2001 DSO - City of Bowie

Transcription

2001 DSO - City of Bowie
2001
Development Sites and
Highway Projects
utline
CITY
OF
BOWIE
Prepared by the Department of
Economic Development
Planning
DSO Numerical Listinq 2001
P 1
P 2
P 3
P 4
Saddlebrook
G 1
Jesuit
Nash Property
UMSTC
G 2
Pointer Ridge Office
Ed Sears Property
P 5
Rogers
Longleaf
P 6
Route 301 Associates
P 7
3809 Crain
P 8
Bowie
P 9
Bowie
Bowie
P 10
Property
Property Rip s Ballfield
Gateway Center
Health Center Complex
Crossing Claggett Property
P 11
Bowie New Town Center
P 12
The Willows
P 13
Pin Oak
P 14
P 15
P 16
Glen Allen Mitchellville East
Village Heim Property
Covington Jenkins Property
Bowie Self
Storage
P 17
Mullikan Station Mitchellville Meadows
P 18
Federal Hill Farm
P 19
E Z
P 20
P 21
Amber Ridge Shopping Center
Coil Center Foreign Trade Zone
P 22
Oak Creek Greens of Dumbarton
P 23
Cameron Grove
Collington Manor
P 24
Storage
P 25
Collington
Station
P 26
Hall Road
Village Activity
P 27
Devonshire Estates
P 28
Ashleigh
P 29
Wood more Estates Tall Oaks
Franklin Property
Estates
P 30
Wood more
P 31
King s Isle
Marleigh
P 32
Highlands
Estates
P 33
Fairwood Turf Farm
P 34
P 35
Westwood
Old Stage Knolls
P 36
Highbridge
P 37
Nazario Woods
P 38
Northridge
P 39
Adnell
Hoffman
P 40
Center
Park
Property Chapel
Estates
Property
Building
GLOSSARY
Basic Plan
conjunction with a ZMA for a CDZ This plan identifies the general location of
project and the general location of access to property from outside
a general design for internal road system
This plan does not contain any specifics
building locations density etc This is the first step in the CDZ process
a
COP
in
plan approved
the different land
roads as well as
as to
DEFINITIONS
uses
within the
Comprehensive Desian Plan the second step in the CDZ process where among other aspects of the
project comprehensive design details including land uses densities non residential
to the project setbacks from streets and property lines and buffering are approved
COZ
Comprehensive Desian Zone
which
proposals
a
typically
office
are
of residential commercial
projects
in
a
access
district
intensive than
or
uses
requiring multi step review of development
traditional subdivision and may consist of a mixture
institutional uses
NOTE Projects marked with an asterisk
are
special zoning
more
land
a
CDZ
Cluster Subdivision
Preliminary Subdivision Plan which is not within a CDZ where lot sizes are reduced
and grouped more tightly than would normally be permitted within that zone in exchange for preserving
environmental characteristics including steep slopes flooded areas 1 OO year floodplain and wetlands
etc
OSP
a
in the form of
common
open space
Detailed Site Plan
SDP
cluster
a detailed design plan similar to an
developments within a standard zoning district
architectural and landscaping plans
not a CDZ
required
for
Two
special
aspects
subdivisions such
of the DSP
as
are
County process for legally dividing property into smaller parcels such as
development Except for projects within CDZ s or for special subdivisions such as
cluster developments within a standard zoning district no further public review may be necessary
beyond this stage in the development process before proceeding to Record Plat or final plat and then
to the issuance of building permit s
Preliminary
Subdivision Plan the
lots for sale and
Final Subdivision Plan
boundaries
parcel
SOP
on
plan which is placed in the County Land Records to record and
parcels created through a Preliminary Subdivision Plan to permit the
a
step
detailed
a
buildings landscaping
a
land
Architectural
plans
are a
part
of this review process
permitted by right in a zone unless the use is found
minimal or negligible impacts on adjacent properties
use
criteria and will have
where all improvements such as roads
will be located in a CDZ project This is the
plan identifying precisely
entrance drives and trails etc
in the CDZ review process
Special Exception
WSSC
property
lawful sale of the
s
Specific Desiqn Plan
third
establish
not
to meet very
Washinqton Suburban Sanitary Commission a bi County agency responsible for
sewer service outside of the
City s public sewer and water system
specific
providing public
water
and
ZHE
Zonina Hearina Examiner
a
a
quasi judicial official of the County responsible for reviewing and preparing
Special Exceptions as to conformity with County laws and
