DOWNSPOUT HANGER ROOF CLIPS

Transcription

DOWNSPOUT HANGER ROOF CLIPS
INSTRUCTION MANUAL
DOWNSPOUT HANGER
ROOF CLIPS
WJ20SR15
WJ20SR13
Description
The WJ20SR13 roof clip kit and the WJ20SR15 downspout hanger kit are
suitable for use with self-regulating heating cables. Do not use other hardware or
techniques which may damage the heating cable, cause an electrical hazard,
have risk of fire or poor performance.
WJ20SR13
WJ20SR13
WJ20SR10 Tee
Tools Required (refer to
WJ20SR13 roof clips are used to
secure self-regulating heating cables to
shingle roofs, metal seam roofs and
gutters. For applications where nails
and screws will be used to install
clips, refer to page 2. For applications
where adhesive will be used to install
clips, refer to page 3. WJ20SR13 is a
bag of 10 clips.
WJ20SR15
WJ20SR15 downspout hanger is used
to provide mechanical protection to the
self-regulating heating cables against
sharp edges and to hold the heating
cable in place at the top of
downspouts. Refer to page 3 for
instruction on how to install
WJ20SR15 downspout hanger.
NFPA70, National Electrical Code
(NEC), Article 426)
WJ20SR15
1. Screwdriver
Downspout Hanger
2. Pliers
3. Caulking Gun
Recommended Adhesives for
Metal Roofs
1. SpeedBonder@H3300(Methacrylate
Adhesive)
2. SpeedBonder@H4800(Methacrylate
Adhesive)
3. Plexus MA300(Methacrylate
Adhesive)
4. Plexus MA310(Methacrylate
Adhesive)
Kit Contents
WJ20SR13
A
Qty
Description
10
Roof Clips
WJ20SR15
Qty
B
1
Description
Downspout hanger
1
5. DGE@Grey RTV 167 Adhesive
(Neutral-cure Silicone Adhesive)
WARNING
1. Roof Clips and downspout hangers
must be installed properly to ensure
proper operation and to prevent
the risk of electrical hazard or fire.
Follow all design, installation,
assembly, and test instructions
carefully.
2. To comply with the requirements of
national electrical codes, ground
-fault equipment protection must
be used on each heating cable branch
circuit as per Article 426 of the
National Electrical Code and Section
62 of CAN/CSA-C22 1. Canadan Code
for the installation of self-regulating
heating cable.
3. Do not use Clip and downspout
hanger for installation on slate or
tile roofs as damage may occur to
roof material. Consult roofing
manufacturer for use on specific
roof material.
4. De-energize all power circuits
before installation or servicing
5. Keep ends of heating devices and
kit components dry before and
during installation.
WJ20SR13 with adhesive
7. While using pliers to close clamps
on heating cable, heating cable
should not be crushed or altered
structurally in any way.
Figure
4
Determine
heating cable layout and
1.
clip
placement
according
to to
Install
heating
cable.
Use pliers
5. roof
WJ20SR13
installation
instructions.
close clamps,
but do not
crush the
heating cable.
8. The cable should not be twisted
during installation.
9. Heating cable should not be
embedded in the thermal insulation.
6. Damanged heating cable can cause
arcing or fire. Do not energize any
damaged heating cable. Repair or
replace damaged heating cable
prior to applying power.
2. Apply sealant, appropriate for your
roof, to back side of roof clip where
nail or screw will be used.
4. Spread sealant on top of nail or screw
heads.
through holes.
3. Prepare roof surface per adhesive
3
manufacture’s specification.
Apply a
liveral amount of adhesive to back
side of Roof Clips.
Figure 5
Figure 1
Figure 5
2. Adhesive Selection
select appropriate adhesive
21-6282/21-6284
with adhesive
For most metal roofs, we recommend
Determine
heating
1. GE
RTV 167
Grey. cable layout and
roof clip placement accoring to 21-6282
Figure
4 roof installation
21-6284
Prepare
surface per instructions
adhesive
3. and
manufacture’s
Apply
heating specification.
cable. Use pliers
to a
5. Install
liberalclamps,
amountbut
of adhesive
to back
close
do not crush
the
side
of roof
clips.
heating
cable.
