appendix f environmental management programme
Transcription
appendix f environmental management programme
APPENDIX F ENVIRONMENTAL MANAGEMENT PROGRAMME PROPOSED CONSTRUCTION OF A FILLING STATION AND ASSOCIATED FACILITIES ON PORTION 1 OF THE FARM SEAVIEW NO. 746, EAST LONDON, EASTERN CAPE PROVINCE ENVIRONMENTAL MANGEMENT PROGRAMME JULY 2015 Prepared for: Edcot Trust 11b Kennington Road Nahoon East London 5241 Tel: (043) 707 1825 Prepared by: Terratest (Pty) Ltd P.O. Box 27308 Greenacres Port Elizabeth 6045 Tel: 041 363 4428 Fax: 041 363 1922 Construction Environmental Management Programme EC/7/A/LN1/14/15-08 TITLE: Environmental Management Programme for the proposed construction of a Filling Station and associated facilities on Portion 1 of the Farm Seaview No. 746 TERRATEST NO.: DATE: REPORT STATUS: 41303 July 2015 DRAFT CARRIED OUT BY: COMMISSIONED BY: Terratest (Pty) Ltd Edcot Trust P.O. Box 27308 11b Kennington Road Greenacres Nahoon Port Elizabeth East London 6057 5241 Tel : 041 363 4428 Tel: (043) 707 1825 Fax : 041 363 1922 E-mail: [email protected] AUTHOR: CLIENT CONTACT PERSONS: Sarah Baxter Mr Brett Bursey SYNOPSIS: The Environmental Management Programme for the proposed construction of a Filling Station and associated facilities on Portion 1 of the Farm Seaview No. 746 in East London, Eastern Cape Province KEY WORDS: Environmental Management Programme; Method Statements, Filling station © COPYRIGHT: Terratest (Pty) Ltd. QUALITY VERIFICATION This report has been prepared under the controls established by a quality management system that meets the requirements of ISO9001: 2008 which has been independently certified by DEKRA Certification under certificate number 90906882 Verification By Author Capacity Environmental Scientist Name Date Sarah Baxter Checked by Executive Associate Magnus van Rooyen Authorised by Executive Associate Richard Fyvie Terratest (Pty) Ltd Signature Page | 1-i Construction Environmental Management Programme EC/7/A/LN1/14/15-08 PROJECT BACKGROUND 1. Project Description Terratest (Pty) Ltd has been appointed by the Kempston Group to conduct the Environmental Authorisation application process for the proposed establishment of a filling station and associated facilities on Portion 1 of the Farm Seaview No. 746, East London, Eastern Cape Province. The proposed project site is located within the Buffalo City Metropolitan Municipality. The proposed filling station forms part of a larger development, known as the East Coast N2 Gateway project, which has previously been issued Environmental Authorisation by the Department of Economic Development, Environmental Affairs and Tourism (DEDEAT). The proposed filling station and associated facilities will comprise the following: Installation of fuel dispensing islands / bowsers, with associated pumps, cut-off valves, and sub-surface piping between storage tanks and pumps. Establishment of a concrete forecourt area (as per Petroleum Retail Industry Standards) and canopy. Installation of a stormwater management system for the separation and management of contaminated runoff from the forecourt area, as per industry standards. The installation of underground storage tanks (USTs), comprising: o Two petrol storage tanks. o Two diesel storage tanks. o One lead replacement (LRP) tank. These five tanks will have a storage capacity of 30 000 ℓ each, equating to a total storage capacity of 150 000 ℓ or 150 m3. Installation of a tank gauging system that will provide for leak detection and reconciliation services. Establishment of surfaced parking areas. The creation of a single new access point off the R102 road to the proposed filling station site. The proposed project triggers a Listed Activities contained within GN R983 and R985 of the Environmental Impact Assessment (EIA) Regulations (2014) promulgated under the National Environmental Management Act, 1998 (Act No. 107 of 1998), as amended (NEMA). The proposed development therefore requires an Environmental Authorisation (EA) from the DEDEAT. 2. Purpose of the EMP The purpose of this EMP is to ensure that the impacts of the construction and operational phases of the project on the environment are kept to a minimum. This includes ensuring that the mitigation measures described in the Basic Assessment Report (BAR) are implemented, to ensure continued monitoring of the construction and Terratest (Pty) Ltd Page | 1-ii Construction Environmental Management Programme EC/7/A/LN1/14/15-08 operational phases and to ensure the involvement of interested and affected parties (IAPs) in a meaningful way. In addition, the EMP details the roles and responsibilities of all parties with respect to Environmental Management during construction and operation of the proposed development. This EMP is compiled specifically for the proposed filling station and associated facilities on Portion 1 of the Farm Seaview No. 746, East London, Eastern Cape Province. The EMP has as its basis the recommendations listed in the Basic Assessment Report (BAR) and associated specialist studies. It is important to note that the development and implementation of environmental specifications is an on-going process that is iterative in nature. Any changes required by the developer must be approved by the DEDEAT. This EMP has been compiled in accordance with: Lochner, P. 2005. Guideline for Environmental Management Plans. CSIR Report No ENV-S-C 2005-053 H. Republic of South Africa, Provincial Government of the Western Cape, Department of Environmental Affairs & Development Planning, Cape Town. The Integrated Environmental Management Information Series on Environmental Management Plans (DEAT, 2004b). Environmental Auditing (DEAT, 2004d). Environmental Monitoring Committees (DEAT, 2005a). Guideline for the Construction and Upgrade of Filling Stations and Associated Tank Installation (GDACEL, 2001). The EMP should be used as a basis for managing, mitigating and monitoring the environmental impacts associated with the pre-construction (design), construction and operational phases of the proposed activities, as assessed in the BAR for the proposed project. The scope of environmental management described in this EMP pertains to the entire proposed development and has been divided into two volumes, namely: Volume 1: Construction Environmental Management Programme. Volume 2: Operation Environmental Management Programme. 3. Relevant Legislation In all instances, the EA holder, Service Providers, Contractors as well as the Developer and its employees should remain in compliance with relevant local and national legislation, regulations and standards. Particular attention should be paid to the requirements of the following national legislation (not limited to): 3.1 South African Constitution (No 108 of 1996) Chapter 2 of the Constitution comprises the Bill of Rights which makes provision for Environmental Rights. These include that everyone has the right: Terratest (Pty) Ltd Page | 1-iii Construction Environmental Management Programme EC/7/A/LN1/14/15-08 To an environment that is not harmful to their health or well-being. To have the environment protected, for the benefit of present and future generations, through reasonable legislative and other measures that: o Prevent pollution and ecological degradation. o Promote conservation. o Secure ecologically sustainable development and use of natural resources while promoting justifiable economic and social development. 3.2 National Environmental Management Act, 1998 The NEMA is a ‘principles-based Act’ and is an overarching statute regulating various aspects of natural resource use, integrated environmental management and pollution control. The Act provides for sustainable development, environmental protection, equitable distribution of natural resources and the formulation of environmental management frameworks. The definition of the environment includes the land and water of the earth, micro-organisms, plant and animal life or a combination of those things, and the inter relationships among them. NEMA aims to provide for co-operative environmental governance by establishing principles for decisionmaking on matters affecting the environment, institutions that will promote co-operative governance, and procedures for co-ordinating environmental functions exercised by organs of state. Section 24 provides for the prohibition, restriction and control of activities which are likely to have a detrimental effect on the environment. NEMA contains a set of principles that govern environmental management, and against which all environmental management plans and actions are measured. Sustainable development requires the consideration of all relevant factors including the following: Environmental management must place people and their needs at the forefront of its concern, and serve their physical, psychological, developmental, cultural and social interests equitably. That the disturbance of ecosystems and loss of biological diversity are avoided, or where they cannot be altogether avoided, are minimized and remedied. That pollution and degradation of the environment are avoided, or, where unavoidable, are minimised and remedied. That waste is avoided, or where unavoidable is minimised and reused or recycled where possible and/or disposed of in a responsible manner. That a risk-adverse and cautious approach is applied, which takes into account the limits of current knowledge about the consequences of decisions or actions. That negative impacts on the environment and on people’s environmental rights be anticipated and prevented, and where they cannot be altogether prevented, are minimized and remedied. The right of workers to refuse work that is harmful to human health or the environment and to be informed Terratest (Pty) Ltd Page | 1-iv Construction Environmental Management Programme EC/7/A/LN1/14/15-08 of dangers must be respected and protected. The role of women and youth in environmental management and development must be recognised and their full participation therein must be promoted. Responsibility for the environmental health and safety consequences of a policy, programme, project, product, process, service or activity exists throughout its life cycle. The participation of interested and affected parties in environmental governance must be promoted, and people must have the opportunity to develop the understanding, skills and capacity necessary for achieving equitable and effective participation. The participation by vulnerable and disadvantaged persons must be ensured. Decisions must take into account the interests, needs and values of all interested and affected parties, and this includes recognising all forms of knowledge, including traditional and ordinary knowledge. That the cost of remedying pollution, environmental degradation and consequent adverse health effects and of preventing, controlling or minimizing further pollution, environmental damage or adverse health effects must be paid for by those responsible for harming the environment. Community well-being and empowerment must be promoted through environmental education, the raising of environmental awareness, the sharing of knowledge and experience and other appropriate means. Decisions must be taken in an open and transparent manner, and access to information must be provided in accordance with the law. 3.3 National Water Act, 1998 The National Water Act, 1998 (Act 36 of 1998) (NWA) makes provision for the protection of surface water and groundwater resources and their sustainable management for the prevention and remediation of the effects of pollution, and for the control of emergency occurrences. The primary purpose of the NWA is to manage and control South Africa’s water resources by: Meeting the basic human needs of present and future generations. Promoting the efficient, sustainable and beneficial use of water in the public interest. Facilitating social and economic development. Providing for growing demands for water use. Protecting aquatic and associated ecosystems and their biological diversity. Reducing and preventing pollution and degradation of water resources; and meeting international obligations. Landowners and users have an obligation not to pollute water, and prescribe certain measures to prevent pollution. When a bed, bank, course or characteristics of a watercourse is altered, or when the flow of water in a watercourse is impeded or diverted, the Act required that an application for authorisation / license be made Terratest (Pty) Ltd Page | 1-v Construction Environmental Management Programme EC/7/A/LN1/14/15-08 to the Department of Water and Sanitation (DWS). 3.4 Other legislation and specifications Environment Conservation Act No. 73 of 1989. National Environment Management: Air Quality Act, No. 39 of 2004. Water Services Act, No. 108 of 1997. Occupational Health and Safety Act, No 85 of 1993. National Building Regulations and Building Standards Act, No 103 of 1977. South African Heritage Resources Act, No 25 of 1999. Relevant regulations as promulgated under the Standards Act, No 30 of 1982. Minerals and Petroleum Resources Development Act, No. 28 of 2002. The National Road Traffic Act, No. 93 of 1996. All applicable South African National Standards (SANS) specifications. Terratest (Pty) Ltd Page | 1-vi Construction Environmental Management Programme EC/7/A/LN1/14/15-08 VOLUME 1 CONSTRUCTION ENVIRONMENTAL MANAGEMENT PROGRAMME Terratest (Pty) Ltd Page | 2- v Construction Environmental Management Programme EC/7/A/LN1/14/15-08 TABLE OF CONTENTS 1. 2. INTRODUCTION 4 1.1 Objectives of the Construction Environmental Management Programme ......................................... 4 1.2 Status of this Document ...................................................................................................................... 4 GENERAL REQUIREMENTS OF THE EMP 5 2.1 EMP Administration ............................................................................................................................ 5 2.2 Roles and Responsibilities .................................................................................................................. 5 2.2.1 Organizational structure .............................................................................................................. 