on sliding gate`s positions
Transcription
on sliding gate`s positions
October 2014 PRES02-A 31/03/14 PRES01-A 20/10/14 TABLE OF CONTENTS 2 • PRESENTATION • CONCEPT • SPECIFICATIONS • OPTIONS • SPECIAL PRODUCT • MAINTENANCE • APPLICATIONS PRES02-A 20/10/14 3 PRESENTATION PRES02-A 20/10/14 PRESENTATION 4 ♦ History 1st Edmond Onis's patent : quick and mechanical action line blind technology Socomet is founded by his stepson : Jean-François Favreau-Onis 1979 1995 Onis Inc, 1st Socomet subsidiary North American market Serge Bonnefoi New president Socomet is certified ISO 9001 2002 2004 2013 Socomet becomes Onis SAS PRES02-A 20/10/14 PRESENTATION 5 ♦ Network (except Western Europe) RUSSIA KOWEIT Onis USA MEXICO JAPAN CHINA Onis UAE TAIWAN MALAYSIA COLOMBIA VENEZUELA INDIA SINGAPORE BRAZIL ARGENTINA PRES02-A 20/10/14 PRESENTATION 6 ♦ Network – Western Europe FINLAND BENELUX UK GERMANY ONIS FR SPAIN PRES02-A 20/10/14 PRESENTATION 7 ♦ Locations Lambesc, France Houston, Tx, USA Abu Dhabi, UAE PRES02-A 20/10/14 PRESENTATION 8 ♦ Manufacturing facilities • Design office • 10,000 ft² workshop • 2 painting cabinets (1,000 ft²) • 40,000 ft² storage area • 3 cranes (5, 12.5 and 25 tons lifting capacity) PRES02-A 20/10/14 PRESENTATION 9 ♦ Onis sales 2013 SALES BREAKDOWN North America 51% Europe 23% Latin America 17% Asia - Middle east 9% PRES02-A 20/10/14 PRESENTATION 10 ♦ Onis organization chart PRES02-A 20/10/14 11 CONCEPT PRES02-A 20/10/14 CONCEPT 12 • Since 1979 : 35 years of experience – 15000 line blinds worldwide o ONIS is the reference in the design & supply of quick closing line blind for Oil & Gas and petrochemical critical applications. • Onis Line Blind o o replaces traditional method of line blinding guarantees a 100% SAFE AND EFFICIENT POSITIVE ISOLATION such as figure 8, spectacle blinds, paddles, slip blinds… PRES02-A 20/10/14 CONCEPT 13 ♦ Figure 8 working operations steps 1 - Shut off the upstream valve 2 - Depressurize the pipe 3 - Remove bolts 4 - Spread the flanges by at least 10 to 15 mm 5 - Change the figure 8 position and insert new spiral gaskets 6 - Tighten the bolts Process must be repeated for each blinding operation PRES02-A 20/10/14 CONCEPT 14 ♦ The way Onis Line Blind works versus Blinding time Blinding time 1” to 10” 30 seconds 2 hours 12” to 26” 3 minutes Up to 30” to 50” 5 minutes 10 hours ONE PERSON NO TOOLS SIGNIFICANT MANPOWER AND TOOLS (crane, pull lifts…) PRES02-A 20/10/14 CONCEPT 15 ♦ Onis Line Blind is not a valve ≠ • 100% positive isolation of the line between the upstream and the downstream. No leakage risks! • Existing leakage risks between the upstream and the downtream valves seats. PRES02-A 20/10/14 CONCEPT 16 ♦ Onis Line Blind main advantages = Easy & fast operation ≠ No tools Reduce maintenance costs User friendly Improve safety Increase production time Minimize emissions PRES02-A 20/10/14 CONCEPT 17 PRES02-A 20/10/14 CONCEPT 18 ♦ Mechanical concept 2 1- Two power axes with low eccentric 1 (axial expansion ~4 mm) synchronized by a link. 2- Parallel movement by four clamps. 