Port of Miami Tunnel Public Private Partnership (P3)
Transcription
Port of Miami Tunnel Public Private Partnership (P3)
Port of Miami Tunnel Public Private Partnership (P3) Economic Impact One of Miami-Dade County’s Principal Economic Engines Ø 207,000 jobs throughout Florida Ø $27 billion annual economic activity 2 Cruise Capital of the World PortMiami is the Leading Cruise Port in the World Ø 4.8 Million Passengers 2013/14 Ø 13 of the World’s Top Cruise Lines Homeport at PortMiami 3 Gateway to the Americas Ø #12 U.S. international containerized cargo port Ø #1 container cargo port in Florida 21 of the last 25 years Ø Over 40% of all containerized cargo value in Florida enters through PortMiami (approximately $24 billion in wholesale value) 4 Current Capital Projects Ø Deep Dredge Ø Tunnel Ø Rail and Intermodal Ø Super Post-Panamax Gantry Cranes Super Post-Panamax Cranes 5 Tunnel: Direct Access to Interstate Shifting of EB MacArthur Cswy 4 Minutes to Interstate Ø More efficient, faster movement of traffic on and off port. Ø Relieve downtown traffic congestion. MacArthur Cswy Bridge Widening Twin tunnels under Government Cut Ø Direct access to interstate highway system in less than 4 minutes. Ø “Green lanes” and gate consolidation. 6 Modification of Dodge Island Roadway System Construction Images 7 Public Private Partnership Overview Ø Project procured as a Public-Private Partnership Ø 35-year agreement between FDOT & Concessionaire Ø Design-Build-Finance-Operate-Maintain Ø Design and construction period is the first 55 months Ø Operation and maintenance period is the remaining 30 years and 5 months 8 Project Partners Public Sponsors 90% Equity Partner Contractor 10% Equity Partner VMS Operator Federal Support 9 Funding Partners Ø FDOT contributing 50% of capital cost Ø Miami-Dade County contribution $402.5M Ø City of Miami contribution $50M Ø ROW contributions (County & City) $50M Ø FDOT fully funding Tunnel Operations & Maintenance from statewide maintenance funds (about $200 million over 30 years) 10 Public Private Partnership (P3) Payments during Construction Construction Cost $607M Total Milestone Payments = $450M $100M during Construction $350M at Final Acceptance of Construction 11 Public Private Partnership (P3) Payments during O&M Ø Upon Tunnel opening, FDOT begins making availability payments adjusted yearly for inflation Ø Maximum Availability Payment $32.5M/yr Ø Payment is subject to reduction if Tunnel not operational during required hours Ø Contract includes ‘Handback’ requirements to ensure Tunnel is returned to FDOT in first-class condition 12