5 2.2.2 Eastern Cape Department of Economic Development, Environmental Affairs and Tourism ..... 6 2.2.3 The Kempston Group ................................................................................................................. 6 2.2.4 Employer's Representative ......................................................................................................... 6 2.2.5 Environmental Control Officer..................................................................................................... 6 2.2.6 Contractor's Environmental Liaison Officer ................................................................................ 7 2.3 Environmental Awareness Training .................................................................................................... 8 2.4 Method Statements ............................................................................................................................. 8 3. CONTROL OF CONSTRUCTION ACTIVITIES 10 4. CONTROL OF POST-CONSTRUCTION AND REHABILITATION ACTIVITIES 24 5. NON-COMPLIANCES 26 5.1 Offences and Penalties .............................................................................................................26 5.2 Fines .........................................................................................................................................27 5.3 Penalties ...................................................................................................................................28 APPENDICES Appendix A - Complaints Register Appendix B - Environmental Incidents Register Appendix C - Example of a method statement Appendix D - Environmental Awareness Training Material Terratest (Pty) Ltd Page | 1-i Construction Environmental Management Programme EC/7/A/LN1/14/15-08 DEFINITIONS For the purpose of this document the following definitions will apply: Alien vegetation means all undesirable vegetation, defined as but not limited to, all declared category 1 and category 2 plants in terms of the Conservation of Agricultural Resources Act (43 of 1983) (CARA) amended regulations 15 and 16 as promulgated in March 2001. Construction activity refers to any action taken by the Contractor, his subcontractors, suppliers or personnel in undertaking the construction work. Construction area(s) refers to all areas used by the Contractor in order to carry out the required construction activities. This includes, all offices, accommodation facilities, testing facilities/laboratories, batching areas, storage & stockpiling areas, workshops, spoiling areas, access roads, traffic accommodation (e.g. bypasses), etc. Contractor is a person or company appointed by the Applicant to carry out construction activities. Emergency is an undesired event that does result in a significant environmental impact and requires the notification of the relevant statutory body, such as a Local Authority. Environment means the surroundings within which humans exist and that are made up of - land, water and atmosphere; micro-organisms, plant and animal life; any part or combination of the above and the interrelationships among and between them; the physical, chemical, aesthetic and cultural properties and conditions of the foregoing that influence human health and well-being. Environmental Control Officer is an individual appointed to monitor and audit the implementation and of the EMP. Environmental Impact is a change to the environment, whether adverse or beneficial, wholly or partially, resulting from an organisation’s activities, products or services. Environmental Management Programme is a detailed plan of action prepared to ensure that recommendations for enhancing or ensuring positive impacts and limiting or preventing negative environmental impacts are implemented during the life cycle of a project. This EMP focuses on the Construction, Post Construction Rehabilitation and Operation / Maintenance Phases of the proposed project. Environmental Impact refers to any change to the environment, whether desirable or undesirable, that would result directly or indirectly from any construction activity. Hazardous material/substances refer to any substance that contains an element of risk and could have a deleterious effect on the environment. Incident is an undesired event which may result in a significant environmental impact but can be managed through internal response. Terratest (Pty) Ltd Page | 1-ii Construction Environmental Management Programme EC/7/A/LN1/14/15-08 ABBREVIATIONS AVCP Alien Vegetation Clearing Programme BA Basic Assessment BAR Basic Assessment Report DEDEAT Department of Economic Development, Environmental Affairs and Tourism DWS Department of Water and Sanitation EA Environmental Authorisation ECO Environmental Control Officer EIA Environmental Impact Assessment ELO Environmental Liaison Officer EMP Environmental Management Programme ER Employers Representative IAP Interested and Affected Party IDP Integrated Development Plan MS Method Statement NEMA National Environmental Management Act, 1998 (Act No. 107 of 1998) Terratest (Pty) Ltd Page | 1-iii Construction Environmental Management Programme 1. 1.1 EC/7/A/LN1/14/15-08 INTRODUCTION Objectives of the Construction Environmental Management Programme The primary objectives of the EMP are as follows: To ensure that any impacts on the environment associated with the construction phase are prevented and, where they cannot be prevented, are minimised. To indicate responsibilities, schedules and staff resources regarding the implementation of these action plans. To describe action plans and mitigation measures for the potential environmental impacts. To highlight a monitoring programme, that will enable review of the success of the EMP and the provision of such information to the relevant decision-makers. The Construction EMP sets environmental targets for the Contractor and reasonable standards against which the Contractor’s performance can be measured during the construction phase. This document will form the basis for the environmental specifications that the Contractor, in terms of the construction contract, will be obliged to adhere to during construction. This document will be included in the contract documentation for the construction phase and will thus form a binding agreement between the Contractor and the applicant for the Environmental Authorisation (hereafter referred to as the EA holder). The below sections of the Construction EMP comprises of the following: General Requirements of the EMP: This section identifies the management structure and responsibilities of the various stakeholders. The procedures for environmental management and monitoring of the construction phase are also presented. Control of Construction Activities: This section presents all the environmental specifications, action plans and mitigation measures relating to the proposed project. Control of Post-Construction and Rehabilitation Activities: This section identifies all the rehabilitation and post-construction activities required to be undertaken for the proposed project. Non-Compliances: This section provides all details regarding fines and penalties that is applicable to the construction phase of the proposed project. 1.2 Status of this Document The provisions of this EMP are binding on the Contractor (and his subcontractors, where applicable) during the construction period and Defects Liability Period of the contract. This specification must therefore be read in conjunction with all the documents that comprise the contract documents for this contract. In the event that any conflict occurs between the terms of the EMP and the Project Specification or the EA, the terms of the EMP shall stand. Responsibility for environmental management on the site, as stipulated in the EMP will be handed over from Terratest (Pty) Ltd Page | 1-4 Construction Environmental Management Programme EC/7/A/LN1/14/15-08 the Contractor to the Applicant upon issuing of a completion certificate at site handover. 2. 2.1 GENERAL REQUIREMENTS OF THE EMP EMP Administration During the Construction Phase, copies of this EMP shall be kept at the construction site office and must be distributed to all senior contract personnel. All senior personnel shall be required to familiarise themselves with the contents of this document and will further be required to sign a register confirming their understanding of the document. If necessary, the Environmental Control Officer (ECO) must conduct a training session with senior personnel regarding the implementation of the EMP. During the construction phase, senior personnel will be required to educate their workers regarding the contents of this document and how to comply with its requirements. This register shall be continuously updated as changeover of senior personnel takes place. 2.2 Roles and Responsibilities The implementation of this EMP requires the involvement of several stakeholders, each fulfilling a different but vital role to ensure sound environmental management during the construction and operational phases. These stakeholders are discussed below. 2.2.1 Organizational structure Details of the proposed organizational structure are presented in Figure 1. The structure illustrates the reporting procedures for stakeholders in the implementation of this EMP. Authority DEDEAT Environmental Management Committee IAPs Environmental Control Officer TBC Employer Edcot Trust Employer’s Representative TBC Contractor TBC Figure 2: Proposed EMP implementation organisational structure Terratest (Pty) Ltd Page | 1-5 Construction Environmental Management Programme 2.2.2 EC/7/A/LN1/14/15-08 Eastern Cape Department of Economic Development, Environmental Affairs and Tourism The DEDEAT is the designated authority responsible for authorising the environmental application and the EMP related to the project. The DEDEAT has overall responsibility for ensuring that the Applicant complies with the conditions of the Environmental Authorisation (EA) and this EMP. 2.2.3 The Kempston Group Under South African environmental legislation, the Applicant/Employer is accountable for the potential impacts of the activities that are undertaken and is responsible for managing these impacts. The Kempston Group, as the Applicant / Employer therefore has overall environmental responsibility to ensure that the implementation of this EMP complies with the relevant legislation and the conditions of the EA. The Employer will appoint a Contractor to undertake the construction and operation of the proposed development, but will still ultimately be responsible for any environmental impacts. 2.2.4 Employer's Representative The appointed Civil and Consulting Engineers, as the Employer’s Representative (ER) would act as the Employer’s on-site implementing agent, together with the appointed Contractors during the construction and operational phases, and will have the responsibility to ensure that the Employer’s responsibilities are executed in compliance with the relevant legislation, the EA and the EMP. In addition to general project management, the ER, together with the Applicant has the responsibility to appoint the ECO. Any on-site decisions regarding environmental management, however, are ultimately the responsibility of the ECO. The on-site ER shall assist the ECO where necessary and will have the following responsibilities in terms of the implementation of this EMP: Ensuring that the necessary environmental authorisations and permits have been obtained. Reviewing and approving the Contractor’s Method Statements with input from the ECO where necessary. Assisting the Contractor in finding environmentally responsible solutions to problems with input from the ECO where necessary. Ordering the removal of person(s) and/or equipment not complying with the EMP specifications. Issuing fines for transgressions of site rules and penalties for contravention of the EMP. Providing input into the ECO’s on-going internal review of the EMP, which is submitted as a report to the Employer. 2.2.5 Environmental Control Officer The independent ECO appointed to the project will monitor and review the on-site environmental management and implementation of this EMP by the Contractor during both the construction and operational phases. This will be done by conducting site audits for the duration of the contract and supply monthly audit reports for Terratest (Pty) Ltd Page | 1-6 Construction Environmental Management Programme EC/7/A/LN1/14/15-08 submission to the Project Team. The ECO’s duties will include the following: Assisting the ER in ensuring that the necessary environmental authorisations and permits have been obtained prior to construction and operation commencing. Maintaining open and direct lines of communication between the ER, Employer and Contractor with regard to environmental matters. Reviewing the Contractor’s construction Method Statements together with the ER. Site inspections of all construction areas with regard to compliance with the EMP. Monitoring and verifying adherence to the EMP, the EA and approved Method Statements at all times. Monitoring and verifying that environmental impacts are kept to a minimum. Taking appropriate action if the specifications are not followed, this includes reporting the transgressions to the ER. Monitoring the undertaking by the Contractor of environmental awareness training for all staff and new personnel coming onto site. Advising on the removal of person(s) and/or equipment not complying with the specifications of the EMP (via the ER). Recommendations regarding the issuing of fines for transgressions of site rules and penalties for contraventions of the EMP (via the ER). Auditing the implementation of the EMP and compliance with the EA on a monthly basis. Compiling a final audit report regarding the EMP and its implementation during the construction period after completion of the contract and submitting this report to the Employer and the authorising authority. The ECO will continue to conduct audits throughout the operational phase. 