written recommendation for ZMA s and
ordinances
ZMA
Zonina Map Amendment
addition to that
proposal to change the zoning
previously permitted on the property
NOTE
a
of land to
permit
a use
other than
Staff Contacts may be reached at 301 809 3047
or
in
DEVELOPMENT SITES OUTLINE
PIPELINE PROJECTS
Pipeline projects are generally identified as major projects for which an official subdivision or zoning
application has been filed is under review or a decision is pending Also pipeline projects include properties
such as surplus schools undergoing renovation re use active projects with approved Water and Sewer Systems
Area changes and projects under construction
NOTE Projects marked with an asterisk
are
projects in a
CDZ
P 1
SAOOLEBOOK
R R
Zoning
Rural Residential cluster 335
478 acres
acres
O S
Proposed Land
Project Status
Project
Use
Contact
Open Space 143 acres
520 single family detached units
DSP for east side approved 1994 DSP for west side approved 1996
All 190 units in Saddlebrook East completed 114 units
within Phase I on the east side annexed in April 2000 Annexation of the
remaining lots on the east side Phase II is effective March 2001 The
west side containing 330 units has numerous units under construction
East
West
Saddlebrook L C
Pyles Development Company
Mr John Pyles
Mr
John Petrella
301 924 6407
202 244 3772
Mid Atlantic Builders
Caruso Homes
Mr
Stephen
Paul
Mr David
Herzog
301 231 0009
301 261 0277
Pulte Homes
Mr Jeb Bittner
Mid Atlantic Builders
41 0 644 5603
301 231 0009
Mr
Stephen
Paul
Ryan Homes
Ms Laury Lobel
301 996 7926
Staff Contact
P 2
Lori
Shirley
NASH PROPERTY Weston Planned Retirement Community
Zoning
Proposed
R R
Land Use
Rural Residential
filed for a Special
Application
95
Exception
in the R R Zone for
Retirement
Contact
41 0 740 8780
Staff Contact
acres
Planned
Community 798 units for active seniors 50 years and
including a 115 000 square foot retail component 2000
The Adler Corporation
Wilkes Artis Hedrick
Lane
Mr David Adler
Mr Chip Reed
older
Project
a
Lori
301 345 7700
Shirley
1
P 3
UNIVERSITY OF MARYLAND SCIENCE
TECHNOLOGY CENTER
Zoning
E I A
Employment
Proposed
Area
Mixed
employment office
Land Use
Institutional
uses
466
of up to
acres
4
6
million sq ft
Project
Status
Property acquired by new owners and Preliminary Subdivision Plan for
1 95 million sq ft reapproved 1999 Developer marketing site for office
and research and development uses Development plans submitted for
several parcels including a 137 000 sq ft office research and
development building two four story office buildings totaling 300 000
sq ft a single story office building at
450
30
sq ft and four single story
research and development buildings totaling 122 800 sq ft
117 000 sq ft
Completed
Project
Contact
Staff Contact
P 4
Supercomputing
Cynthia
Fenton Joe Meinert
ROGERS
Zoning
Proposed Land
Project Status
Project
C M Commercial Miscellaneous
Use
Contact
Two lots
occupied by existing automobile dealerships Detailed Site Plan
dealership approved 1998 Opened 2000
Pohanka Automotive Group
William Rogers
Mr Geoff Pohanka
for 22 500 sq ft automobile
Rogers Chevrolet
Mr
Staff Contact
22 acres
3 commercial lots
301 262 7600
P 5
Research Center
130 000 sq ft U S Census Bureau Computing Facility
See separate handout on UMSTC Property Owners
301 423 1541
Frank Stevens
LONGLEAF
Zoning
R R Rural Residential 130 acres
R A Residential Agricultural 34 acres
O S Open Space 36 acres
Proposed Land Use
Project Status
Project Contact
240
single family detached units
completed 31 under
166 homes
National Electrical Benefits Fund
Mr Wayne Shekailo
200
acres
construction
Builders
Mid Atlantic
301 352 9600
703 393 0300
Staff Contact
Frank Stevens
Richmond American
301 464 4755
McDaniels Homes
301 809 9694
2
P 6
GOVERNOR S GREEN
Route 301 Associates Property
M X T Mixed Use
Zoning
Transportation
30
acres
Oriented
Proposed Land
Project Status
Use
Commercial Residential
Plan and DSP approved for 60 000 sq ft of retail a 4 000
sq ft bankoffice building 6 000 sq ft restaurant and a 338 unit
apartment complex 1998 15 apartment buildings completed 2000
Detailed Site Plan for Phase II for a 6 742 sq ft218 seat non fast food
Preliminary
restaurant
Carrabba
s
Italian Grill
buildings plus
Project
Contact
6 garage buildings
Hedrick
Lane
Wilkes Artis
and 140 apartment units in 6
2000
