UP / Metra Overview
Transcription
UP / Metra Overview
UP / Metra Overview Wes Lujan, Assistant Vice President, Public Affairs October 21, 2014 Chicago To Wisconsin UP - Metra Commuter Territory West Line Challenges • Extreme mix of passenger & freight • Two curfew “windows” per day To Harvard and Janesville • Daily rail “traffic jam” backup into and across Iowa Lake Bluff UP North Line 70 Metra Trains 8 UP Trains • Unable to support growth • Preservation of Metra Performance Barrington UP Northwest Line 70 Metra Trains 2 UP Trains Arlington Heights Wilmette Des Plaines To Belvidere Chrysler Plant Evanston UP West Line (Geneva sub) 60 Metra Trains 52 UP Trains EJ&E Geneva Wheaton Clybourn Proviso/ Global II Park MP 15 West Chicago Elburn MP 44.00 Mayfair Elmhurst Routes to connecting Roads and other UP lines North Ave Oak Park IHB Elburn Coach Yard Elk Grove Kedzie Ogden Jct. Global I Ogilvie Transportation Center Canal St. UP West Line – Geneva sub Critical route to Chicago Gateway Importance of Geneva Sub Critical to Union Pacific Seattle Eastport • 25% UP Carloads thru Chicago Portland Duluth Powder River Basin • 70% Traffic Local to Chicago Twin Cities Chicago Omaha SLC Denver Oakland N. Platte • Access to UP’s major customer facilities • 5 Coal Plants Kansas City • 6 Intermodal Ramps • 4 Auto Facilities St. Louis LA West Colton Memphis Phoenix Calexico Ft. Worth Nogales • 2,500+ Small Business Shippers • Connections to Eastern Roads • Routes from West Coast Ports Dallas • Coal Route from Wyoming El Paso San Antonio Eagle Pass Laredo Brownsville Houston New Orleans Critical to Metra • 60 Weekday trains • 30,000 daily riders 2013 Business Mix by Freight Revenue $20.7 Billion Strengthening the Franchise 2014 Estimate * Includes cash capital, leases and other non-cash capital. UP / Metra West Line project Historical Context and Objectives • Original Agreement in 2008 • Developed jointly by UP and Metra • 3 of 4 phases are funded and almost complete • Addresses a shared fluidity problem on the West Line (UP Geneva sub) • Reduces gate down time in West Line communities • Significant reduction in idling trains • Preserves Metra Performance as freight traffic grows • Eliminate commuter curfews for freight trains • Makes Geneva sub capabilities = BNSF Aurora sub • Estimated Project Costs increased as additional design and engineering completed UP / Metra - West Line 2014 3rd Main Track Design/ Construction Project Background Timeline 2011-2014 Universal Crossovers Constructed Steps 2011-2014 Station Safety Upgrades 2010-2011 Signal Modernization Half Block Upgrade • Safety • Fluidity 2009-2010 Project Design Dec ‘08 Joint Investment Agreement 2007 UP/Metra Joint Joint Evaluation and Improvement Recommendation Dec ‘06 UP/Metra Agree to Joint Study & Computer Simulation Sept ‘06 Metra request For Long Term Plan Time • Performance • Maintainability • Recoverability UP/Metra West Line Project $165 million, split 50/50 Cost $MM Comments Project Elements 1) Station and Safety upgrades 2) Signal System modernization 3) 2 new Universal Crossovers 4) 3rd ML construction $24 $20 $32 $89 Two stations to finish in 2014 Operational in July 2011 Lombard-Nov 2011, Wheaton-Apr 2014 Requires design in 2014 MP 19.4 EJ&E MP 24.5 Eola Melrose Park MP 11.3 River Forest Melrose Park Maywood Provo Jct. Vale MP 10 Oak Park Park MP 15 Bellwood Turner MP 29.5 Berkeley Elmhurst Villa Park Lombard Glen Ellyn College Ave Wheaton W. Chicago Kress MP 32.10 Winfield West Chicago Proviso Global II Coach Kedzie Yard MP 3.6 BRC Elburn Coach Yard Peck MP 38.20 La Fox Elburn MP 44.00 Geneva $165 Ogden Jct. Ogilvie Global I UP/Metra West Line Project Station Safety Improvements • Complete Pedestrian Gate coverage – On Road or Ped crossings adjacent to platforms • End of Platform Diversions – Channel commuter flow away from tracks – Eliminate mid platform pedestrian crossings – Direct flows behind pedestrian gates • Another Train Warning System – Alert commuters that a 2nd train is entering station – Prevent unsafe behavior • Inter Track Fencing – Extensions beyond platform areas – Address flows from parking areas • 3 New Commuter Grade Separations UP/Metra West Line Project Station Improvements – Another Train Warning Sign (ATW Sign) 52 devices installed at 8 stations to date Operating Scenario When either no train or one train is approaching or present - Lights and audible warning are off When one train is approaching or present and another train approaches – 1) Red “Danger” illuminates and flashes continuously 2) White “Another Train Coming” illuminates steady 3) Audible warning sounds continuously 4) All remain active until only one train is detected in the area UP/Metra West Line Project Cab Signal Signal Modernization – Half Block application Completed in 2011 Previous “Restricting” 3 mi. signal block, Restricting signal – 20 mph Cab Signal Change Cab Signal Change As Improved 1.5 mi. signal block, Approach signal, Passenger - 40 mph Cab Signal Change 1.5 mi. signal block, Restricting signal – 20 mph Cab Signal Change • Shorter blocks allow trains to follow more closely • Train speeds in blocks increase • More capacity and fluidity • 15% reduction in delay Cab Signal Change UP/Metra West Line Project Additional Crossovers 15 miles between sorting locations Before 7 passenger stations in former segment with no sort capability. Proviso W. Chicago Turner MP 29.5 Park MP 15 After 5 miles between sorting locations Turner MP 29.5 Wheaton MP 24.5 Spring 2014 Grace (Lombard) MP 19.4 2011 • Flexibility to pass slower or disabled trains • Routing option around tracks closed for maintenance outages • 10% reduction in delay Park MP 15 UP/Metra West Line Project Complete the 3rd Main Track • Remove 2 critical bottlenecks (gaps) • Fluid movement between Elburn – Kedzie Unrestricted use of all 3 tracks for the full distance 50% reduction in freight train idling time 10% reduction in train delay, 11% reduction in “gate down” time • Critical Incident Recoverability 57% delay recovery improvement from a major outage (crossing accident, broken rail etc.) 10% On time performance improvement on days with an outage Melrose Park Maywood Melrose Park MP 11.3 Oak Park Provo Jct. Ogilvie Vale MP 10 River Forest MP 24.5 Park MP 15 Bellwood Turner MP 29.5 Berkeley Kress MP 32.1 W. Chicago MP 19.4 Proviso/Global II Elmhurst Villa Park Lombard Glen Ellyn College Ave Wheaton Winfield West Chicago 1.6 mile gap Kedzie Coach MP 3.6 Yard BRC Elburn Coach Yard Peck MP 38.2 Geneva Elburn MP 44.00 La Fox 6.2 mile gap Ogden Jct. CREATE B-2 Project at Bellwood Complement to the West Line Project • 3 miles of 3rd Main Track • 2 new stations • Grade separated freight connection • Minimizes Metra – Freight conflicts UP/Metra Geneva Sub Station safety upgrades Improve passenger safety and facilitate multiple train moves