2.2.6 Contractor's Environmental Liaison Officer The Contractor referred to is appointed by the Employer to undertake the construction activities for the project. The appointed Contractor will be required to appoint a competent individual as the Contractor’s on-site Environmental Liaison Officer (ELO). The selected ELO must be at least at Foreman level appointment and must fully familiarise him-/herself with the contents of this EMP. He/she will be required to sign the register confirming his/her familiarity with the document. The ELO must furthermore possess the necessary skills to action environmental management to all personnel involved in the contract. The ELO will be responsible for overseeing the Contractor’s internal compliance with the EMP requirements and ensuring that the environmental specifications are adhered to. The ELO will be responsible for keeping detailed records of all site activities that may pertain to the environment and include all these aspects in an environmental register. This register must be presented at each EMC meeting and be made available to the ECO during his/her fortnightly audits. In addition to the environmental Terratest (Pty) Ltd Page | 1-7 Construction Environmental Management Programme EC/7/A/LN1/14/15-08 register the ELO must keep a register of complaints from any community members on environmental issues. Finally, the ELO will be required to keep a record of all on-site environmentally related incidents and how these incidents were dealt with. 2.3 Environmental Awareness Training The Contractor shall ensure that adequate environmental awareness training of senior site personnel takes place and that all construction and operational phase workers receive an induction presentation on the importance and implications of the EMP. See Appendix 4 for environmental awareness training material. The presentation shall be conducted, as far as possible, in the employees’ language of choice. As a minimum, training shall include: Explanation of the importance of complying with the EMP. Discussion of the potential environmental impacts of construction / operational activities. The benefits of improvement personal performance. Employees’ roles and responsibilities, including emergency preparedness. Explanation of the mitigation measures that must be implemented when carrying out their activities. Explanation of the specifics of this EMP and its implementation. Explanation of the management structure of individuals responsible for matters pertaining to the EMP. The contractor shall keep records of all environmental training sessions, including names, dates and the information presented. These records will be presented to the ECO on request during his/her audits. 2.4 Method Statements Method Statements (MS) are written submissions by the Contractor to the ER in response to the requirements of this EMP or to a request by the ER. The Contractor shall be required to prepare Method Statements for several specific construction activities and/or environmental management aspects. The Contractor shall not commence the activity for which a Method Statement is required until ER has approved the relevant Method Statement. Method Statements must be submitted at least 20 working days prior to date on which approval is required to the ER. The ER must in turn accept or reject the Method Statement within 10 working days of receipt. Failure to submit a Method Statement may result in suspension of the activity concerned until such time as a Method Statement has been submitted and approved. An approved Method Statement shall not absolve the Contractor from any of his obligations or responsibilities in terms of the contract. However, any damage caused to the environment through activities undertaken Terratest (Pty) Ltd Page | 1-8 Construction Environmental Management Programme EC/7/A/LN1/14/15-08 without an approved Method Statement shall be rehabilitated at the Contractor’s expense. The Method Statements shall cover relevant details with regard to: Construction procedures and location of the construction camp. Start date and duration of the procedure. Materials, equipment and labour to be used. How materials, equipment and labour would be moved to and from the site as well as on site during construction. Storage, removal and subsequent handling of all materials, excess materials and waste materials of the procedure. Emergency procedures in case of any reasonably potential accident/incident which would occur during the procedure. Compliance/non-compliance with the EMP specifications and motivation if non-compliant. Method statements (MS) required: Based on the specifications in this EMP, the following Method Statements (MS) are required as a minimum: MS1: Site layout and establishment MS2: Site clearing MS3: Handling, storage and disposal of hazardous substances (if applicable) MS4: Solid waste (general and hazardous) control system MS5: Erosion remediation and stabilisation MS6: Stormwater Control MS7: Rehabilitation procedures Terratest (Pty) Ltd Page | 1-9 Construction Environmental Management Programme 3. EC/7/A/LN1/14/15-08 CONTROL OF CONSTRUCTION ACTIVITIES Most environmental impacts of developments occur in the construction phase of the project. As a result the regulation of construction activities and the general conduct of the workforce is an essential component of this EMP and must be carried out in conjunction with the ECO. In the tables that follow, the following abbreviations have been used: E = Engineer ECO = Environmental Control Officer C = Contractor OM = Operational Manager S = Staff Terratest (Pty) Ltd Page | 1-10 Construction Environmental Management Programme EC/7/A/LN1/14/15-08 Table 1: Environmental Specifications ENVIRONMENTAL MANAGEMENT ACTIVITY RESPONSIBILITY OCCURRENCE METHOD C Ongoing Site inspection C Ongoing Site inspection C/ECO During staff induction / Ongoing Site inspection and staff interviews C Prior to moving onto site ECO Ongoing C/ECO Ongoing - ECO During staff induction, followed by ongoing monitoring Liaison with labour C Before construction Inspection of MS / Admin A Complaints Register must be maintained on the site for the duration of the construction phase. This should be kept in the Environmental File. An example of the format of the complaints register is attached in Appendix A. An Environmental Incidents Register must be maintained on the site for the duration of the construction phase. This should be kept in the Environmental File. An example of the format of the environmental incidents register is attached in Appendix B. Environmental Education and Awareness It must be ensured that all site personnel have a basic level of environmental awareness training. The contractor must ensure that all construction staff are aware of the following: • • • • • • What is meant by “environment” Why the environment needs to be protected and conserved How construction activities can impact on the environment What can be done to mitigate against such impacts Awareness of emergency spills response provisions Social responsibility during construction (being considerate to residents etc.) It is the Contractors’ responsibility to provide the site foreman with environmental training and to ensure that the foreman has sufficient understanding to pass this information onto the construction staff. Translators are to be used if necessary, to ensure that all staff understand what is required of them in terms of the EMP. The Contractor / ECO must be on hand to explain any technical issues and to answer questions. The need for a ‘clean site’ policy needs to be explained to everyone working on site. Liaison with Contractor, Foreman Liaison with labour Site Establishment MS1: Before construction can begin, the Contractor shall submit to the ER for approval a Method Statement detailing a layout plan and the method of establishment of the construction camp, i.e. all offices, storage and stockpiling areas and all other areas / facilities required for the undertaking of activities required for completion of the project. The plan shall include the location and layout of waste storage facilities, ablution facilities, stockpiling and spoil areas (if applicable), no go areas and hazardous material storage areas (if applicable). The demolition and removal of these facilities on completion of construction works shall also be detailed. Terratest (Pty) Ltd Page | 1-11 Construction Environmental Management Programme ENVIRONMENTAL MANAGEMENT ACTIVITY EC/7/A/LN1/14/15-08 RESPONSIBILITY OCCURRENCE METHOD C Before construction Site inspection C Before construction C For duration of construction Site inspection C For duration of construction Site inspection / The Contractor is to adhere to the following with regards to the Materials Storage Area and Contractors Camp: • • • All servitudes and existing services must be verified prior to establishment The camp site must be fenced before construction commences Site establishment shall not take place on steep slopes, within 100 m of wetland areas and watercourses or sites declared as no-go areas The Contractor shall restrict all his activities, materials, equipment and personnel to within the area specified. The Contractor shall ensure that the approved construction area will be adequate to cover the project without further space adjustments being required at a later date. Adequate parking must be provided for site staff and visitors. No-Go Areas Areas where construction activities (including temporary access tracks) are prohibited are referred to as no-go areas. These include watercourses, wetlands, steep slopes and areas which have been severely eroded. Entry into these areas by any person, vehicle or equipment without the ER’s written permission will result in a penalty. All declared no-go areas will be demarcated by temporary fencing, the position of which shall be agreed to by the ER and the ELO, and appropriate signage. All private property outside of the construction areas as set out in the site layout plan shall be considered no-go areas. The ER may declare additional no-go areas at any time during the construction phase as deemed necessary and/or at the request of the ECO and/or the EMC. Demarcation materials (fencing, signage, etc.) shall not be moved or removed at any stage of the project without the written consent of the ER. Temporary Fencing The Contractor shall erect temporary fencing along the perimeter of the contractor’s site camp and designated no-go areas. Temporary fencing shall, as a minimum, consist of wooden or metal posts at 3m intervals, with two plain wire strands tensioned horizontally at heights of 300mm and 900mm above the ground, threaded with commercial type danger tape. The Contractor shall maintain in good order all demarcation fencing and barriers for the duration of construction activities, or as otherwise instructed. Ablutions Portable chemical toilets must be provided for the construction workforce. These facilities must be regularly serviced by an appropriate service provider. Toilets must be no closer than 50m from any natural water body watercourses (Section 1 (24 and 29) National Water Act (36 of 1998)). Terratest (Pty) Ltd C C C C For duration of construction For duration of construction For duration of construction For duration of construction Site inspection Site inspection Site inspection Site inspection C For duration of construction Site inspection C For duration of construction Site inspection C For duration of construction Site inspection C Ongoing Site inspection C Ongoing Site inspection Page | 1-12 Construction Environmental Management Programme ENVIRONMENTAL MANAGEMENT ACTIVITY The construction of long drop toilets is forbidden. Under no circumstances may local drainage lines or streams be used as a toilet or cleaning facility by workers on site. The Contractor shall be responsible for ensuring that all ablution facilities are maintained in a clean and sanitary condition to the satisfaction of the ER. Sanitation facilities should be well maintained and serviced, any breakages or leaks should be fixed immediately to prevent loss of containment. Eating Areas If none is available, the Contractor shall provide adequate temporary shade within the construction areas to ensure that site personnel do not move off site to eat. The Contractor shall provide adequate refuse bins at all eating areas to the satisfaction of the ER, in order to minimise littering. If deemed necessary by the ER, the Contractor shall demarcate designated eating areas. EC/7/A/LN1/14/15-08 RESPONSIBILITY OCCURRENCE METHOD C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Before construction Inspection of MS C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection / Water provision The Contractor shall make available safe drinking water fit for human consumption at the site offices and all other working areas. All drinking water must be from a legal source and comply with recognised standards for potable use. The Contractor shall comply with the provisions of the National Water Act, 1998 (Act 36 of 1998) and its Regulations pertaining to the abstraction of waters from rivers and streams and the use thereof. If water is stored on site, drinking water and multi-purposed water storage facilities shall be clearly distinguished and demarcated. No water for either drinking or construction purposes may be abstracted from local streams, rivers or drainage lines. Site Clearing MS2: The Contractor shall submit a site clearing method for all areas where the Contractor is required to, or intends to, clear vegetation. The Method Statement will include: • • • • A clear indication of land reference Which areas will be cleared How these areas will be cleared How the cleared materials will be stored or disposed of No vegetation clearing shall take place without written approval of the Method Statement by the ER. Vegetation clearing shall take place in a phased manner in order to retain vegetation cover for as long as possible. Topsoil removal and stockpiling The Contractor shall remove topsoil from all areas where topsoil will be impacted on by construction activities, including temporary activities such as storage and stockpiling areas. Terratest (Pty) Ltd Page | 1-13 Construction Environmental Management Programme ENVIRONMENTAL MANAGEMENT ACTIVITY Stripped topsoil shall be stockpiled in areas agreed with by the ER for later use in rehabilitation and shall be