approved
Mr Richard Reed
301 345 7700
Staff Contact
P 7
Frank Stevens
3809 CRAIN PROPERTY
Rip
Zoning
Proposed
Land Use
s
Ballfield
C M
Commercial Miscellaneous
R R
Rural Residential
50
acres
Commercial recreational attraction and
miscellaneous commercial
Project
Status
Record Plat for 35
1999
acres approved 1998 131 849 sq ft Home Depot
Gas station carwash convenience center opened 1998
opened
Special Exception application for a 4 000 square foot fast food restaurant
Chic FiI A on a 1 acre parcel approved and site under construction
2000
Project
3809 Crain Limited
Contact
Knight
Manzi Brennan
Mr Nick Bassford
Mr Bill
Knight
410 266 3101
301 952 0100
Staff Contact
P 8
Lori
Partnership
Shirley
BOWIE GATEWAY CENTER
formerlv known
Zoning
Proposed
as
Land Use
Project Status
Completed
the International Renaissance Center
C M Commercial Miscellaneous
102 acres
1
to
million
ft
of
mixed
retail
commercial
restaurant
office use
Up
sq
five blocks
See below
752 784 sq
completed as follows
existing office building Omni
400
5
sq ft non fast food
restaurant Applebee s opened 1994
403
144
sq ft home center
Lowe s opened 1995 6 700 sq ft non fast food restaurant Bob
Evans Farms opened 1995 27 000 sq ft bankoffice building
Community Bank of Maryland opened 1995 1 910 sq ft gas
station shop car wash Exxon opened 1996 12 621
sq ft auto
insurance office claims center State Farm Insurance opened 1996
117 800 sq ft department store Target opened 1996 42 954
sq ft
400
95
ft of office and commercial
sq ft
3
on
sporting goods store The Sports Authority opened 1996 23 912 sq
ft office supply store Staples opened 1996 25 125 sq ft book music
store Borders
opened 1996 2 200 sq ft fast food restaurant
McDonalds opened 1996 93 000 sq ft department store Kohl s
opened 1997 54 990 sq ft bankoffice building Washington Savings
Bank opened 1997 3 285 sq ft 114 seat fast food restaurant
Wendy s opened 1997 25 000 sq ft pet supply store PETsMART
opened 1997 11 138 sq ft tire retail service center NTB opened
1997 and a 48 948 sq ft retail store HomePlace opened 1997 8 042
sq ft variety retail store Pier 1 Imports and a 2 956 sq ft office retail
Eye Care Center opened 1998 4 598 sq ft130 seat non fast food
restaurant Memphis Bar B Q opened 1999 23 923 sq ft retail
craft store Michael s Crafts opened 1999 6 899 sq ft299 seat non
fast food restaurant On the Border opened 2000 5 567 sq ft
225
seat non fast food restaurant Chili s
2000
and
a3
opened
story
40 200 sq ft medical office building opened 2000
5 674 sq
Approved
ft
260 seat
non
fast food restaurant
Lone Star Steakhouse
Saloon
Project
Contact
Trammell Crow
Mr
Pat
Coggins
301 718 0330
Staff Contact
P 9
Frank Stevens
BOWIE HEALTH CENTER COMPLEX
Zoning
Proposed Land
Project Status
R R
Use
64 acres
Rural Residential
Limited health care facilities
Site Plan for 60 bed addition to
home 7 000
sq ft sub acute therapy center 30 000 sq ft ambulatory services
pavilion 80 bed assisted living facility approved 1996 Subacute therapy
nursing
ambulatory services pavilion and assisted living facility completed
Nursing home expansion on hold 2000
Rosenbaum
Meyers Billingsley Rodbell
center
1999
Project Contact
Ms
Michele LaRocca
301 699 5800
Staff Contact
P 10
BOWIE CROSSING
Zoning
Proposed
Land Use
Cynthia
Fenton
Claggett Property
C O Commercial Office
2 604 seat 55 800 sq ft 14
restaurants
21 acres
screen
378 seats 8 000 sq
theater 3
non
fast food
ft 288 seats 6 000 sq ft and
234 seats 5 000 sq ft totaling 19 000 sq ft and 900 seats
3 000 sq ft bank building and a 125 room multi story hotel
Project
Status
Conceptual
Site Plan and
4
Preliminary
Plan
approved
1996
a
Special
Exception theater use approved 1997 Detailed Site Plans for 3 non
fast food restaurants and a 3 story 103 room hotel approved 1998 14
opened 1998 6 863 sq ft 226 seat non fast
food restaurant Don Pablo s opened 1999 4 671 sq ft 233 seat non
fast food restaurant TGIFriday s opened 1999 and 3 story hotel with
103 rooms Hampton Inn opened 1999 A 1 080 sq ft 48 seat
addition to TGI Friday s and a 6 804 sq ft 270 seat
non fast food
restaurant Tony Roma s opened 2000
screen
Project
Contact
Hoyt
s
Trammell Crow
Pat
Coggins
301 718 0330
Frank Stevens
Staff Contact
P 11
theater
BOWIE NEW TOWN CENTER
M A C Major Activity Center
R S Residential Suburban
Zoning
Proposed
Project
274 acres
Land Use
Status
