South Access - Town of Westwood

Transcription

South Access - Town of Westwood
Westwood Station Planning
Board
Hearing #16
September 11, 2007
Traffic Review Agenda
ƒ Peer Review Presentation
John Kennedy, VHB
• Refined Trip Generation and
Distribution
• Overall Access/Egress Modification
• Canton Street Corridor
• Proposed Mitigation
ƒ
Q&A
Changed Areas Since Initial Submission
North
Development Program
Initial Filing
Supplemental Filing
Land Use Type
Stage 1
Full Build
Stage 1
Full Build
Retail
1,348,000 SF
1,348,000 SF 1,348,000 SF
1,348,000 SF
Residence (w/
Fitness)
760,000 SF
1,365,000 SF 690,000 SF
1,365,000 SF
Residence
495 Units
1,000 Units
495 Units
1,000 Units
Hotel
230,000 SF
230,000 SF
230,000 SF
230,000 SF
Hotel
328 Units
328 Units
328 Units
328 Units
Office
125,000 SF
1,490,000 SF 125,000 SF
1,508,000 SF
Public/Comm.
30,000 SF
30,000 SF
12,000 SF
12,000 SF
Utility
50,000 SF
50,000 SF
50,000 SF
50,000 SF
Total Area
2,543,000 SF
4,513,000 SF 2,455,000 SF
4,513,000 SF
Trip Generation
Trip Generation
Trip Distribution – Arrival
ƒ Mitigated and Unmitigated
40%
NOTE - “Mitigated” Percentages at University Avenue include Everett and Forbes.
Trip Distribution – Departure
ƒ Mitigated and Unmitigated
Northern Access – MassHighway Control
North
Northern Access – MassHighway Control
North
Northern Access – MassHighway Control – Review Ongoing
Whitewood Road Connector and Fire Safety Access
ƒ Design Vehicle B40
ƒ Direction to be Determined
Connector Road
Fire Safety Access
Northern Access – Westwood Station Blvd.
ƒ Additional Lanes
ƒ Slip Lane Eliminated
ƒ Enhanced Pedestrian
Access at Market
Street
Northern Access – Westwood Station Blvd.
ƒ By-Pass Lane Added at Common Street for All Southbound ThroughTraffic
North
Central Section and Site – Market St. to Harvard St.
ƒ Westwood Station Blvd.
North
Central Section and Site – Market St. to Harvard St.
ƒ Westwood Station Blvd. – Cross Section
• 85 Foot Right-of-Way Defined
• 28 Foot Travelways, with Median and Left Turn Lanes
• 10 Foot Wide Shared Path with 10 Foot Separation to Traffic
• Left Turn Lanes Designed to 95th Percentile Queue, Normal
Traffic
• Side by Side Turn Lanes Harvard to NSTAR – 6 Lane Section
Central Section and Site
ƒ Westwood Station Blvd. Typical Section
Central Section and Site – Market St. to Harvard St.
ƒ University Avenue
North
Central Section and Site – Market St. to Harvard St.
Harvard Street
ƒ University Avenue – Left Turn Lane
University Avenue
Central Section and Site – Market St. to Harvard St.
Harvard Street
ƒ University Avenue – Left Turn Lane
University Avenue
Central Section and Site – Market St. to Harvard St.
ƒ Harvard Street
North
Central Section and Site – Market St. to Harvard St.
Wes
two
od
Sta
tion
B
Harvard Street
ƒ Widened to Four-Lane Cross Section
ƒ 80 Foot Right-of-Way Provided (vs. 40 Foot
Initial)
ƒ Area for Fifth Lane Provided
ƒ Sidewalks and Bicycle Accommodation
lv d
Internal Modifications
ƒ
ƒ
ƒ
ƒ
Cabot Loop
Common Street east of Alleyway
Office Area west of WWSB
Retail Access at NSTAR
Central Section and Site – Market St. to Harvard St.
ƒ Internal Modifications
North
South Access
ƒ Westwood Station Blvd. Realignment
North
South Access
ƒ Westwood Station Blvd. Realignment
04/12/07
08/16/07
South Access
ƒ Westwood Station Blvd. Realignment
South Access
ƒ Canton Street Alignment Modification
North
South Access
ƒ Canton Street Alignment Modification
South Access
ƒ Canton Street, Westwood Station
Blvd. Alignment
• Separate Canton and Oceana
Alignment
• Full Access to/from Oceana
• Limited Access to/from Canton
Street
• No Right Turn WWSB to Canton
• No Left Turn Canton to WWSB
• Emergency Access to Oceana to
Canton Street
South Access
ƒ University Avenue/Canton
Street Modifications
• Left Turn Prohibition
Canton Street to University
Avenue
• Lane Use Changes on
Canton Street Westbound
• Right Turn Access
Permitted University to
Canton Street
South Access
ƒ Canton Street Modifications
• Neighborhood Traffic Mitigation
Program
North
South Access
ƒ Canton Street
• Neighborhood Traffic
Mitigation Program
Full Build Mitigation Plans
ƒ North Access Improvements
ƒ Central Section and Site Improvements
ƒ South Access Improvements
• Ramp from I-95 NB to Dedham Street
• Dedham/Canton Street Improvements
• Canton Street/Oceana Drive Modifications
Early Action Mitigation Plans
ƒ Address Cut-Through Traffic I-95 NB Off-Ramp
• Limit Stage 1 Traffic Signal Operations
• Signals not Installed Until Warranted At:
– WWSB/Oceana/Canton
– WWSB/Harvard Street
– WWSB/NSTAR/Market Street
• Signals Flash During Morning Peak
– WWSB/Market Place
• Selectmen Action on Neighborhood Traffic Calming Program
Stage 1 Master Plan
Full Build Master Plan
Q and A
Questions?
Northern Access – MassHighway Control - Review Ongoing