adequately protected. Topsoil is considered to be the natural soil covering, including all the vegetation and organic matter. The depth of the soil may vary and due to this reason the top 300mm of soil must be removed and preserved as topsoil. Topsoil stockpiles shall be convex in shape and no more than 2m high. Stockpiles shall be shaped so that no surface water ponding can take place. Topsoil stockpiles shall be protected from erosion by wind and rain by providing suitable stormwater and cut-off drains (approved by the ER) and/or the establishment of temporary indigenous vegetation. Topsoil stockpiles shall not be subject to compaction greater than 1 500 kg/m 2 and shall not be pushed by a bulldozer for more than 50m. Topsoil stockpiles shall be monitored regularly to identify any alien plants. If any establish, these must be removed when they germinate to prevent contamination of the soil. Before topsoil is to be re-used the stockpiles should be fertilised. Any topsoil contaminated by hazardous substances shall not be used but shall be disposed of at a registered H:h landfill site. Proof of appropriate disposal must be filed in the Environmental File in the Contractor’s Camp. The Contractor shall be held responsible for the replacement, at his expense, of any unnecessary loss of topsoil due to his failure to work according to the approved Method Statement and the requirements of this EMP. Soil must be stockpiled in such a way as to minimize erosion. EC/7/A/LN1/14/15-08 RESPONSIBILITY OCCURRENCE METHOD C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Before construction Inspection of MS C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection / Soil erosion and sedimentation control MS5: The Contractor shall submit a Method Statement to the ER for approval detailing the methods of stabilisation and erosion prevention and remediation in specific areas, as and when the need arises. The Contractor shall, as and when necessary, implement erosion control measures to the satisfaction of the ER. During construction, the Contractor shall protect all areas susceptible to erosion by installing necessary temporary and permanent drainage works as soon as possible and by taking any other measures necessary to prevent stormwater from concentrating in streams and scouring slopes and steep banks. Any runnels or erosion channels developed during the construction or maintenance period shall be backfilled and compacted and the areas restored to a proper condition similar to the condition before the erosion occurrence. Terratest (Pty) Ltd Page | 1-14 Construction Environmental Management Programme ENVIRONMENTAL MANAGEMENT ACTIVITY EC/7/A/LN1/14/15-08 RESPONSIBILITY OCCURRENCE METHOD C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Before construction Inspection of MS C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Design stage – onceoff Site inspection C Before operation commences Site inspection C Ongoing Site inspection / Stabilisation of cleared areas to prevent and control erosion and/or sedimentation shall be actively managed. The method of stabilisation shall be determined in consultation with the ER. Consideration and provision shall be made for the following methods (or combination thereof): • • • • • • • • Brushcut packing; Mulch or chip cover; Straw stabilising; Watering, planting or sodding; Soil binders; Anti-erosion compounds; Mechanical cover; and Packing structures (including the use of geo-fabric and log/pole fencing) Traffic and movement over stabilised areas shall be restricted and controlled and damage to stabilised areas shall be repaired and maintained to the satisfaction of the ER. In areas where construction activities have been completed and where no further disturbance would take place, rehabilitation and re-vegetation (comprising the replacement of top soil and grass planting) must commence as soon as possible. Stormwater management MS6: The Contractor shall submit a Method Statement to the ER for approval detailing the method of stormwater control measures for the entire project area. Temporary stormwater control measures must be installed as and when necessary, to prevent and minimise the erosion of exposed soils. To prevent stormwater damage, the increase in stormwater runoff resulting from the construction activities must be estimated and the drainage patterns accessed accordingly. A drainage plan must be submitted to the Engineer for approval. Temporary cut off drains and berms may be required to capture stormwater and promote infiltration. Stormwater management from the forecourt area should be designed to collect all runoff which should pass through an oil/water separator prior to be discharged Groundwater protection Fuel storage tanks will need to be constructed according to SABS guidelines and good engineering practice. If above-ground storage tanks are to be utilised, they should be constructed with bunds to prevent surface leakage of hydrocarbons. Monitoring wells should be installed in each corner of any Underground Storage Tank (UST) excavations as per SABS and monitored regularly as an early leak detection system. Baseline water quality of the nearby boreholes should be established. As a first response, emergency spill kits on site are a necessity for handling any minor spills that may impact on the water resources for emergency response to any surface spills. Terratest (Pty) Ltd Page | 1-15 Construction Environmental Management Programme ENVIRONMENTAL MANAGEMENT ACTIVITY It must be ensured that, at locations where conditions of high ground water or flood water are known to exist or likely to occur, the tank is safeguarded against movement or floating by means of a reinforced concrete slab cast on top of the tank or by means of concrete saddles. The permeability of soils must be taken into consideration when installing the tank(s). Ensure that all tank installations include: A filler box, which can contain the contents of a bulk delivery vehicle, discharge hose. Earthing and snap-tight-quick-coupling for loading of material into tanks to minimise risk of fires and prevent spillage and loss of material. An overfill protector fitted on the tanks. A leak detector on all submersible pumps that automatically checks the integrity of the pipe work on the pressure side of the pump. Pipelines that do not retain product after use and that joints are not made underground. Ensure that the underground storage tanks are thoroughly inspected prior to installation for fracture and damage and that the inspection authority has issued test certificates. Leak and pressure tests must be conducted on tanks and pipelines to ensure integrity prior to operation and the inspection authority must issue pressure test certificates. An emergency shut-off valve must be supplied between the supply pipeline and dispenser inlet. Installation must comply with local authority bylaws and all procedures and equipment used must be in accordance with the Occupational Health & Safety Act (No. 85 of 1993) and its Regulations and applicable South African National Standards (SANS) codes (refer to Appendix B for a list of applicable SANS codes). The following Measures should be implemented during the installation of the UST’s: Excavation dimensions should be at least 1.05m + tank diameter below the forecourt paving, and 1.0m + tank diameter wide and long. 0.5m should be allowed between any adjacent tanks Observation wells should be placed in each corner of the excavation The excavation should be level at the base and free of rock or sharp objects A minimum thickness of 150mm backfill should be placed in the excavation and compacted to engineering specification. A cohesive sand or gravel should be used as backfill A sheet of suitable non-metallic (polyethylene) sheeting should be placed across the excavation floor in river sand with a minimum fall of 150mm across the tank length. The sheeting should extend up the excavation walls by at least 1.1m An internal observation well should be placed above the sheeting at the lowest point The tanks should be placed level and the cohesive sand backfill placed around the tanks by hand shovel in compacted layers of 150mm. Workshop, equipment maintenance and storage All vehicles and equipment shall be kept in good working order to maximise efficiency and minimise pollution. Terratest (Pty) Ltd EC/7/A/LN1/14/15-08 RESPONSIBILITY OCCURRENCE METHOD C Once-off Site inspection C After tank installation Site inspection C During tank installation Site inspection C At all times Site inspection C During tank installation Site inspection C Ongoing Site inspection / Page | 1-16 Construction Environmental Management Programme ENVIRONMENTAL MANAGEMENT ACTIVITY EC/7/A/LN1/14/15-08 RESPONSIBILITY OCCURRENCE METHOD C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C/ECO Before construction commences ECO On receipt of natural materials C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection No foreign material generated/deposited during construction shall remain on site. C Ongoing Site inspection Areas affected by stockpiling shall be reinstated to the satisfaction of the ER and the ECO. C Ongoing Site inspection C Before construction Inspection of MS All maintenance, including washing and refuelling of plant shall take place off-site. If refuelling is necessary on site it shall take place at a designated location, away from any sensitive environments and over a drip tray. The Contractor shall ensure that no contamination of soil or vegetation occurs as a result of refuelling activities. Drip trays shall be provided for all stationary plant. The washing of equipment shall be restricted to urgent maintenance requirements only. All washing shall be undertaken in the maintenance area, and these areas must be equipped with suitable wastewater collection measures. The use of detergents for washing shall be restricted to low phosphate and nitrate containing, low sudsing-type detergents. Materials Management Contractors shall prepare a source statement indicating the sources of all materials and submit these to the ECO for approval prior to the commencement of any work. A signed document from the supplier of natural materials (e.g. material to be utilised in backfilling around structures or in foundations for the substation) must be obtained confirming that they have been obtained in a sustainable manner and in compliance with relevant legislation (if applicable). Material Stockpiling The Contractor shall plan his activities so that materials can be transported directly to and placed at the point where it is to be used. Should temporary stockpiling become necessary, the areas for the stockpiling of excavated / imported material shall be indicated and demarcated on the site plan submitted in writing to the ER for his approval, together with the Contractor’s proposed measures for prevention, containment and rehabilitation against environmental damage. Stockpiles shall be positioned and sloped to create the least visual impact. / Review of source statement Review of signed document Hazardous substances MS3: If hazardous materials are to be stored on the site, the Contractor shall provide a Method Statement detailing the types of hazardous substances/materials that are to be used, as well as the storage, handling and disposal procedures for each substance / material and emergency procedures in the event of misuse or spillage that might negatively affect people or the environment. Terratest (Pty) Ltd Page | 1-17 Construction Environmental Management Programme ENVIRONMENTAL MANAGEMENT ACTIVITY Should any hazardous material / substances (e.g. petrochemicals, oils, paints, etc.) need to be stored on the site, this shall be under controlled conditions. All hazardous materials/substances shall be stored in a secured, appointed area that is fenced and has restricted entry. All storage shall take place using suitable, sealable containers to the approval of the ER. These containers must be placed within a bunded area which has the capacity to contain 110% of the total volume it stores. The floor and wall of the bund area shall be impervious to prevent infiltration of any spilled/leaked materials into the soil. No spillages or accumulated stormwater within this bunded area will be allowed to be flushed from the bund into the surrounding area. All fluids accumulated within the bunded area shall be removed by a registered service provider and disposed of at an approved landfill site which is registered to deal with waste of this nature. Proof of appropriate disposal must be kept in the Environmental File at the Contractor’s Camp. Hazard signs indicating the nature of the stored materials shall be displayed on the storage facility or containment structure. Should there be a need to store fuel on the site, it shall be stored in a steel tank supplied and maintained by the fuel supplier. The tanks shall be located in a secure, demarcated area and an adequate bund wall (110% of the total volume of the tank) shall be provided. The floor and wall of the bund area shall be impervious to prevent infiltration of any spilled/leaked fuel into the soil. No possible spillages or accumulated stormwater within this bunded area will be allowed to be flushed from the bund into the surrounding area. All fluids accumulated within the bunded area shall be removed by a registered service provider and disposed of at a licensed landfill site which is registered to deal with waste of this nature. Proof of appropriate disposal must be kept in the Environmental File at the Contractor’s Camp. Material Safety Data Sheets (MSDS’s) must be readily available for all chemicals / hazardous substances to be used on site. Where possible and available, MSDS’s should include additional information on ecological impacts and measures to minimise and mitigate against any negative environmental impacts in the result of an accidental spill. Weighbills shall be sourced from the service provider for any hazardous waste disposal and be kept on site for inspection by the ECO during his/her audits. Should any significant spills of hazardous substances occur, these must be reported to the DEDEAT. EC/7/A/LN1/14/15-08 RESPONSIBILITY OCCURRENCE METHOD C Ongoing Site inspection C Ongoing