservations Guarantee most profitable capacity utilization Import from SNP optimization result Flexible levels of finite check Release capacity prior to production to fill total capacity Conversion from time to production unit Example Capacity Reservations for named customers Unreserved capacity everyone can use it Collective reservation not named customers can use it © SAP 2007 / PP/DS Overview 20 Industry Solutions IMC and AD: Scheduling for Project Manufacturing Mill and Mining: Block Planning Auto: Model Mix Planning © SAP 2007 / PP/DS Overview 21 Production Scheduling Project Planning Advance Procurement Engineering Production Planning & Optimization Production Scheduling Manufacturing Execution Engineering Change Management Quality Assurance & Control Shipping, Assembly & Start-Up Monitor alerts on projects / main assemblies Pegging – automatic matching of demand and supply Visualization of complete order context Alerts - Early warning system late orders, bottlenecks Project Planning Manufacturing Filter on alerts in order context, sort late orders by delay Interactive scheduling to reduce late projects, orders Detect critical path for order context Reduce buffers on critical path Reduce duration of project order operations Multi-level forwards/backwards scheduling Interactive scheduling to reduce capacity overload Evaluate resource utilization, filter on overload Alternative work centers, sequences, production versions Switch to external procurement, subcontracting Work overtime, run additional shifts Adaptiveness and Simulation What-if simulation, compare alternatives © SAP 2007 / PP/DS Overview 22 Procurement / Warehouse Block Planning (Mill and Mining) Business Requirement Combine optimal resource utilization and precise customer due dates Consider constraints like minimal and maximal lot sizes, setup time, fixed maintenance intervals etc. Plan bottleneck resources in an early planning phase where the final products and product characteristics are not known Solution Define time intervals on a resource where products with certain characteristics can be produced Operations of orders are scheduled into matching blocks 100 to, grade A, grammage 180 Product xy A, 180 Quality S Width 1000 © SAP 2007 / PP/DS Overview 23 Product vb A, 200 Quality M Width 1200 120 to, A, 200 75 to, C, 150 Model-Mix Planning: Situation Orders Line network Restrictions Quantity Distance X in Y Block Equal distribution Position Objective Business value Generation of a feasible plan for highly configurable products with high volume Balanced usage of production resources Adherence to promised delivery date © SAP 2007 / PP/DS Overview 24 Early identification of potential bottlenecks Reliable delivery date leads to increased customer satisfaction Model-Mix-Planning Period Slot 1 Sequencing 2 day 1 © SAP 2007 / PP/DS Overview 25 day x day x+1 day y A snapshot of SAP SCM customers Demand Planning and Supply Planning Production Planning & Detailed Scheduling SAP 2007 / PP/DS ©© SAP 2008 / Page 26 Overview 26 Order Fulfillment & Transportation Management Supply Network Collaboration SAP SCM Ms. Sherry Gong [email protected] Ms. Fan Li [email protected] Q&A Thank you for your interest! www.sap.com/scm “This presentation is a preliminary version and not subject to your license agreement or any other agreement with SAP. This document contains only intended strategies, developments, and functionalities of the SAP® product and is not intended to be binding upon SAP to any particular course of business, product strategy, and/or development. Please note that this document is subject to change and may be changed by SAP at any time without notice. SAP assumes no responsibility for errors or omissions in this document.” © SAP 2007 / PP/DS Overview 27 Forecasting and Allocation in Supply-Chains ORBIS Consulting Shanghai ( ) Zao Fong Universe Building, 3D 1800 Zhongshan Xilu 200235 Shanghai Tel.: +86 21 6440 1276 Fax: +86 21 6440 1279 http://www.orbis-china.com.cn André Bohe ORBIS Consulting Shanghai www.orbis.de AGENDA Forecast and Planning situation Supply Chain Structure Methods / Conflicts 1.a) Definition of Goals and Functionalities in SAP R/3 1.b) Realisation with SAP R/3 2.a) Definition of Goals and Functionalities in SCM-DP 2.b) Realisation with SAP SCM-DP 3.a) Definition of Goals and Functionalities in SCM-SNP 3.b) Current Project Status