1 225 million sq ft of retail 719 500 sq ft of office and
1 365 multi family and townhouse units
See below
150 000 sq ft of office space completed
110 000 sq ft office building
40 000 sq ft office condominiums
Completed
as
follows
1 059
dwelling units completed including
family units and 491 townhouse
pavilion completed
678 multi
Under Construction
Approved
Project
Contacts
units
Hiker biker trail and
630 000 sq ft commercial retail 1999
441
107
sq ft commercial retail 2000
MLS Commercial
Real Estate Services
Ms
Kathy Coakley
410 771 1700
Parcels J
K and V
The Simon
Washington
Mr Rod
Mr
Property Group
Vosper
317 685 7331
Mall Site
Staff Contact
P 12
Christian
Homes
Duffy
301 772 8915
Parcel N
Parcel U Condominiums
Frank Stevens
THE WILLOWS
Zoning
Proposed Land
Project Status
Project
43
M A C
Use
Contacts
Major Activity Center
family units senior apartments
Revised Comprehensive Design Plan CDP
Specific Design Plan SDP approved 2000
79 multi
Mr Richard Reed
Wilkes Artis Hedrick
301 345 7700
Staff Contact
acres
and
Mr Bill MacQuilliam
Lane
The MacQuilliam
301 858 1330
Frank Stevens
5
Organization
P 13
PIN OAK VILLAGE Heim
Property
R U
Zoning
Residential Urban
Local Activity Center
116
acres
LA C
Proposed
Land Use
220 senior housing units 20 000 sq ft commercial
center 943 residential units including 196 4 plex
condominiums 224 back to back townhouses 348
apartments and 141 townhouses
Completed
220 unit senior apartment building 196 four plex
condos 348 apartments 141 townhouses and 154 back to back
townhouses
Under Construction
44 back to back townhouses
Washington Homes
Project
Contact
Mr Steve
Stavrou Associates
Mr Steve Stavrou
Humphrey
Snyder
301 772 8916 ext 519
Staff Contact
P 14
COVINGTON
Cynthia
Jenkins
Property
Zoning
Proposed
301 577 6610
Fenton
Land Use
Completed
R S
Residential Suburban
R U
Residential Urban
474 residential units
including
111
96 12
acres
plex
condominiums 146 townhouse units and 232 single family
detached units
176 single family detached units 146 townhouse units and six 12
plex
condominium units
Under Construction
Project Contact
8 single family detached units and
Colton Communities
Staff Contact
301 982 9400
Cynthia Fenton
Ms Sandi
P 15
plex
under construction
Gallagher
GLEN ALLEN
Zoning
Proposed
R R
Land Use
398
Rural Residential cluster
single family detached units
Project
Status
383 units
Project
Contact
The
Bob
completed
Drees Company
Haverkamp
703 256 8783
Staff Contact
P 16
one 12
Cynthia
acres
15 units under construction
ext 263
Fenton
BOWIE SELF STORAGE
Zoning
Proposed
320
20 acres
R R
Land Use
Project Status
Contact
Rural Residential
to C M Commercial Miscellaneous and Special
12 mini warehouse storage facilities 194 575 sq ft
Application filed 1999 Continued indefinitely 2000
Rezoning
Mr
George Brugger
Brugger
Fossett
301 486 1900
Staff Contact
Cynthia
Fenton
6
Exception
for
P 17
MULLlKAN STATION
Zoning
Proposed Land Use
Project Status
Project Contact
Mitchellville Meadows
R A
20
Residential
single family
Agriculture
81
acres
88
acres
13
acres
detached units
16 units completed 1 under construction
Greenhorne
O Mara
Mr
Gary
Rubino
301 982 2800
Staff Contact
P 18
Fenton
Cynthia
FEDERAL HILL FARM
Zoning
Proposed Land Use
Project Status
Project Contact
R A
Residential
Agriculture
single family detached units
27 units completed 5 units under
The Hogan Group
32
construction
Frank Burdette
301 970 2005
Cynthia Fenton
Staff Contact
P 19
E Z STORAGE
Zoning
Proposed
C M Commercial Miscellaneous
Land Use
Project
Status
Project
Contact
Special Exception to construct 137 000 3 buildings mini warehouse
storage facility
Application filed 1999 Special Exception approved by County Planning
Board and under review by Zoning Hearing Examiner 2000
Craig Pittinger
Siena Corporation
301 776 0220
Staff Contact
P 20
Cynthia
Fenton
AMBER RIDGE SHOPPING CENTER
Zoning
Proposed Land
Project Status
C S C Commercial
Use
19 acres
Shopping Center
180 000 sq ft commercial shopping center
Preliminary Plan approved but appealed to Circuit Court
and District Council by the City 1998 Remanded from Circuit Court to
District Council 1999 Preliminary Plan 1 year extension approved by
Planning
Project
Contact
Board
Preliminary Plan for mitigation denied by District
Council Petition for Judicial Review for all actions pending 2000
Earp Associates
Ms Maureen
Earp
301 568 7272
Staff Contact