Site inspection C/E Before construction commences Review of MSDSs C Ongoing Site inspection C Ongoing Site inspection Ensure that any hydrocarbon/chemical/hazardous substance spills are cleaned up as soon as possible. C Ongoing Site inspection Provide drip-trays for vehicles that leak hydrocarbons and fix these leaks off site immediately. C Ongoing Site inspection Ensure that a proper spill-kit is available at all times where hydro-carbon handling will be undertaken. C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection / Cement and concrete mixing If concrete or cement mixing is to be undertaken on the site, this must be undertaken on an impermeable surface. Any contaminated water generated by these activities must be contained and appropriately treated / disposed of. No contaminated water may be discharged to the environment. At the end of each day, any leftover / unused cement is to be removed from the site for appropriate disposal by the concrete supplier. Washing of the excess concrete into the ground is not allowed. Terratest (Pty) Ltd Page | 1-18 Construction Environmental Management Programme ENVIRONMENTAL MANAGEMENT ACTIVITY EC/7/A/LN1/14/15-08 RESPONSIBILITY OCCURRENCE METHOD C Before construction Inspection of MS C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection / Waste management MS4: The Contractor shall submit a Method Statement detailing a solid waste control system (minimisation procedures, separation, storage, provision of bins, site clean-up schedule, bin cleanout schedule, recycling options and points of disposal for the various waste types (general and hazardous, as a minimum) to the ER for approval. Waste management on site shall be strictly controlled and monitored. Only approved waste disposal methods shall be allowed, these include: • • Topsoil: Topsoil will be utilised on site for rehabilitation purposes. • General construction waste: must be removed from bins at sufficient intervals to prevent overflow. This waste must be stored in skips within a designated waste storage area in the Contractor’s Camp. General waste must be transported to the local municipal general waste landfill site by either the municipality, the Contractor or a private waste disposal contractor. Service agreements in this regard must be obtained by the Applicant / Contractor prior to the commencement of construction activities. Material: landfilled (if approved by the relevant municipality), spoiled in closed borrow pit (with permission from borrow pit operator and/or landowner). • Hazardous construction wastes: Must be stored in a designated, access controlled, sign posted and bunded storage area. This waste must be collected as and when necessary by an appropriately trained service provider and must be transported to a Hazardous Waste Landfill Site for disposal. The Contractor shall ensure that all site personnel are instructed in the proper disposal of all waste. Demarcated and fenced areas where waste can be safely contained and stored on a temporary basis within the Contractors Camp must be established. General waste storage areas must be separate from hazardous waste storage areas. When adequate volumes (not more than 1 month) have accumulated, waste is to be removed from site and disposed of at a licensed facility. No burning, on-site burying or dumping of waste shall be allowed. Refuse handling areas should be confined to concrete lined facilities that are covered to prevent ingress of rainfall. Terratest (Pty) Ltd Page | 1-19 Construction Environmental Management Programme ENVIRONMENTAL MANAGEMENT ACTIVITY EC/7/A/LN1/14/15-08 RESPONSIBILITY OCCURRENCE METHOD C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection / General Solid Waste • The Contractor shall ensure that all facilities are maintained in a neat and tidy condition and the site shall be kept free of litter. Measures shall be taken to reduce the potential for litter and negligent behaviour with regard to the disposal of all refuse. At all places of work the Contractor shall provide litter bins, containers and refuse collection facilities for later disposal at a registered landfill site. • It is recommended that general wastes be separated on the site and delivered to appropriate depots for recycling. This would be facilitated by the provision of separate and labelled bins / skips. • Solid waste may be temporarily stored on site in a designated area approved by the ER prior to collection and disposal at a registered landfill site. Waste storage containers shall be covered, tipproof, weatherproof and scavenger proof. The waste storage area shall be fenced off to prevent windblown litter. • All solid waste shall be disposed of at a registered landfill site. The Contractor shall supply the ER with the Weighbills for these disposals who will keep them on record for the duration of the project. Hazardous Waste • All hazardous waste (including bitumen, paint and all petrochemicals, etc.) shall be disposed of at a registered hazardous landfill site. • Hazard signs indicating the nature of the stored wastes shall be displayed on the storage facility or containment structure. • All hazardous wastes must be stored under controlled conditions in a secured, appointed area that is fenced and has restricted entry. All storage shall take place using suitable, sealable containers to the approval of the ER. These containers must be placed within a bunded area which has the capacity to contain 110% of the volume it stores. The floor and wall of the bund area shall be impervious to prevent infiltration of any spilled/leaked materials into the soil. No spillages or accumulated stormwater within this bunded area will be allowed to be flushed from the bund into the surrounding area. All fluids accumulated within the bunded area shall be removed by a registered service provider and disposed of at an approved landfill site which is registered to deal with waste of this nature. • Weighbills must be maintained in the Environmental File at the Contractor’s Camp as proof of appropriate disposal. Noise control It must be ensured that noise levels are kept to a minimum during the construction phase. All machinery and equipment to be utilised on the site should be fitted with mufflers and must be maintained in good working order to minimise noise levels. It is recommended further that the Contractor encourage construction workers to minimise shouting and hooting on the site. Construction work should be completed in as short a time frame as possible in order to limit the longevity of these impacts. The Contractor shall endeavour to keep noise generating activities to a minimum. The Contractor shall restrict all operations that result in undue noise disturbance to local communities and/or dwellings to daylight hours on workdays (Monday to Friday) or as otherwise agreed with the ER. Terratest (Pty) Ltd Page | 1-20 Construction Environmental Management Programme ENVIRONMENTAL MANAGEMENT ACTIVITY The Contractor shall warn any local communities and/or residents that could be disturbed by noise generating activities well in advance and shall keep such activities to a minimum. The Contractor shall be responsible for compliance with the relevant legislation with the respect to noise. Ensure that the potential noise source will conform to the South African Bureau of Standards recommended code of practice, SANS Code 0103:1983, so that it will not produce excessive or undesirable noise when it is released. Equipment must be operated within its specifications and capacity and must not be overloaded. All the Contractors’ equipment shall be fitted with effective exhaust silencers and shall comply with the South African Bureau of Standards recommended code of practice and the South African National Standard (SANS) Code 0103:1983, for construction plant noise generation. All machinery / plant must be serviced and lubricated regularly to ensure a good working order. EC/7/A/LN1/14/15-08 RESPONSIBILITY OCCURRENCE METHOD C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection / Dust control The Contractor shall ensure that the generation of dust is minimised and shall implement a dust control programme, as necessary, to maintain a safe working environment and minimise nuisance for surrounding residential areas/dwellings. Construction vehicles shall comply with speed limits and haul distances shall be minimised. Material loads shall be suitably covered and secured during transportation. Exposed soils and material stockpiles shall be protected against wind erosion. The location of stockpiles shall take into consideration the prevailing wind directions and locations of sensitive receptors. The Contractor shall implement dust suppression measures (e.g. Water spray vehicles, covering material stockpiles, etc.) if and when required. Environmentally-friendly soil stabilisers may be used as additional measures to control dust on gravel roads and construction areas if complaints are received regarding dust generation. General Aesthetics The Contractor shall not deface, paint, damage or mark any natural feature (e.g. rocks, etc.) situated on or around the site for survey or any other purposes unless agreed beforehand with the ER. Any features, affected by the Contractor in contravention of this clause shall be restored / rehabilitated to the satisfaction of the ER. All construction areas must be kept neat and tidy at all times. Different materials and equipment must be kept in designated areas and storing/stockpiling shall be kept orderly. Lighting (if utilised) shall be of the downward facing spill off type. Transportation The Contractor shall ensure that all suppliers and their delivery drivers are aware of procedures and restrictions (e.g. no-go areas) in terms of this EMP. Terratest (Pty) Ltd Page | 1-21 Construction Environmental Management Programme ENVIRONMENTAL MANAGEMENT ACTIVITY Material shall be appropriately secured to ensure safe passage between destinations during transportation. Loads shall have appropriate cover to prevent them spilling from the vehicle during transit. The Contractor shall be responsible for any clean-up resulting from the failure by his employees or suppliers to properly secure transported materials. Traffic control EC/7/A/LN1/14/15-08 RESPONSIBILITY OCCURRENCE METHOD C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection / The following internal road network improvements , as shown in Figure 5.1 of the Traffic Impact Assessment (Emonti, 2015), are required to be made by the development: • • • Control strategy • • The construction of a roundabout (large traffic circle) at the MR00686/primary access road intersection • • • • A 20m building line being imposed along the N2 and the southbound on-ramp • No direct vehicular, bicycle or pedestrian access being permitted onto the N2. In this regard an adequate pedestrian and vehicle proof fence/wall is to be erected along the property boundary with the N2 Disabled bays Loading bays The following public road network improvements are required to accommodate the development, as per the Traffic Impact Assessment: The construction of two public transport facilities, together with the associated pedestrian facilities, along the MR00686 in close proximity to the proposed access point, i.e. one at each of the exit lanes along the MR00686 A 150m building line from the centre point of the N2/MR00686 interchange A 10m building line being imposed along the MR00686 No direct vehicular, bicycle or pedestrian access being permitted onto the MR00686 other than at the proposed access road • Construct a surfaced sidewalk along the western side of the MR00686 for the entire length of the site Parking and loading bays must be provided as per the Traffic Impact Assessment. Protection of Flora No Alien Vegetation must be permitted to establish on the site as a result of disturbances during the construction phase. The Contractor shall be responsible for informing all employees about the need to prevent any harmful effects on natural vegetation on or around the construction site as a result of their activities. The removal, damage and disturbance of natural vegetation without the written approval of the RE is prohibited. All No-Go areas must be clearly fenced off with temporary fencing prior to any machinery moving onto site. Machinery operators and Contractors should be briefed about the constraints before commencing work on site. Terratest (Pty) Ltd Page | 1-22 Construction Environmental Management Programme ENVIRONMENTAL MANAGEMENT ACTIVITY EC/7/A/LN1/14/15-08 RESPONSIBILITY OCCURRENCE METHOD C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection C Ongoing Site inspection / Protection of Fauna The Contractor shall ensure his employees do not undertake any hunting, trapping, shooting, poisoning or other disturbance of any fauna on-site or in the areas surrounding the site. The feeding of any wild animals is prohibited. The use of pesticides is prohibited unless approved by the ER. Fire Control The Contractor shall take all reasonable steps to avoid increasing the risk of fire through activities on site. The Contractor shall ensure that basic fire-fighting equipment is available at all construction activities on site. The Contractor shall appoint a fire officer who shall be responsible for ensuring immediate and appropriate action in the event of a fire. The Contractor shall ensure that all site personnel are aware of the procedure to be followed in the event of a fire. Protection of heritage and cultural features If any archaeological or paleontological artefacts or remains/graves are uncovered during earthmoving activities, work in the vicinity of the find shall cease immediately. The Contractor shall immediately notify the ER, who shall contact the relevant Competent Authority who will take appropriate steps. The Contractor will be required to abide by the specifications as set out by the Competent Authority or the heritage specialist appointed to investigate the find. The Contractor may not, without a permit issued by the relevant heritage resources authority, destroy, damage, excavate, alter, deface or otherwise disturb archaeological material. Terratest (Pty) Ltd Page | 1-23 Construction Environmental Management Programme 4. EC/7/A/LN1/14/15-08 