VIE EN RO SE
Transcription
VIE EN RO SE
Participatory design Non acoustic post operam data analysis comparing appreciation results of intervention realized with a process of participatory design vs others VIE EN.RO.SE. Ingegneria - Firenze LIFE08 ENV/IT/000386 with the contribution of the LIFE financial instrument of the European Community Workshop HUS AIA-DAGA 20 H 13 Conferenc e on Acoustic s 18th M arch 2013, Me A method for comparing appreciation results of interventions realized with a process of participatory design and a “traditional” intervention for noise reduction one, has been evaluated. The comparison has been carried out through the definition of objective and subjective criteria. The case-study used for the comparison is the intervention in "M. L. King" School, consisting in a noise barrier, realized in 2007. “Don Minzoni” (2012) “M.L.King”(2007) LIFE08 ENV/IT/000386 with the contribution of the LIFE financial instrument of the European Community ran Workshop HUS AIA-DAGA 20 H 13 Conferenc e on Acoustic s 18th M arch 2013, Me COMPARATIVE METHOD - post-operam Data Analysis “Don Minzoni” School “M.L.King” School INTERVENTION FOR HUSH PROJECT (PARTECIPATORY DESIGN) «TRADITIONAL» INTERVENTION FOR NOISE REDUCTION OBJECTIVE AND SUBJECTIVE CRITERIA LIFE08 ENV/IT/000386 with the contribution of the LIFE financial instrument of the European Community ran Workshop HUS AIA-DAGA 20 H 13 Conferenc e on Acoustic s 18th M arch 2013, Me ran OBJECTIVE CRITERIA - post-operam Data Analysis 1- TOOLS 2- LEVELS 3- SCORE - CRITERIA 1 0,5 The objective evaluation is based on the analysis of all documents (reports and technical drawings) of the several phases of the project, implementation and testing. 0 Completeness of the phases: Completeness Completeness of phase is not 1 Completeness of the of the phases: the phases: phase present phases (analysis, design, phase is present is not present, but Effectiveness of Effectiveness of implicitly implementation and the intervention: the intervention: considered post-operam); no problems all the problems Effectiveness of connected to the 2 Effectiveness of the connected to the intervention: criteria are intervention. the criteria are only some solved solved problems connected to the criteria are solved LIFE08 ENV/IT/000386 with the contribution of the LIFE financial instrument of the European Community Workshop HUS AIA-DAGA 20 H 13 Conferenc e on Acoustic s 18th M arch 2013, Me OBJECTIVE CRITERIA - post-operam Data Analysis 1 COMPLETENESS OF THE PHASES ANTE-OPERAM ANALYSIS DESIGNING IMPLEMENTATION POST-OPERAM ANALYSIS 2 EFFECTIVENESS OF THE INTERVENTION LIFE08 ENV/IT/000386 with the contribution of the LIFE financial instrument of the European Community ran Workshop HUS AIA-DAGA 20 H 13 Conferenc e on Acoustic s 18th M arch 2013, Me OBJECTIVE CRITERIA - post-operam Data Analysis COMPLETENESS OF THE PHASES Don Minzoni M.L.King URBAN PLACEMENT ACCESSIBILITY (bus line, proximity to residential areas) 1 0,5 1 0 SITE ANALYSIS (building / green staff / flooring / streets) 1 0 IDENTIFICATION OF STAKEHOLDERS 1 0 ANALYSIS OF ACOUSTIC CLASSIFICATION PLAN 1 1 ANALYSIS OF THE SOUND SOURCES (traffic sources, human sources, natural sounds, other mechanical sounds) 1 IDENTIFICATION OF HOMOGENOUS ACOUSTIC SUB-AREAS 1 0 ACOUSTIC SURVEY (acoustic measures and traffic count) 1 1 ANALYSIS OF ACOUSTIC MAP – scenario ANTE -OPERAM 1 1 SOUNDSCAPE ANALYSIS (soundwalks and binaural recording) 1 0 PSYCHO ACOUSTIC ANALYSIS (subjective maps based on perception by questtionnaires and