Engineering Design Management
Joe Carmouche EDM
Engineering Design Management
Web: www.edmuk.co.uk
Email: [email protected]
Office: 01764 650618
Mobile 07739511244
Statutory Compliance Testing
Analysis of water temperature at pertinent points following
approved code of practice “L8 control of legionella in water
supplies”. Temperature of both cold and hot water supplies
need to meet defined parameters.
Joe Carmouche IEng. FCIPHE
Incorporated Engineer
Energy Saving Carbon Reduction
Installation of CHP (Combined heat and power plant) at a
large hotel resulted in annual reduction in carbon emissions
of 225 tons per year. Annual cost saving of around £40,000.
Project given interest free loan. Savings made more than
offset costs to pay back loan. Project qualified as “good
CHP” allowing ECAs to be claimed.
Renovation Historic Building retaining original features.
Requirement: create modern executive bedrooms while
retaining original character. Scope of work - refit new
services, existing cornice, timber features retained and
reformed to suit alterations, wiring and pipe work routed
to avoid disturbance to finishes. End result a traditional
building with modern amenities.
Professional Profile
A highly motivated individual with strong organisational skills, able
to work within tight time schedules and to agreed budgets. Good
communicator and team player with a desire to achieve the highest standard. Sound engineering knowledge gained over forty years
in many aspects of engineering with particular strengths in project
renovation, project management, operation and maintenance systems and mechanical services design, in the hospital and hospitality
sectors.
Renovation project 180 rooms.
Project cost £3.75 m.
Scope of responsibility: Project manager - liaise with hotel
operations team, project budget cost, design development,
procurement of material and labour. Project work
programme, on-site supervision, cost control and health
and safety CDM 07.
New build 5 star Self-catering Cottages.
Project cost £2.5m.
Scope of responsibility: Owner’s representative with input
at design stage. On-site construction monitoring, quality
and cost control, mechanical systems design, material
procurement. Fit out and handover.
New build and renovation Hotel Entrance and Foyer.
Project cost £2.8m
Scope of responsibility: Project manager - coordination of
activities in a working building. Sub contract labour and
materials for internal fit out. Owner’s representative on
main construction work for progress, cost, and handover.
Joe Carmouche EDM
Engineering Design Management
Statutory Requirement
Building owners and operators face tough challenges in returning a profit during these difficult economic times.
Management efforts are therefore focused on main business activities and whilst there is a recognition and
acceptance of the need to ensure premises are complying with statutory requirements, often other priorities take
precedence.
Engineering Design Management have the necessary experience and expertise to assist organisations assess
their current level of compliance, identify where their business may be at risk due to statutory non-compliance or
potentially violate the terms of insurance cover.
A service is offered to building owners and managers comprising a survey of their premises to determine status of
compliance for the different systems outlined below.
The survey, depending on property size takes one day and is followed up with a report on the findings which are
presented to owners or operators. The report will provide a detailed assessment of where systems or procedures
are in need of improvement to safeguard the business and identify exposure to litigation or risk.
As an additional service Engineering Design Management can produce a computer based testing schedule which
defines the appropriate interval of testing for each system and equipment to assist owners or operators plan,
manage and meet their obligations.
Areas covered in the survey.
Environmental Health (Water Systems)
Review of potable water systems both private and public
Storage of water - local bye-laws Control procedures for Legionella
Water temperature anti-scalding protection and testing
Health and Safety (Fire)
Fire procedure risk assessment
Systems Testing: Fire alarm, portable appliance, emergency lighting
Health and Safety (small works)
Client’s site rules for contractors: register, risk assessments, work procedures
Client’s register COSHH, asbestos records
Plant Register for insurers test purposes
Lifting and pressurised equipment
Gas Testing
Appliances landlord’s certificate
Flue pipe inspection
Electrical Systems and Equipment Testing
Periodic fixed electrical testing
Portable appliance testing
Microwave generating equipment
Air Conditioning
“F” gas regulations
Air conditioning energy performance and testing of duct work
Joe Carmouche EDM
Engineering Design Management
Project Management Services
Knowledge and experience gained over the last 40 years allows me to offer design, engineering and project
management services to clients intending to embark on new build, extensions or renovation work.