CONTROL OF POST-CONSTRUCTION AND REHABILITATION ACTIVITIES Site rehabilitation is an essential component of this EMP and must be carried out in conjunction with the ECO. The guideline is to be used as the basic structure for the site rehabilitation; the specific details must be decided by the Engineer and/or Operational Manager in conjunction with the ECO. The requirements for the control of soil, water, dust and noise pollution stipulated in Section 5 of this EMP still apply during the site rehabilitation phase of the project. Similarly, the requirements for soil management, erosion control, alien vegetation removal and vegetation and fauna protection also apply. Terratest (Pty) Ltd Page | 1-24 Construction Environmental Management Programme EC/7/A/LN1/14/15-08 Table 2: Rehabilitation Environmental specifications ENVIRONMENTAL SPECIFICATIONS / RESPONSIBILITY OCCURRENCE METHOD Excavate all areas of contaminated substrate (e.g. from sumps utilised to capture contaminated runoff from concrete / cement mixing areas), transfer the contaminated substrate to an appropriate disposal site and treat the affected areas with appropriate ameliorants. C On completion of construction Site inspection Remove all plastic linings used for pollution control and transfer to an appropriate disposal site. C Pollution Control Structures Break up all concrete structures that have been created (e.g. working and parking surfaces) and remove concrete waste to an appropriate disposal site. Waste Remove all leftover construction materials from the storage area and construction site and either sell, auction, donate to the local community or transfer to the Contractor’s base. If leftover materials are donated to the local community, it is the Contractor’s responsibility to ensure that the materials are used appropriately, and do not cause harm to the environment. Alien vegetation Existing and newly established alien vegetation must be removed from the entire property and replaced, where necessary, with suitable indigenous / endemic vegetation species. Re-vegetation All areas of bare soil must be re-vegetated and rehabilitated utilising approved hydroseeding methods. It is important that the re-vegetation activities be planned in advance to ensure that seed and grass stockists are able to supply the required volume when required. E On completion of construction On completion of the project Site inspection Site inspection C On completion of construction Site inspection C/ECO Ongoing Site inspection C/ECO E On completion of construction On completion of construction Site inspection Site inspection Re-vegetated areas may need to be watered to ensure plant growth and development. C/ECO Ongoing. Site inspection The site should be contoured to ensure free flow of runoff and to prevent ponding of water. C/ECO Ongoing. Site inspection Terratest (Pty) Ltd Page | 1-25 Construction Environmental Management Programme 5. EC/7/A/LN1/14/15-08 NON-COMPLIANCES The Contractor shall comply with the environmental specifications and requirements on an on-going basis and any failure on his part to do so shall entitle the RE to impose a penalty. In the event of non-compliance the following recommended process shall be followed: The RE shall issue a notice of non-compliance to the Contractor, stating the nature and magnitude of the contravention. A copy shall be provided to the ECO; The Contractor shall act to correct the non-conformance within 24 hours of receipt of the notice, or within a period that may be specified within the notice; The Contractor shall provide the RE with a written statement describing the actions to be taken to discontinue the non-conformance, the actions taken to mitigate its effects and the expected results of the actions. A copy shall be provided to the ECO; In the case of the Contractor failing to remedy the situation within the predetermined time frame, the RE shall impose a monetary penalty based on the conditions of contract; In the case of non-compliance giving rise to physical environmental damage or destruction, the RE shall be entitled to undertake such remedial works as may be required to make good such damage and to recover from the Contractor the full costs incurred in doing so; In the event of a dispute, difference of opinion, etc. between any parties in regard to or arising out of interpretation of the conditions of the EMP, disagreement regarding the implementation or method of implementation of conditions of the EMP, etc. any party shall be entitled to require that the issue be referred to specialists for determination; and The RE shall at all times have the right to stop work and/or certain activities on site in the case of noncompliance or failure to implement remediation measures. 5.1 Offences and Penalties Any avoidable non-compliance with the conditions of the EMP shall be considered sufficient ground for the imposition of a penalty. Possible offences, which should result in the issuing of a contractual penalty, include, but are not limited to: Unauthorised entrance into “No-Go” areas; Catching and killing of wild animals; Unauthorised damage to natural vegetation; Unauthorised camp establishment (including stockpiling, storage, etc.); Hydrocarbons/hazardous material: negligent spills/leaks and insufficient storage; Ablution facilities: non-use, insufficient facilities, insufficient maintenance; Late method statements or failure to submit method statements; Terratest (Pty) Ltd Page | 1-26 Construction Environmental Management Programme EC/7/A/LN1/14/15-08 Insufficient solid waste management (including littering, not cleaning-up litter, unauthorised dumping, etc.); Water resource contamination from wastewater/construction materials, etc.; Erosion due to negligence/non-performance; Excessive cement/concrete spillage/contamination; Insufficient fire control and unauthorised fires; and Non-induction of staff. 5.2 Fines Fines may be issued per incident at the discretion of the RE and to a maximum as indicated below. Such fines shall be issued in addition to any remedial costs incurred as a result of non-compliance with the Environmental Specifications. The RE shall inform the Contractor of the contravention and the amount of the fine, and shall deduct the amount from monies due under the Contract. The money shall be donated to an environmental organisation nominated by the RE. The following Fines may be issued for any transgressions listed below in consultation between the ECO and RE. ID DESCRIPTION RAND VALUE (INCL. VAT) F Any persons, vehicles, plant, or thing related to the Contractors operations within the designated boundaries of a “no-go” area Any vehicle driving in excess of designated speed limits Any vehicle being driven, and items of plant or materials being parked or stored outside the demarcated boundaries of the site Persons walking outside the demarcated (fenced) boundaries of the site Persistent and un-repaired oil leaks from machinery. The use of inappropriate methods of refuelling such as the use of a funnel rather than a pump Litter on site G Deliberate lighting of illegal fires on site R7,000 I J Individual not making use of the site ablution facilities. Dust or excess noise on or emanating from site Any person, vehicle, item of plant, or anything related to the Contractors operations causing a public nuisance R1,000 R1,000 A B C D E K R5,000 R1,000 R2,000 R500 R3,000 R1,000 R2,000 Additional fines may be issued per incident at the discretion of the ECO. Such fines shall be issued in addition to any remedial costs incurred as a result of non-compliance with the CEMP. The ECO shall inform the Contractor and the RE of the contravention and the amount of the fine, and the RE shall deduct the amount from monies due under the Contract. For each subsequent similar offence the fine may, at the discretion of the ECO, be doubled in value to a maximum value of R 50,000 including VAT. Terratest (Pty) Ltd Page | 1-27 Construction Environmental Management Programme 5.3 EC/7/A/LN1/14/15-08 Penalties Where the Contractor inflicts non-repairable damage upon the environment or fails to comply with any aspects of the CEMP, he must be liable to pay a penalty fine over and above any other contractual consequence. The Contractor is deemed NOT to have complied with this Specification if: Within the boundaries of the site, site extensions and haul/access roads there is evidence of contravention of the CEMP; Environmental damage due to negligence; The Contractor fails to comply with corrective or other instructions issued by the ECO within a specific time; and The Contractor fails to respond adequately to complaints from the public. Payment of any fines in terms of the contract shall not absolve the offender from being liable from prosecution in terms of any law. The following penalties (inclusive of VAT @ 14%) are suggested for transgressions: ID A IMPACT Erosion B Oil spills C D E F G Damage to indigenous vegetation Damage to sensitive environments DESCRIPTION A penalty equivalent in value to the cost of rehabilitation plus 20% A penalty equivalent in value to the cost of clean-up operation plus 20% A penalty equivalent in value to the cost of restoration plus 20%. A penalty equivalent in value to the cost of restoration plus 20%. A penalty to a maximum of R 100 000 must be paid for any damage to any cultural/historical sites A penalty to a maximum of R100 000 must paid for each tree Damage to trees removed without prior permission, or a maximum of R5 000 for damage to any tree, which is to be retained on site. Penalties for removing or damaging trees: Girth of trunk (1m above Replacement value per tree ground level) 0 – 15 mm R100.00 16 – 30 mm R200.00 31 – 50 mm R500.00 51 – 75 mm R1 000.00 76 – 100 mm R2 500.00 101 – 150 mm R5 000.00 150 – 300 mm R10 000.00 Larger than 300 mm R15 000.00 to R100 000.00 Damage to cultural sites NOTE THAT THESE PENALTIES DO NOT PRECLUDE PROSECUTION UNDER ANY OTHER LAW), SUCH AS NEMA, NATIONAL WATER ACT (36 OF 1998). Terratest (Pty) Ltd Page | 1-28 Construction Environmental Management Programme EC/7/A/LN1/14/15-08 APPENDIX A COMPLAINTS REGISTER Terratest (Pty) Ltd Page | 2-i Construction Environmental Management Programme EC/7/A/LN1/14/15-08 Complaints Register This a register for recording all complaints received from neighbours i.e. Complaints about noise, odours, dust etc. Date of Complaint Terratest (Pty) Ltd Complainant’s Name Contact Details Nature of Complaint Corrective Action Taken Date Action Completed Page | 2-ii Construction Environmental Management Programme EC/7/A/LN1/14/15-08 APPENDIX B ENVIRONMENTAL INCIDENTS REGISTER Terratest (Pty) Ltd Page | 2-iii Construction Environmental Management Programme EC/7/A/LN1/14/15-08 Environmental Incident Register This is record of incidents as defined in NEMA and the NWA. Incidents should be recorded and reported to the applicable authorities. Date of Incident Terratest (Pty) Ltd Details of Incident Party/ies Responsible Corrective Action Taken Date Action Completed Page | 2-iv Construction Environmental Management Programme EC/7/A/LN1/14/15-08 APPENDIX C EXAMPLE OF A METHOD STATEMENT CONTROL SHEET Terratest (Pty) Ltd Page | 2- v Construction Environmental Management Programme EC/7/A/LN1/14/15-08 PROPOSED DEVELOPMENT OF THE FILLING STATION AND ASSOCIATED FACILITIES ON PORTION 1 OF THE FARM SEAVIEW NO. 746, EAST LONDON, EASTERN CAPE PROVINCE Contract No.: ................................................ METHOD STATEMENT CONTROL SHEET [THIS CONTROL SHEET IS TO BE ATTACHED TO ALL METHOD STATEMENTS] THIS SECTION TO BE COMPLETED BY CONTRACTOR/METHOD STATEMENT AUTHOR ONLY TITLE: DESCRIPTION: SUBMITTED BY: DATE REQUESTED BY RE: DATE SUBMITTED: DATE RESPONSE REQUIRED BY: DATE WORK START: REVIEW SCHEDULE: DATE AUTHORITY DISTRIBUTION AND AUTHORISATION: RE Name Signature Date COMMENTS ECO CONTRACTOR CONTRACTOR NOTE: METHOD STATEMENTS SHOULD ADDRESS THE FOLLOWING: WHAT Brief description of the work to be undertaken HOW Detailed description of the process of work, methods and materials WHERE Description/sketch/map of locality of work (where applicable) WHEN Due commencement date and completion date estimate (day/night work) MS Number: Terratest (Pty) Ltd Page | 2- vi Construction Environmental Management Programme EC/7/A/LN1/14/15-08 APPENDIX D ENVIRONMENTAL AWARENESS TRANING MATERIAL Terratest (Pty) Ltd Page | 2- vii Construction Environmental Management Programme EC/7/A/LN1/14/15-08 ENVIRONMENTAL AWARENESS TRAINING: CONSTRUCTION WORKERS Terratest (Pty) Ltd Page | 2- viii Construction Environmental Management Programme Terratest (Pty) Ltd EC/7/A/LN1/14/15-08 Page | 2- ix Terratest (Pty) Ltd Page | 2- x Construction Environmental Management Programme EC/7/A/LN1/14/15-08 VOLUME 2 OPERATION ENVIRONMENTAL MANAGEMENT PROGRAMME Terratest (Pty) Ltd Page | 2-iv Operational Environmental Management Programme EC/7/A/LN1/14/15-08 TABLE OF CONTENTS 1. INTRODUCTION 1 2. EMP ADMINISTRATION 2 2.1 Roles and Responsibilities .......................................................................................................... 2 2.1.1 Permit Holder .............................................................................................................................. 2 2.1.2 Eastern Cape Department of Economic Development, Environment Affairs and Tourism (DEDEAT) .................................................................................................................................................. 2 3. 2.1.3 Buffalo City Metropolitan Municipality ......................................................................................... 2 2.1.4 Service Station Operator ............................................................................................................ 2 2.1.5 Operations Manager ................................................................................................................... 3 2.2 Monitoring, Review and Auditing ................................................................................................ 