interviews about expecions of the users ) 1 0 CONSIDERATION OF OTHER FACTORS ( visual aspects, air quality, well maintenance, safety,, ecc…): multi-sensorial approach of the landscape 1 0 12 3 PHASE 1 – ANTE-OPERAM ANALYSIS ANTE-OPERAM ANALYSIS 0,5 LIFE08 ENV/IT/000386 with the contribution of the LIFE financial instrument of the European Community ran Workshop HUS AIA-DAGA 20 H 13 Conferenc e on Acoustic s 18th M arch 2013, Me OBJECTIVE CRITERIA - post-operam Data Analysis COMPLETENESS OF THE PHASES PHASE 2 – DESIGNING ATTENTION IN DESIGNING FOR DESIRES AND EXPECTATIONS OF THE END-USERS, ACCORDING TO RESULTS OF ANALYSIS PHASE ATTENTION IN DESIGNING FOR PROBLEMS EXPRESSED BY MUNICIPALITY ATTENTION TO OTHER COMPLEMENTARY NON ACOUSTIC FACTORS CONNECTED TO GLOBAL WELLNESS MORE DIFFERENT SOLUTION CONSIDERED FOR NOISE REDUCTION ASSESSMENT OF THE PROPOSAL SOLUTIONS WITH END-USERS AND MUNICIPALITY FOR THE CHOISE OF THE BEST SOLUTION ATTENTION TO MATERIALS Don Minzoni 1 M.L.King 0 1 1 1 0 1 1 1 0 1 1 ATTENTION TO COLORS 1 0 ATTENTION TO SPATIAL DISTRIBUTION ACCORDING TO ACOUSTIC CLIMATE 1 0 SHARING WITH END-USERS OF CHANGES IN THE PROJECT 0 0 8 3 DESIGNING LIFE08 ENV/IT/000386 with the contribution of the LIFE financial instrument of the European Community ran Workshop HUS AIA-DAGA 20 H 13 Conferenc e on Acoustic s 18th M arch 2013, Me OBJECTIVE CRITERIA - post-operam Data Analysis COMPLETENESS OF THE PHASES Don Minzoni M.L.King ASSESSMENT OF CHANGE IN THE PROJECT ACCORDING TO ISSUES RAISED IN THE PSYCHO-ACOUSTIC ANALYSIS 1 n.c. SHARING WITH END-USERS OF CHANGES IN THE PROJECT DURING THE IMPLEMENTATION 0 n.c. 1 n.c. PHASE 4 – POST-OPERAM ANALYSIS Don Minzoni M.L.King ACOUSTIC TEST CONSIDERING ALSO THE COURTYARD QUESTIONNAIRES FOR POST-OPERAM ASSESSMENT 1 1 1 0 2 1 PHASE 3 – IMPLEMENTATION IMPLEMENTATION POST-OPERAM ANALYSIS LIFE08 ENV/IT/000386 with the contribution of the LIFE financial instrument of the European Community ran Workshop HUS AIA-DAGA 20 H 13 Conferenc e on Acoustic s 18th M arch 2013, Me OBJECTIVE CRITERIA - post-operam Data Analysis COMPLETENESS OF THE PHASES Don Minzoni M.L.King TOTAL SCORE ANTE-OPERAM ANALYSIS 12 3 12 DESIGNING 8 3 9 IMPLEMENTATION 1 n.c. 2 POST-OPERAM ANALYSIS 2 1 2 23 (22*) 7 25 PHASE COMPLETENESS OF THE PHASES * Not considered the score of the phase considered n.c. (not classifiable) for «M.L.King» School LIFE08 ENV/IT/000386 with the contribution of the LIFE financial instrument of the European Community ran Workshop HUS AIA-DAGA 20 H 13 Conferenc e on Acoustic s 18th M arch 2013, Me OBJECTIVE CRITERIA - post-operam Data Analysis EFFECTIVENESS OF THE INTERVENTION DON MINZONI M.L.KING 1 0,5 n.c. n.c. APPROPRIATE SERVICES AND EQUIPMENT 1 n.c. STATE OF THE PAVING VISIBILITY OF THE NOISE SOURCES AREA OF ACOUSTIC EFFICACY 1 1 1 1 0,5 0,5 0,5 1 1 1 1 0,5 n.c. n.c. 0,5 1 10 (5,5)* 4 CRITERIA ACCESSIBILITY APPROPRIATE GREEN STAFF ACHIEVEMENT OF THE QUALITY ACOUSTIC VALUES ANALYSIS OF THE DISTRIBUTION OF THE USERS IN THE AREA ANALYSIS OF THE ACTIVITIES ATTENDED IN THE AREA CLEANLINESS AND MAINTENANCE SAFETY EFFECTIVENESS OF THE INTERVENTION * Not considered the score of the phase considered n.c. (not classifiable) for «M.L.King» School LIFE08 ENV/IT/000386 with the contribution of the LIFE financial instrument of the European Community ran Workshop HUS AIA-DAGA 20 H 13 Conferenc e on Acoustic s 18th M arch 2013, Me COMPARATIVE METHOD - post-operam Data Analysis “Don Minzoni” School “M.L.King” School «TRADITIONAL» INTERVENTION FOR NOISE REDUCTION INTERVENTION FOR HUSH