I strongly believe that good planning and management from concept stage to project completion are essential in
delivering a successful project in terms of quality, cost and time scale. If appointed my client would receive my full
effort and commitment to ensure the final product meets or exceeds the client’s wishes.
Project Management Services.
Pre contract phase:
- Assistance in developing project brief
- Assistance with appointment of design team
- Design of mechanical plumbing and electrical services
- Advise on energy efficient low carbon systems for heating, and hot water production
- Advise on low energy lighting options
- Advise on selection of material and help with procurement
- Assistance with appointment of contractors and sub contractors
- Assistance with setting project time plan
- Assistance with determining project costs
Contract phase:
- Develop site health and safety procedures
- Attend technical and construction meetings
- Monitor work quality and progress against agreed programme
- Cost monitoring
- Communications between client and contractor(s)
- Assist with final account and handover
Joe Carmouche EDM
Engineering Design Management
Renewable Energy Carbon Reduction Opportunities
Engineering Design Management provides a service to owners and operators which will identify opportunities for
the installation of energy efficient, low carbon emission systems and equipment.
At the initial stage a site survey is carried out at the premises to assess existing engineering systems, plant and
equipment. The findings of the survey are evaluated and recommendations made which identify opportunities
where equipment and systems can be upgraded or replaced to improve energy efficiency. The benefits will result
in less energy being consumed, lower energy costs and a reduction in carbon emissions. Improvements proposed
will achieve an acceptable return on capital investment in renewable technology or recommend replacement of
existing plant with more energy efficient alternatives.
Specifically the survey and evaluation will identify opportunities in:
- Space heating and domestic hot water production
- Heat recovery, air and water
- Comfort and evaporative cooling
- Low energy lighting
- Photovoltaic - Solar energy
- Ground and air source heat pumps
- Water saving devices
- Voltage optimisers
- Combined heating and power plant
The survey and recommendations identify opportunities to reduce energy and carbon emissions. Engineering
Design Management provide management expertise in processing applications on behalf of owners to obtain
“feed in tariffs” or interest free loans through Carbon Trust or other authorities.
Engineering Design Management would welcome the opportunity to meet with building owners or operators to
discuss where their expertise can assist in reducing both energy usage and carbon emissions. Please contact our
office by telephone or e-mail to discuss your requirements further.
Statutory Compliance Testing
Analysis of water temperature at pertinent points following
approved code of practice “L8 control of legionella in water
supplies”. Temperature of both cold and hot water supplies
need to meet defined parameters.
Joe Carmouche IEng. FCIPHE
Incorporated Engineer
Energy Saving Carbon Reduction
Installation of CHP (Combined heat and power plant) at a
large hotel resulted in annual reduction in carbon emissions
of 225 tons per year. Annual cost saving of around £40,000.
Project given interest free loan. Savings made more than
offset costs to pay back loan. Project qualified as “good
CHP” allowing ECAs to be claimed.
Renovation Historic Building retaining original features.
Requirement: create modern executive bedrooms while
retaining original character. Scope of work - refit new
services, existing cornice, timber features retained and
reformed to suit alterations, wiring and pipe work routed
to avoid disturbance to finishes. End result a traditional
building with modern amenities.
Professional Profile
A highly motivated individual with strong organisational skills, able
to work within tight time schedules and to agreed budgets. Good
communicator and team player with a desire to achieve the highest standard. Sound engineering knowledge gained over forty years
in many aspects of engineering with particular strengths in project
renovation, project management, operation and maintenance systems and mechanical services design, in the hospital and hospitality
sectors.
Renovation project 180 rooms.
Project cost £3.75 m.
Scope of responsibility: Project manager - liaise with hotel
operations team, project budget cost, design development,
procurement of material and labour. Project work
programme, on-site supervision, cost control and health
and safety CDM 07.
New build 5 star Self-catering Cottages.
Project cost £2.5m.
Scope of responsibility: Owner’s representative with input
at design stage. On-site construction monitoring, quality
and cost control, mechanical systems design, material
procurement. Fit out and handover.
New build and renovation Hotel Entrance and Foyer.
Project cost £2.8m
Scope of responsibility: Project manager - coordination of
activities in a working building. Sub contract labour and
materials for internal fit out. Owner’s representative on
main construction work for progress, cost, and handover.