Cynthia
Fenton
7
P 21
COLLlNGTON CENTER FOREIGN TRADE ZONE
Zoning
Proposed
Land Use
E I A Employment and Institutional Area
Offices research laboratories specialty
1 282 acres
manufacturing retail and wholesalers
by section
North Area
Collington Corporate Center Revised CDP for 2 6 4 7 million square feet of office retail
and industrial space on 414 acres approved 1989 Revised Basic Plan to amend list of permitted uses
and change the internal site layout and transportation pattern approved by District Council without
changes to list of permitted uses
Central Area Collington Center
Revision to CDP for up to 6 5 million square feet of office light
industrial uses on 708 acres approved 1990 Approximately 2 million square feet completed
50 developable acres remain
South Area Collington Land Reserve 1 98 million square feet on 168 acres for
manufacturing warehousing and distribution facilities completed The south area is fully
developed
Central Area
Northern Area
Project Contact
Paul
Tom
Milbourne
Stephen
Project
Status
301 952 3706
P 22
Staff Contact
Joe Meinert
OAK CREEK
Greens of Dumbarton
L A C Local
Zoning
R L
Proposed
Land Use
301 918 2902
Activity
Residential Low
1 148
Center
919
acres
Density
detached units 219
townhouses 26 000 square feet retail office
single family
center church and
Project
Status
Project
Contact
day care facility
including an18 hole golf course recommended for
approval by the Zoning Hearing Examiner ZHE 1998 Basic Plan
revision approved by District Council 2000
Knight Manzi Brennan Shay Ham
Mr Bill Knight
Revised Basic Plan
301 952 0100
Staff Contact
P 23
Lori
Shirley
CAMERON GROVE
Zoning
Proposed
381 acres
R L Residential Low
Land Use
Density
community and 164 single family
70 units completed 20 units under
1 004 senior retirement
SDP
approved
1998
construction
Project
Contact
Staff Contact
Evangel Temple
Bishop John Meares
Stavrou Associates
Mr Jeff Kirby
202 635 8000
301 577 6610
Lori
Shirley
8
homes
P 24
COLLlNGTON MANOR
Zoning
Proposed Land Use
Project Status
Project Contact
R A
Residential
R R
Rural Residential
69
64
136
Agriculture
single family detached
units completed
acres
units
Beazer Homes
Mr Joe Fortino
301 621 8151
Lori Shirley
Staff Contact
P 25
COLLlNGTON STATION
Zoning
Proposed Land Use
Project Status
Project Contact
R R
528
Rural Residential cluster
single family detached units
475 units
completed
285
acres
10 under construction
Beazer Homes
Mr Joe Fortino
301 621 8151
Staff Contact
P 26
Lori
Shirley
HALL ROAD VILLAGE ACTIVITY CENTER
Zoning
Proposed Land
Project Status
R R
Use
Rural Residential
14
acres
Commercial
ZMA
application
for L A C Local
Activity Center zone for 125 000
by Planning Board ZHE hearing
Contract for purchase lapsed 2000
140 000 sq ft retail center denied
Project
Contact
continued
O Malley
Mr
Staff Contact
P 27
DEVONSHIRE ESTATES
Zoning
Proposed Land Use
Project Status
Project Contact
Staff Contact
Larry
indefinitely
1998
Miles
Taub
301 572 7900
Cynthia Fenton
Stogner
R R
Rural Residential
single family
completed 3 under
The Associated Companies
186
105 acres
detached units
148 units
construction
Richmond American
Mr James Flood
Don Wilson
301 654 7041
301 390 8562
Lori
Shirley
9
P 28
ASHLEIGH
Zoning
Proposed Land
Project Status
Use
R R
Rural Residential cluster
R E
Residential Estate
122
97
acres
single family detached units
Preliminary Plan and
Extension to
DSP for rough grading approved
All lots recorded 1998 Revised DSP approved 2000
Sakellaris Construction Co
Greenhorne
O Mara
1997
Project
Contact
Staff Contact
P 29
Mr
301 982 2800
WOODMORE ESTATES Tall Oaks Estates
R E
Zoning
Proposed Land
Project Status
Project
Use
Contact
Staff Contact
P 30
Mr James Sakellaris
410 426 5000
Frank Stevens
Rubino
Property
Residential Estate
132
235
acres
detached units
single family
Preliminary subdivision approved 1989
1991
approved 1990 All lots recorded
reapproved 2000
Rosenbaum
Meyers Billingsley Rodbell
Limited
Detailed
Site Plan
Limited Detailed Site Plan
Curtis Homes LLC
Paul Rodbell
Dave
301 699 5800
Frank Stevens
301 702 3200
Priddy
WOODMORE HIGHLANDS
Zoning
Proposed Land Use
Project Status
Project Contact
R E
125
Residential Estate
single family
completed
111 units
acres
11 under construction
Curtis Homes
Lonergan Homes
Ed Lonergan
Priddy
301 702 3200
Frank Stevens
Staff Contact
182
detached units
Dave
P 31
Franklin
