Imperial Beach Palm Avenue / 7th St Eco
Transcription
Imperial Beach Palm Avenue / 7th St Eco
Jim Janney – Mayor of Imperial Beach Andy Hall – City Manager of Imperial Beach Hank Levien – Public Works Director Vicki Madrid – CIP Project Manager Peter Lau – Construction Inspector Ryan Zellers – Project Manager Eriko Kobayashi – Lead Civil Engineer John Taylor y – Lead Landscape Architect Emily Hubbard – Landscape Architect Imperial Beach Palm P l Avenue A / 7th St Eco-Bikeway Project • • 1994 2004 2012 2013 2010 2000 1990 2006 • • • Eco-Route E R t Bik Bikeway Proposed P d in 1990’s Palm Ave / 7th St. Analyzed & Conceptualized in 2004-2005 Design from 2006-2012 Awarded Grant 2012 Construction 2013 Connectivity GOALS GOAL : Connectivity • • • between Ecological and Tourist Areas Enhance Pedestrian and Bicycle Mobility and Safety Utilize EcoFriendly Landscape and Best M Management t Practices Class III Bike Route on 7th St from y y to Palm Ave Bayshore Bikeway Class III Bike Route on Palm Ave from 7th St to Rainbow St Class II Bike Lanes on Palm Ave from 7th St to 3rd St with Road Diet: 4 Lanes > 2 Lanes I Imperial i l Beach B h Palm Avenue / 7th St Eco-Bikeway Eco Bikeway Project Imperial Beach Palm Avenue / 7th St Eco-Bikeway Project GOAL : Mobility & Safety • • • • • Road Diet Reduced Number of Travel Lanes Pop-Outs for Traffic Calming Landscaping for Pedestrian Buffer New Bike Lanes Pedestrian Median Refuge Island with Warning Devices Imperial Beach Palm Avenue / 7th St Eco-Bikeway Project • • • • • GOAL : Eco-Friendly Aesthetics Pop-Outs with Landscaped Buffers N ti Plantings Native Pl ti and d Xeriscape Palletes “Green Surfboards” for Community Character and Natural Element to Urban Design Landscape p Areas Adapted to Allow for Road Runoff Infiltration Re-Used Re Used Palm Trees Construction Cost October 2013 $1.6 M Completion Date Future Projects SR-75 MixedUse Corridor Project Imperial I i l Beach B h Palm Avenue / 7th St Eco-Bikeway Eco Bikeway Project