Troutdale Riverfront Renewal Site
Transcription
Troutdale Riverfront Renewal Site
Development Opportunity Prospectus Troutdale Riverfront Renewal Site Troutdale Urban Renewal Agency January 2008 Site Characteristics Ownership The site is currently under ownership of the City and a private owner. The City will turn over its acreage to the Urban Renewal Agency and the Agency has rights to purchase the privately owned portion. Location The site is located in a prime area for mixed-use development because of its proximity to major highways and streets, river waterfront and greenway trails, and the existing downtown area/central business district. General site boundaries are listed below. North: East: South: West: Interstate 84 Sandy River waterfront Union Pacific Railroad Columbia Gorge Premium Outlets Size Total: 20.3-acres or 883,546 square feet Outside floodplain: 18.3 acres or 798,546 square feet Condition The site is essentially flat with the exception of the extreme eastern portion that slopes down to the Sandy River. The site is visible from Interstate 84 and from part of the city’s residential areas located south and uphill of the site. The City’s former sewer treatment plant facilities and other industrial businesses previously operated on the site. There is little existing vegetation except on the eastern part of the site. The structures now found on the property will be demolished, with the possible exception of the 130-foot historic water tower. The tower, which is higher than any structure that could be built under existing zoning regulations, could be a visual asset to the redevelopment of the site. Environmental Level I and II environmental assessments been completed for both properties and are available for review. The sites will be cleared and remediated by the City and private property owner prior to developer acquisition. Average Daily Traffic Northern edge: I-84: 46,700 (future site access from 257th Ave. off of Exit 17) Western edge: 257th Ave: 17,300 – 19,500 at 200 feet south and north of mall entrance (future site access through outlet mall road extension) Southern edge: East Columbia River Hwy: 2,500 at 100 feet east of Kibling Ave. (future site access with new road under RxR bridge) Schools Reynolds High School, Walt Morey Middle Schools, and two neighborhood Elementary Schools Mt. Hood Community College campus located at western city limits Employment Centers Mountain Views River Views/Access 27 major employers with 4,800 employees in a 15-minute drive of the site Cascade range to the north and Broughton Bluff to the east in Lewis and Clark State Park Columbia River Gorge National Scenic Area to the northeast and Scenic Sandy River to the east 1 Market Opportunity Community Demographics City of Troutdale population (2007): 15,430 Median household income (2000): $56,593 (4th highest in Portland metropolitan region) High school graduate or greater (2000): 91.4% of adult population Commercial Market in East Multnomah County Retail space average rent price per sq. ft.: $19.00 - 22.00 (new construction, triple net) Outlet mall average rent per sq. ft.: 1 $21.00 – 28.00 (triple net) Office space average rent price per sq. ft.: $22.00 (Class A) $18.00 (Class B) $15.00 (Class C) Land Appraisal Various recent professional estimates place the land value between $12 and $17 per square foot. Development Program Development of the Riverfront Renewal site will significantly expand on Troutdale’s existing central business district and waterfront amenities. A synergistic blend of historic, commercial, residential, and open space uses can be created through the physical connection of the site to the existing downtown/central business district, outlet mall, and Sandy River waterfront. Several multi-modal infrastructure projects are planned to provide these connections: a pedestrian bridge over the Union Pacific rail right-of-way will link the downtown’s main street with the site and existing outlet mall; new roads through the site will connect to the existing surrounding street network; and new trails will connect the site’s waterfront to a regional open space and trail system. The complete planning and policy objectives for the site can be found in the Troutdale Town Center Plan (1998) and the Troutdale Riverfront Renewal Plan (2006) on the City’s website: www.ci.troutdale.or.us/documents/towncenterplan.pdf www.ci.troutdale.or.us/mayor-council/documents/riverfrontrenewalplan(revised).pdf The site is uniquely located adjacent the Sandy River Connection Project. This location offers the advantage of immediate waterfront access and views to future residents and tenants. The Sandy River Connection Project is one of the planning efforts underway to complete the missing links in a 40-mile loop regional trail system (www.40mileloop.org). The 40-mile loop was originally proposed in 1904 by the Olmsted brothers to connect Portland area parks. Now there are approximately 140 miles of regional trails on the loop around and through the Portland metropolitan area. The Riverfront Renewal site planning must be coordinated with the regional trail connection plans so that future residents, employees, and visitors can enjoy the recreational and scenic opportunities. The City adopted a “Full Vision Plan” for the site in 2003, prior to approving the urban renewal plan in 2006. The vision plan expresses one of the many possible conceptual site plan variations designed to meet the policy, planning, and design objectives. The adopted vision plan is intended to spur discussion and further visioning exercises and conceptual planning for the site through the RFQ/RFP and development process. The Agency will craft a specific development plan for implementation with a selected private developer. Design principles, minimum expectations, and infrastructure needs have been identified and are presented on the following pages. 