conteco

Transcription

conteco
CEBCBusinessMeeGng–Milan,Italy
THEPRACTICEOFPROJECTVALIDATION
Monday,12thOctober2015
AngelodePrisco
President&CEO
morevalue,morequality
AGENDA
q CONTECOCheckProfile
-Profile
-EngineeringFields
-Organiza:on
q TheProjectValida:on
-Scope
-ItalianNorma:ve
-UNICEIENISO/IEC17020Inspec:onbodiestypesA,BeC
-Aimsandskills
-Verifica:oncriteria
-CheckofDocumenta:on
q Somevirtuousexample
morequality,morevalue
CONTECOCheck–Profile
CONTECOCheck,foundedin1994,isthefirstcompanyinItalyaccreditedbyACCREDIA,
accordingtoUNICEIENISO/IEC17020,as“ThirdPartyInspecKonBody”oftypeA.
DuringthelastyearsCONTECOundertookindependentdesignverificaKonandtechnical
controlforover40billionsofeuro(valueofworks).
CONTECOcarriesoutserviceswithinthefieldofprojectverificaKonandassessment.Its
acKviKes are addressed at the evalua:on of project correctness, both technical and
formal, in order to ensure the fulfillment of design standards and procedures
requirements,compliancewithClient’sspecificaKonandachievethehighestqualityand
standardfortheproject.
ValidaKonandverificaKonacKviKesaredevelopedduringbothdesignandconstrucKon
phasesbymeansofspecificassessmentproceduresconsolidatedduringovermorethan
20yearsofac:vity.
morequality,morevalue
CONTECOCheck–Engineeringfields
BUILDINGS
INFRASTRUCTURES
}  RenovaKonproject
}  Roadsandmotorways
}  ExhibiKon/culturalvenues,theatres
}  Railwaysandsubways
}  ResidenKal
}  Portsandairports
}  Commercialandservice-sector
}  Damsandhydraulicworks
}  Hospitals
}  Tunnels,bridgesandviaducts
}  Schools/universiKes
}  UrbanizaKonprojects
}  SportsfaciliKes
}  Environmentalprojects
}  IndustrialfaciliKes
}  Powerplants
morequality,morevalue
CONTECOCheck–OrgnizaGon
morequality,morevalue
DesignValidaGon–Scope
TheaimofverificaKonistoprovideanindependentandobjec:vereviewoftheproject
design.TheverificaKonprocessofeachPackageDesigniscarriedoutaccordingtothe
Designphases:
Þ FeasibilityStudyStrategicPlanningVerificaKon
Þ PreliminaryDesignVerificaKon
Þ DetailedDesignVerificaKon
Þ AsBuiltVerificaKon
DesigndocumentverificaKonconcerns:
- conformity with design and development inputs (Project bases and Client
specificaKons);
- conformitywithstandards,
- conformity with design procedures and formal correctness (idenKficaKon, graphic
form,readability,etc.);
- technical correctness (correct use of calculaKon methods, correct calculaKons,
precisionofdimensions,etc.);
- completenessandclarity;
- precisereferencesconsistencywithotherdesigndocuments.
morequality,morevalue
DesignValidaGon–ItaliannormaGvereferences
q  Art.112D.Lgs.163/2006
D.Lgs 163/2016, on arKcle 112, provides that ContracKng AuthoriKes are required to
verify project documents as provided for arKcle 93 (part 1 and 2) as well as their
compliancewithcurrentregulaKons.
IncasetocontractofonlyexecuKonwork,DesignVerificaKonit takesplacebefore
thestartoftheprocurementproceduresor,incaseofDetaildesigndrawnupbythe
Tenderer,ittakesplacebeforethestartofthework.
RUP (the Project manager of Public ContracKng Authority) performs the formal
approval of the project (in Italian “Validazione”); before of this approval, the
checkingofprojecthasconductedinaccordancewithDPR207/2010“Regolamento",
eventuallydiscussingwiththeDesigneranydiscrepancyorinconsistencyfoundit.
morequality,morevalue
DesignValidaGon–IEC17020InspecGonbodiestypesA,BandC
DesignverificaKoncanbeperformedby:
Amountofthework
(building,infrastructure…)
Internal
InspecKonBody
External
InspecKonBody
>20.000.000euro
• TypeB-UNI17020
• TypeAorC-UNI17020
>1.000.000euro
and
<20.000.000euro
• TypeB-UNI17020
• TecnicalOfficeof
ContracKngAuthority
• TypeAorC-UNI17020
• Designer-UNIEN
ISO9001
<1.000.000euro
• asabove
• RUP
• asaboveevenwithout
qualitycerKficaKons
morequality,morevalue
DesignValidaGon–VerificaGoncriteria
CheckCalcula:ons
§ Codes,standardsandregulatoryrequirementsarecorrectlyselected,referredand
applied
§ ApplicableconstrucKonandoperaKngexperiencesareconsidered
§ AppropriatecalculaKonmethodsareused
§ LoadcombinaKonsarereasonableandforeseeable
§ ConclusionsarereasonablecomparedtoassumpKons
§ MathemaKcalaccuracyandsafetymargins
§ Appropriatenessofanycomputerprogramused
§ Correctnessofcomputerinputandreasonablenessofoutput
Checkandrevisedrawings
§ Completeness
§ Dimensionalaccuracy
§ CompaKbilityandconsistencywithotherdesigndocuments
§ Clarity
§ Precisereferences
morequality,morevalue
DesignValidaGon–CheckofDocumentaGon
ProjectdocumentaKontocheckisusually:
q  GeneralReports
q  Specialis:csReports(i.e.Structuralcalcula:onReport)
q  Drawings
q  Costevalua:on
q  Technicalspecifica:ons
q  SafetyPlanandCoordina:on
q  Planofuseandmaintenance
morequality,morevalue
Somevirtuousexample-Roadsandmotorways
morequality,morevalue
Somevirtuousexample-Tunnels
morequality,morevalue
Somevirtuousexample–MetroandRailways
morequality,morevalue
Somevirtuousexample–TallBuildings
morequality,morevalue
Somevirtuosuscases–Residen:alsandHospitals
morequality,morevalue
Somevirtuousexample–Sportfacili:es
morequality,morevalue
Somevirtuousexample–Interna:onalevents
morequality,morevalue
CONTECOCheckS.r.l.
ViaSansovino,4·20133MILANO
Tel.+390270601904·Fax+390270601912
[email protected]·www.conteco.it
headquarter
morevalue,morequality