Gary
301 452 8980
KING S ISLE ESTATES
Zoning
Proposed Land
Project Status
R A Residential
Use
single family detached units and one parcel
Preliminary Plan of Subdivision approved by the
Subdivision lots recorded 2000
Project
Project
Contact
Agriculture
on
hold
Loiederman Associates Inc
Ken Dunn
301 794 7555
Staff Contact
40 8
acres
20
Lori
Shirley
10
Planning
Board 1997
P 32
MARLEIGH
R L Residential Low
Zoning
Proposed Land
Project Status
Use
164
Development
acres
185 single family detached units and 46 townhouse units
SDP for Phase I for 34 single family detached units approved 1995
SDP For Phase II for 151 single family detached units 46 townhouse
units community pool and bathhouse tot and pre teen lots active
recreation
family
family
and hiker biker trail system approved 1996 75 single
detached units and 29 townhouse units completed 15 single
area
units and 16 townhouse units clubhouse and
community pool
under construction
Project
Contact
Enterprise Hills Associates
c o Trafalgar House Residential Maryland
Mr Joe Fortino
301 621 8151
Staff Contact
P 33
Frank Stevens
FAIRWOOD TURF FARM
Zoning
Proposed
M X C Mixed Use
Land Use
1 700
Status
1 057 acres
units and 350 000 sq ft of
residential uses retail office institutional and educational
Comprehensive Sketch Plan CSP for 1 000 of the 1 700 approved units
and 350 000 sq ft of nonresidential uses approved by Planning Board
dwelling
various
Project
Community
1996
non
CSP
approved by District Council 1997 Final Development Plan
FDP and Preliminary Plan of Subdivision approved by the Planning
Board 1997 FDP approved by the District Council 1998 The
Preliminary Plan is for Phase I Section One which includes up to
100 000 sq ft of retail uses up to 125 000 sq ft
office institutional other non residential uses and up to 412 dwelling units
including 169 single family detached units and 243 other residential units
townhouses
Community wide signage approved by the Planning
Board 1999
Phase I infrastructure and grading plans approved 2000
Part I Phase 2 FDP and Preliminary Plan of subdivision for
40
211
acres
Project
Contact
under review
The Rouse Company
Mr AI Edwards
410 992 6027
Staff Contact
P 34
Lori
Shirley
WESTWOOD
Zoning
Proposed Land
Project Status
R E
Use
229
Residential Estate
Subdivision
detached units
lots
recorded
1995
management pond
450
Staff Contact
Lori
254
acres
single family
location
frontage approved
Shirley
11
1996
Limited
landscaping
and
DSP
for
fencing along
stormwater
site MD Rte
P 35
OLD STAGE KNOLLS
Zoning
Proposed Land
Project Status
R R
Use
23
Rural Residential cluster
single family detached units
Sediment control
approved
Contact
acres
Final Subdivision Plan approved 1995 Grading sediment control
Water
Sewer paving permits and final SWM Plan approval obtained
1996
Project
12
streets
Cordero Ward
reapproved 1999 Rough grading permit
graded Water and sewer installation begun 2000
Associates
Mr Don Pichu
Staff Contact
P 36
301 345 0440
Cynthia Fenton
HIGHBRIDGE PARK
Zoning
R S Residential Suburban
L A C Local Activity Center
Proposed
Project
Project
Land Use
Status
Contact
136
acres
60 000 square foot commercial center 204
townhouse units and 171 single family detached
units
Residential component
L A C Contact
completed
1997
Highbridge LLC
MLS Properties
Ms Kathy Coakley
c o
410 771 1700
Staff Contact
P 37
Lori
Shirley
NAZARIO WOODS
Zoning
Proposed Land Use
Project Status
Project
Contact
R R
Rural Residential cluster
single family residential lots
Preliminary Subdivision Plan and
acres
Conceptual Detailed Site Plan
approved 1998 Detailed site plan and extension to
Preliminary Plan approved 2000
Rosenbaum
Meyers Billingsley Rodbell
Joyce Engineering
Ms Michele LaRocca
Bill Joyce
301
Staff Contact
26
43
699 5800
Frank Stevens
301 595 4353
12
P 38
NORTHRIDGE
Zoning
R R
R S
Proposed
Land Use
Project
Status
Project
Contact
Rural Residential
Residential Suburban
80
acres
1 83 acres
551 single family detached units and 304
townhouses
528
single family detached and 304 single family
completed 2 units under construction
Northridge Associates
attached units
Mr Bill Lukens
301 953 3110
Cynthia Fenton
Staff Contact
P 39
ADNELL
Zoning
Proposed Land
Project Status
Project
R R
Use
Contact
Staff Contact
P 40
HOFFMAN PROPERTY
Zoning
Proposed Land Use
Project Status
Project Contact
150
Rural Residential cluster
Preliminary