1 Outlet Mall average rent per square foot based on various professional estimates provided by the City of Troutdale. 2 Policy, Planning, and Design Principles Overall Transportation Infrastructure Open Space / Public Space Commercial Residential Environment Design Redevelop the site in a sustainable manner and create catalytic mixed-use development in the City’s core Share with the private sector the cost of redeveloping the area in a manner that especially supports city policies regarding land use, design and transportation Promote land uses and design that are efficient in their use of transportation Provide a connected street system that serves development in the area Provide a system of pedestrian and bicycle trails that connect downtown to the Sandy River Provide pedestrian linkages between the downtown and the Columbia Gorge Premium Outlets Provide the opportunity for redevelopment by constructing or relocating public infrastructure, including streets, sanitary sewer, storm sewer, and water facilities Develop public parks and trails that capitalize on the Sandy River as a community resource and connect to the regional trail system (40-mile loop) Provide suitable locations for cultural and recreational activities and other community-oriented uses Incorporate public spaces such as a public plaza within the development plans for the area Continue to enhance the development environment for professional and general office space Create a better awareness of the market opportunities that exist or will exist in Troutdale for job generating uses Provide more housing in Troutdale’s downtown core area Encourage environmentally sensitive site planning and design that provides access to, and views of, the river Make intentional effort to leave the waterfront ecology untouched Storm water retention, infiltration basins, and other mechanisms for ground water recharge must be considered and may be incorporated as site amenities Reflect historic Troutdale in future development through design contributing to the feel that the city has grown over time with authenticity Strive for a contextual fit among buildings, and avoid architecture of replication and mimicry Encourage the use of local artists for public art within the area, especially art that reflects local history and culture Encourage site planning that recognizes and responds to the traditional Columbia Gorge east winds Development teams will be required to attain LEED certification in their proposals at a minimum, LEED Silver standard is preferred An acoustic treatment, especially of residential uses is strongly encouraged, to buffer the railroad use at the southern edge of the site (frequent usage by non-passenger trains), and I-84 at the northern edge of the site Residential building orientation should create shared open spaces to create community while affording privacy for individual units Enhance public entryways to the area and existing downtown Minimum Expectations and Preferred Goals • Minimum public amenities expected on-site: o Public plaza (1-acre minimum) o Riverfront Park (includes land within the 100-year floodplain, estimated at 2-acres) • Preferred design goals include: o A mix of commercial and residential uses o A mix of building heights with limited 1-story buildings o LEED certification required, LEED Silver preferred 3 Urban Renewal Area Infrastructure Needs Planned Infrastructure Projects Urban Renewal Agency Role Developer Role A ccess improvem en ts to NE 257 t h A venu e a nd to the His toric Col umb ia R iver Hi ghw ay. This project will result in an important loop road providing a vital connection between the existing outlet mall, the redeveloped mixeduses on the site, and the existing “Main Street” serving the historic downtown. Funded by Agency. Developer participation is not required. Infras truc ture/u til ity improve men ts. This project consists of constructing or relocating water, sanitary sewer, and surface water management facilities extension to the site. Primarily funded by Agency. Developer participation may be required based on site-specific design impacts to existing and planned utility infrastructure. Sandy R iverfront Park. This project consists of a Sandy Riverfront pathway and related improvements to increase public enjoyment of its scenic resources and provide an amenity for adjacent development. Primarily funded by Agency. Developer participation