SAP SCM-SNP 3.c) Next Steps 2 © ORBIS Consulting Shanghai 2010 4 Forecast and Planning Situation 3 © ORBIS Consulting Shanghai 2010 4 Forecast and Planning Situation – Supply Chain Structure Logistic Center Central Warehouse Situation: Production Sites - Different SAP Systems with different Clients - more than 100 SAP Locations - more than 10 Non-SAP Locations Demands Material Supply Material Supply Demands Cross Company Scenario‘s Cross Client Scenario‘s Sales Orders Sales Orders 4 © ORBIS Consulting Shanghai 2010 4 Forecast and Planning Situation – Methods/Conflicts Logistic Center Central Warehouse With Stock-Responsibility With Stock-Responsibility Priority 1: Demands, coming from Real sales-orders Unreliable Customer Forecasts Min/Max-Levels (not flexible) Safty Stock (not dynamic) Priority 2: Demands, coming from Min/Max-Triggers Phase-In Phase-Out 5 © ORBIS Consulting Shanghai 2010 4 Forecast and Planning Situation – Methods/Conflicts Logistic Center Central Warehouse With Stock-Responsibility With Stock-Responsibility Not able to distinguish between demands Priority 1: Demands, coming from real sales-orders Priority of own Cust.Demands Calculate own Forecast to Prod. sites Priority 2: Demands, coming from Min/Max-Triggers 6 © ORBIS Consulting Shanghai 2010 4 1.a) Definition of Goals and Functionalities SAP-R/3 7 © ORBIS Consulting Shanghai 2010 4 Definition of Goals and Functionalities „Reduce Stocks in Logistic Center by replacing manual Reorderpoint Planning with automatic consumption based forecasting“ Automatic Calculation of consumtion based Forecast-Figures Forecast-Figures and PIRs on weekly basis Consumption of Forecast with Sales Orders Automatic Transfer of Forecast-Figures to MRP Automatic Creation of Transfer P.O.s after MRP 8 © ORBIS Consulting Shanghai 2010 4 Realisation with SAP R/3 9 © ORBIS Consulting Shanghai 2010 4 Realisation with SAP R/3 SOP Demand Mgt MRP Purchasing Projects an „Independent Forecast“ by week based on 52 weeks usage history. This forecast is transferred to Demand Mgt. where it is converted into Planned Idependent Requirements Manages rules for the impacts on “PIRs” and for adjusting “PIRs” accordingly Consumption by Sales Orders Keeps track of impacting transactions and PIR’s. Calculates “Net Requirements” for the Coverage period, based on Demand Management figures. Produces Purchase Requisitions Purchase Requisition will be automatically converted into Purchase Orders according to replenishment horzion Run mass Sales Forecast Transfer into PIRs for use in MRP-Run 16 Weeks forecast for Product-Group Requirements Listing Run MRP Stock, PIR‘s Sales Orders, Transfer P.Os Purchase Requisitions 10 © ORBIS Consulting Shanghai Purchase Orders 2010 4 Realisation with SAP R/3 Still open Issues No global view on stocks and Planning Situation (Cross System, cross Client and Non-SAP Systems) No Alert Functionality for critical Stock-Levels / Stock coverage No possibility to track the Requirements (Customer orders / Stock refill) No automatic mass processing in SOP for new products “Isolated” Planning of single Logistic Centers No Consideration of “non-working” periods 11 © ORBIS Consulting Shanghai 2010 4 2.a) Definition of Goals and Functionalities for SCM-DP 12 © ORBIS Consulting Shanghai 2010 4 Definition of Goals and Functionalities in SAP-SCM A.) “Get Global view on stocks and planning situation” Integrate all SAP-Systems/Clients and Non-SAP Systems Define Alert Functionality for Stock-Levels and Stock coverage B.) „Replace R/3 SOP-Forecast with SCM-DP Forecast and provide Key-Figure for SNP-Planning“ Consider plant holiday in Forecasting mechanism Include new Products automatically for Forecasting Use Phase-In / Phase-Out Functionality 13 © ORBIS Consulting Shanghai 2010 4 2.b) Realisation with SAP SCM-DP 14 © ORBIS Consulting Shanghai 2010 4 2.b) Realisation with SAP SCM-DP A.) “Get Global view on stocks and planning situation” 1. Definition of Data-Flow model Info-Cube Level Info-Cube Level Transformation Level: Field-Mapping and Rules DataSource Level: Definition of fields and Upload-process Source-System Level: SAP Systems Non-SAP Systems 15 © ORBIS Consulting Shanghai 2010 4 2.b) Realisation with SAP SCM-DP A.) “Get Global view on stocks and planning situation” 2. Definition of Process-Chains and upload cycles 16 © ORBIS Consulting Shanghai 2010 4 2.b) Realisation