DARZ - WAGNER
Transcription
DARZ - WAGNER
OxyReduct® FirExting® SILENT Reference solution Fire prevention and soft flooding in a data centre Ta i l o r - m a d e f i r e protection for maximum-security data centres THE CUSTOMER In a former vault building, DARZ GmbH operates a data centre with what is likely to be the highest level of building security in Germany. Founded in 2010, DARZ GmbH is a full service provider that offers colocation/housing, managed services and data centre solutions in an extraordinary environment at its data centre in Darmstadt. This is located in the former vault building of the Hessian State Bank and has what is likely to be the highest level of building security of any data centre in Germany. DARZ founder and Managing Director Sergey Mirochnik with the German Data Centre Award 2015 Erected in the late 1980s, the centrally located building with its striking white facade housed the Hessian State Bank’s gold and a suitable, high-security infrastruc intersection-free fibreglass con cash reserves from 1988 to 2005. ture”, explains DARZ founder nection to Frankfurt furthermore The building’s physical security and Managing Director Sergey enables the realisation of dual is evident in its structure with Mirochnik, clarifying: “Our concept data centre solutions in accord metre-thick walls and bullet aims at avoiding risks before they ance with the highest protective proof tank windows as well as arise. This also involves huge category for banks and insurance the design of the vault area as costs. However, in these danger companies (Basel III, Luxembourg a ‘building in a building’ able to ous times, especially for data, we regulation). DARZ GmbH sought withstand explosions and earth believe that our customers value to round out this IT landscape by quakes. This provides optimum our efforts and investments.” constructing a high-grade data basic structural protection. Follo centre infrastructure (TÜV Level wing extension renovations, in The site’s suitability as a colocation III+/Tier 3+), true to its motto: particular the installation of new, data centre was also based on its “Data is worth more than gold!”. redundant building technology location: Darmstadt is only about From a green IT perspective, the for use as a data centre, the new 30 kilometres from the world’s overall concept, with its indirect data centre with a total output of largest internet exchange DE-CIX free cooling, has already been 5.2 MW was put into operation by in Frankfurt am Main and, with its awarded the 2015 German Data DARZ GmbH in July 2014. technical university, three Fraun Centre Award in the “Overall En hofer Institutes, several localIT ergy Efficiency in Data Centres” Award-winning green IT data associations and a city IT cluster category. centre with high availability facility, an important place for the We supplemented the building ITC sector. The short distance protection that we inherited with with a both fully redundant and Fire prevention concept customised T H E R I S K A N A LY S I S In today’s world, constant data availability and the prevention of as much downtime as possible are vital for companies. If a company acts as a service ware. A fire prevention concept provider that offers data centre was therefore required for the capacities, as in the case with high-security building in order to DARZ GmbH, maintaining 24/7 minimise the internal risks. The availability is essential to survival. technical fire prevention solution The company is not only respon should detect any outbreak of fire sible for its own data but also, at the earliest possible moment in and in particular, for that of its order to enable a rapid response. customers. Accordingly, the Optimum fire suppression methods associated liability risks can be should also prevent consequential high. A full-service provider such damages caused by the extin as DARZ GmbH which stores guishing process itself. customer-owned hardware in its data centre is also responsible for the physical safety of this hard THE PROTECTION OBJECTIVE Certified maximum safety All areas of the building had to and the avoidance of conse- be equipped with fire prevention quential damage in the form solutions, which take the various of downtime and hardware structural conditions into ac- defects that could lead to count. data losses are of the utmost importance. ■■ The safety level needed to be approved by an expert from ■■ A suitable solution was the Property Insurers Organi- also required for the special zation VdS in order to sup- structure of the vault room port DARZ’s sales team with not usually found in normal a credible guarantee promise. buildings as it was not possible to create pressure relief ■■ Instant effectiveness of the extinguishing equipment surfaces for a gas extinguishing solution. Great demands on fire prevention THE SOLUTION The energetically-optimised choice of cooling tech nology posed special challenges with regard to fire prevention. Gaseous extinguishing agents was selected for the Darmstadt which fight fires effectively without data centre. In combination with leaving residue are ideally suited air sampling smoke detectors for to the IT sector. When fed into the highly sensitive fire detection and extinguishing zone, the inert gas supplementary point-type detectors, nitrogen displaces oxygen until fires can be detected and combat there is no longer enough of it to ted at the earliest possible stage. sustain a fire. WAGNER’s protection concepts As a natural component of the air goes one step further we breathe (78% vol.), nitrogen is in order to effectively and reliably non-toxic and has a density similar extinguish a fire within the short to that of air. It is also simple and est time possible, gas extinguish compact to store in extinguishing ing systems have to flood the area cylinders and can be distributed to be protected with extinguishing quickly and homogenously around gas under high pressure. As a the room without residues when result, conventional nitrogen ex used for extinguishing purposes. tinguishing systems used to cre ate sound pressure levels of over In view of all of these reasons, a 130 db(A) when the gas rapidly nitrogen-based FirExting® gas ex rushed through the extinguishing tinguishing