PROJECT (PARTECIPATORY DESIGN) SCORE SCORE COMPLETNESS OF THE PHASES COMPLETNESS OF THE PHASES 7 22 EFFECTIVENESS OF THE INTERVENTION 5,5 27,5 EFFECTIVENESS OF THE INTERVENTION OBJECTIVE CRITERIA 4 11 LIFE08 ENV/IT/000386 with the contribution of the LIFE financial instrument of the European Community ran Workshop HUS AIA-DAGA 20 H 13 Conferenc e on Acoustic s 18th M arch 2013, Me SUBJECTIVE CRITERIA - post-operam Data Analysis 1- TOOLS 2- SCORE - CRITERIA 1 0,5 The subjective assessment is based on the results of the end-users questionnaires Improvement of the perception on the criteria or no problems emerged in the ante-operam analysis 0 only some problems connected to the criteria are solved no problem connected to the criteria are solved LIFE08 ENV/IT/000386 with the contribution of the LIFE financial instrument of the European Community ran Workshop HUS AIA-DAGA 20 H 13 Conferenc e on Acoustic s 18th M arch 2013, Me SUBJECTIVE CRITERIA - post-operam Data Analysis CRITERIA ACCESSIBILY APPROPRIATE GREEN STAFF APPROPRIATE SERVICES AND EQUIPMENT STATE OF THE PAVING TAXONOMY OF THE NOISE SOURCES CLEANLINESS AND MAINTENANCE DON MINZONI M.L.KING 1 n.c. 0 n.c. 0,5 0,5 0,5 1 n.c. n.c. 1 n.c. SAFETY FUNCTIONALITY OF THE SPACES 1 n.c. 0,5 0,5 SOUNDSCAPE 0,5 0,5 1 1 7 (2,5)* 2,5 GLOBAL SATISFACTION SUBJECTIVE ANALYSIS * Not considered the score of the phase considered n.c. (not classifiable) for «M.L.King» School LIFE08 ENV/IT/000386 with the contribution of the LIFE financial instrument of the European Community ran Workshop HUS AIA-DAGA 20 H 13 Conferenc e on Acoustic s 18th M arch 2013, Me COMPARATIVE METHOD - post-operam Data Analysis “Don Minzoni” School “M.L.King” School TRADITIONAL INTERVENTION FOR NOISE REDUCTION INTERVENTION FOR HUSH PROJECT (PARTECIPATORY DESIGN) SCORE SCORE OBJECTIVE ANALYSIS OBJECTIVE ANALYSIS 27,5 11 SUBJECTIVE ANALYSIS SUBJECTIVE ANALYSIS 2,5 2,5 30 OBJECTIVE AND SUBJECTIVE CRITERIA 13,5 LIFE08 ENV/IT/000386 with the contribution of the LIFE financial instrument of the European Community ran Workshop HUS AIA-DAGA 20 H 13 Conferenc e on Acoustic s 18th M arch 2013, Me CONCLUSION The OBJECTIVE COMPARISON shows that: the intervention for "Don Minzoni" School is certainly positive; the intervention for "Don Minzoni" School shows a deepen and critical analysis of the acoustic and non-acoustic situation in the scenario ante-operam; the intervention for "Don Minzoni" School has been useful to consider and solve also nonacoustical critical issues; The “traditional” intervention design for “M.L.King” School is certainly useful to reduce the noise, but it has not considered other issues and factors connected to the use of the courtyard. The SUBJECTIVE COMPARISON shows that: the subjective analysis is not so representative for “M.L.King” School because the users haven’t joined to the design and implementation of the intervention (date: 2005-2007); However it is possible to make a general assessment of the effectiveness of the intervention in “Don Minzoni” School: almost all the criteria are considered as at least adequate and in most cases also as good, attesting the effectiveness of the participatory design method. LIFE08 ENV/IT/000386 with the contribution of the LIFE financial instrument of the European Community ran Thanks to European Commission that contributed to this project considering and co-financing it into the LIFE+2008 Financial Programme. http://www.hush-project.eu LIFE08 ENV/IT/000386 with the contribution of the LIFE financial instrument of the European Community