detached units
Subdivision Plan extension
subdivision
re
approved
Adnell Partnership
M K Enterprises Inc
Chapel
1997
Preliminary
Wilkes Artis Hedrick
Norman Rivera
Lane
Estates
Rural Residential cluster
single family detached units
35 units completed
Comstock Homes
Dan Martin
Lori
approved
301 345 7700
R R
35
acres
1999
301 588 5696
Frank Stevens
301 253 9724
Staff Contact
89
single family
Shirley
13
36
acres
General Interest Proiects
General
recognized or considered for development due
constantly
by the City due to potential impacts
The General interest category should not be considered all inclusive as the sheer number of potential projects
would be unmanageable for purposes of monitoring Even though a proposed land use may be listed no official
application has yet been filed for these projects Owners of such properties may have submitted formal
considerations for rezoning during the Master Plan Sectional Map Amendment process or have prepared and
presented a conceptual development scheme
to their location
G 1
interest
scale
projects are properties
proposed use s etc and
that have been
monitored
are
JESUIT PROPERTY
Zoning
R R
O S
Rural Residential
Proposed Land Use
Project Contact
Residential
Mr Steven C
500
acres
Open Space
Putnam
301 274 9591
Staff Contact
G 2
Lori
Shirley
POINTER RIDGE OFFICE BUILDING
Zoning
Proposed Land Use
Project Contact
C O
Ed Sears
Commercial Office
Commercial office
Urban
Mr J
Engineering
Edgar Sears
703 642 8080
Staff Contact
Property
Cynthia
Fenton
14
Associates
Jr
1
acre
BOWIE AREA
TRANSPORTATION PROJECTS
H l
MD Route 450
Annapolis Road
SHA
project remains one of the City s highest priorities for funding through the State s
The project involves upgrading and widening the existing
Consolidated Transportation Program CTP
road and some relocated sections to a multi lane divided highway Sidewalks and hikerlbiker facility will
be included as appropriate The project limits are from Bell Station Road to MD Route 3 This stretch is
The MD Route 450
divided into two segments
4 miles long Project planning was
Stonybrook Drive about 5
The City has been
is
over 80 percent completed
engineering
completed
for
the segment from
construction
Construction
funding
funding
seeking both right of way and
CTP
Bell Station Road to Stonybrook Drive is included in the Draft FY 2001 2006
1
From Bell Station Road to
in 1988 and final
Stonybrook Drive to west of MD Route 3 a distance of about 137 miles Project
planning was also completed for this segment in 1988 Since that time the project has been put
In the Draft FY 2001 2006 CTP no funding for either engineering right of way
on hold
acquisition or construction was programmed for this project This segment is the City s highest
priority for engineering funding on the current City Transportation Priority List
2
H 2
From
MD Route 3
SHA
planning required to upgrade MD Route 3 from US Route 50 to MD
Route 32 to address safety and capacity concerns The City SHA Crofton Odenton and representatives
of western Anne Arundel County MD Route 3 Study Commission have concluded that there is a need
to upgrade MD Route 3 including construction of interchanges at the two MD Route 3 450 intersections
The project is funded for project planning in the CTP
This
H 3
The
project
will consist of the
PGC DPW
Mitchellville Road
project
consists of three segments for
T
improvements
These segments include the construction of a
a four lane divided road from Northview
six lane divided road from MD Route 197 to Northview Drive
Drive to Mount Oak Road and
segment has been
mostly completed
of Excalibur Road in 1996
segments will be
H 4
roadway resurfacing
by
completed
the
from Mount Oak Road to US Route 301
A 36 foot wide half section
developers
of the Jenkins Heim
The first
from MD 197 to south
completed
project Construction
was
of the
remaining
in 2001
US Route 301 South Corridor Transportation Study
improvements from south of
interchange
completion of project planning to
for
recommended
alternatives
and right of way acquisition
prepare appropriate environmental approvals
was
in
the
CTP
to
are
develop a design for access
approved
provided in the current CTP Funding
This multi modal corridor
study
La Plata to the US 301IUS 50
continues to examine
MDOT
in Bowie
highway
and transit
Funds for the
of Transportation
Comprehensive Listing
Projects