for capital cost is expected. Publ ic pl a za. This project consists of a public plaza to enhance public use of the area and provide an amenity for adjacent development. Primarily funded by Agency. Developer participation is strongly encouraged. Publ ic p arkin g fac ili ties . The project consists of a public parking facility to serve commercial and public uses of the area. Structured parking is encouraged to support the urban form of the development. Partially funded by Agency. Developer participation is required. Pedes tria n cross ing over Unio n P ac ific ra ilroad tracks . The project will provide a pedestrian over-crossing of the UP tracks, connecting the Historic Columbia River Highway (downtown Troutdale) and the area (Riverfront Renewal site and outlet mall). Primarily funded by Agency. Developer participation is strongly encouraged. Code Requirements Site Zoning Town C ent er Overlay (TC) 20.3 acres 100% of the site Residential Density1 • Maximum 1 dwelling unit per 1,500 sq. ft. of net site area •25% density increase permitted under the Planned Development process Genera l Co mmer cia l District (G C) 12.0 acres 59% of the site Mixed Office/ Ho usi ng District ( M-O/ H) 8.3 acres 41% of the site Building Height2 Parking2 • No use may exceed minimum off-street parking requirement by more than 10% -- Building Footprint No maximum • Each use allowed at least 1 space in excess of minimum required 45 feet maximum • For general retail uses: minimum of 4.1 spaces per 1,000 sq. ft. GFA required No maximum 35 feet maximum • For residential uses: minimum of 2 spaces per unit Maximum: 20,000 square feet -- • Multi-family units built in conjunction with a commercial use are not subject to the maximum and minimum density requirements • For residential in conjunction with commercial uses: minimum of 1 space per residential unit • For office uses: minimum of 2.7 spaces per 1,000 sq. ft. GFA • For commercial uses: no off-street parking required, but the TC Overlay maximums apply 1. Residential Density: Net site area is calculated after subtracting areas dedicated to the public (e.g. streets and parks) and areas defined as “undevelopable” in the Development Code from the gross site area. A density increase of 25% above the 1 dwelling unit/1,500 sq. ft. of net site area is permissible under the Planned Development (PD) process. Residential densities up to 36 dwelling units/ acre ma y b e p ermissible through the PD process. 2. Building Height and Parking: Variances may be applied for t o request m odi fications to minimum and maxi mum building height and park ing requirements based on unique physical site constraints. (GFA is Gross Floor Area.) 4 Other Conditions The City’s purchase option agreement with the outlet mall for the easement to extend 257th Way includes notto-compete language for outlet store uses (e.g. manufacturer or company stores, and certain discount stores) and signage sharing requirements (e.g. new signs placed on the site must include a panel for use by the outlet mall, at their own use and maintenance expense). Development Incentives • City/Agency to provide roadway improvements for essential site access • City/Agency to provide other public improvements and amenities • City/Agency to clear site of structures based on the needs of the specific design selected • City/Agency is willing to negotiate phased land acquisition payment plan • City/Agency is willing to phase SDC payments concurrent with building permit issuance • City/Agency is willing to participate in TOD program • City/Agency is willing to participate in Vertical Housing Tax Abatement program for proposals that include buildings with 3 or more stories. • Agency expects to have tax increment funds for various project aspects • Typical permit review turnaround for substantially complete commercial building plan submittals is 6-8 weeks Positive Atmosphere • McMenamin’s Edgefield, located in Troutdale, is among the top 25 largest destination resorts in Oregon and Washington. Expansion plans for Edgefield include adding 55 unique overnight lodging units within the next 12-18 months. • Mt. Hood Community College, one of the largest employers in East Multnomah County, is located at the western edge of the Troutdale. MHCC’s renovated competition swimming pool offers year-round swim meet facilities. A three-day meeting generates an estimated $1.5 million in food, lodging, entertainment, and fuel spending for the area. The college plans to submit a bid for the 2012 Olympic swim trial venue. • Fed Ex Corporation is constructing a 415,000 square foot regional ground distribution center in Troutdale (one of nine regional hubs in the nation). The facility is planned to open in Fall 2009, initially with 500 employees, growing to 900 employees over 5 years. • Major attractions within a 30-minute drive of the Riverfront Renewal site: o o o Portland International Airport (PDX) Downtown Portland Columbia River Gorge National Scenic Area, including 3 of the top 6 tourist attractions in Oregon: o Multnomah Falls Bonneville Dam Vista House Several boat access/launching points along the Sandy and Columbia Rivers 5