4 3- Four gaskets ONLY : properly and uniformly compressed in order to guarantee a perfect sealing. 3 4- lift rollers system centers the Slide gate between the 2 bodies in order to preserve the gaskets 5- 100% full bore : no dead chamber 4 2 PRES02-A 20/10/14 CONCEPT 19 ♦ Product range Range Standard US ISO Dimension ½ ‘’ to 52’’ 12mm to 1270mm Rating 150# to 2500# PN 20 to PN 420 Pressure max Up to 6100 psi Up to 420 bars Temperature -155°F to 1200°F -104°C to 650°C Each Onis Blind is custom built according to the specific data of each process PRES02-A 20/10/14 CONCEPT 20 ♦ Gaskets - Design temperature conditions and medias +1200°F +650°C GRAPHITE GASKETS +480°F +250°C ELASTOMERE GASKETS -50°F -45°C -155°F -104°C SILICONE GASKETS GRAPHITE GASKETS PRES02-A 20/10/14 CONCEPT 21 ♦ A custom made product DESIGN • 100% of Onis line blinds follow ASME Standards Design : ASME Section VIII Div-1B ANSI B31.3 ASME B16.34 No welding in contact with the media Materials : Forged materials only ASME Sect II part D/ B31.3 according to ASTM/EN10204 NACE cert.MR-0175/ISO15156 Flanges : ASME/ANSI B16.5, B16.48, B31.3… Specific demand : Fire API-607 Or any requested customer standards PRES02-A 20/10/14 CONCEPT 22 ♦ A custom made product TECHNICAL SPECIFICATION F03-H CUSTOMER: END USER : PROJECT: LOCATION: Contact customer name : DIMENSIONS & BASIC Cust omer logo MATERIALS & DESIGN ITEM 14xxx 1 1st Date Onis Written by : Controled by : approved by : Country J.Al l es i na L.La ti mi er NOMINAL SIZE (NPS or DN) inch mm ONIS MODEL : FLANGE RATING class PN 3 END CONNECTION / FLANGE FACING 4 FLANGE FACING FINISH RF B16.5 6 INTERNAL DIAMETER 7 BODY THICKNESS 8 SCHEDULE B16.47 A Ra3,2/6,3 (µm) Ra6,3/12,5 (µm) mm 1 CONNECTION - 1 BLEEDER PORTS - 1-1 approved with commentaries Quantity GASKETS (X4 OR X8) - 3 EN 1092 EN1759 Ra 1,6/3,2 (µm) Ra3,2/6,3 (µm) WEIGHT (Kg) FIRE SAFE DESIGN 11 CORROSION ALLOWANCE NORMAL WORKING POSITION 15 18 17 DRAWING N° 20 BODY 21 SLIDE GATE (wetted parts) 22 NACE Certificate 25 GASKETS / O'RINGS 26 OTHER PARTS carbon + stainless steel 28 DESIGN CODE Slide gate thickness 30 APPLICATION / PROCESS If yes : Blind Details : PIPE POSITION Horizontal Vertical 16 PAINTING SYSTEM UNPAINTED No No Yes SLIDE COVER in stainless steel Full bore Protection plastic caps 13 DRAIN PORTS : No wood SLIDE GATE MOVEMENT Not supplied Dim. Yes Flanges fixed Seats Horizontal NPT/GAS 2-3-4 PMI test : 23 No ASME B31.3 unknown 20 Process phase seats 5002 Blue ASTM or ASME ISO wetted parts NDE test : No Yes, details : Fire safe design ON000 (graphite) SUBMITTED PED 97/23CE ASME VIII div1 UG34 UP - M ID -DOWN NPT/GAS Thickness : 24 4 27 stainless steel none Yes, details : Qty per gate Dim. Final ISO OVERLAY UP - M ID -DOWN RAL : For approval 20.1 Downstream WITH ADDITIONAL ACCESSORIES (PIN LOCATOR OR REFER TO SLIDE M OVEM ENT