3 ENVIRONMENTAL SPECIFICATIONS 4 APPENDICES Appendix A - Environmental Agreement Appendix B - List of South African National Standards ABBREVIATIONS BTEX: Benzene, Toluene, Ethylbenzene, and Xylene DEDEAT: Department of Economic Development, Environment Affairs and Tourism EMP: Environmental Management Programme I&AP: Interested and Affected Party NEMWA: National Environmental Management: Waste Act, 1998 (No. 59 of 2008), as amended NWMS: National Waste Management Strategy UST: Underground Storage Tank Terratest (Pty) Ltd Page | 2-iiv Operational Environmental Management Programme 1. EC/7/A/LN1/14/15-08 INTRODUCTION The purpose of the Operational Environmental Management Programme (EMP) is to ensure that any impacts on the environment associated with the operation of the Filling Station are prevented and, where they cannot be prevented, are minimised. The Operation EMP sets environmental targets for the service station operator and reasonable standards against which its performance can be measured. Any future management plans developed for the service station should be based on this Operational EMP. Where there is a conflict between documents, this approved Operational EMP will take precedence. The provisions of this EMP are binding on the holder of the Environmental Authorisation (EA) and the subcontractors appointed to undertake maintenance work, for the operational lifetime of the development. The sections below include the following: • Administration and regulation of environmental obligations: This section identifies the management structure and responsibilities of the various stakeholders. • Environmental specifications: This section presents all the environmental specifications relating to the proposed project. Terratest (Pty) Ltd Page | 2-1 Operational Environmental Management Programme 2. EC/7/A/LN1/14/15-08 EMP ADMINISTRATION During the Operational Phase, a copy of this EMP must be maintained by the Service Station Operator. All senior operational and maintenance staff will be required to familiarise themselves with the contents of the document and will have to sign a register to the effect that they have read and understood the contents of the document. Senior staff will be required to educate their operational staff as to the contents of this document and how to remain compliant. 2.1 Roles and Responsibilities 2.1.1 Permit Holder The applicant for the EA (hereafter referred to as the EA holder) will ensure that actions are implemented to establish accountability and responsibility between the different role players. The EA holder intends to appoint a service station operator to manage the daily operations. Should the EA holder wish to transfer his responsibilities to the service station operator, the necessary amendments to the EA would need to be made. An application for amendment in terms of the applicable legislation at the time will be made to the relevant Environmental Authority, taking into account the requirements of this authority. The responsibilities of the EA holder, which would be transferred to the service station operator upon transfer of the EA, are inter alia to ensure that: • All requirements of the EA and EMP are communicated to, understood and followed by all persons working on the project who may have an impact on the environment. • A procedure exists for reporting incidents and resolving any problems rapidly. • Sufficient records are kept relating to the compliance/non-compliance with the conditions of the EA. These records must be made available to the relevant authority within seven days of receipt of a written request. 2.1.2 Eastern Cape Department of Economic Development, Environment Affairs and Tourism (DEDEAT) DEDEAT is the designated authority responsible for authorising the Operation EMP. DEDEAT has overall responsibility for ensuring that the service station operator complies with the Operation EMP. DEDEAT shall also be responsible for approving any amendments that may be required to the Operation EMP. 2.1.3 Buffalo City Metropolitan Municipality The Buffalo City Metropolitan Municipality (BCMM) has the responsibility to ensure that the service station operator complies with local By-laws. 2.1.4 Service Station Operator The service station operator is ultimately responsible for the implementation of the Operational EMP and the Terratest (Pty) Ltd Page | 2-2 Operational Environmental Management Programme financial cost of all environmental control measures. EC/7/A/LN1/14/15-08 The service station operator shall ensure that its responsibilities are executed in compliance with the Operational EMP. Any on-site decision regarding environmental management is ultimately the responsibility of the service station operator. The service station operator shall have the following responsibilities in terms of the implementation of this Operational EMP: • Address any issues at the request of the DEDEAT, BCMM, surrounding land owners and/or the public. • Oversee the implementation of internal operations and activities. • Appointment of an Operations Manager for all day-to-day maintenance/management activities. • Management of the various contractors (e.g. landscaping, maintenance, cleaning, etc.). • Ensure all employees are aware of potential environmental problems and ensure they show adequate consideration of these issues. • Maintain and manage infrastructure (including internal roads), equipment and open areas. A contractor may be appointed in this regard, however, the service station operator would still be responsible for the management of the contractor. 2.1.5 Operations Manager An Operations Manager shall be responsible for: • Monitoring and undertaking all the day-to-day maintenance/management activities (excluding the responsibilities of the Waste Contractor). • 2.2 Undertaking continual internal review of the property. Monitoring, Review and Auditing An internal review procedure shall be established by the service station operator to monitor the progress and implementation of the Operational EMP. The Operations Manager shall undertake the internal review. Where and when necessary, procedures that require modification shall be changed to improve the efficiency of the Operational EMP. Any changes or adjustments to the Operational EMP shall be registered and included in an updated Operational EMP document. The updated Operational EMP shall be submitted to DEDEAT for approval. Terratest (Pty) Ltd Page | 2-3v Operational Environmental Management Programme 3. EC/7/A/LN1/14/15-08 ENVIRONMENTAL SPECIFICATIONS This section of the EMP shall be updated once the final designs are approved. Final design drawings shall be included in the site Environmental Compliance File. Such an update will include details on the storm water management plan, access roads and effluent handling based on the approved layouts. In the tables that follow, the following abbreviations have been used: A = Authority (DEDEAT or BCMM) SSO = Service Station Operator OM = Operational Manager C = Contractor S = Staff Terratest (Pty) Ltd Page | 2-4 Operational Environmental Management Programme EC/7/LN1/14/15-08 Table 1: Infrastructure end equipment maintenance ENVIRONMENTAL MANAGEMENT ACTIVITY RESPONSIBILITY OCCURRENCE SSO Prior to erecting signage OM Monthly SSO After each tank installation / replacement SSO After each tank installation / replacement SSO At all times SSO Once-off, this plan should be audited and updated as required. OM At least monthly OM During fuel tank removal Maintenance of buildings and associated infrastructure Prior to the erection of any signage a signage application must be submitted in terms of the local municipality’s advertising guidelines and by-laws and to the Northern Cape Government: Department of Roads and Public Works (NCG: DRPW) for approval. Ensure that the buildings, boards, signage, access roads, etc. are checked regularly by the Operations Manager and maintained to ensure the safety of users and that the area remains aesthetically pleasing. Installation, Maintenance, Replacement and Monitoring of Fuel Storage Facilities Ensure that all tank installations include: A filler box, which can contain the contents of a bulk delivery vehicle, discharge hose. Earthing and snap-tight-quick-coupling for loading of material into tanks to minimise risk of fires and prevent spillage and loss of material. An overfill protector fitted on the tanks. A leak detector on all submersible pumps that automatically checks the integrity of the pipe work on the pressure side of the pump. Pipelines that do not retain product after use and that joints are not made underground. Ensure that the underground storage tanks are thoroughly inspected prior to installation for fracture and damage and that the inspection authority has issued test certificates. Leak and pressure tests must be conducted on tanks and pipelines to ensure integrity prior to operation and the inspection authority must issue pressure test certificates. An emergency shut-off valve must be supplied between the supply pipeline and dispenser inlet. Installation, maintenance and/or any replacement activities must comply with local authority bylaws and all procedures and equipment used must be in accordance with the Occupational Health & Safety Act (No. 85 of 1993) and its Regulations and applicable South African National Standards (SANS) codes (refer to Appendix B for a list of applicable SANS codes). Develop a monitoring programme in accordance with general industry standards. The monitoring programme shall include borehole and tank integrity monitoring: At least two monitoring boreholes should be placed – one upstream and one downstream of the Underground Storage Tanks (UST). Monitoring boreholes should be sampled on a six-monthly basis, or more frequently if required. Groundwater samples should be analysed for at least total petroleum hydrocarbons, BTEX (Benzene, Toluene, Ethylbenzene, and Xylene) volatile aromatic compounds, polycyclic aromatic hydrocarbons, broad spectrum phenols and lead (Pb). Records of monitoring must be kept and made available to relevant authorities on request. Should contamination be detected, monitoring must be extended to monitoring boreholes in the surrounding area (a hydro census is to be undertaken to determine the location and usage of these boreholes). If contamination is detected in the extended borehole survey, a rehabilitation plan must be compiled and executed. The leak detectors must be regularly tested and records kept. Removal of old fuel tank(s) Ensure that all fuel is removed from tanks and that tanks are degassed prior to excavating the tanks. All pipes and vents Terratest (Pty) Ltd Page | 2-5 Operational Environmental Management Programme ENVIRONMENTAL MANAGEMENT ACTIVITY EC/7/A/LN1/14/15-08 RESPONSIBILITY OCCURRENCE Locate all electrical, storm water or water pipelines prior to excavation to ensure they are not damaged in the excavation process. OM During fuel tank removal Ensure all soil removed during excavation is stockpiled in a demarcated area on site in an appropriate manner. OM During fuel tank removal OM During fuel tank removal OM During fuel tank removal OM / Contractor During fuel tank removal OM / Contractor During fuel tank removal OM / Waste Contractor During fuel tank removal RESPONSIBILITY OCCURRENCE SSO During landscaping OM / S Once-off, refresher courses as and when required OM / S Weekly for the first 6 months, thereafter monthly S As and when required Ensure that the access roads and all infrastructure blend in with the surrounding landscape. SSO Once-off No spotlight should be directed to the R101 or neighbouring residential areas. OM At all times The future lighting system should not flicker or cause stroboscopic effects. OM At all times The signage should comply with the municipal By-laws in this regard and any ECG: DT standards / requirements as the OM At all times connected to the tank(s) must be disconnected and sealed before the tank(s) is removed. Ensure that the area to be excavated is cordoned off (e.g. with red danger tape) and no smoking signs displayed around the site. Ensure that the site engineer, contractor and a contamination expert is present either as the tanks are being removed or immediately afterwards to undertake safety and contamination inspections. In case of a suspected leak the following steps must be taken: Take soil samples from a number of points in the excavated area as well as from the stockpiled soil. Take water samples if there are free-standing pools in the excavated pit. Send soil and water samples to an appropriate laboratory for analysis. Should the analysis indicate contamination, soil (and water) must be removed from the pit until all of the contaminated material has been removed. The contaminated soil must be stockpiled separately and remediated on site or removed to an appropriate landfill site. Contaminated water must be pumped out, collected and disposed of in an appropriate manner. Further soil samples must be taken and sent for analysis with the process repeated until analysis shows contamination to be within acceptable levels. Ensure that the pit remains open while the samples are being tested. Steam-clean contaminated metal – all water from this cleaning process to be sent to the waste water stream. Recycle metal, including piping, as far as possible, prior to considering disposal. Table 2: Landscaping, vegetation management and visual impacts ENVIRONMENTAL MANAGEMENT ACTIVITY No alien invasive vegetation (as listed in the Conservation of Agricultural Resources Act [Act No 43 of 1983]) shall be used for rehabilitation or landscaping purposes. A suitable indigenous species list must be used for landscaping on site. Workers shall be familiarised with the appearance of invasive alien vegetation and garden exotics versus desirable plants on site. This shall form part of routine training for all workers engaged in this activity. Invasive alien vegetation shall be hoed or pulled out by hand and removed from beds and other areas or by using an appropriate South African National Biodiversity Institute (SANBI) methodology. It is to be ensured that all parts of the invasive plants are removed to prevent/minimise re-establishment of that species. Approved herbicides shall only be used and applied under supervision of capable and qualified staff / contractors. Terratest (Pty) Ltd Page | 2-6 Operational Environmental Management Programme ENVIRONMENTAL MANAGEMENT ACTIVITY EC/7/A/LN1/14/15-08 