3. Orient the roof clip as needed, attach
roof surface
per
adhesive
3.
it Prepare
to roof using
a nail or
a screw
manufacture’s specification. Apply a
liveral amount of adhesive to back
side of Roof Clips.
4. Spread sealant on top of nail or screw
heads.
4. Place clip on prepared surface. Press
down to ensure adhesive flows
through holes.
1.
21-6280
to Use
approximately
5. Bend
Installthe
heating
cable.
pliers to 90
degree.
Insertas
cable
ties
throughbut
holes
close clamps
figure
5 shown,
on
the
21-6280.
do not
the heating cable.
Figure
3 crush
2. Position the WJ20SR15 and tighten the
cable ties. Trim off excess cable tie.
4. Place clip on prepared surface. Press
down to ensure adhesive flows
through holes.
3
3
Figure 1
Position the 21-6280 and tighten the
2. Adhesive Selection
cable ties. Trim off excess cable tie.
select appropriate adhesive
Figure 5
Figure 1
Figure
3 metal roofs, we recommends
For most
Figure 4
GE
RTV
167
Position the 21-6280
and
tighten
the with
onGrey.
prepared
surface.
Press
4. Place clip
21-6282/21-6284
adhesive
Install heating cable. Use pliers to
5.
cable ties. Trim offdown
excesstocable
tie.adhesive flows
ensure
close clamps as figure 5 shown, but
heating cable layout and
1. Determine
through holes.
do not crush the heating cable.
roof clip placement accoring to 21-6282
and 21-6284 installation instructions
Figure 4
5. Install heating cable. Use pliers to
close clamps, but do not crush the
heating cable.
Figure 3
Figure 5
The 21-6280 should be centered on
the edge of the Figure
downspout
to
1
prevent mechanical damage and to
support the heating cable.
Figure 3
The 21-6280 should be centered on
the edge of the downspout to
3
Figure 5
4. Place clip on prepared surface. Press
Figure 4
down to ensure adhesive flows
21-6282/21-6284
with
adhesive
Install heating cable. Use pliers to
5.
through holes.
close clamps as figure 5 shown, but
1. Determine heating cable layout and
do not crush the heating cable.
roof clip placement accoring to 21-6282
and 21-6284 installation instructions
2
Figure 2
3
The 21-6280 can be used to protect
the heating cable from sharp edges,
which
Figure
2 can also be sued in gutter as
a spacer.
3. The WJ20SR15 should be centered on
the edge of the downspout to
prevent mechanical damage and to
support the heating cable.
3
Figure 2
Position the 21-6280 and tighten the
cable ties. Trim off excess cable tie.
the heating cable from sharp edges,
The 21-6280
should
be centered
which
can also
be sued
in gutter on
as
edge of the downspout to
athe
spacer.
prevent mechanical damage and to
support the heating cable.
Figure 1
Figure 1
Figure 4
Figure 2
Figure 1
Figure 3
Figure 3
Figure 1
Figure 3
1. Bend the WJ20SR15 to approximately
90 degree. Insert cable ties through
holes on the WJ20SR15.
Installing 21-6280 in gutter
Figure 5
3. Prepare roof surface per adhesive
manufacture’s
specification. Apply a
Figure
4
liveral amount of adhesive to back
Install
heating
cable. Use pliers to
5.
side
of Roof
Clips.
close clamps, but do not crush the
heating cable.
WJ20SR15 in gutter
The 21-6280
can be used to protect
Figure
2
WJ20SR13 with screw or nail
1. Determine heating cable layout and
roof clip placement according to
WJ20SR13 installation instructions.
Figure 4
Figure
Install3 heating cable. Use pliers to
5.
figure 5surface.
shown,Press
but
Placeclamps
clip on as
prepared
4. close
do
nottocrush
theadhesive
heating flows
cable.
down
ensure
3
The WJ20SR15 can be used to
protect the heating cable from sharp
edges, which can also be used in the
gutter as a spacer.