OPERATION 50 TO 53) Vertical CUSTOMER SPECIFICATION : For information SILDE OPERATING DEVICE - 6 Yes Upstream Pos. API607 No 1 side 2 sides mobile ONIS STANDARD IM28-F Rev firm 1 If yes : 12 9 14 approx BODY - 2 Welding End SM inch 10 Yes 0 Line Item N° ONIS CODE : B16.47 B SF Revision : Signature Customer's Approval Name Date approved F.Dul a t 2 FACE TO FACE SP-xxxx PO N° 1 5 Rev Date CUSTOMER TAG : CUSTOMER RFQ N° : ASTM or ASME CUSTOMER PROCESS CONDITIONS ONIS BN No Materials properties Yes ASME II part D CONDITIONS Qty per gate Fluid Group : Cat : III Other : Min Cleaning Phase PRESSURES 4 1 Max Bar PSI Bar PSI °C °F °C °F OPERATING PRESSURE 31 3 MEDIUM DESIGN PRESSURE TEMPERATURES Temp. 32 PHYSICAL STATE 33 % H2S unknown Liquid Gas OPERATING TEMP. Liquid Gas DESIGN TEMP. others: Frequency at max. operating temperature : SLIDE GATE - 4 Duration : MAX WORKING & TESTING CONDITIONS MAWP (PS) 40 °C Bar °F PSI at Max AWT (TS max) Minimum resistance test (shell test) : 1,5 times the Design Pressure at room temperature Minimum hydraulic leakness test : 1,1 times the Design Pressure Duration of the tests complies to ONIS Factory Acceptance Test procedure P21-A at Min AWT (Ts mini) 41 HYDRAULIC SHELL TEST 42 HYDRAULIC LEAKNESS TEST 43 PNEUMATIC LEAKNESS TEST 44 WITNESS INSPECTION 6 87 Yes No SPECIFIC TEST : Yes No OPERATION SPREAD / CLAMP SEATS MOVEMENT 50 MANUAL OPERATION No Yes 51 ELECTRICAL ACTUATOR No Yes 52 HYDRAULIC ACTUATOR No Yes 53 PNEUMATIC ACTUATOR No Yes 60 SAFETY LOCK No Yes No Yes Lever Hand wheel/ Gear box Voltage Amperage 5-6 Manual pump Power supplied by end user No Yes No Yes Pressure Air Power supplied by end user No Yes Air Pressure TIONS Vol t. ha l f bodi es cl a mped Amp. Details SLIDE GATE MOVEMENT No Yes No Yes No Yes No Yes No Yes No Yes SPREAD / CLAMP SEATS MOVEMENT ha l f bodi es s prea ded HELIUM TEST Hand wheel worm screw Voltage SEATS OPERATING DEVICE - 5 54 Gear box Amperage Max operation time with lever Manual pump Power supplied by end user No Yes No Yes Pressure Air Power supplied by end user No Yes Air Pressure 1mn With gear box <24" 5mn <52" 15mn SLIDE GATE MOVEMENT bl i nd pos i ti on Vol t. Ful l bore pos i ti on Amp. PRES02-A 20/10/14 63 Explosion proof No Yes CONCEPT 23 ♦ Standards test TEST 100% of ONIS Line Blind are TESTED Following ASME B31.3, API598, API6D, MSS SP61 Shell Test 1.5 x MAWP Maximum Allowable Working Pressure Leak Test 1.1 x MAWP Maximum Allowable Working Pressure Or full rating class Any customer requirements PRES02-A 20/10/14 CONCEPT 24 ♦ Quick summary • Material : Forged construction up to 42”. • Design : • 100% full bore : No dead chamber (no cavitation). • Reliable mechanical concept : No internal gaskets, Few parts in movement, Self Locking system. • 4 gaskets only on slide, out of process. • Following ASME standards. • Test : Each line blind is100% tested. PRES02-A 20/10/14 25 SPECIFICATIONS PRES02-A 20/10/14 SPECIFICATIONS 26 ♦ Product range