RESPONSIBILITY OCCURRENCE RESPONSIBILITY OCCURRENCE SSO and/or OM At all times OM At all times OM / S At all times ENVIRONMENTAL MANAGEMENT ACTIVITY RESPONSIBILITY OCCURRENCE Ensure compliance with the National Waste Management Strategy (NWMS) and the National Environmental Management: Waste Act (No 58 of 2008) [NEMWA] Minimum Requirements for waste disposal by landfill. Wherever possible, an integrated waste management approach shall be used, based on the principles of waste minimisation, reduction, reuse and recycling of materials. In this regard, recyclable items shall be separated from other waste. OM / Waste Contractor At all times OM / Waste Contractor At all times OM / Waste Contractor Until it can be moved to the permanent storage area or collected for disposal service station abuts a provincial road. Table 3: Access control and noise management ENVIRONMENTAL MANAGEMENT ACTIVITY Vehicles must access and exit the site in terms of approved detailed design plans, approved by Eastern Cape Government: Department of Transport (ECG:DT) and the BCMM. Provincial and municipal regulations and bylaws regarding noise generation and management must be adhered to at all times. Equipment used in the operation of the facility must be kept in good state of maintenance so that noise is minimised. Table 4: Waste and water management Solid Waste All waste shall be temporarily stored at a dedicated waste disposal area(s). Separate containers shall be provided for waste food/produce, glass, metal, plastic and cardboard/ paper in the waste disposal area(s). Vermin and weatherproof bins (with lids) of sufficient number and capacity to store solid waste produced on a daily basis shall be provided in the public use areas. The lids shall be kept firmly on the bins at all times. In general, littering, discarding or burying of any materials shall not be allowed on site. Should litter be present on site, litter shall be collected from the property on a daily basis and dispose thereof in one of the designated waste management containers. The waste disposal areas shall be kept neat and tidy at all times. OM / Waste Contractor OM / Waste Contractor At all times At all times OM / S At all times OM At all times All recyclable waste shall either be transported to a recycling facility or collected by a reputable waste recycling company. Waste Contractor Weekly or more often as may be required All non-recyclable domestic waste (e.g. surplus food, food packaging, organic waste, etc.) shall be collected by a waste contractor on a weekly basis or more frequently as required. Waste Contractor Weekly OM At all times No solid waste of any kind (including garden refuse) shall be burnt or buried on site. Terratest (Pty) Ltd Page | 2-7 Operational Environmental Management Programme ENVIRONMENTAL MANAGEMENT ACTIVITY Spill clean-up kits and absorbent material shall be kept on site to assist in immediate clean-up of any hazardous material spills. Waste management procedures stipulating hazard classification, separation, storage, handling, transport, recycling, reduction strategy, clean-up and disposal requirements as well as personnel responsible for each of these aspects, must be developed and kept on site. As a minimum requirement, all hazardous waste must be separated and recycled / disposed of according to the NEMWA Minimum Requirements for the Handling, Classification and Disposal of Hazardous Waste. Safe disposal certificates of hazardous waste are to be obtained and kept on site. All employees must be trained with regard to hazardous waste procedures. EC/7/A/LN1/14/15-08 RESPONSIBILITY OCCURRENCE OM At all times SSO and/or OM Once-off OM / Waste Contractor At all times OM / S upon appointment with refresher courses as and when necessary Stormwater and erosion control: The construction of roads, parking areas and roofing structures will increase the impermeable surface area on the site leading to reduced ground absorption of storm water and increased surface water runoff. This will result in an increase in the quantity and velocity of storm water leaving the site which, in turn, has the potential to transport contaminants away from the site into natural environments and create soil erosion in vulnerable areas. It also creates the potential for traffic disruption during storm events when storm water floods the streets as there is no place to channel the water to. Develop and implement a storm water management plan. Ensure that all stormwater designs are approved by the local municipality. Any amendments that may be required to the stormwater management plan shall be submitted to the SSO and/or OM Once-off municipality for approval. Ensure the correct maintenance procedures are implemented for efficient functioning of the stormwater system. OM At all times SSO and/or OM Weekly inspections OM Weekly inspections, backfill as and when needed OM Weekly inspections OM Before operation commences OM Before operation commences Ensure that the waste water treatment system is functional at all times. OM Weekly inspections Contain all surface spillages on-site through channels and trenches. OM At all times Environmentally friendly degreasers for washing and cleaning must be used where practicably possible. OM At all times Implement stormwater diversion measures around the site to prevent clean surface flow from becoming contaminated. Ensure clean and dirty water separation at all times. Only clean water may be diverted to the off-site stormwater system. Any lateral runnels or erosion channels that develop on site shall be backfilled and compacted. All stormwater outlet structures and drains shall be kept clear of litter and debris at all times to ensure that no blockages occur. In the event that any foreign objects (e.g. food containers, paper, dead animals, etc.) are discovered in the stormwater system, that pose either a risk to human health and/or ecosystem functioning or that is aesthetically displeasing, they shall be removed manually and disposed of via the waste management system. Effluent An operation and maintenance plan needs to be developed for the water treatment works to address in particular, plant down time and associated loss of containment. An interceptor drain system should be installed along the base of any fill platform (if applicable) or at the downslope side of the forecourt, to intersect and collect potentially polluted surface water runoff from the forecourt. This drain should feed through an oil/water separator at the lowest point of the site so that any product can be recovered and disposed of in a suitable manner. Terratest (Pty) Ltd Page | 2-8 Operational Environmental Management Programme ENVIRONMENTAL MANAGEMENT ACTIVITY Contaminated surface water (i.e. all surface water collected on the property) must be sent through an oil / water separator or sump of sufficient capacity. All accidental surface spills of oil or fuel must be contained on-site and diverted to the oil / water separator. If there is a risk that the sump could overflow (such as in a storm event) then the spilled material must be stored in a tanker or other appropriate container until it can be treated and disposed of. All water from the oil / water separator or sump must be diverted to the waste water treatment system – no dirty water from the site is allowed to flow into the storm water system. The oil / water separator should be regularly checked and kept clean to prevent blockage and overflow. Any material collected must be disposed at an appropriately registered waste disposal site. The contents of grease traps or other waste oil, grease and/or fuel disposal/storage containers may under no circumstances be voided to the surrounding area. Periodic monitoring of the piezometers around the tank excavation should be carried out using an electronic interface meter to detect the presence of any possible Light Non-Aqueous Phase Liquids (LNAPLs). The piezometers can also be used as an initial product recovery system should LNAPLs be detected at any stage. EC/7/A/LN1/14/15-08 RESPONSIBILITY OCCURRENCE OM At all times OM At all times OM At all times OM Weekly inspections OM Monthly or as required RESPONSIBILITY OCCURRENCE OM At all times SSO and/or OM Once-off OM Monthly RESPONSIBILITY OCCURRENCE SSO and/or OM Once-off OM At all times OM Once-off SSO and/or OM At least upon appointment, undertake refresher courses as and when necessary SSO At all times Table 5: Air quality and vapour recovery ENVIRONMENTAL MANAGEMENT ACTIVITY Ensure that the impact of vent gases from vent pipes and the interceptor chamber is minimised through positioning of the vent pipes at a point remote form all buildings and neighbouring properties. Develop an air quality monitoring programme in accordance with general industry standards. Monitor all breather vents from underground tanks on at least a monthly basis. Table 6: Emergency plan ENVIRONMENTAL MANAGEMENT ACTIVITY Develop an emergency plan for all major and minor spills at the service station (with consideration of air, groundwater, soil and surface water). Ensure that appropriate firefighting equipment is available on site at all times. Erect hazard signs in all potential high risk areas. Provide appropriate emergency training to all permanent employees. Ensure that storage of flammable stocks for sale takes place in a secure area. Terratest (Pty) Ltd Page | 2-9 Operational Environmental Management Programme EC/7/A/LN1/14/15-08 Table 7: Labour and social issues ENVIRONMENTAL MANAGEMENT ACTIVITY Ensure the provision and proper utilisation, maintenance and management of toilet, wash and waste facilities for staff. Raise awareness under staff to the need to refrain from indiscriminate waste disposal and/or pollution of local soil and water resources. All employees must undergo the necessary safety, health and environmental training and wear the necessary protective clothing. Terratest (Pty) Ltd RESPONSIBILITY OCCURRENCE OM At all times OM Regularly SSO and/or OM Upon appointment, as and when required Page | 2-10 APPENDIX A ENVIRONMENTAL AGREEMENT PROPOSED DEVELOPMENT OF THE FILLING STATION AND ASSOCIATED FACILITIES ON PORTION 1 OF THE FARM SEAVIEW NO. 746, EAST LONDON, EASTERN CAPE PROVINCE Contract No.: ............................................................. OPERATION ENVIRONMENTAL MANAGEMENT PROGRAMME (EMP) MADE AND ENTERED BETWEEN: The Service Station Operator Herein represented by: .......................................................................................................... In his/her capacity as: ............................................................................................................ (Duly authorised hereto) Hereafter referred to as “ ......................................................................................................” AND ............................................................................................................................................... Herein Represented by: ......................................................................................................... (Duly authorised hereto) Hereafter referred to as the “THE CONTRACTOR” The parties record that the Contractor shall bear the following obligations in terms of this Agreement: 1. Comply with all provisions of the Construction EMP; 2. Comply with the requirements of the Occupational Health and Safety Act (No. 85 of 1993); 3. Bind any Sub-Contractors to comply with the Operation EMP to which this agreement is appended; 4. Enforce compliance with the Operation EMP by: • Appointing an Environmental Officer; and • Ensuring that all staff is familiar with the Operation EMP. 5. Protect the environment of the site against environmental damage; 6. To make good any environmental damage; and 7. Failure to comply with the Operation EMP may result in fines and reported non-compliance may result in the suspension of work or termination of the contract. SIGNATORIES Date at ...................................... on this .............................. day of ............................................. 20 ................ Service station operator ............................................................................ Print name: ................................................ (duly authorised) As Witnesses: ............................................................................ ............................................................................ Contractor ............................................................................ Print name: ................................................ (duly authorised) As Witnesses: ............................................................................ ............................................................................ APPENDIX B SOUTH AFRICAN NATIONAL STANDARDS SANS CODE # DESCRIPTION 10083:2012 The measurement and assessment of occupational noise for hearing conservation purposes. 10400 TT 53 Sections 1-6 The application of the National Building Regulations Part T: Fire protection – Installation of Liquid Fuel Dispensing Pumps and Tanks Part 1: Storage and distribution of petroleum products in above-ground bulk installations Part 2: Electrical and other installations in the distribution and marketing sector Part 3: The installation, modification, and decommissioning of underground storage tanks, pumps/dispensers and pipework at service stations and consumer installations Reference is made to: The installation of a leak detection system including observation and monitoring wells situated around the tank to facilitate early warning that a leak has arisen; and Installation of leak detectors on the pressure systems. Above-ground storage tanks for petroleum products - reference is made to: Venting; Pipes and fittings; Storage tank filling operations; Testing, inspection and maintenance; and Fire safety. The classification of hazardous locations and the selection of apparatus for use in such locations. 10089 Parts 1, 2&3 10131:2004 10108: 2005 1535 1830 Manufacturing and Materials : Glass-reinforced polyester-coated steel tanks for the underground storage of hydrocarbons and oxygenated solvents and intended for burial horizontally Flexible piping for underground use at