system from WAGNER nozzles, causing vibrations and G 310025 Air sampling smoke detector Special sound absorbers are attached to the extinguishing nozzles therefore serious damage to hard flooding is a further special feature. DARZ’s high requirements in disks. The indirect damage from Flow regulators were attached to terms of IT security as the design this is often much worse than the the extinguishing agent cylinders enables the high-security building fire damage itself – not only in the in order to minimise pressure envelope to remain as intact as form of temporary server failures, spikes at the start of the extin possible. but also due to data damage or guishing process. Special protection in the even loss. S 303006 S 315002 The soft flooding device also con vault room Silent extinguishing system siderably reduces the size of the What distinguishes DARZ from protects sensitive IT equipment pressure-release vents needed. all other data centre buildings WAGNER solved this problem This means that a single on-site in Germany is the vault room. in the server areas of the DARZ F90 conduit system can provide In line with its original purpose, data centre by developing special pressure relief for all extinguishing the room is hermetically sealed sound absorbers (FirExting® SILENT zones on the first basement floor from the outside. The pressure with VdS device approval) which of the DARZ. Only one opening to relief holes required to use a gas are attached to the extinguishing the outdoors is therefore needed extinguishing system would be nozzles and reduce the sound for all the pressure relief on the associated with a huge amount pressure to approx. 98 dB(A). Soft first basement floor. This meets of cost and effort. Instead, active The nitrogen required for extinguishing purposes is stored in a cylinder bank and fed into the data centre at a low pressure using a soft flooding device if necessary. fire prevention through oxygen “What is good for one is not reduction is used. permissible for another.” Receiving the VdS certificate as WAGNER’s OxyReduct® system quickly as possible was an impor generates nitrogen from the air tant goal for DARZ GmbH, and in the room and the ventilation one which was easily achieved system feeds it into the protected thanks to WAGNER’s solution. area, where it continuously According to the client Miroch reduces the amount of oxygen nik, WAGNER’s expertise played in the vault to create a heavily a major part in this as: “The fire-retardant atmosphere. The main challenge is meeting all O2 level of 15.9% vol. is below the requirements of the different the ignition threshold of typical IT committees such as the VdS but materials, so a fire can no longer also the fire brigade, construction develop or spread. authorities and TÜV.” Flow regulators were attached to the extinguishing agent cylinders in order to minimise pressure spikes at the start of the extinguishing process. E X A M P L E S Y S T E M I N T H E D ATA C E N T R E 4 2 3 4 1 6 5 1 Air sampling smoke detector 4 Alarm indicator 2 Point-type detector 5 Extinguishing cylinder bank (nitrogen) as a soft flooding option 3 Extinguishing nozzles with silent sound absorbers 6 Extinguishing control panel Innovative engineering solutions To protect the former vault room, the OxyReduct® fire prevention system feeds in nitrogen via the ventilation system to reduce the oxygen level and create a fire-retardant atmosphere. Summary centre infrastructure as well as The unique construction material the energy-efficient management used for the data centre made of the facility as a whole. By DARZ special, even for WAGNER’s working with strong partners, we project manager. Frankfurt branch were able to build one of Europe’s manager Michael Leibner recalls: most environmentally friendly data “We had never before worked centres. with special bulletproof concrete. The holes we had to make in this extremely hard material were a real stress test for all the equip ment we used. We also had to proceed with extreme caution. Remaining on schedule under these conditions was definitely a challenge.” Managing Director Sergey Mirochnik stressed the impor tance of the interaction between all the trades in the data centre: “We placed great value on the efficiency of all individual com ponents throughout the data LY F E EV TECTION FIRE PR DE HAZARD MANAGEMENT SYSTEM FI RE SU PPRESSI Headquarters Sales International WAGNER Group GmbH Headquarters Schleswigstraße 1–5 D-30853 Langenhagen Germany Phone +49 511 97383 0 [email protected] WAGNER sets standards for innovative and comprehensive solutions in fire protection: with TITANUS® for very early fire detection, FirExting® for fire-extinguishing, with OxyReduct® to actively prevent fires from breaking out and VisuLAN® for hazard management. For more information visit www.wagner.eu. ON Subsidiaries worldwide Austria WAGNER Austria GmbH Am Hafen 6/1/12 A-2100 Korneuburg Phone +43 2262 64262 0 [email protected] Benelux WAGNER Nederland B.V. Computerweg 1 3542 DP Utrecht Postbus 1045 3600 BA Maarssen Phone +31 346 5580 10 [email protected] France WAGNER Group GmbH Bureau de liaison France 33 avenue du Maine F-75015 Paris Phone +33 1 4410413 0 [email protected] Great Britain WAGNER UK Limited Wagner House – Unit F South Cambridge Business Park Babraham Road Sawston Cambridge CB22 3JH Phone +44 870 333 6116 [email protected] Poland WAGNER Poland Sp. z o.o. ul. Puławska 38 PL 05-500 Piaseczno Phone +48 22 185530 0 [email protected] Russia WAGNER RU GmbH Businesscentre SMART PARK 117246, Moscow Nauchnij Projezd 14 A, Building 1, Office 4.12. Phone +7 495 96767 69 [email protected] Singapore WAGNER Asia No. 61 Tai Seng Avenue #B1-01 Crescendas Print Media Hub Singapore 534167 Phone +65 6296 7828 [email protected] Switzerland WAGNER SCHWEIZ AG Industriestrasse 44 CH-8304 Wallisellen Phone +41 44 832540 0 [email protected] USA WAGNER Fire Safety, Inc. 135 Beaver Street #402 Waltham, MA 02452 Phone +1 781 899 9100 [email protected] © WAGNER Group GmbH. Subject to technical changes without notice. Art. no. 68-30-1295. Last revised 08/15. E EAR N IR N O TI
Similar documents
The Lenbachhaus, Munich`s Municipal Art Gallery
Dubai WAGNER Middle East FZE Dubai Airport Freezone Authority
More information