Model seats' (un)clamping operation Model PLB : ½’’ – 10’’ Model PLR : 10’’ – 42’’ DN 12 – 250 DN 250 – 750 Lever Model MPL : > 42’’ > DN 1250 Hand wheel (Gearbox) Hand wheel (Gearbox) Effort transmission 4-clamping points 4-clamping points 6 to 12 clamping points + lateral clamp system Slide gate's movement Slide gate's guiding system, + additional rollers >3’’ Slide gate's guiding system with rollers Slide gate's guiding system with rollers For graphite gasket, model PLR above 3’’ PRES02-A 20/10/14 SPECIFICATIONS 27 PLB : ½” to 10” 150# use levers PRES02-A 20/10/14 SPECIFICATIONS 28 ♦ PLR : Gear box operator PLR 3’’ 2500# PRES02-A 20/10/14 SPECIFICATIONS 29 ♦ Product line Vertical pipe – horizontal slide gate movement Horizontal pipe – vertical slide gate movement Horizontal pipe – horizontal slide gate movement PRES02-A 20/10/14 SPECIFICATIONS 30 ♦ Complementary accessories for vertical slide gate movement PRES02-A 20/10/14 SPECIFICATIONS 31 ♦ Operative way to clamp / unclamp seats Manual lever Manual hand wheel on gearbox With actuator: • Pneumatic • Electric • Hydraulic PRES02-A 20/10/14 32 OPTIONS PRES02-A 20/10/14 OPTIONS 33 ♦ Safety lock devices • Safety lock on lever or hand wheel : avoid to unclamp seats if operator is not allowed. • Safety locks with double entries keys on sliding gate's positions. PRES02-A 20/10/14 OPTIONS 34 ♦ Safety lock devices • Safety lock on slide gate position(s) and/or operating device • Can be interlocked one to each other on the same Line Blind or on different ones. INTERLOCK BY SAFETY LOCK Possibility of Interlock panel for many entries by double safety locks with keys PRES02-A 20/10/14 OPTIONS 35 ♦ Limit switches • Safety limit switches : On slide gate position(s) and/or bodies position Limit switches (atex) on the 2 slide gate positions and gear box PRES02-A 20/10/14 OPTIONS 36 ♦ Drain ports or flush ports • Drain ports : to make easier the depressurization and collect process residues • Flush ports : in order to inject inert gas (nitrogen, …) MACHINING IN THE BODIES PRES02-A 20/10/14 37 SPECIAL PRODUCT PRES02-A 20/10/14 SPECIAL PRODUCT 38 ♦ Onis Vannobturateur • Double block bleed valves Bleeder port PRES02-A 20/10/14 SPECIAL PRODUCT 39 ♦ Filter support NESTLE PRES02-A 20/10/14 SPECIAL PRODUCT 40 ♦ Rupture disc support PRES02-A 20/10/14 SPECIAL PRODUCT 41 ♦ Twin line blinds Twin blinds with Interlock and Safety position PRES02-A 20/10/14 SPECIAL PRODUCT 42 ♦ Quick action filter changer line blind PLF 400 (16") Crude oil PRES02-A 20/10/14 43 MAINTENANCE PRES02-A 20/10/14 MAINTENANCE 44 ♦ Few needs of maintenance SPARE PARTS = GASKETS ONLY ! • No need to change gaskets every time: reusable elastomer and graphite gaskets • Gaskets are outside the process : it's possible to check them before to operate • Preventive maintenance: only greasing, axes are mounted on self-lubricating bushings for life Check regularly the gaskets quality PRES02-A 20/10/14 MAINTENANCE 