in Bowie Area
control and service road construction between US 50 and Mount Oak Road
has been issued
H 5
by
A Corridor Theme report
MDOT
MD Route 197 from Kenhill Drive to MD Route 450 SHA
This
project would consist of the planning required to convert this segment of MD Route 197 to a four
roadway with medians and significant landscaping to relieve congestion and improve safety 1s a
result of a study undertaken for the City in 1996 it was found that this existing two lane section is a
congested segment of road in the morning and evening rush hours The project is the highest priority for
project planning on the County s Draft 1999 Transportation Priority List
lane
H 6
This
US Route 50
project
h Occupancy Vehicle HOV Lanes SHA
Hh
involves the construction of High
Occupancy Volume
US Route 50 from east of US Route 301 to east of I
acceleration lane for the ramp
scheduled
H 7
to
begin
I
95
495
The
HOV
lanes in each direction
project
also includes
connecting MD 197 southbound to US 50 westbound
expected to be completed by July 2001
along
extending the
The project is
in the FY 2000 and it is
Cameras at traffic signals PGC DPW
T
A program to install cameras at selected intersections to ticket vehicles
running red lights has
The County has installed red light cameras at the intersection of Pointer
Drive and US
begun
Ridge
Route 301 and Governor
Bridge
Road and US Route 301
Additional cameras have been
proposed by the
City
H 8
Jennings Mill Drive traffic signal SHA
The SHA has
Installation is
H 9
agreed
to install a traffic
expected
in late
signal
at this
intersection
Route 214 Central A venue
Governor Bridge Road SHA
Plans to enhance
including
This project
safety
at the intersection
of US Route 301 and Governor
the construction of an exclusive right turn lane
H 10
on
2001
summer
was
completed in
on
Bridge
Road
northbound US 301
2000
Landscaping the median of MD Route 197 between US Route 50 and US Route 301
SHA
This
project involves installing landscaping in the median ofMD 197 south to improve the appearance to
entering our community A task force formed with the objective of creating a landscape
concept plan for this section ofMD Route 197 submitted its final report to Council in February 2000
Installation of the
landscaping is pending SHA funding approval
travelers
H ll
This
Route 197 North
lLandsStreetcsapipenl
project involves creation of a concept plan for the corridor from relocated Route 450 to Bowie
University The proposal involves conversion of the continuous center turn lane to a landscaped
median and other streetscape
improvements to enhance the identity and appearance of the corridor A
State
Projects in
Bowie Area
Comprehensive Listing
of Transportation
task force
of local residents and business
consisting
is
concept
plan
expected
H 12
Jericho
owners
met
regularly during
2000
Finalization of a
in 2001
Park Road
The section of the road
passing through Bowie
State
University
will be relocated within the campus in
the next few years
Northview Park and Ride Lot Study
H 13
This is
a
two
phase study
I which involves
soon
begin
and issues
H 14
a
Phase II aims
supply
develop strategies to increase usage of the Bowie Park and Ride Lot Phase
Comprehensive Parking and Management and Needs Study will
at developing a parking profile including identification of parking problems
to
review of the 1988
demand needs and recommendations
US Route 301 and MD Route 197 Interchan2e Study SHA
project consists of the planning and preliminary design of a new interchange and a continuous fully
integrated frontage road system This project is necessary for the continued safe and efficient movement
of traffic into out of and through the City Preliminary review has been finished on a needs analysis
and a focus group has been meeting A public forum to review several alternatives was held in late 2000
This project is only funded for planning purposes at this time
This
BOWIE
COLLINGTON
VICINITY
D
BOWIE AREA DEVELOPMENT SITES
GENERAL LOCATION MAP
v
K
l
f
J
0
1
rr
Y
P
i
381L
P l
4
7
40
P
A
ft
T
M
f
A
Ft
Y
L
r
ltJ7f
0tJ2
P 34
Iv
1 i
1
J
lll
n
cr
u
n
I
I
F
r
f
l
J3
I
jd
zP
r
P
P2
W
ii
f
32
7
Ii
r
L
N
10
7
P 5
H
P ll
1
P 14
P 30
P 3l
J
v
Fr
P 15
l
n
I
N
D
J
2S
P
l
17
F
JJf
k
t
r
I
G
P 18
P 27
p
l
a
1
i
ffp 19
P 24
P 23
ll
I
L
LJ
W
J
j
I
AI
n
r
r
f
NORTH
J
BOWIE AREA
IDGHWAYPROJECTS
January 1 2001
6
NOR1l1