with SAP SCM-DP A.) “Get Global view on stocks and planning situation” 3. Definition of Tableau Country Location Prod. Hierarchy Product Nav. Attributes 17 © ORBIS Consulting Shanghai 2010 4 2.b) Realisation with SAP SCM-DP A.) “Get Global view on stocks and planning situation” 4. Definition of Alert-Monitor and Alert-Handling Alerts, created after Macro-Calculation and Result-Check Mail, triggerd by Alert Creation 18 © ORBIS Consulting Shanghai 2010 4 2.b) Realisation with SAP SCM-DP B.) „Replace R/3 SOP-Forecast with SCM-DP Forecast and provide Key-Figure for SNP-Planning“ 1. Enlargement of existing Settings by Forecast Key-Figures and -models InfoArea, InfoObjectCatalog, InfoObject Planning Object Structure Planning Area (expand with Forecast-Figures) Planning Tableau (expand with Forecast-Figures) 2. Creation of Forecast Profile 19 © ORBIS Consulting Shanghai 2010 4 2.b) Realisation with SAP SCM-DP Realised Functionalities: BW-functionality to collect data from Non-SAP systems Process chain to define update and upload procedures Global view on Stocks , Stockranges and other Key-Figures (across Clients, across Systems) with Planning Tableau possible Extended Planning structrues and levels (clearly arranged Display of KeyFigures and Graphics) Automatic Integration of new products to be forecasted via Core Interface 20 © ORBIS Consulting Shanghai 2010 4 2.b) Realisation with SAP SCM-DP Realised Functionalities: Individual Calculation of Key-Figures with Macro-Technology Automatic Alert-Creation Mail to responsible Person (direct link) More forecasting methods available (e.g. Statistical Forecast, causal analysis, Croston, Holt-Winters) Considering Factory-Calendar in Forecast-Calculation „Like-Modelling“ in Case of Phase-in /Phase-out Products „SCM-DP is easier to handle more flexible and offers much more functions and possibilities compared to R/3-Functionalities“ 21 © ORBIS Consulting Shanghai 2010 4 3.a) Definition of Goals and Functionalities for SCM-SNP 22 © ORBIS Consulting Shanghai 2010 4 Definition of Goals and Functionalities in SAP-SCM “Planning of entire Supply-Chain based on DP Forecast Key-Figures with Prioritisation of actual Demands ” „Calculate and allocate quantities for production plants „Reduce Costs in entire Supply Chain” 23 © ORBIS Consulting Shanghai 2010 4 3.b) Actual Project Status SAP SCM-SNP 24 © ORBIS Consulting Shanghai 2010 4 Actual Project Status SAP SCM-SNP Decision-Process for CTM or Optimization because Prioritization of Demands necessary Planning methods Heuristic CTM Optimization Infinite planning / (MRPII - approach) Rule-based finite planning of individual needs Integrated finite planning Passes on demand / generates reallocations Prioritization of demand and supply (rules) Prioritization of demand and supply (costs) Generates reallocations Generates reallocations BOM explosion / generates feasible supply BOM explosion / generates feasible supply Constraint-based planning Linear programming BOM explosion / generates supply Interactive / local capacity evaluation 25 © ORBIS Consulting Shanghai 2010 4 Actual Project Status SAP SCM-SNP Optimization With Optimzier it is only possible run a bucket-based planning Character based Optimization is not provided (Variant Configuration) Optimizer does not „know“ Make-toOrder production Decision pro CTM 26 © ORBIS Consulting Shanghai 2010 4 3.c) Next Steps 27 © ORBIS Consulting Shanghai 2010 4 Next Steps To Do: 1. Create Prioritization rules for different demand categories (sales orders; PIRs; Transfer P.o.) 2. Create Prioritization rules in between sales orders (material availability date; delivery priority; recieving location) 3. Definie CTM-Planning Parameter with link of prioritized demands to prioritized receipts 4. Create PP/DS Alerts (Quantity + Scheduling – Alerts) for open demands after CTM-Run 5. Check Possibility to change CTM results with BEx-Analyzer and copy back to SNP-Planningtableau via IP (integrated Planning) 28 © ORBIS Consulting Shanghai 2010 4 3rd SIG Automotive Meeting Thank you for your Attention André Bohe ORBIS Consulting Shanghai Co., Ltd. ZAO FONG Universe Building, Office: 3D No. 1800 Zhongshan Xilu (/Yishan Lu) 200235 Shanghai Tel: +86 21 6440 12- 76 Fax: +86 21 6440 12- 79 Mobile: +86 131 2215 2136 1800 3 D Email: [email protected] www.orbis-china.com.cn 29 © ORBIS Consulting Shanghai 2010 4