45 ♦ Installation 4 mm MAXI per meter of Nominal Diameter measured on all the diameter and out of misalignment of flanges DURING INSTALLATION FOLLOW THE « RULES OF ART » Forbidden !!! PRES02-A 20/10/14 46 APPLICATIONS PRES02-A 20/10/14 ONIS APPLICATIONS 47 ♦ Where are Onis line blinds used ? Onis Blinds are currently used in : - Refineries - Chemical plants - Pipelines - Compression stations - Offshore The Onis Blinds can be used in any service (i.e, H2S, Nitrogen, Decoke/ Feed lines, diesel, natural gas, benzine, chlorine, HCN and more). It is also used to isolate reactors, heaters, pumps, compressors and furnaces. PRES02-A 20/10/14 OIL & GAS PRODUCTION - OFFSHORE 48 These customers are operated offshore with ONIS : • Total E&P • Pemex • Petrobras Manufacturers or Engineering firms who have installed ONIS : • Solar turbines • SBM PRES02-A 20/10/14 OIL & GAS PRODUCTION - OFFSHORE Pemex, PB-Littoral-T , Mx PLR 600 (24”) PN 150 (900#) Sour gas metering skid 49 Pemex, Akal, Cantarell, MX PLR 400 (16’’) PN 20 (150#) Sour gas PRES02-A 20/10/14 OIL & GAS PRODUCTION - FPSO 50 PETROBRAS SBM Offshore, Crude Oil – FPSO Saquarema & Marica Metering PLC 500 (20’’), PN 50 (300) PRES02-A 20/10/14 OIL & GAS PRODUCTION - ONSHORE 51 Aramco, Abqaiq, KSA PLR 250 (10”) PN 250 (1500#) Parallel Slide Movement PRES02-A 20/10/14 STEAMCRACKER 52 -Feed lines -Decoking air -Quench oil -Polisher uses -Hot recycling air -Stripping -Flares These customers are operated steamcrakers with ONIS : • • • • • • • • • • • OMV DEA SHELL BASF Exxon Mobil WESTLAKES ELENAC FINA, Total Petrochemical Kemia VEBA • • • • • • • • • • • Chevron Phillips Borealis Enichem Polimeri Europa Qenos QAPCO Qatofin DOW Williams BP Chem Borouge Manufacturers or Engineering firms who have installed ONIS : • • • • • • CBI/ABB-LUMMUS LURGI KTI TECHNIP TECHNIMONT SHAW STONE & WEBSTER • SELAS KIRCHNER • LINDE • HEURTEY KAEVNER PRES02-A 20/10/14 STEAMCRACKER 53 Naphtachimie, Lavera, FR PLR 250 (10’’) PN 50 (300#) Temp 450°C (842°F) PRES02-A 20/10/14 FCCU TRANSFER LINE 54 Petrobras, Manaus (BR) FCCU Transfer Line 450 (18”) PN 50 (300#) Temp. , 570°C (1058°F) PRES02-A 20/10/14 FCCU TRANSFER LINE 55 Petrobras, Manaus (BR) FCCU Transfer Line 450 (18”) PN 50 (300#) Temp. 570°C (1058°F) PRES02-A 20/10/14 STORAGE 56 - Manifold - Pump station - Loading arm These customers are operated storage with ONIS : • Exxon mobil • Oman refinery • Geostock • Total • Shell • TIGF PRES02-A 20/10/14 STORAGE 57 Military gasoline storage, La Rochelle (FR) Jet fuel PLR 350 (14’’) PN 16 PRES02-A 20/10/14 GAS TRANSPORTATION 58 These customers operated with ONIS : • TIGF • Pemex • Total • Geostock • Geogaz Manufacturers or Engineering firms who have installed ONIS : • Segula • IRD PRES02-A 20/10/14 GAS TRANSPORTATION 59 TIGF, Captieux (FR) Natural Gas Flare PLR 500 (20’’ ) PN 100 (#600) PRES02-A 20/10/14 FLARE 60 These customers are operated flare with ONIS : • Total • BASF • Shell • Dow • BP • Petrobras • Air Liquide • Bayernoil • General Electric • OMV Burghausen • Qatofina • TIGF… Manufacturers or Engineering firms who have installed ONIS : • Foster Wheeler • Linde • Technip • Technicas Reunidas… PRES02-A 20/10/14 FLARE 61 SHELL CHEMICAL, Berre (FR) Flare manifold with double tips 2 MPL 900 (36’’) PN 20 (150#) 5 PLR 600 (24’’) PN 20 (150#) PRES02-A 20/10/14 VCM REACTOR 62 VCM REACTORS (MASSIVE OR SUSPENSION) PRES02-A 20/10/14 HCN 63 INVISTA, Orange (USA) MPL 900 ANSI 125 Hot gas cooler PRES02-A 20/10/14 64 REFERENCES PRES02-A 20/10/14 REFERENCES 65 Chemical / Chimie Chemical / Chimie Chemical / Chimie AIR LIQUIDE (FR/NL/ES/TH) DSM CHEMICALS (NL/USA/UK) MONTELL (FR) Chemical / Chimie SNEP (MA) AIR PRODUCT (UK/USA) DSM COPOLYMER (USA) NAN YA PLASTICS (TW) SOCABU (FR) AKSO CHEMIE (NL) DSM RESINS (CN/TW) NAPHTACHIMIE (FR) SOLVAY (BE/DE/FR/KR) ALLIED SIGNAL (USA) DUPONT NEMOURS (USA) NOBEL/SNEAP (FR) SOLVAY INDUPA (AR) AQUITAINE CHIMIE (FR) EASTMAN CHEMICAL (USA) NOROXO (FR) SOTRASOL (FR) ARCO (FR) ELENAC (FR) NORSOLOR (FR) STATOIL (SE/NO) ATOCHEM (FR/NL/US) ENICHEM (IT) NOVA CHEMICALS (FR/USA) STERLING CHEMICAL (US) BASELL (ex ELENAC) (DE) EQUISTAR CHEMICAL (USA) OXY (USA) SUPERMETANOL (VE) BASF (BE/DE/USA/KR) ETERNAL CHEMICAL (TW/CN) OXYCHEM (BE) TRINIDAD (USA) BAYER-LANXESS (DE/FR) EXXON CHEM (USA/FR/NL/SG) PEMEX (MX) TROSBERG (DE) BAYERNOIL (DE) FERRO BRIDGEPORT (USA) PETROGAL (PT) UNICHEM (NL) BF GOODRICH (USA) FMC (USA) PETROKEMIA (SA) UNION CARBIDE (NL/USA) UOP (B/UK/USA) BOREALIS (AT) FORMOSA PLASTICS (TW) PETROMONT (CA) BOREALIS POLYMER (FI) FROMOSA TX (USA) PHILLIPS 66 (USA) VEBA (DE) BOROUGE (AE) GENERAL ELECTRIC (FR/ES/USA) POLIKEM (YE) VESTOLIT (DE) BP CHEMICALS (NL/UK/FR) GEON (CA) POLIMERI EUROPA (FR) VISTA CHEMICAL (US) BUTACHHIMIE (FR) GOOD YEAR (USA) POLIMEROS (MX) WACKER CHEMIE (DE) CERTAINTEED (USA) GREAT LAKE CHEM (FR) QAPCO (QA) WESTLAKE PVC (USA) CHEMIEPARK (DE) HAAS (UK) QENOS (AU) ZEON (UK/USA) CHEVRON CHEMICAL (USA) HEXOW (CN) R.V.I. (DE) CHEVRON ORONITE (FR) HOECHST (DR) REPSOL QUIMICA (ES) CHIMEX (FR) HONEYWELL (US) RHODIA (FR) CHINAN CHEMICALS (CN) HÜLS (DR) RHOM & HAAS (FR/UK/USA) CIBA-GEIGY (USA) HUNTSMAN (FR/CA/UK/USA) RHONE POULLENC (FR) CONDEA VISTA (USA) I.C.I. (FR) RUHR OEL (DE) COURTAULD (UK) KEMYA OLEFINES (SA) S.A. VINYL (FR) CRAY VALLEY (ES) KRONOS (NL) S.K.W. (DE) DAIREN CHEMICAL (TW) LA PIGMENT (US) SANOFI (FR) SANOFI CHIMIE (FR) DEGUSSA (DE/USA) LUCKY GOLDSTAR (KR) DEX PLASTOMERS (NL) LURGI DATANG (CN) SASOL (ZA) DISTUGIL (FR) MEADWESTWACO (USA) SATOMO INDOVYL (ID) DOW (FR/NL/US) MICHELIN (FR) SHELL CHIMIE (FR/NL/USA) DOW CHEMICAL (UK) MILES (USA) SINGAPORE AROMATICS (SG) DOW/EQUATE (KW) MONSANTO (USA) SN2A (FR) PRES02-A 20/10/14 REFERENCES 66 Oil & Gas/ Pétrole Gaz Oil & Gas/ Pétrole Gaz Engineering / Ingénierie Engineering / Ingénierie BP (F/UK/OM/US) OMV (DE) ABB LUMMUS (NL/USA) S&B Engineering (US) BP BLAINE (USA) PAKISTAN REFINERY (PK) AFD LEUNA (DE) SADE (FR) CARMEL OLEFINS (IL) PDVSA (VE) AUXITEC (FR) SECOMAT (FR) SELAS KIRCHNER (US) CEPSA (ES) PEMEX (MX) BADGER (FR) CHEVRON(USA) PETROBRAS (BR/AR) BECHTEL (UK) SERETE (FR) CHINESE PETROLEUM (TW) PETROGAL (PT) BERGH & JURGENS (UK) SHAW-STONE&WEBSTER (USA) CONOCO(NL/UK/USA) PETRONOR (ES) BOUYGUES OFFSHORE (FR) SIDSA (ES) CORAF (CG) PHILIPS 66 (USA) BUFETE (MX) SOCETEC (FR) SOFREGAZ (FR) CORPOVEN (VE) PREEMRAFF LYKESIL (SE) BULHER (FR) COURONNAISE RAFFINAGE (FR) PRIMAGAZ (FR) CHIYODA (JP) TECHNIP(FR) CROWN CENTRAL (US) REPSOL (ES) CNIM (FR) THYSSEN KRUPP (DE) CRR (FR) ROYAL AIR FORCE (UK) CTCI (TW) MISCELLANEOUS DEA HEIDE (DE) S.I.R. (CI) DISEPROSA (ES) DEUTSCHE BP (DE) S.R.P.P. Réunion (FR) EIA (ES) ALUMINIUM PECHINEY (FR) ECOPETROL (CO) SAIBOS AKOGEP (NG) FORSTER WHEELER (FR/ES) ASCO METAL (FR ELF (CG/NG) SAR (SN) HEURTEY PETROCHEM (FR) CERESTAR (FR) ELF ANTAR (FR) SARA Martinique (FR) HOWE BAKER (USA) CHICAGO COKE (USA) ESSO SAF (FR) SASOL (ZA) HYDROCARBON (FR) CIM (FR) EXXON MOBIL (USA) SEREPT (TU) JACOBS (US/FI) CLIMADEF (FR) FINA (B/USA) SHELL (FR/USA) JGC (JP) COGEMA (FR) FMC (USA) SNEAP (FR) KBR (USA) COMURHEX (FR) FORMOSA PETROCHEMICAL (TW) SONARA (CM) KCE (TW) DRESSER-RAND (FR) FORTUM (FI) STAR ENTERPRISES (USA) KREBS (FR) FOLGERS (US) GAZ DE France (FR) STAR REFINERY (TA) KTI-TECHNIP (NL) INCO(UK/CA) GEOSTOCK/GEOSEL (FR) STIR (TN) KVAERNER (FR) INFRACOR (DE) MANNESMANN (DE) GSO (FR) TOTAL (FR/NL/UK/USA) LINDE (DE) LINDSEY OIL (UK) TOTAL FINA ELF (NG) LURGI (DE) NESTLE (FR) MOBIL OIL (FR/SG/TR) TOTAL GAZ/TIGF (FR) MERCK (US) ORINOCO IRON (VE) MONGSTAD (NW) TRANSGAZ (FR) NESTE ENGINEERING (FI) PONTICELLI (FR) NATIONALOILVELL (USA) WILLIAMS (US) PETROTECHNA (FR) PORT DE BORDEAUX (FR) NATIONAL REFINERY (PK) WESTERN RAFINERY (USA) POLYTEC (FR) UGINE (FR) NATREF (ZA) ZADCO Abu Dhabi (UAE) PORT DE MARSEILLE (FR) NESTE (FI) PROSPERITE FERMIERE (FR) OMAN REFINERY (OM) ICA (MX) PRES02-A 20/10/14 67 CONCLUSION PRES02-A 20/10/14 CONCLUSION 68 ♦ Safety & production advantages FAST AND USER FRIENDLY 1. Improve Safety by reducing exposure 2. Increase production quantity by reducing downtime 3. Reduce plant maintenance costs 4. Decrease Emissions by reducing flange opening time 5. Zero tools (no need of torque tools, cranes) PRES02-A 20/10/14 CONCLUSION 69 ♦ Safety & production advantages MAINTAINABILITY AND RELIABILITY • 4 Gaskets only on slide gate, 2 accessible out of process • No internal gasket • Long lasting and reliable, 30 years of service CUSTOMIZABLE • Controllable for a supervision from a control room • Custom designed according to our customers specifications and standards PRES02-A 20/10/14 CONTACT US 70 www.onislineblind.com Website: [email protected] E-mail ONIS S.A.S ONIS Inc ONIS MIDDLE EAST Avenue Fernand Julien, ZA de Berthoire 13410 Lambesc FRANCE One Riverway Suite 1700, Houston, Texas 77056 USA P.O. box 4058 - Abu Dhabi Mall East Tower, 6th Floor – ABU DHABI PRES02-A 20/10/14